Through the transmission line design and planning method of the GIS platform, the geological safety, convenience and efficiency are screened to optimize the transmission line, which solves the problems of insufficient geological safety, convenience and environmental efficiency in the existing technology, and improves the safety and efficiency of the transmission line. Effectiveness, reducing costs and health risks, achieving a win-win situation for the economy and the environment.

CN118469074BActive Publication Date: 2024-10-08TAIZHOU JINGDAO ELECTRIC POWER ENG CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410592995.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2024-10-08
Estimated Expiration
2044-05-14

AI Technical Summary

Technical Problem

Existing transmission line design and planning methods have deficiencies in geological safety, construction convenience, and environmental benefits. They fail to fully consider geological disaster risks, altitude effects, and environmental impacts, resulting in increased safety risks, high construction costs, and increased health risks for residents. .

Method used

Using the GIS platform, by screening geologically safe transmission lines, evaluating construction convenience and efficiency, calculating geological disaster risk coefficient, altitude flatness and transportation convenience, economic benefit index and environmental benefit index, the optimal transmission line is selected to improve Reliability and effectiveness of design planning.

Benefits of technology

It improves the geological safety and construction efficiency of transmission lines, reduces construction and maintenance costs, reduces residents' health risks, achieves a win-win situation of economic and environmental benefits, and enhances the stability and social acceptance of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118469074B_ABST
    Figure CN118469074B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of transmission line design and planning, and specifically discloses a transmission line design and planning method using a GIS platform, the method comprising: geological safety transmission line screening, construction convenience assessment, construction efficiency assessment and optimal transmission line confirmation; the invention selects the optimal transmission line from the three aspects of geological safety, construction convenience and construction efficiency, thereby improving the stability and safety of the power grid, reducing the impact of geological disasters on power grid operation, reducing residents' resistance to power grid construction, and reducing residents' health risks, improving residents' quality of life, achieving a win-win situation of economic and environmental benefits, and enhancing the social acceptance of power grid projects, providing strong support for the sustainable development of the local economy, and selecting the optimal transmission line plan through systematic analysis and evaluation, providing strong technical support and decision-making basis for power grid construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power transmission line design and planning, and in particular to a power transmission line design and planning method using a GIS platform. Background Art

[0002] In the process of transmission line design and planning, it is necessary to comprehensively consider multiple factors such as terrain, landform, environment, and power demand. Traditional design and planning methods are often based on manual calculations and drawing, which are inefficient and difficult to fully consider various factors. With the development of geographic information system (GIS) technology, its application in power line design and planning is becoming more and more extensive. Therefore, in order to meet the needs of modern power engineering design, it is necessary to analyze the design and planning of transmission lines based on GIS.

[0003] The existing analysis methods for the design and planning of GIS-based transmission lines still have the following problems: 1. At the geological safety level, currently only whether there are risky geological types in the transmission line, such as cliffs, river valleys, etc., are considered, and the occurrence of geological disasters in the area where the towers in the transmission line are located is not considered, which increases the safety risk of the transmission line and reduces the reliability of the geological safety analysis of the transmission line, thus having a serious impact on people's normal life and production activities.

[0004] 2. In terms of construction convenience, currently only the convenience of surrounding transportation is considered during the construction of transmission lines, without considering whether the altitude of the transmission lines is flat, that is, the impact of the altitude of the transmission lines on the construction convenience is not considered. If the area where the transmission lines pass through is at a high altitude, this will increase the labor intensity and construction risks of the construction workers. At the same time, the construction period in high-altitude areas may also be longer, thereby increasing the total construction cost. After the transmission lines are built, if the altitude of the areas they pass through is high and the terrain is complex, maintenance will also become difficult.

[0005] 3. In terms of construction effectiveness, currently only the economic benefits of construction are taken into consideration, and the environmental benefits are not taken into consideration. That is, the electromagnetic impact of transmission lines on residents' living environment increases residents' health risks and reduces their quality of life. At the same time, environmental benefits are an important part of sustainable development. If we only pursue economic benefits and ignore environmental benefits, it may hinder the process of sustainable development and fail to achieve a win-win situation of economic and environmental benefits. Summary of the invention

[0006] In view of this, in order to solve the problems raised in the above background technology, a transmission line design and planning method based on a GIS platform is proposed.

