Through the hydropower plant hazard source research and early warning system based on data analysis, real-time monitoring and analysis of the parameters of electromechanical equipment and dam bodies solves the problem of insufficient risk analysis of hydropower plant equipment and dam bodies in the existing technology, and realizes the Accuracy and timeliness of safety management and early warning of hydroelectric power plants.

CN118736795AInactive Publication Date: 2024-10-01YOUJIANG WATER CONSERVANCY DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410878865.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing hydropower plant hazard source research and early warning system lacks comprehensive analysis of electromechanical equipment and future hydropower plant dam water level and pressure predictions, resulting in the inability to fully analyze the hazards of equipment and dams, increasing the possibility of accidents. nature and severity.

Method used

A data analysis-based hazard source research and early warning system for hydropower plants is designed. The database stores the historical maintenance times of electromechanical equipment and the historical rainfall data of the dam body, monitors the parameters of the equipment and dam body in real time, and analyzes the risks of the equipment and dam body. Existence coefficients are used to screen out key equipment and hazard sources and carry out early warning processing.

Benefits of technology

It can accurately identify equipment and dams with potential problems, improve resource utilization efficiency, promptly identify safety hazards, reduce the probability and severity of accidents, and take preventive measures in advance to reduce losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118736795A_ABST
    Figure CN118736795A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of research, judgment and early warning of danger sources of hydroelectric power plants, and particularly discloses a data analysis-based research, judgment and early warning system for danger sources of hydroelectric power plants, which comprises key data management, equipment monitoring and danger early warning functions of the hydroelectric power plants. The database stores equipment maintenance records, rainfall data and catchment area information, the equipment screening module recognizes equipment with high maintenance frequency, the equipment danger analysis module monitors and evaluates the working state and risk of the equipment in real time, and the danger source judgment module recognizes potential dangerous equipment. The water level and water pressure monitoring module tracks the condition of a dam body in real time, the dam body danger judgment module predicts rainfall, water level and water pressure and evaluates the risk of the dam body, the danger early warning module summarizes information of all danger sources, analyzes the risk degree and takes corresponding measures, and the whole system aims at improving the safety and operation efficiency of a hydroelectric power plant.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of risk source assessment and early warning of hydropower plants, and relates to a risk source assessment and early warning system for hydropower plants based on data analysis. Background Art

[0002] With the rapid development and widespread application of hydropower technology, hydropower plants have become an important part of the global energy supply. However, hydropower plants face a variety of hazards during operation, such as reservoir discharge, turbine failure, electrical equipment failure, flood disasters, landslides, etc. Once these hazards occur, they may not only cause damage to power generation equipment, but also have serious impacts on personnel safety and environmental ecology.

[0003] Although the existing hydroelectric power plant hazard source assessment and early warning system meets certain requirements, it still has limitations, which are specifically reflected in: 1. Existing technologies often only focus on the parameters of a single hydroelectric power plant electromechanical equipment, such as temperature, and ignore the working time, current and voltage of the electromechanical equipment. There is a lack of comprehensive analysis of the electromechanical equipment, which makes it impossible to fully analyze the dangers of the electromechanical equipment. In addition, the failure or performance degradation of the electromechanical equipment may lead to safety accidents, such as fire, leakage, etc., which will pose a threat to personnel safety.

[0004] 2. The existing technology only focuses on the water level and water pressure of the current hydropower plant dam, and lacks the prediction of the water level and water pressure of the future hydropower plant dam, which makes it impossible to fully analyze the danger of the dam, so that the hydropower plant cannot take timely response measures when a dangerous situation occurs, increasing the possibility and severity of accidents. Summary of the invention

[0005] In view of this, in order to solve the problems raised in the above background technology, a hydropower plant hazard source assessment and early warning system based on data analysis is proposed.

[0006] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides a hydropower plant hazard source assessment and early warning system based on data analysis, including: a database: used to store the historical maintenance times of various electromechanical equipment in the hydropower plant, the historical rainfall data of the basin where the dam is located, and the water catchment area of ​​the dam.

[0007] Key equipment screening module: used to screen out various key equipment according to the historical maintenance times of various electromechanical equipment in the hydropower plant.

