Industrial equipment management system and method based on digital Internet of Things

By analyzing the wear degree and movement trajectory of the mechanical components of the industrial robot, we build a fault analysis model, monitor the equipment status in real time, and locate the fault point through the Internet of Things platform. This solves the problem of industrial equipment being unable to be monitored and maintained remotely in real time, and improves the reliability of the equipment. and maintenance efficiency.

CN118642452BActive Publication Date: 2024-10-25JILIN BEIGUO INTELLIGENT IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411117840.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-25
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

Existing industrial equipment cannot achieve remote transmission and remote control through the Internet of Things. As a result, users cannot understand the operating status of the equipment in real time and cannot perform maintenance in a timely manner, causing unnecessary trouble caused by equipment failure.

Method used

By analyzing the wear degree and movement trajectory changes of industrial robot mechanical parts, we build a fault analysis model, monitor equipment status in real time, predict fault risks, set early warning signals, and locate fault points for maintenance through the Internet of Things platform.

Benefits of technology

It realizes real-time monitoring and early warning of industrial equipment, improves equipment reliability and maintenance efficiency, and avoids unnecessary trouble caused by equipment failure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118642452B_ABST
    Figure CN118642452B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of Internet of Things, and specifically to an industrial equipment management system and method based on a digital Internet of Things. The system includes an industrial equipment fault analysis module, an industrial equipment fault risk prediction module, an early warning signal setting module, and a fault point rapid positioning module. The industrial equipment fault analysis module is used to analyze the degree of wear of mechanical parts of an industrial robot and the influence of changes in movement trajectories on the performance of the industrial robot in combination with historical data, and to construct an industrial equipment fault analysis model according to the analysis results. The present invention analyzes the change trends of various data indicators of industrial equipment in historical data during operation, and then judges the operating status of the corresponding industrial equipment according to the change trends of various data indicators, and constructs a fault risk prediction model in combination with the analysis results, thereby avoiding unnecessary troubles caused by the failure of industrial equipment and improving the maintenance efficiency of industrial equipment by staff.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of Internet of Things, and in particular to an industrial equipment management system and method based on digital Internet of Things. Background Art

[0002] Industrial Internet of Things is the integration of various types of acquisition and control sensors or controllers with perception and monitoring capabilities, as well as mobile communications, intelligent analysis and other technologies into all aspects of the industrial production process, thereby greatly improving manufacturing efficiency, improving product quality, reducing product costs and resource consumption, and ultimately achieving a new stage of upgrading traditional industries to intelligence. In terms of application form, the application of Industrial Internet of Things has the characteristics of real-time, automation, embedded (software), security and information interoperability. However, the industrial equipment currently on the market cannot remotely transmit and control operating information through the Internet of Things. Users cannot understand the operating status of industrial equipment in real time and cannot perform advance maintenance of industrial equipment in a timely manner, causing unnecessary troubles caused by the suddenness of industrial equipment. Therefore, in response to the above problems, an industrial equipment management system and method based on digital Internet of Things are proposed. Summary of the invention

[0003] The purpose of the present invention is to provide an industrial equipment management system and method based on digital Internet of Things to solve the problems raised in the above background technology. The present invention provides the following technical solutions:

[0004] An industrial equipment management method based on digital Internet of Things, the method comprising the following steps:

[0005] S1: Analyze the wear degree of the mechanical parts of industrial robots and the impact of movement trajectory changes on the performance of industrial robots based on historical data, and build an industrial equipment failure analysis model based on the analysis results;

[0006] S2: Monitor the working status of the currently monitored industrial robot in real time, and determine the degree of failure risk of the currently monitored industrial robot in combination with the industrial equipment failure analysis model, and build a failure risk prediction model based on the determination results;

[0007] S3: Set the warning signal condition value based on the analysis results of the fault risk prediction model, and send the warning signal to the Internet of Things platform;

[0008] S4: Receive early warning signals through the Internet of Things platform, locate and predict fault points based on early warning signals, and take corresponding measures to repair the predicted fault points.

[0009] Furthermore, the method of S1 comprises the following steps:

[0010] Step 1001: Obtain the project task of the ath industrial robot in the monitored area through historical data, and record the time taken for the corresponding joint in each project task to rotate from the initial position to the target position as set A.

