A method for quickly leveling cement mortar floor

By obtaining the height information after leveling the cement mortar floor, calculating the regional correlation degree and using the OPTICS algorithm and ARIMA model for prediction, the problem of low reliability of height leveling adjustment in the leveling process in the existing technology is solved, and the leveling of the cement mortar floor is improved. efficiency and quality.

CN118312803BActive Publication Date: 2024-10-15SHENZHEN NANYUE CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410692268.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2024-10-15
Estimated Expiration
2044-05-31

AI Technical Summary

Technical Problem

In the prior art cement mortar floor leveling process, the scraping treatment has a low impact on the height leveling, resulting in low credibility and low efficiency of the adjustment results.

Method used

By obtaining the height information after each scraping, the regional correlation degree is calculated, and the OPTICS algorithm clustering and ARIMA model are used to predict the height and adjust the scraping process.

Benefits of technology

It improves the efficiency of the leveling process and the credibility of the adjustment results, ensuring that the cement mortar floor achieves high leveling quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118312803B_ABST
    Figure CN118312803B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of data processing technology, and in particular to a method for rapid leveling of cement mortar floors. The method determines the points to be leveled by obtaining the regional correlation according to the deviation of the local height information of the leveling point from the standard situation; the spatial positions of the points to be leveled are clustered by the OPTICS algorithm to obtain the ordered list decision diagram for each leveling, and in the ordered list decision diagram after the current leveling, the reachable distance distribution and regional correlation of each output position in all the ordered list decision diagrams for leveling are clustered to obtain the cluster of the points to be leveled for the current leveling; a prediction model is constructed based on the distribution and height information of the points to be leveled in the cluster of the points to be leveled, and the height of each leveling point after the current leveling is predicted and the leveling process is adjusted. The present invention dynamically predicts and analyzes the subsequent height information according to the situation that the local height is not leveled, and timely adjusts the leveling operation to make the adjustment result more credible, thereby improving the efficiency of leveling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of data processing, and in particular to a method for quickly leveling a cement mortar floor. Background Art

[0002] Ground leveling in construction refers to the process of making uneven surfaces flat. When laying cement mortar, cement mortar needs to be leveled to make the ground flat. As the demand for leveling increases, the time it takes to scrape and level the cement mortar ground with a leveling device is getting longer and longer. How to quickly level the ground while ensuring high leveling quality requirements has become one of the important issues in improving construction efficiency.

[0003] During the cement mortar ground leveling construction process, the cement mortar will expand to the surrounding areas with the leveling operation of the leveling device to fill the surrounding concave areas. This may cause the already leveled area to still have certain height information changes. The adhesion of mud and sand on the cement mortar leveling device and the stacking of excess cement mortar will cause different changes. When there is too much or too little cement mortar at different positions during the construction process, irregular bulges or pits will also be formed to cause height changes. In the continuous leveling of cement mortar, whether the cement mortar can meet the leveling requirements is often based on historical leveling experience. However, the different mortar mixing ratios, cement grades, and wear conditions of cement mortar ground leveling devices or scrapers during construction will affect the flatness of the cement mortar surface formed immediately. Subsequent leveling adjustments are only made based on the current height analysis. The leveling process still has an impact on the height flatness of the cement mortar area. The analysis of height information has low credibility for the adjustment results of the current leveling process, making the efficiency of the leveling process still low. Summary of the invention

[0004] In order to solve the technical problem that the scraping treatment in the prior art still has an impact on the height flatness of the cement mortar area, the analysis of the height information has a low credibility for the adjustment result of the current scraping treatment, and the efficiency of the scraping and leveling process is still low, the purpose of the present invention is to provide a cement mortar floor fast leveling method, and the technical scheme adopted is as follows:

[0005] According to one aspect of an embodiment of the present invention, a method for quickly leveling a cement mortar floor is provided, comprising:

[0006] In the leveling operation area, obtain the height information of each leveling point after each scraping;

[0007] After each scraping, the regional correlation of each leveling point after each scraping is obtained according to the deviation of the height information of each leveling point in the preset local range; based on the regional correlation, the point to be leveled after each scraping is determined from the leveling points;

[0008] Based on the position and height information of the points to be leveled, the OPTICS algorithm clustering is performed to obtain the ordered list decision diagram after each leveling; in the ordered list decision diagram after the current leveling, according to the local distribution of the reachable distance of each output position in all the ordered list decision diagrams after leveling and the regional correlation of the corresponding points to be leveled, clustering is performed in the ordered list decision diagram after the current leveling to obtain the clustering cluster of the points to be leveled after the current leveling;

[0009] Through the distribution of the points to be leveled in the clusters of the points to be leveled and the height information after each leveling, an ARIMA model is constructed to predict the height information of the leveling points, and the height prediction value of each leveling point after the current leveling is obtained; the leveling process is adjusted based on the height prediction value.

[0010] Furthermore, the method for obtaining the regional association degree includes:

[0011] The difference between the height information of each leveling point after each scraping and the preset expected height value is used as the height difference of each leveling point after each scraping;

[0012] For a leveling point after any scraping, other leveling points within a preset local range of the leveling point are used as local leveling points of the leveling point;

[0013] Determine the local deviation of each local leveling point according to the degree of deviation between the leveling point and each local leveling point in terms of height difference;

[0014] The regional correlation of the leveling point is obtained by combining the local deviations of all local leveling points of the leveling point; the local deviations are negatively correlated with the regional correlations.

[0015] Furthermore, the step of determining the points to be leveled after each scraping from the leveling points based on the regional correlation includes:

[0016] After each scraping, the leveling points with area correlation less than the preset leveling threshold are used as the points to be leveled after each scraping.

[0017] Furthermore, the method for obtaining the cluster of points to be leveled includes:

[0018] For any ordered list decision graph after scraping, according to the distribution of regional association degree of each output position in the ordered list decision graph and the deviation of each output position from the adjacent output position in the reachable distance, the change confidence of each output position in the ordered list decision graph is obtained;

[0019] In the ordered list decision graph after the current scraping, the initial neighborhood parameters of the ordered list decision graph after the current scraping are determined according to the distribution of reachable distances of all output positions;

[0020] In the ordered list decision diagram after the current scraping, according to the degree of deviation of the reachable distance of each output position from the initial neighborhood parameter and the distribution of the change confidence of each output position in all the ordered category decision diagrams after the scraping, the adjustment bias degree of each output position in the ordered list decision diagram after the current scraping is obtained;

[0021] According to the initial neighborhood parameters and the adjusted deflection degree of the ordered list decision diagram after the current scraping, the adjusted neighborhood parameters of the ordered list decision diagram after the current scraping are determined; based on the adjusted neighborhood parameters, the clustering clusters of points to be leveled in the ordered list decision diagram after the current scraping are obtained.

