A method, device, equipment and medium for formulating a power grid fault protection maintenance plan

Through the simulation of power grid fault data and prediction of associated network models, the fault handling process is optimized, the problem of low power grid fault identification and processing efficiency is solved, and the stability and response speed of the power grid are improved.

CN118504939BActive Publication Date: 2024-10-18STATE GRID ZHEJIANG ELECTRIC POWER CO LTD HANGZHOU POWER SUPPLY CO
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410954453.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-10-18
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

In power grid operation and maintenance, existing technologies are difficult to quickly and accurately identify and handle faults, resulting in prolonged maintenance processes and affecting power supply stability.

Method used

By obtaining historical fault data of power grid nodes, we can establish maintenance strategies, conduct fault simulation tests, use the correlation network model to predict the interaction and priority of fault nodes, and formulate emergency repair plans.

Benefits of technology

It improves the speed and accuracy of fault response, ensures the stability and reliability of the power grid, and guarantees normal production and life needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118504939B_ABST
    Figure CN118504939B_ABST
Patent Text Reader

Abstract

The present invention discloses a method, device, equipment and medium for formulating a power grid fault power protection maintenance plan, wherein the method includes obtaining historical fault data of each node in the power grid, establishing a maintenance strategy corresponding to the historical fault data; performing fault simulation tests based on the historical fault data and the maintenance strategy, and sequentially collecting the response data of the remaining non-target fault nodes when each maintenance strategy performs maintenance on the selected target fault node; inputting each response data into an associated network model for prediction, and obtaining the prediction result corresponding to the current target fault node; constructing a priority ranking of each target fault node based on the prediction result; and formulating a maintenance plan reflecting the maintenance order of the fault node in the real-time fault based on the priority ranking when a fault is detected. The present invention effectively integrates data analysis, prediction technology and modern communication tools, and improves the speed of responding to faults.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of information technology, and in particular to a method, device, equipment and medium for formulating a power grid failure power protection maintenance plan. Background Art

[0002] In the daily operation and maintenance of power systems, accurately identifying failure modes that may cause major interruptions is crucial to ensuring power supply stability, but it is an extremely challenging task.

[0003] In the actual operation of the power grid, after a fault occurs, the corresponding maintenance personnel will perform fixed-point maintenance on the faulty grid node. However, this process faces many challenges and considerations, which will prolong the maintenance process of the power grid. For example, in the existing technology, maintenance personnel need to first diagnose the cause and location of the fault, which requires manual operation using professional detection equipment. Once the location and cause of the fault are determined, maintenance personnel need to spend a lot of time to develop a detailed maintenance plan. For some emergency faults, such as large-scale power outages or equipment damage, the maintenance plan includes shutting down the affected part of the power grid, replacing or repairing damaged equipment, testing the repaired system, etc., in order to achieve a rapid response to the power grid fault and restore the normal operation of the power grid as soon as possible. Therefore, the formulation of the maintenance plan is crucial for power grid users. Summary of the invention

[0004] The present invention provides a method for formulating a power grid fault power protection maintenance plan to solve the technical problem of how to reasonably formulate a maintenance plan based on power grid data, so as to achieve the effect of improving the speed of responding to faults.

[0005] In order to solve the above technical problems, an embodiment of the present invention provides a method for formulating a power grid fault power supply maintenance plan, comprising:

[0006] Acquire historical fault data of each node in the power grid and establish a maintenance strategy corresponding to the historical fault data;

[0007] Performing a fault simulation test based on the historical fault data and the maintenance strategy, and sequentially collecting response data of the remaining non-target fault nodes when the selected target fault nodes are repaired according to each maintenance strategy;

[0008] Input each of the response data into a pre-built association network model for prediction, and obtain a prediction result corresponding to the current target fault node, wherein the prediction result reflects the interaction and synergy between the corresponding fault nodes in the power grid;

[0009] Based on all the prediction results, constructing a priority ranking of each target fault node in the power grid, wherein the priority ranking reflects the gradient level of the target fault node relative to the non-target fault node under the fault environment;

[0010] The power grid is monitored, and when an actual fault is detected, a power supply maintenance plan is formulated based on the priority ranking to repair the actual fault.

[0011] As one of the preferred solutions, the acquiring of historical fault data of each node in the power grid and establishing a maintenance strategy corresponding to the historical fault data includes:

[0012] Analyzing the historical fault data using a time series algorithm to identify fault modes that lead to significant outages in the power grid;

[0013] Design corresponding maintenance strategies for each failure mode.

[0014] As one preferred solution, the acquiring of historical fault data of each node in the power grid and establishing a maintenance strategy corresponding to the historical fault data further includes:

[0015] Arranging the historical fault data in chronological order to form a fault time series data set;

[0016] Establishing a fault prediction model based on a time series prediction algorithm and training the time series prediction algorithm parameters using the fault time series data set;

[0017] The fault prediction model is used to predict the fault type, obtain the probability of occurrence of each fault type, and sort them according to the size of the occurrence probability to generate a fault risk list.

[0018] As one of the preferred solutions, each of the response data is input into a pre-built association network model for prediction to obtain a prediction result corresponding to the current target fault node, including:

[0019] Network theory is used to conduct cross-regional and cross-time analogy analysis of nodes in the power grid. By comparing and learning from similar nodes, the interactions and synergies of nodes can be identified.

[0020] As one of the preferred solutions, the fault simulation test is performed based on the historical fault data and the maintenance strategy to obtain the priority ranking of each target fault node, including:

[0021] collecting response data of non-target fault nodes when repairing the target fault node according to the repair strategy;

[0022] Based on the response data, using network theory to predict the interaction and synergy of nodes in the power grid;

[0023] According to the prediction result, the priority ranking of the target faulty node is determined.

[0024] As one of the preferred solutions, the monitoring of the power grid and, when an actual fault is detected, formulating a power supply maintenance plan for repairing the actual fault based on the priority ranking includes:

[0025] Based on the priority ranking, a multi-objective maintenance scheduling model is constructed, wherein the multi-objective maintenance scheduling model reflects the influence of various factors in the power grid maintenance process;

[0026] According to the output results of the multi-objective maintenance scheduling model, a corresponding maintenance plan result is constructed.

[0027] As one of the preferred schemes, when constructing the multi-objective maintenance scheduling model, the optimization objectives of the multi-objective maintenance scheduling model include minimizing the scope of fault impact, minimizing maintenance time, and minimizing resource consumption; the constraints of the multi-objective maintenance scheduling model include maintenance time window, resource upper limit, and manpower availability.

[0028] As one of the preferred solutions, before formulating a power supply maintenance plan for repairing the actual fault, it also includes:

[0029] Collect road disruption information, apply machine learning algorithms, analyze the correlation between road disruption data and multi-task deployment reports, and update the maintenance plan.

[0030] Another embodiment of the present invention provides a device for formulating a power grid fault power supply maintenance plan, comprising:

[0031] An acquisition module, used to acquire historical fault data of each node in the power grid and establish a maintenance strategy corresponding to the historical fault data;

[0032] A test module, used to perform a fault simulation test based on the historical fault data and the maintenance strategy, and sequentially collect response data of the remaining non-target fault nodes when the selected target fault nodes are repaired according to each maintenance strategy;

[0033] A prediction module, used to input each of the response data into a pre-built association network model for prediction, and obtain a prediction result corresponding to the current target fault node, wherein the prediction result reflects the interaction and synergy between the corresponding fault nodes in the power grid;

[0034] A sorting module, configured to construct a priority ranking of each target fault node in the power grid based on all the prediction results, wherein the priority ranking reflects the gradient level of the target fault node relative to the non-target fault node under the fault environment;

[0035] The maintenance module is used to monitor the power grid and, when an actual fault is detected, formulate a power supply maintenance plan for repairing the actual fault based on the priority sorting.

[0036] Another embodiment of the present invention provides a power grid fault power supply maintenance plan formulation device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, it implements the power grid fault power supply maintenance plan formulation method as described above.

[0037] Yet another embodiment of the present invention provides a computer-readable storage medium storing a computer program, wherein when the device where the computer-readable storage medium is located executes the computer program, the method for formulating a power grid fault power supply maintenance plan as described above is implemented.

[0038] Compared with the prior art, the embodiments of the present invention have the following advantages:

[0039] 1) The present invention improves maintenance efficiency by monitoring the operating status of the equipment in real time, and promptly discovering and diagnosing potential faults to ensure that the faults are handled in a timely manner. 2) The present invention performs fault simulation tests through power grid data to obtain the priority ranking of each target fault node, thereby improving the speed and accuracy of fault response and enhancing the stability of power supply equipment.

[0040] 3) The present invention establishes a clear fault handling process based on the priority ranking of each target fault node, which helps to improve the stability and reliability of the power system and ensure people's normal production and living needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a flowchart of a method for formulating a power grid fault power supply maintenance plan in one embodiment of the present invention;

[0042] Figure 2 It is a structural schematic diagram of a power grid fault power protection maintenance plan formulation device in one embodiment of the present invention;

[0043] Figure 3 It is a schematic diagram of a power grid fault power protection maintenance plan device in one embodiment of the present invention. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] In the description of this application, the terms "first", "second", "third", etc. are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", etc. may explicitly or implicitly include one or more of the feature. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0046] In the description of the present application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be a connection between the two elements. The terms "vertical", "horizontal", "left", "right", "upper", "lower" and similar expressions used herein are only for illustrative purposes, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0047] In the description of this application, it should be noted that, unless otherwise defined, all technical and scientific terms used in the present invention have the same meaning as those commonly understood by those skilled in the art. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood by specific circumstances.

[0048] An embodiment of the present invention provides a method for formulating a power grid fault protection maintenance plan. For details, see Figure 1 , Figure 1 The flowchart of the method for formulating a power grid fault power supply maintenance plan provided in one embodiment of the present invention is shown. It includes steps S1 to S5:

[0049] S1. Obtain historical fault data of each node in the power grid and establish a maintenance strategy corresponding to the historical fault data;

[0050] S2, performing a fault simulation test based on the historical fault data and the maintenance strategy, and sequentially collecting response data of the remaining non-target fault nodes when the selected target fault nodes are repaired according to each maintenance strategy;

[0051] S3, inputting each of the response data into a pre-built association network model for prediction, and obtaining a prediction result corresponding to the current target fault node, wherein the prediction result reflects the interaction and synergy between the corresponding fault nodes in the power grid;

[0052] S4. Based on all the prediction results, construct a priority ranking of each target fault node in the power grid, wherein the priority ranking reflects the gradient level of the target fault node relative to the non-target fault node under the fault environment;

[0053] S5. Monitor the power grid and, when an actual fault is detected, formulate a power supply maintenance plan for repairing the actual fault based on the priority ranking.

[0054] In the embodiment of the present invention, preferably, the acquiring of historical fault data of each node in the power grid and establishing a maintenance strategy corresponding to the historical fault data includes:

[0055] Analyzing the historical fault data using a time series algorithm to identify fault modes that lead to significant outages in the power grid;

[0056] Design corresponding maintenance strategies for each failure mode.

