By analyzing meteorological information and adjusting communication paths, the problem of poor satellite communication quality in bad weather is solved and stable communication in bad weather is achieved.

CN118740248AInactive Publication Date: 2024-10-01WIRELESS TAG TECH CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411093615.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing satellite communication methods cannot adjust communication methods according to weather conditions, making it difficult to ensure communication quality in bad weather.

Method used

By obtaining the position of satellite communication equipment and the planned trajectory of low-orbit satellites, we analyze meteorological information, determine the communication path with the least impact, and adjust the communication path to ensure optimal communication. If it is not a direct device, communicate through a relay device.

Benefits of technology

Minimize the impact of weather on the satellite communication process, ensure communication quality, and ensure communication stability in bad weather.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118740248A_ABST
    Figure CN118740248A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of communication, and particularly relates to a satellite communication method, device and system based on meteorological analysis, and the method comprises the steps: firstly determining a communication path between a low-orbit satellite and each satellite communication device, and then determining the influence degree of weather on each communication device through the analysis of meteorological information; according to the method and the device, the communication path of any satellite communication device can be adjusted when the satellite communication device needs to communicate with the satellite, so that the communication path of the satellite communication device is always kept to be the optimal communication path; the influence of weather on the satellite communication process can be reduced to the greatest extent, and the communication quality is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of communications, and in particular to a satellite communication method, device and system based on meteorological analysis. Background Art

[0002] Satellite communication sends information from a ground station to a satellite, which then forwards it to one or more ground stations to achieve long-distance communication. This communication method has advantages in wide coverage and stable communication quality, and is widely used in global communications, broadcasting, navigation, scientific research and other fields.

[0003] However, since satellite communications need to send signals to satellites, they are greatly affected by weather interference, especially the weakening of signals by clouds and rainfall. Existing satellite communication methods communicate directly with satellites regardless of the weather conditions, and it is difficult to adjust the communication method according to weather conditions, and thus it is difficult to ensure continuous and stable communication effects in severe weather. Summary of the invention

[0004] In view of this, the embodiments of the present application provide a satellite communication method, device and system based on meteorological analysis, which can solve the problem that the existing satellite communication methods are difficult to adjust the communication mode according to weather conditions, and thus it is difficult to ensure continuous and stable communication effects in bad weather.

[0005] A first aspect of an embodiment of the present application provides a satellite communication method based on meteorological analysis, which is applied to a central end. The satellite communication method based on meteorological analysis includes:

[0006] S1: Obtain the location of each satellite communication device in the set area and the planned trajectory of the low-orbit satellite;

[0007] S2: when receiving the communication task information sent by any satellite communication device, the satellite communication device is used as the first satellite communication device, and the communication time range between the first satellite communication device and the low-orbit satellite is determined according to the received communication task information, wherein the communication task information includes the start time and the end time of the corresponding satellite communication device performing the satellite communication task;

[0008] S3: for any satellite communication device, determine the relative position of the satellite communication device and the low-orbit satellite, and then determine the communication path between the satellite communication device and the low-orbit satellite within the communication time range according to the relative position and the planned operation trajectory;

[0009] S4: Obtaining weather information of a set area within the communication time range;

[0010] S5: Determine the degree of influence of weather on each communication path within the communication time range based on meteorological information;

[0011] S6: taking the communication path with the least impact as the first path, determining whether the satellite communication device corresponding to the first path is the first satellite communication device, and if so, returning a first instruction to the first satellite communication device so that the first satellite communication device directly communicates with the low-orbit satellite;

[0012] S7: If the satellite communication device corresponding to the first path is not the first satellite communication device, the satellite communication device corresponding to the first path is used as the second communication device, and a second instruction is sent back to the first satellite communication device, so that the first satellite communication device communicates with the low-orbit satellite through the second satellite communication device.