[0022] Furthermore, the method for obtaining the change confidence includes:

[0023] For any output position in the ordered list decision graph after any scraping, the preset number of adjacent output positions closest to the output position are used as adjacent output positions of the output position;

[0024] The difference between the reachable distances of the output position and each adjacent output position is used as the distribution difference of each adjacent output position;

[0025] The distribution ratio of the regional correlation degree corresponding to the output position in the ordered decision graph and the distribution difference of all adjacent output positions are fused to obtain the change confidence of each output position.

[0026] Furthermore, the method for obtaining the initial neighborhood parameters includes:

[0027] The maximum reachable distance in the current flattened ordered list decision graph is used as the initial neighborhood parameter.

[0028] Furthermore, the method for obtaining the adjustment deflection degree includes:

[0029] For any output position in the current ordered list decision graph after scraping, determine the influence coefficient of the output position by combining the change confidence of the output position in all ordered list decision graphs after scraping;

[0030] The ratio of the difference between the reachable distance of the output position and the initial neighborhood parameter in the initial neighborhood parameter is used as the adjustment index of the output position;

[0031] The adjustment index is adjusted by the influence coefficient of the output position to obtain the adjustment bias of the output value.

[0032] Furthermore, the method for obtaining the adjustment neighborhood parameter includes:

[0033] Combine all adjustment deflections in the ordered list decision diagram after the current scraping to obtain the adjustment coefficient of the current scraping;

[0034] The product of the initial neighborhood parameter and the adjustment coefficient is used as the adjustment value of the current scraping;

[0035] According to the initial neighborhood parameters and the adjustment value, the adjustment neighborhood parameters of the currently scraped ordered decision graph are determined.

[0036] Furthermore, the method for obtaining the height prediction value includes:

[0037] Arrange the height information of each leveling point according to the scraping order to obtain the height sequence of each leveling point;

[0038] The cluster of points to be leveled that contains the largest number of points to be leveled is taken as the target cluster;

[0039] Based on the height sequence of each point to be leveled in the target cluster, obtain the ARIMA model parameters corresponding to each point to be leveled;

[0040] Combine the ARIMA model parameters corresponding to all the points to be leveled in the target cluster to build an ARIMA model;

[0041] Based on the height sequence of each leveling point after the current scraping, the ARIMA model is used to predict the height of each leveling point after the current scraping, and the predicted value of the height of each leveling point after the current scraping is obtained.

[0042] Furthermore, the horizontal coordinate of the point to be leveled in the ordered list decision diagram represents the output position, and the vertical coordinate represents the reachable distance.

[0043] According to another aspect of an embodiment of the present invention, a cement mortar floor rapid leveling system is provided, comprising:

[0044] An acquisition module is used to acquire the height information of each leveling point after each scraping in the leveling operation area;

[0045] The to-be-leveled point screening module is used to obtain the regional correlation of each leveling point after each leveling according to the deviation of the height information of each leveling point in a preset local range after each leveling; and determine the to-be-leveled point after each leveling from the leveling points based on the regional correlation;

[0046] The clustering acquisition module is used to perform OPTICS algorithm clustering based on the position and height information of the points to be leveled, and obtain the ordered list decision diagram after each leveling; in the ordered list decision diagram after the current leveling, according to the local distribution of the reachable distance of each output position in all the ordered list decision diagrams after the leveling and the regional correlation of the corresponding points to be leveled, clustering is performed in the ordered list decision diagram after the current leveling to obtain the cluster cluster of the points to be leveled after the current leveling;

[0047] The prediction and adjustment module is used to construct an ARIMA model to predict the height information of the leveling points through the distribution of the points to be leveled in the cluster of the points to be leveled and the height information after each leveling, and obtain the height prediction value of each leveling point after the current leveling; and perform leveling processing adjustments based on the height prediction value.

[0048] According to yet another aspect of an embodiment of the present invention, a computer device is provided.

[0049] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the computer program implements the steps of a method for rapid leveling of cement mortar floor as described above when executed by the processor.

[0050] According to yet another aspect of an embodiment of the present invention, a computer-readable storage medium is provided.

[0051] A computer-readable storage medium stores a computer program, which can be executed by at least one processor to enable the at least one processor to perform the steps of a method for quickly leveling a cement mortar floor as described above.

[0052] The embodiments of the present invention have the following beneficial effects:

[0053] In the leveling operation area, the regional correlation is obtained according to the deviation between the local height information of the leveling point and the standard situation to determine the points to be leveled. The standard deviation of the local height is used to select the parts that have not been leveled in the cement mortar floor construction for key analysis. The spatial positions of the points to be leveled are clustered by the OPTICS algorithm to obtain the ordered list decision diagram for each leveling. In the ordered list decision diagram after the current leveling, the reachable distance distribution and regional correlation of each output position in the ordered list decision diagram of all leveling are clustered, that is, the OPTICS algorithm clustering is adjusted by the regional correlation and reachable distance of the output position after all leveling to obtain a more accurate cluster of the points to be leveled for the current leveling, which is convenient for the centralized analysis of the points that have not been leveled in the cement mortar floor construction. Finally, the adaptive prediction model is constructed through the distribution and height information of the points to be leveled in the cluster of the points to be leveled, so as to realize the height prediction of each leveling point after the current leveling and adjust the leveling process. The present invention dynamically predicts and analyzes subsequent height information based on the unevenness of the local height of the leveling point, and timely adjusts the subsequent scraping operation, so that the adjustment result has high credibility and improves the leveling efficiency of the scraping process.

