Method, apparatus and double-layer hose for prestressed double-layer hose

By using a specific preparation method and apparatus, an inner layer of flexible tubing is formed by injection molding and stretched axially to create prestress. An outer layer is then prepared by injection molding on the outer circumferential surface. This method solves the problem that existing double-layer adhesive models cannot realistically simulate tubular biological tissues such as blood vessels, and enables more accurate research data and better surgical guidance.

CN118721818BActive Publication Date: 2026-11-17CHANGSHA UNIVERSITY
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410610694.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2026-11-17
Estimated Expiration
2044-05-16

AI Technical Summary

Technical Problem

Existing double-layer adhesive models cannot realistically simulate the multi-layered structure and corresponding characteristics of tubular biological tissues such as blood vessels, resulting in significant discrepancies between research data and actual conditions.

Method used

The inner hose is formed by injection molding, and then stretched axially to form a second shape. The outer hose is then prepared by injection molding on the outer circumference. After releasing the stretch, the hose is demolded to form a prestressed double-layer hose.

Benefits of technology

The prepared double-layered flexible tube can realistically simulate the prestress characteristics of tubular tissues in animals or humans, improve the reliability of research data, and guide the design of soft robots and vascular diagnosis and treatment technologies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118721818B_ABST
    Figure CN118721818B_ABST
Patent Text Reader

Abstract

This application relates to the field of soft matter structure manufacturing technology, and discloses a method, apparatus, and double-layer hose preparation method. The method involves first forming an inner layer hose of a first shape, then axially stretching the inner layer hose of the first shape to a second shape, forming an outer layer hose on the outer circumference of the inner layer hose of the second shape, and finally releasing the stretch on the inner layer hose and demolding to obtain the double-layer hose. The inner layer hose of the double-layer hose is then used to form the outer layer hose in the stretched second shape, resulting in axial prestress between the inner and outer layers of the double-layer hose, thus producing a prestressed double-layer hose that meets the requirements. The prestressed double-layer hose prepared by this application can simulate more realistic animal tubular tissue, providing a better technical reference for subsequent research and disease treatment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of soft matter structure manufacturing technology, specifically to a method, apparatus and double-layer hose preparation method for prestressed double-layer hose. Background Technology

[0002] Hydrogels are a class of hydrophilic polymer materials with a three-dimensional (3D) network structure. They are slippery, soft materials filled with a large amount of bound water, interfacial water, and free water media within their three-dimensional polymer network. Hydrogels exhibit physiological properties similar to animal tissues and organs and have wide applications in biomedical research.

[0003] For example, tubular tissues such as human blood vessels have multi-layered structures. To simulate tubular biological tissues and complex soft structures like blood vessels, existing technologies provide a simple double-layered rubber tubing as a simulation model. However, in actual operation, the existing double-layered rubber tubing model still differs from the tubular tissues of animals, resulting in significant errors between the research data and the actual situation, and thus failing to provide adequate guidance for research and surgical procedures. Summary of the Invention

[0004] The purpose of this application is to provide a method, apparatus and double-layer hose for preparing prestressed double-layer hose, in order to solve the problem that existing double-layer adhesive models cannot realistically simulate the multi-layer structure and corresponding characteristics of tubular biological tissues such as blood vessels, resulting in a large error between research data and actual situation.

[0005] To achieve the above objectives, in a first aspect, this application provides a method for preparing a prestressed double-layer flexible hose, comprising: S100: Inner tube in the first form of injection molding; S200: The inner hose in the first form is stretched axially to a predetermined length and held so that the inner hose (11) in the first form undergoes elastic deformation to obtain the inner hose in the second form. S300: Prepare an outer hose by injecting adhesive onto the outer peripheral surface of the inner hose in the second form; S400: After the outer hose has solidified, the tension on the inner hose is released, and the hose is demolded to obtain a prestressed double-layer hose.

