Smart industrial park monitoring safety management method, system, electronic equipment and medium
By obtaining user repair information and electronic maps, it can quickly locate and handle abnormal cameras, solving the problem of low maintenance efficiency of abnormal cameras in large smart industrial parks, and achieving rapid maintenance and safety monitoring.
Patent Information
- Application Number
- CN202410816895.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-06-24
AI Technical Summary
In large smart industrial parks, when the cameras in the surveillance system are abnormal, it is difficult for maintenance personnel to quickly locate and deal with them, resulting in long maintenance times, low efficiency, and the need for the cooperation of multiple people.
By obtaining user repair information and electronic maps, we can quickly locate abnormal cameras, obtain video data to determine abnormal situations, and formulate maintenance plans based on the situation, including backup cameras and linkage cameras, to optimize the maintenance process.
It improves maintenance efficiency, shortens maintenance time, reduces the impact on the production process, reduces maintenance costs, and improves monitoring safety.
Smart Images

Figure CN118396598B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of industrial park monitoring, and in particular to a smart industrial park monitoring safety management method, system, electronic equipment and medium. Background Art
[0002] In large-scale smart industrial parks, monitoring systems are of vital importance. A large number of video points are scattered all over the place, and the density is gradually increasing. When the camera image of a certain video point is detected to be abnormal, maintenance personnel are required to quickly perform repairs to reduce the impact on the production process and reduce safety hazards.
[0003] At present, when a camera monitoring a certain video point has an abnormality, the staff will feedback the repair information, and the maintenance personnel will repair the abnormal camera according to the repair information. However, it is difficult for the maintenance personnel to determine the unique video point through the user's repair information, and it still requires the cooperation of multiple people to complete it. In addition, the maintenance plan cannot be determined quickly based on the repair information, which makes the maintenance time long and the efficiency low. Summary of the invention
[0004] In order to improve maintenance efficiency, the present application provides a smart industrial park monitoring safety management method, system, electronic equipment and medium.
[0005] In the first aspect, the present application provides a smart industrial park monitoring and safety management method, which adopts the following technical solutions:
[0006] A smart industrial park monitoring safety management method, comprising:
[0007] Obtaining user repair information and an electronic map, wherein the user repair information includes an affected device, and the affected device is a device corresponding to a picture taken by an abnormal camera;
[0008] Determine an abnormal camera based on the user repair information and the electronic map;
[0009] Obtaining video data of the abnormal camera;
[0010] determining an abnormal condition based on the video data;
[0011] A maintenance plan is determined based on the abnormal situation, and the maintenance plan includes a backup camera, a linkage camera, and a maintenance method.
[0012] By adopting the above technical solution, the abnormal camera can be quickly located through the user's repair information and electronic map, and the abnormal situation can be quickly determined through the video data of the abnormal camera, and a maintenance plan can be determined based on the abnormal situation, so that maintenance personnel can perform maintenance as soon as possible according to the maintenance plan, and maintenance according to the maintenance method shortens the maintenance time and effectively improves maintenance efficiency.
[0013] Optionally, the determining the abnormal camera based on the user repair information and the electronic map includes:
[0014] Searching for a first camera from the electronic map, where the first camera is a camera at a preset distance from the affected device;
[0015] Acquire first video data of the first camera;
[0016] Performing image recognition on the first video data to determine whether there is an abnormality;
[0017] The first camera corresponding to the first video data having an abnormality is determined as an abnormal camera.
[0018] By adopting the above technical solution, it is possible to more conveniently find a camera that may have an abnormality, i.e., the first camera, according to the electronic map, thereby effectively narrowing the possible range of abnormal cameras, and identifying the first video data of the first camera, so that the abnormal camera can be determined. When determining the abnormal camera, it is not necessary for multiple people to cooperate, which effectively improves the efficiency of determining the abnormal camera, thereby improving the maintenance efficiency.
[0019] Optionally, determining an abnormal situation based on the video data includes:
[0020] Identify the video data and determine the fault type;
[0021] Determine a first fault cause based on the fault type and a preset rule;
[0022] Obtain historical maintenance records;
[0023] Determining the last maintenance time and the last maintenance situation based on the historical maintenance records;
[0024] Determine a second fault cause based on the last maintenance time, the last maintenance situation, and the first fault cause;
[0025] An abnormal condition is determined based on the fault type and the second fault cause.
[0026] By adopting the above technical solution, the first fault cause is determined by the fault type and preset rules, and the first fault cause is screened again according to the last maintenance time and the last maintenance situation to obtain the second fault cause, that is, the cause that is more likely to cause the fault, thereby shortening the time for maintenance personnel to find the cause of the fault, thereby improving maintenance efficiency.