[0007] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides a transmission line design and planning method with the help of a GIS platform, comprising the following steps: S1, geologically safe transmission line screening: extracting each preset transmission line in the target transmission line planning area and the location of each tower in each preset transmission line and the corresponding historical geological disaster information in the surrounding area, and extracting the geological type of each line section corresponding to each preset transmission line from the target GIS platform, screening out various geologically safe transmission lines, and naming them as target transmission lines.

[0008] S2. Construction convenience assessment: randomly select sampling points in each target transmission line, extract the altitude of each sampling point in each target transmission line from the target GIS platform, and collect the number of transportation roads and the road type of each transportation road corresponding to the location of each tower in each target transmission line, assess the construction convenience of each target transmission line, and screen out the transmission lines with convenient construction through comparative analysis.

[0009] S3. Construction effectiveness evaluation: extract the preset investment amount in the target transmission line planning area and the total length of the transmission lines corresponding to each construction-convenient transmission line, collect the residential information corresponding to the surrounding areas of each tower in each construction-convenient transmission line, and evaluate the construction effectiveness of each construction-convenient transmission line.

[0010] S4. Confirmation of the optimal transmission line: Extract the construction-convenient transmission line corresponding to the maximum construction benefit from the construction benefits of each construction-convenient transmission line, use it as the optimal transmission line in the target transmission line planning area, and provide feedback on the optimal transmission line.

[0011] Specifically, the historical geological disaster information includes the number of geological disasters and the time points corresponding to the occurrence of each disaster.

[0012] Specifically, the specific process of screening out various geologically safe transmission lines is as follows: A1. Compare the geological type of each line section corresponding to each preset transmission line with the risk geological type set stored in the database. If the geological type of a line section corresponding to a preset transmission line is within the risk geological type set, then the preset transmission line is recorded as a risky transmission line, and the risky transmission lines are eliminated, and the remaining preset transmission lines are recorded as reference transmission lines.

[0013] A2. Extract the number of geological disasters and the corresponding time points of each disaster from the historical geological disaster information, and calculate the geological disaster risk coefficient ζ of each reference transmission line i , where i represents the number of the reference transmission line, i=1,2,...,n.

[0014] A3. Compare the geological hazard risk factor of each reference transmission line with the set reference geological hazard risk factor. If the geological hazard risk factor of a reference transmission line is less than the set reference geological hazard risk factor, then the reference transmission line is recorded as a geological safety transmission line, thereby obtaining various geological safety transmission lines.

[0015] Specifically, the specific process of calculating the geological disaster risk coefficient of each reference transmission line is as follows: B1. Record the number of geological disasters occurring on each reference transmission line as β i .

[0016] B2. Subtract the time points corresponding to the occurrence of each disaster on each reference transmission line from each other to obtain the interval duration corresponding to the occurrence of each disaster on each reference transmission line, recorded as T i .

[0017] B3. Calculate the geological disaster risk factor of each reference transmission line Among them, β′ and T′ represent the number of geological disasters and the interval duration set as the reference, respectively; a1 and a2 represent the weights of the geological disaster risk assessment corresponding to the number of geological disasters and the interval duration set, respectively; a1+a2=1; and e represents a natural constant.

[0018] Specifically, in the process of evaluating the construction convenience of each target transmission line, it is necessary to construct and analyze the construction convenience coefficient of each target transmission line. The specific analysis process is: C1. Based on the altitude of each sampling point in each target transmission line, calculate the altitude flatness ξ of each target transmission line. j , where j represents the number of the target transmission line, j=1,2,...,m.

[0019] C2. Calculate the traffic convenience of each target transmission line based on the number of transportation roads corresponding to the location of each tower in each target transmission line and the road type of each transportation road j .

[0020] C3. Calculate the construction convenience coefficient χ of each target transmission line j , Among them, a3 and a4 represent the weights of the construction convenience assessment corresponding to the set altitude flatness and transportation convenience, respectively, a3+a4=1.