[0011] A={[A a 1. A a 2. A a 3, ..., A a n ]},

[0012] Among them A a n It represents the time taken by the corresponding joint of the a-th industrial robot in the monitoring area to rotate from the initial position to the target position when running the n-th project task;

[0013] Step 1002: Obtain the time taken by the corresponding joint of the a-th industrial robot to rotate from the initial position to the target position in different project tasks, and record the wear degree of the mechanical parts corresponding to the time taken by the corresponding joint of the a-th industrial robot to rotate from the initial position to the target position in the n-th project task as M n ,

[0014] M n =α·|B n T -A a n |,

[0015] Where α represents the proportionality coefficient, α∈(0,1), and the proportionality coefficient is a preset value of the database. n T It represents the standard time required for the corresponding joint of the industrial robot to rotate from the initial position to the target position when running the nth project task. n T Preset value for the database, B n T ∈(0,+∞);

[0016] The database preset value B in the present invention n T It is related to the specific project of the industrial robot. Different industrial robots need different standard time for different projects. Therefore, B n T ∈(0,+∞);

[0017] Step 1003: With point o as the origin, the number of rotations as the x-axis, and the degree of wear of the mechanical parts of the industrial robot as the y-axis, a first plane rectangular coordinate system is constructed. In the first plane rectangular coordinate system, the coordinate points of the degree of wear of the mechanical parts corresponding to the rotation of the relevant joints from the initial position to the target position of the a-th industrial robot are marked, and two adjacent coordinate points are connected in sequence to generate a fitting curve, which is recorded as F 转动 (x);

[0018] Step 1004: Obtain the movement trajectory of the corresponding joint of the ath industrial robot in the monitored area rotating from the initial position to the target position during the Lth operation of the nth project task.

[0019] With point o1 as the origin, the time node as the x1 axis, and the movement distance of the corresponding joint of the industrial robot as the y1 axis, a second plane rectangular coordinate system is constructed. In the second plane rectangular coordinate system, the corresponding coordinate points of the movement distance of each time node of the ath industrial robot in the monitoring area from the initial position to the target position in the Lth operation of the nth project task are marked, and two adjacent coordinate points are connected in sequence to generate a moving trajectory fitting curve, which is recorded as F L (x1),

[0020] A moving trajectory fitting curve F will be generated L The deviation between (x1) and the fitting curve generated by the movement trajectory of the corresponding joint from the initial position to the target position in the first operation of the nth project task by the ath industrial robot in the monitored area is recorded as P 1(L) ,

[0021] P 1(L) =∫ u x1=1 |F L (x1)-F1(x1)|d(x1),

[0022] Where u represents the total number of coordinate points corresponding to the movement position of the a-th industrial robot in the monitored area at each time node when the corresponding joint rotates from the initial position to the target position in the L-th running of the n-th project task in the second plane rectangular coordinate system, and F1(x1) represents the fitting curve generated by the movement trajectory of the a-th industrial robot in the monitored area when the corresponding joint rotates from the initial position to the target position in the first running of the n-th project task;

[0023] Step 1005: Repeat step 1004 to obtain the deviation between the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in each operation of the nth project task by the ath industrial robot in the monitored area and the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in the first operation of the nth project task by the ath industrial robot in the monitored area.

[0024] With point o2 as the origin, the number of runs as the x2 axis, and the deviation as the y2 axis, a third plane rectangular coordinate system is constructed. In the third plane rectangular coordinate system, the coordinate points of the deviation between the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in each operation of the nth project task by the ath industrial robot in the monitored area and the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in the first operation of the nth project task by the ath industrial robot in the monitored area are marked, and two adjacent coordinate points are connected in sequence to generate a fitting curve, which is recorded as F 偏差 (x2);

[0025] Step 1006: Combine the analysis results of step 1003 and step 1005 to build an industrial equipment failure analysis model, denoted as M n fault , the default number of rotations of the industrial robot during each operation is one,

[0026] M n fault =β1·F 转动 (x)+β2·F 偏差 (x2),

[0027] Wherein β1 and β2 are proportional coefficients, β1+β2=1, β1∈(0,1), β2∈(0,1), and the proportional coefficients are preset values ​​of the database.

[0028] The present invention combines historical data to obtain all the time and movement trajectory of each joint rotating from an initial position to a target position when an industrial robot runs for the first time, and uses the data corresponding to the first operation as reference data. By analyzing the changing trend of the degree of wear of mechanical parts of the corresponding industrial robot under different rotation times and the deviation relationship between the corresponding movement trajectory of the industrial robot and the reference data, and combining the analysis results, an industrial equipment fault analysis model is constructed. Furthermore, by analyzing the operating status of the industrial equipment in the historical data, a corresponding fault analysis report is obtained, thereby providing data reference for subsequent real-time monitoring and judging whether the current operating status of the industrial robot is abnormal.

[0029] Furthermore, the method of S2 comprises the following steps:

[0030] Step 2001: setting the self-check period of the current industrial robot to be monitored to γ;

[0031] Step 2002: Obtain the self-test report of the γ1th cycle of the currently monitored industrial robot, match the movement time of the corresponding joint of the currently monitored industrial robot in the operation of the nth project task with the historical data, and obtain the wear degree change trend of the corresponding joint-related mechanical parts, which is recorded as F n 磨损程度 (x) The industrial robot to be monitored currently is not the same device as the industrial robot in the historical data;

[0032] Step 2003: The deviation change trend curve between the moving distance of the corresponding joint of the current monitored industrial robot in the execution of the nth project task and the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position when the first execution of the nth project task is recorded as F n 移动轨迹 (x2);