[0013] A second aspect of an embodiment of the present application provides a satellite communication device based on meteorological analysis, the satellite communication device based on meteorological analysis comprising:

[0014] A first acquisition module is used to acquire the position of each satellite communication device in a set area and the planned operation trajectory of the low-orbit satellite;

[0015] A first processing module is used for, when receiving communication task information sent by any satellite communication device, using the satellite communication device as a first satellite communication device, and determining a communication time range between the first satellite communication device and the low-orbit satellite according to the received communication task information, wherein the communication task information includes a start time and an end time of the corresponding satellite communication device performing the satellite communication task;

[0016] The second processing module is used to determine the relative position of any satellite communication device and the low-orbit satellite, and then determine the communication path between the satellite communication device and the low-orbit satellite within the communication time range according to the relative position and the planned operation trajectory;

[0017] The second acquisition module is used to acquire the meteorological information of the set area within the communication time range;

[0018] The third processing module is used to determine the degree of influence of weather on each communication path within the communication time range according to meteorological information;

[0019] a fourth processing module, configured to use the communication path with the least impact as the first path, determine whether the satellite communication device corresponding to the first path is the first satellite communication device, and if so, return a first instruction to the first satellite communication device so that the first satellite communication device directly communicates with the low-orbit satellite;

[0020] The fifth processing module is used to use the satellite communication device corresponding to the first path as the second communication device if the satellite communication device corresponding to the first path is not the first satellite communication device, and to send a second instruction back to the first satellite communication device, so that the first satellite communication device communicates with the low-orbit satellite through the second satellite communication device.

[0021] A third aspect of an embodiment of the present application provides a satellite communication system based on meteorological analysis, and the satellite communication system based on meteorological analysis includes:

[0022] Several satellite communication devices for communicating with low-orbit satellites;

[0023] The central end communicates with various satellite communication devices and low-orbit satellites to execute the satellite communication method based on meteorological analysis.

[0024] Compared with the prior art, the embodiments of the present application have the following beneficial effects: the method provided by the present invention includes obtaining the positions of various satellite communication devices in a set area and the planned operation trajectory of the low-orbit satellite; when receiving communication mission information sent by any satellite communication device, using the satellite communication device as the first satellite communication device, and determining the communication time range between the first satellite communication device and the low-orbit satellite based on the received communication mission information; for any satellite communication device, determining the relative position of the satellite communication device and the low-orbit satellite, and then determining the communication path of the satellite communication device with the low-orbit satellite within the communication time range based on the relative position and the planned operation trajectory; obtaining meteorological information of the set area within the communication time range; determining the degree of influence of weather on each communication path within the communication time range based on the meteorological information; using the communication path with the lowest degree of influence as the first path, and judging Whether the satellite communication device corresponding to the first path is the first satellite communication device, if so, the first instruction is sent back to the first satellite communication device, so that the first satellite communication device directly communicates with the low-orbit satellite; if the satellite communication device corresponding to the first path is not the first satellite communication device, the satellite communication device corresponding to the first path is used as the second communication device, and the second instruction is sent back to the first satellite communication device, so that the first satellite communication device communicates with the low-orbit satellite through the second satellite communication device; in the present application, the degree of influence of weather on each communication device can be determined by analyzing meteorological information, and then an optimal communication path can be determined. When any satellite communication device needs to communicate with a satellite, its communication path can be adjusted to keep its communication path always as the optimal communication path, thereby minimizing the influence of weather on its satellite communication process and ensuring communication quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0026] Figure 1 It is a schematic diagram of the implementation process of the satellite communication method based on meteorological analysis provided in an embodiment of the present application;

[0027] Figure 2 It is a schematic diagram of a cloud model of a satellite communication method based on meteorological analysis provided in an embodiment of the present application;

[0028] Figure 3 It is a schematic diagram of a module flow of a satellite communication device based on meteorological analysis provided in an embodiment of the present application;

[0029] Figure 4 is a schematic diagram of the composition of a satellite communication system based on meteorological analysis provided in an embodiment of the present application;

[0030] Figure 5 is a schematic diagram of a satellite communication device of a satellite communication system based on meteorological analysis provided in an embodiment of the present application;

[0031] Figure 6 It is a schematic diagram of the central end provided in an embodiment of the present application. DETAILED DESCRIPTION

[0032] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0033] In order to illustrate the technical solution described in this application, a specific embodiment is provided below for illustration.

