A method for tracing and improving the service quality of diversified community nursing services

By building a service quality-project flow prediction model and anomaly detection algorithm, real-time monitoring and optimization of community nursing services is solved, the problem of insufficient service quality monitoring in traditional methods is achieved, timely warning and optimization of service quality is achieved, and service efficiency and quality are improved. .

CN118333642BActive Publication Date: 2024-11-01SHIYAN PEOPLES HOSPITAL BAOAN DISTRICT SHENZHEN
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410407399.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-11-01
Estimated Expiration
2044-04-07

AI Technical Summary

Technical Problem

In community nursing services, traditional statistical analysis methods are difficult to quickly and accurately discover abnormal points of service quality decline, and the real-time and sensitivity are insufficient, making it difficult to build service quality evaluation models and prediction models, and cannot effectively respond to the dynamic changes and diversified evaluation of service quality. index.

Method used

By obtaining and analyzing the process data and project circulation data of community care services, building a service quality-project circulation prediction model, monitoring service quality in real time, using anomaly detection algorithm and rule engine to automatically generate processing solutions, dynamically adjust resources and personnel configuration, and optimize services Process and resource allocation.

Benefits of technology

Real-time monitoring and early warning of community nursing service quality, timely detection of abnormalities, optimize service processes and resource allocation, improve service quality and efficiency, and ensure high-quality and efficient service provision.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118333642B_ABST
    Figure CN118333642B_ABST
Patent Text Reader

Abstract

The present application provides a method for tracing diversified community nursing services and improving service quality, including: judging the key nodes in the process according to the process of community nursing services, obtaining service quality data and service item flow data, and judging the impact of key nodes on the flow rate; after the early warning mechanism is triggered, using an anomaly detection algorithm to analyze the service flow data to find out whether there is any abnormality in the service flow, and if an abnormality is found, determining the key nodes and causes of the abnormality; according to the abnormal nodes and causes, obtaining corresponding processing measures from the knowledge base, and automatically generating a processing plan through a rule engine to generate a community nursing service plan; after the processing plan is executed, continuously monitoring the service quality and flow, judging the processing effect through feedback data analysis, and if the effect is not ideal, adjusting the processing plan until the problem is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of information technology, and in particular to a method for tracing diversified community nursing services and improving service quality. Background Art

[0002] In the field of community nursing quality traceability and service item change flow, there is a key technical contradiction: how to quickly and accurately find abnormal points of service quality decline in the massive community nursing service data, and timely warn and intervene. The difficulty of this problem lies in the fact that community nursing services involve multiple links and processes, there are complex connections and influences between different service items, and the evaluation indicators of service quality are diverse and dynamically changing. Traditional statistical analysis methods are difficult to fully consider various factors, and lack real-time and sensitivity. Specifically, from receiving patient applications to completing services, community nursing services must go through multiple steps such as qualification review, on-site evaluation, formulation of service plans, service delivery, and quality inspection. Each step will generate structured and unstructured multi-dimensional data. How to mine the association rules between service items from these high-dimensional, heterogeneous, and dynamic data, build a service quality evaluation model, and conduct online learning and prediction based on real-time data streams is a technical bottleneck that urgently needs to be broken through. At the same time, the abnormal warning of service quality cannot be simply based on the threshold comparison of a single indicator, but needs to comprehensively consider the combination mode and dynamic change trend of multiple indicators. How to design a sensitive, stable, and explainable anomaly detection algorithm that can adaptively learn the normal patterns of service items and promptly discover various unknown abnormal patterns is also a technical challenge. Summary of the invention

[0003] The present invention provides a method for tracing diversified community nursing services and improving service quality, which mainly includes:

[0004] According to the process of community nursing services, determine the key nodes in the process, obtain service quality data and service project flow data, and determine the impact of key nodes on the flow rate;

[0005] By analyzing the historical service quality data and project turnover data of community nursing, we found the probability distribution of individuals choosing different follow-up projects under different service qualities, and determined the association rules between service quality and follow-up project selection;

[0006] According to the association rules, a service quality-project flow prediction model is constructed. When new service quality data is generated, the model is used to predict the subsequent projects that individuals may choose and the allocation ratio of resources, equipment and personnel for community nursing services.

[0007] Real-time monitoring of key nodes of community nursing services to obtain service quality data, and through comparative analysis with historical data, determine whether the service quality is showing a downward trend. If so, an early warning mechanism will be triggered;

[0008] After the early warning mechanism is triggered, an anomaly detection algorithm is used to analyze the service flow data to find out whether there are any abnormalities in the service flow. If an abnormality is found, the key nodes where the abnormality occurred and the cause of the abnormality are determined;

[0009] According to the abnormal nodes and causes, the corresponding treatment measures are obtained from the knowledge base, and the treatment plan and community care service plan are automatically generated through the rule engine;

[0010] After the treatment plan is implemented, the service quality and flow are continuously monitored, and the treatment effect is judged through feedback data analysis. If the effect is not ideal, the treatment plan is adjusted until the problem is solved;

[0011] Evaluate the allocation of resources, equipment and staffing for community nursing services, identify any unreasonable allocations through data analysis, and dynamically adjust the allocation of resources, equipment and staffing based on service quality and project turnover forecast results to ensure service quality and efficiency.

[0012] As a preferred solution, the process of community nursing services is used to determine the key nodes in the process, obtain service quality data and service item flow data, and determine the impact of key nodes on the flow rate, including:

[0013] Obtain process data of community nursing services, and determine key nodes in the process through data processing and analysis; based on the determined key nodes, use information technology to obtain service quality data and service item flow data related to the key nodes; clean, integrate and standardize the obtained service quality data and service item flow data to obtain a structured data set that can be used for analysis; use data analysis techniques, such as statistical analysis and data mining, to determine the degree of influence of key nodes on the service item turnover rate and quantify the degree of influence; if the degree of influence of key nodes on the turnover rate exceeds the preset threshold, mark the node as a key optimization object, and determine other nodes related to the node based on business relevance to form an optimized node set; for the optimized node set, use process optimization algorithms, such as heuristic algorithms, genetic algorithms, etc. to generate optimized process plans, and use simulation technology to evaluate the feasibility and effectiveness of the optimization plans; convert the optimized process plans into executable business rules and workflows, and realize the automated execution of the optimization plans in actual business through workflow engines and business rule engines, and continuously monitor and evaluate the optimization effects to form a closed-loop optimization mechanism.