[0033] Step 2004: Obtain the failure risk level of the nth project task in the γ1th cycle of the currently monitored industrial robot according to the industrial equipment failure analysis model, recorded as Mγ1 (n) fault ,

[0034] Among them, Mγ1 (n) fault =β1·F n 磨损程度 (x)+β2·F n 移动轨迹 (x2);

[0035] Step 2005: Map the analysis results of step 2004 and step 1006 to the same coordinate system through the origin software, maximize the overlap of the two fitting curves by translating the positions of the fitting curves, remove the overlapping curves, fit a straight line to the non-overlapping part of the historical analysis results relative to the nth project task failure risk degree in the γ1th cycle of the current industrial robot to be monitored, and splice the fitted straight lines. Read the length of the straight line through the origin software and record it as L n , and build a fault risk prediction model based on the analysis results, denoted as F future ,

[0036] F future =δ·∑ n r=1 (L r / L 标准 ),

[0037] Where δ represents the proportionality coefficient, which is a preset value in the database, δ∈(0,1), L 标准 It indicates the length of the straight line read after the industrial equipment failure analysis model curve generated by the ath industrial robot completing the complete process for the first time in the historical data is fitted with a straight line by the origin software. By default, the industrial equipment failure analysis model curves generated by each industrial robot completing the complete process for the first time in the historical data are the same. Due to the problems in the manufacturing process, there are errors in the accuracy of the parts, and thus the industrial equipment failure analysis model curves generated by different industrial robots in subsequent operations are different.

[0038] The present invention obtains the fault risk degree of the current industrial robot by real-time monitoring of various indicators during the operation of the current industrial robot, combines the industrial equipment fault analysis model, and compares the fault risk degree of the current robot with the analysis results of historical data, and then constructs a fault risk prediction model according to the comparison results, providing data reference for the subsequent setting of early warning signal condition values.

[0039] Furthermore, the method of S3 comprises the following steps:

[0040] Step 3001: Obtain the fault risk prediction model in step 2005, and set the warning condition value in combination with the fault risk prediction model.

[0041] If F future >ξ, it indicates that the operating state of the current monitored industrial robot is abnormal, where ξ is the preset value of the database, ξ∈(0,1),

[0042] If 0≤F future ≤ξ, it indicates that the current operating status of the monitored industrial robot is normal;

[0043] Step 3002: Based on the judgment result of step 3001, if there is any abnormality in the operating status of the currently monitored industrial robot, a warning signal is sent to the Internet of Things platform.

[0044] The present invention compares the fault risk prediction model with the preset value, determines whether the operating status of the corresponding industrial robot in the current monitored area is abnormal according to the comparison result, and sends the abnormal report to the Internet of Things platform, providing data reference for the subsequent rapid positioning and prediction of the fault point in combination with the abnormal report.

[0045] Furthermore, the method of S4 comprises the following steps:

[0046] Step 4001: The IoT platform receives the warning signal, performs preprocessing based on the received warning signal, compares the fault risk calculation results corresponding to each item in each self-check cycle of the current industrial robot with the analysis results in the historical data, and then quickly locates the fault point;

[0047] Step 4002: Acquire the current fault point location of the industrial robot in combination with the analysis result of step 4001, and notify relevant maintenance personnel to check the fault point.

[0048] When the present invention receives a warning signal through the Internet of Things platform, it analyzes the movement time and movement trajectory of each joint of the corresponding industrial robot in the current monitored area one by one, judges the predicted fault point in combination with the historical data analysis results, and notifies the relevant maintenance staff of the predicted fault point.

[0049] An industrial equipment management system based on digital Internet of Things, the system includes the following modules:

[0050] Industrial equipment failure analysis module: The industrial equipment failure analysis module is used to analyze the wear degree of the mechanical parts of the industrial robot and the impact of the movement trajectory change on the performance of the industrial robot in combination with historical data, and to build an industrial equipment failure analysis model based on the analysis results;

[0051] Industrial equipment failure risk prediction module: The industrial equipment failure risk prediction module is used to monitor the working status of the currently monitored industrial robot in real time, and judge the failure risk degree of the currently monitored industrial robot in combination with the industrial equipment failure analysis model, and build a failure risk prediction model based on the judgment result;

[0052] Early warning signal setting module: The early warning signal setting module is used to set the early warning condition value in combination with the analysis results of the industrial equipment failure risk prediction module, and send the early warning signal to the Internet of Things platform;

[0053] Fault point rapid positioning module: The fault point rapid positioning module is used to receive early warning signals through the Internet of Things platform, locate and predict fault points based on the early warning signals, and take corresponding measures to repair the predicted fault points.