[0034] Figure 1 A satellite communication method based on meteorological analysis provided in Embodiment 1 of the present application is shown, which is applied to a central end. The satellite communication method based on meteorological analysis includes:

[0035] S1: Obtain the location of each satellite communication device in the set area and the planned trajectory of the low-orbit satellite;

[0036] S2: when receiving the communication task information sent by any satellite communication device, the satellite communication device is used as the first satellite communication device, and the communication time range between the first satellite communication device and the low-orbit satellite is determined according to the received communication task information, wherein the communication task information includes the start time and the end time of the corresponding satellite communication device performing the satellite communication task;

[0037] S3: for any satellite communication device, determine the relative position of the satellite communication device and the low-orbit satellite, and then determine the communication path between the satellite communication device and the low-orbit satellite within the communication time range according to the relative position and the planned operation trajectory;

[0038] S4: Obtaining weather information of a set area within the communication time range;

[0039] S5: Determine the degree of influence of weather on each communication path within the communication time range based on meteorological information;

[0040] S6: taking the communication path with the least impact as the first path, determining whether the satellite communication device corresponding to the first path is the first satellite communication device, and if so, returning a first instruction to the first satellite communication device so that the first satellite communication device directly communicates with the low-orbit satellite;

[0041] S7: If the satellite communication device corresponding to the first path is not the first satellite communication device, the satellite communication device corresponding to the first path is used as the second communication device, and a second instruction is sent back to the first satellite communication device, so that the first satellite communication device communicates with the low-orbit satellite through the second satellite communication device.

[0042] In this embodiment, this method is executed in the central end, which can be an independent physical server or terminal, or a server cluster composed of multiple physical servers, or a cloud server that provides basic cloud computing services such as cloud servers, cloud databases, cloud storage and CDN; the satellite communication equipment can be a satellite phone, satellite TV, satellite navigator, small satellite terminal station, etc., which are not limited here; each satellite communication device can communicate with the central end and low-orbit satellites, and each satellite communication device can also communicate with each other, and the central end can communicate with low-orbit satellites; the set area can be a street, an urban area or other areas, which is determined according to the actual needs of the user and is not limited here; the planned motion trajectory is the running trajectory determined by the low-orbit satellite according to the numerical simulation of its orbital position, the earth's gravitational field and atmospheric resistance;

[0043] In this embodiment, any satellite communication device needs to send communication task information to the central end before communicating with the low-orbit satellite. The communication task information includes the communication purpose, communication content, and the start time and end time of the device performing the satellite communication task. The start time and the end time are both a future time. The range between the start time and the end time is the communication time range, and the communication time range is a future time range.

[0044] In the present application, the communication path between the low-orbit satellite and each satellite communication device is first determined, and then the degree of influence of the weather on each communication device is determined by analyzing the meteorological information, and then an optimal communication path is determined. When any satellite communication device needs to communicate with the satellite, if the optimal communication path is the communication path of other satellite communication devices, the satellite communication device is used as a transit device, and the information of the communication device that needs to communicate can be transmitted to the low-orbit satellite using the optimal communication path. That is, the various satellite communication devices in the set area form a situation of mutual help to ensure that the communication devices that need to communicate can always communicate through the optimal communication path, minimize the impact of weather on its satellite communication process, and ensure the quality of communication.

[0045] As a preferred embodiment, after step S2, the following steps are further included:

[0046] Generate a regional geographic information model of a set area;

[0047] Marking the location points of each satellite communication device on the regional geographic information model according to the location of each satellite communication device;

[0048] Retrieve a pre-stored low-orbit satellite model, import the low-orbit satellite model into the regional geographic information model, and move the low-orbit satellite model according to a planned trajectory, wherein the planned trajectory includes the low-orbit satellite position corresponding to each moment within a set time range in the future, and each low-orbit satellite position corresponds to a position point in the regional geographic information model.