[0021] Specifically, the specific process of calculating the altitude flatness of each target transmission line is as follows: D1. Record the altitude of each sampling point in each target transmission line as H jr , where r represents the number of the sampling point, r = 1, 2, ..., g.

[0022] D2. Extract the maximum and minimum values ​​from the altitude of each sampling point in each target transmission line, and subtract the maximum and minimum values ​​to obtain the altitude difference of each target transmission line, recorded as △H. j .

[0023] D3. Calculate the altitude flatness ξ of each target transmission line j , Among them, H j(r+1) represents the altitude of the r+1th sampling point in the jth target transmission line, △H′ and △H 落 They represent the altitude deviation and altitude difference of the set reference respectively.

[0024] Specifically, the specific process of calculating the traffic convenience of each target transmission line is as follows: E1. The number of transportation roads corresponding to the location of each tower in each target transmission line is recorded as ε jp , where p represents the number of the tower in the target transmission line, p = 1, 2, ..., q.

[0025] E2. Compare the road types of each transport road corresponding to the location of each tower in each target transmission line with the important level transport road types stored in the database, count the number of important level transport roads corresponding to the location of each tower in each target transmission line, and record it as μ jp .

[0026] E3. Calculate the traffic convenience of each target transmission line ω j , Among them, ε′ and K represent the number of reference transport roads and the proportion of important-level transport roads, respectively; a5 and a6 represent the weights of the set number of transport roads and the proportion of important-level transport roads corresponding to the proportion of traffic convenience assessment, respectively; a5+a6=1; q represents the number of towers in the target transmission line.

[0027] Specifically, the residential information includes the number of residential communities and the center point location of each residential community.

[0028] Specifically, in the process of evaluating the construction benefits of each convenient transmission line, it is necessary to construct and analyze the construction benefit index of each convenient transmission line. The specific analysis process is: F1. The preset investment amount in the target transmission line planning area and the total length of the transmission line corresponding to each convenient transmission line are respectively recorded as τ 预 and L y , where y represents the number of the convenient transmission line for construction, y=1,2,...,z.

[0029] F2. Extract the required investment amount corresponding to the unit transmission line length from the database and record it as τ0.

[0030] F3. Calculate the economic benefit index θ of each convenient transmission line y , Among them, △τ represents the deviation of the investment amount set as a reference.

[0031] F4. Extract the number of residential communities and the center point of each residential community from the residential information corresponding to the surrounding areas of each tower in each conveniently constructed transmission line, and calculate the environmental benefit index ψ of each conveniently constructed transmission line y .

[0032] F5. Calculate the construction benefit index δ of each convenient transmission line y , Among them, a7 and a8 represent the weights of the construction benefit assessment corresponding to the set economic benefit index and environmental benefit index respectively, a7+a8=1.

[0033] Specifically, the specific process of calculating the environmental benefit index of each conveniently constructed transmission line is as follows: G1. The number of residential communities corresponding to the surrounding areas of each tower in each conveniently constructed transmission line is recorded as σ yx , where x represents the number of the tower in the construction-convenient transmission line, x=1,2,...,f.

[0034] G2. Compare the location of each tower in each convenient transmission line with the center point of each residential area corresponding to the surrounding area, obtain the distance between each tower in each convenient transmission line and each residential area, and calculate the average value to obtain the average distance between each tower in each convenient transmission line and the residential area, recorded as L yx .

[0035] G3. Calculate the environmental benefit index of each convenient transmission line construction ψ y , Among them, σ′ and L′ represent the number of residential communities and the distance between residential communities for reference, respectively; b1 and b2 represent the weights of environmental benefit assessment corresponding to the number of residential communities and the distance between residential communities, respectively; b1+b2=1; and f represents the number of towers in the construction of convenient transmission lines.

[0036] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects: (1) The present invention selects the optimal transmission line from the three aspects of geological safety, construction convenience and construction efficiency, thereby improving the reliability of the optimal transmission line confirmation, improving the stability and safety of the power grid, reducing the impact of geological disasters on power grid operations, reducing residents' resistance to power grid construction, enhancing the social acceptance of power grid projects, reducing operation and maintenance costs, improving the overall operation efficiency of the power grid, and providing strong support for the sustainable development of the local economy.