[0027] Optionally, before determining a maintenance plan based on the abnormal situation, the method further includes:
[0028] Acquire first equipment and production tasks in the industrial park, where the first equipment refers to all equipment in the industrial park;
[0029] Determine a second device based on the production task, where the second device is the device required for the production task;
[0030] determining a first importance level of the first device based on a first level association, the first device including the second device;
[0031] determining a second importance level of the second equipment based on the second level association and the production task;
[0032] adjusting the importance level of the second device based on the first importance level and the second importance level;
[0033] Determine the critical location based on the criticality level of the device and the location of the device;
[0034] The important positions are combined to obtain a plurality of important areas, and backup cameras are installed in the important areas.
[0035] By adopting the above technical solution, instead of installing a backup camera for each camera at each video point, important areas are determined according to the equipment and task conditions, and backup cameras are only installed in important areas, thereby reducing the cost of backup cameras. In addition, when cameras in important areas have abnormalities or failures, real-time monitoring can also be carried out.
[0036] Optionally, determining a maintenance plan based on the abnormal situation includes:
[0037] Determine a first monitoring area based on the abnormal camera;
[0038] Determine an important area that overlaps with the first monitoring area as a first important area;
[0039] Determining the overlap between the first important area and the first monitoring area;
[0040] sorting the first important areas based on the overlap;
[0041] Determine the first important area whose ranking is in the front preset position and whose overlap degree is greater than the preset overlap degree as the second monitoring area;
[0042] Sending a start instruction to the backup camera corresponding to the second monitoring area;
[0043] determining the total area formed by the second monitoring area as a backup monitoring area;
[0044] Compare the backup monitoring area with the first monitoring area to obtain a linkage monitoring area, wherein the linkage monitoring area is an area included in the first monitoring area but not included in the backup monitoring area;
[0045] Determine linkage cameras based on the monitorable area of cameras in the industrial park;
[0046] Send a linkage instruction to the linkage camera.
[0047] By adopting the above technical solution, the backup camera that needs to be activated is determined through the first monitoring area of the abnormal camera and the important area where the backup camera is installed, the area that cannot be covered by the backup camera is determined as the linkage monitoring area, and a suitable linkage camera is found in the linkage monitoring area, so that the linkage camera and the backup camera can complete temporary monitoring of the first monitoring area, thereby improving the security of monitoring.
[0048] Optionally, determining the linked cameras based on the monitorable area of the cameras in the industrial park includes:
[0049] Determine the camera in the monitorable area including the linkage monitoring area as the first candidate linkage camera;
[0050] If there are multiple first candidate linkage cameras, obtaining the importance level of the device corresponding to the first candidate linkage camera, where the device corresponding to the first candidate linkage camera is the device included in the picture captured by the first candidate linkage camera;
[0051] Determine the first candidate linkage camera corresponding to the device with the lowest importance level as the linkage camera;
[0052] If the first candidate linkage camera does not exist, a camera whose monitorable area overlaps with the linkage monitoring area is determined as a second candidate linkage camera;
[0053] Combining the second candidate linkage cameras to obtain a plurality of candidate linkage camera combinations, each of the candidate linkage camera combinations including at least two of the second candidate linkage cameras;
[0054] Merging the monitorable areas corresponding to the second candidate linkage camera in the candidate linkage camera combination to obtain a plurality of merged monitoring areas;
[0055] The combined monitoring area completely covers the linkage monitoring area, and the candidate linkage camera combination with the least number of the second candidate linkage cameras is determined as the linkage combination;
[0056] The second candidate linkage camera corresponding to the linkage combination is determined as the linkage camera.
[0057] By adopting the above technical solution, if there are multiple first alternative linkage cameras, the linkage camera is determined according to the importance level of the equipment corresponding to the first alternative linkage camera, thereby reducing the impact of the linkage process on the original. If there is no first alternative linkage camera, the second alternative linkage camera is determined according to the monitorable area, and the second alternative linkage camera is selected as the linkage camera as little as possible, thereby also reducing the impact on the original.
[0058] Optionally, determining a maintenance plan based on the abnormal situation includes:
[0059] Determine the fault type and fault cause based on the abnormal situation;
[0060] Obtain maintenance personnel information;
[0061] Determine the number of maintenance personnel based on the association between the fault type, the fault cause and the preset number of maintenance personnel;
[0062] Determine a first maintenance personnel based on the number of maintenance personnel, the preset maintenance rules and the maintenance personnel information, where the first maintenance personnel is the maintenance personnel for this fault;
[0063] Obtain maintenance suggestions based on the fault type and the fault cause, wherein the maintenance suggestions include equipment to be used;
[0064] A maintenance method is generated based on the maintenance personnel and the maintenance suggestion.
[0065] By adopting the above technical solution, maintenance personnel are selected according to the preset number of maintenance personnel and preset maintenance rules, and maintenance suggestions are provided to the maintenance personnel, which shortens the time for selecting maintenance personnel and the time for maintenance personnel to perform maintenance, thereby improving maintenance efficiency.