[0057] Specifically, historical data such as the time, location, type and processing results of the fault are collected and stored, and the data are stored in a special fault database. The database uses an appropriate storage method such as a relational database or a time series database to facilitate subsequent data analysis and processing. Before the data is stored, the original fault data is preprocessed and cleaned, such as outlier processing, missing value filling and other operations, to improve data quality.

[0058] Perform feature engineering on the collected historical fault data to extract features that can reflect the laws of fault occurrence, such as the time period features of the fault (weekdays / weekends / holidays, etc.), fault duration features, fault frequency features, etc., and merge the extracted features with the original data to form a new fault feature data set. Select a suitable machine learning algorithm to train the fault feature data set, such as using deep learning algorithms such as LSTM and GRU for time series classification, and using algorithms such as IsolationForest and One-ClassSVM for anomaly detection. Through training, a machine learning model that can identify major fault modes is obtained, and the trained machine learning model is used to predict and identify new fault data to determine whether it belongs to a major fault mode. For the identified major fault mode, analyze its feature representation, and determine the cause and influencing factors of the fault based on the time period features and location features in the fault mode, such as whether it is related to factors such as weekdays / weekends, specific areas or equipment.

[0059] According to the results of the analysis of the causes and influencing factors of the failure, formulate targeted fault prevention and handling strategies, such as focusing on monitoring and maintaining equipment prone to failure, strengthening on-duty and emergency response in time periods and areas with high incidence of failures, etc. When formulating strategies, specific implementation measures and effect evaluation methods should also be considered. Implement the fault prevention and handling strategies in specific work, regularly update and maintain the fault database, and continuously optimize machine learning models and strategies.

[0060] Furthermore, based on historical fault data and expert experience, a scenario library of emergencies such as tunnel interruption, groundwater spread, and soil liquefaction is established. For each scenario, a corresponding response plan is designed, including emergency handling procedures, personnel division of labor, material allocation, etc., to form a complete emergency plan system and enter it into the knowledge base module of the emergency response system. The communication module of the emergency response system supports multiple communication methods, such as text messages, emails, voice calls, instant messaging, etc.; through system settings, according to factors such as event level, scope of impact, and handling requirements, the communication channels and notification objects in different scenarios are customized, and different notification rules and priorities are set to ensure the timeliness and accuracy of information transmission.

[0061] In addition, when an emergency occurs, relevant personnel can be automatically notified and multi-party communications can be established to facilitate command and dispatch and information sharing. Furthermore, a resource management module is established in the emergency response system to input various resources such as personnel information, equipment, vehicles and materials, and set resource allocation rules and priorities according to factors such as event type, impact, and difficulty of handling. Different resource matching rules and scheduling sequences are set to improve resource utilization efficiency and response speed. When an emergency occurs, the system can automatically match and allocate corresponding resources according to the resource allocation plan in the response plan, and generate transfer orders and outbound orders to guide on-site rescue operations.

[0062] Furthermore, in the emergency response system, special emergency handling processes and response plans are designed for different emergency scenarios, such as tunnel interruption, groundwater spread, soil liquefaction, etc., and the corresponding communication channels, personnel division of labor and resource allocation plans are linked to form an automated emergency response plan. Through simulation testing and optimization, the feasibility and effectiveness of the plan are improved.

[0063] Specifically, for the groundwater spread scenario, a special water volume monitoring and early warning module is developed in the emergency response system. By deploying water level sensors and flow meters around the tunnel, groundwater data is collected in real time. Different levels of early warning thresholds are set according to historical data, experience values, safety margins and other factors, and are associated with the emergency response process to achieve accurate early warning and rapid response. When an abnormal rise in water level or a sudden increase in seepage volume is detected, an automatic early warning is issued and the corresponding emergency response process is triggered, including the start of drainage pumps, the preparation of plugging materials, the evacuation of personnel, etc., to control the spread of groundwater. For the soil liquefaction scenario, geological survey data and soil parameters are integrated in the emergency response system. According to soil conditions, groundwater levels, load conditions and other parameters, a soil liquefaction potential assessment model is established, and quantitative judgment indicators and thresholds are set to provide a basis for the selection and implementation of emergency measures. Finite element analysis and other algorithms are used to evaluate the stability of the soil around the tunnel. When the assessment results show that the soil is at risk of liquefaction, the system can automatically recommend emergency measures, such as soil reinforcement, grouting and water stopping, and optimize the construction plan and resource allocation to guide emergency rescue work.

[0064] Using virtual simulation technology, a digital twin model of multi-physical field coupling such as tunnels, groundwater, and soil is constructed in the emergency response system. Through parameter sensitivity analysis, uncertainty quantification and other methods, the setting of model parameters is optimized, and the simulation results are compared and verified with the actual monitoring data. The model is continuously updated iteratively to improve the accuracy and reliability of simulation predictions. Through the setting and adjustment of model parameters, various emergency scenarios are simulated, and the effects of different response plans are evaluated. The simulation results are applied to actual emergency command to provide scientific support for emergency decision-making. Through a large number of simulation tests and iterative optimization, the emergency response system is continuously improved to form a visual, automated, and intelligent emergency command platform for tunnel emergencies.

[0065] In the embodiment of the present invention, preferably, the acquiring of historical fault data of each node in the power grid and establishing a maintenance strategy corresponding to the historical fault data further includes:

[0066] Arranging the historical fault data in chronological order to form a fault time series data set;

[0067] Establishing a fault prediction model based on a time series prediction algorithm and training the time series prediction algorithm parameters using the fault time series data set;

[0068] The fault prediction model is used to predict the fault type, obtain the probability of occurrence of each fault type, and sort them according to the size of the occurrence probability to generate a fault risk list.

[0069] Specifically, based on historical fault data, including the time, type, cause, impact range, handling process, recovery time, etc. of the fault, these data are arranged in chronological order to form a fault time series data set, and the data is cleaned, denoised, normalized and other preprocessing operations are performed to meet the input requirements of the time series algorithm. According to the characteristics of the fault time series data, such as trend, periodicity, randomness, etc., a suitable time series prediction algorithm is selected, such as ARIMA, LSTM, Prophet, etc., and a fault prediction model is established by tuning the algorithm parameters and training the model. The performance of the model is evaluated by using methods such as rolling prediction or forward validation. The accuracy and generalization ability of the model are measured by using indicators such as RMSE, MAE, and MAPE, and the model with the best performance is selected as the final prediction model. Using the trained fault prediction model, the types of faults that may occur in the future are predicted to obtain the probability of each type of fault, and the fault types are sorted according to the probability to generate a fault risk list, which provides a basis for the formulation of fault prevention and maintenance plans.

[0070] In an embodiment of the present invention, specifically, when repairing a specific fault point, according to the characteristics and fault mode of the equipment, a suitable sensor type is selected, such as a vibration sensor, a temperature sensor, an oil sensor, etc., the installation location and quantity of the sensor are reasonably arranged, and a suitable data collection frequency and data transmission method are selected, such as wired, wireless, Internet of Things, etc., to ensure the real-time and reliability of the data, and at the same time, the performance data of other related fault points, such as temperature, vibration, noise, etc., are monitored and collected, and the performance and response of these fault points during the maintenance process are recorded in real time to form a fault-related data set during the maintenance period.

[0071] The collected fault-related data are analyzed and mined, and the Apriori algorithm or FP-growth algorithm is used to mine association rules to obtain the association rules and indicators such as support and confidence between faults. The Bayesian network or structural equation model is used for causal inference to obtain the causal relationship and impact intensity between faults, discover the association relationship and impact rules between different fault points, and form a fault-related knowledge graph.

[0072] The fault-related knowledge graph is combined with the fault prediction model to build a comprehensive fault prediction and diagnosis system. When the prediction model finds that a certain fault point may fail, the system uses graph-based search algorithms, such as breadth-first search and shortest path search, to find fault nodes and associated edges related to the predicted fault in the knowledge graph, and uses rule-based reasoning engines, such as the Rete algorithm, to infer the chain reactions and impact range that may be caused by the predicted fault according to the rules in the knowledge graph, and give corresponding response measures and maintenance suggestions to achieve early warning and linkage disposal of faults.

[0073] Continuously optimize and update the fault prediction and diagnosis system, use incremental learning or online learning to regularly or irregularly train and tune the prediction model with new fault data, so that the model can adapt to changes in fault modes; use active learning to actively identify weak links in the knowledge graph, and collect relevant data in a targeted manner, expand and refine the knowledge graph, improve its coverage and accuracy, enable the system to adapt to changing fault modes and equipment status, improve the accuracy and real-time performance of fault prediction and diagnosis, and ultimately achieve intelligent operation and maintenance and health management of equipment.

[0074] For example, when collecting historical fault data, the original data can be extracted from the equipment's ERP system, MES system, SCADA system, etc. For data items with many missing values ​​or outliers, such as fault recovery time, the random forest algorithm is used to complete the data. For data items with large noise, such as fault cause description, the Kalman filter algorithm is used to smooth the data, and the Min-Max normalization method is used to scale the data so that it falls within the range of 0 to 1.

[0075] When establishing a fault prediction model, you can use the Auto ARIMA algorithm to automatically select the optimal ARIMA model parameters, such as p, d, and q values. Use a combination of grid search and random search to optimize the hyperparameters of the LSTM model, such as the number of hidden layers, number of hidden units, dropout rate, etc. Use 5-fold cross validation to evaluate model performance and select the model with the smallest RMSE as the final model.

[0076] When predicting the model, you can use a rolling prediction method to predict the failure probability for the next 1 day, 7 days, and 30 days each time, and use a probability threshold such as 0.5 to determine whether a failure will occur.

[0077] When collecting fault-related data, vibration sensors can be installed on vulnerable parts of key equipment, with a sampling frequency set to once per minute, and data transmitted to the cloud via a wireless sensor network; temperature sensors can be installed in the control cabinet of the equipment, with a sampling frequency set to once every 10 minutes, and data transmitted to the edge gateway via industrial Ethernet. When mining fault association rules, the Apriori algorithm can be used, with the minimum support set to 0.05 and the minimum confidence set to 0.8, to obtain association rules such as "When fault A occurs, fault B will occur with a probability of 0.9 within 10 minutes";

[0078] When performing fault causal inference, a Bayesian network can be used to set prior probabilities based on expert knowledge, such as "the probability that fault C is the cause of fault D is 0.7", and then the EM algorithm is used to learn network parameters. Finally, the causal relationship between faults can be inferred based on the network topology and conditional probability.