[0054] Furthermore, the industrial equipment fault analysis module includes a data preprocessing unit, a mechanical component wear degree monitoring unit, a movement trajectory deviation monitoring unit and a fault analysis model building unit:

[0055] The data preprocessing unit is used to obtain the project task of the corresponding industrial robot in combination with the historical data, and to record the relevant data of the corresponding industrial robot in the project task during operation in real time;

[0056] The mechanical component wear degree monitoring unit is used to analyze the relationship between the wear degree and time when the corresponding joint of the industrial robot rotates from the initial position to the target position in different project tasks;

[0057] The movement trajectory deviation monitoring unit is used to analyze the deviation relationship between the movement trajectory generated by the relevant joints of the industrial robot rotating from the initial position to the target position in the corresponding task project and the preset value;

[0058] The fault analysis model building unit is used to build an industrial equipment fault analysis model in combination with the analysis structures of the mechanical component wear degree monitoring unit and the movement trajectory deviation monitoring unit.

[0059] Furthermore, the industrial equipment failure risk prediction module includes an equipment status acquisition unit, a failure risk real-time monitoring unit and a failure risk prediction unit:

[0060] The device status acquisition unit is used to obtain the self-test report of each cycle of the currently monitored industrial robot in real time;

[0061] The fault risk real-time monitoring unit is used to analyze the degree of fault risk of each cycle in combination with the self-check report of each cycle of the currently monitored industrial robot;

[0062] The fault risk prediction unit is used to construct a fault risk prediction model in combination with the analysis result of the fault risk real-time monitoring unit.

[0063] Furthermore, the warning signal setting module includes a warning condition setting unit and a warning signal sending unit:

[0064] The warning condition setting unit is used to set the warning signal condition value in combination with the analysis structure of the fault risk prediction unit;

[0065] The warning signal sending unit is used to send the warning signal to the Internet of Things platform in combination with the analysis result of the warning condition setting unit.

[0066] Furthermore, the fault point rapid location module includes an early warning signal receiving unit and a fault point location unit:

[0067] The warning signal receiving unit is used to receive the warning signal through the Internet of Things platform and process the received signal;

[0068] The fault point locating unit is used to quickly locate the current fault point of the industrial robot in combination with the analysis result of the early warning signal receiving unit.

[0069] The present invention analyzes the changing trends of various data indicators of industrial equipment in historical data during operation, and then judges the operating status of the corresponding industrial equipment according to the changing trends of various data indicators, builds a fault risk prediction model in combination with the analysis results, sets early warning condition values ​​based on the fault risk prediction model, and judges the current operating status of the industrial equipment by comparing the changing trends of various indicators when the current industrial equipment is running with historical data, and then further analyzes the fault location according to the operating status, thereby avoiding unnecessary troubles caused by the failure of industrial equipment and improving the maintenance efficiency of industrial equipment by staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0070] Figure 1 It is a flow chart of an industrial equipment management method based on digital Internet of Things of the present invention;

[0071] Figure 2 It is a module schematic diagram of an industrial equipment management system based on digital Internet of Things of the present invention. DETAILED DESCRIPTION

[0072] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0073] Example 1: Please refer to Figure 1 , in this embodiment:

[0074] A method for managing industrial equipment based on a digital Internet of Things is implemented, the method comprising the following steps:

[0075] S1: Analyze the wear degree of the mechanical parts of industrial robots and the impact of movement trajectory changes on the performance of industrial robots based on historical data, and build an industrial equipment failure analysis model based on the analysis results;

[0076] The method of S1 comprises the following steps:

[0077] Step 1001: Obtain the project task of the ath industrial robot in the monitored area through historical data, and record the time taken for the corresponding joint in each project task to rotate from the initial position to the target position as set A.

[0078] A={[A a 1. A a 2. A a 3, ..., A a n ]},

[0079] Among them A a n It represents the time taken by the corresponding joint of the a-th industrial robot in the monitoring area to rotate from the initial position to the target position when running the n-th project task;

[0080] Step 1002: Obtain the time taken by the corresponding joint of the a-th industrial robot to rotate from the initial position to the target position in different project tasks, and record the wear degree of the mechanical parts corresponding to the time taken by the corresponding joint of the a-th industrial robot to rotate from the initial position to the target position in the n-th project task as M n ,

[0081] M n =α·|B n T -A a n |,

[0082] Where α represents the proportionality coefficient, α∈(0,1), and the proportionality coefficient is a preset value of the database. n T It represents the standard time required for the corresponding joint of the industrial robot to rotate from the initial position to the target position when running the nth project task. n T Preset value for the database, B n T ∈(0,+∞);

[0083] Step 1003: With point o as the origin, the number of rotations as the x-axis, and the degree of wear of the mechanical parts of the industrial robot as the y-axis, a first plane rectangular coordinate system is constructed. In the first plane rectangular coordinate system, the coordinate points of the degree of wear of the mechanical parts corresponding to the rotation of the relevant joints from the initial position to the target position of the a-th industrial robot are marked, and two adjacent coordinate points are connected in sequence to generate a fitting curve, which is recorded as F 转动 (x);

[0084] Step 1004: Obtain the movement trajectory of the corresponding joint of the a-th industrial robot in the monitoring area rotating from the initial position to the target position during the L-th operation of the n-th project task.