[0066] In the second aspect, the present application provides a smart industrial park monitoring and safety management system, which adopts the following technical solutions:
[0067] A smart industrial park monitoring and safety management system, comprising:
[0068] A first acquisition module is used to acquire user repair information and an electronic map, wherein the user repair information includes an affected device, and the affected device is a device corresponding to a picture taken by an abnormal camera;
[0069] An abnormality determination module, used for determining abnormal cameras based on the user repair information and the electronic map;
[0070] A second acquisition module is used to acquire video data of the abnormal camera;
[0071] a situation determination module, configured to determine an abnormal situation based on the video data;
[0072] A plan determination module is used to determine a maintenance plan based on the abnormal situation, and the maintenance plan includes a backup camera, a linkage camera and a maintenance method.
[0073] By adopting the above technical solution, the abnormal camera can be quickly located through the user's repair information and electronic map, and the abnormal situation can be quickly determined through the video data of the abnormal camera, and a maintenance plan can be determined based on the abnormal situation, so that maintenance personnel can perform maintenance as soon as possible according to the maintenance plan, and maintenance according to the maintenance method shortens the maintenance time and effectively improves maintenance efficiency.
[0074] In a third aspect, the present application provides an electronic device, which adopts the following technical solution:
[0075] An electronic device comprises a processor, wherein the processor is coupled to a memory;
[0076] The memory stores a computer program that can be loaded by the processor and execute the smart industrial park monitoring and safety management method described in any one of the first aspects.
[0077] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution:
[0078] A computer-readable storage medium stores a computer program that can be loaded by a processor and execute the smart industrial park monitoring and safety management method described in any one of the first aspects. BRIEF DESCRIPTION OF THE DRAWINGS
[0079] Figure 1 It is a flow chart of a smart industrial park monitoring safety management method provided in an embodiment of the present application.
[0080] Figure 2 It is a structural block diagram of a smart industrial park monitoring and safety management system provided in an embodiment of the present application.
[0081] Figure 3 It is a structural block diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0082] The present application is further described in detail below in conjunction with the accompanying drawings.
[0083] The embodiment of the present application provides a smart industrial park monitoring safety management method, which can be executed by an electronic device, which can be a server or a terminal device, wherein the server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server providing cloud computing services. The terminal device can be a smart phone, a tablet computer, a desktop computer, etc., but is not limited thereto.
[0084] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0085] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.
[0086] like Figure 1 As shown, a smart industrial park monitoring safety management method, the main process of the method is described as follows (steps S101 to S105):
[0087] Step S101, obtaining user repair information and electronic map.
[0088] Among them, the user's repair report information includes the affected equipment, which is the equipment corresponding to the abnormal camera shooting picture. The electronic map includes the location of each camera and the distribution of each equipment in the industrial park.
[0089] In this embodiment, user repair information is obtained from each user, and an electronic map is obtained from a database.
[0090] Step S102: determine abnormal cameras based on the user's repair report information and the electronic map.
[0091] After obtaining the user's repair report information, the abnormal camera is searched from the electronic map according to the user's repair report information and the location of the abnormal camera is determined.
[0092] Specifically, the abnormal camera is determined based on the user's repair report information and the electronic map, including: searching for a first camera from the electronic map, where the first camera is a camera at a preset distance from the affected device; obtaining first video data of the first camera; performing image recognition on the first video data to determine whether there is an abnormality; and determining the first camera corresponding to the first video data with the abnormality as the abnormal camera.
[0093] In this embodiment, a first area is determined by the affected device, and the first area is an area with the affected device as the center and a preset distance as the radius, wherein the preset distance is set according to actual conditions and is not specifically limited here. The first area is marked in the electronic map, and the camera in the first area is determined as the first camera, that is, the camera that may have an abnormality. The first video data of the first camera is obtained from the database, and image recognition is performed on the first video data through a preset image recognition model to determine whether there is an abnormality, wherein the preset image recognition model is not specifically limited here. If there is an abnormality, the first camera corresponding to the first video data is determined as the abnormal camera, and the location of the abnormal camera can be quickly known from the electronic map, so that maintenance personnel can reach the location as soon as possible for maintenance.
[0094] Step S103: Acquire video data of the abnormal camera.
[0095] The video data of the abnormal camera is obtained from the database to facilitate the subsequent determination of the abnormal situation.
[0096] Step S104: determine abnormal conditions based on the video data.
[0097] Specifically, determining abnormal conditions based on video data includes: identifying video data to determine the type of fault; determining a first fault cause based on the fault type and preset rules; obtaining historical maintenance records; determining the last maintenance time and the last maintenance situation based on the historical maintenance records; determining the second fault cause based on the last maintenance time, the last maintenance situation and the first fault cause; determining the abnormal condition based on the fault type and the second fault cause.