[0037] (2) The present invention selects geologically safe transmission lines from two perspectives: whether there are risky geological types in the transmission lines and the occurrence of geological disasters in the area where the towers are located. This reduces the safety risks of the transmission lines, improves the reliability of the geological safety analysis of the transmission lines, and thus reduces the impact on people's normal life and production activities.

[0038] (3) The present invention evaluates the construction convenience of each target transmission line from two perspectives: whether the surrounding traffic is convenient during the construction of the transmission line and whether the altitude of the transmission line is flat. It selects the transmission lines with convenient construction, thereby reducing the labor intensity and construction risks of construction personnel. At the same time, the construction period in areas with flat altitudes may also be shorter, thereby reducing the total construction cost. After the transmission line is built, the subsequent maintenance difficulty is reduced.

[0039] (4) The present invention evaluates the construction efficiency of each convenient transmission line from the perspectives of economic benefits and environmental benefits, thereby reducing health risks to residents, improving their quality of life, and achieving a win-win situation in economic and environmental benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0041] Figure 1 The figure is a schematic flow chart of the steps of the method of the present invention. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] See also Figure 1As shown, the present invention provides a transmission line design and planning method with the aid of a GIS platform, including: S1, geologically safe transmission line screening: extracting each preset transmission line in the target transmission line planning area and the location of each tower in each preset transmission line and the corresponding historical geological disaster information in the surrounding area, and extracting the geological type of each line section corresponding to each preset transmission line from the target GIS platform, screening out various geologically safe transmission lines, and naming them as target transmission lines.

[0044] It should be noted that the locations of each preset transmission line in the target transmission line planning area and each tower in each preset transmission line are extracted from the planning file of the target transmission line planning area.

[0045] In a specific embodiment of the present invention, the historical geological disaster information includes the number of geological disasters and the time points corresponding to the occurrence of each disaster.

[0046] It should be noted that the number of geological disasters occurring in the surrounding areas corresponding to each tower in each preset transmission line and the time point corresponding to each disaster are extracted from the disaster prevention and treatment center in the planning area of ​​the target transmission line.

[0047] In a specific embodiment of the present invention, the geological types include but are not limited to plateaus, plains, mountains, cliffs, valleys, lakes and rivers.

[0048] In a specific embodiment of the present invention, the specific process of screening out various geologically safe transmission lines is as follows: A1. Compare the geological type of each line section corresponding to each preset transmission line with the risk geological type set stored in the database. If the geological type of a line section corresponding to a preset transmission line is within the risk geological type set, then the preset transmission line is recorded as a risky transmission line, and the risky transmission lines are eliminated, and the remaining preset transmission lines are recorded as reference transmission lines.

[0049] A2. Extract the number of geological disasters and the corresponding time points of each disaster from the historical geological disaster information, and calculate the geological disaster risk coefficient of each reference transmission line Wherein, i represents the number of the reference transmission line, i=1,2,...,n.

[0050] In a specific embodiment of the present invention, the specific process of calculating the geological disaster risk factor of each reference transmission line is as follows: B1, the number of geological disasters occurring in each reference transmission line is recorded as β i .

[0051] B2. Subtract the time points corresponding to the occurrence of each disaster on each reference transmission line from each other to obtain the interval duration corresponding to the occurrence of each disaster on each reference transmission line, recorded as Ti .

[0052] B3. Calculate the geological disaster risk factor of each reference transmission line Among them, β′ and T′ represent the number of geological disasters and the interval duration set as the reference, respectively; a1 and a2 represent the weights of the geological disaster risk assessment corresponding to the number of geological disasters and the interval duration set, respectively; a1+a2=1; and e represents a natural constant.

[0053] In a specific embodiment of the present invention, the setting value of a1 is 0.5, and the setting value of a2 is 0.5.

[0054] A3. Compare the geological hazard risk factor of each reference transmission line with the set reference geological hazard risk factor. If the geological hazard risk factor of a reference transmission line is less than the set reference geological hazard risk factor, then the reference transmission line is recorded as a geological safety transmission line, thereby obtaining various geological safety transmission lines.