[0085] With point o1 as the origin, the time node as the x1 axis, and the movement distance of the corresponding joint of the industrial robot as the y1 axis, a second plane rectangular coordinate system is constructed. In the second plane rectangular coordinate system, the corresponding coordinate points of the movement distance of each time node of the ath industrial robot in the monitoring area from the initial position to the target position in the Lth operation of the nth project task are marked, and two adjacent coordinate points are connected in sequence to generate a moving trajectory fitting curve, which is recorded as F L (x1),

[0086] A moving trajectory fitting curve F will be generated L The deviation between (x1) and the fitting curve generated by the movement trajectory of the corresponding joint from the initial position to the target position in the first operation of the nth project task by the ath industrial robot in the monitored area is recorded as P 1(L) ,

[0087] P 1(L) =∫ u x1=1 |F L (x1)-F1(x1)|d(x1),

[0088] Where u represents the total number of coordinate points corresponding to the movement position of the a-th industrial robot in the monitored area at each time node when the corresponding joint rotates from the initial position to the target position in the L-th running of the n-th project task in the second plane rectangular coordinate system, and F1(x1) represents the fitting curve generated by the movement trajectory of the a-th industrial robot in the monitored area when the corresponding joint rotates from the initial position to the target position in the first running of the n-th project task;

[0089] Step 1005: Repeat step 1004 to obtain the deviation between the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in each operation of the nth project task by the ath industrial robot in the monitored area and the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in the first operation of the nth project task by the ath industrial robot in the monitored area.

[0090] With point o2 as the origin, the number of runs as the x2 axis, and the deviation as the y2 axis, a third plane rectangular coordinate system is constructed. In the third plane rectangular coordinate system, the coordinate points of the deviation between the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in each operation of the nth project task by the ath industrial robot in the monitored area and the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in the first operation of the nth project task by the ath industrial robot in the monitored area are marked, and two adjacent coordinate points are connected in sequence to generate a fitting curve, which is recorded as F 偏差 (x2);

[0091] Step 1006: Combine the analysis results of step 1003 and step 1005 to build an industrial equipment failure analysis model, denoted as M n fault , the default number of rotations of the industrial robot during each operation is one,

[0092] M n fault =β1·F 转动(x)+β2·F 偏差 (x2),

[0093] Wherein β1 and β2 are proportional coefficients, β1+β2=1, β1∈(0,1), β2∈(0,1), and the proportional coefficients are preset values ​​of the database.

[0094] S2. Monitor the working status of the currently monitored industrial robot in real time, and determine the degree of failure risk of the currently monitored industrial robot in combination with the industrial equipment failure analysis model, and build a failure risk prediction model based on the determination results;

[0095] The method of S2 comprises the following steps:

[0096] Step 2001: setting the self-check period of the current industrial robot to be monitored to γ;

[0097] Step 2002: Obtain the self-test report of the γ1th cycle of the currently monitored industrial robot, match the movement time of the corresponding joint of the currently monitored industrial robot in the operation of the nth project task with the historical data, and obtain the wear degree change trend of the corresponding joint-related mechanical parts, which is recorded as F n 磨损程度 (x);

[0098] Step 2003: The deviation change trend curve between the moving distance of the corresponding joint of the current monitored industrial robot in the execution of the nth project task and the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position when the first execution of the nth project task is recorded as F n 移动轨迹 (x2);

[0099] Step 2004: Obtain the failure risk level of the nth project task in the γ1th cycle of the currently monitored industrial robot according to the industrial equipment failure analysis model, recorded as Mγ1 (n) fault ,

[0100] Among them, Mγ1 (n) fault =β1·F n 磨损程度 (x)+β2·F n 移动轨迹 (x2);

[0101] Step 2005: Map the analysis results of step 2004 and step 1006 to the same coordinate system through the origin software, maximize the overlap of the two fitting curves by translating the position of the fitting curve, remove the overlapping curve, fit a straight line to the non-overlapping part of the historical analysis result relative to the failure risk degree of the nth project task in the γ1th cycle of the current industrial robot to be monitored through the origin software, and splice the fitted straight lines. Read the length of the straight line through the origin software and record it as L n , and build a fault risk prediction model based on the analysis results, denoted as F future ,

[0102] F future =δ·∑ n r=1 (L r / L 标准 ),

[0103] Where δ represents the proportionality coefficient, which is a preset value in the database, δ∈(0,1), L 标准 It indicates the length of the straight line read after the industrial equipment failure analysis model curve generated by the a-th industrial robot completing the complete process for the first time in the historical data is fitted with a straight line by the origin software. By default, the industrial equipment failure analysis model curve generated by each industrial robot completing the complete process for the first time in the historical data is the same.

[0104] S3: Set the warning signal condition value based on the analysis results of the fault risk prediction model, and send the warning signal to the Internet of Things platform;

[0105] The S3 method comprises the following steps:

[0106] Step 3001: Obtain the fault risk prediction model in step 2005, and set the warning condition value in combination with the fault risk prediction model.