[0098] In this embodiment, the video data is identified by a preset fault identification model to obtain the fault type, wherein the preset fault identification model is not specifically limited here, and a preset rule is obtained from a database, wherein the preset rule is a correspondence between the fault type and the fault cause, so the first fault cause can be determined by the fault type and the preset rule, the first fault cause is the cause that may cause the fault type, the historical maintenance record is obtained from the database, and the historical maintenance record corresponding to the abnormal camera is searched from the historical maintenance record, so that the last maintenance time and the last maintenance situation of the abnormal camera can be determined, the last maintenance situation includes the fault type, the fault cause and the maintenance method, the first interval duration between the last maintenance time and the current time is calculated, and the correspondence between the fault cause and the interval duration is obtained from the database, because some fault causes will not occur again in a short time, so some possible fault causes can be eliminated through the first interval duration of this time, so as to determine the second fault cause, that is, the first fault cause includes the second fault cause, and the fault type and the second fault cause are jointly determined as an abnormal situation.
[0099] Step S105: Determine a maintenance plan based on the abnormal situation.
[0100] The maintenance plan includes backup cameras, linkage cameras, and maintenance methods.
[0101] When an abnormality occurs, the abnormal camera cannot monitor the smart industrial park well. At this time, other cameras (backup cameras and / or linkage cameras) are needed to complete the monitoring, so as to reduce the impact of the abnormality and take appropriate maintenance methods to carry out maintenance as soon as possible.
[0102] Specifically, before determining a maintenance plan based on the abnormal situation, the method also includes: obtaining a first equipment and a production task in the industrial park, the first equipment being all equipment in the industrial park; determining a second equipment based on the production task, the second equipment being the equipment required for the production task; determining a first importance level of the first equipment based on a first-level association, the first equipment including the second equipment; determining a second importance level of the second equipment based on a second-level association and the production task; adjusting the importance level of the second equipment based on the first importance level and the second importance level; determining an important location based on the importance level of the equipment and the location of the equipment; combining the important locations to obtain a plurality of important areas, wherein backup cameras are installed in the important areas.
[0103] In this embodiment, the corresponding conditions of all equipment in the industrial park and the production tasks are obtained from the management personnel or the database. For the convenience of description, all equipment are expressed as first equipment, and the equipment required for the production task is determined as second equipment, that is, the second equipment is part of the first equipment.
[0104] The first level association and the second level association are obtained from the database. The first level association is the corresponding association relationship between the equipment and the importance level, and the second level association is the corresponding association relationship between the production task and the importance level. The first importance level of each first equipment is determined by the first level association, and the second importance level of each production task is determined by the second level association, and the second importance level of the production task is determined as the second importance level of the corresponding second equipment. At this time, the second equipment has both the first importance level and the second importance level. There are three levels for both the first importance level and the second importance level, namely, level I, level II and level III. Each level has a corresponding level score. The score obtained by the level score corresponding to the first importance level * the first weight + the level score corresponding to the second importance level * the second weight is determined as the equipment score. The first weight and the second weight are preset, and the specific values are not specifically limited here. The corresponding relationship between the equipment score and the importance level is obtained from the database, so the final importance level of each second equipment can be determined by the equipment score. The importance level of the equipment other than the second equipment in the first equipment is the corresponding first importance level. Among them, there are also three levels of importance, namely, level I, level II and level III.
[0105] The positions corresponding to the equipment with the importance level of level I are determined as important positions, and the important positions are marked on the electronic map. The distance between every two important positions is calculated, and two positions with a distance less than a preset distance are divided into a combination to obtain multiple combinations. There can be multiple positions in each combination, but for each position, the distance with other positions in the combination must be less than the preset distance. The multiple positions in each combination are connected on the electronic map, and the area surrounded by the connection line is determined as the important area. Similarly, there may be only one position in the combination, and the area with the position as the center and the preset distance as the radius is determined as the important area, and the important area is sent to the staff so that the staff can install a backup camera in the important area, wherein the preset distance is determined according to the shooting situation of the backup camera, for example: it can be the shooting distance of the backup camera.
[0106] When determining important areas, the industrial park can also be divided into several small areas according to preset division rules, and small areas where there are equipment with importance level I can be determined as important areas, and backup cameras can be installed. The preset division rules are pre-set and are not specifically limited here.
[0107] Specifically, determining a maintenance plan based on an abnormal situation includes: determining a first monitoring area based on an abnormal camera; determining an important area that overlaps with the first monitoring area as the first important area; determining the degree of overlap between the first important area and the first monitoring area; sorting the first important area based on the degree of overlap; determining the first important area that has a ranking in front of a preset ranking and a degree of overlap greater than a preset degree of overlap as the second monitoring area; sending a start instruction to a backup camera corresponding to the second monitoring area; determining the total area formed by the second monitoring area as the backup monitoring area; comparing the backup monitoring area with the first monitoring area to obtain a linkage monitoring area, which is an area included in the first monitoring area but not included in the backup monitoring area; determining a linkage camera based on the monitorable area of the camera in the industrial park; and sending a linkage instruction to the linkage camera.
[0108] In this embodiment, when a camera fails, a suitable backup camera is first found and enabled. For the linked monitoring area that the backup camera cannot monitor, the linked camera is started to monitor, so that the backup camera and the linked camera can jointly complete the monitoring of the first monitoring area, reducing the impact of the failure.