[0014] As a preferred solution, the historical service quality data and project circulation data of community nursing are analyzed to find the probability distribution of individuals choosing different follow-up projects under different service qualities, and determine the association rules between service quality and follow-up project selection, including:

[0015] Obtain historical community nursing service quality data and project flow data, and form a structured data set through data integration and cleaning; conduct exploratory analysis on the data set, and discover the differences in subsequent project selection under different service qualities through statistical analysis and visualization technology; use association rule mining algorithms, such as April, FP-growth, etc., to mine the association rules between service quality and subsequent project selection and obtain an association rule set; based on the association rule set, calculate the conditional probability distribution of each subsequent project selection under different service qualities to form a probability distribution matrix; if the selection probability of a specific subsequent project under a certain service quality is significantly higher than that of other projects, it is judged that there is a strong correlation between the service quality and the subsequent project; perform cluster analysis on the correlation relationship, and divide the correlation relationship into different correlation patterns according to the correlation strength and business relevance to form a correlation pattern library; based on the correlation pattern library, build a decision support model for service quality and subsequent project selection. When a new community nursing service is generated, the model predicts the most likely subsequent project to be selected, and provides corresponding service quality improvement suggestions to continuously optimize the service process and quality.

[0016] As a preferred solution, the service quality-project flow prediction model is constructed according to the association rules. When new service quality data is generated, the model is used to predict the subsequent projects that individuals may choose and the allocation ratio of resources, equipment and personnel for community nursing services, including:

[0017] Obtain the association rules between existing service quality and subsequent project selection as the basis of the prediction model; construct a service quality-project flow prediction model through data mining and machine learning technology, and use decision tree, random forest and other algorithms to train model parameters; when new service quality data is generated, use it as input feature, and obtain the probability distribution of subsequent project selection through the prediction model; according to the probability distribution of subsequent project selection, combined with historical data and expert experience, determine the type and quantity of community care service resources required for different projects; use resource allocation optimization algorithms, such as integer programming, heuristic algorithms, etc., to calculate the optimal allocation ratio of community care service resources among different projects, and obtain the allocation plan of equipment and personnel; if the predicted resource demand of a project is significantly higher than the current configuration, the resource early warning mechanism is triggered, and resource application and scheduling requests are sent to relevant departments through the business collaboration platform; continue to collect new service quality data and project flow data, regularly update and optimize the prediction model, dynamically adjust the resource allocation plan, realize two-way optimization of service quality and resource allocation, and form a closed-loop management mechanism.

[0018] As a preferred solution, the key nodes of community nursing services are monitored in real time to obtain service quality data, and by comparing and analyzing with historical data, it is determined whether the service quality shows a downward trend. If so, an early warning mechanism is triggered, including:

[0019] Through business process analysis and data mining technology, key nodes are identified from the community nursing service process, and a key node monitoring indicator system is constructed; IoT sensors, smart terminals and other technical means are used to collect real-time data from key nodes to obtain indicator data related to service quality, such as service time and patient satisfaction; the collected real-time service quality data is transmitted to the cloud data center, integrated and processed with historical data to form a structured quality data set; statistical analysis and data mining are performed on the quality data set, and through time series analysis, anomaly detection and other algorithms, it is determined whether the service quality shows a downward trend and quality anomalies are identified; according to the quality analysis results, the service quality warning threshold is dynamically set, and when the real-time quality indicator is lower than the threshold, the warning mechanism is triggered and warning information is generated; if the warning information reaches a certain level, the business rule engine automatically generates service quality improvement suggestions and pushes them to relevant service personnel and managers; the implementation of service quality improvement measures is continuously tracked, and through data feedback and evaluation, the quality warning model and improvement strategy are continuously optimized to form a closed-loop quality management mechanism.

[0020] As a preferred solution, after the early warning mechanism is triggered, an anomaly detection algorithm is used to analyze the service flow data to find out whether there is any abnormality in the service flow. If an abnormality is found, the key nodes where the abnormality occurs and the cause of the abnormality are determined, including:

[0021] The signal triggered by the early warning mechanism is obtained as the basis for starting anomaly detection, and integrated with the early warning system through the data interface; anomaly detection algorithms, such as isolation forest and local anomaly factor, are used to perform multi-dimensional analysis on the service flow data to determine whether there are any anomalies; if an anomaly is detected, cluster analysis is performed on the service flow data based on the anomaly detection results to obtain clusters of abnormal data; statistical analysis is performed on the clusters of abnormal data to calculate the proportion of abnormal data in each key node, and the node with the highest proportion is the key node where the anomaly occurs; for the key nodes where the anomaly occurs, association rule mining algorithms, such as April and FP-growth, are used to discover the association pattern between the node and other nodes and attributes; based on the association pattern, a causal relationship diagram of the anomaly is constructed, and the root cause of the anomaly is traced through graph analysis algorithms, such as PageRank and shortest path; the key nodes and root cause information of the anomaly are fed back to the business process management system to trigger the process optimization mechanism, automatically generate process improvement plans, and deploy them to the execution link of the service flow to continuously optimize the service process and quality.

[0022] As a preferred solution, the corresponding treatment measures are obtained from the knowledge base according to the abnormal nodes and causes, and the treatment plan is automatically generated through the rule engine to generate a community care service plan, including:

[0023] Through anomaly detection and cause analysis, the key nodes and root causes of anomalies are obtained as the basis for retrieving treatment measures from the knowledge base; natural language processing technology is used to semantically understand and standardize the abnormal nodes and causes, and convert them into standard concepts and relationships in the knowledge base; based on the standardized abnormal nodes and causes, a knowledge base query statement is constructed to retrieve the related treatment measures and obtain a set of candidate treatment measures; the candidate treatment measures are evaluated for relevance and applicability, and the most relevant and applicable treatment measures are screened out by setting thresholds to form a set of preferred treatment measures; the preferred treatment measures are input into the rule engine, matched with the predefined processing rules, and specific processing steps and parameters are generated to form a treatment plan; if the treatment plan involves multiple treatment measures, the conflict and dependency relationships between the treatment measures are resolved through the conflict resolution mechanism in the rule engine to optimize the treatment plan; the optimized treatment plan is integrated into the community care service plan, and a complete service plan is automatically generated through the assembly of plan templates and knowledge elements, and the plan execution process is triggered to continuously evaluate and improve the service plan and knowledge base.

[0024] As a preferred solution, after the processing plan is implemented, the service quality and flow situation are continuously monitored, and the processing effect is judged through feedback data analysis. If the effect is not ideal, the processing plan is adjusted until the problem is solved, including:

[0025] The service quality monitoring system is used to monitor the service process after the execution of the treatment plan in real time, and obtain service quality data, such as satisfaction, timeliness and other indicators; the service flow monitoring system is used to track the flow of service items at each node, obtain data such as flow time and arrival rate, and form a service flow data set; the service quality data and service flow data are transmitted to the feedback data management platform, and a structured feedback data set is formed through data integration and cleaning; data mining algorithms, such as association rules and decision trees, are used to analyze the feedback data, judge the effect after the execution of the treatment plan, and obtain the effect evaluation results; according to the effect evaluation results, quantitative indicators and thresholds of the treatment effect are set, such as 5% increase in satisfaction, 10% reduction in flow time, etc., to judge whether the treatment effect meets expectations; if the treatment effect does not meet expectations, the treatment plan adjustment mechanism is triggered, and the parameters and logic of the treatment plan are optimized through optimization algorithms, such as genetic algorithms, particle swarm algorithms, etc.; the optimized treatment plan is redeployed to the service process, and the execution effect is continuously monitored until the treatment effect meets expectations or the problem is solved, forming a closed-loop solution optimization mechanism to continuously improve service quality and efficiency.