[0006] As a further improvement to the above technical solution: In one possible implementation, step S100 includes: S110: Prepare a flexible inner core in advance; S120: The first mold, which is radially split, is used to close the mold outside the inner core; S130: Inject the colloidal stock solution for preparing the inner layer hose into the first mold; S140: After the colloidal stock solution solidifies to form the inner tube in the first form, the first mold is opened. S150: Stretch the inner core and the inner hose of the first form along the axial direction to obtain the inner hose of the second form and retain it.

[0007] In one possible implementation, the inner core is an elastic tube or an elastic rod.

[0008] In one possible implementation, the preset length to which the inner hose of the first form is stretched is 15%-30% of the original length.

[0009] In one possible implementation, the colloidal stock solution used to prepare the inner layer hose is a hydrogel stock solution; The procedure before step S100 includes: S90: Prepare the hydrogel stock solution.

[0010] In one possible implementation, an venting operation is performed in step S100 when forming the inner layer hose of the first shape and / or in step S300 when preparing the outer layer hose.

[0011] To achieve the above objectives, in a second aspect, this application also provides a prestressed double-layer hose manufacturing apparatus, which applies the prestressed double-layer hose manufacturing method provided according to the first aspect above, the prestressed double-layer hose manufacturing apparatus comprising: Base; The first mold is detachably mounted on the base for forming the inner tube in a first form; The second mold is detachably mounted on the base and is used to nest around the outer layer of the inner hose after demolding. The inner diameter of the second mold is larger than that of the first mold. The second mold is used to form the outer layer of the hose. A tensioning mechanism, arranged on the base or on one side of the base; and The inner core is connected to the base at one end and to the stretching end of the stretching mechanism at the other end. When forming the inner hose in the first form, the inner core is arranged coaxially with the first mold. Both the first mold and the second mold adopt a split-type demolding structure.

[0012] To achieve the above objectives, in a third aspect, this application also provides a double-layer hose, which is manufactured according to the prestressed double-layer hose preparation method provided in the first aspect or the prestressed double-layer hose preparation apparatus provided in the second aspect.

[0013] Compared to existing technologies, the beneficial effects of this application are: This application provides a method, apparatus, and a prestressed double-layer flexible tube for fabrication. The method involves first forming a first-shaped inner layer flexible tube, then stretching it axially to induce elastic deformation into a second-shaped inner layer flexible tube. An outer layer flexible tube is then formed on the outer periphery of the second-shaped inner layer flexible tube. Finally, the stretching of the inner layer flexible tube is released, and the tube is demolded to obtain the double-layer flexible tube. Because the inner layer flexible tube undergoes elastic deformation before the outer layer flexible tube is formed, axial prestress is present between the inner and outer layers of the double-layer flexible tube, resulting in a prestressed double-layer flexible tube that meets the requirements. The prestressed double-layer flexible tube fabricated using this method can realistically simulate tubular tissues in animals or humans (such as human blood vessels). Data obtained from studies using this prestressed double-layer flexible tube is more realistic and reliable, allowing for better analysis of the influence mechanism of prestress on soft tubular structures and vascular lesions, thus better guiding the design of soft robots and vascular diagnosis and treatment technologies.

[0014] Other features and advantages of this application will be described in detail in the following detailed description section. Attached Figure Description