[0049] In this embodiment, the central end generates a regional geographic information model based on the geographic information of the preset set area and through geographic information system software (such as ArcGIS). The regional geographic information model can be adjusted to a plane view or a three-dimensional view; the position of the satellite communication device obtained is the actual position (such as coordinates), and there is a corresponding position point in the regional geographic information model for the actual position. These position points are marked to obtain the position of the satellite communication device in the regional geographic information model. Similarly, the position of the low-orbit satellite in the regional geographic information model at each time can be obtained accordingly.

[0050] As a preferred embodiment, for any satellite communication device, the relative position of the satellite communication device and the low-orbit satellite, that is, the relative position of the position point of the satellite communication device and the center point of the low-orbit satellite model, the line connecting the position point of the satellite communication device and the center point of the low-orbit satellite model is the communication path, and the communication path moves with the movement of the low-orbit satellite model;

[0051] Meteorological information includes satellite cloud image information and rainfall information;

[0052] After step S4, the method further includes:

[0053] Generate a cloud model, import the cloud model into the regional geographic information model, and adjust the model state of the cloud model according to the satellite cloud image information, wherein the satellite cloud image information includes the cloud information corresponding to each moment within a set time range in the future, each cloud information corresponds to a model state, and the cloud information includes the cloud position, cloud morphology, and cloud thickness at the corresponding time point;

[0054] The rainfall spatial area is determined in the regional geographic information model based on the rainfall information.

[0055] The rainfall information includes the predicted rainfall area and rainfall probability corresponding to each moment within a set time range in the future. The rainfall spatial area is determined in the regional geographic information model based on the rainfall information, that is, the rainfall spatial area is determined at each moment within the set time range;

[0056] Determine the rainfall spatial area at any time within the set time range including:

[0057] Determine the model ground area corresponding to the predicted rainfall area at the moment on the model ground of the regional geographic information model;

[0058] The spatial area between the model ground area and the cloud model at that moment is taken as the rainfall spatial area.

[0059] In this embodiment, the set time range can be 6 hours, 12 hours or other time periods from the current time. The center obtains satellite cloud image information from the meteorological center. The meteorological center predicts the change trend of the cloud layer based on the monitored satellite cloud image, and then obtains the cloud layer information corresponding to each moment within a set time range in the future. The cloud layer information includes the cloud layer position, cloud layer shape, cloud layer thickness, etc. at the corresponding time point; Figure 2As shown, the central end generates a cloud layer model through 3D modeling software (such as Blender), and then changes the model parameters of the cloud layer model according to the cloud layer information, so that the cloud layer model presents the cloud layer shape and cloud layer thickness corresponding to the cloud layer information, and then moves the model information to the model position corresponding to the cloud layer position (actual cloud layer position) in the regional geographic information model, so that the cloud layer model is in a specific model state in the regional geographic information model. If the cloud layer model needs to be adjusted, the model parameters of the cloud layer model are changed according to the new cloud layer information, so that it presents a new cloud layer shape and cloud layer thickness, and then moves the model to the model position corresponding to the new cloud layer position in the regional geographic information model, and moves the future cloud layer model out of the regional geographic information model; alternatively, the original cloud layer model can be directly moved out of the regional geographic information model, and after adjusting its model state, it can be moved back into the regional geographic information model to achieve the effect of adjusting the model state of the cloud layer model.

[0060] In this embodiment, the predicted rainfall area is the actual ground area where the meteorological center predicts it will rain, and the model ground area is the ground area corresponding to the actual ground area in the regional geographic information model. Since rain will affect the entire area between the ground and the cloud layer, it is necessary to determine the spatial area between the model ground area and the cloud layer model, namely the rainfall spatial area, to simulate the impact of rainfall on the communication signal during the propagation process in the entire rain area; the rainfall spatial area is a cylindrical area, and any cross-section of the cylinder is consistent with the shape of the model ground area.