[0026] As a preferred solution, the above-mentioned evaluation of the allocation of resources, equipment and personnel for community nursing services is carried out, and unreasonable allocation is found through data analysis. Based on the service quality and project turnover forecast results, the allocation of resources, equipment and personnel is dynamically adjusted to ensure service quality and efficiency, including:

[0027] Through the service resource management system, the configuration data of resources, equipment and personnel of community nursing services are obtained to build a configuration data set; data mining algorithms, such as association rules and cluster analysis, are used to analyze the configuration data, identify the patterns and characteristics of unreasonable configurations, and form a configuration optimization rule base; service quality prediction results and project flow prediction results are used as inputs, and through machine learning algorithms, such as support vector machines and decision trees, resource, equipment and personnel demand prediction models are established; based on the demand prediction model, the demand for resources, equipment and personnel for each service project in the future is predicted, and a dynamic demand matrix is ​​generated; dynamic demand The matrix is ​​compared with the current configuration data, and the optimal configuration plan of resources, equipment and personnel is solved through optimization algorithms, such as integer programming and heuristic search, to generate a configuration adjustment plan; if the difference between the configuration adjustment plan and the current configuration exceeds the preset threshold, the dynamic adjustment process of resources, equipment and personnel is triggered, and adjustment tasks and instructions are automatically generated; through the task scheduling system, the adjustment task is decomposed into a series of executable operations, such as resource application, equipment procurement, personnel training, etc., and tasks are automatically allocated and executed according to priority and dependency, so as to realize the dynamic optimization configuration of resources, equipment and personnel and continuously ensure service quality and efficiency.

[0028] The technical solution provided by the embodiment of the present invention may have the following beneficial effects:

[0029] The present invention discloses a method for tracing and improving the service quality of diversified community nursing services. The unique business scenario problem is to ensure the quality and efficiency of community nursing services, by monitoring the key nodes in the service process, predicting the impact of service quality on individual subsequent project selection, and triggering an early warning mechanism when the service quality declines, and dynamically adjusting the allocation of resources, equipment and personnel to cope with the changing service needs. The present invention provides a systematic solution to ensure the high quality and efficiency of community nursing services. Through a data-driven decision support system, resource allocation can be dynamically adjusted, service processes can be optimized, and situations of declining service quality can be prevented and responded to in a timely manner, thereby improving the overall performance and reliability of community nursing services. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 The present invention is a flowchart of a method for tracing back diversified community nursing services and improving service quality.

[0031] Figure 2 A schematic diagram of a method for tracing and improving service quality of diversified community nursing services according to the present invention. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0033] like Figure 1-2 In this embodiment, a method for tracing diversified community nursing services and improving service quality may specifically include:

[0034] S101. According to the process of community nursing services, determine the key nodes in the process, obtain service quality data and service item flow data, and determine the impact of key nodes on the flow rate.

[0035] Obtain process data of community nursing services, and determine key nodes in the process through data processing and analysis. According to the determined key nodes, use information technology to obtain service quality data and service item flow data related to the key nodes. Clean, integrate and standardize the obtained service quality data and service item flow data to obtain a structured data set that can be used for analysis. Through data analysis techniques such as statistical analysis and data mining, determine the degree of influence of key nodes on the service item flow rate and quantify the degree of influence. If the degree of influence of key nodes on the flow rate exceeds the preset threshold, mark the node as a key optimization object, and determine other nodes related to the node based on business relevance to form an optimized node set. For the optimized node set, use process optimization algorithms such as heuristic algorithms and genetic algorithms to generate optimized process plans, and use simulation technology to evaluate the feasibility and effectiveness of the optimization plan. Convert the optimized process plan into executable business rules and workflows, and realize the automatic execution of the optimization plan in actual business through workflow engines and business rule engines, and continuously monitor and evaluate the optimization effect to form a closed-loop optimization mechanism.

[0036] Specifically, when obtaining community nursing service process data, data can be collected through electronic medical record systems, nursing information systems, etc. For example, key node data can be extracted from 1,000 community nursing service cases. Through statistical analysis of these data, it is found that there are five key nodes with service quality scores below 80 points, namely, condition assessment, formulation of nursing plans, implementation of nursing measures, effect evaluation and discharge guidance. Next, for these five key nodes, relevant service quality data and flow data are collected, such as condition assessment accuracy, nursing plan completeness, nursing measure execution rate, effect evaluation satisfaction, etc., totaling 20,000 data. These data are cleaned, integrated and standardized to remove duplicate, erroneous and incomplete data, and finally 18,000 structured data are obtained. Using data mining techniques such as correlation analysis, the correlation coefficients between each key node and the flow rate are calculated, and it is found that the correlation coefficients between condition assessment accuracy and nursing plan completeness and flow rate are 0.8 and 0.75 respectively, which exceed the preset threshold of 0.7, so they are marked as key optimization objects. At the same time, considering the business relevance between condition assessment and nursing plan, the two are combined into an optimization node set. For this set of optimization nodes, a process optimization model based on genetic algorithm was designed. By setting constraints such as nursing service time and labor cost, and taking turnover rate as the optimization objective function, multiple optimization schemes were generated. After 100 iterations, the optimal process scheme was obtained. Compared with the original scheme, the turnover rate increased by 15% and the service time was shortened by 10%. In order to realize the automatic execution of the scheme, the optimized process was converted into a series of business rules in the form of if-then, such as "if the accuracy of the condition assessment is less than 90%, the condition assessment quality warning is triggered", etc., and interpreted and executed through the rule engine. At the same time, the process was embedded in the workflow of the nursing information system to realize the automatic scheduling and monitoring of the process. By continuously collecting the optimized process data, calculating the changes of various indicators, and evaluating the optimization effect, a closed-loop optimization mechanism based on data-driven is formed.

[0037] S102. Analyze the historical service quality data and project circulation data of community nursing, find the probability distribution of individuals choosing different follow-up projects under different service qualities, and determine the association rules between service quality and follow-up project selection.

[0038] The historical service quality data and project flow data of community nursing were obtained, and a structured data set was formed through data integration and cleaning. The data set was exploratory analyzed, and the differences in the selection of subsequent projects under different service qualities were found through statistical analysis and visualization technology. The association rule mining algorithms, such as April and FP-growth, were used to mine the association rules between service quality and subsequent project selection, and the association rule set was obtained. According to the association rule set, the conditional probability distribution of the selection of each subsequent project under different service qualities was calculated to form a probability distribution matrix. If the selection probability of a specific subsequent project under a certain service quality is significantly higher than that of other projects, it is judged that there is a strong correlation between the service quality and the subsequent project. Cluster analysis was performed on the correlation relationship, and the correlation relationship was divided into different correlation patterns according to the correlation strength and business relevance to form a correlation pattern library. Based on the correlation pattern library, a decision support model for service quality and subsequent project selection was constructed. When a new community nursing service is generated, the model is used to predict the most likely subsequent project to be selected, and corresponding service quality improvement suggestions are provided to continuously optimize the service process and quality.