[0015] The accompanying drawings are provided to further illustrate this application and form part of the specification. They are used together with the following detailed description to explain this application. It should be understood that the following drawings only show some embodiments of this application and should not be considered as limiting the scope. For those skilled in the art, other related drawings can be obtained from these drawings without creative effort. In the drawings: Figure 1 A flowchart illustrating a method for preparing a prestressed double-layer hose according to an embodiment of this application is shown; Figure 2 The image shows an axial cross-sectional view of a double-layer hose prepared by the prestressed double-layer hose preparation method provided in the embodiments of this application; Figure 3 This paper shows a partial axial view of a double-layer hose manufacturing apparatus provided in an embodiment of this application; Figure 4 An exploded view of a first mold provided in an embodiment of this application is shown; Figure 5 This illustration shows an isometric view of a double-layer hose manufacturing apparatus with a first mold installed, as provided in an embodiment of this application. Figure 6 An exploded view of a second mold provided in an embodiment of this application is shown; Figure 7This illustration shows an isometric view of the double-layer hose preparation apparatus provided in an embodiment of this application when a second mold is installed. Figure 8 The diagram illustrates the dimensional changes of an incompressible hyperelastic double-layer cylindrical structure before (a) and after (b) uniaxial tension, according to an embodiment of this application.

[0016] Explanation of reference numerals in the attached figures: 10. Double-layer hose; 11. Inner hose; 12. Outer hose; 100. Base; 110. Positioning slot; 200. First mold; 210. First half mold; 300. Second mold; 310. Second half mold; 400. Tensioning mechanism; 410. Column; 420. Tensioning head; 430. Drive assembly; 431. Lead screw module; 500, inner core. Detailed Implementation

[0017] The specific embodiments of this application will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are for illustration and explanation only and are not intended to limit the embodiments of this application.

[0018] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other.

[0019] In the embodiments of this application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this application and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application.

[0020] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this application, "multiple" means two or more, unless otherwise explicitly specified.

[0021] In this application, unless otherwise expressly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0022] The present application will now be described in detail with reference to the accompanying drawings and exemplary embodiments.

[0023] Example 1 Please see Figure 1 and Figure 2 This embodiment provides a method for preparing a prestressed double-layer hose, which can produce a prestressed double-layer hose 10.

[0024] In this embodiment, the method for preparing prestressed double-layer flexible hose includes the following steps: S100: Inner hose 11 in the first form of injection molding. The inner hose 11 in the first form is defined as the inner hose 11 in its original state, at which time the inner hose 11 does not have stress.

[0025] S200: The inner hose 11 in the first form is stretched axially to a predetermined length and held, so that the inner hose 11 in the first form undergoes elastic deformation to obtain the inner hose 11 in the second form. It should be noted that the inner wall of the inner hose 11 in the second form is intact and must not be torn or otherwise damaged.

[0026] S300: The outer layer hose 12 is prepared by injecting adhesive onto the outer peripheral surface of the inner layer hose 11 in the second form.

[0027] S400: After the outer hose 12 has solidified, the tension on the inner hose 11 is released, and the double-layer hose 10 with prestress is obtained by demolding.

[0028] It should be noted that tubular tissues such as blood vessels in the human body are multi-layered structures and have prestress. In order to conduct research on the pathological mechanisms of tubular biological tissues such as blood vessels from a mechanical perspective, it is not only necessary to use a hyperelastic model with prestress to describe them, but also to provide a method and experimental model to simulate tubular biological tissues such as blood vessels and complex soft structures. This will allow for a better analysis of the influence mechanism of prestress on soft tubular structures and vascular lesions, so as to better guide the design of soft robots and vascular diagnosis and treatment technologies.

[0029] Thus, the prestressed double-layer hose 10 prepared by the prestressed double-layer hose preparation method of this application can realistically simulate the tubular tissues of animals or humans (such as tubular tissues such as human blood vessels, which have a multi-layered structure and are prestressed), making the data obtained by applying the prestressed double-layer hose 10 more realistic and reliable, so as to provide better guidance for subsequent research and surgical procedures.

[0030] To more clearly describe the technical solution of this embodiment, the following section elaborates on each step in the above-described method for preparing prestressed double-layer flexible hoses, as follows: Please refer to the following: Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7 The above step S100 includes: S110: Prepare a flexible inner core 500 in advance. Understandably, since the inner core 500 is flexible, it has the ability to deform axially, so that it can be stretched axially along with the subsequently prepared inner hose 11 to ensure that the wall thickness of the inner hose 11 changes uniformly during the stretching process.