[0055] The embodiment of the present invention selects geologically safe transmission lines from two perspectives: whether there are risky geological types in the transmission lines and the occurrence of geological disasters in the area where the towers are located. This reduces the safety risks of the transmission lines, improves the reliability of the geological safety analysis of the transmission lines, and thus reduces the impact on people's normal life and production activities.

[0056] S2. Construction convenience assessment: randomly select sampling points in each target transmission line, extract the altitude of each sampling point in each target transmission line from the target GIS platform, and collect the number of transportation roads and the road type of each transportation road corresponding to the location of each tower in each target transmission line, assess the construction convenience of each target transmission line, and screen out the transmission lines with convenient construction through comparative analysis.

[0057] In a specific embodiment of the present invention, the road types include but are not limited to expressways, main roads, secondary roads and rural roads.

[0058] It should be noted that the number of transportation roads corresponding to the location of each tower in each target transmission line and the road type of each transportation road are collected from the traffic management data of the target transmission line planning area.

[0059] In a specific embodiment of the present invention, in the process of evaluating the construction convenience of each target transmission line, it is necessary to construct and analyze the construction convenience coefficient of each target transmission line. The specific analysis process is: C1. Based on the altitude of each sampling point in each target transmission line, calculate the altitude flatness ξ of each target transmission line. j, where j represents the number of the target transmission line, j=1,2,...,m.

[0060] In a specific embodiment of the present invention, the specific process of calculating the altitude flatness of each target transmission line is as follows: D1, the altitude of each sampling point in each target transmission line is recorded as H jr , where r represents the number of the sampling point, r = 1, 2, ..., g.

[0061] D2. Extract the maximum and minimum values ​​from the altitude of each sampling point in each target transmission line, and subtract the maximum and minimum values ​​to obtain the altitude difference of each target transmission line, recorded as △H. j .

[0062] D3. Calculate the altitude flatness ξ of each target transmission line j , Among them, H j(r+1) represents the altitude of the r+1th sampling point in the jth target transmission line, △H′ and △H 落 They represent the altitude deviation and altitude difference of the set reference respectively.

[0063] C2. Calculate the traffic convenience of each target transmission line based on the number of transportation roads corresponding to the location of each tower in each target transmission line and the road type of each transportation road j .

[0064] In a specific embodiment of the present invention, the specific process of calculating the traffic convenience of each target transmission line is as follows: E1, the number of transportation roads corresponding to the location of each tower in each target transmission line is recorded as ε jp , where p represents the number of the tower in the target transmission line, p = 1, 2, ..., q.

[0065] E2. Compare the road types of each transport road corresponding to the location of each tower in each target transmission line with the important level transport road types stored in the database, count the number of important level transport roads corresponding to the location of each tower in each target transmission line, and record it as μ jp .

[0066] In a specific embodiment of the present invention, the important level transportation road types include but are not limited to expressways and main roads.

[0067] E3. Calculate the traffic convenience of each target transmission line ω j , Among them, ε′ and K represent the number of reference transport roads and the proportion of important-level transport roads, respectively; a5 and a6 represent the weights of the set number of transport roads and the proportion of important-level transport roads corresponding to the proportion of traffic convenience assessment, respectively; a5+a6=1; q represents the number of towers in the target transmission line.

[0068] In a specific embodiment of the present invention, the setting value of a5 is 0.5, and the setting value of a6 is 0.5.

[0069] C3. Calculate the construction convenience coefficient χ of each target transmission line j , Among them, a3 and a4 represent the weights of the construction convenience assessment corresponding to the set altitude flatness and transportation convenience, respectively, a3+a4=1.

[0070] In a specific embodiment of the present invention, the setting value of a3 is 0.5, and the setting value of a4 is 0.5.

[0071] It should be noted that the specific process of selecting the convenient-to-construction transmission lines through comparative analysis is: comparing the construction convenience coefficient of each target transmission line with the set reference construction convenience coefficient; if the construction convenience coefficient of a target transmission line is greater than the set reference construction convenience coefficient, then the target transmission line is recorded as a convenient-to-construction transmission line, thereby obtaining various convenient-to-construction transmission lines.