[0061] As a preferred embodiment, the communication time range is within the set time range, and determining the degree of influence of weather on any communication path within the communication time range according to meteorological information includes:

[0062] S51: taking the first moment in the communication time range as the target moment;

[0063] S52: moving the low-orbit satellite model to a position point corresponding to the target time in the regional geographic information model, thereby determining the position of the communication path;

[0064] S53: adjusting the cloud layer model in the regional geographic information model to a model state corresponding to the target time;

[0065] S54: determining a rainfall spatial area corresponding to the target time in the regional geographic information model;

[0066] S55: Identify that the communication path is in a first line segment in the cloud layer model, and identify that the communication path is in a second line segment in a rainfall space area;

[0067] S56: Calculate a first length ratio of the first line segment in the communication path and a second length ratio of the second line segment in the communication path;

[0068] S57: Calculating the instantaneous impact degree according to the first length ratio and the second length ratio;

[0069] S58: taking the next moment in the communication time range as the target moment, and executing steps S52 to S58 until the instantaneous impact degree corresponding to each moment in the communication time range is obtained;

[0070] S59: Calculate the impact degree of the weather on the communication path according to each instantaneous impact degree.

[0071] The instantaneous impact degree is calculated by the following formula:

[0072]

[0073] Among them, d is the instantaneous impact degree, l t is the length of the communication path, l1 is the length of the first line segment, l2 is the length of the second line segment, α1 is the weight coefficient of the first length, α2 is the weight coefficient of the second length, and β is the rainfall probability of the rainfall space area corresponding to the second line segment.

[0074] The degree of weather impact on the communication path is calculated using the following formula:

[0075]

[0076] Where D is the impact of weather on the communication path, d i is the instantaneous impact degree corresponding to the i-th moment in the communication time range, and n is the number of moments in the communication time range.

[0077] In this embodiment, the communication time range can be 1 hour, 2 hours or other durations from the current time, which is not limited here; the interval between each two adjacent target times can be 5 seconds, 10 seconds, 20 seconds or other durations, which is a specific implementation method determined according to actual accuracy requirements and is not limited here; the first line segment is the part of the communication path in the cloud model, indicating that it will be affected by the cloud layer, and the second line segment is the part of the communication path in the rainfall space area, indicating that it will be affected by rainfall;

[0078] In this embodiment, the sum of α1 and α2 is 1, for example, α1 is 0.3, and α2 is 0.7, which is not limited here; β is an adjusted rainfall probability, for example, the rainfall probability given by the meteorological center is 75%, the set time range duration is 6 hours, the communication time range duration is 2 hours, and the ratio of the communication time range duration to the set time range duration is 1 / 3, then β=75%*1 / 3=25%; the present application first obtains the instantaneous impact degree, and then obtains the overall impact degree based on the instantaneous impact degree, so that the obtained impact degree can more accurately represent the impact degree of the entire communication time range.

[0079] like Figure 3 As shown, the present application also proposes a satellite communication device based on meteorological analysis, comprising:

[0080] A first acquisition module is used to acquire the position of each satellite communication device in a set area and the planned operation trajectory of the low-orbit satellite;

[0081] A first processing module is used for, when receiving communication task information sent by any satellite communication device, using the satellite communication device as a first satellite communication device, and determining a communication time range between the first satellite communication device and the low-orbit satellite according to the received communication task information, wherein the communication task information includes a start time and an end time of the corresponding satellite communication device performing the satellite communication task;

[0082] The second processing module is used to determine the relative position of any satellite communication device and the low-orbit satellite, and then determine the communication path between the satellite communication device and the low-orbit satellite within the communication time range according to the relative position and the planned operation trajectory;

[0083] The second acquisition module is used to acquire the meteorological information of the set area within the communication time range;

[0084] The third processing module is used to determine the degree of influence of weather on each communication path within the communication time range according to meteorological information;

[0085] a fourth processing module, configured to use the communication path with the least impact as the first path, determine whether the satellite communication device corresponding to the first path is the first satellite communication device, and if so, return a first instruction to the first satellite communication device so that the first satellite communication device directly communicates with the low-orbit satellite;

[0086] The fifth processing module is used to use the satellite communication device corresponding to the first path as the second communication device if the satellite communication device corresponding to the first path is not the first satellite communication device, and to send a second instruction back to the first satellite communication device, so that the first satellite communication device communicates with the low-orbit satellite through the second satellite communication device.