[0109] The specific steps are: determine the area monitored by the abnormal camera as the first monitoring area, determine the important area that overlaps with the first monitoring area as the first important area, calculate the area of the overlapping part of the first important area and the first monitoring area and the area of the first monitoring area according to the pixel counting method, and calculate the degree of overlap by the formula, the formula is: degree of overlap = area of the overlapping part / area of the first monitoring area, sort the first important areas from high to low according to the degree of overlap, and determine the first important area with a preset ranking in the front and a degree of overlap greater than the preset overlap as the second monitoring area, wherein the preset ranking and the preset degree of overlap are pre-set and are not specifically limited here, send a start command to the backup camera corresponding to the second monitoring area, and when multiple backup cameras are started, determine the total area formed by multiple second monitoring areas as the backup monitoring area.
[0110] The first monitoring area that is not included in the backup monitoring area is determined as the linkage monitoring area, and the linkage camera is determined by the monitorable area of the camera in the industrial park and the linkage monitoring area, and a linkage instruction is sent to the linkage camera. The linkage instruction is a camera rotation instruction, so that the linkage camera can capture the picture of the original monitoring area of the camera and the picture of the linkage monitoring area. Similarly, there can be one or more linkage cameras.
[0111] Specifically, the linkage camera is determined based on the monitorable area of the camera in the industrial park, including: determining the camera whose monitorable area includes the linkage monitoring area as the first alternative linkage camera; if there are multiple first alternative linkage cameras, obtaining the importance level of the equipment corresponding to the first alternative linkage camera, and the equipment corresponding to the first alternative linkage camera is the equipment included in the shooting picture of the first alternative linkage camera; determining the first alternative linkage camera corresponding to the equipment with the lowest importance level as the linkage camera; if there is no first alternative linkage camera, determining the camera whose monitorable area overlaps with the linkage monitoring area as the second alternative linkage camera; combining the second alternative linkage cameras to obtain multiple alternative linkage camera combinations, each alternative linkage camera combination includes at least two second alternative linkage cameras; merging the monitorable areas corresponding to the second alternative linkage cameras in the alternative linkage camera combination to obtain multiple merged monitoring areas; determining the alternative linkage camera combination whose merged monitoring area completely covers the linkage monitoring area and has the least number of second alternative linkage cameras as the linkage combination; and determining the second alternative linkage camera corresponding to the linkage combination as the linkage camera.
[0112] In this embodiment, a camera that completely covers the linked monitoring area in the monitorable area is determined as the first alternative linked camera. There may be only one first alternative linked camera. If there is only one first alternative linked camera, the first alternative linked camera is determined as the linked camera. There may also be multiple first alternative linked cameras. If there are multiple first alternative linked cameras, the importance level of the device corresponding to the first alternative linked camera is obtained. The method for determining the importance level of the device has been explained above and will not be repeated here. The first alternative linked camera corresponding to the device with the lowest importance level is determined as the linked camera. At this time, the number of linked cameras is 1. If the first alternative linked camera corresponds to multiple devices, the device with the highest importance level among the multiple devices is determined as the device corresponding to the first alternative linked camera.
[0113] If the first alternative linkage camera does not exist, the camera whose monitorable area overlaps with the linkage monitoring area is determined as the second alternative linkage camera, and the second alternative linkage cameras are combined according to the exhaustive method to obtain multiple alternative linkage camera combinations, and the number of second alternative linkage cameras in each alternative linkage camera combination is greater than or equal to 2. The monitorable areas corresponding to the second alternative linkage cameras in the alternative linkage camera combinations are merged to obtain multiple merged monitoring areas, and each alternative linkage camera combination corresponds to a merged monitoring area. The alternative linkage camera combinations are screened, and the corresponding merged monitoring areas completely cover the linkage monitoring area, and the alternative linkage camera combination with the least number of second alternative linkage cameras is determined as the linkage combination, and the second alternative linkage camera corresponding to the linkage combination is determined as the linkage camera. At this time, the number of linkage cameras is greater than or equal to 2.
[0114] Specifically, determining a maintenance plan based on the abnormal situation includes: determining the fault type and the cause of the fault based on the abnormal situation; obtaining maintenance personnel information; determining the number of maintenance personnel based on the association between the fault type, the fault cause and the preset number of maintenance personnel; determining the first maintenance personnel based on the number of maintenance personnel, preset maintenance rules and the maintenance personnel information, the first maintenance personnel being the maintenance personnel for this fault; obtaining maintenance suggestions based on the fault type and the cause of the fault, the maintenance suggestions including equipment to be used; generating maintenance methods based on the maintenance personnel and the maintenance suggestions.
[0115] The maintenance plan not only includes starting the backup camera or linkage camera for temporary monitoring, but also requires arranging maintenance personnel to repair the abnormal camera as soon as possible.