[0031] S120: A radially split first mold 200 is used to close the mold outside the inner core 500. The radially split first mold 200 facilitates demolding and does not interfere with the stretching of the inner hose 11.

[0032] S130: Inject the colloidal stock solution for preparing the inner layer hose 11 into the first mold 200. During the injection process, the first mold 200 can be tapped or vibrated at a certain frequency to expel air bubbles in the injected colloidal stock solution and gas present in the first mold 200, so as to ensure that the colloidal stock solution can occupy and fill the entire first mold 200, and at the same time ensure that no air bubbles are trapped in the prepared inner layer hose 11, thus ensuring the preparation quality.

[0033] S140: After the colloidal stock solution solidifies to form the inner tube 11 in the first form, the first mold 200 is opened. Since the first mold 200 is a radially split mold structure, the first mold 200 can be removed along the radial direction of the inner tube 11 to achieve mold opening, which greatly reduces the impact of the first mold 200 on the inner tube 11.

[0034] S150: The inner core 500 and the first-shaped inner hose 11 are stretched axially to obtain and maintain the second-shaped inner hose 11. The inner hose 11 is elastic and undergoes elastic deformation during stretching, thus ensuring that there is prestress between the inner and outer layers after the double-layer hose is manufactured.

[0035] Optionally, the inner core 500 can be selected as an elastic tubing or an elastic rod. The inner diameter of the elastic tubing should be as small as possible to ensure a thicker wall, thereby ensuring uniform wall thickness change of the inner hose 11 during stretching and ensuring uniform thickness.

[0036] Optionally, the inner core 500 may be made of rubber, silicone or latex.

[0037] In some embodiments, the preset length of the inner hose 11 of the first configuration is 15%-30% of the original length. This is to ensure that the inner hose 11 has corresponding internal stress after stretching.

[0038] It should also be noted that the wall thickness of the inner hose 11 will change during the stretching process. If the stretching length is too long, plastic deformation may easily occur, and in severe cases, it may break. Therefore, the relationship between the stretching length and the wall thickness of the inner hose 11 needs to be considered.

[0039] Please refer to the following: Figure 8 Specifically, the inner core 500 and the inner flexible tube 11 formed outside the inner core 500 are considered as an incompressible, hyperelastic, double-layered cylindrical structure subjected to unidirectional tension. In the initial unstretched state, the length of the inner flexible tube 11 is defined as L, the radius of the inner core 500 as A, the radius of the inner flexible tube 11 as B, and the initial wall thickness of the inner flexible tube as C=BA; the length of the stretched inner flexible tube 11 is... The radius of the inner core 500 is a, and the radius of the inner flexible tube 11 is b; the axial elongation ratio is... Due to the incompressibility condition, the circumferential stretch ratio is ,Right now ,

[0040] The wall thickness of the inner flexible tube 11 after stretching is c, and satisfies the following conditions: Thus, KE achieves precise control over the thickness of the double-layer hose, as well as accurate matching of the prestress and the thickness of the inner hose 11.

[0041] Furthermore, the maximum tensile length of the inner flexible tube 11 that satisfies elastic deformation can be obtained by conducting tensile tests on inner flexible tubes 11 with different corresponding thicknesses. Substituting these values ​​into the above formula, the minimum wall thickness corresponding to the inner flexible tube 11 under the corresponding thickness and maximum tensile length can be calculated. The maximum stretch is This allows us to construct the thickness C and the maximum tensile amount. The relationship curve can be used to determine the maximum tensile strength of the inner hose 11 of corresponding thickness. Therefore, the thickness of the inner hose 11 after molding is determined before stretching, and then the thickness C and the maximum stretch amount are considered. The relationship curve determines the maximum stretch of the inner hose 11, and the stretch of the inner hose 11 during the stretching process does not exceed the maximum stretch.

