A method for realizing wellhead replacement based on freezing pressure control method

Through freezing pressure control technology, a freezing temporary plugging agent sealing layer is formed, which solves the hidden dangers and pollution problems of well killing and blowout methods in oilfield well workover operations, realizes safe and environmentally friendly wellhead replacement, shortens construction time and reduces costs. cost.

CN118564202BActive Publication Date: 2024-10-22河北新铁虎石油机械有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411018918.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-10-22
Estimated Expiration
2044-07-29

AI Technical Summary

Technical Problem

In oilfield well workover operations, existing well killing and blowout methods have hidden dangers such as blowout, leakage, and crushing. Blowout will release toxic gases that pollute the environment and increase costs. It is impossible to kill the well without blowing out the well. Replace the wellhead valve.

Method used

Adopting a freezing pressure control method, by calculating the amount and preparation of temporary plugging agent, installing a freezing box, adding refrigerant to the wellhead and oil casing to form a blocking layer of freezing temporary plugging agent, ensuring that the wellhead is replaced after sealing, and finally thawing and releasing the temporary plugging agent. Blocking agent.

Benefits of technology

It realizes safe and environmentally friendly wellhead replacement without suppressing the well or blowing out, shortens the construction time, reduces the cost, and can quickly restore wellhead production, solving the problem of long-term pressurized wellheads that cannot be repaired.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118564202B_ABST
    Figure CN118564202B_ABST
Patent Text Reader

Abstract

The invention discloses a method for replacing a wellhead based on a freezing pressure control method, and the steps are as follows: S1, calculating the dosage of a temporary plugging agent and preparing the temporary plugging agent, S2, cleaning a meter cover and installing a freezing box, S3, pre-freezing the wellhead by using a solid-liquid mixture refrigerant, S4, maintaining the freezing operation, and pumping the temporary plugging agent into the well to form a freezing temporary plugging agent plugging layer, S5, maintaining the freezing operation, and sequentially performing a forward pressure test and a reverse pressure test, S6, maintaining the freezing operation, and realizing fast replacement of the wellhead by using two cranes in coordination, S7, thawing operation, and S8, blowdown operation. The method is suitable for replacing wellhead valves of oil and water wells and gas wells, and the maximum sealing pressure can reach 20MPa. The method has the advantages of short construction time, low construction cost, no pollution to the environment, no damage to the bottom hole pressure, and rapid recovery of production, and can realize the repair of the wellhead that cannot be repaired due to long-term pressure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of well repair operations, and in particular to a method for replacing a wellhead based on a freezing pressure control method. Background Art

[0002] During well repair in oil fields, the task of replacing wellhead valves is often encountered. In the past, if there was pressure in the well, it was necessary to use well killing or blowout to control the well pressure before valve replacement. In the above two operation methods, well killing is to pump a liquid with certain performance and quantity into the well, and balance the formation pressure by the pressure of the liquid column of the pumped liquid, so that the fluid in the formation cannot flow into the wellbore within a certain period of time, so as to complete a certain operation.

[0003] Since well killing needs to protect the oil layer, it is necessary to follow the principle of pressure without blowout, pressure without leakage, and pressure without death. It can be seen that the construction process of well killing method is relatively complicated, and there are also hidden dangers such as blowout, leakage, and death. Release of blowout is a method of releasing the pressure in the well. However, there may be a large amount of toxic gas (such as H2S) in the well, and the pressure release must be accompanied by the release of toxic gas; if it is released directly in the natural environment, it will greatly pollute the environment and pose a great safety hazard. If the released well fluid is transported by tank trucks, the operating cost will be greatly increased. Based on this, whether it is a well killing method or a release of blowout method, there are serious defects. Therefore, it is necessary to design a new well pressure control method without well killing and release of blowout in response to the above technical problems, so as to facilitate the subsequent operation method of valve replacement construction. Summary of the invention

[0004] The purpose of the present invention is to provide a method for replacing a wellhead valve under pressure based on a freezing pressure control method without killing the well and releasing the blowout when there is pressure in the well.

