Structure and manufacturing process of wetland ecological brick and coastal wetland landform regulation and control system
By designing a wetland ecological brick structure with positioning nails, braided layers and acidic fillers, the problem of poor tidal flat repair results caused by tidal dispersion has been solved, and effective protection and natural restoration of tidal flats have been achieved.
Patent Information
- Application Number
- CN202410806366.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-01
AI Technical Summary
Existing coastal wetland restoration measures are easily washed away by tides, resulting in reduced protection and inability to effectively repair tidal flats.
The structure and production process of a wetland ecological brick are designed, including the brick body, positioning nails, braided layer and acidic filler. The positioning nails are fixed to the ground, the braided layer provides resistance, and the oblique holes are filled with acidic filler to neutralize the alkaline water flow. Prevent tides from dispersing.
The wetland ecological brick structure can effectively resist tidal dispersion, prevent water flow from damaging the tidal flats, and is conducive to the natural restoration process.
Smart Images

Figure CN118727664A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coastal wetland ecological restoration, and specifically to the structure and manufacturing process of wetland ecological bricks and a coastal wetland landform control system. Background Art
[0002] Coastal wetlands refer to the interlaced transition zone between terrestrial ecosystems and marine ecosystems. According to the definition of the Ramsar Convention, the lower limit of coastal wetlands is 6 meters below sea level (usually the lower limit is often set at the outer edge of the growth area of large seaweed), and the upper limit is the freshwater or brackish lakes and marshes connected to the inland river basins above the high tide line, as well as the river sections of rivers that flow into the sea and cannot be reached by seawater upstream. Equivalent terms include coastal wetlands, coastal wetlands or coastal wetlands. The topography includes estuaries, shallow seas, beaches, salt flats, tidal flats, tidal gullies, peat swamps, sand dams, sandbanks, lagoons, mangroves, coral reefs, seagrass beds, bays, seawalls, islands, etc.
[0003] Due to the effect of tides on coastal wetlands, common restoration measures are often washed away and fail to protect the tidal flats after low tide. As a result, the tidal flat ecology that has been slowly repaired will be destroyed again when faced with tides, and the expected restoration effect cannot be achieved. Summary of the invention
[0004] 1. Technical issues to be solved
[0005] In view of the deficiencies in the prior art, the present invention provides a structure, a manufacturing process and a coastal wetland landform control system for wetland eco-bricks, which solves the problem that the common restoration measures of blocking the tides in coastal wetlands to repair the tidal flats will be washed away by the tides, thereby reducing the protection strength.
[0006] (II) Technical solution
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: the structure of the wetland ecological brick includes a brick body, the four corners of the brick body are provided with vertically distributed positioning holes, positioning pins are inserted into the positioning holes, and the brick body is provided with a horizontal insertion groove connected to the positioning hole;
[0008] The outer side of the brick body is provided with a braided layer, the inner side of the braided layer is fixedly connected with an extension layer, the extension layer matches the insertion groove, and the positioning nail passes through the extension layer;
[0009] The brick body is provided with oblique holes which are distributed obliquely, the downward end of the oblique holes is blocked by the braided layer, and the inside of the oblique holes is filled with acidic fillers.
[0010] Preferably, the length of the positioning nail is consistent with the height of the brick body. The positioning nail includes a nail body, and the side of the nail body is fixed with a side edge that matches the positioning hole. One end of the nail body is fixedly connected with a nail head, and the other end is provided with a socket.
[0011] Preferably, the horizontal cross-sectional dimensions of the nail head and the socket are equal, and the brick body and the positioning nails are both made of a mixture of concrete and marine waste.
[0012] Preferably, the acidic filler is prepared by mixing porous ceramic particles and potassium hydrogen sulfate in a ratio of 1-5:1.
[0013] Preferably, the braided layer and the extension layer are both woven with seagrass warp and weft.