[0042] In this embodiment, the colloidal stock solution used to prepare the inner layer flexible tube 11 is a hydrogel stock solution.

[0043] In some embodiments, the colloidal stock solution for preparing the outer flexible tube 12 may also be a hydrogel stock solution, thus obtaining a prestressed double-layer hydrogel tube. Of course, in other embodiments, the colloidal stock solution for the outer flexible tube 12 may be prepared using colloidal stock solutions of other materials.

[0044] It should be noted that hydrogel materials, due to their high water content, good water retention, excellent biocompatibility, and microstructure similar to the extracellular matrix, are considered to be the most closely related biofunctional materials to living tissues. Therefore, tubular hydrogel materials can, to some extent, be integrated with the human body and applied in wound healing and bone disease treatment. Thus, bilayer hydrogel tubes prepared using hydrogel stock solutions can better simulate tubular tissues in the human body (such as blood vessels), serving as anatomical models for surgical simulation. This allows for better analysis of the influence mechanism of prestress on soft tubular structures and vascular lesions, thereby better guiding the design of soft robots and vascular diagnosis and treatment techniques.

[0045] The process includes step S90 before step S100, wherein step S90 is the preparation of the hydrogel stock solution.

[0046] In step S100, venting is performed when forming the inner tube 11 in the first form and in step S300 when preparing the outer tube 12. For example, the mold is tapped or vibrated at a certain frequency to expel air bubbles in the injected hydrogel stock solution and gas present in the mold, ensuring that the hydrogel stock solution can occupy and fill the entire mold, thereby ensuring that the prepared inner tube 11 and outer tube 12 are free of air bubbles and guaranteeing the preparation quality.

[0047] Please refer to the following: Figure 6 and Figure 7 Furthermore, vent holes can be made in the first mold 200 for preparing the inner tubing 11 and the second mold 300 for preparing the outer tubing (described in detail below) to allow gas to escape from the molds. After venting, a sealing element is used to seal the vent holes to prevent adhesive from overflowing.

[0048] Example 2 Please see Figure 2 , Figure 3 , Figure 5 and Figure 7This embodiment provides a prestressed double-layer hose preparation device, which applies the prestressed double-layer hose preparation method provided in Embodiment 1 above.

[0049] In this embodiment, the prestressed double-layer hose manufacturing device includes a base 100, a first mold 200, a second mold 300, a tensioning mechanism 400, and an inner core 500. Both the first mold 200 and the second mold 300 are detachably mounted on the base 100, but are used sequentially according to the forming order of the inner hose 11 and the outer hose 12. The base 100 is provided with positioning grooves 110 for positioning the first mold 200 and the second mold 300, respectively.

[0050] Understandably, the first mold 200 is used to form the inner hose 11 in the first form; the second mold 300 is used to nest around the inner hose 11 after demolding, and the inner diameter of the second mold 300 is larger than the inner diameter of the first mold 200. The second mold 300 is used to form the outer hose 12.

[0051] The stretching mechanism 400 is arranged on one side of the base 100 and connected to the base 100. One end of the inner core 500 is connected to the base 100, and the other end is connected to the stretching end of the stretching mechanism 400. When forming the inner tube 11 in the first form, the inner core 500 is arranged coaxially with the first mold 200. The inner core 500 is elastic, as detailed in Embodiment 1 above, and will not be repeated here.

[0052] Please refer to the following: Figure 4 and Figure 6 In this embodiment, both the first mold 200 and the second mold 300 adopt a radially open demolding structure. The first mold 200 includes two radially aligned first half molds 210. During assembly, the two first half molds 210 are closed and fixed on the base 100. A first injection cavity for molding the inner tubular tube 11 is formed between the two first half molds 210, and the axis of the inner core 500 coincides with the axis of the first injection cavity (see [link to documentation]). Figure 5 The second mold 300 includes two radially aligned second half molds 310, which are assembled after the first mold 200 is opened. When assembling the second mold 300, the two second half molds 310 are closed and fixed to the base 100. At this time, a second injection cavity is formed between the second mold 300 and the already formed inner tubular tube 11, and the axis of the second injection cavity coincides with the axis of the inner core 500 (see [reference]). Figure 7 ).