[0005] To this end, the technical solution of the present invention is as follows:

[0006] A method for replacing a wellhead based on a freezing pressure control method, the steps are as follows:

[0007] S1. Calculate the amount of temporary plugging agent and prepare the temporary plugging agent according to the specifications of the well; the amount of temporary plugging agent is the sum of the volume of the temporary plugging agent plugging layer in the tubing space, the volume of the temporary plugging agent plugging layer in the casing annulus space, and the volume of the wellhead valve and the internal channel of the connecting pipeline;

[0008] S2. Dig a freezing box installation pit from the ground in a manner surrounding the wellhead, and install a freezing box for freezing the temporary plugging agent plugging layer; preferably, before installing the freezing box, clean the surface casing in the freezing box installation pit to ensure the subsequent energy transfer of the refrigerant;

[0009] S3. Freeze the wellhead structure and the oil casing near the wellhead by continuously adding refrigerant into the freezing box. The freezing operation time is ≥ 2h.

[0010] S4, while maintaining the same freezing method as step S3, pumping a temporary plugging agent into the well, and after the pumping is completed, according to the theoretical freezing speed, calculating the time for the refrigerant energy to be transferred from the outer wall of the casing to the center of the casing as the minimum freezing time, freezing the temporary plugging agent plugging layer, so as to form a frozen temporary plugging agent plugging layer to achieve sealing of the wellhead;

[0011] S5, while maintaining the same freezing method as step S3, by sequentially performing forward pressure test and reverse pressure test, ensuring that the plugging layer of the frozen temporary plugging agent effectively seals the wellhead;

[0012] S6, while maintaining the same freezing method as step S3, the bolts of all the mounting flanges on the old wellhead are loosened and then tightened in sequence to ensure that each bolt can be removed smoothly when the new wellhead is replaced later, that is, the time for replacing the wellhead is reduced as much as possible;

[0013] S7, repeat step S5 to again ensure that the plugging layer of the temporary freezing plugging agent effectively seals the wellhead;

[0014] S8, while maintaining the same freezing method as step S3, the old wellhead is replaced with a new wellhead;

[0015] S9, remove the refrigerant, dismantle the freezing box, and thaw the temporary plugging agent plugging layer;

[0016] S10. Open the newly replaced wellhead valve and spray the thawed temporary plugging agent out of the well by relying on the pressure in the well.

[0017] Furthermore, in step S1, the layer heights of the freezing plugging layers in the oil pipe space and the oil casing annulus space are the same, and are both composed of an upper freezing buffer section, a freezing section and a lower freezing buffer section formed in sequence from top to bottom. The height of the upper freezing buffer section and the height of the lower freezing buffer section are 1m, and the height of the freezing section is ≥1m, so that the layer height of the temporary plugging agent plugging layer is at least 3m.

[0018] Furthermore, in step S1, the temporary plugging agent is prepared by mixing bentonite and water in a volume ratio of (1.35~1.45):1 and stirring them evenly, so that the prepared temporary plugging agent has the advantages of high viscosity, good adhesion and no flow, and can be attached to the wellhead pipe wall when subsequently injected into the pressure well.

[0019] Furthermore, in step S2, the freezing box installation pit is a deep pit with a depth ≥2m and a diameter ≥2m; the height of the freezing box is ≥1m, the distance from the inner wall of the box body to the outer wall of the casing is ≥0.2m, and the distance from the top of the box body to the wellhead is the same as the height of the upper freezing buffer section to ensure that the freezing box is installed at a position corresponding to the preset freezing section in the well.

[0020] Furthermore, in step S2, the outer wall surface of the freezing box is coated with an insulation layer; a layer of temporary plugging agent is applied to all the joints of the edges of the box body of the freezing box to ensure the freezing effect of the wellhead while ensuring the sealing of the box body to prevent leakage during use.

[0021] Furthermore, in step S3, the refrigerant is a solid-liquid mixture of dry ice and methanol, and the refrigerant temperature is maintained at ≤-20°C.

[0022] Specifically, the refrigerant is added to the freezing box in the following manner:

[0023] 1) In the initial state, first pour 1 / 2Vbox of methanol into the freezing box according to the inner cavity volume Vbox of the freezing box, and then add 1 / 3Vbox~1 / 2Vbox of dry ice into the freezing box in batches to form a solid-liquid mixture composed of dry ice and methanol;

[0024] 2) In the subsequent process, according to the consumption of methanol or dry ice in the solid-liquid mixture refrigerant, methanol or dry ice is continuously added, and the solid-liquid mixture refrigerant is stirred at intervals.

