A multi-platform collaborative intelligent office management system

Through the multi-platform collaborative intelligent office management system, project information and natural language processing tools are used to screen out matching approvers, solving the problem of complex corporate project approval processes and improving office efficiency.

CN118469489BActive Publication Date: 2024-10-18JIANGSU YUEDA NETWORK TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410588177.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-13
Publication Date
2024-10-18
Estimated Expiration
2044-05-13

AI Technical Summary

Technical Problem

In the existing technology, the enterprise project approval process is complex and lengthy, and the approver is not familiar with the project business, resulting in unnecessary steps and severely limiting office efficiency.

Method used

Design a multi-platform collaborative intelligent office management system. Through project information collection, project scale determination, project type determination and approver simplification modules, historical project information and pending project information are used to screen out matching approvers and simplify the approval process. The system includes a project information collection module, a project scale determination module, a project type determination module and an approver simplification module. It uses natural language processing tools to obtain keyword feature vectors, calculates semantic similarity and matching index, and recommends the most matching approver.

Benefits of technology

It simplifies the approval process, improves office efficiency, and ensures that the approver has a full understanding of the project, thus reducing unnecessary steps and time and improving the efficiency of project approval.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118469489B_ABST
    Figure CN118469489B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of data management, and specifically discloses a multi-platform collaborative intelligent office management system, comprising the following modules: a project information acquisition module: obtaining an enterprise's historical projects, approvers' historical participating projects and pending projects, and respectively obtaining project information of the historical projects, the historical participating projects and the pending projects; a project scale determination module: obtaining the average cycle and the average budget according to the project cycles and project budgets of all historical projects; then obtaining the project scale index of the pending projects and the participating project scale index of the approvers; a project type determination module: extracting keywords from the project profiles of the historical participating projects and the pending projects respectively, converting them into text vectors, and obtaining the semantic similarity of the historical text vectors and the approval text vectors; an approver simplification module: obtaining the matching index between the pending projects and the approvers, setting a threshold for the number of approvers, and selecting recommended approvers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data management, and in particular to a multi-platform collaborative intelligent office management system. Background Art

[0002] Office management refers to the process of planning, organizing, coordinating and controlling various activities within the office to ensure the efficient operation of the office; office management involves many aspects, including personnel management, material management, information management, financial management, environmental management, etc.

[0003] Information management in office management includes communication and coordination. Communication and coordination is mainly to ensure effective communication within the office and with other departments, including document communication, process approval communication, etc., to promote teamwork and information sharing, achieve efficient use of information resources, and ensure work efficiency.

[0004] In the prior art, the project approval process within an enterprise often adopts fixed approval links or approvers for approval; however, for different projects, the project types are different, the project involves different fields, and the approvers have different understandings of the projects. Some approvers are not familiar with the business involved in the project, but still approve according to the original fixed approval process, resulting in a complex and lengthy approval process, which often contains unnecessary steps, greatly limiting office efficiency. Summary of the invention

[0005] The purpose of the present invention is to provide a multi-platform collaborative intelligent office management system to solve the above technical problems.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] A multi-platform collaborative intelligent office management system, including the following modules:

[0008] Project information collection module: obtain the enterprise's historical projects, the approver's historical participation projects and pending approval projects, and obtain the project information of the historical projects, historical participation projects and pending approval projects respectively; the project information includes project cycle, project budget and project introduction;

[0009] Project scale determination module: Based on the project cycle and project budget of all historical projects, the average cycle T0 and average budget B0 are obtained respectively; then the project scale index of the project to be approved is obtained Where T and B are the project cycle and project budget of the project to be approved respectively;

[0010] According to the project cycle and project budget of all historical projects participated by the approver, the average participation cycle T' and the average participation budget B' are obtained respectively, and the scale index of the approved project participation is obtained.

[0011]

[0012] Project type determination module: extract keywords from the project profiles of historical participating projects and pending projects, record them as historical keywords and approval keywords; convert the historical keywords and approval keywords into text vectors, record them as historical text vectors and approval text vectors; obtain the cosine value of the angle between the historical text vector and the approval text vector, record them as semantic similarity S;

[0013] Approver simplification module: obtain the matching index MI between the project to be approved and the approver, where:

[0014] MI=λ-(|PSI-PSI′|+|1-S|);

[0015] Where λ is a preset constant; a threshold value n of the number of approvers is set, and the matching indexes of all approvers and the items to be approved are sorted from large to small, and the first n approvers are selected as recommended approvers for the items to be approved.