[0014] The proposed manufacturing process of the wetland ecological brick structure includes the following steps:
[0015] Step 1: Make an inner support core that is consistent with the shape of the positioning hole, and make a three-dimensional mold that corresponds to the outer side of the brick body, and insert the inner support core at the bottom of the three-dimensional mold, and then mix concrete and marine waste and vertically pour them into the three-dimensional mold;
[0016] Step 2: After the poured bricks are separated from the three-dimensional mold, the insertion grooves are cut and the oblique holes are drilled, and then the bricks are dried;
[0017] Step 3: Use seagrass warp and weft to weave the braided layer and the extended layer respectively, and then use seagrass to weave the braided layer and the extended layer together;
[0018] Step 4: Wrap the braided layer around the outside of the dried brick body, and insert the extension layer into the insertion groove. At this time, the braided layer blocks the lower end of the inclined hole;
[0019] Step 5: Insert the positioning nail into the positioning hole with one end of the nail head downward, passing through the extension layer in the process, and finally fill the acid filler into the inclined hole from the upward end and press it tightly.
[0020] 8. The coastal wetland landform control system adopts the wetland ecological brick structure made by the above-mentioned manufacturing process, and adopts the following steps to control the coastal wetland landform:
[0021] Step 1: Divide the coastal wetland areas according to geomorphological differences and hydrological dynamics;
[0022] Step 2: Observe the tidal hydrological dynamics and the shape of the mudflat terrain after low tide to determine the layout boundary line;
[0023] Step 3: Place the wetland ecological brick structure on the layout boundary line, and tilt the upward side of the inclined hole toward the mudflat side after the tide recedes, then press the positioning nail downward so that the nail head is inserted into the ground. The two wetland ecological brick structures at the same height are squeezed and contacted through the woven layer, and the upper and lower distributed wetland ecological brick structures are connected together through the upper and lower distributed positioning nails in the form of nail head and socket plug-in.
[0024] (III) Beneficial effects
[0025] The present invention provides a structure and manufacturing process of wetland ecological bricks and a coastal wetland landform control system. It has the following beneficial effects:
[0026] The structure of the wetland ecological brick in the present invention is fixed to the ground by positioning nails after being arranged on the layout boundary line of the tidal flat terrain after low tide. The upper and lower wetland ecological brick structures are connected by positioning nails. The structures of the wetland ecological bricks at the same height are squeezed against each other, and the woven layer provides resistance to prevent the situation of being washed away by the tide. The water flows through the inclined holes and is neutralized by the acidic filler to reach the tidal flat from the other side, ensuring that the tidal flat is not strongly impacted by the water flow, which is conducive to the natural restoration process. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a schematic diagram of the structure of wetland eco-bricks;
[0028] Figure 2 This is the rear view of the structure of the wetland eco-brick;
[0029] Figure 3 This is a top view of the structure of the wetland eco-brick;
[0030] Figure 4 It is a cross-sectional view of the structure of the wetland ecological brick at the inclined hole;
[0031] Figure 5 It is a longitudinal section view of the structure of the wetland ecological brick at the positioning nails;
[0032] Figure 6 This is a schematic diagram of the structure of positioning nails in the structure of wetland ecological bricks.