[0025] Furthermore, in step S4, the temporary plugging agent is pumped into the well in a layer-by-layer manner from the outside to the inside, and the pumping pressure is 1.2 to 1.4 times the well pressure.

[0026] Furthermore, in step S4, during the process of pumping the temporary plugging agent layer by layer from the outside to the inside, before each layer of the temporary plugging agent is pumped, a foam plug is inserted into the temporary plugging agent injection pipeline in advance so that the foam plug first enters the corresponding pipe column space to expand, which can effectively promote the adhesion of the temporary plugging agent to the pipe wall.

[0027] Further, in step S5, the forward pressure test method is: continue to inject the temporary plugging agent into the well at the test pressure, if the temporary plugging agent can continue to be pumped into the well, if it cannot continue to be pumped into the well, then a freezing temporary plugging agent plugging layer is formed; the test pressure is a pressure greater than the well pressure and less than 1.5 times the well pressure; the reverse pressure test method is: open the wellhead valve to release the well pressure, if no gas or liquid is ejected from the wellhead, and the wellhead pressure gauge is 0, then close the wellhead valve, and observe the pressure change of the pressure gauge in the next 1 hour; if there is no pressure rise in the next 1 hour, and when the valve is opened again, there is still no gas and liquid overflowing, it proves that the freezing temporary plugging agent plugging layer has completely sealed the wellhead.

[0028] Furthermore, in step S8, in order to quickly replace the old wellhead with a new wellhead, a crane is set up at the construction site to lift the old wellhead, and another crane is set up to lift the new wellhead, and before replacing the wellhead, the crane used to lift the old wellhead pre-adjusts the lifting point to a suitable height position above the wellhead, and then moves the boom horizontally to the other side, so that when the wellhead is replaced, the crane only needs to move the boom horizontally into place; and the crane used to lift the new wellhead also pre-adjusts the lifting point to a suitable height position above the wellhead, and then moves the boom horizontally to the other side, and lifts the new wellhead to the same suitable height position, so that when the wellhead is replaced, the crane only needs to move the boom horizontally into place.

[0029] Furthermore, in step S9, after the freezing box is removed, explosion-proof heating equipment is used to quickly thaw the freezing temporary plugging agent plugging layer by setting a heating pipeline in the freezing box installation pit or delivering hot air into the freezing box installation pit.

[0030] Compared with the existing technology, the method of replacing the wellhead based on freezing pressure control can be widely used in the replacement of wellheads of oil and water wells and gas wells. According to the actual construction, the maximum sealing pressure that can be achieved can reach 20MPa. Compared with the existing well killing and blowdown methods, it not only has a short construction time and low construction cost, but also has the advantages of not polluting the environment, not damaging the bottom hole pressure, and can quickly resume production. It can also solve the current problem that wellheads with long-term pressure cannot be repaired. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a flow chart of the method for realizing wellhead replacement based on freezing pressure control method of the present invention;

[0032] Figure 2 It is a schematic diagram of the wellhead status of the method for realizing wellhead replacement based on the freezing pressure control method of the present invention. DETAILED DESCRIPTION

[0033] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the following embodiments are by no means intended to limit the present invention in any way.

[0034] See also Figure 1 The specific implementation steps of the method for realizing wellhead replacement based on freezing pressure control are as follows:

[0035] S1. Calculate the dosage of temporary plugging agent and prepare the temporary plugging agent according to the specifications of the well. The specific steps are as follows:

[0036] S101. Calculate the dosage V of temporary plugging agent:

[0037] The dosage V of the temporary plugging agent is related to the preset layer height of the temporary plugging agent plugging layer in the tubing space and the casing annulus space, as well as the channel volume in the wellhead valve and connecting pipeline also filled with the temporary plugging agent. The specific calculation expression is:

[0038] V=V1+V2+V3;

[0039] Wherein, V1 is the volume of the temporary plugging agent plugging layer in the tubing space, V2 is the volume of the temporary plugging agent plugging layer in the casing annulus space, and V3 is the volume of the internal channel of the wellhead valve and the connecting pipeline.