[0016] As a further solution of the present invention: the process of obtaining the project cycle includes:

[0017] When the project is a completed project, the start time and end time of the project are obtained, and the time period between the start time and the end time is recorded as the project cycle of the project;

[0018] When the project is an ongoing project, the start time and the estimated end time of the project are obtained, and the estimated end time is taken as the end time of the project. The time period between the start time and the end time is recorded as the project cycle of the project.

[0019] As a further solution of the present invention: the process of obtaining the project budget includes:

[0020] When the project is a completed project, obtain the total amount of funds invested by the enterprise from the start time to the end time of the project and record it as the project budget of the project;

[0021] When a project is ongoing, obtain the funds that the company expects to invest in the project at the beginning of the project and record it as the project budget.

[0022] As a further solution of the present invention: the process of obtaining the average period and the average budget includes:

[0023] Based on all historical projects, we can obtain the project cycle data set {T1, T2, ..., T m}, where T1 represents the project cycle of the first historical project, and m is the total number of historical projects; then the average cycle

[0024]

[0025] According to all historical projects, we can get the project budget data set {B1, B2, ..., B m}, where B1 represents the project budget of the first historical project; then the average budget

[0026] As a further solution of the present invention: a pre-trained language model based on the Transformer architecture is used to extract keywords in the project introduction, and the historical keywords and approval keywords are converted into text vectors.

[0027] As a further solution of the present invention: the process of obtaining the cosine value of the angle includes:

[0028] The historical text vector is recorded as The approval text vector is Where k is the dimension, and The angle between them is θ;

[0029] Then the cosine value of the angle between the historical text vector and the approval text vector is:

[0030]

[0031] As a further solution of the present invention: the process of setting the approval number threshold includes:

[0032] Set the standard number of people threshold, denoted as Sp, where Sp≥1, then the approval number threshold Wherein α is a preset coefficient and α>1.

[0033] As a further solution of the present invention: the selection process of the recommended approver includes:

[0034] After sorting the matching indexes of all approvers and the items to be approved, if the nth and n+1th matching indexes are the same, the semantic similarities between the historical participating projects of the approvers corresponding to the nth and n+1th matching indexes and the items to be approved are obtained, which are recorded as S n and S n+1 ;

[0035] Compare S n and S n+1 The size of , select the approver with greater semantic similarity as the nth recommended approver.

[0036] Beneficial effects of the present invention:

[0037] In the prior art, the project approval process within an enterprise often adopts fixed approval links or approvers for approval; for different projects, the fields involved in the projects are different, and the approvers have different understandings of the projects. Some approvers are not familiar with the business involved in the projects, but still approve them according to the original fixed approval process, resulting in a complex and lengthy approval process, which often contains unnecessary steps, greatly limiting office efficiency; compared with the prior art, the present invention measures the project scale of the pending projects based on the project information of the enterprise's historical projects and the project information of the pending projects with the average cycle and average budget of the historical projects; then, based on the approver's historical participation in the projects, the project scale of the approver's historical participation in the projects is measured with the average cycle and average budget of the historical projects; by comparing the project scales of the approver's historical participation in the projects and the pending projects, Approver can be screened out whose historical project scale is consistent with the scale of the project to be approved; and natural language processing tools are used to obtain the keywords of the project profile of the project to be approved, and the keywords of the project profile of the approver's historical project profile, to obtain the feature vectors of the keywords of both, and to obtain the semantic similarity of the two feature vectors, which is used to measure whether the project type of the approver's historical project is consistent with the project type of the project to be approved; combined with the project scale index and semantic similarity of the approver's historical project, determine whether it matches the project scale index and semantic similarity of the project to be approved; obtain the matching index of the two based on the difference between the project scale index and semantic similarity of the two; the higher the matching index between the approver and the project to be approved, the more matched the two are, and the approver can be screened according to the matching index to simplify the approval process and improve office efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] The present invention will be further described below in conjunction with the accompanying drawings.