[0008] Equipment hazard analysis module: used to monitor the temperature, working time, current and voltage of various key equipment at the set monitoring time points in real time, and then analyze the hazard coefficient of various key equipment.

[0009] Equipment hazard source determination module: It is used to determine whether there are hazard sources in various types of key attention equipment according to the hazard existence coefficient of each type of key attention equipment, and then screen out various types of dangerous equipment.

[0010] Water level and water pressure monitoring module: used to monitor the water level of the dam of the hydropower plant and the water pressure of the dam at each set monitoring point in real time.

[0011] Dam danger determination module: used to analyze the future rainfall in the basin where the dam of the hydropower plant is located through the historical rainfall data of the basin where the dam of the hydropower plant is located, analyze the future water level of the dam of the hydropower plant and the future water pressure of the dam at each set monitoring point, and then analyze the danger coefficient of the dam and determine whether the danger source is the dam.

[0012] Danger warning module: It is used to treat each dangerous equipment and dam body as a danger source, calculate the danger coefficient of each danger source, analyze the danger level of each danger source, and then take corresponding measures.

[0013] Preferably, the screening out of various types of key focus equipment includes: extracting the maintenance times of various types of electromechanical equipment corresponding to the set monitoring time period from the historical maintenance times of various types of electromechanical equipment, and then dividing the maintenance times of various types of electromechanical equipment corresponding to the set monitoring time period by the set monitoring time period to obtain the maintenance frequency of various types of electromechanical equipment.

[0014] The maintenance frequency of each type of electromechanical equipment is compared with the corresponding preset maintenance frequency threshold. If the maintenance frequency of a certain type of electromechanical equipment is greater than or equal to the corresponding preset maintenance frequency threshold, then this type of electromechanical equipment is a key focus equipment, and then various types of key focus equipment are screened out.

[0015] Preferably, the real-time monitoring of the working time of various key attention devices and the temperature, current and voltage at each set monitoring time point includes: real-time monitoring of the temperature of various key attention devices at each set monitoring time point through a temperature sensor, denoted as T dj , where d represents the number corresponding to different key attention devices, d = 1, 2, 3, ... D, j represents the number corresponding to different monitoring time points, j = 1, 2, 3, ... J, and the working time of various key attention devices at each set monitoring time point is monitored in real time through the timer, recorded as H dj , the current and voltage of various key equipment at each set monitoring time point are monitored in real time through the current and voltage tester, which are recorded as L dj and Y dj .

[0016] Preferably, the analysis of the risk existence coefficient of each type of key attention equipment includes: comparing the temperature of each type of key attention equipment at each set monitoring time point with the set safety temperature, if the temperature of a certain type of key attention equipment at a set monitoring time point is greater than the set safety temperature, then recording the temperature anomaly coefficient of this type of key attention equipment as τ1;

[0017] If the temperature of each type of key attention equipment at each set monitoring time point is lower than the set safety temperature, then the temperature of a certain type of key attention equipment at a set monitoring time point is compared with the set safety temperature range corresponding to the working time of the key attention equipment at the set monitoring time point. If the temperature of the key attention equipment at the set monitoring time point does not meet the set safety temperature range corresponding to the working time of the key attention equipment at the set monitoring time point, then the temperature of the key attention equipment at the set monitoring time point is abnormal;

[0018] The number of monitoring time points of this type of key attention equipment with abnormal temperature is screened out, and the ratio of the number of monitoring time points of this type of key attention equipment with abnormal temperature to the total number of monitoring time points is taken as the temperature anomaly coefficient of this type of key attention equipment, denoted as τ2;

[0019] Calculate the temperature anomaly coefficient τ of each key equipment d , and τ d is equal to τ1 or τ2;

[0020] Analyze the risk coefficient δ of various key equipment d : where H′ d It represents the allowable working time of the set d-th category key focus equipment during normal operation, L0 represents the set reference current of the electromechanical equipment in the hydropower plant, Y0 represents the set reference voltage of the electromechanical equipment in the hydropower plant, and J represents the total number of monitoring time points.

