A method and device for controlling the overall rotation of a navigation satellite constellation in semi-autonomous operation
By using the least squares algorithm to solve and slide window update methods in the semi-autonomous operation of navigation satellites, the problem of overall rotation error accumulation of navigation satellite constellations is solved, significantly improving the semi-autonomous navigation accuracy of navigation satellites and achieving higher The accuracy of the orbit and clock difference solution.
Patent Information
- Application Number
- CN202410605016.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-15
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-05-15
AI Technical Summary
When the navigation satellite is semi-autonomous, due to the lack of space-time reference information related to the earth, the overall rotation error of the constellation is accumulated, making it difficult to operate autonomously for a long time. The simulation method for solving the parameters of the semi-autonomous orbit and clock difference of navigation satellites supported by the ground station cannot be effective. Improve the autonomous orbital accuracy of satellites that cannot establish direct contact with the ground station, resulting in inconsistent autonomous orbital accuracy, which is prone to failure of autonomous orbital determination.
A method of overall rotation control for the overall rotation of the constellation of the navigation satellite is adopted. The initial parameters of the overall rotation of the constellation are injected at 0:00:00 by the ground station, the observations of the two-way star ground are sampled, and the least squares algorithm is used to solve the overall rotation parameters of the constellation. Update and find the mean value in the sliding window, and periodically note correction parameters to ensure the semi-autonomous operation of the constellation.
The accuracy of the semi-autonomous navigation orbit and clock difference of navigation satellite has been significantly improved. The URE accuracy has been increased from 2.12m to 0.51m, and the clock difference accuracy has been increased from 2.76ns to 2.07ns, which has solved the problem of difficult control of the overall rotation of the constellation and improved the The semi-autonomous navigation accuracy of navigation satellites.
Smart Images

Figure CN118519176B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of satellite navigation technology, and in particular to a method and device for controlling the overall rotation of a semi-autonomous constellation of a navigation satellite. Background Art
[0002] When only using the two-way ranging data of the intersatellite link for fully autonomous navigation of the navigation satellite constellation, due to the lack of time and space reference information related to the earth, the accumulation of the overall rotation error of the constellation cannot be eliminated or suppressed, making it difficult for the constellation to operate autonomously for a long time. To solve this problem, it is necessary to establish a connection between the constellation and the ground, that is, to introduce an absolute reference on the ground. A ground station refers to a ground base station with radio transmission capability, which can be regarded as a pseudo-satellite and participates in the ranging of the intersatellite link as an absolute reference for autonomous navigation.
[0003] When the navigation satellite is semi-autonomous, only a small number of ground stations can be used to establish observations with the satellite. At any time, basically only 1 to 3 satellites can establish contact with the ground station, that is, the ground station can observe the navigation satellite, and the amount of satellite-to-ground observation data is far less than the amount of inter-satellite observation data. Most satellites only have observation data of the inter-satellite link. Under this condition, in order to solve the problem of the overall rotation of the navigation constellation, the semi-autonomous orbit and clock error parameter solution simulation method of the navigation satellite supported by the ground station is currently used, that is, by imposing strong constraints on the observation data of the ground station, it is used to improve the autonomous orbit determination accuracy of the satellites with line of sight with the ground station, but the autonomous orbit determination accuracy of the satellites that cannot establish direct contact with the ground station cannot be improved, so the autonomous orbit determination accuracy of the entire constellation is inconsistent. For orbit determination during semi-autonomous operation, each satellite must perform autonomous orbit determination and serve as a reference star for other satellites. This kind of constellation with uneven accuracy is prone to autonomous orbit determination failure.
[0004] It can be seen that the navigation satellite semi-autonomous orbit and clock error parameter solution simulation method supported by the above ground station has certain limitations when applied to solving the overall rotation problem of the navigation constellation. Summary of the invention
[0005] The purpose of the present invention is to provide a method and device for controlling the overall rotation of a semi-autonomous constellation of a navigation satellite to solve the above-mentioned problem.
[0006] To achieve the above-mentioned purpose, a first aspect of an embodiment of the present invention discloses a method for controlling the overall rotation of a semi-autonomous navigation satellite constellation, the method comprising:
[0007] S1. At 0:0:0:0 on the measurement start date, the ground station injects a set of preset initial parameters of the overall rotation of the constellation to the navigation satellites in the navigation satellite constellation to start the semi-autonomous operation of the navigation satellite constellation;
[0008] S2. On the D day, the ground station samples and obtains the two-way satellite-to-ground observation value information between the observable navigation satellite in the navigation satellite constellation and the ground station; the two-way satellite-to-ground observation values include the first type of satellite-to-ground observation values and the second type of satellite-to-ground observation values, the first type of satellite-to-ground observation values represent the observation values transmitted by the navigation satellite and received by the ground station; the second type of satellite-to-ground observation values represent the observation values transmitted by the ground station and received by the navigation satellite; the sampling starts at time T1, with Δt as the sampling interval and M as the measurement duration, the Δt value range is 5 to 10 minutes; the M value range is 4 to 6 hours; the initial value of time T1 is 0 hours, 0 minutes, and 0 seconds; the D represents the measurement date, and the initial value of D is the measurement start date;
[0009] S3. According to the navigation system parameter information and the two-way satellite-to-ground observation value information, a least squares algorithm is used to solve the constellation overall rotation parameter to obtain the constellation overall rotation parameter value; the navigation system parameter information represents the parameter information of the navigation system operation, including but not limited to the predicted orbit parameters of the navigation satellite, the predicted clock error parameters, the precise coordinates of the ground station, the precise clock error and the error correction term in the satellite-to-ground observation;
[0010] S4, with the duration K as the sliding window time length, slidingly execute steps S2 to S3 N times within the Dth day to obtain N constellation overall rotation parameter values; each time sliding, update T1 to T1+K, the sampling end time within the last sliding window of the day is before 23:59:59 of the day, and the value range of K is: M≤K<24 hours; Indicates rounding down;
[0011] S5, performing an average processing on the N constellation overall rotation parameter values to obtain the constellation overall rotation correction parameter value on the Dth day;
[0012] S6. At 23:59:59 on the D day, the ground station injects the constellation overall rotation correction parameter value to the navigation satellites in the navigation satellite constellation for the semi-autonomous operation of the navigation satellite constellation on the D+1 day;
[0013] S7. Update D to D+1, and execute steps S2 to S7 in a loop until an end instruction is received.