[0072] The embodiment of the present invention evaluates the construction convenience of each target transmission line from two perspectives: whether the surrounding traffic is convenient during the construction of the transmission line and whether the altitude of the transmission line is flat. It selects the transmission lines with convenient construction, reduces the labor intensity and construction risks of the construction personnel, and at the same time, the construction period in the area with flat altitude may be shorter, thereby reducing the total construction cost. After the transmission line is built, the subsequent maintenance difficulty is reduced.

[0073] S3. Construction effectiveness evaluation: extract the preset investment amount in the target transmission line planning area and the total length of the transmission lines corresponding to each construction-convenient transmission line, collect the residential information corresponding to the surrounding areas of each tower in each construction-convenient transmission line, and evaluate the construction effectiveness of each construction-convenient transmission line.

[0074] It should be noted that the preset investment amount of the target transmission line planning area and the total length of the transmission lines corresponding to each convenient construction transmission line are extracted from the planning document of the target transmission line planning area.

[0075] In a specific embodiment of the present invention, the residential information includes the number of residential communities and the center point position of each residential community.

[0076] It should be noted that the number of residential communities corresponding to the surrounding areas of each tower in the construction-convenient transmission lines and the center point position of each residential community are collected from the residential management planning center in the target transmission line planning area.

[0077] In a specific embodiment of the present invention, in the process of evaluating the construction benefits of each convenient transmission line, it is necessary to construct and analyze the construction benefit index of each convenient transmission line. The specific analysis process is: F1, the preset investment amount of the target transmission line planning area and the total length of the transmission line corresponding to each convenient transmission line are respectively recorded as τ 预 and L y , where y represents the number of the convenient transmission line for construction, y=1,2,...,z.

[0078] F2. Extract the required investment amount corresponding to the unit transmission line length from the database and record it as τ0.

[0079] F3. Calculate the economic benefit index θ of each convenient transmission line y , Among them, △τ represents the deviation of the investment amount set as a reference.

[0080] F4. Extract the number of residential communities and the center point of each residential community from the residential information corresponding to the surrounding areas of each tower in each conveniently constructed transmission line, and calculate the environmental benefit index ψ of each conveniently constructed transmission line y .

[0081] In a specific embodiment of the present invention, the specific process of calculating the environmental benefit index of each conveniently constructed transmission line is as follows: G1. The number of residential communities corresponding to the surrounding areas of each tower in each conveniently constructed transmission line is recorded as σ yx , where x represents the number of the tower in the construction-convenient transmission line, x=1,2,...,f.

[0082] G2. Compare the location of each tower in each convenient transmission line with the center point of each residential area corresponding to the surrounding area, obtain the distance between each tower in each convenient transmission line and each residential area, and calculate the average value to obtain the average distance between each tower in each convenient transmission line and the residential area, recorded as L yx .

[0083] G3. Calculate the environmental benefit index of each convenient transmission line construction ψ y , Among them, σ′ and L′ represent the number of residential communities and the distance between residential communities for reference, respectively; b1 and b2 represent the weights of environmental benefit assessment corresponding to the number of residential communities and the distance between residential communities, respectively; b1+b2=1; and f represents the number of towers in the construction of convenient transmission lines.

[0084] In a specific embodiment of the present invention, the setting value of b1 is 0.5, and the setting value of b2 is 0.5.

[0085] F5. Calculate the construction benefit index δ of each convenient transmission line y , Among them, a7 and a8 represent the weights of the construction benefit assessment corresponding to the set economic benefit index and environmental benefit index respectively, a7+a8=1.

[0086] In a specific embodiment of the present invention, the setting value of a7 is 0.5, and the setting value of a8 is 0.5.

[0087] The embodiments of the present invention evaluate the construction benefits of each convenient transmission line from the two perspectives of economic benefits and environmental benefits, thereby reducing health risks to residents, improving their quality of life, and achieving a win-win situation in economic and environmental benefits.

[0088] S4. Confirmation of the optimal transmission line: Extract the construction-convenient transmission line corresponding to the maximum construction benefit from the construction benefits of each construction-convenient transmission line, use it as the optimal transmission line in the target transmission line planning area, and provide feedback on the optimal transmission line.