[0021] Preferably, the determining whether there are hazardous sources in various types of key attention equipment includes: comparing the hazardous existence coefficient of various types of key attention equipment with a preset equipment hazardous existence coefficient threshold; if the hazardous existence coefficient of a certain type of key attention equipment is greater than the preset equipment hazardous existence coefficient threshold, then the hazardous source of the hydropower plant is the key attention equipment, and then various types of key attention equipment having a hazardous existence coefficient greater than the preset equipment hazardous existence coefficient threshold are screened out as various types of hazardous equipment.

[0022] Preferably, the real-time monitoring of the water level of the dam body of the hydropower plant and the water pressure of the dam body at each set monitoring point includes: arranging a water level sensor in the dam body of the hydropower plant to collect the water level of the dam body of the hydropower plant, denoted as S, and arranging a water pressure sensor at each set monitoring point in the dam body of the hydropower plant to collect the water pressure of the dam body of the hydropower plant at each set monitoring point, denoted as W. i , where i represents the number corresponding to different monitoring points, i=1,2,3,...I.

[0023] Preferably, the analysis of the future water level of the dam of the hydroelectric power plant and the future water pressure of the dam at each set monitoring point includes: extracting the rainfall in each historical month in each historical year within a set historical period from the historical rainfall data of the watershed where the dam of the hydroelectric power plant is located, averaging the rainfall in each historical month in each historical year within the set historical period, and obtaining the average rainfall in each historical month as the future rainfall in the watershed where the dam of the hydroelectric power plant is located.

[0024] The dam catchment area of ​​the hydropower plant is extracted from the database.

[0025] Divide the future rainfall in the basin where the hydropower plant's dam is located by the dam's catchment area to obtain the increase in the hydropower plant's dam water level, recorded as ΔS.

[0026] The increase in the dam water level of the hydropower plant is added to the dam water level of the hydropower plant to obtain the future water level of the dam of the hydropower plant, which is recorded as S.

[0027] Analyze the future water pressure W of the dam of the hydropower plant at each set monitoring point i ′,W i ′=W i +ρgΔS, where g represents the acceleration due to gravity and ρ represents the density of water.

[0028] Preferably, the specific calculation formula for analyzing the danger coefficient of the dam body is: θ=χ1·ε+χ2·ε′, where ε represents the current danger coefficient of the dam body, Among them, ε′ represents the future danger coefficient of the dam body, Where S0 represents the set reference water level of the dam of the hydropower plant, W0 represents the set reference water pressure of the dam of the hydropower plant, I represents the total number of monitoring points, χ1 represents the weight corresponding to the current danger coefficient of the dam, χ2 represents the weight corresponding to the future danger coefficient of the dam, and χ1+χ2=1.

[0029] Preferably, the determining whether the danger source is the dam body comprises: comparing the danger existence coefficient of the dam body with a preset danger existence coefficient threshold of the dam body; if the danger existence coefficient of the dam body is greater than or equal to the preset danger existence coefficient threshold of the dam body, then the danger source is the dam body.

[0030] Preferably, the analysis of the danger level of each danger source includes: taking each dangerous equipment and the dam body as a danger source, counting the danger existence coefficient of each danger source, comparing the danger existence coefficient of each danger source with the set equipment danger existence coefficient range corresponding to each danger level, counting the danger level of each danger source, and then performing corresponding processing according to the danger level of each danger source.

[0031] Compared with the prior art, the present invention has the following beneficial effects: (1) By analyzing the maintenance frequency of various types of electromechanical equipment within a set monitoring time period and comparing it with a preset maintenance frequency threshold, the present invention can accurately identify those key equipment with high maintenance frequency and potential problems. This accurate identification helps to concentrate limited resources on processing equipment that really needs attention, thereby improving resource utilization efficiency.

[0032] (2) The present invention monitors the temperature, operating time, current and voltage of various key equipment at each set monitoring time point in real time, and then analyzes the hazard coefficient of various key equipment. It can timely identify potential safety hazards of electromechanical equipment, improve the accuracy of equipment safety management, and provide strong support for the decision-making of managers. Managers can formulate more scientific and reasonable safety management strategies based on the hazard coefficient and operating status of the equipment.