[0039] Figure 1 It is a structural schematic diagram of a multi-platform collaborative intelligent office management system of the present invention. DETAILED DESCRIPTION

[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] See also Figure 1 As shown, the present invention is a multi-platform collaborative intelligent office management system, including the following modules:

[0042] Project information collection module: obtain the enterprise's historical projects, the approver's historical participation projects and pending approval projects, and obtain the project information of the historical projects, historical participation projects and pending approval projects respectively; the project information includes project cycle, project budget and project introduction;

[0043] The acquisition process of the project cycle includes:

[0044] When the project is a completed project, the start time and end time of the project are obtained, and the time period between the start time and the end time is recorded as the project cycle of the project;

[0045] When the project is an ongoing project, the start time and the estimated end time of the project are obtained, and the estimated end time is taken as the end time of the project, and the time period between the start time and the end time is recorded as the project cycle of the project;

[0046] The process of obtaining the project budget includes:

[0047] When the project is a completed project, obtain the total amount of funds invested by the enterprise from the start time to the end time of the project and record it as the project budget of the project;

[0048] When the project is an ongoing project, obtain the funds that the enterprise expects to invest in the project at the beginning of the project and record it as the project budget;

[0049] It should be further explained that the process of obtaining the project brief includes: the project brief is a document that describes the basic information, purpose, objectives, business scope, key milestones and expected results of the project, and provides an overall view of the project; in the early stage of project planning, the project brief is generally obtained through the following steps: project kick-off meeting, convening key stakeholders of the project, including project sponsors, potential users, project team members and other relevant personnel, to discuss the purpose, objectives and expected results of the project at the meeting; demand collection and analysis, one-on-one interviews or group discussions with stakeholders to collect their expectations and needs for the project, analyze business needs, technical needs and market needs to determine the scope and limitations of the project; market research and benchmark analysis, research market trends, competitors and industry standards to understand Understand the project's positioning in the market and compare the success factors and challenges of similar projects through benchmark analysis; Document review: Review existing project documents, historical records and case studies to obtain project background information and learn lessons from past projects so as to avoid the same mistakes in new projects; Goal setting: Based on the information collected, clarify the project goals (specific, measurable, achievable, relevant, and time-bound); Project scope definition: Determine the boundaries of the project, including the results that the project will deliver and what will not be included; Stakeholder consensus: Reach consensus with all key stakeholders to ensure that they have a common understanding and support for the content of the project brief; Project brief writing: Based on the above information, write a project brief, including project purpose, goals, expected results, key milestones, budget overview, risk assessment, etc.;

[0050] Project scale determination module: Based on the project cycle and project budget of all historical projects, the average cycle T0 and average budget B0 are obtained respectively; then the project scale index of the project to be approved is obtained Where T and B are the project cycle and project budget of the project to be approved respectively;

[0051] According to the project cycle and project budget of all historical projects participated by the approver, the average participation cycle T' and the average participation budget B' are obtained respectively, and the scale index of the approved project participation is obtained.

[0052]

[0053] It should be further explained that, based on the project information of the pending projects, the project scale of the pending projects is measured by the average cycle and average budget of historical projects; based on the historical projects participated by the approver, the project scale of the historical projects participated by the approver is measured by the average cycle and average budget of historical projects; by comparing the project scales of the historical projects participated by the approver and the pending projects, the approvers whose historical project scales are consistent with the scales of the pending projects can be screened out;

[0054] The process of obtaining the average period and the average budget includes:

[0055] Based on all historical projects, we can obtain the project cycle data set {T1, T2, ..., T m}, where T1 represents the project cycle of the first historical project, and m is the total number of historical projects; then the average cycle

[0056]

[0057] According to all historical projects, we can get the project budget data set {B1, B2, ..., B m}, where B1 represents the project budget of the first historical project; then the average budget

[0058] It can be understood that the project cycle represents the total workload required for project execution, usually in units of man-hours or man-days. The unit of the project cycle in the present invention is day. The longer the project cycle, the greater the workload and the larger the project scale. The project budget represents the total financial resources required for project execution, usually in units of currency (such as US dollars, RMB, etc.). The unit of the project budget in the present invention is RMB. The more the project budget, the more budget funds, and the larger the project scale.

