Visual document model editing method
By analyzing the route environment and traffic data in the route planning data document, the edited route path model is generated, which solves the problem of high editing of document models in the existing technology, and achieves more efficient adaptive editing in the industry.
Patent Information
- Application Number
- CN202410834097.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-06-25
AI Technical Summary
The existing technology fails to address specific structures and requirements in specific industry fields when editing document models, resulting in the need of editors to make adaptive adjustments, increasing costs.
By obtaining route planning data documents, analyzing route environment and traffic data, generating edited route path models, and synchronizingly giving reference to route planning engineers. The specific steps include route environment and traffic analysis, and calculating outliers based on weather, altitude, and flight data. and decision values, label candidate steering points, and edit route path model.
It effectively reduces the cost of editing documents models and improves editing efficiency and accuracy for specific application industries.
Smart Images

Figure CN118607483B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of model editing, and in particular to a visual document model editing method. Background Art
[0002] In the field of aviation operations, route traffic path planning is the key to ensuring flight safety, improving operational efficiency, and optimizing route layout. With the development of data science, visualization technology plays an increasingly important role in analyzing and presenting aviation data documents. Combining modern data visualization technology with aviation data documentation methods can provide a deeper understanding of the causes and impacts of route traffic anomalies, thereby providing airlines with more accurate and practical management suggestions.
[0003] For example, a Chinese patent with publication number CN110688109A discloses a method for creating a model editing system and a model editing system. It includes: creating a model framework editing module, a model framework editing module, which is used to edit various types of model frameworks; creating a model visualization editing module, a model visualization editing module, which is used to edit the attribute editing box of the model in the visualization interface under the currently used model framework, and edit the visual attributes of the model in the attribute editing box. By creating a system including a model framework editing module and a model visualization editing module, the user can use the visualization interface provided by the model visualization editing module to view the attribute editing box in the visualization editing interface under the specified model framework, and to view the attributes of the model in the attribute editing box. Compared with the method of writing source code, since the input is a visual attribute, it is not only not abstract but also convenient and quick to write, so the method of using attribute visualization editing can improve the efficiency of model creation and editing.
[0004] For example, the Chinese patent with publication number CN111737780A discloses an online model editing method and an online model editing system. After configuration, the models of different platforms are de-differentiated and imported into the model loader, connected to the material repeater, and the standardized processed materials are placed in the temporary storage area. In the operation area, the model in the model loader and the materials in the temporary storage area are taken for operation and output of the operation results. The operation results are rendered with a 3D rendering engine, and the model scene is restored to complete the online model editing. In this invention, users can access the model editor through a browser. The editor has a rich material library built in, and various models can be freely combined to create various models. You can also import your own models, edit existing models by splitting and merging, and update them to the business system with one click after saving, so as to realize the seamless release of 3D models. This invention greatly shortens the modeling cycle, reduces the implementation cost, improves the scalability of the model, supports online editing of models, and seamless release to application scenarios, providing underlying technical support for the implementation of visual smart buildings.
[0005] The above patents all have the problem raised by the background technology: they fail to take into account the specific document structure, specifications and requirements for specific industry fields when editing the document model, so that in actual application, editors are often required to make adaptive adjustments for specific application industry fields, resulting in excessively high document model editing costs when making adaptive adjustments for specific application industry fields; to solve these problems, the present invention proposes a visual document model editing method. Summary of the invention
[0006] In view of the shortcomings of the prior art, the main purpose of the present invention is to provide a visual document model editing method that can effectively solve the problems in the background technology. The specific technical solutions of the present invention are as follows:
[0007] The visual document model editing method includes the following specific steps:
[0008] S1. Acquire a route planning data document, wherein the route planning data document includes: a route data document, a traffic route information document, and a flight data document. The route data document includes weather data and altitude data of multiple areas passed through on the pre-planned route path, and the traffic route information document includes air traffic data;
[0009] S2, substituting the route data file into the route environment analysis strategy to analyze the environments of multiple areas passed by the pre-planned route path, and obtaining the route environment analysis results;
[0010] S3, substituting the flight data document and the traffic route information document into the route traffic analysis strategy to analyze the route traffic on the pre-planned route path and obtain the route traffic analysis result;
[0011] S4, substituting the route environment analysis results and the route traffic analysis results into the route path model editing strategy to obtain the edited route path model;
[0012] S5. Synchronize the edited route path model to the route planning engineer for reference.