[0054] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0056] Figure 1 A flow chart of a method for rapid leveling of a cement mortar floor provided by an embodiment of the present invention;

[0057] Figure 2 An ordered list decision diagram provided by an embodiment of the present invention;

[0058] Figure 3 A schematic diagram of obtaining clusters of points to be leveled in an ordered list decision diagram provided by one embodiment of the present invention;

[0059] Figure 4 A flow chart of a method for obtaining clusters of points to be leveled provided by an embodiment of the present invention;

[0060] Figure 5 A structural diagram of a cement mortar floor rapid leveling system provided by an embodiment of the present invention;

[0061] Figure 6 A schematic diagram of the structure of a computer device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0062] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation method, structure, features and effects of a cement mortar floor rapid leveling method proposed by the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" do not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0063] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0064] The specific scheme of the cement mortar floor rapid leveling method provided by the present invention is described in detail below with reference to the accompanying drawings.

[0065] See also Figure 1 , which shows a flow chart of a cement mortar floor rapid leveling method provided by an embodiment of the present invention, the method comprising the following steps:

[0066] S1: In the leveling operation area, obtain the height information of each leveling point after each scraping.

[0067] In the construction area, data is collected on the surface of cement mortar. In the embodiment of the present invention, the evenly stirred cement mortar is poured into the leveling operation area, and the laser rangefinder is used to obtain the height to assist the leveling. Since the height measurement needs to be performed after each leveling work to determine whether the required flatness is achieved, a sampling point is preset in the leveling operation area as the leveling point to obtain the height information. In the embodiment of the present invention, the area of ​​5 square centimeters is taken as the minimum area, and the leveling operation area is evenly divided according to the minimum area. After the leveling operation area is divided, the center point of each minimum area is taken as the preset sampling point, that is, the leveling point. Since the ground leveling needs to be continuously leveled until it is flat, the height of each leveling point is obtained once after each leveling. After the current leveling, a set of height information with time sequence meaning can be obtained for each leveling point, that is, the height information arranged according to the leveling order. In order to ensure that the subsequent leveling process adjustment is more referenceable, the height information of the leveling point after at least two levelings is obtained before the current leveling. It should be noted that the acquisition of height information by the laser rangefinder is a technical means well known to those skilled in the art, and will not be repeated here.

[0068] At this point, the collection of height information in the leveling operation area has been completed. In order to achieve rapid leveling, data analysis and processing are added. By predicting and analyzing the height changes at different positions, subsequent scraping operations can be adjusted in time to reduce the impact of problems such as invalid scraping or insufficient cement mortar on rapid leveling.

[0069] S2: After each scraping, the regional correlation of each leveling point after each scraping is obtained according to the deviation of the height information of each leveling point in the preset local range; based on the regional correlation, the point to be leveled after each scraping is determined from the leveling points.

[0070] Since the flatness of the cement mortar surface has not yet met the requirements, there are concave and convex areas on the cement mortar surface. When the leveling point is in a relatively flat area, its height information has little impact on the subsequent process. For areas with weak flatness, the excess cement mortar will be filled during the leveling process. Therefore, the uneven area will have a greater impact on the subsequent adjustment of the leveling process. Therefore, the uneven area is taken as the focus of data analysis to improve the accuracy of subsequent analysis. Therefore, after each leveling, the regional correlation of each leveling point after each leveling is obtained according to the deviation of the height information of each leveling point in the preset local range, and the local flatness of each leveling point is reflected through the regional correlation.

[0071] Preferably, the difference between the height information of the leveling point and the preset expected height value is used as the height difference of the leveling point, wherein the preset expected height is the ground leveling height required for construction. In an embodiment of the present invention, the preset expected height value is set according to the required height of the cement mortar surface in the specific real-time situation. For example, the preset expected height value is 6 cm, which is not limited here.

[0072] In one embodiment of the present invention, the difference between the height information of each leveling point after each scraping and the preset expected height value is normalized to obtain the height difference of each leveling point after each scraping, reflecting the difference between the height after scraping and the required ground height. The smaller the height difference, the more likely it is that there is a significant unevenness at the corresponding position of the leveling point. In one embodiment of the present invention, the expression of the height difference is:

[0073]

[0074] In the formula, Expressed as After the first scraping The height difference of the leveling points, Expressed as After the first scraping The height information of the leveling point, Indicates the preset expected height value, It is represented as a normalization processing function. It should be noted that normalization is a technical means well known to those skilled in the art. The normalization function can be linear normalization or standard normalization, etc. The specific normalization method is not limited here.

[0075] In other embodiments of the present invention, the absolute value of the difference between the height information of each leveling point after each scraping and the preset expected height value can also be used as the height difference of each leveling point after each scraping, which is not elaborated here.

[0076] Furthermore, for a leveling point after any scraping, other leveling points within the preset local range of the leveling point are used as local leveling points of the leveling point. Considering that the influence of cement mortar scraping is regional, further analysis is performed by determining the local leveling point of the leveling point. In an embodiment of the present invention, the preset local range is a neighborhood range with a side length of 25 cm centered on the leveling point. The specific numerical value can be adjusted by the implementer according to the specific implementation situation and is not limited here.

[0077] Further, according to the degree of deviation between the leveling point and each local leveling point in height difference, the local deviation of each local leveling point is determined, reflecting the degree of prominence of the concave-convex degree of each local leveling point within the regional range. In the embodiment of the present invention, the average value of the height difference of all leveling points within the preset local range of the leveling point is calculated to obtain the local difference value of the leveling point, reflecting the overall difference degree of the local height of the leveling point. The local leveling point of the leveling point is taken as the target point in turn, and the difference in the height difference between the leveling point and the target point is calculated to obtain the deviation degree of the target point, reflecting the height deviation between the leveling point and each local leveling point, and also reflecting the degree of the local surface unevenness. According to the proportion of the deviation degree of the target point in the local difference value of the leveling point, the local deviation degree of the target point is obtained by taking the absolute value.

[0078] In other embodiments of the present invention, the difference in height difference between the leveling point and each local leveling point can be calculated to obtain the deviation of each local leveling point. The ratio of the deviation of each local leveling point to the sum of all deviations is used as the local deviation of each local leveling point, reflecting the significant unevenness of each local leveling point, which will not be elaborated here.