[0014] As an optional implementation manner, in the first aspect of the embodiment of the present invention, the method of solving the constellation overall rotation parameter using a least squares algorithm according to the navigation system parameter information and the two-way satellite-ground observation value information to obtain the constellation overall rotation parameter value includes:
[0015] S31, according to the navigation system parameter information, calculating the theoretical satellite-ground observation value correction corresponding to the measurement time of the two-way satellite-ground observation value in the two-way satellite-ground observation value information in time sequence, and obtaining the theoretical satellite-ground observation value correction information; the theoretical satellite-ground observation value correction information includes the theoretical ground-satellite observation value correction and the theoretical satellite-ground observation value correction;
[0016] S32, using the navigation system parameter information, the theoretical satellite-to-ground observation value correction information, and the two-way satellite-to-ground observation value information, a least squares algorithm is used to solve the constellation overall rotation parameter solution model to obtain the constellation overall rotation parameter value;
[0017] The constellation overall rotation parameter solution model is:
[0018]
[0019] In formula (1), Indicates T i The first type of satellite-earth observation value at the moment; Indicates T i The second type of satellite-to-earth observation value at the moment; ρ SA Indicates T i The theoretical satellite-to-ground observation value transmitted by the satellite and received by the ground station at the moment, ρ AS Indicates T i The theoretical satellite-to-ground observation value transmitted by the ground station and received by the satellite at the moment, ρ SA and ρ AS The expression is shown in formula (2); i Time represents the sampling time of the two-way satellite-to-ground observation value; represents the error correction term in satellite-to-earth observations transmitted by satellite and received by ground stations, δρ SASTA ,δρ ASTAS They represent the corrections of theoretical earth-satellite observation values and theoretical satellite-earth observation values respectively; It represents the error correction term in the satellite-to-earth observation transmitted by the ground station and received by the satellite. and This includes but is not limited to equipment delay, satellite antenna phase center and relativistic effects, tropospheric delay, ionospheric delay, station antenna phase center, earth tides, and earth rotation effects;
[0020]
[0021] In formula (2), Indicates that the ground station is at T i The position vector in the J2000 coordinate system at the moment, The expression is as shown in formula (3); Indicates that the satellite is at T iThe orbital vector in the J2000 coordinate system at time, The expression is as shown in formula (4); R(ω) is the overall rotation matrix of the navigation constellation, and the expression is as shown in formula (5); ω is the overall rotation parameter of the constellation, and the expression is as shown in formula (6);
[0022]
[0023]
[0024]
[0025]
[0026] In formula (3) to formula (6), x A ,y A ,z A are the components of the position vector of the ground station on the x, y, and z axes, respectively, which are provided by the ground station and are precisely known; s ,y s ,z s T i The x, y, and z-axis components of the satellite orbit vector at any given moment are calculated on the satellite and transmitted to the ground station as known quantities; UTCUT1 is the difference between Coordinated Universal Time and Meridian Universal Time UT1.
[0027] As an optional implementation manner, in the first aspect of the embodiment of the present invention, the step of calculating, in time sequence, according to the navigation system parameter information, a theoretical satellite-to-ground observation correction corresponding to the measurement time of the two-way satellite-to-ground observation value in the two-way satellite-to-ground observation value information to obtain the theoretical satellite-to-ground observation correction information includes:
[0028] S311, obtaining the measurement time of the two-way satellite-to-ground observation value in the two-way satellite-to-ground observation value information in time sequence to obtain an observation time sequence;
[0029] S312, according to the observation time sequence, using the navigation satellite predicted orbit parameters, predicted clock error parameters, ground station precise coordinates and precise clock error in the navigation system parameter information, sequentially calculate the theoretical value of the theoretical earth-satellite observation value correction amount transmitted by the ground station and received by the satellite at each observation time, and obtain the theoretical earth-satellite observation value correction amount information;
[0030] S313. According to the observation time sequence, using the navigation satellite predicted orbit parameters, predicted clock error parameters, ground station precise coordinates and precise clock error in the navigation system parameter information, sequentially calculate the theoretical value of the satellite-to-earth observation value correction amount transmitted by the satellite and received by the ground station at each observation time, and obtain the theoretical satellite-to-earth observation value correction amount information.
[0031] As an optional implementation, in the first aspect of the embodiment of the present invention, the navigation satellite constellation is 24 Beidou MEO satellites, and the ground station is deployed in any area between 18° and 23° north latitude in China.
[0032] As an optional implementation, in the first aspect of the embodiment of the present invention, the duration M is 4 hours; the duration K is 4 hours; and the N is 6.