[0087] The process of each module in the satellite communication device based on meteorological analysis provided in the embodiment of the present application realizing its own function can be specifically referred to the aforementioned Figure 1 The description of the illustrated embodiment will not be repeated here.

[0088] like Figure 4 As shown, the present application also proposes a satellite communication system based on meteorological analysis, and the satellite communication system based on meteorological analysis includes:

[0089] Several satellite communication devices for communicating with low-orbit satellites;

[0090] The central end communicates with various satellite communication devices and low-orbit satellites to execute the satellite communication method based on meteorological analysis.

[0091] In this embodiment, the central end cooperates with each satellite communication device to first determine the communication path between the low-orbit satellite and each satellite communication device, and then determine the degree of influence of the weather on each communication device through analysis of meteorological information, and then determine an optimal communication path. When any satellite communication device needs to communicate with the satellite, its communication path can be adjusted to keep its communication path always the optimal communication path; the present application can minimize the impact of weather on its satellite communication process and ensure the quality of communication.

[0092] like Figure 5 As shown, as a preferred embodiment, each satellite communication device includes a LoRa module and a WiFi module; when any satellite communication device communicates with other satellite communication devices, if the communication distance exceeds the preset distance, the satellite communication device uses the LoRa module for communication; if the communication distance does not exceed the preset distance, the satellite communication device uses the WiFi module for communication.

[0093] In this embodiment, LoRa is a long range radio, and its biggest feature is that it can transmit farther than other wireless methods under the same power consumption conditions; in this application, the preset distance can be 30m, 50m or other lengths; the satellite communication equipment can select a suitable communication module for communication according to the actual communication distance to ensure its communication effect.

[0094] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0095] It should be understood that when used in the present application specification, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0096] It should also be understood that the term “and / or” used in the specification of the present application refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0097] As used in the present specification, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting" depending on the context. Similarly, the phrase "if it is determined" or "if [the described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [the described condition or event] is detected" or "in response to detecting [the described condition or event]" depending on the context.

[0098] In addition, in the description of the present specification, the terms "first", "second", "third", etc. are only used to distinguish descriptions, and cannot be understood as indicating or implying relative importance. It should also be understood that although the terms "first", "second", etc. are used to describe various elements in some embodiments of the present application in the text, these elements should not be limited by these terms. These terms are only used to distinguish one element from another element. For example, the first table can be named as the second table, and similarly, the second table can be named as the first table, without departing from the scope of the various described embodiments. The first table and the second table are both tables, but they are not the same table.

[0099] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0100] Figure 6 is a schematic diagram of the structure of the central end provided by an embodiment of the present application. Figure 6As shown, the central end of this embodiment includes: at least one processor and a memory, wherein the memory stores a computer program that can be run on the processor. When the processor executes the computer program, the steps in the above-mentioned satellite communication method embodiments based on meteorological analysis are implemented, for example Figure 1 Steps S1 to S7 are shown.

[0101] The central end may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The central end may include, but is not limited to, a processor and a memory. Those skilled in the art will understand that Figure 6 It is only an example of the central end and does not constitute a limitation of the central end. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the central end may also include an input sending device, a network access device, a bus, etc.

[0102] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0103] In some embodiments, the memory may be an internal storage unit of the central end, such as a hard disk or memory of the central end. The memory may also be an external storage device of the central end, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the central end. Further, the memory may also include both the internal storage unit of the central end and an external storage device. The memory is used to store an operating system, an application program, a boot loader (BootLoader), data and other programs, such as the program code of the computer program, etc. The memory may also be used to temporarily store data that has been sent or is to be sent.

[0104] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0105] An embodiment of the present application also provides a central end, which includes at least one memory, at least one processor, and a computer program stored in the at least one memory and executable on the at least one processor, and when the processor executes the computer program, the central end implements the steps in any of the above-mentioned method embodiments.