[0039] Specifically, 10,000 historical service quality data and project flow data were obtained from the community care management system. After data cleaning and integration, 800 invalid and duplicate data were removed, and finally 9,200 structured data records were obtained. Through statistical analysis of service quality data, it was found that the service quality score showed a normal distribution, with a mean of 85 points and a standard deviation of 10 points. The service quality was divided into three levels: high (above 90 points), medium (70-90 points), and low (below 70 points). The chi-square test was performed on the subsequent project selection under different quality levels, and the p value was found to be less than 0.01, indicating that there was a significant correlation between service quality and subsequent project selection. Next, the April association rule mining algorithm was used, with the minimum support set to 0.05 and the minimum confidence set to 0.8. 20 association rules were mined, such as "high service quality → rehabilitation training (support 0.08, confidence 0.85)", which means that the probability of selecting rehabilitation training projects under high service quality is 0.85. The conditional probability distribution was calculated according to the association rules, and a 3×6 probability distribution matrix was obtained, in which the rows represent the service quality level and the columns represent the subsequent project types. Through analysis, it was found that the selection probabilities of rehabilitation training and drug treatment under high service quality were 0.85 and 0.78 respectively, which were significantly higher than other quality levels. Therefore, it was judged that there was a strong correlation between high service quality and these two projects. Cluster analysis was performed on the association relationship, and the K-means algorithm was used to cluster the 20 association rules into three categories, representing strong association, moderate association and weak association respectively. Each type of association pattern was interpreted in combination with business characteristics to form an association pattern library. Finally, a decision tree model was constructed based on the association pattern library, which input the service quality level and output the probability distribution of the subsequent project selection. When a new community care service is created, the decision tree model is used to predict the subsequent project selection based on its service quality score. For example, if the quality score is 92 points, the probability of selecting rehabilitation training is 0.88, and the probability of drug treatment is 0.75. Based on this, corresponding service quality improvement suggestions are provided, such as strengthening personalized guidance on rehabilitation training, optimizing drug treatment plans, etc. Through continuous data analysis and model optimization, the overall quality and efficiency of community care services are continuously improved.

[0040] S103. Based on the association rules, a service quality-project flow prediction model is constructed. When new service quality data is generated, the model is used to predict the subsequent projects that individuals may choose and predict the allocation ratio of resources, equipment and personnel for community nursing services.

[0041] Obtain the association rules between existing service quality and subsequent project selection as the basis of the prediction model. Use data mining and machine learning technology to build a service quality-project flow prediction model, and use decision trees, random forests and other algorithms to train model parameters. When new service quality data is generated, use it as an input feature, and use the prediction model to obtain the probability distribution of subsequent project selection. According to the probability distribution of subsequent project selection, combined with historical data and expert experience, determine the type and quantity of community care service resources required for different projects. Use resource allocation optimization algorithms, such as integer programming and heuristic algorithms, to calculate the optimal allocation ratio of community care service resources among different projects, and obtain the allocation plan for equipment and personnel. If the predicted resource demand of a project is significantly higher than the current configuration, the resource early warning mechanism is triggered, and resource application and scheduling requests are sent to relevant departments through the business collaboration platform. Continuously collect new service quality data and project flow data, regularly update and optimize the prediction model, dynamically adjust the resource allocation plan, achieve two-way optimization of service quality and resource allocation, and form a closed-loop management mechanism.

[0042] Specifically, from the existing association rules between service quality and subsequent project selection, strong association rules with a confidence greater than 0.8 are selected, such as "service quality score greater than 90 points → rehabilitation training project (confidence 0.85)", and used as the rule set of the prediction model. The decision tree algorithm is used to construct a service quality-project flow prediction model, with service quality score as input feature and subsequent project type as output label. The model is trained using 10-fold cross validation to obtain a prediction model with an average accuracy of 0.87. When a new service quality data is generated, such as a quality score of 92 points for a community nursing service, it is input into the prediction model, and the probability distribution of subsequent project selection is obtained as follows: rehabilitation training 0.6, drug treatment 0.2, psychological counseling 0.1, and nutritional guidance 0.1. According to historical data statistics, rehabilitation training projects require an average of 1 rehabilitation device and 2 rehabilitation therapists for every 10 people served; drug treatment projects require an average of 1 pharmacist for every 20 people served; psychological counseling projects require an average of 1 psychological counselor for every 30 people served; and nutritional guidance projects require an average of 1 nutritionist for every 50 people served. Assuming that the community is expected to provide 100 nursing services this month, the required resource allocation is obtained through weighted average calculation based on the predicted project distribution, which is 6 rehabilitation devices, 12 rehabilitation therapists, 1 pharmacist, 1 psychological counselor, and 1 nutritionist. The integer programming model is used to optimize the resource allocation plan. The objective function is to minimize the total cost of resources. The constraints include the upper and lower limits of the quantity of various resources, service quality goals, etc. The optimal resource allocation plan is solved as follows: 5 rehabilitation devices, 10 rehabilitation therapists, 1 pharmacist, 1 psychological counselor, and 0 nutritionists. If the optimized plan is significantly different from the actual resource allocation of the current community, such as the shortage of rehabilitation therapists reaches 5, a resource warning will be triggered immediately, and a resource demand report will be automatically generated and sent to the human resources department. At the same time, a resource scheduling task will be created in the collaborative platform to share and temporarily transfer personnel with other communities to ensure the normal development of nursing services. The latest service quality and project flow data are extracted from the business system on a regular basis every month, the prediction model is retrained, and the association rules and resource allocation standards are updated. While improving service quality, it also optimizes resource utilization efficiency and achieves a dynamic balance.

[0043] S104. Carry out real-time monitoring of key nodes of community nursing services, obtain service quality data, and determine whether the service quality shows a downward trend by comparing and analyzing with historical data. If there is a decline, trigger the early warning mechanism.

[0044] Through business process analysis and data mining technology, key nodes are identified from the community nursing service process, and a key node monitoring indicator system is constructed. IoT sensors, smart terminals and other technical means are used to collect real-time data from key nodes to obtain indicator data related to service quality, such as service time and patient satisfaction. The collected real-time service quality data is transmitted to the cloud data center, integrated and processed with historical data to form a structured quality data set. Statistical analysis and data mining are performed on the quality data set. Through algorithms such as time series analysis and anomaly detection, it is determined whether the service quality is showing a downward trend and quality anomalies are identified. According to the quality analysis results, the service quality warning threshold is dynamically set. When the real-time quality indicator is lower than the threshold, the warning mechanism is triggered and warning information is generated. If the warning information reaches a certain level, the business rule engine automatically generates service quality improvement suggestions and pushes them to relevant service personnel and managers. The implementation of service quality improvement measures is continuously tracked, and the quality warning model and improvement strategy are continuously optimized through data feedback and evaluation to form a closed-loop quality management mechanism.