[0089] The embodiments of the present invention screen out the optimal transmission line from the three aspects of geological safety, construction convenience and construction efficiency, thereby improving the reliability of the optimal transmission line confirmation, improving the stability and safety of the power grid, reducing the impact of geological disasters on the operation of the power grid, reducing residents' resistance to power grid construction, enhancing the social acceptance of power grid projects, reducing operation and maintenance costs, improving the overall operation efficiency of the power grid, and providing strong support for the sustainable development of the local economy.

[0090] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.

Claims

1. A transmission line design and planning method using a GIS platform, characterized in that: The steps include: S1. Screening of geologically safe transmission lines: extract the locations of each preset transmission line and each tower in each preset transmission line in the target transmission line planning area and the corresponding historical geological disaster information in the surrounding area, and extract the geological type of each line section corresponding to each preset transmission line from the target GIS platform, screen out various geologically safe transmission lines, and name them as target transmission lines; S2. Construction convenience evaluation: randomly select sampling points in each target transmission line, extract the altitude of each sampling point in each target transmission line from the target GIS platform, collect the number of transportation roads corresponding to the location of each tower in each target transmission line and the road type of each transportation road, evaluate the construction convenience of each target transmission line, and select each construction-convenient transmission line through comparative analysis; S3. Construction benefit evaluation: extract the preset investment amount of the target transmission line planning area and the total length of the transmission line corresponding to each convenient construction transmission line, collect the residential information corresponding to the surrounding area of ​​each tower in each convenient construction transmission line, and evaluate the construction benefit of each convenient construction transmission line; S4. Confirmation of the optimal transmission line: Extract the construction-convenient transmission line corresponding to the maximum construction benefit from the construction benefits of each construction-convenient transmission line, use it as the optimal transmission line in the target transmission line planning area, and feedback the optimal transmission line; The specific process of screening out various geologically safe power transmission lines is as follows: A1. Compare the geological type of each line section corresponding to each preset transmission line with the risk geological type set stored in the database. If the geological type of a line section corresponding to a preset transmission line is within the risk geological type set, the preset transmission line is recorded as a risky transmission line, and the risky transmission lines are eliminated, and the remaining preset transmission lines are recorded as reference transmission lines; A2. Extract the number of geological disasters and the corresponding time points of each disaster from the historical geological disaster information, and calculate the geological disaster risk coefficient of each reference transmission line Wherein, i represents the number of the reference transmission line, i=1,2,...,n; A3. Compare the geological hazard risk factor of each reference transmission line with the geological hazard risk factor of the set reference. If the geological hazard risk factor of a reference transmission line is less than the geological hazard risk factor of the set reference, then the reference transmission line is recorded as a geological safety transmission line, thereby obtaining various geological safety transmission lines; The specific process of calculating the geological disaster risk factor of each reference transmission line is as follows: B1. The number of geological disasters occurring on each reference transmission line is recorded as β i ; B2. Subtract the time points corresponding to the occurrence of each disaster on each reference transmission line from each other to obtain the interval duration corresponding to the occurrence of each disaster on each reference transmission line, recorded as T i ; B3. Calculate the geological disaster risk factor of each reference transmission line Among them, β′ and T′ represent the number of geological disasters and the interval length of the reference respectively, a1 and a2 represent the weights of the geological disaster risk assessment corresponding to the number of geological disasters and the interval length of the reference respectively, a1+a2=1, and e represents a natural constant; In the process of evaluating the construction convenience of each target transmission line, it is necessary to construct and analyze the construction convenience coefficient of each target transmission line. The specific analysis process is as follows: C1. Calculate the altitude flatness ξ of each target transmission line based on the altitude of each sampling point in each target transmission line j , where j represents the number of the target transmission line, j = 1, 2, ..., m; C2. Calculate the traffic convenience of each target transmission line based on the number of transportation roads corresponding to the location of each tower in each target transmission line and the road type of each transportation road j ; C3. Calculate the construction convenience coefficient χ of each target transmission line j , Among them, a3 