[0106] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.

[0107] An embodiment of the present application provides a computer program product. When the computer program product runs on a mobile center terminal, the mobile center terminal can implement the steps in the above-mentioned method embodiments when executing the computer program product.

[0108] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium, etc.

[0109] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0110] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0111] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0112] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A satellite communication method based on meteorological analysis, applied to a central end, characterized in that: The satellite communication method based on meteorological analysis comprises: S1: Obtain the location of each satellite communication device in the set area and the planned trajectory of the low-orbit satellite; S2: when receiving the communication task information sent by any satellite communication device, the satellite communication device is used as the first satellite communication device, and the communication time range between the first satellite communication device and the low-orbit satellite is determined according to the received communication task information, wherein the communication task information includes the start time and the end time of the corresponding satellite communication device performing the satellite communication task; S3: for any satellite communication device, determine the relative position of the satellite communication device and the low-orbit satellite, and then determine the communication path between the satellite communication device and the low-orbit satellite within the communication time range according to the relative position and the planned operation trajectory; S4: Obtaining weather information of a set area within the communication time range; S5: Determine the degree of influence of weather on each communication path within the communication time range based on meteorological information; S6: taking the communication path with the least impact as the first path, determining whether the satellite communication device corresponding to the first path is the first satellite communication device, and if so, returning a first instruction to the first satellite communication device so that the first satellite communication device directly communicates with the low-orbit satellite; S7: If the satellite communication device corresponding to the first path is not the first satellite communication device, the satellite communication device corresponding to the first path is used as the second communication device, and a second instruction is sent back to the first satellite communication device, so that the first satellite communication device communicates with the low-orbit satellite through the second satellite communication device.

2. The method according to claim 1, characterized in that: After step S2, the method further includes: Generate a regional geographic information model of a set area; Marking the location points of each satellite communication device on the regional geographic information model according to the location of each satellite communication device; Retrieve a pre-stored low-orbit satellite model, import the low-orbit satellite model into the regional geographic information model, and move the low-orbit satellite model according to a planned trajectory, wherein the planned trajectory includes the low-orbit satellite position corresponding to each moment within a set time range in the future, and each low-orbit satellite position corresponds to a position point in the regional geographic information model.

3. The method according to claim 2, characterized in that For any satellite communication device, the relative position of the satellite communication device and the low-orbit satellite, that is, the relative position of the location point of the satellite communication device and the center point of the low-orbit satellite model, the line connecting the location point of the satellite communication device and the center point of the low-orbit satellite model is the communication path, and the communication path moves with the movement of the low-orbit satellite model; Meteorological information includes satellite cloud image information and rainfall information; After step S4, the method further includes: Generate a cloud model, import the cloud model into the regional geographic information model, and adjust the model state of the cloud model according to the satellite cloud image information, wherein the satellite cloud image information includes the cloud information corresponding to each moment within a set time range in the future, each cloud information corresponds to a model state, and the cloud information includes the cloud position, cloud morphology, and cloud thickness at the corresponding time point; The rainfall spatial area is determined in the regional geographic information model based on the rainfall information.

4. The method according to claim 3, characterized in that The rainfall information includes the predicted rainfall area and rainfall probability corresponding to each moment within a set time range in the future. The rainfall spatial area is determined in the regional geographic information model based on the rainfall information, that is, the rainfall spatial area is determined at each moment within the set time range; Determine the rainfall spatial area at any time within the set time range including: Determine the model ground area corresponding to the predicted rainfall area at the moment on the model ground of the regional geographic information model; The spatial area between the model ground area and the cloud model at that moment is taken as the rainfall spatial area.