[0059] It is worth noting that it is a common practice to measure the scale of a project based on the project cycle and project budget, because these two factors can usually reflect the complexity of the project and the amount of resources required; when the project cycle of the project to be approved is longer than the average cycle of the company's historical projects, the project cycle of the project to be approved is larger than the company's historical projects; similarly, when the project budget of the project to be approved is larger than the average budget of the company's historical projects, the project budget of the project to be approved is larger than the company's historical projects; the longer the project cycle, the larger the project budget, the larger the project scale index, and the larger the project scale of the project to be approved;

[0060] Project type determination module: extract keywords from the project profiles of historical participating projects and pending projects, record them as historical keywords and approval keywords; convert the historical keywords and approval keywords into text vectors, record them as historical text vectors and approval text vectors; obtain the cosine value of the angle between the historical text vector and the approval text vector, record them as semantic similarity S;

[0061] It should be further explained that the keywords of the project profile of the project to be approved are obtained by using natural language processing tools, and the keywords of the project profiles of the projects in which the approver has participated in the past are obtained, and the feature vectors of the keywords of the two are obtained, and the meaning similarity of the two feature vectors is obtained, which is used to measure whether the project type of the project in which the approver has participated in the past is consistent with the project type of the project to be approved;

[0062] Using a pre-trained language model based on the Transformer architecture to extract keywords in the project profile, and converting the historical keywords and approval keywords into text vectors;

[0063] The process of obtaining the cosine value of the angle includes:

[0064] The historical text vector is recorded as The approval text vector is Where k is the dimension, and The angle between them is θ;

[0065] Then the cosine value of the angle between the historical text vector and the approval text vector is:

[0066]

[0067] It can be understood that the pre-trained language model based on the Transformer architecture is a natural language processing tool, including BERT, RoBERTa, and GPT; the pre-trained language model usually includes two stages: the pre-training stage and the fine-tuning stage; in the pre-training stage, the model performs self-supervised learning through a large-scale text corpus. It tries to predict the next word of the input text or hides some words and requires the model to restore these words. Such self-supervised tasks help the model learn the potential structure and semantic information of the language; the pre-trained language model of the Transformer architecture usually uses a pre-training task called Masked Language Model (MLM), in which the model randomly masks some words in the input sentence and tries to predict these masked words; in the fine-tuning stage, the pre-trained language model is further adjusted to adapt to specific downstream tasks, such as text classification, named entity recognition, sentiment analysis, etc.; by fine-tuning on a specific task, the model can better adapt to the specific data and requirements of the task;

[0068] Approver simplification module: obtain the matching index MI between the project to be approved and the approver, where:

[0069] MI=λ-(|PSI-PSI′|+|1-S|);

[0070] Where λ is a preset constant; set the number of approvers threshold n, sort all approvers and the matching index of the items to be approved from large to small, and select the first n approvers as the recommended approvers of the items to be approved;

[0071] It should be further explained that λ is a constant, |PSI-PSI'| is the difference between the project scale index of the approver's historical participation project and the project scale index of the project to be approved, and |1-S| represents the semantic similarity between the project profile index of the approver's historical participation project and the project profile of the project to be approved. When the project profiles of the two are completely similar, the semantic similarity PSI = 1. Therefore, the smaller the difference between the semantic similarity of the project profiles of the two and 1, the higher the semantic similarity of the project profiles of the two; then, the smaller the difference between the project scale index of the approver's historical participation project and the project scale index of the project to be approved, the smaller the difference between the semantic similarity of the project profiles of the two and 1, the larger the matching index MI, and the more matching the approver and the project to be approved.

[0072] The process of setting the approval number threshold includes:

[0073] Set the standard number of people threshold, denoted as Sp, where Sp≥1, then the approval number threshold Where α is a preset coefficient and α>1;

[0074] It is worth noting that the setting of the standard number of people threshold ensures that there are at least a certain number of approvers, and the setting of the number of people threshold varies with the scale of the project. The larger the project scale, the more people the number of people threshold is set to.

[0075] The selection process of the recommended approver includes:

[0076] After sorting the matching indexes of all approvers and the items to be approved, if the nth and n+1th matching indexes are the same, the semantic similarities between the historical participating projects of the approvers corresponding to the nth and n+1th matching indexes and the items to be approved are obtained, which are recorded as S n and S n+1 ;

[0077] Compare S n and S n+1 The size of the approver is selected as the nth recommended approver;

[0078] It can be understood that, by combining the project scale index and semantic similarity of the approver's historical participation in the projects, it is determined whether the approver matches the project scale index and semantic similarity of the project to be approved; the matching index of the two is obtained based on the difference between the project scale index and semantic similarity of the two respectively; the higher the matching index between the approver and the project to be approved, the more matched the two are, and the approvers are screened according to the matching index to simplify the approval process and improve office efficiency.