[0033] A second aspect of an embodiment of the present invention discloses a navigation satellite semi-autonomous operation constellation overall rotation control device, which applies the navigation satellite semi-autonomous operation constellation overall rotation control method disclosed in the first aspect of an embodiment of the present invention, and the device includes:
[0034] Initial parameter injection module: used for injecting a set of preset initial parameters of the overall rotation of the constellation to the navigation satellites in the navigation satellite constellation at 0:0:0 on the measurement start date, so as to start the semi-autonomous operation of the navigation satellite constellation;
[0035] A sampling module; used for sampling two-way satellite-to-ground observation value information between an observable navigation satellite and a ground station in a navigation satellite constellation; the two-way satellite-to-ground observation value includes a first type of satellite-to-ground observation value and a second type of satellite-to-ground observation value, wherein the first type of satellite-to-ground observation value represents the observation value transmitted by the navigation satellite and received by the ground station; the second type of satellite-to-ground observation value represents the observation value transmitted by the ground station and received by the navigation satellite;
[0036] The module for calculating the overall rotation parameters of the constellation is used to calculate the overall rotation parameters of the constellation by using the least squares algorithm according to the navigation system parameter information and the two-way satellite-to-ground observation value information to obtain the overall rotation parameter value of the constellation; the navigation system parameter information includes the predicted orbit parameters of the navigation satellite, the predicted clock error parameters, the precise coordinates of the ground station, the precise clock error and the error correction items in the satellite-to-ground observation;
[0037] The constellation overall rotation parameter sliding calculation module is used to use the duration K as the sliding window time length, use the sampling module to collect the two-way satellite-to-ground observation value information between the observable navigation satellites in the navigation satellite constellation and the ground station, use the constellation overall rotation parameter solving module to solve the constellation overall rotation parameter value, and obtain N constellation overall rotation parameter values by sliding calculation;
[0038] A constellation overall rotation correction parameter value calculation module is used to perform an average processing on the N constellation overall rotation parameter values to obtain a constellation overall rotation correction parameter value;
[0039] A correction parameter injection module; used for the ground station to inject the constellation overall rotation correction parameter value to the navigation satellites in the navigation satellite constellation at a specified time;
[0040] A cyclic execution module; used for updating the execution date, cyclically utilizing the initial parameter annotation module, the sampling module, the constellation overall rotation parameter solution module, the constellation overall rotation parameter sliding calculation module, the constellation overall rotation correction parameter value calculation module and the correction parameter annotation module, to semi-autonomously operate the constellation overall rotation control of the navigation satellite until an end instruction is received.
[0041] A third aspect of an embodiment of the present invention discloses a navigation satellite semi-autonomous operation constellation overall rotation control device, the device comprising:
[0042] A memory storing executable program code;
[0043] a processor coupled to the memory;
[0044] The processor calls the executable program code stored in the memory to execute the method for controlling the overall rotation of a semi-autonomous constellation of a navigation satellite disclosed in the first aspect of an embodiment of the present invention.
[0045] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0046] Compared with the existing simulation method for calculating the semi-autonomous orbit and clock error parameters of navigation satellites supported by ground stations, the method and device for controlling the overall rotation of the semi-autonomous constellation of navigation satellites disclosed in the embodiment of the present invention are based on the actual engineering construction needs of the semi-autonomous navigation of the navigation system, and provide a method for controlling the overall rotation of the semi-autonomous constellation of navigation satellites, which solves the problem of possible failure of autonomous orbit determination due to the overall rotation of the navigation constellation, and can be directly applied to the actual engineering of the navigation system. Compared with the simulation method for calculating the semi-autonomous orbit and clock error parameters of navigation satellites supported by ground stations, the present invention solves the problem that the overall rotation of the constellation is difficult to control when the navigation satellite is semi-autonomous. The semi-autonomous orbit determination URE accuracy of the navigation satellite based on the present invention is improved from 2.12m to 0.51m, and the clock error accuracy is improved from 2.76ns to 2.07ns, which greatly improves the orbit and clock error solution accuracy of the semi-autonomous navigation of the navigation satellite. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 A flow chart of a method for controlling the overall rotation of a navigation satellite constellation in semi-autonomous operation disclosed in an embodiment of the present invention;
[0048] Figure 2 A schematic diagram of the structure of a navigation satellite semi-autonomous operation constellation overall rotation control device disclosed in an embodiment of the present invention;
[0049] Figure 3 A schematic diagram of the structure of another navigation satellite semi-autonomous operation constellation overall rotation control device disclosed in an embodiment of the present invention;
[0050] Figure 4 A detailed diagram of the orbit error of a navigation satellite for 60 days of semi-autonomous orbit determination based on a simulation method for calculating semi-autonomous orbit and clock error parameters of a navigation satellite supported by a ground station disclosed in an embodiment of the present invention;
[0051] Figure 5 This is a detailed diagram of orbit error of a navigation satellite semi-autonomous orbit determination for 60 days based on the present invention disclosed in an embodiment of the present invention. DETAILED DESCRIPTION
[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0053] Embodiment 1
[0054] See also Figure 1 . Figure 1 A schematic diagram of a method for controlling the overall rotation of a navigation satellite constellation in semi-autonomous operation disclosed in an embodiment of the present invention.