[0033] (3) The present invention determines whether there are danger sources in various types of key attention equipment according to the danger existence coefficient of each type of key attention equipment, and then screens out various types of dangerous equipment. It can quickly identify equipment whose danger coefficient exceeds the safety standard. This timely identification helps to take preventive measures before potential dangers turn into actual accidents, thereby reducing the probability and severity of accidents and ensuring the safe operation of hydropower plants.

[0034] (4) The present invention analyzes the future water level of the dam of the hydroelectric power plant and the future water pressure of the dam at each set monitoring point, and then analyzes the danger coefficient of the dam, and determines whether the danger source is the dam. This helps to take preventive measures in advance before dangerous situations occur to reduce risks. It can timely discover potential safety risks and issue early warnings before the danger reaches a certain level, providing the hydroelectric power plant with sufficient time to formulate and implement corresponding response measures to reduce or avoid possible losses. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0036] Figure 1 It is a schematic diagram of the connection of each module of the system of the present invention. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] See also Figure 1 As shown, the present invention provides a hydropower plant hazard source analysis and early warning system based on data analysis, which includes: a database, a key equipment screening module, an equipment hazard analysis module, an equipment hazard source determination module, a water level and water pressure monitoring module, a dam body hazard determination module and a hazard early warning module.

[0039] The equipment hazard analysis module is connected to the key equipment screening module and the equipment hazard source determination module respectively, the database is connected to the key equipment screening module and the water level and water pressure monitoring module respectively, the dam body hazard determination module is connected to the water level and water pressure monitoring module and the hazard warning module respectively, and the hazard warning module is connected to the equipment hazard source determination module and the dam body hazard determination module respectively.

[0040] Database: used to store the historical maintenance times of various electromechanical equipment of the hydropower plant, the historical rainfall data of the basin where the dam is located, and the water catchment area of ​​the dam.

[0041] The key equipment screening module is used to screen out various key equipment according to the historical maintenance times of various electromechanical equipment in the hydropower plant.

[0042] As a preferred embodiment, the various types of electromechanical equipment include: turbines, generators and transformers.

[0043] Furthermore, the screening out of various types of key focus equipment includes: extracting the maintenance times of various types of electromechanical equipment corresponding to the set monitoring time period from the historical maintenance times of various types of electromechanical equipment, and then dividing the maintenance times of various types of electromechanical equipment corresponding to the set monitoring time period by the set monitoring time period to obtain the maintenance frequency of various types of electromechanical equipment.

[0044] The maintenance frequency of each type of electromechanical equipment is compared with the corresponding preset maintenance frequency threshold. If the maintenance frequency of a certain type of electromechanical equipment is greater than or equal to the corresponding preset maintenance frequency threshold, then this type of electromechanical equipment is a key focus equipment, and then various types of key focus equipment are screened out.

[0045] By analyzing the maintenance frequency of various types of electromechanical equipment within a set monitoring time period and comparing it with a preset maintenance frequency threshold, the present invention can accurately identify key equipment with a high maintenance frequency and possible potential problems. This accurate identification helps to concentrate limited resources on processing equipment that really needs attention, thereby improving resource utilization efficiency.

[0046] The equipment hazard analysis module is used to monitor the temperature, working time, current and voltage of various key equipment at each set monitoring time point in real time, and then analyze the hazard coefficient of various key equipment.

[0047] Furthermore, the real-time monitoring of the working time of various key attention devices and the temperature, current and voltage at each set monitoring time point includes: real-time monitoring of the temperature of various key attention devices at each set monitoring time point through a temperature sensor, denoted as T dj , where d represents the number corresponding to different key attention devices, d = 1, 2, 3, ... D, j represents the number corresponding to different monitoring time points, j = 1, 2, 3, ... J, and the working time of various key attention devices at each set monitoring time point is monitored in real time through the timer, recorded as H dj , the current and voltage of various key equipment at each set monitoring time point are monitored in real time through the current and voltage tester, which are recorded as L dj and Y dj .