[0053] It should be noted that when injecting adhesive into the second injection cavity, the inner core 500 and the inner tubing 11 should first be stretched to a preset length using the stretching mechanism 400 and held in place (see [link to relevant documentation]). Figure 7This stretching step can be performed before or after the second mold 300 is closed. During stretching, both ends of the inner hose 11 are fixedly connected to the inner core 500, for example, by inserting positioning pins or circumferential mounting clamps to fix the inner hose 11 to the inner core 500.

[0054] In some embodiments, the two first half molds 210 and the two second half molds 310 can be fixed by a snap-fit ​​method after they are molded together, for example, by using a concave-convex structure to achieve a snap-fit ​​fit.

[0055] In other embodiments, the two first half molds 210 and the two second half molds 310 can be fixed with bolts or screws after they are closed, for example, quick-release screws.

[0056] In some other embodiments, the two first half molds 210 and the two second half molds 310 can be fixed by means of clamping fixtures after they are molded together.

[0057] Please see Figure 3 The aforementioned stretching mechanism 400 includes a column 410, a stretching head 420 disposed on the column 410, and a drive assembly 430. The stretching head 420 is sleeved on the column 410 and connected to the inner core 500. The stretching head 420 slides vertically with the column 410, and the drive assembly 430 can drive the stretching head 420 to move vertically along the column 410.

[0058] Optionally, the drive assembly 430 may be a lead screw module 431, wherein the lead screw module nut seat is disposed on the tension head 420, and the vertical rod of the lead screw shaft in the lead screw module passes through the nut seat in the vertical direction and is connected to the column 410. In this way, by rotating the lead screw shaft, the tension head 420 is driven to move in the vertical direction by utilizing the threaded engagement between the lead screw shaft and the nut seat.

[0059] Optionally, the drive assembly 430 may be a pneumatic cylinder, hydraulic cylinder, electric cylinder, linear motor, or lead screw motor. It should be understood that the above are merely illustrative examples and are not intended to limit the scope of protection of this application.

[0060] Optionally, the column 410 can be replaced with a slide rail, and the extension head 420 can be provided with a slide block that slides with the slide rail.

[0061] Optionally, the column 410 can be equipped with scale markings for determining the stretching length and ensuring stretching accuracy. Alternatively, a separate scale can be used, or a laser displacement sensor can be employed to measure the stretching length.

[0062] Furthermore, this embodiment also provides a double-layer hose 10. The double-layer hose 10 is manufactured according to the prestressed double-layer hose manufacturing method provided in Embodiment 1 or the prestressed double-layer hose manufacturing apparatus provided in Embodiment 2 above.

[0063] Thus, the double-layer hose 10 includes an inner hose 11 and an outer hose 12 distributed radially in sequence, wherein the inner hose 11 is elastic and has axial prestress.

[0064] Optionally, the inner hose 11 and the outer hose 12 are made of the same material.

[0065] Optionally, the double-layered tubing 10 can be a double-layered hydrogel tubing.

[0066] The prestressed double-layer hose fabrication device provided in this embodiment also has the following advantages: 1. Prepare the hydrogel stock solution and make it into a double-layer hydrogel tube. The thickness of the inner and outer layers can be controlled by the first mold 200 and the second mold 300.

[0067] 2. The inner core 500 is elastic and the stretching length of the inner hose 11 can be precisely controlled by the screw module, thereby precisely controlling the prestress of the inner hose 11 after stretching.

[0068] 3. The inner core 500 can be made of a super elastic solid cylindrical latex tube as the inner core of the mold. This material can be stretched 6-7 times.