[0079] When reasoning in the knowledge graph, the Drools rule engine based on the Rete algorithm can be used to convert fault association rules and causal relationships into IF-THEN rules, such as "IF fault A occurs THEN fault B will occur with a probability of 0.9 within 10 minutes". During the reasoning process, the predicted faults and the faults that have occurred are input into the rule engine as facts, and the possible chain failures are obtained through forward reasoning. When optimizing the system, the model training and evaluation process can be triggered regularly every day. When the new fault data reaches a certain amount, such as 1,000, it is automatically added to the training set. At the same time, the SMOTE algorithm is used to oversample minority class samples to improve the generalization performance of the model; the knowledge graph is scanned regularly every week, and knowledge representation learning algorithms such as TransE are used to calculate the embedding vectors of entities and relationships. The quality of the graph is measured by the distance between vectors, and the triplets with abnormal distances are manually reviewed and corrected to continuously optimize the structure and semantics of the knowledge graph.

[0080] In an embodiment of the present invention, each of the response data is input into a pre-built association network model for prediction, and a prediction result corresponding to the current target fault node is obtained, which specifically includes: based on the real-time performance data and fault response data of each node in the power grid system, including the output of the generator set, the voltage and current of the bus, the temperature and oil level of the transformer, the number and time of the circuit breaker action, etc., these data are marked and stored according to the timestamp and node ID to form a structured spatiotemporal series data set, laying the foundation for subsequent big data analysis; at the same time, the collected power grid node data is pre-processed and feature-engineered, and noise data and abnormal data are identified and eliminated through data cleaning and anomaly detection algorithms to improve data quality. Appropriate algorithms are selected according to the characteristics of the data, such as isolationforest is suitable for high-dimensional data, and K-means is suitable for low-dimensional data. Through time series decomposition and filtering algorithms, such as STL decomposition and wavelet transform, trend, periodicity and randomness characteristics of node data are extracted to enrich the feature representation of data.

[0081] Construct an association network model of power grid nodes, regard each node as a vertex in the network, calculate the association strength between nodes based on factors such as electrical connection, physical distance, power flow, etc., generate a weighted directed graph, and use community discovery algorithms such as the Louvain algorithm to identify key areas and equipment groups in the power grid and characterize the topological structure of the power grid; use spatiotemporal graph neural network algorithms such as STGCN to learn the dynamic embedding representation of nodes in the power grid association network, update the hidden state of the node through the attribute characteristics of the node, the state of the neighboring nodes, and the physical quantities of the power grid, such as voltage phase angle, line power, etc., and aggregate the neighboring nodes through the attention weights. The influence of the points is captured, the interactions and dependencies between the nodes are captured, the low-dimensional vector representation of the nodes is generated, and the interpretability of the representation is improved; based on the network embedding representation, the causal discovery algorithm, such as the PC algorithm or the FCI algorithm, is used to explore the potential confounding factors and causal mechanisms between the nodes, and to analyze the causal relationship and propagation path between the nodes; at the same time, the prior knowledge of the power grid, such as circuit theory and transient analysis, is introduced to constrain and correct the causal relationship, determine the upstream cause nodes and downstream influence nodes of the fault point, construct the causal chain of the power grid fault, and use the centrality indicators of the graph, such as PageRank or betweenness centrality, to evaluate the importance and impact range of each fault point.

[0082] The method of combining mechanism modeling with data-driven is used to simulate the propagation process and dynamic evolution of faults in the power grid. Physical models, such as power flow calculation and static safety analysis, are first used to calculate the steady-state working conditions of the power grid. Then, data models, such as the SIR model or cascading failure model, are used to simulate the dynamic impact of fault propagation on the power grid. By setting different initial failure points and fault scenarios, considering multi-time scale and multi-scenario simulations, the vulnerability and robustness of the power grid are evaluated, and the risk field and early warning area of ​​power grid faults are generated to guide the security defense and emergency response of the power grid.

[0083] Combined with the physical model and mechanism constraints of the power grid, an active learning algorithm is used to dynamically select the most valuable data for power grid fault prediction and analysis for annotation and learning. A multi-criteria optimization sampling strategy is used to balance factors such as data representativeness, diversity, and annotation cost. Expert feedback and model uncertainty are considered at the same time, and the sampling strategy is dynamically adjusted. Data mining is guided by expert knowledge to improve the generalization performance and prediction accuracy of the model. In addition, an incremental learning algorithm is used to update the model parameters in real time to adapt to the dynamic changes of the power grid and the evolution of fault modes. In addition, online learning and continuous learning mechanisms are introduced to update the model in real time, improve the real-time and accuracy of fault prediction, and realize online analysis and early warning of power grid faults.

[0084] For example, when collecting grid node data, smart sensors and IoT devices such as micro PMUs and smart transformers can be deployed in key locations such as substations and switch stations to collect node voltage, current, frequency and other indicators in real time at a sampling frequency of 100ms. The data is compressed and encrypted through the edge computing gateway, and then transmitted to the cloud data center via 5G or industrial Ethernet and stored in a distributed time series database such as InfluxDB or OpenTSDB.

[0085] When performing data cleaning and anomaly detection, the One-Class SVM algorithm can be used to establish a hypersphere model of normal values ​​for each indicator, and data points that deviate from the hypersphere can be marked as abnormal, such as voltage exceeding ±10% of the rated value, current exceeding 20% ​​of the rated value, etc., and then manually reviewed and confirmed in combination with physical rules and expert knowledge.

[0086] When extracting data features, you can use moving average and STL decomposition to extract the long-term trend of the data, use fast Fourier transform to extract the daily and weekly cycles of the data, use wavelet transform to extract the instantaneous disturbance of the data, and then use indicators such as root mean square and peak-to-peak value to quantify the feature intensity.

[0087] When constructing an associated network model, mutual information and transfer entropy can be used to calculate the information transmission intensity between nodes, the voltage-current phase angle can be used to calculate the electrical distance between nodes, and the power flow sensitivity can be used to calculate the physical coupling between nodes to generate a multi-dimensional heterogeneous weighted network. The spectral clustering algorithm can then be used to divide the node communities with similar functions and adjacent locations.

[0088] When learning network embedding, you can use the spatiotemporal attention graph convolutional network, aggregate node neighborhood information through the graph convolution layer, adaptively fuse node features through the attention layer, model node state dynamics through the GRU recurrent unit, perform feature compression and reconstruction through the autoencoder structure, and add power grid physical constraints as regularization terms to improve the interpretability and physical consistency of the embedded representation.

[0089] When conducting causal analysis, the Bayesian causal discovery algorithm can be used to discover direct causal and indirect correlations between nodes through conditional independence tests, and combined with the causal prior knowledge of the power grid, such as fault tree analysis and sequential quantity equations, the discovered causal structure can be corrected to improve the reliability of causal inference.

[0090] When simulating fault propagation, a mechanism-constrained random walk model can be used. First, the initial state of the power grid before the fault is calculated through the DC power flow equation, and the state of the faulty node is set to -1. Then, the cascade propagation of the fault is simulated through random walk. Adjacent nodes are infected first according to the conductivity between nodes. At the same time, the carrying capacity of the node itself is considered. If the load rate exceeds 80%, it will be infected until the fault propagation reaches stability, and the scope and degree of the fault impact are statistically analyzed.

[0091] During active learning, the maximum uncertainty sampling strategy can be used to calculate the prediction entropy of each candidate data, and data with a prediction probability close to 50% can be prioritized for labeling. Then, the expected error minimization strategy can be used to estimate the expected labeling cost and model improvement benefit for each candidate data, and prioritize labeling of cost-effective data. Model errors can be gradually corrected through human-computer interaction to improve the accuracy and credibility of predictions.

[0092] Furthermore, network theory is used to conduct cross-regional and cross-time analogical analysis of nodes in the power grid, and the interaction and synergy of nodes are identified by comparing and learning from similar nodes.

[0093] Specifically, based on the node operation data in different areas and time periods of the power grid, including parameters such as voltage, current, power, frequency, and static attribute data of the nodes, such as geographic location, electrical parameters, topological connection, etc., these data are standardized and structured according to dimensions such as node ID, timestamp, data type, etc. to form a multidimensional spatiotemporal dataset.

[0094] Preprocess and feature engineer the collected node data. Through data cleaning and data integration, eliminate redundancy, inconsistency and noise between data from different sources, and improve data quality and availability. Through filtering feature selection methods based on information gain, Gini index and other criteria, or using embedded feature selection methods such as L1 regularization and decision trees, screen out the key attributes most relevant to node characteristics. At the same time, use feature extraction methods such as principal component analysis and factor analysis to reduce the dimension and reconstruct the original attributes to obtain a more concise and efficient feature representation and build a unified node feature vector. Use the density-based OPTICS clustering algorithm or the grid-based STING clustering algorithm to perform similarity clustering on nodes in different regions and at different times. By defining appropriate reachable distances and core distances, or dividing multi-layer grid units and calculating the statistical characteristics of nodes in the grid, adaptively discover node clusters of any shape, and find node groups that are geographically close, related in time series, and similar in operation mode.

[0095] For each node group, extract its representative characteristic patterns and behavior patterns, such as typical load curves, voltage curves, power flow distribution, etc. Use the dynamic time warping (DTW) algorithm to find the optimal time alignment by optimizing the nonlinear mapping between different time series; or use the time context embedding (TCC) method to capture the time dependencies at different time scales by learning the context representation of the time series, realize the alignment and calibration of patterns at different time scales, and obtain the standard feature template of the group as a reference benchmark for subsequent analogy analysis. Through graph embedding algorithms such as Node2Vec or DeepWalk, learn the low-dimensional vector representation of the node, capture the position, role and influence of the node in the power grid topology, calculate the similarity between nodes in different regions and different groups through the vector distance metric, and construct a similarity matrix of cross-regional nodes.

[0096] Using graph neural network algorithms such as heterogeneous graph attention network (HAN) or heterogeneous graph transformer (HGT), the attribute features and topological features of nodes are represented and matched end-to-end. By defining the attention mechanism at the node level and semantic level, the feature information of different types of nodes can be adaptively aggregated; or by designing different node type embedding spaces and edge type transformation matrices, the heterogeneous interactions of nodes and edges can be modeled. By using the multi-layer propagation mechanism of the network, the high-order interactions and long-range dependencies between nodes are mined, and the correlation laws and influencing mechanisms of cross-regional nodes in terms of operation mode and response characteristics are discovered. Based on the similarity analysis and correlation analysis of cross-regional nodes, the key commonalities and significant differences in the operation characteristics of power grids between different regions are identified. The typical experience practices that can be learned and referred to by each other between regions are summarized and refined to form the best practice paradigm of regional coordination. At the same time, in view of the weak links and optimization space between regions, improvement plans and innovative ideas for regional coordination are proposed to achieve regional coordinated optimization of power grid node operation and overall benefit improvement.

[0097] For example, when collecting grid node data, intelligent sensors and data acquisition terminals deployed on key equipment such as substations and transmission lines can be used to collect real-time operating parameters such as node voltage, current, active power, reactive power, etc. at a frequency of seconds. The geographic coordinates, topological connections and other static attribute data of the nodes can be recorded through the GIS system, and multi-source heterogeneous data can be organized and stored in a unified data format and naming convention to build a spatiotemporal database of grid nodes covering the entire region and all time periods.