[0048] Furthermore, the analysis of the risk existence coefficient of each type of key attention equipment includes: comparing the temperature of each type of key attention equipment at each set monitoring time point with the set safety temperature, if the temperature of a certain type of key attention equipment at a set monitoring time point is greater than the set safety temperature, then the temperature anomaly coefficient of this type of key attention equipment is recorded as τ1;

[0049] If the temperature of each type of key attention equipment at each set monitoring time point is lower than the set safety temperature, then the temperature of a certain type of key attention equipment at a set monitoring time point is compared with the set safety temperature range corresponding to the working time of the key attention equipment at the set monitoring time point. If the temperature of the key attention equipment at the set monitoring time point does not meet the set safety temperature range corresponding to the working time of the key attention equipment at the set monitoring time point, then the temperature of the key attention equipment at the set monitoring time point is abnormal;

[0050] The number of monitoring time points of this type of key attention equipment with abnormal temperature is screened out, and the ratio of the number of monitoring time points of this type of key attention equipment with abnormal temperature to the total number of monitoring time points is taken as the temperature anomaly coefficient of this type of key attention equipment, denoted as τ2;

[0051] Calculate the temperature anomaly coefficient τ of each key equipment d , and τ d Equal to τ1 or τ2; Analyze the risk coefficient δ of various key equipment d : where H′ d It represents the allowable working time of the set d-th category key focus equipment during normal operation, L0 represents the set reference current of the electromechanical equipment in the hydropower plant, Y0 represents the set reference voltage of the electromechanical equipment in the hydropower plant, and J represents the total number of monitoring time points.

[0052] As a preferred embodiment, the value of τ1 can be 1.

[0053] The present invention monitors the temperature, working time, current and voltage of various key attention equipment at each set monitoring time point in real time, and then analyzes the danger coefficient of various key attention equipment. It can timely identify potential safety hazards of electromechanical equipment, improve the accuracy of equipment safety management, and also provide strong support for the decision-making of managers. Managers can formulate more scientific and reasonable safety management strategies according to the danger coefficient and operating status of the equipment.

[0054] The equipment hazard source determination module is used to determine whether there are hazard sources in various types of key attention equipment according to the hazard existence coefficients of various types of key attention equipment, and then screen out various types of dangerous equipment.

[0055] Furthermore, the determination of whether there are hazardous sources in various types of key attention equipment includes: comparing the hazardous existence coefficient of various types of key attention equipment with a preset equipment hazardous existence coefficient threshold; if the hazardous existence coefficient of a certain type of key attention equipment is greater than the preset equipment hazardous existence coefficient threshold, then the hazardous source of the hydropower plant is the key attention equipment, and then various types of key attention equipment having a hazardous existence coefficient greater than the preset equipment hazardous existence coefficient threshold are screened out as various types of hazardous equipment.

[0056] The present invention determines whether there are danger sources in various types of key attention equipment according to the danger existence coefficient of various types of key attention equipment, and then screens out various types of dangerous equipment. It can quickly identify equipment whose danger coefficient exceeds the safety standard. This timely identification helps to take preventive measures before potential dangers turn into actual accidents, thereby reducing the probability and severity of accidents and ensuring the safe operation of hydropower plants.

[0057] The water level and water pressure monitoring module is used to monitor the water level of the dam body of the hydropower plant and the water pressure of the dam body at each set monitoring point in real time.

[0058] Furthermore, the real-time monitoring of the water level of the dam body of the hydropower plant and the water pressure of the dam body at each set monitoring point includes: arranging a water level sensor in the dam body of the hydropower plant to collect the water level of the dam body of the hydropower plant, denoted as S, and arranging a water pressure sensor at each set monitoring point in the dam body of the hydropower plant to collect the water pressure of the dam body of the hydropower plant at each set monitoring point, denoted as W. i , where i represents the number corresponding to different monitoring points, i=1,2,3,...I.

[0059] The present invention can monitor the water level of the dam body and the water pressure at the set monitoring point in real time and accurately by arranging water level sensors and water pressure sensors in the dam body of the hydroelectric power plant, ensuring that management personnel can quickly understand the current status of the dam body and make timely and effective decisions.

[0060] The dam body danger determination module is used to analyze the future rainfall in the basin where the dam body of the hydropower plant is located through the historical rainfall data of the basin where the dam body of the hydropower plant is located, analyze the future water level of the dam body of the hydropower plant and the future water pressure of the dam body at each set monitoring point, and then analyze the danger coefficient of the dam body, and determine whether the danger source is the dam body.