[0040] See also Figure 2 During the process of pumping the temporary plugging agent into the well, affected by the well pressure and the pumping pressure, the temporary plugging agent plugging layer pumped into the well will be sparsely stacked at the top, densely stacked in the middle, and sparsely stacked at the bottom, so that the temporary plugging agent plugging layer is composed of an upper freezing buffer section, a freezing section, and a lower freezing buffer section formed in sequence from top to bottom; in order to ensure a good freezing sealing effect, the layer height of the temporary plugging agent plugging layer in the tubing space is set the same as the layer height of the temporary plugging agent plugging layer in the casing annulus space, and in each part of the temporary plugging agent plugging layer, the height H1 of the upper freezing buffer section and the height H3 of the lower freezing buffer section are set to 1m, and the height H2 of the freezing section is set to 1m, so that the layer height of the temporary plugging agent plugging layer is set to 3m.

[0041] S102, prepare temporary plugging agent:

[0042] The bentonite and water were mixed and stirred evenly in a volume ratio of 1.4:1 to prepare a temporary plugging agent.

[0043] In this example, the bentonite used is OCMA grade bentonite, which is a clay mineral with montmorillonite as the main component. The temporary plugging agent prepared by using this bentonite has the advantages of high viscosity, good adhesion and no flow, so that it can be easily attached to the wellhead pipe wall when injected into a pressure well. In this way, as the injection amount continues to increase, the temporary plugging agent will gradually form a temporary plugging agent layer on the pipe column, and then the temporary plugging agent can be frozen by applying low temperature conditions on the outside of the pipe wall to achieve the effect of blocking the pressure in the well and freeze the wellhead to seal it for the purpose of replacing the wellhead valve.

[0044] The temporary plugging agent is preferably prepared on-the-spot. In addition, according to the actual application, during the preparation of the temporary plugging agent, if the proportion of bentonite is slightly larger, it will not be able to effectively adhere to the wellhead pipe wall, thereby blocking the wellhead; and if the proportion of water is slightly larger, the freezing coefficient of the temporary plugging agent will be too large, causing the temporary plugging agent to expand excessively after freezing treatment, and cracking the pipe column. According to the test, when the temporary plugging agent of this embodiment is converted from a normal temperature environment to a -30°C environment, its volume expansion rate is only about 1%, and there is no risk of causing damage to the pipe wall during the freezing and pressure control process of the wellhead.

[0045] S2, clean the surface casing and install the freezing box;

[0046] S201, digging a pit with a depth of ≥2m and a diameter of ≥2m from the ground in a manner surrounding the wellhead, as the freezing box installation pit 3;

[0047] S202, clean the surface casing and avoid damaging the pipe body;

[0048] S203, install the freezing box 4 in the freezing box installation pit 3; wherein, the height L2 of the freezing box 4 is ≥1m, the distance L3 from the inner wall of the box body to the outer wall of the casing 1 is ≥0.2m, and the distance L1 from the top of the box body to the wellhead is 1m, to ensure that the freezing box 4 is installed at a position corresponding to the freezing section in the temporary plugging agent plugging layer.

[0049] See also Figure 2 The freezer box 4 is specifically a cylindrical box body, and a through hole matching the size of the sleeve is opened on the bottom of the box body; the box body is split into two parts, and the two parts are detachably fixed together by multiple screws arranged at intervals along the butt edge. If the bottom of the freezer box installation pit 3 is uneven, a layer of gravel is laid to make the bottom of the pit flat, so as to ensure that the freezer box 4 is stably placed in the freezer box installation pit 3 to prevent leakage caused by shaking during subsequent operations.

[0050] As a preferred technical solution of this embodiment, a layer of temporary plugging agent is coated on all the joints of the outer box body of the freezing box 4 to ensure the freezing effect of the wellhead while ensuring the sealing of the box body to prevent leakage during use.

[0051] As another preferred technical solution of this embodiment, a layer of temporary plugging agent is coated on all the joints of the outer box body of the freezing box 4, and then a layer of insulation layer is coated to further increase the freezing effect of the wellhead; specifically, the insulation layer is made of materials such as insulation cotton.

[0052] S3, pre-freezing the wellhead;

[0053] A solid-liquid mixture refrigerant prepared by dry ice and methanol is added into the freezing box 4 to pre-freeze the wellhead structure and the oil casing part close to the wellhead; wherein, the temperature of the solid-liquid mixture refrigerant is ≤-20°C. Since it is the first time to freeze the wellhead, the freezing step of step S3 is also a pre-freezing operation, and the specific freezing operation time is set to 2h.