[0098] When preprocessing data, the isolation forest algorithm or the single-class SVM algorithm can be used for outlier detection, and data points that exceed the normal range by 3 times the standard deviation can be marked as abnormal and eliminated or corrected; the Z-score normalization method can be used to non-dimensionalize attributes of different dimensions to eliminate the impact of dimensional differences; the maximum information coefficient (MIC) can be used to measure the correlation of attributes, and high-correlation attributes with MIC greater than 0.8 can be screened out as redundant attributes for elimination; the recursive feature elimination (RFE) method can be used to rank the feature importance, and the top 20% of attributes can be selected as the key attribute matrix.

[0099] When performing spatiotemporal clustering, the OPTICS algorithm can be used, with the geographical distance and feature similarity of nodes as density evaluation indicators, the minimum sample number MinPts is set to 10, and a reachable distance curve is generated. The eps neighborhood radius of the cluster is determined by the inflection point of the curve, and node clusters of any density are automatically discovered; for clusters discovered by clustering, the silhouette coefficient can be used to evaluate the clustering quality, and clusters with coefficients lower than 0.2 can be re-divided or merged. When extracting typical feature patterns, a sliding time window can be used, with a window length of 1 day and a sliding step of 10 minutes, to perform segmented sampling of the load curve and extract 96 sampling points per day; then the DTW algorithm is used to calculate the similarity of time series between different dates, and the optimal matching path of the two sequences is found through dynamic programming, and the average distance is calculated as a similarity measure; for daily load curves with similarity lower than the threshold, a hierarchical clustering algorithm can be used for clustering, and the centroid of each cluster can be extracted as a typical load pattern. When learning the embedded representation of nodes, the DeepWalk algorithm can be used. A biased random walk sequence is constructed with nodes as vertices and edges as transition probabilities. The Skip-Gram model is used as the framework and the node co-occurrence frequency is used as the optimization target. The distributed representation vector of the node is learned through random gradient descent. For the dimension of the vector, grid search can be used for optimization to find the optimal value between 64 and 256. For the learning rate, an exponential decay strategy can be used, decaying from 0.025 to 0.0001, decaying once every epoch.

[0100] When calculating node similarity, you can use common vector distance metrics such as cosine similarity and Jaccard similarity, or you can use metrics that take attribute covariance into account, such as Mahalanobis distance, to calculate the similarity score between any two nodes across regions. Then, use density-based clustering algorithms such as DBSCAN, with the similarity score as the density threshold, to discover the cluster structure of similar nodes.

[0101] When using the graph neural network algorithm, the heterogeneous graph attention network (HAN) can be used to define attention mechanisms at two granularities: the node layer and the semantic layer. At the node layer, linear transformation and LeakyReLU activation are used to map node features to the same latent space, and then the attention coefficients between nodes are calculated to achieve aggregation of information within the Same-Type neighborhood. At the semantic layer, a multi-head attention mechanism is used to calculate the semantic importance of different meta-paths to nodes to achieve aggregation of information within the Different-Type neighborhood. The iterative update of node embeddings is achieved through K-hop hierarchical propagation, and finally node matching and association mining are achieved through similarity calculation. For the tuning of hyperparameters, such as hidden layer dimension, number of attention heads, learning rate, etc., automatic machine learning methods such as Bayesian optimization can be used for search, and ranking indicators such as HR@10 and NDCG@10 can be used on the validation set to evaluate the model effect.

[0102] Furthermore, by combining geographic information system (GIS) and network theory, the spatial location relationship of nodes and their power flow are analyzed. By constructing a spatial association diagram, the physical connection and current path distribution between nodes are observed to determine their interaction and synergy potential.

[0103] Specifically, the spatial location data of power grid nodes are collected through the Geographic Information System (GIS), including the latitude and longitude coordinates, altitude and other information of key nodes such as substations, switch stations, power plants, and load centers, as well as the starting and ending point coordinates, tower locations, line length and other information of transmission lines. These data are stored in the spatial database in vector data format to construct a spatial geographic dataset of power grid nodes and lines.

[0104] The spatial location data of the power grid nodes are associated with their static and dynamic attribute data. Through spatial data association technologies such as spatial connection or spatial inclusion, the attribute data such as the electrical parameters, operating status, topological connection, etc. of the nodes are attached to the corresponding spatial elements to form a power grid GIS database that integrates spatial and attribute information, providing data support for subsequent spatial topology analysis and power flow calculation.

[0105] Based on the GIS database, the public edge topology model of the power grid is constructed, with equipment nodes such as substations and switch stations as vertices and transmission lines as edges. Through topological rule definition and connectivity analysis algorithm, the physical connection relationship between nodes is automatically extracted, and network topological data structures such as node adjacency matrix and edge list are generated; at the same time, the electrical island partitioning method is considered to divide the connected nodes and lines into an electrical island to form a network topology of multiple electrical islands, which characterizes the spatial connectivity and adjacency characteristics of the power grid. On the basis of the spatial topological relationship network, the power flow distribution information of the power grid is superimposed, and the power flow equation group is established by the node equation method or the loop current method. The Newton-Raphson iteration method is used to solve it, and the voltage amplitude and phase angle of each node, as well as the active power and reactive power of each branch are obtained. In the solution process, the calculation of the linear equation group is accelerated by methods such as LU decomposition or GMRES, and the Homotopy method or OPF method is used to optimize the convergence; for large-scale power grids, regional decomposition or parallel computing can also be used to improve the calculation efficiency, and finally the power flow distribution of the whole network is obtained, reflecting the transmission and exchange of electric energy between nodes. Taking into account the spatial position, topological connection and power flow distribution of nodes, a spatial correlation graph of the power grid is constructed. Through graph embedding algorithms such as Node2Vec or LINE, low-dimensional vector representations of nodes are learned to quantify the similarity and correlation between nodes in the spatial dimension. Clustering algorithms such as K-means or DBSCAN are used to discover the spatial distribution pattern and organizational structure of nodes.

[0106] On the basis of the spatial association graph, the spatial path characteristics of the power flow are analyzed. Through the physical-based shortest path algorithm, such as Kirchhoff's current law or Ohm's law, the line parameters such as resistance, reactance, voltage, etc. are used as edge weights to calculate the current diversion ratio and transmission loss, and the optimal transmission path of power from the source node to the sink node is obtained; at the same time, the optimization-based path search algorithm such as sensitivity analysis or optimal power flow is considered to minimize network losses or maximize power supply reliability, solve the optimal power transmission path, generate key channels and important hubs of the power grid, and evaluate the criticality and influence of nodes in power transmission; in addition, the association rule mining algorithm can be used to discover frequently occurring power transmission modes and path combinations, revealing the inherent laws of power grid operation.

[0107] Combined with the power distribution and transmission path of the power flow, the interdependence of nodes in power supply and power reception is analyzed. Through spatiotemporal causal inference models, such as Granger causal networks or dynamic Bayesian networks, the causal chain of power transmission between nodes at different time scales is examined to characterize the dependency structure of nodes in time and space. At the same time, prior knowledge of the power grid, such as circuit theory and control theory, is introduced to physically constrain the causal relationship between nodes and improve the interpretability of causal discovery. In addition, multi-view causal learning methods can be used to integrate multi-source data such as topology, power flow, and operation, cross-validate the causal role of nodes from multiple perspectives such as connectivity, similarity, and correlation, improve the reliability of causal inference, and ultimately form a spatial causal graph that reflects the collaborative potential of nodes to guide the collaborative planning and mutual backup operation of the power grid.

[0108] For example, when collecting power grid GIS data, satellite remote sensing, drone aerial surveys, etc. can be used to obtain high-resolution remote sensing images of facilities such as substations and transmission lines. Through image interpretation and feature extraction algorithms, such as Hough transform and edge detection, the main transformer, busbar, switchgear and other key components of the substation, the towers, conductors, insulators and other key facilities of the transmission line are automatically identified, and their spatial coordinates and length and other geometric information are extracted. Through manual verification and attribute editing, the business attributes such as equipment model, capacity, and commissioning date are supplemented to form a 1:500 scale power grid spatial geographic database containing 17 types of elements and 283 attributes.

[0109] When conducting spatial topological analysis, a network construction algorithm based on topological rules can be used, such as the point-arc-surface model. The substation is abstracted as a point element, the transmission line is abstracted as an arc element, and the power supply range of the substation is abstracted as a surface element. Through spatial overlay analysis, 188 substation nodes and 311 transmission line edges are automatically generated to build a power grid spatial topology network covering the entire network. At the same time, a depth-first search algorithm is used, with 220kV and above substations as the starting point, to automatically divide 96 connected power supply areas as electrical islands.

[0110] When performing power flow calculations, the improved Newton-Raphson method can be used, and the error tolerance is set to 0.001. The linear equations are first solved through LU decomposition. When the infinite norm of the multiplier vector is less than 0.01, the conjugate gradient method is used for iterative refinement, with a maximum of 20 iterations. At the same time, the optimal power flow model is introduced, with the minimum node voltage amplitude deviation as the objective function, and the power flow balance equation, upper and lower limits of generator output as constraints. The interior point method is used to solve the problem, and the voltage amplitude and phase angle of 1000 nodes in the entire network and the active and reactive power flows of 2000 branches are obtained.

[0111] When constructing a spatial association graph, the Node2Vec algorithm can be used, with parameters set to p=0.5 and q=2. One billion node sequences are trained at a learning rate of 0.01 to obtain a 64-dimensional node vector representation. The t-SNE algorithm is used to visualize the vectors, and it is found that the power grid nodes present a "core-edge" heterogeneous distribution structure in space, which can be divided into 9 closely related areas through K-means clustering.

[0112] When analyzing power transmission paths, an improved Dijkstra shortest path algorithm can be used. The line reactance is used as the edge weight and the node voltage phase angle is used as the distance metric to calculate the shortest electrical distance path between each source-sink node pair. Paths with electrical distances greater than 1.5 times the average distance are defined as key channels, and the intersection nodes of key channels are defined as important hubs. Statistical analysis shows that there are 73 key channels and 27 important hubs in the entire network, among which the key channel density in North China and East China is the highest and the power flow intensity is the greatest.

[0113] When conducting spatiotemporal causal inference, the Granger graph causal model can be used. The 24-hour active power of 96 typical nodes in the previous day is selected as the time series. The optimal lag order is determined to be 6 through the AIC criterion. The partial correlation coefficient matrix between nodes is calculated, and a significance test is performed. The causal topology diagram is constructed with a P value less than 0.05 as the threshold. On this basis, combined with the physical laws and operating experience of the power grid, the causal topology diagram is corrected and completed to obtain a multi-layer heterogeneous causal network that integrates time dependence, space dependence, and physical dependence, revealing the spatiotemporal coupling characteristics and dynamic evolution laws of power grid operation.

[0114] Furthermore, the time series analysis algorithm is used to monitor the power signals transmitted by the power grid nodes in real time. By analyzing the fluctuation pattern and change frequency of the signal, the dynamic interaction between the nodes is inferred. By comparing the correlation of node signals in different time periods, the degree of coordination between the nodes is determined.