[0107] If F future >ξ, it indicates that the operating state of the current monitored industrial robot is abnormal, where ξ is the preset value of the database, ξ∈(0,1),

[0108] If 0≤F future ≤ξ, it indicates that the current operating status of the monitored industrial robot is normal;

[0109] Step 3002: Based on the judgment result of step 3001, if there is any abnormality in the operating status of the currently monitored industrial robot, a warning signal is sent to the Internet of Things platform.

[0110] S4: Receive early warning signals through the Internet of Things platform, locate and predict fault points based on early warning signals, and take corresponding measures to repair the predicted fault points.

[0111] The method of S4 comprises the following steps:

[0112] Step 4001: The IoT platform receives the warning signal, performs preprocessing based on the received warning signal, compares the fault risk calculation results corresponding to each item in each self-check cycle of the current industrial robot with the analysis results in the historical data, and then quickly locates the fault point;

[0113] Step 4002: Acquire the current fault point location of the industrial robot in combination with the analysis result of step 4001, and notify relevant maintenance personnel to check the fault point.

[0114] In this embodiment: an industrial equipment management system based on digital Internet of Things is disclosed (such as Figure 2 As shown), the system is used to implement the specific solution content of the method.

[0115] Example 2: It is assumed that the current industrial robot to be monitored needs to complete three actions in a cycle. The self-inspection cycle of the current industrial robot to be monitored is 7 days. The self-inspection report of one of the cycles is obtained at random. The data of the first day in the self-inspection report is obtained. The time required for the current industrial robot to complete each action is recorded, and each movement trajectory of the industrial robot is recorded. By constructing a plane rectangular coordinate system, the movement time and movement trajectory of the corresponding links of the current robot on the first day are mapped to the plane rectangular coordinate system, and the wear degree change trend of the corresponding joint-related mechanical parts and the change trend of the deviation between the corresponding key movement trajectory and the standard movement trajectory are generated respectively, which are recorded as D3(x1) and S3(x1).

[0116] Combined with the industrial equipment failure analysis model, the failure risk level of the current industrial robot is calculated, denoted as M 1 fault ,

[0117] Among them, M 1 fault =β1·D3(x1)+β2·S3(x1),

[0118] The origin software is used to map the fault risk level of the current industrial robot and the fault risk level corresponding to the first operation of the industrial robot in the historical data to the same plane rectangular coordinate system. When the overlap of the two fitting curves reaches the maximum by moving the fitting curve, the overlapped part is removed. The origin software is used to perform straight line fitting and splicing on the non-overlapping part of the fault risk level of the current industrial robot and the fault risk level corresponding to the first operation of the industrial robot in the historical data. The length value of the spliced ​​straight line is read, and the steps are analyzed repeatedly until the three actions of the current industrial robot to be monitored are completed. Combined with the analysis results, a fault risk prediction model is constructed, which is recorded as Ffuture ,

[0119] F future =δ·∑ 3 r=1 (L r / L 标准 ),

[0120] If F future >ξ, it indicates that the operating status of the current monitored industrial robot is abnormal, and an early warning signal is sent.

[0121] If 0≤F future ≤ξ, it indicates that the current operating status of the monitored industrial robot is normal.