and a4 represent the weights of the construction convenience assessment corresponding to the set altitude flatness and transportation convenience, a3+a4=1; The specific process of calculating the altitude flatness of each target transmission line is as follows: D1. The altitude of each sampling point in each target transmission line is recorded as H jr , where r represents the number of the sampling point, r = 1, 2, ..., g; D2. Extract the maximum and minimum values ​​from the altitude of each sampling point in each target transmission line, and subtract the maximum and minimum values ​​to obtain the altitude difference of each target transmission line, recorded as ΔH. j ; D3. Calculate the altitude flatness ξ of each target transmission line j , Among them, H j(r+1) represents the altitude of the r+1th sampling point in the jth target transmission line, ΔH′ and ΔH 落 They represent the altitude deviation and altitude difference of the set reference respectively; The specific process of calculating the traffic convenience of each target transmission line is as follows: E1. The number of transportation roads corresponding to the location of each tower in each target transmission line is recorded as ε jp , where p represents the number of the tower in the target transmission line, p = 1, 2, ..., q; E2. Compare the road types of each transport road corresponding to the location of each tower in each target transmission line with the important level transport road types stored in the database, count the number of important level transport roads corresponding to the location of each tower in each target transmission line, and record it as μ jp ; E3. Calculate the traffic convenience of each target transmission line ω j , Among them, ε′ and K represent the number of reference transport roads and the proportion of important transport roads, respectively; a5 and a6 represent the weights of the set number of transport roads and the proportion of important transport roads corresponding to the proportion of traffic convenience assessment, respectively; a5+a6=1; q represents the number of towers in the target transmission line; In the process of evaluating the construction benefits of each convenient transmission line, it is necessary to construct and analyze the construction benefit index of each convenient transmission line. The specific analysis process is as follows: F1. The preset investment amount in the target transmission line planning area and the total length of the transmission lines corresponding to each convenient transmission line are recorded as τ 预 and L y , where y represents the number of the transmission line for convenient construction, y = 1, 2, ..., z; F2, extract the required investment amount corresponding to the unit transmission line length from the database and record it as τ0; F3. Calculate the economic benefit index θ of each convenient transmission line y , Among them, Δτ represents the deviation of the investment amount set as reference; F4. Extract the number of residential communities and the center point of each residential community from the residential information corresponding to the surrounding areas of each tower in each conveniently constructed transmission line, and calculate the environmental benefit index ψ of each conveniently constructed transmission line y ; F5. Calculate the construction benefit index δ of each convenient transmission line y , Among them, a7 and a8 represent the weights of the economic benefit index and environmental benefit index corresponding to the construction benefit assessment, a7+a8=1; The specific process of calculating the environmental benefit index of each construction-convenient transmission line is as follows: G1. The number of residential communities corresponding to the surrounding areas of each tower in each convenient transmission line is recorded as σ yx , where x represents the number of the tower in the construction-convenient transmission line, x=1,2,...,f; G2. Compare the location of each tower in each convenient transmission line with the center point of each residential area corresponding to the surrounding area, obtain the distance between each tower in each convenient transmission line and each residential area, and calculate the average value to obtain the average distance between each tower in each convenient transmission line and the residential area, recorded as L yx ; G3. Calculate the environmental benefit index of each convenient transmission line construction ψ y , Among them, σ′ and L′ represent the number of residential communities and the distance between residential communities for reference, respectively; b1 and b2 represent the weights of environmental benefit assessment corresponding to the number of residential communities and the distance between residential communities, respectively; b1+b2=1; and f represents the number of towers in the construction of convenient transmission lines.

2. The method for designing and planning a power transmission line using a GIS platform according to claim 1, characterized in that: The historical geological disaster information includes the number of geological disasters and the time points corresponding to the occurrence of each disaster.

3. The method for designing and planning a power transmission line using a GIS platform according to claim 1, characterized in that: The residential information includes the number of residential communities and the center point location of each residential community.

Citation Information

Patent Citations

  • Subarea assessment and early warning method and system of geological disasters of power transmission lines

    CN109243145A

  • Power transmission line path selection method considering geological disasters

    CN112465247A

  • Smart city power transmission line planning method based on artificial intelligence

    CN114418215A