[0033] Among them, 1. brick body; 2. positioning nail; 3. braided layer; 4. positioning hole; 5. inclined hole; 6. insertion groove; 7. extension layer; 8. acid filler; 201. nail body; 202. side edge; 203. nail head. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] Example:
[0036] like Figure 1-6 As shown, the embodiment of the present invention provides a structure of a wetland ecological brick, including a brick body 1, four corners of the brick body 1 are provided with vertically distributed positioning holes 4, positioning pins 2 are inserted into the positioning holes 4, and the brick body 1 is provided with horizontal insertion grooves 6 connected with the positioning holes 4, and the insertion grooves 6 are respectively distributed at the front and rear sides of the brick body 1;
[0037] The outer side of the brick body 1 is provided with a woven layer 3, and the inner side of the woven layer 3 is fixedly connected with an extension layer 7, which cooperates with the insertion groove 6, and the positioning nail 2 passes through the extension layer 7, that is, after the extension layer 7 is inserted from the insertion groove 6, the positioning nail 2 passes downward through the extension layer 7, and the woven layer 3 and the extension layer 7 connected as one are connected to the brick body 1, the thickness of the woven layer 3 is at least 3mm, and the woven layer 3 and the extension layer 7 are both woven with seaweed warp and weft, and rub against each other with the structure of the adjacent wetland ecological bricks to prevent being pushed by the tide and thus the wetland ecological bricks are relatively unique;
[0038] The brick body 1 is provided with inclined holes 5 which are distributed obliquely. The downward end of the inclined hole 5 is blocked by the woven layer 3 and is filled with an acidic filler 8. Water flows through the woven layer 3 and enters the inclined hole 5. The water is neutralized by the acidic filler 8 and then penetrates into the inclined upper and lower ends of the inclined hole 5 and flows out. The water then reaches the tidal flat, which reduces the damage of the alkaline water flow to the tidal flat and is beneficial to the natural restoration of the tidal flat.
[0039] The length of the positioning nail 2 is consistent with the height of the brick body 1. The positioning nail 2 includes a nail body 201. The side of the nail body 201 is fixed with a side edge 202 that cooperates with the positioning hole 4. One end of the nail body 201 is fixedly connected with a nail head 203, and the other end is provided with a socket to prevent the positioning nail 2 from rotating through the positioning hole 4.
[0040] The nail head 203 has the same horizontal cross-sectional size as the socket, and the brick body 1 and the positioning nail 2 are both made of a mixture of concrete and marine waste.
[0041] The acidic filler 8 is prepared by mixing porous ceramic particles and potassium hydrogen sulfate in a ratio of 1-5:1.
[0042] The proposed manufacturing process of the wetland ecological brick structure includes the following steps:
[0043] Step 1: Make an inner support core that is consistent with the shape of the positioning hole 4, and make a three-dimensional mold that corresponds to the outer side of the brick body 1, and insert the inner support core at the bottom of the three-dimensional mold, then mix the concrete and the marine garbage and vertically pour them into the three-dimensional mold, and use a tamping and vibrating device to compact the concrete and the marine garbage during the process;
[0044] Step 2: After the poured brick body 1 is separated from the three-dimensional mold, the groove 6 is inserted into the cut part and the inclined hole 5 is drilled, and then the brick body 1 is dried;
[0045] Step 3: Use seagrass warp and weft to weave the braided layer 3 and the extension layer 7 respectively, and then use seagrass to weave the braided layer 3 and the extension layer 7 together, so that the braided layer 3 and the extension layer 7 become a connected whole, and then it is convenient to connect the braided layer 3 and the extension layer 7 with the brick body 1 through the positioning nails 2;
[0046] Step 4: Wrap the braided layer 3 around the outside of the sun-dried brick body 1, and insert the extension layer 7 into the insertion groove 6. At this time, the braided layer 3 blocks the lower end of the inclined hole 5, so as to prevent the water flow from directly bringing out the acid filler 8 from the lower end;
[0047] Step 5: Insert the positioning nail 2 with one end of the nail head 203 downward into the positioning hole 4, passing through the extension layer 7 during the process, and finally fill the acid filler 8 from the inclined upward end of the inclined hole 5 and press it tightly.
[0048] The coastal wetland landform control system adopts the wetland ecological brick structure made by the above-mentioned manufacturing process, and adopts the following steps to control the coastal wetland landform:
[0049] Step 1: Divide the coastal wetland areas according to geomorphological differences and hydrological dynamics;
[0050] Step 2: Observe the tidal hydrological dynamics and the shape of the mudflat terrain after low tide to determine the layout boundary line;
[0051] Step 3: Place the wetland ecological brick structure on the layout boundary line, and tilt the inclined hole 5 upward toward the side of the mudflat after the tide recedes, then press the positioning nail 2 downward to insert the nail head 203 into the ground. The two wetland ecological brick structures at the same height are squeezed and contacted through the woven layer 3, and the upper and lower distributed wetland ecological brick structures are connected together through the upper and lower distributed positioning nails 2 by means of the nail head 203 and the socket plug-in connection.