[0122] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0123] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0124] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An industrial equipment management method based on digital Internet of Things, characterized in that: The method comprises the following steps: S1: Analyze the wear degree of the mechanical parts of industrial robots and the impact of movement trajectory changes on the performance of industrial robots based on historical data, and build an industrial equipment failure analysis model based on the analysis results; The method of S1 comprises the following steps: Step 1001: Obtain the project task of the ath industrial robot in the monitored area through historical data, and record the time taken for the corresponding joint in each project task to rotate from the initial position to the target position as set A. A={[A a 1,A a 2,A a 3,...,A a n ]}, Among them A a n It represents the time taken by the corresponding joint of the a-th industrial robot in the monitoring area to rotate from the initial position to the target position when running the n-th project task; Step 1002: Obtain the time taken by the corresponding joint of the a-th industrial robot to rotate from the initial position to the target position in different project tasks, and record the wear degree of the mechanical parts corresponding to the time taken by the corresponding joint of the a-th industrial robot to rotate from the initial position to the target position in the n-th project task as M n , M n =a·|B n T -A a n |, Where α represents the proportionality coefficient, α∈(0,1), and the proportionality coefficient is a preset value of the database. n T It represents the standard time required for the corresponding joint of the industrial robot to rotate from the initial position to the target position when running the nth project task. n T Preset value for the database, B n T ∈(0,+∞); Step 1003: With point o as the origin, the number of rotations as the x-axis, and the degree of wear of the mechanical parts of the industrial robot as the y-axis, a first plane rectangular coordinate system is constructed. In the first plane rectangular coordinate system, the coordinate points of the degree of wear of the mechanical parts corresponding to the rotation of the relevant joints from the initial position to the target position of the a-th industrial robot are marked, and two adjacent coordinate points are connected in sequence to generate a fitting curve, which is recorded as F 转动 (x); Step 1004: Obtain the movement trajectory of the corresponding joint of the a-th industrial robot in the monitoring area rotating from the initial position to the target position during the L-th operation of the n-th project task. With point o1 as the origin, the time node as the x1 axis, and the movement distance of the corresponding joint of the industrial robot as the y1 axis, a second plane rectangular coordinate system is constructed. In the second plane rectangular coordinate system, the corresponding coordinate points of the movement distance of each time node of the ath industrial robot in the monitoring area from the initial position to the target position in the Lth operation of the nth project task are marked, and two adjacent coordinate points are connected in sequence to generate a moving trajectory fitting curve, which is recorded as F L (x1), A moving trajectory fitting curve F will be generated L The deviation between (x1) and the fitting curve generated by the movement trajectory of the corresponding joint from the initial position to the target position in the first operation of the nth project task by the ath industrial robot in the monitored area is recorded as P 1(L) , P 1(L) =∫ u x1=1 |F L (x1)-F1(x1)|d(x1), Where u represents the total number of coordinate points corresponding to the movement position of the a-th industrial robot in the monitored area at each time node when the corresponding joint rotates from the initial position to the target position in the L-th running of the n-th project task in the second plane rectangular coordinate system, and F1(x1) represents the fitting curve generated by the movement trajectory of the a-th industrial robot in the monitored area when the corresponding joint rotates from the initial position to the target position in the first running of the n-th project task; Step 1005: Repeat step 1004 to obtain the deviation between the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in each operation of the nth project task by the ath industrial robot in the monitored area and the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in the first operation of the nth project task by the ath industrial robot in the monitored area. With point o2 as the origin, the number of runs as the x2 axis, and the deviation as the y2 axis, a third plane rectangular coordinate system is constructed. In the third plane rectangular coordinate system, the coordinate points of the deviation between the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in each operation of the nth project task by the ath industrial robot in the monitored area and the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position in the first operation of the nth project task by the ath industrial robot in the monitored area are marked, and two adjacent coordinate points are connected in sequence to generate a fitting curve, which is recorded as F 偏差 (x2); Step 1006: Combine the analysis results of step 1003 and step 1005 to build an industrial equipment failure analysis model, denoted as M n fault , the default number of rotations of the industrial robot during each operation is one, M n fault =β1·F 转动 (x)+β2·F 偏差 (x2), Wherein β1 and β2 are proportional coefficients, β1+β2=1, β1∈(0,1), β2∈(0,1), and the proportional coefficients are preset values ​​in the database; S2: Monitor the working status of the currently monitored industrial robot in real time, and determine the degree of failure risk of the currently monitored industrial robot in combination with the industrial equipment failure analysis model, and build a failure risk prediction model based on the determination results; S3: Set the warning signal condition value based on the analysis results of the fault risk prediction model, and send the warning signal to the Internet of Things platform; S4: Receive early warning signals through the Internet of Things platform, locate and predict fault points based on early warning signals, and take corresponding measures to repair the predicted fault points.

2. According to claim 1, a method for managing industrial equipment based on digital Internet of Things is characterized in that: The method of S2 comprises the following steps: Step 2001: setting the self-check period of the current industrial robot to be monitored to γ; Step 2002: Obtain the self-test report of the γ1th cycle of the currently monitored industrial robot, match the movement time of the corresponding joint of the currently monitored industrial robot in the operation of the nth project task with the historical data, and obtain the wear degree change trend of the corresponding joint-related mechanical parts, which is recorded as F n 磨损程度 (x); Step 2003: The deviation change trend curve between the moving distance of the corresponding joint of the current monitored industrial robot in the execution of the nth project task and the fitting curve generated by the movement trajectory of the corresponding joint rotating from the initial position to the target position when the first execution of the nth project task is recorded as F n 移动轨迹 (x2); Step 2004: Obtain the failure risk level of the nth project task in the γ1th cycle of the currently monitored industrial robot according to the industrial equipment failure analysis model, recorded as Mγ1 (n) fault , where Mγ1 (n) fault =β1·F n 磨损程度 (x)+β2·F n 移动轨迹 (x2); Step 2005: Map the analysis results of step 2004 and step 1006 to the same coordinate system through the origin software, maximize the overlap of the two fitting curves by translating the position of the fitting curve, remove the overlapping curve, fit a straight line to the non-overlapping part of the historical analysis result relative to the failure risk degree of the nth project task in the γ1th cycle of the current industrial robot to be monitored through the origin software, and splice the fitted straight lines. Read the length of the straight line through the origin software and record it as L n , and build a fault risk prediction model based on the analysis results, denoted as F future , F future =δ·∑ n r=1 (L r / L 标准 ), Where δ represents the proportionality coefficient, which is a preset value in the database, δ∈(0,1), L 标准 It indicates the length of the straight line read after the industrial equipment failure analysis model curve generated by the a-th industrial robot completing the complete process for the first time in the historical data is fitted with a straight line by the origin software. By default, the industrial equipment failure analysis model curve generated by each industrial robot completing the complete process for the first time in the historical data is the same.