[0054] The specific method of continuously adding the solid-liquid mixture refrigerant into the freezing box 4 is as follows:

[0055] 1) In the initial state, first, according to the inner cavity volume of the freezing box 4 V box, first pour 1 / 2 V box of methanol, and then add 1 / 3 of the methanol to the freezer box 4 in batches. V box ~1 / 2 V box of dry ice to form a solid-liquid mixture consisting of dry ice and methanol;

[0056] 2) In the subsequent process, methanol or dry ice is continuously added according to the consumption of methanol or dry ice in the solid-liquid mixture refrigerant; specifically, since dry ice will boil when added to methanol, when the solid-liquid mixture refrigerant is in a state of slight boiling or no boiling, it means that the dry ice is about to be or has been completely consumed, and dry ice needs to be added; if the liquid level of the solid-liquid mixture refrigerant is lower than 1 / 4 of the upper edge of the freezing box 4, methanol needs to be added; when adding dry ice, dry ice should be added to methanol in small amounts and multiple times;

[0057] In the above steps 1) and 2), the mixture needs to be stirred at intervals to allow the dry ice and methanol to blend better.

[0058] As a preferred technical solution of this embodiment, during the process of adding the refrigerant, dry ice is preferably granular dry ice with a diameter of 10mm~20mm; a distance of ≥200mm is left between the liquid surface of the refrigerant and the upper edge of the freezing box 4 to avoid waste due to overflow.

[0059] The purpose of the pre-freezing operation in step S3 is to make the temporary plugging agent pumped in later to adhere to the wall of the casing 1 and the oil pipe 2 more easily. The present application adopts a mixture of dry ice and methanol as a refrigerant because: dry ice is a good refrigerant, but if the dry ice is directly exposed to the air, the moisture in the air will easily form an "ice shell" on the outer surface of the dry ice, thereby affecting the freezing effect; and the freezing point of methanol can reach -97°C, so that the mixture formed with dry ice can consume the dry ice to the greatest extent, and the liquid mixture can also better contact with the pipe column and conduct temperature.

[0060] S4, pumping temporary plugging agent into the well to complete the wellhead sealing operation;

[0061] S401, while maintaining the same freezing method as step S3, the temporary plugging agent is pumped into the well in a layer-by-layer manner from the outside to the inside, so as to form a temporary plugging agent plugging layer in the casing annulus space and in the tubing space in turn by using the pumped temporary plugging agent; in this embodiment, the pumping pressure is set to 1.3 times the downhole pressure;

[0062] S402, after the pumping of step S401 is completed, while maintaining the same freezing method as step S3, according to the theoretical freezing rate, calculate the time for the energy of the refrigerant to be transferred from the outer wall of the casing to the center of the casing, as the minimum freezing time, to ensure that the temporary plugging agent pumped into the well in step S401 is completely frozen to a preset temperature; the theoretical freezing rate is generally selected as 1.5 hours / inch; in this embodiment, based on the casing diameter of 7 inches, according to the freezing rate of 1.5 hours / inch, the minimum freezing time is calculated to be 4 hours and 40 minutes, that is, after the temporary plugging agent is completely pumped, while maintaining the same freezing method as step S3, wait for 4 hours and 40 minutes to allow the temporary plugging agent plugging layer to form a frozen temporary plugging agent plugging layer.

[0063] As a preferred technical solution of this embodiment, in step S401, the temporary plugging agent is pumped layer by layer from the outside to the inside, and before each layer of the temporary plugging agent is pumped, a foam plug is inserted in advance into the temporary plugging agent injection pipeline, so that the foam plug first enters the corresponding pipe column space to expand and play a supporting role, thereby ensuring the formation of the temporary plugging agent plugging layer.