[0052] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. The structure of the wetland ecological brick comprises a brick body (1), characterized in that: The four corners of the brick body (1) are provided with vertically distributed positioning holes (4), positioning pins (2) are inserted into the positioning holes (4), and the brick body (1) is provided with horizontal insertion grooves (6) communicating with the positioning holes (4); The outer side of the brick body (1) is provided with a braided layer (3), the inner side of the braided layer (3) is fixedly connected with an extension layer (7), the extension layer (7) is matched with the insertion groove (6), and the positioning nail (2) passes through the extension layer (7); The brick body (1) is provided with obliquely distributed inclined holes (5), the downward end of the inclined hole (5) is blocked by the braided layer (3), and the interior is filled with an acidic filler (8).
2. The structure of the wetland ecological brick according to claim 1 is characterized by: The length of the positioning nail (2) is consistent with the height of the brick body (1). The positioning nail (2) comprises a nail body (201). A side edge (202) matching the positioning hole (4) is fixed on the side of the nail body (201). A nail head (203) is fixedly connected to one end of the nail body (201), and a socket is provided at the other end.
3. The structure of the wetland ecological brick according to claim 2 is characterized by: The nail head (203) has the same horizontal cross-sectional size as the socket, and the brick body (1) and the positioning nail (2) are both made of a mixture of concrete and marine waste.
4. The structure of the wetland ecological brick according to claim 3 is characterized by: The acidic filler (8) is prepared by mixing porous ceramic particles and potassium hydrogen sulfate in a ratio of 1-5:
1.
5. The structure, manufacturing process and coastal wetland landform control system of wetland ecological bricks according to claim 4 are characterized by: The braided layer (3) and the extension layer (7) are both woven with seagrass warp and weft.
6. The manufacturing process of the wetland ecological brick structure according to claim 5 is characterized in that: The following steps are involved: Step 1: making an inner support core having the same shape as the positioning hole (4), and making a three-dimensional mold corresponding to the outer side of the brick body (1), and inserting the inner support core at the bottom of the three-dimensional mold, and then vertically pouring a mixture of concrete and marine waste into the three-dimensional mold; Step 2: After the poured brick body (1) is separated from the three-dimensional mold, the groove (6) is inserted into the cut part and the inclined hole (5) is drilled, and then the brick body (1) is dried in the sun; Step 3: Weaving the braided layer (3) and the extension layer (7) using seagrass warp and weft respectively, and then weaving the braided layer (3) and the extension layer (7) together using seagrass; Step 4: wrap the braided layer (3) around the outside of the sun-dried brick body (1), and insert the extension layer (7) into the insertion groove (6), so that the braided layer (3) blocks the lower end of the inclined hole (5); Step 5: Insert the positioning nail (2) with one end of the nail head (203) downward into the positioning hole (4), passing through the extension layer (7) during the process, and finally fill the acid filler (8) from the inclined upward end of the inclined hole (5) and press it tightly.
7. Coastal wetland landform control system, characterized by: The wetland ecological brick structure is made by the manufacturing process described in claim 6, and the following steps are used to control the coastal wetland landform: Step 1: Divide the coastal wetland areas according to geomorphological differences and hydrological dynamics; Step 2: Observe the tidal hydrological dynamics and the shape of the mudflat terrain after low tide to determine the layout boundary line; Step 3: Place the wetland ecological brick structure on the layout boundary line, and point the inclined hole (5) with its side tilted upward toward the side of the mudflat after the tide recedes. Then press the positioning nail (2) downward so that the nail head (203) is inserted into the ground. The two wetland ecological brick structures at the same height are squeezed and contacted through the woven layer (3). The upper and lower distributed wetland ecological brick structures are connected together through the upper and lower distributed positioning nails (2) by plugging the nail head (203) and the socket.