3. The industrial equipment management method based on digital Internet of Things according to claim 2 is characterized in that: The S3 method comprises the following steps: Step 3001: Obtain the fault risk prediction model in step 2005, and set the warning condition value in combination with the fault risk prediction model. If F future >ξ, it indicates that the operating state of the current monitored industrial robot is abnormal, where ξ is the preset value of the database, ξ∈(0,1), If 0≤F future ≤ξ, it indicates that the current operating status of the monitored industrial robot is normal; Step 3002: Based on the judgment result of step 3001, if there is any abnormality in the operating status of the currently monitored industrial robot, a warning signal is sent to the Internet of Things platform.

4. The industrial equipment management method based on digital Internet of Things according to claim 3 is characterized in that: The method of S4 comprises the following steps: Step 4001: The IoT platform receives the warning signal, performs preprocessing based on the received warning signal, compares the fault risk calculation results corresponding to each item in each self-check cycle of the current industrial robot with the analysis results in the historical data, and then quickly locates the fault point; Step 4002: Acquire the current fault point location of the industrial robot in combination with the analysis result of step 4001, and notify relevant maintenance personnel to check the fault point.

5. An industrial equipment management system based on digital Internet of Things, used to execute an industrial equipment management method based on digital Internet of Things as described in any one of claims 1 to 4, characterized in that: The system includes the following modules: Industrial equipment failure analysis module: The industrial equipment failure analysis module is used to analyze the wear degree of the mechanical parts of the industrial robot and the impact of the movement trajectory change on the performance of the industrial robot in combination with historical data, and to build an industrial equipment failure analysis model based on the analysis results; Industrial equipment failure risk prediction module: The industrial equipment failure risk prediction module is used to monitor the working status of the currently monitored industrial robot in real time, and judge the failure risk degree of the currently monitored industrial robot in combination with the industrial equipment failure analysis model, and build a failure risk prediction model based on the judgment result; Early warning signal setting module: The early warning signal setting module is used to set the early warning condition value in combination with the analysis results of the industrial equipment failure risk prediction module, and send the early warning signal to the Internet of Things platform; Fault point rapid positioning module: The fault point rapid positioning module is used to receive early warning signals through the Internet of Things platform, locate and predict fault points based on the early warning signals, and take corresponding measures to repair the predicted fault points.

6. The industrial equipment management system based on digital Internet of Things according to claim 5 is characterized in that: The industrial equipment fault analysis module includes a data preprocessing unit, a mechanical parts wear degree monitoring unit, a movement trajectory deviation monitoring unit and a fault analysis model building unit: The data preprocessing unit is used to obtain the project task of the corresponding industrial robot in combination with the historical data, and to record the relevant data of the corresponding industrial robot in the project task during operation in real time; The mechanical component wear degree monitoring unit is used to analyze the relationship between the wear degree and time when the corresponding joint of the industrial robot rotates from the initial position to the target position in different project tasks; The movement trajectory deviation monitoring unit is used to analyze the deviation relationship between the movement trajectory generated by the relevant joints of the industrial robot rotating from the initial position to the target position in the corresponding task project and the preset value; The fault analysis model building unit is used to build an industrial equipment fault analysis model in combination with the analysis structures of the mechanical component wear degree monitoring unit and the movement trajectory deviation monitoring unit.

7. The industrial equipment management system based on digital Internet of Things according to claim 5 is characterized in that: The industrial equipment failure risk prediction module includes an equipment status acquisition unit, a failure risk real-time monitoring unit and a failure risk prediction unit: The device status acquisition unit is used to obtain the self-test report of each cycle of the currently monitored industrial robot in real time; The fault risk real-time monitoring unit is used to analyze the degree of fault risk of each cycle in combination with the self-check report of each cycle of the currently monitored industrial robot; The fault risk prediction unit is used to construct a fault risk prediction model in combination with the analysis result of the fault risk real-time monitoring unit.

8. The industrial equipment management system based on digital Internet of Things according to claim 5 is characterized in that: The warning signal setting module includes a warning condition setting unit and a warning signal sending unit: The warning condition setting unit is used to set the warning signal condition value in combination with the analysis structure of the fault risk prediction unit; The warning signal sending unit is used to send the warning signal to the Internet of Things platform in combination with the analysis result of the warning condition setting unit.

9. The industrial equipment management system based on digital Internet of Things according to claim 5 is characterized in that: The fault point rapid positioning module includes an early warning signal receiving unit and a fault point positioning unit: The warning signal receiving unit is used to receive the warning signal through the Internet of Things platform and process the received signal; The fault point locating unit is used to quickly locate the current fault point of the industrial robot in combination with the analysis result of the early warning signal receiving unit.