5. The method according to claim 4, characterized in that The communication time range is within the set time range. The degree of influence of weather on any communication path within the communication time range is determined based on meteorological information, including: S51: taking the first moment in the communication time range as the target moment; S52: moving the low-orbit satellite model to a position point corresponding to the target time in the regional geographic information model, thereby determining the position of the communication path; S53: adjusting the cloud layer model in the regional geographic information model to a model state corresponding to the target time; S54: determining a rainfall spatial area corresponding to the target time in the regional geographic information model; S55: Identify that the communication path is in a first line segment in the cloud layer model, and identify that the communication path is in a second line segment in a rainfall space area; S56: Calculate a first length ratio of the first line segment in the communication path and a second length ratio of the second line segment in the communication path; S57: Calculating the instantaneous impact degree according to the first length ratio and the second length ratio; S58: taking the next moment in the communication time range as the target moment, and executing steps S52 to S58 until the instantaneous impact degree corresponding to each moment in the communication time range is obtained; S59: Calculate the impact degree of the weather on the communication path according to each instantaneous impact degree.

6. The method according to claim 5, characterized in that The instantaneous impact degree is calculated by the following formula: Among them, d is the instantaneous impact degree, l t is the length of the communication path, l1 is the length of the first line segment, l2 is the length of the second line segment, α1 is the weight coefficient of the first length, α2 is the weight coefficient of the second length, and β is the rainfall probability of the rainfall space area corresponding to the second line segment.

7. The method according to claim 5, characterized in that The degree of weather impact on the communication path is calculated using the following formula: Where D is the impact of weather on the communication path, d i is the instantaneous impact degree corresponding to the i-th moment in the communication time range, and n is the number of moments in the communication time range.

8. A satellite communication device based on meteorological analysis, characterized in that: The satellite communication device based on meteorological analysis includes: A first acquisition module is used to acquire the position of each satellite communication device in a set area and the planned operation trajectory of the low-orbit satellite; A first processing module is used for, when receiving communication task information sent by any satellite communication device, using the satellite communication device as a first satellite communication device, and determining a communication time range between the first satellite communication device and the low-orbit satellite according to the received communication task information, wherein the communication task information includes a start time and an end time of the corresponding satellite communication device performing the satellite communication task; The second processing module is used to determine the relative position of any satellite communication device and the low-orbit satellite, and then determine the communication path between the satellite communication device and the low-orbit satellite within the communication time range according to the relative position and the planned operation trajectory; The second acquisition module is used to acquire the meteorological information of the set area within the communication time range; The third processing module is used to determine the degree of influence of weather on each communication path within the communication time range according to meteorological information; a fourth processing module, configured to use the communication path with the least impact as the first path, determine whether the satellite communication device corresponding to the first path is the first satellite communication device, and if so, return a first instruction to the first satellite communication device so that the first satellite communication device directly communicates with the low-orbit satellite; The fifth processing module is used to use the satellite communication device corresponding to the first path as the second communication device if the satellite communication device corresponding to the first path is not the first satellite communication device, and to send a second instruction back to the first satellite communication device, so that the first satellite communication device communicates with the low-orbit satellite through the second satellite communication device.

9. A satellite communication system based on meteorological analysis, characterized in that: The satellite communication system based on meteorological analysis comprises: Several satellite communication devices for communicating with low-orbit satellites; The central end communicates with various satellite communication devices and low-orbit satellites, and is used to execute the satellite communication method based on meteorological analysis as described in any one of claims 1 to 7.

10. A satellite communication system based on meteorological analysis, characterized in that: Each satellite communication device includes a LoRa module and a WiFi module; when any satellite communication device communicates with other satellite communication devices, if the communication distance exceeds the preset distance, the satellite communication device uses the LoRa module for communication; if the communication distance does not exceed the preset distance, the satellite communication device uses the WiFi module for communication.

Citation Information

Patent Citations

  • Ka-band satellite channel modeling method integrated with meteorological factors

    CN103188011A

  • Method for establishing meteorological satellite composite channel simulation model under cloudy weather condition

    CN103457678A

  • Method and device for detecting communication availability of satellite-ground laser communication ground station

    CN115189762A

  • System for predicting influence on satellite communication signal based on antenna pointing

    CN115882980A

  • Satellite channel-oriented geometric random channel modeling method

    CN117040670A