[0061] Furthermore, the analysis of the future water level of the dam of the hydroelectric power plant and the future water pressure of the dam at each set monitoring point includes: extracting the rainfall in each historical month in each historical year within a set historical period from the historical rainfall data of the basin where the dam of the hydroelectric power plant is located, averaging the rainfall in each historical month in each historical year within the set historical period, and obtaining the average rainfall in each historical month as the future rainfall in the basin where the dam of the hydroelectric power plant is located.

[0062] The dam catchment area of ​​the hydropower plant is extracted from the database.

[0063] Divide the future rainfall in the basin where the hydropower plant's dam is located by the dam's catchment area to obtain the increase in the hydropower plant's dam water level, recorded as ΔS.

[0064] The increase in the dam water level of the hydropower plant is added to the dam water level of the hydropower plant to obtain the future water level of the dam of the hydropower plant, which is recorded as S.

[0065] Analyze the future water pressure W of the dam of the hydropower plant at each set monitoring point i ′,W i ′=W i+ρgΔS, where g represents the acceleration due to gravity and ρ represents the density of water.

[0066] Furthermore, the specific calculation formula for analyzing the danger coefficient of the dam body is: θ=χ1·ε+χ2·ε′, where ε represents the current danger coefficient of the dam body, Among them, ε′ represents the future danger coefficient of the dam body, Where S0 represents the set reference water level of the dam of the hydropower plant, W0 represents the set reference water pressure of the dam of the hydropower plant, I represents the total number of monitoring points, χ1 represents the weight corresponding to the current danger coefficient of the dam, χ2 represents the weight corresponding to the future danger coefficient of the dam, and χ1+χ2=1.

[0067] It should be noted that in one embodiment, χ1 can be set to 0.6, and χ2 can be set to 0.4. The current danger coefficient of the dam body directly reflects the current safety status of the dam body. Because it will pose a direct threat to the safety of the dam, it requires immediate attention and processing. The future danger coefficient of the dam body predicts the future safety situation of the dam body, but the future safety situation of the dam body is not as urgent as the current safety situation of the dam body, so the weight corresponding to the current danger coefficient of the dam body is larger.

[0068] Furthermore, the determination of whether the danger source is the dam body includes: comparing the danger existence coefficient of the dam body with a preset danger existence coefficient threshold of the dam body; if the danger existence coefficient of the dam body is greater than or equal to the preset danger existence coefficient threshold of the dam body, then the danger source is the dam body.

[0069] The present invention analyzes the future water level of the dam body of the hydroelectric power plant and the future water pressure of the dam body at each set monitoring point, and then analyzes the danger coefficient of the dam body, and determines whether the danger source is the dam body. This helps to take preventive measures in advance to reduce risks before dangerous situations occur. It can timely discover potential safety risks and issue early warnings before the danger reaches a certain level, providing the hydroelectric power plant with sufficient time to formulate and implement corresponding response measures to reduce or avoid possible losses.

[0070] The danger warning module is used to treat each dangerous equipment and dam body as each danger source, calculate the danger existence coefficient of each danger source, analyze the danger degree of each danger source, and then perform corresponding processing.

[0071] Furthermore, the analysis of the danger level of each danger source includes: taking each dangerous equipment and the dam body as a danger source, counting the danger existence coefficient of each danger source, comparing the danger existence coefficient of each danger source with the equipment danger existence coefficient range corresponding to the set danger level, counting the danger level of each danger source, and then performing corresponding processing according to the danger level of each danger source.

[0072] As a preferred embodiment, the statistically calculating the danger level of each danger source includes:

[0073] If the hazard existence coefficient of a hazard source is within the range of equipment hazard existence coefficients corresponding to the set low-level hazard level, then the hazard level of the hazard source is low; if the hazard existence coefficient of a hazard source is within the range of equipment hazard existence coefficients corresponding to the set ordinary hazard level, then the hazard level of the hazard source is ordinary; if the hazard existence coefficient of a hazard source is within the range of equipment hazard existence coefficients corresponding to the set high-level hazard level, then the hazard level of the hazard source is high.