[0013] Specifically, the weather data includes the temperature, humidity, wind speed, and air pressure of the n areas passed by the pre-planned route at m historical moments; the altitude data includes the average altitude of each area passed by the pre-planned route; the flight data document includes the total number of flights in the n areas passed by the pre-planned route, the number of flight delays, and the number of flights in the n areas passed by m historical moments; the traffic route information document also includes the number of intersections of the routes in each area passed by the pre-planned route and the number of transfer flights in each area.
[0014] Specifically, the route environment analysis strategy includes a route weather analysis sub-strategy and a route altitude analysis sub-strategy.
[0015] Specifically, the route weather analysis sub-strategy includes:
[0016] S11. Get the temperature T of the i-th region at the j-th moment in history ij 、Humidity ij , wind speed W ij , air pressure P ij ;
[0017] S12. Calculate the temperature anomaly value of the i-th area Where i is any value from 1 to n, j is any value from 1 to m;
[0018] S13. Calculate the humidity anomaly value of the i-th area Where i is any value from 1 to n, j is any value from 1 to m;
[0019] S14. Calculate the abnormal wind speed value of the i-th area Where i is any value from 1 to n, j is any value from 1 to m;
[0020] S15. Calculate the abnormal pressure value of the i-th area Where i is any value from 1 to n, j is any value from 1 to m;
[0021] S16. Calculate the weather anomaly value of the i-th area Where i is any value from 1 to n, and j is any value from 1 to m.
[0022] Specifically, the route altitude analysis sub-strategy includes:
[0023] S21, obtaining the average altitude A of the i-th area passed by the pre-planned route i ;
[0024] S22. Calculate the altitude abnormal value of the i-th area Where i is any value from 1 to n.
[0025] Specifically, the route environment analysis strategy further includes: calculating the environmental anomaly value E of the i-th area i =α×S i +β×Hb i , where α and β are the weather influence coefficient and the altitude influence coefficient respectively, α and β are both greater than 0, and α+β=1; the environmental anomaly value of the i-th area is taken as the route environment analysis result of the i-th area.
[0026] Specifically, the route traffic analysis strategy includes:
[0027] S31. Obtain the number of flight delays D in the i-th region passed. i , the total number of flights passing through the i-th region Te i , the number of flights passing through the i-th area at the j-th time Te ij , the number of intersections C of the routes passing through the i-th area i , the number of flights connecting in the i-th region Z i .
[0028] S32: Calculate the route traffic anomaly value of the i-th area Where i is any value from 1 to n, j is any value from 1 to m;
[0029] S33. Taking the route traffic abnormality value of the i-th area as the route traffic analysis result of the i-th area.
[0030] Specifically, the route path model editing strategy includes: calculating the path node decision value F of the i-th area i =a×E i +b×Hj i , where a and b are the environmental decision-making influence coefficient and the route traffic decision-making influence coefficient, a and b are both greater than 0, and a+b=1; a path node decision threshold is preset, when the path node decision value of the i-th area is less than or equal to the path node decision threshold, the path node of the i-th area is used as the candidate route turning point in the route path model; all corresponding areas whose path node decision values in n areas are less than or equal to the path node decision threshold are obtained, and all corresponding areas are used as candidate route turning points; the route path model is edited, and the editing content includes: highlighting the pre-planned route path in the route path model, marking all candidate route turning points in the route path model, and synchronizing the marked route path model to the route planning engineer as a reference.