[0115] Specifically, by installing high-precision power quality monitoring devices and intelligent sensors on the transmission lines and substations at the power grid nodes, key power parameters such as voltage, current, power, and frequency of the nodes are collected in real time at a millisecond sampling frequency, and the collected massive time series data are uploaded to the distributed time series database in the cloud, such as InfluxDB or OpenTSDB, through industrial Ethernet or 5G network, to form a large data set of power signal time series across the entire network.

[0116] The collected raw power time series data is preprocessed and feature engineered, and the multi-scale time-frequency domain features of the time series, such as mean, variance, peak-to-peak value, spectral entropy, etc., are extracted through sliding window segmentation, wavelet transform denoising, Z-score normalization and other technologies. The feature selection method based on mutual information, such as the maximum relevance minimum redundancy algorithm (mRMR) or conditional mutual information (CMI), is used to measure the correlation and independence between the time series features and the target variable, and to screen out the key feature subset that most significantly describes the dynamic behavior of the node.

[0117] In the time series clustering part, the original time series is first discretized and symbolized using methods such as symbolic aggregation approximation (SAX) or fluctuation analysis (FluctuationAnalysis), and then fast approximation algorithms such as FastDTW or Fréchet distance are used to measure the similarity of power signals at different nodes. Then, hierarchical clustering or spectral clustering algorithms are used for clustering to improve the efficiency and robustness of clustering, automatically discover typical fluctuation patterns hidden in time series, and calculate the central sequence, boundary sequence and outlier sequence of each pattern to characterize the dynamic change characteristics of power signals. For each fluctuation pattern found by clustering, combined with time-frequency analysis methods such as wavelet transform, the frequency components and energy distribution characteristics of the time series at different scales are extracted, and singular spectrum analysis (SSA) and other methods are used to perform periodic decomposition and trend extraction on the signal. Frequency domain analysis and nonlinear time series analysis methods such as Fourier transform, power spectral density estimation, Lyapunov index, etc. are used to evaluate the differences in frequency domain characteristics between different modes, and statistical test methods such as t-test and F-test are used to reveal the dynamic evolution law and mode conversion mechanism of power signals.

[0118] In the association rule mining part, time constraints and multi-dimensional combinations are introduced, and time series association rule mining algorithms such as T-APRIORI or DTFPM are used to measure the association strength and statistical significance of rules with indicators such as support, confidence, and lift. Multi-dimensional time series association rules such as "if node A exhibits fluctuation pattern P1 at time T1, and node B exhibits fluctuation pattern P2 at time T2, then node C exhibits fluctuation pattern P3 with confidence C at time T3" are mined to reveal the complex dynamic interaction patterns and dependency structures between nodes.

[0119] In the causal detection part, nonlinear causal discovery methods such as convergent cross mapping (CCM) or kernel causal detection (KCI) are used to capture the nonlinear dynamic coupling relationship of node power signals in different time periods with multi-scale time lag and directionality as indicators, and the statistical reliability of causal relationships is evaluated through significance tests and permutation tests. The universality of linear and nonlinear causal dependencies is further verified using methods such as Granger causality test or conditional transfer entropy, and causal influence metrics such as causal strength index (CSI) are introduced to quantify the degree of causal dependency between nodes, construct a temporal causal network diagram that reflects the degree of node coordination, and mine key nodes and bottleneck links in the dynamic operation of the power grid.

[0120] Develop a time series anomaly detection algorithm based on deep learning, and adaptively learn the multi-scale spatiotemporal dependency and reconstruction rules of power signals through models such as convolutional neural networks (CNN) or long short-term memory networks (LSTM). Rationally design the input and output and network structure of the model, select representative and comprehensive sample sets for training, and use cross-validation, leave-one-out and other strategies to evaluate the generalization performance of the model. Based on the reconstruction error or prediction error, perform adaptive threshold discrimination and probability estimation on the anomaly score, and identify abnormal fluctuations and mutation events in the time series in real time. At the same time, introduce integrated learning algorithms such as isolation forest and single-class SVM to improve the accuracy and robustness of anomaly detection, and combine the fault modes in the expert knowledge base to realize intelligent early warning and root cause diagnosis of the power system.

[0121] In an embodiment of the present invention, preferably, based on the priority ranking, a multi-objective maintenance scheduling model is constructed, wherein the multi-objective maintenance scheduling model reflects the influence of various factors in the power grid maintenance process;

[0122] According to the output results of the multi-objective maintenance scheduling model, a corresponding maintenance plan result is constructed.

[0123] In an embodiment of the present invention, preferably, when constructing the multi-objective maintenance scheduling model, the optimization objectives of the multi-objective maintenance scheduling model include minimizing the scope of fault impact, minimizing maintenance time, and minimizing resource consumption; the constraints of the multi-objective maintenance scheduling model include maintenance time window, resource upper limit, and manpower availability.

[0124] Specifically, in an embodiment of the present invention, based on the importance of a single fault point obtained in the early stage through time series analysis, network topology analysis and other methods, as well as the correlation strength and propagation path between different fault points, the fault nodes of the entire network are ranked in importance, and divided into key nodes, key nodes and general nodes according to their importance levels, and the contribution of each node to the stability of the entire network is calculated to form a node importance attribute table.

[0125] For node combinations with high correlation strength and high fault propagation risk, their correlation failure mechanisms and mutual influence patterns are analyzed. Specifically, in the graph model, the set of fault nodes that can be reached from the source fault node through a directed path is defined as a "fault link" to characterize the cascading propagation of faults in the network; the similarity measurement of time series is introduced to identify high-risk chain failure modes with frequent and simultaneous failures, evaluate the superposition and amplification effect of failures, and formulate targeted collaborative maintenance strategies to curb the occurrence and spread of chain failures from the source; comprehensively consider the importance of single nodes and the synergy between nodes, adopt the idea of ​​joint optimization, and construct a multi-objective maintenance scheduling model. The objective functions include minimizing the scope of fault impact, minimizing maintenance time, minimizing resource consumption, etc. The constraints include maintenance time window, resource upper limit, manpower availability, etc. For the mathematical form of the model, the weighted summation method and ε-constraint method are considered to discuss the convexity and linearization properties of the model.

[0126] In terms of solution methods, combined with the scale and characteristics of the problem, practical heuristic algorithms such as two-stage simulated annealing and NSGA-II are used to solve the optimal multi-node joint maintenance plan and formulate a comprehensive maintenance schedule. According to the comprehensive maintenance plan, the maintenance of the faulty nodes is prioritized to determine the time schedule and sequence of each maintenance task. Consider dividing the maintenance tasks into several functional areas or maintenance bases, each area or base is responsible for several faulty nodes, and the maintenance personnel are dispatched within the area according to the fuzzy time window constraints, and move between bases between areas by fixed shuttles or helicopters. Combined with the spatial location distribution of the faulty nodes, a multi-level and multi-mode maintenance scheduling model is constructed to obtain the optimal walking route of the maintenance personnel, minimize the moving distance and time consumption of the maintenance team, and generate a time-space schedule diagram of the maintenance task. Classify and encode the maintenance resources, and build an information platform and database for resource management. The materials, tools, spare parts, vehicles and other resources involved in the comprehensive maintenance plan are sorted out. According to the resource requirements of each maintenance task, the integer programming method is used to optimize the allocation of maintenance resources, taking into account the transportation scheduling and inventory management of resources. Under the premise of meeting the resource requirements and constraints of each task, through supply chain optimization modeling, the transportation cost and inventory cost are comprehensively considered to achieve lean distribution and replenishment of maintenance resources, minimize the overall resource occupation, and formulate a cross-regional resource allocation plan based on the spatial distribution of resources to form a maintenance resource allocation list. According to the time schedule, spatial route, resource allocation and other elements of the maintenance plan, project management tools such as Gantt charts are used to formulate the execution plan and work breakdown structure of each maintenance task, which are detailed to the daily work content of each person, to form an operational and assessable maintenance construction plan, and the critical path method is used to calculate the earliest start time and the latest completion time of the maintenance plan, identify key tasks, and optimize the maintenance schedule.

[0127] In terms of program evaluation and optimization, the reliability and maintainability analysis methods are introduced, such as fault tree analysis and maintenance guarantee diagram. Taking into account the random failure rate and maintenance rate, the maintenance program's task completion possibility, equipment availability, task punctuality and other indicators are quantitatively evaluated. Through sensitivity analysis, the robustness of the program is judged and risk pre-control is performed. A multi-task maintenance deployment report is summarized, including a comprehensive maintenance schedule, a fault node importance analysis report, a node synergy effect analysis report, a maintenance priority ranking table, a maintenance resource allocation list, a maintenance team scheduling plan, a maintenance task execution plan, etc., and data visualization technology, such as GIS maps and 3D simulation, is used to intuitively present the spatiotemporal deployment process of maintenance tasks for reference in command decision-making.

[0128] Furthermore, in an embodiment of the present invention, road disruption information is collected, and a machine learning algorithm is used to analyze the association between the road disruption data and the multi-task deployment report, and the maintenance plan is updated.

[0129] Specifically, various types of sensors are deployed in key areas such as tunnels and roads, such as video surveillance, strain gauges, inclinometers, crack meters, water level meters, etc., and differentiated indicator requirements are given for different monitoring parameters and scenarios. Wireless sensor networks are used to aggregate data to edge nodes, and data is uploaded to the cloud monitoring platform in real time through communication technologies such as 5G or NB-IoT.

[0130] Meteorological radar, satellite remote sensing and other equipment are used to obtain environmental data such as rainfall and soil moisture in the tunnel surrounding area, with a temporal resolution of minutes and a spatial resolution of meters. InSAR, LiDAR and other technologies are used to obtain geographic information such as regional surface deformation and landslide deformation. Through data fusion algorithms such as Kalman filtering, multi-source heterogeneous data are integrated into a unified space-time framework to build a geographic information database for tunnel disaster monitoring.

[0131] In view of sudden tunnel interruption events, such as collapse, rockfall, water accumulation, etc., an intelligent recognition model based on video and images is established. Specifically, data of different modes are first preprocessed and features are extracted, such as background modeling and foreground segmentation of video data, extraction of motion and appearance features; time-frequency analysis of vibration data, extraction of energy and spectrum features, etc. Then, multi-modal deep learning frameworks such as multi-channel CNN or multi-stream RNN are used to represent and learn the features of different modes in different sub-networks, and fused through feature cascade or decision cascade to achieve multi-modal abnormal classification and positioning.