[0064] S5, while maintaining the same freezing method as step S3, by sequentially performing forward pressure test and reverse pressure test, ensuring that a plugging layer of the freezing temporary plugging agent is formed;

[0065] S501, positive pressure test: continue to inject temporary plugging agent into the well at the test pressure. In this embodiment, the test pressure is set to 1.4 times the downhole pressure;

[0066] If the temporary plugging agent can continue to be pumped into the well, if it cannot continue to be pumped into the well, the forward pressure test is successful, that is, the frozen temporary plugging agent plugging layer is formed; wherein the pressure test pressure is a pressure greater than the well pressure and less than 1.5 times the well pressure; however, if the temporary plugging agent can continue to be pumped into the well under the pressure test pressure during the forward pressure test, it means that the forward pressure test has failed, that is, the frozen temporary plugging agent plugging layer has not been completely formed; in this case, continue to freeze the wellhead in the same freezing method as step S3, and then perform a forward pressure test again every 2 hours until the forward pressure test is successful, and determine that the frozen temporary plugging agent plugging layer is formed;

[0067] S502, reverse pressure test: while maintaining the same freezing mode as step S3, open the wellhead valve to release the well pressure. If there is no gas or liquid ejected from the wellhead and the wellhead pressure gauge is 0, close the wellhead valve and observe the pressure change of the pressure gauge in the next 1 hour;

[0068] If there is no pressure rise in the next hour, and there is still no gas and liquid overflowing when the valve is opened again, it proves that the reverse pressure test is successful, that is, the freezing temporary plugging agent plugging layer has completely sealed the wellhead; however, if any of the above process states cannot meet the requirements during the reverse pressure test, it means that the reverse pressure test has failed, that is, the freezing stage has not been completely frozen successfully; in this case, continue to freeze the wellhead in the same freezing method as step S3, and then perform a reverse pressure test again every 2 hours until the reverse pressure test is successful, and it is determined that the freezing temporary plugging agent plugging layer is formed;

[0069] In step S5, the reverse pressure test must be performed after the forward pressure test is completed to avoid destroying the plugging layer of the frozen temporary plugging agent formed in step S4.

[0070] S6. Preparation before replacing the wellhead:

[0071] While maintaining the same freezing method as step S3, all bolts of the mounting flanges on the old wellhead are loosened and then tightened in sequence to ensure that each bolt can be removed smoothly when the new wellhead is replaced later, that is, the time for replacing the wellhead is reduced as much as possible;

[0072] S7. In the above step S6, when individual bolts are disassembled due to vibration due to rust, the freezing temporary plugging agent sealing layer may be damaged. Therefore, step S5 needs to be repeated again, and the positive pressure test and the reverse pressure test are used in sequence to ensure that the freezing temporary plugging agent sealing layer still effectively seals the wellhead.

[0073] S8, replace the wellhead;

[0074] While maintaining the same freezing method as step S3, one crane is used to lift the old wellhead and another crane is used to lift the new wellhead, so that after the old wellhead is dismantled and lifted away, the new wellhead is immediately lifted to the installation position and the installation process is completed.

[0075] In this step, one implementation method for realizing the rapid replacement of the old and new wellheads is: both cranes pre-adjust the lifting points to above the wellhead; specifically, the crane used to hoist the old wellhead pre-adjusts the lifting point to above the wellhead, and its hook drops to a position where it can be directly connected to and hoisted with the old wellhead, and then the crane rotates the hook to a position that does not affect other operation steps; similarly, the crane used to hoist the new wellhead pre-adjusts the lifting point to above the wellhead, and then the crane rotates the hook to the placement of the new wellhead, and hoists the new wellhead to the transfer height, ready. This method of using two cranes to cooperate in replacing the wellhead can shorten the wellhead replacement time, improve operation safety, reduce the wellhead open time, and improve operation installation performance.

[0076] S9, Thawing operation

[0077] After the methanol and dry ice in the freezing box 4 are cleared, the freezing box 4 is removed to thaw the plugging layer of the temporary freezing plugging agent. In this process, if the new wellhead valve is opened and the temporary freezing plugging agent overflows, it means that the freezing section has begun to thaw.

[0078] As a preferred technical solution of this embodiment, in order to save freezing operation time, explosion-proof heating equipment can be used to quickly thaw the freezing temporary plugging agent sealing layer by setting a heating pipeline in the freezing box installation pit 3 or delivering hot air into the freezing box installation pit 3.

[0079] S10, spraying operation

[0080] After the thawing operation is completed, open the valve at the new wellhead and use the pressure in the well to spray the thawed temporary plugging agent out of the well.