[0079] Finally, the regional correlation of the leveling point is obtained by combining the local deviations of all local leveling points of the leveling point. The regional correlation reflects the relative flatness of the leveling point. The larger the local deviation, the higher the significance of the concave-convex features of the local area of ​​the leveling point, the lower the overall correlation of the area, and the higher the degree of unevenness. Therefore, the local deviation is negatively correlated with the regional correlation. In an embodiment of the present invention, the average value of the local deviations of all local leveling points of the leveling point is calculated for negative correlation mapping and normalization to obtain the regional correlation of the leveling point. The expression of the regional correlation is:

[0080]

[0081] In the formula, Expressed as After the first scraping The regional correlation of the leveling points, Expressed as After the first scraping The total number of local leveling points of leveling points, Expressed as After the first scraping The height difference of the leveling points, Expressed as After the first scraping The first leveling point The height difference of the local leveling points, Expressed as After the first scraping The local difference value of the leveling point, Expressed as an absolute value extraction function, Expressed as an exponential function with a natural constant as base, It is represented as a preset adjustment coefficient, which is set to 0.001 in the embodiment of the present invention. Its purpose is to prevent the formula from becoming meaningless when the denominator is zero. The specific value does not affect the proportion in the local deviation and is not limited here.

[0082] in, Expressed as After the first scraping The first leveling point and the The deviation of the local leveling point, Expressed as After the first scraping The first leveling point and the The local deviation of each local leveling point. When the average local deviation is smaller, it means that the local area of ​​the corresponding leveling point is relatively flat and has a large correlation, so the regional correlation is high. When the average local deviation is larger, it means that the local concave-convex features of the corresponding leveling point are more significant, so the regional correlation is lower and the flatness is low.

[0083] In other embodiments of the present invention, the accumulated values ​​of the local deviations of all local leveling points may be calculated to perform negative correlation mapping and normalization processing to obtain the regional correlation of the leveling point, which will not be elaborated herein.

[0084] During the continuous leveling of cement mortar, the raised parts of cement mortar will expand to the surrounding areas to fill the concave areas around them. Therefore, the leveling points with small regional correlation are the parts to be leveled that need to be focused on, so that the subsequent data analysis can effectively improve the efficiency of the leveling process. Therefore, the points to be leveled after each leveling can be further determined from the leveling points based on the regional correlation. Preferably, after each leveling, the leveling points with regional correlation less than the preset leveling threshold are used as the points to be leveled after each leveling. When the regional correlation is less than the preset leveling threshold, it means that the leveling points have relatively uneven characteristics locally, and key data analysis needs to be performed later. In the embodiment of the present invention, the preset leveling threshold is set to 0.75, and the specific value can be adjusted by the implementer according to the specific implementation situation.

[0085] At this point, the points to be leveled that need special attention have been screened, and data analysis will be further performed based on the points to be leveled.

[0086] S3: Based on the position and height information of the points to be leveled, OPTICS algorithm clustering is performed to obtain an ordered list decision diagram after each leveling; in the ordered list decision diagram after the current leveling, according to the local distribution of the reachable distance of each output position in all ordered list decision diagrams after leveling and the regional correlation of the corresponding points to be leveled, clustering is performed in the ordered list decision diagram after the current leveling to obtain the cluster cluster of the points to be leveled after the current leveling.

[0087] On the cement mortar surface, the unleveled positions are regional, so the points to be leveled are usually distributed in clusters. The leveling adjustment degree can be adjusted according to the distribution of different regions through the clustered points to be leveled. Therefore, the points to be leveled after the current leveling are clustered, and the data prediction is adjusted in time according to the clustering area situation, so that the adjustment process can improve the leveling efficiency more accurately.

[0088] First, the OPTICS algorithm clustering is performed based on the position and height information of the points to be leveled, and an ordered list decision diagram is obtained after each leveling. In the embodiment of the present invention, the position and height information of the points to be leveled in the leveling operation area are used as the corresponding three-dimensional coordinates of each point to be leveled, and the OPTICS algorithm clustering is performed based on the three-dimensional coordinates of all the points to be leveled after each leveling. Before the OPTICS algorithm obtains the clustering cluster, an ordered list decision diagram will be obtained, and then the ordered list decision diagram will be clustered based on the neighborhood radius parameter. In order to obtain a cluster that can more accurately characterize the situation of the points to be leveled, the process of obtaining the clustering cluster is adjusted. Please refer to Figure 2 , which shows an ordered list decision diagram provided by an embodiment of the present invention. The horizontal axis of the point to be leveled in the ordered list decision diagram represents the output position, the vertical axis represents the reachable distance, and the horizontal axis reflects the result queue order when the point to be leveled is output, that is, the output order of the point to be leveled. It should be noted that the OPTICS algorithm is a technical means well known to those skilled in the art, and the process of obtaining the ordered list decision diagram is not described in detail here.

[0089] The neighborhood radius parameter is selected by the reachable distance between the output positions in the ordered list decision graph. However, considering that the uneven areas in the cement mortar leveling process have the characteristics of associated changes, such as the situation where excess sediment fills the surroundings, the associated changes of the points to be leveled will drive the height changes of other local positions. Therefore, the associated influence of each position is considered during clustering to improve the credibility of the clustering results. Therefore, in the ordered list decision graph after current leveling, according to the local distribution of the reachable distance of each output position in all ordered list decision graphs after leveling and the regional association of the corresponding points to be leveled, clustering is performed in the ordered list decision graph after current leveling to obtain the clustering clusters of the points to be leveled after current leveling.

[0090] See also Figure 4 , which shows a flow chart of a method for obtaining clusters of points to be leveled provided by an embodiment of the present invention, the method comprising the following steps:

[0091] S301: Obtain the change confidence of each output position in the ordered list decision graph after each scraping according to the area association and reachable distance of each output position in the ordered list decision graph after each scraping.

[0092] The clustering of unevenness at the corresponding position of each point to be leveled is analyzed from two aspects: the local change of each output position corresponding to the point to be leveled and the distribution of the reachable distance. For the ordered list decision diagram after any scraping, the change confidence of each output position in the ordered list decision diagram is obtained according to the distribution of the regional correlation degree of each output position in the ordered list decision diagram, and the deviation of each output position from the adjacent output position in the reachable distance. Taking into account the local correlation characteristics of each point to be leveled, the influence confidence of each point to be leveled is adjusted.