[0045] Specifically, by combing the business and analyzing the data of the community nursing service process, five key nodes such as disease assessment, drug treatment, and rehabilitation training were identified, and 10 monitoring indicators such as service time, patient satisfaction, and adverse event rate were defined. Radio frequency identification (RFID) sensors and smart terminals are installed at each key node to collect nursing service process data in real time. For example, in the disease assessment link, the patient's vital signs data is collected through smart wristbands, and the evaluation results and time are recorded through the electronic medical record system; in the drug treatment link, the drug use is tracked through smart medicine boxes, and the patient's chief complaint is obtained through the voice interaction system. The collected data is transmitted to the cloud data center through the 5G network. After data cleaning, conversion and integration, a quality data set containing fields such as service time, satisfaction score, and adverse event record is formed. Descriptive statistical analysis is performed on the quality data set, and the mean and standard deviation of each indicator are calculated. Compared with the historical data of the same period, it is found that the mean service time increased from 45 minutes to 60 minutes, and the mean satisfaction decreased from 95 points to 90 points. The ARI MA time series model was used to predict the service time and satisfaction trends in the next week, and the prediction results showed that the service time would continue to increase by 5 minutes and the satisfaction would decrease by 2 points. According to the prediction results and business rules, the warning thresholds were set to be no more than 55 minutes and the satisfaction was no less than 92 points. When the real-time data of service time of 65 minutes and satisfaction of 88 points were received, the warning mechanism was triggered, and a double warning of service time and satisfaction was generated. The business rule engine was used to analyze the reasons for the warning, and it was found that it was mainly caused by insufficient nursing staff and unreasonable nursing process. Therefore, the improvement suggestion of "increasing the number of nursing staff and optimizing nursing process" was generated and pushed to the director of the nursing department and the quality management specialist. Based on this, the nursing department formulated a detailed improvement plan, including recruiting 5 nursing staff, analyzing and optimizing the value stream of nursing process, and reducing the time of non-value-added activities. One month after the implementation of the improvement plan, the quality data analysis and prediction were carried out again, and it was found that the average service time was reduced to 50 minutes, and the satisfaction rose to 94 points, with significant improvement effect. However, the prediction shows that there is still a risk of continued decline in satisfaction, so continuous monitoring and improvement are needed to form a PDCA quality management closed loop.

[0046] S105. After the early warning mechanism is triggered, an anomaly detection algorithm is used to analyze the service flow data to find out whether there is any abnormality in the service flow. If an abnormality is found, the key nodes where the abnormality occurs and the cause are traced.

[0047] The signal triggered by the early warning mechanism is obtained as the basis for starting anomaly detection, and integrated with the early warning system through the data interface. Anomaly detection algorithms, such as isolation forest and local anomaly factor, are used to perform multi-dimensional analysis on the service flow data to determine whether there are anomalies. If anomalies are detected, cluster analysis is performed on the service flow data based on the anomaly detection results to obtain clusters of abnormal data. Statistical analysis is performed on the clusters of abnormal data to calculate the proportion of abnormal data in each key node. The node with the highest proportion is the key node where the anomaly occurs. For the key nodes where the anomaly occurs, association rule mining algorithms, such as April and FP-growth, are used to find the association pattern between the node and other nodes and attributes. Based on the association pattern, a causal relationship diagram of the anomaly is constructed, and the root cause of the anomaly is traced through graph analysis algorithms, such as PageRank and shortest path. The key nodes and root cause information of the anomaly are fed back to the business process management system to trigger the process optimization mechanism, automatically generate process improvement plans, and deploy them to the execution link of the service flow to continuously optimize the service process and quality.

[0048] Specifically, when the service quality early warning system issues a yellow warning signal, the anomaly detection algorithm is automatically triggered to analyze 1,000 service flow data in the past month. The isolation forest algorithm is used to set the contamination rate parameter to 0.1, and 100 decision trees are constructed to calculate the anomaly score of each data. Data with a score greater than 0.6 is judged to be abnormal, and a total of 80 abnormal data are found. K-means clustering analysis is performed on these 80 abnormal data, setting the number of clusters k=3, and iterating 100 times to obtain 3 abnormal data clusters. The key node distribution of the data in each cluster is counted, and it is found that 60% of the abnormal data in cluster 1 comes from the disease assessment node, 50% of the abnormal data in cluster 2 comes from the drug treatment node, and 40% of the abnormal data in cluster 3 comes from the rehabilitation training node. Therefore, it is determined that disease assessment, drug treatment and rehabilitation training are the key nodes for abnormal occurrence. For these three nodes, the FP-growth algorithm was used, with the minimum support set to 0.05 and the minimum confidence set to 0.8. The frequent patterns and association rules of abnormal data were mined, and 10 association rules were found, such as "disease assessment time > 20 minutes & assessment accuracy < 0.9 → abnormal", "drug dosage > 10% of the specified value → abnormal". Based on the association rules, a directed graph of causal relationships of abnormalities was constructed, and the graph was topologically sorted and the shortest path analyzed. It was found that the root cause of abnormal disease assessment was unclear assessment standards, and the root cause of abnormal drug treatment was chaotic drug management. The analysis results were fed back to the service process management system, and process improvement measures such as "formulating unified disease assessment standards, refining assessment items and contents", "establishing a drug registration and verification system, and strictly controlling drug dosage" were automatically generated. After review by management personnel, they were deployed to the execution link of service flow. One month later, anomaly detection analysis was conducted again, and it was found that the number of abnormal data was reduced to 20, and the abnormality rate dropped from 8% to 2%, and the service quality was significantly improved. However, the warning signals have not been completely eliminated, and it is necessary to continue to carry out anomaly detection and process optimization and to establish a normalized quality improvement mechanism.

[0049] S106. According to the abnormal nodes and causes, corresponding processing measures are obtained from the knowledge base, and a processing plan is automatically generated through the rule engine to generate a community care service plan.

[0050] Through anomaly detection and cause analysis, the key nodes and root causes of anomalies are obtained as the basis for retrieving treatment measures from the knowledge base. Natural language processing technology is used to semantically understand and standardize the abnormal nodes and causes, and transform them into standard concepts and relationships in the knowledge base. According to the standardized abnormal nodes and causes, a knowledge base query statement is constructed to retrieve the related treatment measures and obtain a set of candidate treatment measures. The candidate treatment measures are evaluated for relevance and applicability, and the most relevant and applicable treatment measures are screened out by setting thresholds to form a set of preferred treatment measures. The preferred treatment measures are input into the rule engine, matched with the predefined processing rules, and specific processing steps and parameters are generated to form a treatment plan. If the treatment plan involves multiple treatment measures, the conflict and dependency between the treatment measures are resolved through the conflict resolution mechanism in the rule engine to optimize the treatment plan. The optimized treatment plan is integrated into the community care service plan. Through the assembly of plan templates and knowledge elements, a complete service plan is automatically generated, and the plan execution process is triggered to continuously evaluate and improve the service plan and knowledge base.