[0132] During the training process, an end-to-end joint optimization strategy is adopted, and technologies such as attention mechanism and adversarial learning are introduced to improve the generalization performance of the model, so that the detection accuracy reaches more than 95%. In view of hidden dangers such as groundwater seepage and soil liquefaction, a prediction model based on time series data is established, and recurrent neural networks such as LSTM and GRU are used to perform multi-step predictions on key parameters such as tunnel surrounding rock moisture content and soil liquefaction index. The prediction error can be controlled within 10%. At the same time, with the help of transfer learning, incremental learning and other technologies, the prediction model is optimized using historical data of similar tunnels to shorten the model training cycle and improve the prediction effect. Tunnel disaster events and risk prediction information are associated with geographic information data, and the spatiotemporal distribution map and risk level map of tunnel disasters are generated with the help of the spatiotemporal analysis and visualization functions of the GIS platform. According to the different types of disasters, appropriate spatiotemporal data models and analysis methods are selected.

[0133] For example, for sudden collapse, landslide and other disasters, the spatiotemporal point process model is used to analyze its spatiotemporal distribution and aggregation pattern through methods such as kernel density estimation; for gradual settlement, displacement and other disasters, the spatiotemporal grid model is used to analyze its spatiotemporal trend and correlation through methods such as Kriging interpolation and local weighted regression; for continuous seepage, liquefaction and other disasters, the spatiotemporal field model is used to simulate its spatiotemporal evolution process through methods such as partial differential equations and finite element analysis. The spatiotemporal analysis modules and plug-ins of the GIS platform are used to support real-time monitoring and dynamic evaluation of disaster processes, determine the impact range and development trend of disasters, and provide decision-making basis for emergency rescue and maintenance operations.

[0134] Dynamically track changes in the environment around the tunnel, such as natural disasters such as rainstorms and earthquakes, as well as human activities such as construction and blasting, and evaluate their impact on tunnel stability. When the monitoring data or prediction results exceed the warning threshold, the warning is automatically triggered, and a disposal plan is intelligently generated according to the plan rules, such as reinforcement, dredging, and traffic restrictions. At the same time, the operation and maintenance personnel and management departments are notified through push and broadcast. The ontology engineering method is used to define the core concepts, attributes, and relationships in the field of tunnel disasters to form a disaster ontology model.

[0135] Using natural language processing technology, we extract disaster cases and experience knowledge from unstructured texts such as design documents, construction records, maintenance manuals, and accident reports, and perform entity linking and relationship extraction, mapping them to the ontology model to form an instantiated knowledge base. On this basis, we use graph-based machine learning algorithms, such as graph neural networks and graph attention networks, to perform representation learning and reasoning calculations on the tunnel disaster knowledge graph, and realize knowledge services such as disaster source analysis, risk inference, and countermeasure generation. Through algorithms such as association rules and causal inference, we discover the patterns and laws of tunnel disasters, form a cognitive system from data to information to knowledge, and realize full-cycle intelligent management of tunnel operation and maintenance.

[0136] For example, in terms of tunnel monitoring data collection, a vibrating-wire piezometer with a range of 0-1MPa, an accuracy of 0.1%FS, and a sampling frequency of 1 time / hour can be deployed to monitor the seepage water pressure inside the tunnel lining; an optical fiber strain gauge with a range of ±3000με, an accuracy of 1με, and a sampling frequency of 20Hz can be deployed to monitor the stress and deformation of the lining; a laser rangefinder with a range of 0-500m, an accuracy of ±1mm, and a sampling frequency of 1 time / minute can be deployed to monitor the absolute displacement of the arch.

[0137] In terms of environmental monitoring, the rainfall, wind speed and other data outside the tunnel can be obtained through the meteorological station, with a time resolution of 10 minutes and a spatial resolution of 100m; the surface displacement data can be obtained through the GPS base station, with a time resolution of 1 second and a spatial resolution of 10m; the surface deformation monitoring can be carried out through synthetic aperture radar satellite data, with a time resolution of 1 day and a spatial resolution of 1m. Using data assimilation algorithms such as ensemble Kalman filtering, monitoring data from different sources and different time and space scales are integrated to generate a tunnel health status parameter set updated every 10 minutes. In terms of abnormal event recognition, the FasterR-CNN algorithm can be used to extract and classify image features such as water accumulation and collapse in the tunnel, with an mAP of more than 0.9; combined with a one-dimensional convolutional neural network to analyze the vibration signals in the tunnel, abnormal events such as vehicle collisions and explosions can be identified with an accuracy of more than 95%.

[0138] In terms of seepage and liquefaction prediction, a seepage prediction model based on LSTM can be established, and the seepage pressure monitoring data of the past 24 hours can be input to predict the trend of seepage water pressure changes in the next 2 hours. The average relative error can be controlled within 5%; a liquefaction prediction model based on GRU can be established, and the monitoring data of groundwater level, acceleration, etc. in the past 7 days can be input to predict the liquefaction risk level in the next day. The area under the ROC curve can reach more than 0.95. In terms of disaster spatiotemporal analysis, a spatiotemporal Gaussian process regression model can be used, with a grid of 10m and a time step of 1 hour, to perform spatial interpolation and temporal prediction of tunnel settlement data, and generate settlement contour maps and trend prediction maps; a spatiotemporal kernel density estimation model can be used, with a bandwidth of 1km and a time window of 1 day, to analyze the spatiotemporal distribution of collapse disasters in the surrounding areas of the tunnel, identify the spatiotemporal aggregation areas of collapse disasters, and assess the possibility of tunnels being affected by disasters.

[0139] In terms of tunnel disaster knowledge graph construction, with tunnels and disasters as the core objects, more than 10 concept categories (such as geological conditions, support structures, monitoring equipment, disaster bodies, etc.) and more than 50 semantic relationships (such as located, caused, affected, etc.) are defined through ontology construction tools such as Protégé to form a tunnel disaster domain ontology; then natural language processing tools such as Stanford Core NLP are used to perform entity recognition and relationship extraction on text data such as tunnel design documents and accident investigation reports, and more than 500 disaster knowledge triples are obtained, such as <heavy rain, caused, landslide>, <advance support, prevention, arch collapse>, etc.; through knowledge representation learning algorithms such as TransE, the vector representation of each entity and relationship is obtained, and through algorithms such as graph convolutional neural networks, graph reasoning and semantic search of tunnel disasters are realized, such as querying "tunnel disaster chains that may be caused by continuous rainfall".

[0140] In the embodiment of the present invention, for tasks that can be passed, it is ensured that all preparatory measures and resources are in place, and the maintenance team has received task assignments and schedules, monitors and tracks task progress, and ensures real-time updates of information and rapid resolution of problems through real-time communication tools;

[0141] For tasks that cannot be passed, a replacement plan is formulated based on the interaction and synergy between the fault points to solve the impossible fault points by repairing other fault points.

[0142] Specifically, in the embodiment of the present invention, a road interruption information database is constructed, including attributes such as the time, location, cause, and recovery time of the interruption, as well as environmental factors such as rainfall, wind speed, and temperature during the interruption. A composite primary key of interruption ID + road ID + direction code is used to uniquely identify an interruption record. The road ID can be represented by the start and end point numbers of the road, and the direction code can be represented by 0 / 1 for up / down. This can reflect the spatiotemporal location attributes of the interruption record, wherein the time granularity of the interruption data should be at the hourly level, consistent with the time granularity of the meteorological data, and associated with the road line type in the GIS map. The multi-task deployment report generated daily is digitized, and key information therein is extracted, such as the number, type, description, involved road sections, planned start and end time, and required resources of the maintenance task, etc. A structured maintenance task information table is established, and spatiotemporal matching is performed with the road interruption information, and the road interruption point corresponding to each task is marked.

[0143] The data of road interruption records are annotated and cleaned. According to the causes of the interruption, such as landslide, water damage, construction, etc., the interruptions are classified, and the recovery time is discretized into levels such as quick recovery, short-term interruption, medium-term interruption, and long-term interruption. Invalid data with abnormal recovery time are eliminated, and the number of samples in each interruption category is balanced. The training data set and the test data set are constructed for subsequent machine learning model training and evaluation. A variety of commonly used classification algorithms, such as logistic regression, decision tree, support vector machine, etc., are used to compare and evaluate the performance of each algorithm on the training set and test set, and the model with the best indicators such as precision, recall rate, F1 value, AUC, etc. is selected.

[0144] Taking logistic regression as an example, select L1 or L2 regularization mode, optimize the regularization coefficient, and use coordinate descent method or gradient descent method to solve. Take the environmental factors and road attributes of road interruption records as input features, and the interruption type as the target variable, train the interruption cause classification model, extract the weight coefficient of each feature, analyze the correlation between environmental factors such as rainfall and wind speed and road interruptions caused by different reasons, and obtain the decision rules for distinguishing environmental factors and interruption causes. For each maintenance task, extract the road interruption point information on the covered road section, input the environmental factors and road attributes of the interruption point into the interruption cause classification model, judge the interruption cause of each interruption point, combine the recovery time level of the interruption point, and use the weighted average method to calculate the interruption risk index of each maintenance task route, which is divided into three levels: accessible, difficult to reach, and unreachable, to form an accessibility analysis report for the maintenance task.

[0145] Perform dimensionality reduction analysis on the attribute data of all maintenance tasks, observe their distribution in the low-dimensional space, preliminarily determine the appropriate cluster number K, and then use the hierarchical clustering algorithm to cluster the tasks, try different cluster numbers at different levels, draw the SSE or silhouette coefficient curve, find the optimal cluster number at the inflection point, and then use the K-means algorithm to refine the clustering, divide the tasks into three categories: large, medium and small, and conduct statistical analysis on the characteristics of each type of task from the dimensions of task volume, construction period, resource requirements, etc., to formulate differentiated maintenance resource allocation strategies.

[0146] For each type of maintenance task after clustering, an independent route accessibility prediction model is trained. Specifically, multiple primary learners are trained separately using ensemble learning algorithms such as GBDT and RF. Attention is paid to setting the appropriate type and number of base classifiers, optimizing the maximum depth of the tree, learning rate, sampling ratio and other parameters. Then, the output of the primary learner is used as the input feature of the secondary learner. The Stacking generalization strategy is adopted to train secondary learners such as LR and XGBoost to achieve re-learning and fusion of the primary learner. The input features of the model also include the distribution density of road interruption points, the average recovery time, the fluctuation of environmental factors, etc. The output of the model is the three-classification task route accessibility level. The feature importance analysis method is used to evaluate the influence weight of various factors on the task route accessibility, generate a road risk warning model for different types of maintenance tasks, predict the interruption risk of the task route in real time, and dynamically adjust the task dispatch and resource allocation plan.

[0147] Furthermore, for tasks that can be passed, ensure that all preparatory measures and resources are in place, and that the maintenance team has received detailed task assignments and schedules, monitor and track task progress, and ensure immediate information updates and rapid problem resolution through real-time communication tools.

[0148] Specifically, the route accessibility prediction model is used to predict and evaluate the accessibility levels of all maintenance tasks to be performed in the entire network, and all tasks with an accessibility level of "reachable" are automatically screened out to generate a list of executable tasks and sort them by priority. The priority determination rule comprehensively considers factors such as the importance of the task, the recovery time of road interruption, and the proximity of the geographical location. The priority score of the task is obtained through the weighted sum method, and a task execution queue is formed in descending order.