[0055] like Figure 1 As shown, the method for controlling the overall rotation of a navigation satellite constellation in a semi-autonomous operation mode disclosed in an embodiment of the present invention includes:
[0056] S1. At 0:0:0:0 on the measurement start date, the ground station injects a set of preset initial parameters of the overall rotation of the constellation to the navigation satellites in the navigation satellite constellation to start the semi-autonomous operation of the navigation satellite constellation;
[0057] S2. On the D day, the ground station samples and obtains two-way satellite-to-ground observation value information between the observable navigation satellite in the navigation satellite constellation and the ground station; the two-way satellite-to-ground observation value includes a first type of satellite-to-ground observation value and a second type of satellite-to-ground observation value, the first type of satellite-to-ground observation value represents the observation value transmitted by the navigation satellite and received by the ground station; the second type of satellite-to-ground observation value represents the observation value transmitted by the ground station and received by the navigation satellite; the sampling starts at time T1, with Δt as the sampling interval and M as the measurement duration, the Δt value range is 5 to 10 minutes; the M value range is 4 to 6 hours; the initial value of time T1 is 0 hours, 0 minutes, and 0 seconds; the two-way satellite-to-ground observation value information includes two-way satellite-to-ground observation values between the ground station and the observable satellite in the navigation satellite constellation within several measurement time periods; the D represents the measurement date, and the initial value of the D is the measurement start date;
[0058] S3. According to the navigation system parameter information and the two-way satellite-to-ground observation value information, a least squares algorithm is used to solve the constellation overall rotation parameter to obtain the constellation overall rotation parameter value; the navigation system parameter information represents the parameter information of the navigation system operation, including but not limited to the predicted orbit parameters of the navigation satellite, the predicted clock error parameters, the precise coordinates of the ground station, the precise clock error and the error correction term in the satellite-to-ground observation;
[0059] S4, with the duration K as the sliding window time length, slidingly execute steps S2 to S3 N times within the Dth day to obtain N constellation overall rotation parameter values; each time sliding, update T1 to T1+K, the sampling end time within the last sliding window of the day is before 23:59:59 of the day, and the value range of K is: M≤K<24 hours; Indicates rounding down;
[0060] S5. Performing averaging processing on the N constellation overall rotation parameter values to obtain the constellation overall rotation correction parameter value on the D-th day; the averaging processing represents calculating the arithmetic mean of the N constellation overall rotation parameter values.
[0061] S6. At 23:59:59 on the D day, the ground station injects the constellation overall rotation correction parameter value to the navigation satellites in the navigation satellite constellation for the semi-autonomous operation of the navigation satellite constellation on the D+1 day;
[0062] S7. Update D to D+1, and execute steps S2 to S7 in a loop until an end instruction is received.
[0063] It should be noted that steps S1 to S7 are all executed at the ground station.
[0064] It should be noted that since the number of navigation satellites observable by the ground station at one time is limited, by presetting the measurement duration and sliding window, the two-way satellite-to-ground observation value information between all navigation satellites in the navigation satellite constellation and the ground station can be sampled, so that the final obtained constellation overall rotation correction parameter value is more accurate. Since the obtained two-way satellite-to-ground observation value information has sufficient redundancy, it can be calculated in the initial and final reserved time slots of each sliding window.
[0065] In another optional embodiment, in the above step S3, according to the navigation system parameter information and the two-way satellite-ground observation value information, a least squares algorithm is used to solve the constellation overall rotation parameter to obtain the constellation overall rotation parameter value, including:
[0066] S31, according to the navigation system parameter information, calculating the theoretical satellite-ground observation value correction corresponding to the measurement time of the two-way satellite-ground observation value in the two-way satellite-ground observation value information in time sequence, and obtaining the theoretical satellite-ground observation value correction information; the theoretical satellite-ground observation value correction information includes the theoretical ground-satellite observation value correction and the theoretical satellite-ground observation value correction;
[0067] S32, using the navigation system parameter information, the theoretical satellite-to-ground observation value correction information, and the two-way satellite-to-ground observation value information, a least squares algorithm is used to solve the constellation overall rotation parameter solution model to obtain the constellation overall rotation parameter value;
[0068] The constellation overall rotation parameter solution model is:
[0069]
[0070] In formula (1), Indicates T i The first type of satellite-earth observation value at the moment; Indicates T i The second type of satellite-to-earth observation value at the moment; ρ SA Indicates T i The theoretical satellite-to-ground observation value transmitted by the satellite and received by the ground station at the moment, ρ AS Indicates T i The theoretical satellite-to-ground observation value transmitted by the ground station and received by the satellite at the moment, ρ SA and ρ AS The expression is shown in formula (2); i The time represents the sampling time of the two-way satellite-to-ground observation value; δρ SASTA ,δρ ASTAS They represent the corrections of theoretical earth-satellite observation values and theoretical satellite-earth observation values respectively; It represents the error correction term in satellite-to-earth observation transmitted by satellite and received by ground station. It represents the error correction term in the satellite-to-earth observation transmitted by the ground station and received by the satellite. and It includes but is not limited to equipment delay, satellite antenna phase center correction, tropospheric delay error, ionospheric delay error, station antenna phase center correction, earth tide error, and earth rotation effect correction; the equipment delay uses the known value calibrated by the ground station, and its error is 0.0. The remaining errors can be accurately modeled using existing models;
[0071]
[0072] In formula (2), Indicates that the ground station is at T i The position vector in the J2000 coordinate system at the moment, The expression is as shown in formula (3); Indicates that the satellite is at T i The orbital vector in the J2000 coordinate system at time, The expression is as shown in formula (4); R(ω) is the overall rotation matrix of the navigation constellation, and the expression is as shown in formula (5); ω is the overall rotation parameter of the constellation, which is the parameter to be estimated, and the expression is as shown in formula (6);
[0073]
[0074]
[0075]
[0076]
[0077] In formula (3) to formula (6), x A ,y A ,z A are the components of the position vector of the ground station on the x, y, and z axes, respectively. The values are provided by the ground station and are precisely known. s ,y s ,z s T i The x, y, and z-axis components of the satellite orbit vector at this moment are calculated on the satellite and transmitted to the ground station. This value is a known quantity; UTCUT1 is the difference between Coordinated Universal Time and Meridian Universal Time UT1.
[0078] It should be noted that, since the acquired two-way satellite-ground observation information has sufficient redundancy, the least squares algorithm is used to solve the overall rotation parameters of the constellation.
[0079] It should be noted that the above constellation overall rotation parameter ω can also be expressed as shown in formula (7):
[0080]
[0081] In formula (7), x p is the prediction error of the x-axis component of the polar motion parameter, y p is the prediction error of the y-axis component of the pole motion parameter. Since the prediction error of the pole motion parameter is very small, it can be ignored. p and p is set to 0, and the overall constellation rotation parameter ω is expressed by expression (6).