[0031] Compared with the prior art, the present invention has the following beneficial effects:
[0032] The present invention obtains a route planning data document, substitutes the route data document into a route environment analysis strategy to analyze the environment of multiple areas passed through on the pre-planned route path, and obtains a route environment analysis result; substitutes the flight data document and the traffic route information document into the route traffic analysis strategy to analyze the route traffic on the pre-planned route path, and obtains a route traffic analysis result; substitutes the route environment analysis result and the route traffic analysis result into the route path model editing strategy to obtain an edited route path model; and synchronizes the edited route path model to a route planning engineer as a reference. The present invention can solve the problem of excessively high document model editing costs when making adaptive adjustments for specific application industry fields. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 This is a workflow diagram of the visual document model editing method of the present invention. DETAILED DESCRIPTION
[0034] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0035] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0036] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0037] This embodiment provides a visual document model editing method, the specific scheme is as follows: Figure 1 As shown, the visual document model editing method includes the following specific steps:
[0038] S1. Acquire a route planning data document, wherein the route planning data document includes: a route data document, a traffic route information document, and a flight data document. The route data document includes weather data and altitude data of multiple areas passed through on the pre-planned route path, and the traffic route information document includes air traffic data;
[0039] S2, substituting the route data file into the route environment analysis strategy to analyze the environments of multiple areas passed by the pre-planned route path, and obtaining the route environment analysis results;
[0040] S3, substituting the flight data document and the traffic route information document into the route traffic analysis strategy to analyze the route traffic on the pre-planned route path and obtain the route traffic analysis result;
[0041] S4, substituting the route environment analysis results and the route traffic analysis results into the route path model editing strategy to obtain the edited route path model;
[0042] S5. Synchronize the edited route path model to the route planning engineer for reference.
[0043] In this embodiment, the weather data includes the temperature, humidity, wind speed, and air pressure of the n areas passed by the pre-planned route at m historical moments; the altitude data includes the average altitude of each area passed by the pre-planned route; the flight data file includes the total number of flights in the n areas passed by the pre-planned route, the number of flight delays, and the number of flights in the n areas passed by m historical moments; the traffic route information file also includes the number of intersections of the routes of each area passed by the pre-planned route and the number of transfer flights in each area.
[0044] In this embodiment, the route environment analysis strategy includes a route weather analysis sub-strategy and a route altitude analysis sub-strategy.
[0045] In this embodiment, the route weather analysis sub-strategy includes:
[0046] S11. Get the temperature T of the i-th region at the j-th moment in history ij 、Humidity ij , wind speed W ij , air pressure P ij ;
[0047] S12. Calculate the temperature anomaly value of the i-th area Where i is any value from 1 to n, j is any value from 1 to m;
[0048] S13. Calculate the humidity anomaly value of the i-th area Where i is any value from 1 to n, j is any value from 1 to m;
[0049] S14. Calculate the abnormal wind speed value of the i-th area Where i is any value from 1 to n, j is any value from 1 to m;
[0050] S15. Calculate the abnormal pressure value of the i-th area Where i is any value from 1 to n, j is any value from 1 to m;
[0051] S16. Calculate the weather anomaly value of the i-th area Where i is any value from 1 to n, and j is any value from 1 to m.
[0052] In this embodiment, the route altitude analysis sub-strategy includes:
[0053] S21, obtaining the average altitude A of the i-th area passed by the pre-planned route i ;
[0054] S22. Calculate the altitude abnormal value of the i-th area Where i is any value from 1 to n.
[0055] In this embodiment, the route environment analysis strategy further includes: calculating the environmental abnormality value E of the i-th area i =α×S i +β×Hb i , where α and β are the weather influence coefficient and the altitude influence coefficient respectively, α and β are both greater than 0, and α+β=1; the environmental anomaly value of the i-th area is taken as the route environment analysis result of the i-th area.
[0056] In this embodiment, the route traffic analysis strategy includes:
[0057] S31. Obtain the number of flight delays D in the i-th region passed. i , the total number of flights passing through the i-th region Te i , the number of flights passing through the i-th area at the j-th time Te ij , the number of intersections C of the routes passing through the i-th area i , the number of flights connecting in the i-th region Z i .
[0058] S32: Calculate the route traffic anomaly value of the i-th area Where i is any value from 1 to n, j is any value from 1 to m;
[0059] S33. Taking the route traffic abnormality value of the i-th area as the route traffic analysis result of the i-th area.