[0093] In one embodiment of the present invention, for any output position in the ordered list decision diagram after any scraping, the preset number of adjacent output positions closest to the output position are used as the adjacent output positions of the output position, wherein the distance is characterized by the number of adjacent output positions between the output position and the left and right distributed output positions. In the embodiment of the present invention, the preset number of adjacent output positions is set to 2, and the specific data implementer can adjust it according to the specific implementation situation, so the two output positions on the left and right of the output position are used as the adjacent output positions of the output position. It should be noted that if the output position is located at the head and tail positions, the two output positions closest to the output position are the two consecutive output positions on one side of the output position.

[0094] Furthermore, the difference in the reachable distance between the output position and each adjacent output position is taken as the distribution difference of each adjacent output position. The clustering of the reachable distance is reflected by the degree of similarity of the reachable distance. The smaller the distribution difference is, the closer the reachable distance is, and the adjacent output positions are more likely to be points in the same cluster, and the higher the credibility of the output position is.

[0095] Furthermore, the distribution ratio of the regional correlation degree corresponding to the output position in the ordered decision graph and the distribution difference of all adjacent output positions are fused to obtain the change confidence of each output position.

[0096] In the embodiment of the present invention, the average value of the distribution differences of all adjacent output positions is calculated to obtain the distance distribution index of the output position, and the local overall distribution approximation of the output position is reflected in combination with all the distribution differences.

[0097] In other embodiments of the present invention, the sum of all distribution differences may also be used as the distance distribution index of the output position, which is not limited here.

[0098] The ratio of the correlation degree of the area corresponding to the output position to the cumulative value of the correlation degree of all areas in the ordered list decision diagram is used as the correlation index of the output position. The smaller the correlation index of the output position, the more obvious the concave-convex features are in the local area corresponding to the output position. The position corresponding to the output position needs to participate in the change of the inter-proximal scraping height to a high degree. Therefore, the clustering degree should be more affected by the point to be leveled corresponding to the output position. Finally, the change confidence of the analysis point is obtained by combining the correlation index and the distance distribution index. The change confidence reflects the degree of influence of the output position in the clustering process. The correlation index and the distance distribution index are both negatively correlated with the change confidence. The change confidence is the value after normalization. In one embodiment of the present invention, the expression of the change confidence is:

[0099]

[0100] In the formula, Expressed as The first order list decision diagram after the first scraping The confidence level of the change in the output position, Expressed as The first order list decision diagram after the first scraping The regional correlation of the output locations, Expressed as The total number of output positions in the ordered list decision graph after the first scraping, Expressed as The first order list decision diagram after the first scraping The total number of adjacent output positions of an output position is the preset adjacent number. Expressed as The first order list decision diagram after the first scraping The reachable distance of the output location, Expressed as The first order list decision diagram after the first scraping The output position The reachable distance of adjacent output positions, Expressed as an absolute value extraction function, Expressed as an exponential function with a natural constant as base.

[0101] in, Expressed as The distribution difference of the output positions, Expressed as The first order list decision diagram after the first scraping The distance distribution index of the output positions, Expressed as The first order list decision diagram after the first scraping The correlation index of the output positions is as follows: when the distance distribution index is smaller, the correlation index is smaller, which means that the clustering degree of the corresponding output position is strong and the local concave-convex features are more significant. The influence of the output position is higher, so the change confidence is greater.

[0102] The product and negative exponential function form is used to reflect that both the association index and the distance distribution index are negatively correlated with the change confidence. In other embodiments of the present invention, other basic mathematical operations can also be used to reflect that both the association index and the distance distribution index are negatively correlated with the change confidence, such as division or subtraction, etc., which are not limited here.

[0103] S302: Determine the initial neighborhood parameters according to the size of the reachable distance in the currently flattened ordered list decision graph.

[0104] After the ordered list decision diagram is generated, the neighborhood parameter can affect the division of clusters by adjusting the size. When the neighborhood parameter is larger, more points are used as core points, and the cluster will become larger. Conversely, only points with strong aggregation can be divided into a cluster, and the cluster will be smaller. Therefore, it is more important to adjust the neighborhood parameter.

[0105] In one embodiment of the present invention, the maximum reachable distance in the currently scraped ordered list decision graph is used as the initial neighborhood parameter, and is adjusted from the maximum situation to a lower situation.

[0106] In other embodiments of the present invention, the minimum reachable distance may also be used as the initial neighborhood parameter, or the initial neighborhood parameter may be preset, which is not limited here.

[0107] S303: In the ordered list decision diagram after the current scraping, the adjustment bias of each output position in the ordered list decision diagram of the current scraping is obtained through the distribution of the change confidence of each output position in all scrapings and the reachable distance.

[0108] Considering that the scraping and leveling process of cement mortar floor is carried out multiple times, the deviation degree of the current reachable distance is adjusted through the comprehensive change influence of the output position on the ordered list decision diagram after all scraping, and the influence of historical data is analyzed for the influence degree of each current output position on the clustering.

[0109] Preferably, for any output position in the ordered list decision diagram after the current scraping, the influence coefficient of the output position is determined in combination with the change confidence of the output position in all the ordered list decision diagrams after scraping, and the influence of the output position is analyzed comprehensively based on the historical analysis. In an embodiment of the present invention, the average value of the change confidence of the output position in all the ordered list decision diagrams after scraping is calculated to obtain the influence coefficient.

[0110] In other embodiments of the present invention, the influence coefficient of the output position can also be obtained by calculating the cumulative value of the change confidence of the output position in all ordered list decision diagrams after scraping and normalizing it, which will not be elaborated here.

[0111] Furthermore, the proportion of the difference between the reachable distance of the output position and the initial neighborhood parameters in the initial neighborhood parameters is used as an adjustment indicator of the output position. In an embodiment of the present invention, the difference between the initial neighborhood parameters and the reachable distance of the output position is used as the adjustment difference of the output position, and the ratio of the adjustment difference to the initial neighborhood parameters is used as the adjustment indicator of the output position. The deviation between the output position and the initial neighborhood parameters is reflected by the adjustment indicator, which can be further combined with the influence coefficient to reflect the degree of closeness of the initial neighborhood parameters to the reachable distance of the output position.