[0082] As an optional implementation manner, the satellite antenna phase center correction calculation method in the above error correction term includes:
[0083] For satellite antenna phase center correction, the satellite mechanical coordinate system must first be converted to the satellite orbit coordinate system, and then converted to the J2000 inertial system to give the phase center deviation.
[0084] The conversion of the satellite mechanical coordinate system to the satellite orbit coordinate system requires three coordinate axis rotations.
[0085] 1) Around z s Axis rotation yaw angle;
[0086] 2) Around y s Axis rotation pitch angle;
[0087] 3) Around x s The roll angle of the axis rotation.
[0088] The calculation formula for converting the satellite mechanical coordinate system to the satellite orbit coordinate system is as follows:
[0089]
[0090] in It is the position of the antenna phase center in the mechanical coordinate system relative to the origin (geometric center) of the mechanical coordinate system; the three rotation matrices are expressed as follows, with the angle being positive in counterclockwise rotation.
[0091]
[0092]
[0093]
[0094] The three attitude angles (roll, pitch, yaw) are obtained from the telemetry data of the satellite attitude.
[0095] The phase center deviation is given in the satellite reference coordinate system, which is defined as: the origin is at the satellite mass center, the Z axis points to the earth's mass center, the X axis is the direction of satellite movement, and the Y axis, Z axis, and X axis form a right-handed coordinate system. That is:
[0096]
[0097] in and are the position and velocity vector of the satellite in the inertial system respectively.
[0098] The conversion relationship from the satellite reference coordinate system to the J2000 inertial system is as follows:
[0099]
[0100] Therefore, the satellite antenna phase center correction ΔDSatAnt The model is:
[0101]
[0102] For relativistic effects, the distance correction ΔD caused by the influence of the periodic term is CRel The following formula can be used for calculation:
[0103]
[0104] Among them, X S , are the position and velocity vector of the satellite respectively, and c is the speed of light.
[0105] As an optional implementation manner, the method for calculating the tropospheric delay error in the above error correction term includes:
[0106] For the tropospheric delay error, the meteorological observation data measured by the tracking station is used to correct the error in the orbit determination solution. The pseudo-range phase observation data are all corrected using the Black model. In this model, the tropospheric delay error calculation can be completed by inputting temperature, air pressure and humidity. The calculation formula is as follows:
[0107]
[0108] Where E is the inclination angle of the satellite signal, h s is the distance from the geocenter of the measuring station, and the other parameters are calculated as follows:
[0109] l0=0.833+[0.076+0.00015(T s -273)] -0.3E
[0110] h d =148.98(T s -3.96)
[0111] b(E)=1.92(E 2 +0.6) -1
[0112] h w =13000
[0113]
[0114] K w =0.20
[0115] Among them, P s is the atmospheric pressure at the measuring station, T s is the absolute ground temperature at the measuring station, in K.
[0116] As an optional implementation manner, the method for calculating the ionospheric delay error in the above error correction term includes:
[0117] For the ionospheric delay error, the 14-parameter Klobuchar model is selected for correction. The specific model is as follows:
[0118] I z (f,t)=κ(f)×I' z (t)
[0119]
[0120] In the formula, I z '(t) is the vertical zenith delay of the ionosphere in seconds, corresponding to the frequency L1, and t is the local time in seconds at the point where the receiver-satellite line intersects the ionosphere (M). z , it is necessary to multiply a frequency-dependent factor k(f).
[0121] The calculation method of nighttime ionospheric delay DC is as follows:
[0122]
[0123] DC0=A1+B(t-72000)
[0124] The constant DC = DC0 = 5ns used in the Klobuchar model is the biggest limitation on the accuracy of nighttime observations. Usually, the value of the nighttime ionospheric delay DC varies between 5 and 20ns in a solar cycle. It is not a constant every night, but a simple function of time. The newly added A1 and B parameters are used as slow-varying parameters to describe the long-term variation of DC and the time variation every night, respectively. In a solar cycle, the value of A1 takes 16 levels between 5 and 20ns, and the value of B takes 16 levels between 0 and 2-10.
[0125] A2 is the amplitude of the daytime ionospheric delay cosine curve, expressed as α n The coefficients are calculated:
[0126]
[0127] A4 is the period of the cosine curve, and β n The coefficients are obtained:
[0128]
[0129] φ M is the geomagnetic latitude of the ionospheric piercing point.
[0130] Parameters α0, α1, α2, α3, β0, β1, β2, and β3 are the Klobuchar model parameters of the original GPS ephemeris and are fast-changing parameters.
[0131] A3 is the initial phase of the cosine function, corresponding to the extreme point of the curve, with γ n Coefficients:
[0132]
[0133] γ0, γ1, γ2, and γ3 are slowly varying parameters, and the number of effective digits of the parameters is equivalent to that of α and β.
[0134] As an optional implementation, the calculation method for correcting the phase center of the station antenna in the above error correction term includes:
[0135] For the station antenna phase center correction, the correction value is calculated based on the receiver hardware parameters and the joint measurement value between the instrument base point and the station coordinate point. The receiver phase center deviation is usually expressed in local coordinates, that is, the vertical deviation ΔH, north deviation ΔN and east deviation ΔE of the antenna phase center relative to the base point. Therefore, the eccentricity vector in the local coordinate system must be converted to the ground-fixed system through the rotation matrix. The station antenna phase center correction ΔD StaAnt The calculation formula is as follows:
[0136]
[0137]
[0138] Among them, L and φ are the geocentric longitude and latitude of the station. is the local coordinate vector.
[0139] As an optional implementation, the method for calculating the earth tide error in the above error correction term includes:
[0140] For the earth's tidal error, the following formula can be used for calculation:
[0141]
[0142] In the formula, GM E is the Earth's gravitational constant; GM j is the gravitational constant of the tidal body (the moon when j=2, the sun when j=3), R e , r j are the geocentric positions of the station and the tidal body, is the corresponding unit vector, h2 is the Love number, and l2 is the Shida number.