[0116] In this embodiment, the fault type and the fault cause (i.e., the second fault cause mentioned above) are found from the abnormal situation, and the maintenance personnel information is obtained from the database. Different numbers of maintenance personnel are arranged to perform maintenance for different fault types and fault causes, thereby improving the maintenance efficiency and the maintenance accuracy. The preset number of maintenance personnel association is obtained from the database. The preset number of maintenance personnel association is the relationship between the fault type and the fault cause and the number of maintenance personnel. The preset number of maintenance personnel association is determined according to the historical maintenance records, so that the number of maintenance personnel required this time can be determined according to the fault type and the fault cause this time.
[0117] A preset maintenance rule is obtained from a database. The preset maintenance rule is a correspondence between the number of maintenance personnel and the maintenance personnel grade. The maintenance personnel information includes the maintenance personnel grade and the current status. The current status includes the working status and the resting status. A number of maintenance personnel who are in a working status and whose maintenance personnel grade meets the preset maintenance rule are selected from the maintenance personnel. The selected maintenance personnel are determined as the first maintenance personnel. Maintenance suggestions are obtained from a fault maintenance resource library according to the fault type and the fault cause. The maintenance suggestions include equipment to be used, that is, equipment that may be used for this maintenance, to reduce the possibility that the maintenance personnel will not carry sufficient equipment, thereby increasing the maintenance time. The maintenance suggestion also includes maintenance steps. The first maintenance personnel and the maintenance suggestion for this time are jointly determined as a maintenance method. The first maintenance personnel performs fault repair according to the maintenance method, which effectively shortens the maintenance time and improves the maintenance efficiency.
[0118] After each fault repair, a maintenance record will be obtained from the maintenance personnel. The AI analysis model will automatically extract useful information, such as maintenance methods, and store the information in the fault repair resource library, thereby improving the fault repair resource library. Among them, the AI analysis model is a pre-trained model and is not specifically limited here.
[0119] Figure 2 A structural block diagram of a smart industrial park monitoring and safety management system 200 provided in an embodiment of the present application.
[0120] like Figure 2 As shown, the smart industrial park monitoring and safety management system 200 mainly includes:
[0121] The first acquisition module 201 is used to acquire user repair information and an electronic map, wherein the user repair information includes an affected device, and the affected device is a device corresponding to the abnormal camera shooting picture;
[0122] An abnormality determination module 202, used to determine abnormal cameras based on user repair information and electronic maps;
[0123] The second acquisition module 203 is used to acquire video data of the abnormal camera;
[0124] A situation determination module 204, for determining an abnormal situation based on the video data;
[0125] The plan determination module 205 is used to determine a maintenance plan based on the abnormal situation, and the maintenance plan includes a backup camera, a linkage camera, and a maintenance method.
[0126] As an optional implementation of this embodiment, the abnormality determination module 202 is also specifically used to determine the abnormal camera based on the user's repair information and the electronic map, including: searching for the first camera from the electronic map, the first camera being a camera at a preset distance from the affected device; obtaining the first video data of the first camera; performing image recognition on the first video data to determine whether there is an abnormality; and determining the first camera corresponding to the first video data with the abnormality as the abnormal camera.
[0127] As an optional implementation of this embodiment, the situation determination module 204 is also specifically used to determine abnormal situations based on video data, including: identifying video data to determine the fault type; determining the first fault cause based on the fault type and preset rules; obtaining historical maintenance records; determining the last maintenance time and the last maintenance situation based on the historical maintenance records; determining the second fault cause based on the last maintenance time, the last maintenance situation and the first fault cause; determining the abnormal situation based on the fault type and the second fault cause.
[0128] As an optional implementation of this embodiment, the plan determination module 205 is also specifically used to, before determining the maintenance plan based on the abnormal situation, also include: obtaining the first equipment and production tasks in the industrial park, the first equipment being all the equipment in the industrial park; determining the second equipment based on the production task, the equipment required for the second equipment production task; determining the first importance level of the first equipment based on the first level association, the first equipment includes the second equipment; determining the second importance level of the second equipment based on the second level association and the production task; adjusting the importance level of the second equipment based on the first importance level and the second importance level; determining important locations based on the importance level of the equipment and the location of the equipment; combining the important locations to obtain multiple important areas, and backup cameras are installed in the important areas.
[0129] As an optional implementation of this embodiment, the plan determination module 205 is also specifically used to determine a maintenance plan based on abnormal conditions, including: determining a first monitoring area based on an abnormal camera; determining an important area that overlaps with the first monitoring area as a first important area; determining the degree of overlap between the first important area and the first monitoring area; sorting the first important area based on the degree of overlap; determining a first important area that is ranked in a front preset position and has a degree of overlap greater than a preset degree of overlap as a second monitoring area; sending a start instruction to a backup camera corresponding to the second monitoring area; determining the total area formed by the second monitoring area as a backup monitoring area; comparing the backup monitoring area with the first monitoring area to obtain a linkage monitoring area, which is an area included in the first monitoring area but not included in the backup monitoring area; determining a linkage camera based on the monitorable area of the camera in the industrial park; and sending a linkage instruction to the linkage camera.