[0069] 4. The first mold 200 and the second mold 300 adopt a radially split half-mold structure, which facilitates assembly and demolding and improves demolding efficiency.

[0070] The optional embodiments of the present application have been described in detail above with reference to the accompanying drawings. However, the embodiments of the present application are not limited to the specific details in the above embodiments. Within the scope of the technical concept of the embodiments of the present application, various simple modifications can be made to the technical solutions of the embodiments of the present application, and these simple modifications all fall within the protection scope of the embodiments of the present application.

[0071] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable way without contradiction. In order to avoid unnecessary repetition, the embodiments of this application will not describe the various possible combinations separately.

[0072] Furthermore, various different implementation methods of the embodiments of this application can be combined arbitrarily, as long as they do not violate the spirit of the embodiments of this application, they should also be regarded as the content disclosed in the embodiments of this application.

Claims

1. A method for preparing a prestressed double-layer flexible hose, characterized in that, include: S100: Inner tube (11) of injection molding first form. S200: The inner hose (11) in the first form is stretched axially to a predetermined length and held so that the inner hose (11) in the first form undergoes elastic deformation to obtain the inner hose (11) in the second form. S300: The outer layer hose (12) is prepared by injecting adhesive onto the outer peripheral surface of the inner layer hose (11) in the second form. S400: After the outer hose (12) has solidified, the tension on the inner hose (11) is released, and the double-layer hose (10) with prestress is obtained by demolding. Step S100 includes: S110: Prepare a flexible inner core (500) in advance. S120: The first mold (200) of radial split type is used to close the mold outside the inner core (500); S130: Inject the colloidal stock solution for preparing the inner layer hose (11) into the first mold (200); S140: After the colloidal stock solution solidifies to form the inner tube (11) in the first form, the first mold (200) is opened; S150: Stretch the inner core (500) and the inner hose (11) in the first form along the axial direction to obtain the inner hose (11) in the second form and retain it.

2. The method for preparing prestressed double-layer flexible hose according to claim 1, characterized in that, The inner core (500) is an elastic tube or an elastic rod.

3. The method for preparing prestressed double-layer flexible hose according to claim 1, characterized in that, The preset length of the inner hose (11) in the first form is 15%-30% of the original length.

4. The method for preparing prestressed double-layer flexible hose according to claim 1, characterized in that, The colloidal stock solution used to prepare the inner layer hose (11) is a hydrogel stock solution; The procedure before step S100 includes: S90: Prepare the hydrogel stock solution.

5. The method for preparing prestressed double-layer flexible hose according to claim 1, characterized in that, In step S100, an venting operation is performed when forming the inner hose (11) of the first form and / or when preparing the outer hose (12) in step S300.

6. A prestressed double-layer hose manufacturing device, characterized in that, The method for preparing prestressed double-layer hoses according to any one of claims 1-5, wherein the prestressed double-layer hose preparation apparatus comprises: Base (100); The first mold (200) is detachably mounted on the base (100) for forming the inner tube (11) of the first form. The second mold (300) is detachably mounted on the base (100) and is used to nest around the inner hose (11) after demolding. The inner diameter of the second mold (300) is larger than the inner diameter of the first mold (200). The second mold (300) is used to form the outer hose (12). A tensioning mechanism (400) is arranged on the base (100) or on one side of the base (100); and The inner core (500) is connected at one end to the base (100) and at the other end to the stretching end of the stretching mechanism (400). When the inner hose (11) in the first form is formed, the inner core (500) is arranged coaxially with the first mold (200). Both the first mold (200) and the second mold (300) adopt a split-type demolding structure.

7. A double-layered flexible hose, characterized in that, The double-layer hose is prepared by the prestressed double-layer hose preparation method according to any one of claims 1-5 or by the prestressed double-layer hose preparation apparatus according to claim 6.

Citation Information

Patent Citations

  • Improvements relating to hose

    CN1818446A

  • Prestressed tubular belt and method for making

    US20050183934A1