[0079] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A multi-platform collaborative intelligent office management system, It is characterized in that Includes the following modules: Project information collection module: obtain the enterprise's historical projects, the approver's historical participation projects and pending approval projects, and obtain the project information of the historical projects, historical participation projects and pending approval projects respectively; the project information includes project cycle, project budget and project introduction; Project scale determination module: Based on the project cycle and project budget of all historical projects, the average cycle T 0 and average budget B 0 ; then obtain the project scale index of the project to be approved Where T and B are the project cycle and project budget of the project to be approved respectively; According to the project cycle and project budget of all historical projects participated by the approver, the average participation cycle T' and the average participation budget B' are obtained respectively, and the scale index of the approved project participation is obtained. Project type determination module: extract keywords from the project profiles of historical participating projects and pending projects, record them as historical keywords and approval keywords; convert the historical keywords and approval keywords into text vectors, record them as historical text vectors and approval text vectors; obtain the cosine value of the angle between the historical text vector and the approval text vector, record them as semantic similarity S; Approver simplification module: obtain the matching index MI between the project to be approved and the approver, where: MI=λ-(|PSI-PSI′|+|1-S|); Where λ is a preset constant; a threshold value n of the number of approvers is set, and the matching indexes of all approvers and the items to be approved are sorted from large to small, and the first n approvers are selected as recommended approvers for the items to be approved.

2. A multi-platform collaborative intelligent office management system according to claim 1, It is characterized in that The acquisition process of the project cycle includes: When the project is a completed project, the start time and end time of the project are obtained, and the time period between the start time and the end time is recorded as the project cycle of the project; When the project is an ongoing project, the start time and the estimated end time of the project are obtained, and the estimated end time is taken as the end time of the project. The time period between the start time and the end time is recorded as the project cycle of the project.

3. A multi-platform collaborative intelligent office management system according to claim 2, It is characterized in that The process of obtaining the project budget includes: When the project is a completed project, obtain the total amount of funds invested by the enterprise from the start time to the end time of the project and record it as the project budget of the project; When a project is ongoing, obtain the funds that the company expects to invest in the project at the beginning of the project and record it as the project budget.

4. A multi-platform collaborative intelligent office management system according to claim 1, It is characterized in that The process of obtaining the average period and the average budget includes: According to all historical projects, we get the project cycle data set {T 1 , T 2 , ..., T m }, where T 1 represents the project cycle of the first historical project, m is the total number of historical projects; then the average cycle Based on all historical projects, we get the project budget dataset {B 1 , B 2 , ..., B m }, where B 1 represents the project budget of the first historical project; then the average budget 5. A multi-platform collaborative intelligent office management system according to claim 1, It is characterized in that A pre-trained language model based on the Transformer architecture is used to extract keywords in the project introduction, and the historical keywords and approval keywords are converted into text vectors.

6. A multi-platform collaborative intelligent office management system according to claim 1, It is characterized in that The process of obtaining the cosine value of the angle includes: The historical text vector is recorded as The approval text vector is Where k is the dimension, and The angle between them is θ; Then the cosine value of the angle between the historical text vector and the approval text vector is:

7. A multi-platform collaborative intelligent office management system according to claim 1, It is characterized in that The process of setting the approval number threshold includes: Set the standard number of people threshold, denoted as Sp, where Sp≥1, then the approval number threshold Wherein α is a preset coefficient and α>

1.

8. The multi-platform collaborative intelligent office management system according to claim 1, It is characterized in that The selection process of the recommended approver includes: After sorting the matching indexes of all approvers and the items to be approved, if the nth and n+1th matching indexes are the same, obtain the semantic similarity between the historical participating projects of the approvers corresponding to the nth and n+1th matching indexes and the items to be approved, which are recorded as S n and S n+1 ; Compare S n and S n+1 The size of , select the approver with greater semantic similarity as the nth recommended approver.

Citation Information

Patent Citations

  • Intelligent project recommendation method, electronic device and storage medium

    CN110163476A

  • Intelligent project approval system and project approval method

    CN110400126A