[0051] Specifically, through anomaly detection and cause analysis, it was determined that low accuracy of condition assessment was the key node of anomaly occurrence, and the root cause was inconsistent evaluation standards. "Low accuracy of condition assessment" and "inconsistent evaluation standards" were used as keywords and entered into the knowledge base query interface. The TF-IDF algorithm was used to calculate the relevance score between the keywords and each piece of knowledge in the knowledge base. After sorting, a set of candidate treatment measures was obtained, including 10 measures such as "formulating unified evaluation standards", "strengthening evaluation training", and "introducing artificial intelligence-assisted evaluation". The applicability of the candidate measures was evaluated, and according to the rule of "operability>0.8 and implementation cost<50,000 yuan", "formulating unified evaluation standards" and "strengthening evaluation training" were selected as preferred measures. The preferred measures were converted into facts and rules in the rule engine, such as "IF evaluation accuracy<0.9THEN start formulating unified evaluation standards". Through the forward reasoning algorithm, the 10 rules in the rule base were matched to generate specific processing steps such as "establishing an expert committee, holding 3 seminars, and forming version 1.0 of the evaluation standards" and "organizing 5 evaluation trainings, covering 50 nursing staff". Since there are dependencies between the processing steps, such as "the formation of the evaluation criteria depends on the establishment of the expert committee", a constraint-based rule conflict resolution algorithm is used to optimize the execution order of the processing steps by solving the linear programming problem to obtain the final processing plan. The processing plan is embedded in the community care service process, and the service plan template is matched and replaced with the knowledge elements in the processing plan to automatically generate a complete service plan document and execution script. When the service plan is executed, data such as the evaluation accuracy rate during the service process are collected, and the average accuracy rate is calculated to increase from 0.85 to 0.95, and the effectiveness of the plan is verified. At the same time, the collected data is fed back to the knowledge base, and the processing measures and rules in the knowledge base are continuously enriched and optimized through the incremental learning algorithm to form a closed-loop service plan optimization mechanism.

[0052] S107. After the treatment plan is executed, the service quality and flow situation are continuously monitored, and the treatment effect is judged through feedback data analysis. If the effect is not ideal, the treatment plan is adjusted until the problem is solved.

[0053] The service quality monitoring system is used to monitor the service process after the execution of the treatment plan in real time, and obtain service quality data, such as satisfaction, timeliness and other indicators. Through the service flow monitoring system, the flow of service items at each node is tracked, and data such as flow duration and arrival rate are obtained to form a service flow data set. The service quality data and service flow data are transmitted to the feedback data management platform, and a structured feedback data set is formed through data integration and cleaning. Data mining algorithms, such as association rules and decision trees, are used to analyze the feedback data, judge the effect after the execution of the treatment plan, and obtain the effect evaluation results. According to the effect evaluation results, quantitative indicators and thresholds of the treatment effect are set, such as 5% increase in satisfaction, 10% reduction in flow duration, etc., to judge whether the treatment effect meets expectations. If the treatment effect does not meet expectations, the treatment plan adjustment mechanism is triggered, and the parameters and logic of the treatment plan are optimized through optimization algorithms, such as genetic algorithms and particle swarm algorithms. The optimized treatment plan is redeployed to the service process, and the execution effect is continuously monitored until the treatment effect meets expectations or the problem is solved, forming a closed-loop solution optimization mechanism to continuously improve service quality and efficiency.

[0054] Specifically, by deploying a service quality monitoring system at key links in community nursing services, using Internet of Things technologies such as radio frequency identification and infrared sensors, real-time service process data, such as nursing staff response time, operational standardization, etc., are collected, and data is uploaded every 5 minutes to form a service quality data stream. At the same time, RFID tags and smart terminals are used to track the flow process of service items, record the flow time and completion status of each service item at the evaluation, treatment, rehabilitation and other nodes, generate a service flow log, and summarize and generate a service flow data set every day. The collected service quality data stream and service flow data set are transmitted to the feedback data management platform, and the data are extracted, cleaned and converted through ETL tools to eliminate noise data and abnormal data, and generate a high-quality feedback data set, including data in 20 dimensions such as service satisfaction, timeliness, and completeness. April association rule mining algorithm was used to mine association rules between service quality and influencing factors, with service satisfaction as the target attribute, service timeliness and completeness as conditional attributes, and the minimum support was set to 0.05 and the minimum confidence was set to 0.8. Ten strong association rules such as "service timeliness <0.9 & service completeness <0.95 → service satisfaction <0.8" were found. According to the association rules, the evaluation indicators of the treatment effect were determined to be service satisfaction increased to above 0.85 and service timeliness reached above 0.95. By comparing the evaluation indicators with the actual monitoring data, it was found that service satisfaction only increased to 0.82 and service timeliness was 0.93, and the treatment effect did not meet expectations. The treatment plan adjustment mechanism was started, and the genetic algorithm was used to optimize the plan parameters. The population size was set to 50, the crossover probability was 0.8, the mutation probability was 0.1, and the iteration was 100 times. The optimal plan parameters were "nurse response time shortened by 10% and operation standardization improved by 5%". The optimized solution parameters are passed to the service process engine to automatically adjust the service process settings, such as shortening the response time of nursing staff and increasing the assessment of operational standardization. The optimized treatment effect is continuously monitored. After three iterative optimization cycles, the service satisfaction rate has reached 0.92, the service timeliness has reached 0.97, the treatment effect has reached the expected goal, and the problem has been solved. The optimized treatment solution is solidified into the knowledge base to form a standardized service quality problem solution, which provides reference and guidance for the subsequent treatment of similar problems.

[0055] S108. Evaluate the allocation of resources, equipment and personnel for community nursing services, identify any unreasonable allocations through data analysis, and dynamically adjust the allocation of resources, equipment and personnel based on service quality and project turnover forecasts to ensure service quality and efficiency.

[0056] Through the service resource management system, the configuration data of resources, equipment and personnel of community nursing services are obtained to build a configuration data set. Data mining algorithms, such as association rules and cluster analysis, are used to analyze the configuration data, identify the patterns and features of unreasonable configurations, and form a configuration optimization rule base. The service quality prediction results and project flow prediction results are used as inputs, and a resource, equipment and personnel demand prediction model is established through machine learning algorithms, such as support vector machines and decision trees. According to the demand prediction model, the demand for resources, equipment and personnel for each service project in the future is predicted to generate a dynamic demand matrix. The dynamic demand matrix is ​​compared with the current configuration data, and the optimal configuration plan of resources, equipment and personnel is solved through optimization algorithms, such as integer programming and heuristic search, to generate a configuration adjustment plan. If the difference between the configuration adjustment plan and the current configuration exceeds the preset threshold, the dynamic adjustment process of resources, equipment and personnel is triggered, and adjustment tasks and instructions are automatically generated. Through the task scheduling system, the adjustment tasks are broken down into a series of executable operations, such as resource application, equipment procurement, personnel training, etc., and tasks are automatically allocated and executed according to priority and dependency relationships to achieve dynamic optimization of resources, equipment, and personnel, and continuously ensure service quality and efficiency.