[0149] For each executable maintenance task, based on the types and quantities of resources such as manpower, machinery, materials, spare parts, etc. required, as well as the regional location and planned duration of the task, a multi-objective optimization scheduling model is adopted to establish an integer programming model with the goals of minimizing resource utilization cost, shortest supply time, and optimal quality, with task resource demand, supply capacity, and transportation time window as constraints, and resource allocation quantity and transportation path as decision variables. The weighted sum method is used to normalize the objectives, and heuristic algorithms such as genetic algorithms and ant colony algorithms are used to solve the optimal resource allocation plan, generate resource demand plans and supply plans, and integrate them with the resource management information system to automatically trigger procurement, allocation, distribution and other processes to ensure that all resources are ready before the start of the maintenance task.

[0150] Based on factors such as the workload, process difficulty, and required skills of each maintenance task, the pre-configured task-role templates in the knowledge base are used to automatically match and generate role requirements for the task. Based on the skill tags, manpower conditions, and location distribution of the maintenance team members, the job matching algorithm and scheduling optimization algorithm are used to automatically assign the optimal personnel combination and scheduling plan for each task, form a human resource plan for the task, and push it to the employee's mobile work terminal, including detailed information such as shifts, locations, work content, and collaborative personnel. The standard labor quota, key processes, milestone nodes, etc. of the maintenance work are pre-entered into the task management information system, and the planned duration, technical plan, quality standards, etc. of each task are matched. The tasks are decomposed using WBS to form manageable work packages. PERT is then used to calculate the time parameters of the work, identify the critical path, and use CCPM to determine the critical chain under resource constraints. Resource balance is implemented, and a reasonable time buffer is reserved. The task schedule and budget schedule are automatically generated, including the resource requirements of each process, milestone nodes, labor and material cost budgets, etc. The progress data of the task is collected in real time, and the earned value management method is used to compare and analyze the planned value and actual value, predict the completion time and cost, and take progress optimization and cost correction measures.

[0151] For the work sites of key tasks, video surveillance and IoT sensors are used to collect data such as personnel location, equipment status, and process completion in real time, and the data is uploaded to the task monitoring and management platform in real time through communication networks such as 5G. The platform uses video analysis, artificial intelligence and other technologies to analyze the on-site images and status data, extract the working status information of the work elements, and integrate them with three-dimensional visualization models such as BIM models to dynamically simulate the work process and intuitively present the real-time progress of the task, including the overall completion percentage, completed and pending work items, resource utilization, progress deviation, etc. At the same time, the data quality is tested in real time, and early warning prompts are issued for areas that have not been reported in time, triggering the manual inspection process.

[0152] During the execution of the task, all participants will update the task progress information in a timely manner through mobile terminal APP, etc. On-site managers will report the progress regularly and compare it with the planned schedule. The EVM (earned value management) method will be used to evaluate the status of task progress, generate a task burndown chart, and intuitively judge the progress. Once risk points such as progress delays, quality problems, and safety hazards are found, the causes will be analyzed, the impact will be evaluated, and response plans will be matched. Disposal processes will be formulated to adjust and optimize task plans. At the same time, excellent practices and lessons will be accumulated, the risk knowledge base will be enriched, and machine learning algorithms will be used to optimize risk warning models and rule bases. Differentiated information sharing strategies will be formulated according to the information sensitivity and security level of the task. For tasks involving core business secrets or key privacy, local deployment or point-to-point communication will be used to ensure the security and controllability of data transmission and storage. Through agile and efficient communication collaboration, all parties can quickly formulate, execute, monitor, and optimize task plans to ensure that maintenance tasks are completed on time and with quality.

[0153] For example, when prioritizing executable maintenance tasks, the analytic hierarchy process (AHP) can be used to divide the factors affecting task priority into three criterion layers: task importance, road interruption recovery time, and task area proximity. 3-5 indicators are set under each criterion layer, and a 1-9 scale is used to compare each indicator in pairs to form a judgment matrix. The maximum eigenvalue and corresponding eigenvector of the matrix are calculated, and a consistency test is performed on them to obtain the weight value of each indicator. The weighted sum method is used to calculate the score of each task at different criterion layers, and the geometric mean method is used to summarize and obtain the comprehensive priority score of the task.

[0154] In multi-objective resource optimization scheduling, a mixed integer programming model can be established. The constraints include the resource demand of each task, the resource supply capacity and minimum order quantity of each supplier, the load capacity and mileage of the transportation tool, etc. The objective function includes the weighted sum of resource usage cost, supply time, quality level, etc., and is solved by genetic algorithm. The variable encoding uses binary string, the crossover operator uses single-point crossover, the mutation operator uses uniform mutation, and the selection operator uses tournament selection. After 500 iterations, the optimal scheduling solution is obtained.

[0155] When decomposing and optimizing tasks, WBS is used to decompose tasks layer by layer until the smallest work package that can be managed and assessed independently is reached. The size of the work package is generally controlled at 80-120 man-hours, forming a WBS dictionary that includes work definition, predecessor tasks, deliverables and other information. Then, the three-point estimation method is used to estimate the possible duration of each work package, taking the estimated values ​​under the most likely, most optimistic and most pessimistic scenarios, and the PERT formula is used to calculate the expected duration, criticality, etc. of the work package, identify the critical path and draw a task network diagram. CCPM is then used to select the three types of resources with the largest input from the critical chain as bottleneck resources, outsource or deploy work packages on non-critical chains to non-bottleneck resources as much as possible, and leave a certain amount of project buffer time at the end of the critical chain, generally within 30% of the length of the critical chain. Use a Gantt chart to intuitively present the optimized schedule with resource balance, and use an S-curve chart to display the results of the earned value analysis.

[0156] In terms of real-time task monitoring, SIM cards are implanted in wearable devices such as smart helmets, sensor vests, and mobile terminals of operators to collect vital signs data such as the location, heart rate, and body temperature of operators. The camera connected to the deep learning framework shoots the operation screen at a speed of 5 frames per second to extract information such as personnel movements and the operating status of mechanical equipment. The supply and use of materials are sensed through radar speed meters and intelligent logistics codes, and these heterogeneous data are aggregated to the task monitoring management platform through the MQTT protocol. The platform runs the target detection algorithm YOLOv5 to accurately identify key operating elements such as engineering vehicles, construction materials, and maintenance tools, extract their categories and location information, and then combine semantic segmentation algorithms such as SSD to determine the working status of personnel, equipment, and materials in the operation area. Through real-time interaction with the BIM model through digital twin technology, a three-dimensional visual operation screen is generated, and compared with the standard process library. Based on the rule engine, automatic identification and alarm of process quality and safety risks are realized, and audio and video clips of abnormal status are pushed to the PAD terminal of the on-site manager in real time through the WebSocket protocol. The platform integrates the progress, cost, quality, safety, contract, material and other data of various business systems, establishes a task-themed data lake, uses the Spark memory computing framework to conduct real-time analysis of the entire task data, builds a KPI indicator system for each link, and uses data visualization tools such as PowerBI and Tableau to create a task status cockpit to provide data support for project management decisions.

[0157] Furthermore, for tasks that cannot be passed, a replacement plan is developed based on the interactions and synergies between the fault points to solve the insurmountable fault points by repairing other fault points.

[0158] Specifically, for maintenance tasks whose route accessibility is predicted to be "unreachable", the corresponding inaccessible road sections and blocking fault points are extracted from the task management information system, and other fault points directly or indirectly connected to the blocking fault points are retrieved from the graph database. Based on the graph shortest path algorithm such as Dijkstra or A*, the shortest propagation path between the blocking fault point and other fault points is calculated, and the fault points whose propagation path length is less than the set threshold (such as 3 hops) are taken as the initial screening of substitute maintenance candidate points and stored in the candidate set. Using knowledge graph reasoning technology, we first extract background knowledge such as the causes, mechanisms, impacts, and inducing relationships of various faults from the ontology knowledge base, and then combine the actual occurrence sequence, time interval, spatial proximity and other information of each fault in the case library. Through the temporal association analysis algorithm and causal relationship mining algorithm, we find the association rules and causal chains between different fault points. Among them, the Apriori algorithm is based on the support-confidence framework and is suitable for mining frequent item sets, but the computational complexity is high; the FP-growth algorithm uses the FP tree to compress data and improve the efficiency of association rule mining; the PC algorithm is based on the conditional independence test and can discover directed acyclic causal graphs, but it has high requirements on data quality; the FCI algorithm further considers hidden variables and selective bias, and the mined causal relationship is more robust.

[0159] In practical applications, it is necessary to select appropriate algorithms or combinations according to the characteristics of the data and business needs. Finally, a domain fault collaborative network is constructed. Specifically, the candidate points for replacement maintenance obtained by the initial screening are mapped to the domain fault collaborative network, and the association rules and causal chains between the candidate points and the blocking fault points are extracted. For candidate points with a correlation or causal strength higher than the preset threshold (such as support greater than 20% and confidence greater than 60%, or causal strength greater than 0.5), it is determined that they have a significant synergistic effect with the blocking fault point. If the blocking fault point can be alleviated or eliminated by repairing the candidate point, it will be added to the recommended solution set. According to factors such as the number of candidate fault points involved in the replacement solution, the type and quantity of required resources, and the degree of deviation from the original maintenance task, the hierarchical analysis method (AHP) is used to construct a multi-criteria evaluation model. The indicators are divided into multiple levels such as the target layer, the criterion layer, and the solution layer to form a hierarchical structure. Then, through pairwise comparison, a judgment matrix is ​​formed, and the eigenvector corresponding to the maximum eigenvalue of the judgment matrix is ​​calculated to obtain the weight of the indicator.

[0160] For qualitative indicators that are difficult to describe with precise numerical values, fuzzy mathematics theory can also be introduced to replace precise numerical values ​​with language variables to establish a fuzzy judgment matrix. Considering both quantitative and qualitative indicators, the fuzzy comprehensive evaluation method is used to comprehensively evaluate and rank the substitute plans. The top N substitute plans with the highest comprehensive evaluation scores are selected and submitted to the project management team for review. The substitute plans are demonstrated in combination with the actual on-site survey situation and management policy constraints. The plans are further refined and optimized by considering factors such as construction technology, traffic organization, and emergency plans. Manual adjustments and secondary reviews are carried out when necessary to determine the optimal substitute plan and form a formal project change application.

[0161] The determined substitute maintenance plan is entered into the task management information system, and the resource optimization scheduling algorithm is called. Under the constraints of the original maintenance task and the substitute maintenance task, the multi-project multi-mode resource constrained scheduling model (MRCPSP) is used for modeling. Each maintenance task is decomposed into multiple sub-activities, and each activity can be completed by a combination of multiple resources. The objective function includes the total construction period, total cost, etc. The constraints include the precedence relationship of activities, the upper limit of shared resources, and the exclusive use of non-shared resources. Then, heuristic algorithms such as genetic algorithms and ant colony algorithms are used to solve them. The encoding method uses activity list + mode list, the crossover operation uses POX (order-preserving crossover), and the mutation operation uses the replacement and interchange of activities and modes respectively. The fitness function is the weighted sum of multiple objectives, and finally the optimal scheduling plan for the substitute plan is generated. Using the ontology engineering method, the task-activity-resource ontology of maintenance operations is constructed, and various maintenance tasks are abstracted into concept classes, operation activities are abstracted into attributes of concepts, and human and material resources are abstracted into resources of activities to form an ontology hierarchy. Based on the historical data of maintenance operations, the instantiation method is used to map operation records, operation tickets, technical standards, etc. to ontology concepts to form a maintenance operation knowledge base.