[0143] For the effect of the earth's rotation, let the user coordinates be (x u ,yu ,z u ), the satellite coordinates are (x s ,y s ,z s ), ω is the angular velocity of the Earth's rotation, c is the speed of light, then the distance correction ΔD caused by the Earth's rotation is Sagnac for:
[0144]
[0145] In another optional embodiment, in the above step S31, according to the navigation system parameter information, the theoretical satellite-ground observation value correction corresponding to the two-way satellite-ground observation value measurement time in the two-way satellite-ground observation value information is calculated in time sequence to obtain the theoretical satellite-ground observation value correction information, including:
[0146] S311, obtaining the measurement time of the two-way satellite-to-ground observation value in the two-way satellite-to-ground observation value information in time sequence to obtain an observation time sequence;
[0147] S312, according to the observation time sequence, using the navigation satellite predicted orbit parameters, predicted clock error parameters, ground station precise coordinates and precise clock error in the navigation system parameter information, sequentially calculate the theoretical value of the theoretical earth-satellite observation value correction amount transmitted by the ground station and received by the satellite at each observation time, and obtain the theoretical earth-satellite observation value correction amount information;
[0148] S313. According to the observation time sequence, using the navigation satellite predicted orbit parameters, predicted clock error parameters, ground station precise coordinates and precise clock error in the navigation system parameter information, sequentially calculate the theoretical value of the satellite-to-earth observation value correction amount transmitted by the satellite and received by the ground station at each observation time, and obtain the theoretical satellite-to-earth observation value correction amount information.
[0149] It should be noted that the calculation method of the above theoretical satellite-ground observation correction is the same as the method of returning the two-way observation of the navigation satellite inter-satellite two-way ranging data at different times to the same time. It is only necessary to replace the predicted orbit parameters and predicted clock error parameters of one of the satellites with the precise coordinates and precise clock error parameters of the ground station in the present invention. For specific methods, please refer to the document "Preliminary Results Analysis of Centralized Autonomous Orbit Determination of Beidou Satellites Using Inter-satellite Two-way Ranging Data" (Tang Chengpan, Hu Xiaogong, Zhou Shanshi, Chinese Science: Physics, Mechanics and Astronomy, 2017, 47(2): 029501).
[0150] In another optional embodiment, the navigation satellite constellation is composed of 24 Beidou MEO satellites, and the ground station is deployed in any area between 18° and 23° north latitude in China.
[0151] In another optional embodiment, the duration M is 4 hours; the duration K is 4 hours; and the N is 6.
[0152] Embodiment 2
[0153] See also Figure 2 . Figure 2 A schematic diagram of the structure of a navigation satellite semi-autonomous constellation overall rotation control device disclosed in an embodiment of the present invention.
[0154] like Figure 2 As shown, an embodiment of the present invention discloses a navigation satellite semi-autonomous operation constellation overall rotation control device, comprising:
[0155] The initial parameter injection module 201 is used for injecting a set of preset initial parameters of the overall rotation of the constellation to the navigation satellites in the navigation satellite constellation at 0:0:0 on the measurement start date, so as to start the semi-autonomous operation of the navigation satellite constellation;
[0156] Sampling module 202; used for sampling two-way satellite-to-ground observation value information between observable navigation satellites and ground stations in the navigation satellite constellation; the two-way satellite-to-ground observation values include first-category satellite-to-ground observation values and second-category satellite-to-ground observation values, the first-category satellite-to-ground observation values representing the observation values transmitted by the navigation satellite and received by the ground station; the second-category satellite-to-ground observation values representing the observation values transmitted by the ground station and received by the navigation satellite;
[0157] The constellation overall rotation parameter solving module 203 is used to solve the constellation overall rotation parameter by using the least squares algorithm according to the navigation system parameter information and the two-way satellite-to-ground observation value information to obtain the constellation overall rotation parameter value; the navigation system parameter information includes the predicted orbit parameters of the navigation satellite, the predicted clock error parameters, the precise coordinates of the ground station, the precise clock error and the error correction items in the satellite-to-ground observation;
[0158] The constellation overall rotation parameter sliding calculation module 204 is used to use the duration K as the sliding window time length, use the sampling module 202 to collect the two-way satellite-to-ground observation value information between the observable navigation satellites in the navigation satellite constellation and the ground station, use the constellation overall rotation parameter solving module 203 to solve the constellation overall rotation parameter value, and obtain N constellation overall rotation parameter values through sliding calculation;
[0159] The constellation overall rotation correction parameter value calculation module 205 is used to perform an average processing on the N constellation overall rotation parameter values to obtain the constellation overall rotation correction parameter value;
[0160] Correction parameter injection module 206; used for the ground station to inject the constellation overall rotation correction parameter value to the navigation satellites in the navigation satellite constellation at a specified time;
[0161] A cyclic execution module 207 is used to update the execution date, and cyclically utilize the initial parameter annotation module 201, the sampling module 202, the constellation overall rotation parameter solution module 203, the constellation overall rotation parameter sliding calculation module 204, the constellation overall rotation correction parameter value calculation module 205 and the correction parameter annotation module 206 to semi-autonomously operate the navigation satellite constellation overall rotation control until an end instruction is received.
[0162] This second embodiment is a product embodiment corresponding to the first embodiment. The steps and methods included are the same as those of the first embodiment and will not be described in detail in the second embodiment.