[0057] Specifically, the resource configuration data of the community nursing service center, including the list of medical equipment, drug inventory, nursing staff information, etc., totaling 5,000 records, were extracted from the service resource management system to form a structured configuration data set. The April association rule mining algorithm was used, with equipment utilization and drug turnover as target attributes, service project type, service number of people, etc. as conditional attributes, and the minimum support was set to 0.02 and the minimum confidence was set to 0.8. The association rules between equipment utilization and drug turnover and service projects and number of people were mined, such as "rehabilitation training projects & daily service number of people>50→treatment bed utilization rate<0.6", indicating that when the number of people served on the same day exceeds 50, the utilization rate of the treatment bed may be lower than 0.6, and there is configuration redundancy. The mined association rules are used as configuration optimization rules and stored in the rule base. At the same time, the output results of the service quality prediction model and the project flow prediction model are used as training data for the support vector machine (SVM) algorithm. The demand prediction model is trained with service quality and project flow as features and the demand for resources, equipment and personnel as target values. The average prediction accuracy is 85% using 5-fold cross validation. The demand prediction model is used to predict that the demand for treatment beds for rehabilitation training projects in the next week is 20 and the demand for nursing staff is 15, forming a dynamic demand matrix. The dynamic demand matrix is ​​compared with the current configuration data, and it is found that there are 5 surplus treatment beds and 2 shortages of nursing staff, triggering the resource adjustment process. The integer programming model is used, with the minimization of total cost as the objective function, and the demand satisfaction rate and service quality as constraints to solve the optimal configuration plan, and an adjustment plan is obtained to reduce 3 treatment beds and increase 1 nursing staff. The adjustment plan is decomposed into a series of tasks, such as the allocation of idle treatment beds and internal recruitment of nursing staff, which are automatically assigned to relevant departments and personnel for execution through the task scheduling system. After a week of dynamic adjustment, the utilization rate of treatment beds in the rehabilitation training project increased from 0.7 to 0.9, the service quality satisfaction increased from 4.2 to 4.5, and resource allocation became more precise and efficient.

[0058] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for tracing and improving the quality of diversified community nursing services. It is characterized in that The method comprises: According to the process of community nursing services, determine the key nodes in the process, obtain service quality data and service project flow data, and determine the impact of key nodes on the flow rate; By analyzing the historical service quality data and project turnover data of community nursing, we found the probability distribution of individuals choosing different follow-up projects under different service qualities, and determined the association rules between service quality and follow-up project selection; According to the association rules, a service quality-project flow prediction model is constructed. When new service quality data is generated, the model is used to predict the subsequent projects that individuals may choose and the allocation ratio of resources, equipment and personnel for community nursing services. Real-time monitoring of key nodes of community nursing services to obtain service quality data, and through comparative analysis with historical data, determine whether the service quality is showing a downward trend. If so, an early warning mechanism will be triggered; After the early warning mechanism is triggered, an anomaly detection algorithm is used to analyze the service flow data to find out whether there are any abnormalities in the service flow. If an abnormality is found, the key nodes where the abnormality occurred and the cause of the abnormality are determined; According to the abnormal nodes and causes, the corresponding treatment measures are obtained from the knowledge base, and the treatment plan and community care service plan are automatically generated through the rule engine; After the treatment plan is implemented, the service quality and flow are continuously monitored, and the treatment effect is judged through feedback data analysis. If the effect is not ideal, the treatment plan is adjusted until the problem is solved; Evaluate the allocation of resources, equipment and staffing for community nursing services, identify any unreasonable allocations through data analysis, and dynamically adjust the allocation of resources, equipment and staffing based on service quality and project turnover forecast results to ensure service quality and efficiency.

2. The method according to claim 1, It is characterized in that According to the process of community nursing services, determining the key nodes in the process, obtaining service quality data and service item flow data, and determining the impact of key nodes on the flow rate include: Obtain process data of community nursing services and identify key nodes in the process through data processing and analysis; According to the determined key nodes, information technology means are used to obtain service quality data and service project flow data related to the key nodes; Clean, integrate and standardize the acquired service quality data and service item flow data to obtain a structured data set for analysis; Through data analysis technology, determine the impact of key nodes on the turnover rate of service items and quantify the impact; If the impact of a key node on the turnover rate exceeds a preset threshold, the node is marked as a key optimization object, and other nodes related to the node are determined based on business relevance to form an optimization node set; For the set of optimized nodes, the process optimization algorithm is used to generate the optimized process plan, and the feasibility and effectiveness of the optimization plan are evaluated through simulation technology; Convert the optimized process plan into executable business rules and workflows, and realize the automated execution of the optimization plan in actual business through the workflow engine and business rule engine. Continuously monitor and evaluate the optimization effect to form a closed-loop optimization mechanism.

3. The method according to claim 1, It is characterized in that The analysis of the historical service quality data and project circulation data of community nursing is conducted to find the probability distribution of individuals choosing different follow-up projects under different service qualities, and to determine the association rules between service quality and follow-up project selection, including: Obtain historical community care service quality data and project flow data, and form a structured data set through data integration and cleaning; Conduct exploratory analysis on the data set, and discover the differences in subsequent project selection under different service qualities through statistical analysis and visualization techniques; Adopt association rule mining algorithm to mine the association rules between service quality and subsequent project selection and obtain the association rule set; According to the association rule set, the conditional probability distribution of each subsequent project selection under different service qualities is calculated to form a probability distribution matrix; If the probability of selecting a specific subsequent project under a certain service quality is significantly higher than that of other projects, it is judged that there is a strong correlation between the service quality and the subsequent project; Perform cluster analysis on association relationships, and divide association relationships into different association patterns according to association strength and business relevance to form an association pattern library; Based on the association pattern library, a decision support model for service quality and subsequent project selection is constructed. When new community nursing services are generated, the model predicts the most likely subsequent projects to be selected, and provides corresponding service quality improvement suggestions to continuously optimize service processes and quality.