[0112] Finally, the adjustment index is adjusted by the influence coefficient of the output position to obtain the adjustment bias of the output value. In the embodiment of the present invention, the adjustment is in the form of a product. The product of the adjustment index of the output position and the influence coefficient is normalized to obtain the adjustment bias of the output position, which reflects the degree to which the initial neighborhood parameters need to be adjusted due to the output position. In the embodiment of the present invention, the expression of the adjustment bias is:

[0113]

[0114] In the formula, Represents the first The adjustment deflection of the output position, is represented as the initial neighborhood parameter, Represents the first The adjustment deflection of the output position, Expressed as the total number of all scraping times, Expressed as The first order list decision diagram after the first scraping The confidence level of the change in the output position, Represented as a normalized processing function.

[0115] in, Represents the first The adjustment difference of the output position, Represents the first The adjustment index of the output position, The following is the first row in the ordered list decision diagram after the current scraping. The influence coefficient of the output position is: when the adjustment index is larger, it means that the initial neighborhood parameters at the output position need to be adjusted to a greater extent; when the influence coefficient is larger, it means that the output position needs to be considered more during the leveling process. Therefore, the larger the adjustment deviation is, the more the initial neighborhood parameters at the output position need to be adjusted.

[0116] S304: Determine the adjusted neighborhood parameters of the ordered list decision graph after the current flattening according to the initial neighborhood parameters and the adjusted deflection degree of the ordered list decision graph after the current flattening.

[0117] The adjustment deflections of all output positions in the ordered list decision diagram after the current leveling are comprehensively considered to reflect the degree to which the initial neighborhood parameters need to be adjusted. The initial neighborhood parameters are adjusted to obtain the adjusted neighborhood parameters of the ordered list decision diagram after the current leveling. Preferably, first, the adjustment coefficient of the current leveling is obtained by combining all the adjustment deflections in the ordered list decision diagram after the current leveling. In one embodiment of the present invention, the average of the adjustment deflections of all output positions in the ordered list decision diagram after the current leveling is calculated to obtain the adjustment coefficient, which reflects the degree to which the initial neighborhood parameters after all output positions in the comprehensive ordered list decision diagram need to be adjusted.

[0118] In other embodiments of the present invention, the adjustment deflections of all output positions may be arranged in order of magnitude, and the median may be taken as the adjustment coefficient, which is not limited or elaborated herein.

[0119] Secondly, the product of the initial neighborhood parameter and the adjustment coefficient is used as the adjustment value of the initial neighborhood parameter to reflect the size of the adjustment amount. Finally, the adjustment neighborhood parameter of the ordered decision diagram after the current scraping is determined according to the initial neighborhood parameter and the adjustment value. In one embodiment of the present invention, when the initial neighborhood parameter is the maximum reachable distance in the ordered list decision diagram after the current scraping, the difference between the initial neighborhood parameter and the adjustment value is used as the adjustment neighborhood parameter of the ordered list decision diagram after the current scraping, and the initial neighborhood parameter is adjusted downward. The expression for adjusting the neighborhood parameter is:

[0120]

[0121] In the formula, It is represented as the adjusted neighborhood parameter of the ordered list decision graph after the current scraping. is represented as the initial neighborhood parameter, It is represented by the total number of output positions in the ordered list decision graph after the current scraping. Represents the first The adjustment bias of each output position.

[0122] in, It is expressed as the adjustment coefficient of the ordered list decision diagram after the current scraping. It is expressed as the adjustment value of the ordered list decision diagram after the current scraping. The larger the adjustment value, the greater the impact on the initial neighborhood parameters, and the higher the degree of downward adjustment required.

[0123] In other embodiments of the present invention, when the initial neighborhood parameter is the minimum reachable distance in the ordered list decision graph after the current scraping, the sum of the initial neighborhood parameter and the adjustment value is used as the adjusted neighborhood parameter of the ordered list decision graph after the current scraping, and the initial neighborhood parameter is increased and adjusted, that is, the expression for adjusting the neighborhood parameter is: , where It is represented as the adjusted neighborhood parameter of the ordered list decision graph after the current scraping. is represented as the initial neighborhood parameter, It is represented by the total number of output positions in the ordered list decision graph after the current scraping. Represents the first The adjustment bias of each output position will not be described in detail here.

[0124] S305: Obtaining clusters of points to be leveled in the ordered list decision graph after the current leveling based on the adjusted neighborhood parameters.

[0125] Based on adjusting the neighborhood parameters, the OPTICS algorithm clustering is continued to obtain the clusters of points to be leveled in the ordered list decision diagram after the current leveling. It should be noted that the clustering obtained by using the neighborhood parameters is a well-known process in the OPTICS algorithm clustering, which is a technical means well known to those skilled in the art and will not be described in detail here. Figure 3 , which shows a schematic diagram of obtaining clusters of points to be leveled in an ordered list decision diagram provided by an embodiment of the present invention, the dotted line indicates adjusting the neighborhood parameters, and the points to be leveled corresponding to the output position in each data segment X are taken as a cluster, Figure 3 There are 5 data segments X in total, which reflects that there are 5 clusters of points to be leveled.

[0126] At this point, the cluster analysis of the points to be leveled is completed, and the possible situation of the next leveling is analyzed through the height change of the regionally distributed location points that need to be leveled, so as to adjust the leveling process.

[0127] S4: Based on the distribution of the points to be leveled in the clusters of the points to be leveled and the height information after each leveling, an ARIMA model is constructed to predict the height information of the leveling points, and the height prediction value of each leveling point after the current leveling is obtained; the leveling process is adjusted based on the height prediction value.

[0128] The height prediction model is adjusted based on the height changes of the points to be leveled distributed in different regions, so that the data analysis and prediction of the points to be leveled are more accurate and the subsequent adjustment processing is more effective. The prediction model adopts the ARIMA model, which is relatively simple and flexible, and has higher robustness and stability for data analysis under time series changes. The model parameters can be adjusted to adapt to different time data structures. Therefore, in the embodiment of the present invention, the ARIMA model is constructed by analyzing the changes in the height information in the clusters of the points to be leveled.

[0129] Preferably, first, the height information of each leveling point is sorted according to the scraping order to obtain the height sequence of each leveling point, and the prediction analysis of the next height information is performed based on the height sequence. Secondly, the cluster of points to be leveled containing the largest number of points to be leveled is used as the target cluster. In the embodiment of the present invention, the prediction model is adjusted through the cluster with the largest number, so that the uneven area that needs to be adjusted the most is better considered.