[0060] In this embodiment, the route path model editing strategy includes: calculating the path node decision value F of the i-th area i =a×E i +b×Hj i , where a and b are the environmental decision-making influence coefficient and the route traffic decision-making influence coefficient, a and b are both greater than 0, and a+b=1; a path node decision threshold is preset, when the path node decision value of the i-th area is less than or equal to the path node decision threshold, the path node of the i-th area is used as the candidate route turning point in the route path model; all corresponding areas whose path node decision values in n areas are less than or equal to the path node decision threshold are obtained, and all corresponding areas are used as candidate route turning points; the route path model is edited, and the editing content includes: highlighting the pre-planned route path in the route path model, marking all candidate route turning points in the route path model, and synchronizing the marked route path model to the route planning engineer as a reference.
[0061] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A visual document model editing method, characterized in that: The method comprises the following specific steps: S1. Acquire a route planning data document, wherein the route planning data document includes: a route data document, a traffic route information document, and a flight data document. The route data document includes weather data and altitude data of multiple areas passed through on the pre-planned route path, and the traffic route information document includes air traffic data; S2, substituting the route data file into the route environment analysis strategy to analyze the environments of multiple areas passed by the pre-planned route path, and obtaining the route environment analysis results; The route environment analysis strategy includes a route weather analysis sub-strategy, and the route weather analysis sub-strategy includes: S11. Get the temperature of the i-th region at the j-th moment in history ,humidity , wind speed , air pressure ; S12. Calculate the temperature anomaly value of the i-th area , where i is any value from 1 to n, and j is any value from 1 to m; S13. Calculate the humidity anomaly value of the i-th area , where i is any value from 1 to n, and j is any value from 1 to m; S14. Calculate the abnormal wind speed value of the i-th area , where i is any value from 1 to n, and j is any value from 1 to m; S15. Calculate the abnormal pressure value of the i-th area , where i is any value from 1 to n, and j is any value from 1 to m; S16. Calculate the weather anomaly value of the i-th area , where i is any value from 1 to n, and j is any value from 1 to m; The route environment analysis strategy also includes a route altitude analysis sub-strategy, and the route altitude analysis sub-strategy includes: S21. Obtain the average altitude of the ith area passed by the pre-planned route. ; S22. Calculate the altitude abnormal value of the i-th area , where i is any value from 1 to n; The route environment analysis strategy also includes: calculating the environmental anomaly value of the i-th area ,in are the weather influence coefficient and the altitude influence coefficient respectively. are greater than 0, and ; The environmental anomaly value of the ith region is used as the environmental analysis result of the route of the ith region; S3, substituting the flight data document and the traffic route information document into the route traffic analysis strategy to analyze the route traffic on the pre-planned route path and obtain the route traffic analysis result; The route traffic analysis strategy includes: S31. Obtain the number of flight delays in the i-th region , the total number of flights passing through the i-th region , the number of flights passing through the i-th area at the j-th time , the number of intersections of the routes passing through the i-th area , the number of flights connecting in the i-th region ; S32, calculate the route traffic abnormality value of the i-th area , where i is any value from 1 to n, and j is any value from 1 to m; S33, taking the route traffic abnormality value of the i-th area as the route traffic analysis result of the i-th area; S4, substituting the route environment analysis results and the route traffic analysis results into the route path model editing strategy to obtain the edited route path model; The route path model editing strategy includes: calculating the path node decision value of the i-th area ,in is the environmental decision-making influence coefficient and the route traffic decision-making influence coefficient, are greater than 0, and ; Preset a path node decision threshold, when the path node decision value of the i-th area is less than or equal to the path node decision threshold, use the path node of the i-th area as a candidate route turning point in the route path model; obtain all corresponding areas in n areas whose path node decision values are less than or equal to the path node decision threshold, and use all corresponding areas as candidate route turning points; edit the route path model, the editing content includes: highlighting the pre-planned route path in the route path model, marking all candidate route turning points in the route path model, and synchronizing the marked route path model to the route planning engineer as a reference; S5. Synchronize the edited route path model to the route planning engineer for reference.
2. The visual document model editing method according to claim 1, characterized in that: The weather data includes the temperature, humidity, wind speed and air pressure of the n areas passed by the pre-planned route at m historical moments; the altitude data includes the average altitude of each area passed by the pre-planned route; the flight data file includes the total number of flights in the n areas passed by the pre-planned route, the number of flight delays, and the number of flights in the n areas passed by m historical moments; the traffic route information file also includes the number of intersections of the routes in each area passed by the pre-planned route and the number of transfer flights in each area.