4. The method according to claim 1, It is characterized in that According to the association rules, a service quality-project flow prediction model is constructed. When new service quality data is generated, the model is used to predict the subsequent projects that individuals may choose, and the allocation ratio of resources, equipment and personnel for community nursing services, including: Obtain the association rules between existing service quality and subsequent project selection as the basis for the prediction model; Through data mining and machine learning technology, a service quality-project turnover prediction model is constructed, and decision tree and random forest algorithms are used to train model parameters; When new service quality data is generated, it is used as an input feature and the probability distribution of subsequent project selection is obtained through the prediction model; Determine the type and quantity of community nursing service resources required for different projects based on the probability distribution of subsequent project selection, combined with historical data and expert experience; Using resource allocation optimization algorithm, we calculated the optimal allocation ratio of community nursing service resources among different projects and obtained the allocation plan of equipment and personnel; If the predicted resource demand of a project is significantly higher than the current configuration, the resource early warning mechanism will be triggered, and resource application and scheduling requests will be sent to relevant departments through the business collaboration platform; Continuously collect new service quality data and project flow data, regularly update and optimize prediction models, dynamically adjust resource allocation plans, achieve two-way optimization of service quality and resource allocation, and form a closed-loop management mechanism.

5. The method according to claim 1, It is characterized in that The key nodes of community nursing services are monitored in real time to obtain service quality data, and by comparing and analyzing with historical data, it is determined whether the service quality shows a downward trend. If so, an early warning mechanism is triggered, including: Through business process analysis and data mining technology, key nodes are identified from the community nursing service process, and a key node monitoring indicator system is constructed; Use IoT sensors or smart terminal technology to collect real-time data from key nodes and obtain service quality-related indicator data; The collected real-time service quality data is transmitted to the cloud data center, integrated and processed with historical data to form a structured quality data set; Perform statistical analysis and data mining on quality data sets, and use time series analysis and anomaly detection algorithms to determine whether service quality is declining and identify quality anomalies; According to the quality analysis results, the service quality warning threshold is dynamically set. When the real-time quality index is lower than the threshold, the warning mechanism is triggered and warning information is generated; If the warning information reaches a certain level, the business rule engine will automatically generate service quality improvement suggestions and push them to relevant service personnel and managers; Continuously track the implementation of service quality improvement measures, continuously optimize quality early warning models and improvement strategies through data feedback and evaluation, and form a closed-loop quality management mechanism.

6. The method according to claim 1, It is characterized in that After the early warning mechanism is triggered, an anomaly detection algorithm is used to analyze the service flow data to find out whether there is any abnormality in the service flow. If an abnormality is found, the key nodes where the abnormality occurs and the cause of the abnormality are determined, including: Obtain the signal triggered by the early warning mechanism as the basis for starting anomaly detection, and integrate it with the early warning system through the data interface; Use anomaly detection algorithms to conduct multi-dimensional analysis of service flow data to determine whether there are any anomalies; If an abnormal situation is detected, cluster analysis is performed on the service flow data based on the abnormal detection results to obtain the cluster of abnormal data; Perform statistical analysis on the abnormal data clusters and calculate the abnormal data ratio of each key node. The node with the highest ratio is the key node where the abnormality occurs. For the key nodes where the anomaly occurs, the association rule mining algorithm is used to discover the association pattern between the node and other nodes and attributes; Based on the association pattern, a causal relationship diagram of the anomaly is constructed, and the root cause of the anomaly is traced through the graph analysis algorithm; The key nodes and root causes of the exceptions are fed back to the business process management system, triggering the process optimization mechanism, automatically generating process improvement plans, and deploying them to the execution link of the service flow to continuously optimize the service process and quality.

7. The method according to claim 1, It is characterized in that According to the abnormal nodes and causes, corresponding processing measures are obtained from the knowledge base, and a processing plan is automatically generated through a rule engine to generate a community care service plan, including: Through anomaly detection and cause analysis, the key nodes and root causes of anomalies are obtained as the basis for retrieving treatment measures from the knowledge base; Use natural language processing technology to understand the semantics and standardize the representation of abnormal nodes and causes, and convert them into standard concepts and relationships in the knowledge base; According to the standardized abnormal nodes and causes, a knowledge base query statement is constructed to retrieve the relevant processing measures and obtain a set of candidate processing measures; Evaluate the relevance and applicability of candidate treatment measures, select the most relevant and applicable treatment measures by setting thresholds, and form a set of preferred treatment measures; Input the preferred treatment measures into the rule engine, match them with the predefined treatment rules, generate specific treatment steps and parameters, and form a treatment plan; If the processing plan involves multiple processing measures, the conflict resolution mechanism in the rule engine is used to resolve the conflicts and dependencies between the processing measures and optimize the processing plan; Integrate the optimized treatment plan into the community care service plan, automatically generate a complete service plan through the assembly of plan templates and knowledge elements, trigger the plan execution process, and continuously evaluate and improve the service plan and knowledge base.

8. The method according to claim 1, It is characterized in that After the implementation of the treatment plan, the service quality and flow are continuously monitored, and the treatment effect is judged through feedback data analysis. If the effect is not ideal, the treatment plan is adjusted until the problem is solved, including: Use a service quality monitoring system to monitor the service process in real time after the treatment plan is executed and obtain service quality data; Through the service flow monitoring system, the flow of service items at each node is tracked, the flow duration and arrival rate data are obtained, and a service flow data set is formed; Transmit service quality data and service flow data to the feedback data management platform, and form a structured feedback data set through data integration and cleaning; Use data mining algorithms to analyze feedback data, determine the effect of the treatment plan after execution, and obtain effect evaluation results; According to the effect evaluation results, set the quantitative indicators and thresholds of the treatment effect to determine whether the treatment effect meets expectations; If the treatment effect does not meet expectations, the treatment plan adjustment mechanism will be triggered to optimize the parameters and logic of the treatment plan through the optimization algorithm; Redeploy the optimized processing solution into the service process and continuously monitor the execution effect until the processing effect reaches the expected level or the problem is solved, forming a closed-loop solution optimization mechanism to continuously improve service quality and efficiency.

9. The method according to claim 1, It is characterized in that The above-mentioned evaluation of the allocation of resources, equipment and personnel for community nursing services, and the discovery of unreasonable allocation through data analysis, and the dynamic adjustment of the allocation of resources, equipment and personnel according to the service quality and project turnover forecast results to ensure the quality and efficiency of services, including: Through the service resource management system, the configuration data of resources, equipment and personnel of community nursing services are obtained and the configuration data set is constructed; Use data mining algorithms to analyze configuration data, identify patterns and features of unreasonable configurations, and form a configuration optimization rule base; Taking the service quality prediction results and project turnover prediction results as input, a resource, equipment and personnel demand prediction model is established through machine learning algorithms; According to the demand forecasting model, forecast the demand for resources, equipment and personnel for each service project in the future and generate a dynamic demand matrix; Compare the dynamic demand matrix with the current configuration data, solve the optimal configuration plan of resources, equipment and personnel through optimization algorithm, and generate configuration adjustment plan; If the difference between the configuration adjustment plan and the current configuration exceeds the preset threshold, the dynamic adjustment process of resources, equipment and personnel is triggered, and adjustment tasks and instructions are automatically generated; Through the task scheduling system, the adjustment tasks are broken down into a series of executable operations, and tasks are automatically allocated and executed according to priorities and dependencies, achieving dynamic optimization of resources, equipment and personnel, and continuously ensuring service quality and efficiency.