[0074] The present invention regards various dangerous equipment and dam bodies as various danger sources, calculates the danger existence coefficient of each danger source, analyzes the danger degree of each danger source, and then performs corresponding treatment. It can accurately judge the danger degree of each danger source, ensure the accuracy and timeliness of early warning, and thus take corresponding treatment measures in time, invest more attention and resources on danger sources with higher danger levels, and improve safety management efficiency.

[0075] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.

Claims

1. A hydropower plant hazard source assessment and early warning system based on data analysis, characterized by: include: Database: used to store the historical maintenance times of various electromechanical equipment of the hydropower plant, the historical rainfall data of the basin where the dam is located, and the catchment area of ​​the dam; Key equipment screening module: used to screen out various key equipment according to the historical maintenance times of various electromechanical equipment in the hydropower plant; Equipment hazard analysis module: used to monitor the temperature, working time, current and voltage of various key equipment at each set monitoring time point in real time, and then analyze the hazard coefficient of various key equipment; Equipment hazard source determination module: used to determine whether there are hazard sources in various types of key equipment according to the hazard existence coefficient of various types of key equipment, and then screen out various types of dangerous equipment; Water level and water pressure monitoring module: used to monitor the water level of the dam of the hydropower plant and the water pressure of the dam at each set monitoring point in real time; Dam danger determination module: used to analyze the future rainfall in the basin where the dam of the hydropower plant is located through the historical rainfall data of the basin where the dam of the hydropower plant is located, analyze the future water level of the dam of the hydropower plant and the future water pressure of the dam at each set monitoring point, and then analyze the danger coefficient of the dam and determine whether the danger source is the dam. Danger warning module: It is used to treat each dangerous equipment and dam body as a danger source, calculate the danger coefficient of each danger source, analyze the danger level of each danger source, and then take corresponding measures.

2. According to claim 1, a hydropower plant hazard source assessment and early warning system based on data analysis is characterized by: The above-mentioned screening out various types of key focus equipment includes: Extracting the maintenance times of various types of electromechanical equipment corresponding to the set monitoring time period from the historical maintenance times of various types of electromechanical equipment, and then dividing the maintenance times of various types of electromechanical equipment corresponding to the set monitoring time period by the set monitoring time period to obtain the maintenance frequency of various types of electromechanical equipment; The maintenance frequency of each type of electromechanical equipment is compared with the corresponding preset maintenance frequency threshold. If the maintenance frequency of a certain type of electromechanical equipment is greater than or equal to the corresponding preset maintenance frequency threshold, then this type of electromechanical equipment is a key focus equipment, and then various types of key focus equipment are screened out.

3. According to claim 1, a hydropower plant hazard source assessment and early warning system based on data analysis is characterized by: The real-time monitoring of the working time of various key equipment and the temperature, current and voltage at each set monitoring time point includes: The temperature of various key equipment at each set monitoring time point is monitored in real time through temperature sensors, denoted as T dj , where d represents the number corresponding to different key attention devices, d = 1, 2, 3, ... D, j represents the number corresponding to different monitoring time points, j = 1, 2, 3, ... J, and the working time of various key attention devices at each set monitoring time point is monitored in real time through the timer, recorded as H dj , the current and voltage of various key equipment at each set monitoring time point are monitored in real time through the current and voltage tester, which are recorded as L dj and Y dj .

4. According to claim 1, a hydropower plant hazard source assessment and early warning system based on data analysis is characterized by: The analysis of the risk factors of various key equipment includes: Compare the temperature of each type of key equipment at each set monitoring time point with the set safety temperature. If the temperature of a certain type of key equipment at a set monitoring time point is greater than the set safety temperature, the temperature anomaly coefficient of this type of key equipment is recorded as τ1; If the temperature of each type of key attention equipment at each set monitoring time point is lower than the set safety temperature, then the temperature of a certain type of key attention equipment at a set monitoring time point is compared with the set safety temperature range corresponding to the working time of the key attention equipment at the set monitoring time point. If the temperature of the key attention equipment at the set monitoring time point does not meet the set safety temperature range corresponding to the working time of the key attention equipment at the set monitoring time point, then the temperature of the key attention equipment at the set monitoring time point is abnormal; The number of monitoring time points of this type of key attention equipment with abnormal temperature is screened out, and the ratio of the number of monitoring time points of this type of key attention equipment with abnormal temperature to the total number of monitoring time points is taken as the temperature anomaly coefficient of this type of key attention equipment, denoted as τ2; Calculate the temperature anomaly coefficient τ of each key equipment d , and τ d is equal to τ1 or τ2; Analyze the risk coefficient δ of various key equipment d : where H′ d It represents the allowable working time of the set d-th category key focus equipment during normal operation, L0 represents the set reference current of the electromechanical equipment in the hydropower plant, Y0 represents the set reference voltage of the electromechanical equipment in the hydropower plant, and J represents the total number of monitoring time points.