[0130] As an optional implementation of this embodiment, the plan determination module 205 is also specifically used to determine the linkage camera based on the monitorable area of the camera in the industrial park, including: determining the camera whose monitorable area includes the linkage monitoring area as the first alternative linkage camera; if there are multiple first alternative linkage cameras, obtaining the importance level of the equipment corresponding to the first alternative linkage camera, and the equipment corresponding to the first alternative linkage camera is the equipment included in the shooting picture of the first alternative linkage camera; determining the first alternative linkage camera corresponding to the equipment with the lowest importance level as the linkage camera; if there is no first alternative linkage camera, determining the camera whose monitorable area overlaps with the linkage monitoring area as the second alternative linkage camera; combining the second alternative linkage cameras to obtain multiple alternative linkage camera combinations, each alternative linkage camera combination includes at least two second alternative linkage cameras; merging the monitorable areas corresponding to the second alternative linkage cameras in the alternative linkage camera combination to obtain multiple merged monitoring areas; determining the alternative linkage camera combination whose merged monitoring area completely covers the linkage monitoring area and has the least number of second alternative linkage cameras as the linkage combination; and determining the second alternative linkage camera corresponding to the linkage combination as the linkage camera.
[0131] As an optional implementation of this embodiment, the plan determination module 205 is also specifically used to determine a maintenance plan based on abnormal conditions, including: determining the fault type and fault cause based on the abnormal conditions; obtaining maintenance personnel information; determining the number of maintenance personnel based on the association between the fault type, the fault cause and the preset number of maintenance personnel; determining the first maintenance personnel based on the number of maintenance personnel, preset maintenance rules and maintenance personnel information, the first maintenance personnel being the maintenance personnel for this fault; obtaining maintenance suggestions based on the fault type and fault cause, the maintenance suggestions including equipment to be used; generating maintenance methods based on the maintenance personnel and maintenance suggestions.
[0132] In one example, the module in any of the above devices can be one or more integrated circuits configured to implement the above methods, such as: one or more application specific integrated circuits (ASICs), or, one or more digital signal processors (DSPs), or, one or more field programmable gate arrays (FPGAs), or a combination of at least two of these integrated circuit forms.
[0133] For another example, when the modules in the device can be implemented in the form of a processing element scheduling program, the processing element can be a general-purpose processor, such as a central processing unit (CPU) or other processor that can call a program. For another example, these modules can be integrated together and implemented in the form of a system-on-a-chip (SOC).
[0134] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the above-described devices and modules can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0135] Figure 3 A structural block diagram of an electronic device 300 provided in an embodiment of the present application.
[0136] like Figure 3 As shown, the electronic device 300 includes a processor 301 and a memory 302 , and may further include an information input / information output (I / O) interface 303 , one or more of a communication component 304 , and a communication bus 305 .
[0137] The processor 301 is used to control the overall operation of the electronic device 300 to complete all or part of the steps of the above-mentioned smart industrial park monitoring safety management method; the memory 302 is used to store various types of data to support the operation of the electronic device 300, and these data may include, for example, instructions for any application or method used to operate on the electronic device 300, and data related to the application. The memory 302 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, EPROM), programmable read-only memory (Programmable Read-Only Memory, PROM), read-only memory (Read-Only Memory, ROM), magnetic memory, flash memory, magnetic disk or optical disk. One or more.
[0138] The I / O interface 303 provides an interface between the processor 301 and other interface modules, and the above-mentioned other interface modules can be keyboards, mice, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 304 is used for wired or wireless communication between the electronic device 300 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 304 can include: Wi-Fi components, Bluetooth components, NFC components.
[0139] The electronic device 300 can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the smart industrial park monitoring and safety management method given in the above embodiment.
[0140] The communication bus 305 may include a path to transmit information between the above components. The communication bus 305 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. The communication bus 305 may be divided into an address bus, a data bus, a control bus, etc.
[0141] The electronic device 300 may include, but is not limited to, mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc., and may also be servers, etc.
[0142] The present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned smart industrial park monitoring and safety management method are implemented.
[0143] The computer-readable storage medium may include: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.
[0144] The terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus.
[0145] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of application involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned application concept. For example, the above features are replaced with (but not limited to) technical features with similar functions applied in the present application.