[0163] Embodiment 3
[0164] See also Figure 3 , Figure 3 FIG. 1 is another schematic diagram of a navigation satellite semi-autonomous operation constellation overall rotation control structure disclosed in an embodiment of the present invention. Figure 3 As shown, the device may include:
[0165] A memory 301 storing executable program codes;
[0166] a processor 302 coupled to the memory 301;
[0167] The processor 302 calls the executable program code stored in the memory 301 to execute the steps of the navigation satellite semi-autonomous constellation overall rotation control method described in the first embodiment.
[0168] Embodiment 4
[0169] This embodiment is an experimental comparison between the navigation satellite semi-autonomous constellation overall rotation control method provided by the present invention and the prior art.
[0170] The following experiment uses the satellite-to-earth observation data between the ground station and the navigation satellite to verify the semi-autonomous orbit determination and clock error accuracy of the navigation satellite based on the present invention. The time period is 60 days from May 1 to June 29, 2022. 24 MEO navigation satellites are selected and 1 ground station is deployed in Haikou area.
[0171] Based on the existing ground station-supported navigation satellite semi-autonomous orbit and clock error parameter solution simulation method and the present invention, a 60-day semi-autonomous operation test of the navigation satellite was carried out. The orbit and clock error results of each satellite were calculated and compared with the precise ephemeris and precise clock error released by the international MGEX organization. The orbit radial error RERR, tangential error TERR, normal error NERR and user range error URE (URE: User range error) of the constellation were statistically analyzed, and the mean of each type of error of the 24 satellites was taken as the final result of the error. The orbit accuracy and clock error accuracy statistics of the 24 MEO satellites on the 60th day are shown in Table 1 below. The calculation formula of URE is as follows.
[0172]
[0173] Table 1 Orbit and clock error accuracy of 24 navigation MEO satellites during 60-day autonomous orbit determination in semi-autonomous operation
[0174]
[0175] The orbit error details of the navigation satellite semi-autonomous orbit determination for 60 days based on the simulation method of semi-autonomous orbit and clock error parameter calculation for navigation satellites supported by existing ground stations are as follows: Figure 4 shown.
[0176] The orbit error details of the navigation satellite semi-autonomous orbit determination for 60 days based on the present invention are as follows: Figure 5 shown.
[0177] Through the above technical scheme, the following conclusions can be drawn: compared with the existing simulation method for calculating the semi-autonomous orbit and clock error parameters of navigation satellites supported by ground stations, the present invention solves the problem that the overall rotation of the constellation is difficult to control when the navigation satellite is semi-autonomous. The semi-autonomous orbit determination URE accuracy of the navigation satellite based on the present invention is improved from 2.12m to 0.51m, and the clock error accuracy is improved from 2.76ns to 2.07ns, which greatly improves the orbit and clock error solution accuracy of the semi-autonomous navigation of the navigation satellite.
[0178] The above implementation modes are only used to illustrate the present invention, but not to limit the present invention. Ordinary technicians in the relevant technical field can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions also belong to the scope of the present invention. The patent protection scope of the present invention should be defined by the claims.
Claims
1. A method for controlling the overall rotation of a navigation satellite constellation in semi-autonomous operation, characterized in that: The method comprises: S1. At 0:0:0:0 on the measurement start date, the ground station injects a set of preset initial parameters of the overall rotation of the constellation to the navigation satellites in the navigation satellite constellation to start the semi-autonomous operation of the navigation satellite constellation; S2. On the D day, the ground station samples and obtains the two-way satellite-to-ground observation value information between the observable navigation satellite in the navigation satellite constellation and the ground station; the two-way satellite-to-ground observation values include the first type of satellite-to-ground observation values and the second type of satellite-to-ground observation values, the first type of satellite-to-ground observation values represent the observation values transmitted by the navigation satellite and received by the ground station; the second type of satellite-to-ground observation values represent the observation values transmitted by the ground station and received by the navigation satellite; the sampling starts at time T1, with Δt as the sampling interval and M as the measurement duration, the Δt value range is 5 to 10 minutes; the M value range is 4 to 6 hours; the initial value of time T1 is 0 hours, 0 minutes, and 0 seconds; the D represents the measurement date, and the initial value of D is the measurement start date; S3. According to the navigation system parameter information and the two-way satellite-ground observation value information, a least squares algorithm is used to solve the constellation overall rotation parameter to obtain the constellation overall rotation parameter value; S4, with the duration K as the sliding window time length, slidingly execute steps S2 to S3 N times within the Dth day to obtain N constellation overall rotation parameter values; each time sliding, update T1 to T1+K, the sampling end time within the last sliding window of the day is before 23:59:59 of the day, and the value range of K is: M≤K<24 hours; Indicates rounding down; S5, performing an average processing on the N constellation overall rotation parameter values to obtain the constellation overall rotation correction parameter value on the Dth day; S6. At 23:59:59 on the D day, the ground station injects the constellation overall rotation correction parameter value to the navigation satellites in the navigation satellite constellation for the semi-autonomous operation of the navigation satellite constellation on the D+1 day; S7. Update D to D+1, and execute steps S2 to S7 in a loop until an end instruction is received.