5. According to claim 1, a hydropower plant hazard source assessment and early warning system based on data analysis is characterized by: The determination of whether there are any hazardous sources in various types of key equipment includes: The hazard existence coefficient of each type of key attention equipment is compared with the preset equipment hazard existence coefficient threshold. If the hazard existence coefficient of a certain type of key attention equipment is greater than the preset equipment hazard existence coefficient threshold, the hazardous source of the hydropower plant is the key attention equipment, and then various types of key attention equipment with hazard existence coefficients greater than the preset equipment hazard existence coefficient threshold are screened out as various types of dangerous equipment.

6. According to the data analysis-based water power plant hazard source assessment and early warning system of claim 1, it is characterized by: The real-time monitoring of the dam water level of the hydropower plant and the water pressure of the dam at each set monitoring point includes: Water level sensors are arranged in the dam of the hydropower plant to collect the water level of the dam, which is denoted as S. Water pressure sensors are arranged at various monitoring points in the dam to collect the water pressure of the dam at the set monitoring points, which is denoted as W. i , where i represents the number corresponding to different monitoring points, i=1,2,3,...I.

7. The data analysis-based early warning system for hydropower plant hazards according to claim 6 is characterized by: The analysis of the future water level of the dam of the hydropower plant and the future water pressure of the dam at each set monitoring point includes: Extract the rainfall of each historical month in each historical year within a set historical period from the historical rainfall data of the watershed where the dam of the hydropower plant is located, average the rainfall of each historical month in each historical year within the set historical period, and obtain the average rainfall of each historical month as the future rainfall of the watershed where the dam of the hydropower plant is located; Extract the dam catchment area of ​​the hydropower plant from the database; Divide the future rainfall in the basin where the hydropower plant's dam is located by the dam's catchment area to obtain the increase in the dam's water level, recorded as ΔS. Add the increase in the dam water level of the hydropower plant to the dam water level of the hydropower plant to obtain the future dam water level of the hydropower plant, which is recorded as S; Analyze the future water pressure W of the dam of the hydropower plant at each set monitoring point i ′,W i ′=W i +ρgΔS, where g represents the acceleration due to gravity and ρ represents the density of water.

8. The data analysis-based early warning system for hydropower plant hazards according to claim 1 is characterized by: The specific calculation formula for analyzing the danger coefficient of the dam body is: θ=χ1·ε+χ2·ε′, where ε represents the current danger coefficient of the dam body, Among them, ε′ represents the future danger coefficient of the dam body, Where S0 represents the set reference water level of the dam of the hydropower plant, W0 represents the set reference water pressure of the dam of the hydropower plant, I represents the total number of monitoring points, χ1 represents the weight corresponding to the current danger coefficient of the dam, χ2 represents the weight corresponding to the future danger coefficient of the dam, and χ1+χ2=1.

9. The hydropower plant hazard source assessment and early warning system based on data analysis according to claim 1 is characterized by: The step of determining whether the danger source is the dam body comprises: The danger existence coefficient of the dam body is compared with a preset danger existence coefficient threshold of the dam body. If the danger existence coefficient of the dam body is greater than or equal to the preset danger existence coefficient threshold of the dam body, the danger source is the dam body.

10. The hydropower plant hazard source assessment and early warning system based on data analysis according to claim 1 is characterized by: The analysis of the danger level of each danger source includes: Take each dangerous equipment and dam body as a hazard source, calculate the hazard existence coefficient of each hazard source, compare the hazard existence coefficient of each hazard source with the equipment hazard existence coefficient range corresponding to the set hazard degree, calculate the hazard degree of each hazard source, and then take corresponding measures according to the hazard degree of each hazard source.