Claims
1. A smart industrial park monitoring safety management method, characterized in that: include: Obtaining user repair information and an electronic map, wherein the user repair information includes an affected device, and the affected device is a device corresponding to a picture taken by an abnormal camera; Determine an abnormal camera based on the user repair information and the electronic map; Obtaining video data of the abnormal camera; determining an abnormal condition based on the video data; Determine a maintenance plan based on the abnormal situation, the maintenance plan including a backup camera, a linkage camera, and a maintenance method; Before determining a maintenance plan based on the abnormal situation, the method further includes: Acquire first equipment and production tasks in the industrial park, where the first equipment refers to all equipment in the industrial park; Determine a second device based on the production task, where the second device is the device required for the production task; determining a first importance level of the first device based on a first level association, the first device including the second device; determining a second importance level of the second equipment based on the second level association and the production task; adjusting the importance level of the second device based on the first importance level and the second importance level; Determine the critical location based on the criticality level of the device and the location of the device; Combining the important positions to obtain a plurality of important areas, wherein backup cameras are installed in the important areas; The determining of a maintenance plan based on the abnormal situation comprises: Determine a first monitoring area based on the abnormal camera; Determine an important area overlapping with the first monitoring area as a first important area; Determining the overlap between the first important area and the first monitoring area; sorting the first important areas based on the overlap; Determine the first important area whose ranking is in the front preset position and whose overlap degree is greater than the preset overlap degree as the second monitoring area; Sending a start instruction to the backup camera corresponding to the second monitoring area; determining a total area formed by the second monitoring area as a backup monitoring area; Comparing the backup monitoring area with the first monitoring area to obtain a linkage monitoring area, wherein the linkage monitoring area is an area included in the first monitoring area but not included in the backup monitoring area; Determine linkage cameras based on the monitorable area of cameras in the industrial park; Sending a linkage instruction to the linkage camera; The method of determining the linked cameras based on the monitorable area of the cameras in the industrial park includes: Determine the camera in the monitorable area including the linkage monitoring area as the first candidate linkage camera; If there are multiple first candidate linkage cameras, obtaining the importance level of the device corresponding to the first candidate linkage camera, where the device corresponding to the first candidate linkage camera is the device included in the picture captured by the first candidate linkage camera; Determine the first candidate linkage camera corresponding to the device with the lowest importance level as the linkage camera; If the first candidate linkage camera does not exist, a camera whose monitorable area overlaps with the linkage monitoring area is determined as a second candidate linkage camera; Combining the second candidate linkage cameras to obtain a plurality of candidate linkage camera combinations, each of the candidate linkage camera combinations including at least two of the second candidate linkage cameras; Merging the monitorable areas corresponding to the second candidate linkage camera in the candidate linkage camera combination to obtain a plurality of merged monitoring areas; The combined monitoring area completely covers the linkage monitoring area, and the candidate linkage camera combination with the least number of the second candidate linkage cameras is determined as the linkage combination; The second candidate linkage camera corresponding to the linkage combination is determined as the linkage camera.
2. The method according to claim 1, characterized in that The determining of abnormal cameras based on the user repair information and the electronic map includes: Searching for a first camera from the electronic map, where the first camera is a camera at a preset distance from the affected device; Acquire first video data of the first camera; Performing image recognition on the first video data to determine whether there is an abnormality; The first camera corresponding to the first video data having an abnormality is determined as an abnormal camera.
3. The method according to claim 1, characterized in that The determining of an abnormal situation based on the video data comprises: Identify the video data and determine the fault type; Determine a first fault cause based on the fault type and a preset rule; Obtain historical maintenance records; Determining the last maintenance time and the last maintenance situation based on the historical maintenance records; Determine a second fault cause based on the last maintenance time, the last maintenance situation, and the first fault cause; An abnormal condition is determined based on the fault type and the second fault cause.
4. The method according to claim 1, characterized in that: The determining of a maintenance plan based on the abnormal situation comprises: Determine the fault type and fault cause based on the abnormal situation; Obtain maintenance personnel information; Determine the number of maintenance personnel based on the association between the fault type, the fault cause and the preset number of maintenance personnel; Determine a first maintenance personnel based on the number of maintenance personnel, the preset maintenance rules and the maintenance personnel information, where the first maintenance personnel is the maintenance personnel for this fault; Obtain maintenance suggestions based on the fault type and the fault cause, wherein the maintenance suggestions include equipment to be used; A maintenance method is generated based on the maintenance personnel and the maintenance suggestion.
5. A smart industrial park monitoring and safety management system, the smart industrial park monitoring and safety management system executes the smart industrial park monitoring and safety management method according to claim 1, characterized in that: include: A first acquisition module is used to acquire user repair information and an electronic map, wherein the user repair information includes an affected device, and the affected device is a device corresponding to a picture taken by an abnormal camera; An abnormality determination module, used for determining abnormal cameras based on the user repair information and the electronic map; A second acquisition module is used to acquire video data of the abnormal camera; a situation determination module, configured to determine an abnormal situation based on the video data; A plan determination module is used to determine a maintenance plan based on the abnormal situation, and the maintenance plan includes a backup camera, a linkage camera and a maintenance method.
6. An electronic device, characterized in that: comprising a processor coupled to a memory; The processor is configured to execute a computer program stored in the memory, so that the electronic device executes the method according to any one of claims 1 to 4.
7. A computer-readable storage medium, characterized in that: The method comprises a computer program or an instruction, which, when executed on a computer, causes the computer to execute the method according to any one of claims 1 to 4.
Citation Information
Cited By
Smart park safety monitoring management platform
CN120782244A