2. The method for controlling the overall rotation of a semi-autonomous navigation satellite constellation according to claim 1, characterized in that: The method of solving the constellation overall rotation parameter by using a least squares algorithm according to the navigation system parameter information and the two-way satellite-ground observation value information to obtain the constellation overall rotation parameter value includes: S31, according to the navigation system parameter information, calculating the theoretical satellite-ground observation value correction corresponding to the measurement time of the two-way satellite-ground observation value in the two-way satellite-ground observation value information in time sequence, and obtaining the theoretical satellite-ground observation value correction information; the theoretical satellite-ground observation value correction information includes the theoretical ground-satellite observation value correction and the theoretical satellite-ground observation value correction; S32, using the navigation system parameter information, the theoretical satellite-to-ground observation value correction information, and the two-way satellite-to-ground observation value information, a least squares algorithm is used to solve the constellation overall rotation parameter solution model to obtain the constellation overall rotation parameter value; The constellation overall rotation parameter solution model is: In formula (1), Indicates T i The first type of satellite-earth observation value at the moment; Indicates T i The second type of satellite-to-earth observation value at the moment; ρ SA Indicates T i The theoretical satellite-to-ground observation value transmitted by the satellite and received by the ground station at the moment, ρ AS Indicates T i The theoretical satellite-to-ground observation value transmitted by the ground station and received by the satellite at the moment, ρ SA and ρ AS The expression is shown in formula (2); i The time represents the sampling time of the two-way satellite-to-ground observation value; δρ SASTA ,δρ ASTAS They represent the corrections of theoretical earth-satellite observation values and theoretical satellite-earth observation values respectively; It represents the error correction term in satellite-to-earth observation transmitted by satellite and received by ground station. It represents the error correction term in the satellite-to-earth observation transmitted by the ground station and received by the satellite; In formula (2), Indicates that the ground station is at T i The position vector in the J2000 coordinate system at the moment, The expression is as shown in formula (3); Indicates that the satellite is at T i The orbital vector in the J2000 coordinate system at time, The expression is as shown in formula (4); R(ω) is the overall rotation matrix of the navigation constellation, and the expression is as shown in formula (5); ω is the overall rotation parameter of the constellation, and the expression is as shown in formula (6); In formula (3) to formula (6), x A ,y A ,z A are the components of the position vector of the ground station on the x, y, and z axes respectively; s ,y s ,z s T i The x, y, and z components of the satellite orbit vector at the moment; UTCUT1 is the difference between Coordinated Universal Time and Meridian Universal Time UT1.
3. The method for controlling the overall rotation of a semi-autonomous navigation satellite constellation according to claim 2, characterized in that: The step of calculating the theoretical satellite-ground observation correction corresponding to the measurement time of the two-way satellite-ground observation in the two-way satellite-ground observation information according to the navigation system parameter information in time sequence to obtain the theoretical satellite-ground observation correction information includes: S311, acquiring the measurement time of the two-way satellite-to-ground observation value in the two-way satellite-to-ground observation value information in time sequence to obtain an observation time sequence; S312, according to the observation time sequence, using the navigation satellite predicted orbit parameters, predicted clock error parameters, ground station precise coordinates and precise clock error in the navigation system parameter information, sequentially calculate the theoretical value of the theoretical earth-satellite observation value correction amount transmitted by the ground station and received by the satellite at each observation time, and obtain the theoretical earth-satellite observation value correction amount information; S313. According to the observation time sequence, using the navigation satellite predicted orbit parameters, predicted clock error parameters, ground station precise coordinates and precise clock error in the navigation system parameter information, sequentially calculate the theoretical value of the satellite-to-earth observation value correction amount transmitted by the satellite and received by the ground station at each observation time, and obtain the theoretical satellite-to-earth observation value correction amount information.
4. The method for controlling the overall rotation of a navigation satellite constellation in semi-autonomous operation according to claim 1, characterized in that: The navigation satellite constellation is composed of 24 Beidou MEO satellites, and the ground station is deployed in any area between 18° and 23° north latitude in China.
5. The method for controlling the overall rotation of a navigation satellite constellation in semi-autonomous operation according to claim 1, characterized in that: The duration M is 4 hours; the duration K is 4 hours; and the duration N is 6.
6. A navigation satellite semi-autonomous operation constellation overall rotation control device, characterized in that: The method for controlling the overall rotation of a navigation satellite constellation in semi-autonomous operation as claimed in any one of claims 1 to 5 is adopted, wherein the device comprises: Initial parameter injection module: used for injecting a set of preset initial parameters of the overall rotation of the constellation to the navigation satellites in the navigation satellite constellation at 0:0:0 on the measurement start date, so as to start the semi-autonomous operation of the navigation satellite constellation; A sampling module; used for sampling two-way satellite-to-ground observation value information between an observable navigation satellite and a ground station in a navigation satellite constellation; the two-way satellite-to-ground observation value includes a first type of satellite-to-ground observation value and a second type of satellite-to-ground observation value, wherein the first type of satellite-to-ground observation value represents the observation value transmitted by the navigation satellite and received by the ground station; the second type of satellite-to-ground observation value represents the observation value transmitted by the ground station and received by the navigation satellite; The constellation overall rotation parameter solving module is used to solve the constellation overall rotation parameter by using the least squares algorithm according to the navigation system parameter information and the two-way satellite-to-ground observation value information to obtain the constellation overall rotation parameter value; The constellation overall rotation parameter sliding calculation module is used to use the duration K as the sliding window time length, use the sampling module to collect the two-way satellite-to-ground observation value information between the observable navigation satellites in the navigation satellite constellation and the ground station, use the constellation overall rotation parameter solving module to solve the constellation overall rotation parameter value, and obtain N constellation overall rotation parameter values by sliding calculation; A constellation overall rotation correction parameter value calculation module is used to perform an average processing on the N constellation overall rotation parameter values to obtain a constellation overall rotation correction parameter value; A correction parameter injection module; used for the ground station to inject the constellation overall rotation correction parameter value to the navigation satellites in the navigation satellite constellation at a specified time; A cyclic execution module; used for updating the execution date, cyclically utilizing the initial parameter annotation module, the sampling module, the constellation overall rotation parameter solution module, the constellation overall rotation parameter sliding calculation module, the constellation overall rotation correction parameter value calculation module and the correction parameter annotation module, to semi-autonomously operate the constellation overall rotation control of the navigation satellite until an end instruction is received.
7. A navigation satellite semi-autonomous operation constellation overall rotation control device, characterized in that: The device comprises: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the navigation satellite semi-autonomous constellation overall rotation control method as described in any one of claims 1-5.