[0130] Furthermore, based on the height sequence of each point to be leveled in the target cluster, the ARIMA model parameters corresponding to each point to be leveled are obtained. In an embodiment of the present invention, the ARIMA model parameters may include autoregressive order, difference order and moving average order. The method of obtaining ARIMA model parameters according to the data sequence is a technical means well known to those skilled in the art, such as obtaining the difference order through the seasonality of the height sequence, obtaining the autoregressive order through the autocorrelation function, obtaining the moving average order through the partial autocorrelation function, etc., which will not be elaborated here.

[0131] Further, in combination with the ARIMA model parameters corresponding to all the points to be leveled in the target cluster, an ARIMA model is constructed. In an embodiment of the present invention, the average value of the ARIMA model parameters corresponding to all the points to be leveled in the target cluster is calculated to obtain the final ARIMA model parameters. Based on the final ARIMA model parameters, an ARIMA model is constructed. The parameters adjusted for all the points to be leveled in the target cluster are comprehensively constructed to make the subsequent prediction and analysis of uneven points more accurate. Finally, the height sequence of each leveling point after the current scraping is predicted by the ARIMA model to obtain the predicted height value of each leveling point after the current scraping.

[0132] In other embodiments of the present invention, the model parameters can also be comprehensively adjusted for each uneven area in the clustering results, the number of points to be leveled in each cluster of points to be leveled is normalized as the quantity weight of each point to be leveled in each cluster of points to be leveled, the ARIMA model parameters corresponding to each point to be leveled in all clusters of points to be leveled are obtained, the ARIMA model parameters corresponding to all points to be leveled are weighted and averaged in combination with the quantity weights to obtain the final ARIMA model parameters, and the final ARIMA model is constructed for prediction, which will not be elaborated here.

[0133] The height prediction value is the possible height information for the next scraping process based on the ground that has been scraped and processed. The next scraping process can be adjusted according to the prediction situation to reduce the efficiency of the final leveling. For example, in one embodiment of the present invention, when the height prediction value of the leveling point is greater than the preset expected height value, it is necessary to reduce the filling situation of the scraping to it in the next scraping. When the height prediction value of the leveling point is less than the preset expected height value, it is detected whether the height prediction value of the adjacent leveling point meets the filling compensation to make the corresponding height reach the preset expected height value. If it cannot meet the preset expected height value, cement mortar needs to be added for scraping. In other embodiments of the present invention, the height prediction value and the relevant data of the current scraping operation can also be input into the trained decision neural network model to output the adjusted scraping direction and force, etc., which will not be elaborated here. By combining data analysis with the scraping process adjustment during the leveling process, the scraping process operation is adjusted in time to speed up the ground leveling efficiency and achieve a better ground leveling effect.

[0134] It should be noted that, in order to facilitate calculation, all indicator data involved in the calculation in the embodiment of the present invention are preprocessed to eliminate the dimension effect. The specific means of eliminating the dimension effect are technical means well known to those skilled in the art and are not limited here.

[0135] In summary, in the leveling operation area, according to the deviation between the local height information of the leveling point and the standard situation, the regional correlation is obtained to determine the points to be leveled, and the standard deviation of the local height is used to select the parts that have not been leveled in the cement mortar floor construction for key analysis. The spatial positions of the points to be leveled are clustered by the OPTICS algorithm to obtain the ordered list decision diagram for each leveling. In the ordered list decision diagram after the current leveling, the reachable distance distribution and regional correlation of each output position in the ordered list decision diagram of all leveling are clustered, that is, the OPTICS algorithm clustering is adjusted by the regional correlation and reachable distance of the output position after all leveling, and a more accurate cluster of the points to be leveled is obtained for the current leveling, which is convenient for the centralized analysis of the points that have not been leveled in the cement mortar floor construction. Finally, the adaptive prediction model is constructed through the distribution and height information of the points to be leveled in the cluster of the points to be leveled, so as to realize the height prediction of each leveling point after the current leveling and adjust the leveling process. The present invention dynamically predicts and analyzes subsequent height information based on the unevenness of the local height of the leveling point, and timely adjusts the subsequent scraping operation, so that the adjustment result has high credibility and improves the leveling efficiency of the scraping process.

[0136] The embodiment of the present invention provides a cement mortar floor rapid leveling system, please refer to Figure 5 , which shows a structural diagram of a cement mortar floor rapid leveling system provided by an embodiment of the present invention. The system 700 includes: an acquisition module 701, a leveling point screening module 702, a cluster acquisition module 703, and a prediction adjustment module 704.

[0137] An acquisition module 701 is used to acquire the height information of each leveling point after each scraping in the leveling operation area;

[0138] The to-be-leveled point screening module 702 is used to obtain the regional correlation of each leveling point after each leveling according to the deviation of the height information of each leveling point in a preset local range after each leveling; and determine the to-be-leveled point after each leveling from the leveling points based on the regional correlation;

[0139] The clustering acquisition module 703 is used to perform OPTICS algorithm clustering based on the position and height information of the points to be leveled, and obtain an ordered list decision diagram after each leveling; in the ordered list decision diagram after the current leveling, according to the local distribution of the reachable distance of each output position in all the ordered list decision diagrams after the leveling and the regional correlation of the corresponding points to be leveled, clustering is performed in the ordered list decision diagram after the current leveling to obtain a cluster cluster of the points to be leveled after the current leveling;

[0140] The prediction and adjustment module 704 is used to construct an ARIMA model to predict the height information of the leveling points through the distribution of the leveling points in the leveling point cluster and the height information after each leveling, and obtain the height prediction value of each leveling point after the current leveling; and perform leveling processing adjustment based on the height prediction value.

[0141] Since the specific implementation process of a cement mortar floor rapid leveling system in this embodiment is the same as the specific implementation process of a cement mortar floor rapid leveling method mentioned above, it will not be described in detail here.

[0142] The present invention also provides a computer device, see Figure 6 , which shows a schematic diagram of the structure of a computer device provided by an embodiment of the present invention, the computer device 500 at least includes, but is not limited to, a memory 501, a processor 502, a network interface 503 and a system 700 that can communicate with each other through a system bus.

[0143] The memory 501 includes at least one type of computer-readable storage medium, including flash memory, hard disk, read-only memory, magnetic storage, disk or optical disk, etc. In the embodiment of the present invention, the memory 501 is used to store computer program codes of the system 700 in the computer device 500.