[0081] At this point, the wellhead replacement is completed.

[0082] The method for achieving wellhead replacement based on the freezing pressure control method can be actually applied to valve replacement in oil and water wells and gas wells.

[0083] Taking a certain oil and water well in Chang 12-1 Well, Lijia Village, Qijia Town, Changchun City, Jilin Province as an example, the well pressure of the oil and water well is 20Mpa. Due to environmental protection reasons, it cannot be repaired under pressure for a long time. In the actual operation of replacing the wellhead by using the method of the present invention to replace the wellhead based on the freezing pressure control method, the sealing pressure achieved by the freezing temporary plugging agent plugging layer is 7Mpa, the total amount of dry ice is 600kg, the total amount of methanol is 200kg, the construction cost is about 15,000 yuan, and the construction time is about 3 days.

[0084] Taking a gas well in Jingbian County, Yulin City as an example, in the actual operation of replacing the wellhead using the method of the present invention based on the freezing pressure control method, the sealing pressure achieved by the freezing temporary plugging agent plugging layer is 7Mpa, the total amount of dry ice is 700kg, the total amount of methanol is 250kg, the construction cost is about 25,000 yuan, and the construction time is about 4 days. According to the well conditions of the gas well, the construction cost and construction time of the traditional well killing construction method are 100,000 yuan and 7 days respectively, and the construction cost and construction time of the blowdown construction method are 80,000 yuan and 14 days respectively. It can be seen that the method of the present application has obvious advantages over the traditional method in terms of construction cost and construction time.

[0085] To sum up, the method of wellhead replacement based on freezing pressure control in the present application can be widely used in valve replacement of oil and water wells and gas wells, and the maximum sealing pressure can reach 20MPa; in the actual construction process, the amount of dry ice used is about 500kg~1000kg, the amount of methanol used is about 150kg~300kg, and the construction time is 3~5 days. Both the construction time and the construction cost have obvious advantages over the traditional well killing construction method and the blowdown construction method; in addition, it can be seen from the specific construction process that the method does not pollute the environment, does not damage the bottom hole pressure, can quickly resume production, and solves the current problem that the long-term pressurized wellhead cannot be repaired.

Claims

1. A method for replacing a wellhead based on a freezing pressure control method, characterized in that: Here are the steps: S1. Calculate the amount of temporary plugging agent and prepare the temporary plugging agent according to the specifications of the well; the amount of temporary plugging agent is the sum of the volume of the temporary plugging agent plugging layer in the tubing space, the volume of the temporary plugging agent plugging layer in the casing annulus space, and the volume of the wellhead valve and the internal channel of the connecting pipeline; In step S1, the layer heights of the freezing plugging layers in the tubing space and the casing annulus space are the same, and are both formed from top to bottom in sequence with an upper freezing buffer section, a freezing section and a lower freezing buffer section, the height of the upper freezing buffer section and the height of the lower freezing buffer section are 1m, and the height of the freezing section is ≥1m; the temporary plugging agent is prepared by mixing bentonite and water in a volume ratio of (1.35-1.45):1 and stirring evenly; S2, excavating a freezing box installation pit from the ground around the wellhead downward to install a freezing box for the freezing temporary plugging agent plugging layer; S3. Pre-freeze the wellhead structure and the oil jacket near the wellhead by continuously adding refrigerant into the freezing box, and the freezing operation time is ≥ 2h; the refrigerant is a solid-liquid mixture of dry ice and methanol, and the refrigerant temperature is maintained at ≤-20℃; S4, while maintaining the same freezing method as step S3, pump the temporary plugging agent into the well, and after the pumping is completed, calculate the time for the refrigerant energy to be transferred from the outer wall of the casing to the center of the casing according to the theoretical freezing rate of 1.5 hours / inch as the minimum freezing time, and freeze the temporary plugging agent plugging layer; S5, while maintaining the same freezing method as step S3, by sequentially performing forward pressure test and reverse pressure test, ensuring that the plugging layer of the frozen temporary plugging agent effectively seals the wellhead; S6, while maintaining the same freezing method as step S3, the bolts of all the mounting flanges on the old wellhead are loosened and then tightened in sequence; S7, repeat step S5 to again ensure that the plugging layer of the temporary freezing plugging agent effectively seals the wellhead; S8, while maintaining the same freezing method as step S3, the old wellhead is replaced with a new one; a crane is set up at the construction site for lifting the old wellhead, and another crane is set up for lifting the new wellhead, and before replacing the wellhead, the crane used to lift the old wellhead pre-adjusts the lifting point to a suitable height position above the wellhead, and then moves the boom horizontally to the other side, so that when replacing the wellhead, the crane only needs to move the boom horizontally into place; and the crane used to lift the new wellhead also pre-adjusts the lifting point to a suitable height position above the wellhead, and then moves the boom horizontally to the other side, and lifts the new wellhead to the same suitable height position, so that when replacing the wellhead, the crane only needs to move the boom horizontally into place; S9, remove the refrigerant, remove the freezing box, and thaw the temporary plugging agent plugging layer; S10. Open the valve at the new wellhead and use the pressure inside the well to spray the thawed temporary plugging agent out of the well.