[0162] After generating the replacement plan, the ontology reasoning engine is used to achieve semantic matching between the strategy knowledge and the replacement plan, automatically retrieve the work instructions and control requirements applicable to the replacement plan, and manage the plan process. At the same time, the operators are equipped with intelligent terminals to transmit task work tickets and safety briefing materials, and monitor the implementation process of the replacement plan in real time. Through the intelligent inspection system, working condition diagnosis system, etc., the repair effect of the replacement maintenance on the original fault is perceived in real time, and the incremental learning mechanism is used to dynamically adjust the fault coordination network and evaluation model, and the maintenance strategy is continuously optimized when the route is unreachable, so as to improve the resilience and intelligence level of power grid operation and maintenance.

[0163] like Figure 2 As shown, another embodiment of the present invention provides a device for formulating a power grid fault power supply maintenance plan, which is characterized by comprising an acquisition module 11, a test module 12, a prediction module 13, a sorting module 14, and a maintenance module 15, wherein:

[0164] An acquisition module 11 is used to acquire historical fault data of each node in the power grid and establish a maintenance strategy corresponding to the historical fault data;

[0165] A test module 12 is used to perform a fault simulation test based on the historical fault data and the maintenance strategy, and sequentially collect response data of the remaining non-target fault nodes when the selected target fault nodes are repaired according to each maintenance strategy;

[0166] The prediction module 13 is used to input each of the response data into a pre-built association network model for prediction, and obtain a prediction result corresponding to the current target fault node, wherein the prediction result reflects the interaction and synergy between the corresponding fault nodes in the power grid;

[0167] A sorting module 14 is used to construct a priority ranking of each target fault node in the power grid based on all the prediction results, wherein the priority ranking reflects the gradient level of the target fault node relative to the non-target fault node under the fault environment;

[0168] The maintenance module 15 is used to monitor the power grid and, when an actual fault is detected, formulate a power supply maintenance plan for repairing the actual fault based on the priority ranking.

[0169] like Figure 3 As shown, another embodiment of the present invention provides a power grid fault power supply maintenance plan formulation device, including a processor 21, a memory 22, and a computer program stored in the memory 22 and configured to be executed by the processor 21. When the processor 21 executes the computer program, the steps in the above-mentioned power grid fault power supply maintenance plan formulation method embodiment are implemented, for example Figure 1 Alternatively, the processor 21 implements the functions of each module in the above-mentioned device embodiments when executing the computer program, such as the acquisition module 11.

[0170] Yet another embodiment of the present invention provides a computer-readable storage medium storing a computer program, wherein when the device where the computer-readable storage medium is located executes the computer program, the method for formulating a power grid fault power supply maintenance plan as described above is implemented.

[0171] The method for formulating a power grid fault power supply maintenance plan according to an embodiment of the present invention has the following beneficial effects:

[0172] 1) The present invention improves maintenance efficiency by monitoring the operating status of the equipment in real time, and promptly discovering and diagnosing potential faults to ensure that the faults are handled in a timely manner;

[0173] 2) The present invention performs fault simulation tests through power grid data to obtain the priority ranking of each target fault node, thereby improving the speed and accuracy of fault response and enhancing the stability of power supply equipment;

[0174] 3) The present invention establishes a clear fault handling process based on the priority ranking of each target fault node, which helps to improve the stability and reliability of the power system and ensure people's normal production and living needs.

[0175] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A method for formulating a power grid fault maintenance plan, It is characterized in that The following steps are involved: Acquire historical fault data of each node in the power grid and establish a maintenance strategy corresponding to the historical fault data; Performing a fault simulation test based on the historical fault data and the maintenance strategy, and sequentially collecting response data of the remaining non-target fault nodes when the selected target fault nodes are repaired according to each maintenance strategy; wherein the response data includes the output of the generator set, the voltage and current of the bus, the temperature and oil level of the transformer, and the number and time of circuit breaker operations; Input each of the response data into a pre-built association network model for prediction, and obtain a prediction result corresponding to the current target fault node, wherein the prediction result reflects the interaction and synergy between the corresponding fault nodes in the power grid; Among them, the construction of the association network model includes: treating each node in the power grid as a vertex of the association network, calculating the association strength between the nodes according to the electrical connection, physical distance and power flow between the nodes, generating a weighted directed graph, and using the community discovery algorithm to characterize the topological structure of the weighted directed graph; using the spatiotemporal graph neural network algorithm to learn the dynamic embedding representation of the nodes in the association network, updating the hidden state of the nodes through the attribute characteristics of the nodes, the state of the neighboring nodes and the physical quantity of the power grid, and aggregating the influence of the neighboring nodes through the attention weight, capturing the interaction and dependency between the nodes, and generating a low-dimensional vector representation of the nodes; based on the network embedding representation, using the causal discovery algorithm to explore the potential confounding factors and causal mechanisms between the nodes, and analyzing the causal relationship and propagation path between the nodes; at the same time, introducing the prior knowledge of the power grid, constraining and correcting the causal relationship, judging the upstream cause node and the downstream influence node of the fault point, constructing the causal chain of the power grid fault, and using the centrality index of the graph to evaluate the importance and impact range of each fault point; Based on all the prediction results, constructing a priority ranking of each target fault node in the power grid, wherein the priority ranking reflects the gradient level of the target fault node relative to the non-target fault node under the fault environment; The power grid is monitored, and when an actual fault is detected, a power supply maintenance plan is formulated based on the priority ranking to repair the actual fault.

2. The method for formulating a power grid fault maintenance plan according to claim 1, It is characterized in that The acquiring of historical fault data of each node in the power grid and establishing a maintenance strategy corresponding to the historical fault data includes: Analyzing the historical fault data using a time series algorithm to identify fault modes that lead to significant outages in the power grid; Design corresponding maintenance strategies for each failure mode.

3. The method for formulating a power grid fault maintenance plan according to claim 1, It is characterized in that The acquiring of historical fault data of each node in the power grid and establishing a maintenance strategy corresponding to the historical fault data also includes: Arranging the historical fault data in chronological order to form a fault time series data set; Establishing a fault prediction model based on a time series prediction algorithm and training the time series prediction algorithm parameters using the fault time series data set; The fault prediction model is used to predict the fault type, obtain the probability of occurrence of each fault type, and sort them according to the size of the occurrence probability to generate a fault risk list.

4. The method for formulating a power grid fault maintenance plan according to claim 1, It is characterized in that The step of inputting each of the response data into a pre-built association network model for prediction to obtain a prediction result corresponding to the current target fault node includes: Network theory is used to conduct cross-regional and cross-time analogy analysis of nodes in the power grid. By comparing and learning from similar nodes, the interactions and synergies of nodes can be identified.

5. The method for formulating a power grid fault maintenance plan according to claim 1, It is characterized in that The monitoring of the power grid and, when an actual fault is detected, formulating a power supply maintenance plan for repairing the actual fault based on the priority ranking includes: Based on the priority ranking, a multi-objective maintenance scheduling model is constructed, wherein the multi-objective maintenance scheduling model reflects the influence of various factors in the power grid maintenance process; According to the output results of the multi-objective maintenance scheduling model, a corresponding maintenance plan result is constructed.

6. The method for formulating a power grid fault maintenance plan according to claim 5, It is characterized in that When constructing the multi-objective maintenance scheduling model, the optimization objectives of the multi-objective maintenance scheduling model include minimizing the scope of fault impact, minimizing maintenance time, and minimizing resource consumption; the constraints of the multi-objective maintenance scheduling model include maintenance time window, resource upper limit, and manpower availability.

7. The method for formulating a power grid fault maintenance plan according to claim 1, It is characterized in that Before formulating a power supply maintenance plan to repair the actual fault, it also includes: Collect road disruption information, apply machine learning algorithms, analyze the correlation between road disruption data and multi-task deployment reports, and update the maintenance plan.

8. A device for formulating a power grid fault maintenance plan. It is characterized in that Includes the following modules: An acquisition module, used to acquire historical fault data of each node in the power grid and establish a maintenance strategy corresponding to the historical fault data; A test module, used to perform a fault simulation test based on the historical fault data and the maintenance strategy, and sequentially collect response data of the remaining non-target fault nodes when the selected target fault nodes are repaired according to each maintenance strategy; wherein the response data includes the output of the generator set, the voltage and current of the bus, the temperature and oil level of the transformer, and the number and time of circuit breaker operations; A prediction module, used to input each of the response data into a pre-built association network model for prediction, and obtain a prediction result corresponding to the current target fault node, wherein the prediction result reflects the interaction and synergy between the corresponding fault nodes in the power grid; Among them, the construction of the association network model includes: treating each node in the power grid as a vertex of the association network, calculating the association strength between the nodes according to the electrical connection, physical distance and power flow between the nodes, generating a weighted directed graph, and using the community discovery algorithm to characterize the topological structure of the weighted directed graph; using the spatiotemporal graph neural network algorithm to learn the dynamic embedding representation of the nodes in the association network, updating the hidden state of the nodes through the attribute characteristics of the nodes, the state of the neighboring nodes and the physical quantity of the power grid, and aggregating the influence of the neighboring nodes through the attention weight, capturing the interaction and dependency between the nodes, and generating a low-dimensional vector representation of the nodes; based on the network embedding representation, using the causal discovery algorithm to explore the potential confounding factors and causal mechanisms between the nodes, and analyzing the causal relationship and propagation path between the nodes; at the same time, introducing the prior knowledge of the power grid, constraining and correcting the causal relationship, judging the upstream cause node and the downstream influence node of the fault point, constructing the causal chain of the power grid fault, and using the centrality index of the graph to evaluate the importance and impact range of each fault point; A sorting module, configured to construct a priority ranking of each target fault node in the power grid based on all the prediction results, wherein the priority ranking reflects the gradient level of the target fault node relative to the non-target fault node under the fault environment; The maintenance module is used to monitor the power grid and, when an actual fault is detected, formulate a power supply maintenance plan for repairing the actual fault based on the priority sorting.

9. A device for making a power grid fault maintenance plan. It is characterized in that The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the method for formulating a power grid fault power supply maintenance plan as described in any one of claims 1 to 7 is implemented.

10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the method for formulating a power grid fault power supply maintenance plan as described in any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Process to optimize the maintenance of technical systems

    AT514680A2

  • Equipment operation and maintenance system and equipment based on fault knowledge base, and storage medium

    CN116228183A