[0144] The processor 502 is used to control the overall operation of the computer device 500. In the embodiment of the present invention, the processor 502 is used to run the computer program code of the system 700 stored in the memory 501 to implement the steps of the above-mentioned method for rapid leveling of cement mortar floor.

[0145] The network interface 503 is used to establish a communication connection between the computer device 500 and other electronic devices. In the embodiment of the present invention, the network interface 503 is used to connect the computer device 500 to an external terminal through a network, establish a data transmission channel and a communication connection between the computer device 500 and the external terminal, etc.

[0146] The embodiment of the present invention further provides a computer-readable storage medium, such as a flash memory, a hard disk, an optical disk, or a server, etc., on which a computer program is stored, and the corresponding function is realized when the program is executed by a processor. The computer-readable storage medium in the embodiment of the present invention is used to store the computer program of the system 700, and the processor executes the steps of the above-mentioned cement mortar floor rapid leveling method.

[0147] It should be noted that the sequence of the above embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0148] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

Claims

1. A method for rapid leveling of cement mortar floor. It is characterized in that The method comprises: In the leveling operation area, obtain the height information of each leveling point after each scraping; After each scraping, the regional correlation of each leveling point after each scraping is obtained according to the deviation of the height information of each leveling point in the preset local range; based on the regional correlation, the point to be leveled after each scraping is determined from the leveling points; Based on the position and height information of the points to be leveled, the OPTICS algorithm clustering is performed to obtain the ordered list decision diagram after each leveling; in the ordered list decision diagram after the current leveling, according to the local distribution of the reachable distance of each output position in all the ordered list decision diagrams after leveling and the regional correlation of the corresponding points to be leveled, clustering is performed in the ordered list decision diagram after the current leveling to obtain the clustering cluster of the points to be leveled after the current leveling; Based on the distribution of the points to be leveled in the cluster of the points to be leveled and the height information after each leveling, an ARIMA model is constructed to predict the height information of the leveling points, and the height prediction value of each leveling point after the current leveling is obtained; the leveling process is adjusted based on the height prediction value; The method for obtaining the regional association degree includes: The difference between the height information of each leveling point after each scraping and the preset expected height value is used as the height difference of each leveling point after each scraping; For a leveling point after any scraping, other leveling points within a preset local range of the leveling point are used as local leveling points of the leveling point; Determine the local deviation of each local leveling point according to the degree of deviation between the leveling point and each local leveling point in terms of height difference; The regional correlation of the leveling point is obtained by combining the local deviations of all local leveling points of the leveling point; the local deviations are negatively correlated with the regional correlations; The method for obtaining the cluster of points to be leveled includes: For any ordered list decision graph after scraping, according to the distribution of regional association degree of each output position in the ordered list decision graph and the deviation of each output position from the adjacent output position in the reachable distance, the change confidence of each output position in the ordered list decision graph is obtained; In the ordered list decision graph after the current scraping, the initial neighborhood parameters of the ordered list decision graph after the current scraping are determined according to the distribution of reachable distances of all output positions; In the ordered list decision diagram after the current scraping, according to the degree of deviation of the reachable distance of each output position from the initial neighborhood parameter and the distribution of the change confidence of each output position in all the ordered category decision diagrams after the scraping, the adjustment bias degree of each output position in the ordered list decision diagram after the current scraping is obtained; According to the initial neighborhood parameters and the adjusted deflection degree of the ordered list decision diagram after the current scraping, the adjusted neighborhood parameters of the ordered list decision diagram after the current scraping are determined; based on the adjusted neighborhood parameters, the clusters of points to be leveled in the ordered list decision diagram after the current scraping are obtained; The method for obtaining the change confidence comprises: For any output position in the ordered list decision graph after any scraping, the preset number of adjacent output positions closest to the output position are used as adjacent output positions of the output position; The difference between the reachable distances of the output position and each adjacent output position is used as the distribution difference of each adjacent output position; The distribution ratio of the regional correlation degree corresponding to the output position in the ordered decision graph and the distribution difference of all adjacent output positions are merged to obtain the change confidence of each output position; The method for obtaining the initial neighborhood parameters includes: The maximum reachable distance in the current scraped ordered list decision graph is used as the initial neighborhood parameter; The method for obtaining the adjustment deflection degree includes: For any output position in the current ordered list decision graph after scraping, determine the influence coefficient of the output position by combining the change confidence of the output position in all ordered list decision graphs after scraping; The ratio of the difference between the reachable distance of the output position and the initial neighborhood parameter in the initial neighborhood parameter is used as the adjustment index of the output position; The adjustment index is adjusted by the influence coefficient of the output position to obtain the adjustment bias of the output position; The method for obtaining the adjustment neighborhood parameter includes: Combine all adjustment deflections in the ordered list decision diagram after the current scraping to obtain the adjustment coefficient of the current scraping; The product of the initial neighborhood parameter and the adjustment coefficient is used as the adjustment value of the current scraping; According to the initial neighborhood parameters and the adjustment value, the adjustment neighborhood parameters of the ordered decision graph after the current scraping are determined; The horizontal coordinate of the point to be leveled in the ordered list decision diagram represents the output position, and the vertical coordinate represents the reachable distance.

2. A method for rapid leveling of cement mortar floor according to claim 1, It is characterized in that The step of determining the points to be leveled after each scraping from the leveling points based on the regional correlation includes: After each scraping, the leveling points with area correlation less than the preset leveling threshold are used as the points to be leveled after each scraping.

3. According to the method for rapid leveling of cement mortar floor according to claim 1, It is characterized in that The method for obtaining the height prediction value comprises: Arrange the height information of each leveling point according to the scraping order to obtain the height sequence of each leveling point; The cluster of points to be leveled that contains the largest number of points to be leveled is taken as the target cluster; Based on the height sequence of each point to be leveled in the target cluster, obtain the ARIMA model parameters corresponding to each point to be leveled; Combine the ARIMA model parameters corresponding to all the points to be leveled in the target cluster to build an ARIMA model; Based on the height sequence of each leveling point after the current scraping, the ARIMA model is used to predict the height of each leveling point after the current scraping, and the predicted value of the height of each leveling point after the current scraping is obtained.