2. The method for realizing wellhead replacement based on freezing pressure control method according to claim 1 is characterized in that: In step S2, the freezing box installation pit is a deep pit with a depth ≥2m and a diameter ≥2m; the height of the freezing box is ≥1m, the distance from the inner wall of the box body to the outer wall of the casing is ≥0.2m, and the distance from the top of the box body to the wellhead is the same as the height of the upper freezing buffer section.

3. The method for replacing a wellhead based on a freezing pressure control method according to claim 1, characterized in that: In step S2, the outer wall surface of the freezing box is coated with a heat-insulating layer; and a layer of temporary blocking agent is applied to the joint edge seams of the box body of the freezing box.

4. The method for replacing a wellhead based on freezing and pressure control according to claim 1, characterized in that: In step S3, the refrigerant is added to the freezing box in the following manner: 1) In the initial state, first, according to the inner cavity volume V of the freezing box, box , first pour 1 / 2V into the freezer box box of methanol, and then add 1 / 3V of methanol to the freezer in batches. box ~1 / 2V box of dry ice to form a solid-liquid mixture composed of dry ice and methanol; 2) in the subsequent process, according to the consumption of methanol or dry ice in the solid-liquid mixture refrigerant, methanol or dry ice is continuously added, and the solid-liquid mixture refrigerant is stirred at intervals.

5. The method for replacing a wellhead based on freezing and pressure control according to claim 1, characterized in that: In step S4, the temporary plugging agent is pumped into the well layer by layer from outside to inside, and the pumping pressure is 1.2 to 1.4 times the well pressure.

6. The method for replacing a wellhead based on freezing and pressure control according to claim 1, characterized in that: In step S4, the temporary plugging agent is pumped into the well layer by layer from the outside to the inside, and before each layer of the temporary plugging agent is pumped, a foam plug is inserted in advance into the temporary plugging agent injection pipeline.

7. The method for replacing a wellhead based on freezing and pressure control according to claim 1, characterized in that: In step S5, The forward pressure test method is: continue to inject the temporary plugging agent into the well at the test pressure, and the test pressure is a pressure greater than the well pressure and less than 1.5 times the well pressure; if the temporary plugging agent cannot be continuously pumped into the well, a frozen temporary plugging agent plugging layer is formed; otherwise, the same freezing method as step S3 is maintained, and the forward pressure test is performed again every 2 hours until it is determined that the frozen temporary plugging agent plugging layer is formed; The reverse pressure test method is: open the wellhead valve to release the well pressure. If there is no gas or liquid spraying out of the wellhead and the wellhead pressure gauge is 0, close the wellhead valve and observe the pressure change of the pressure gauge in the next hour; if there is no pressure rise in the next hour, and when the valve is opened again, there is still no gas and liquid overflowing, it proves that the freezing temporary plugging agent plugging layer has completely sealed the wellhead; otherwise, maintain the same freezing method as step S3, and reverse pressure test again every 2 hours until it is determined that the freezing temporary plugging agent plugging layer is formed.

8. The method for replacing a wellhead based on freezing and pressure control according to claim 1, characterized in that: In step S9, after the freezing box is removed, explosion-proof heating equipment is used to quickly thaw the freezing temporary plugging agent plugging layer by setting a heating pipeline in the freezing box installation pit or delivering hot air into the freezing box installation pit.