Mining truck dispatching method and device for mining area and medium

By calculating the basic score and skill score of the mining truck driver, and combining it with the random forest model, multi-faceted scheduling of mining trucks is realized, which solves the problem of difficulty in assessment and scheduling due to different loading and unloading paths in the existing technology, and improves the operation of the mine. Efficiency and driver quality of work.

CN118747584APending Publication Date: 2024-10-08SHENZHEN GET EXPRESS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410779130.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The existing technology does not consider the different loading and unloading paths of mining trucks in the mining area, making it difficult to effectively assess and schedule the driver's workload, resulting in a waste of manpower and resources.

Method used

By obtaining the driving data and transportation material data of mining truck drivers on different paths, the basic score and skill score are calculated, and the random forest model is used to predict demand and adjust parameters to achieve multi-faceted scheduling of mining trucks and ensure that drivers are Reasonable allocation of different paths and energy consumption.

Benefits of technology

It provides unified evaluation standards, improves the operational efficiency of mines, improves drivers' work enthusiasm and technical level, reduces the waste of human resources, and promotes the greening and intelligence of mines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118747584A_ABST
    Figure CN118747584A_ABST
Patent Text Reader

Abstract

The invention discloses a mining area-oriented mining truck scheduling method and device and a medium, and relates to the technical field of mining truck scheduling. The method comprises the steps that driving data and transportation cargo data of a mine card driver in a corresponding path are acquired, the path comprises level road transportation, uphill transportation and downhill transportation, the driving data comprises oil consumption, transportation time and transportation times, and the transportation cargo data comprises transportation cargo types; the transportation time and the transportation times are calculated to obtain the basic score of the mine truck driver, and the fuel consumption is compared and calculated to obtain the skill score of the mine truck driver; and dispatching the mining trucks corresponding to the mine truck drivers according to the basic scores and the skill scores. According to the method, different drivers are reasonably scheduled to complete different tasks in combination with different loading and unloading paths and energy consumption, a unified judgment standard is provided for work of the drivers in a mining area, and the overall operation efficiency of a mine is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of mining truck dispatching, and in particular to a mining truck dispatching method, equipment and medium for mining areas. Background Art

[0002] For mine managers, due to the different qualities of the mined ore, different loading and unloading paths are often required to complete the screening and distribution of materials. Taking sand and gravel aggregate mines as an example, the gradual mining of mines can be roughly divided into three types: short mud pulling (nearby unloading), earth stripping (hillside unloading) and machine mouth unloading (crushing station inlet unloading). Due to the different lengths of the paths, the different quality of the cargo in the full car state, and the different quality of the cargo, it is often difficult to assess the workload of the driver, and there is no unified standard to divide the driver's salary. At the same time, it is difficult to let drivers with different work efficiency complete the corresponding work, and the specific work is often not tailored to the needs, resulting in a waste of manpower and resources.

[0003] If fuel consumption is the main criterion for scoring, it may happen that experienced drivers only pull a few trucks on roads that are more fuel-efficient and then slow down the loading and unloading times, resulting in an inflated driver score; if the number of loading and unloading times is the main criterion for scoring, it may happen that due to different loading and unloading routes, some drivers have a short total driving distance but a high number of loading and unloading times, resulting in an inflated driver score; if the total mass of the goods pulled is the main criterion for scoring, taking sand and gravel aggregate mines as an example, it may happen that with the mining of the mine, the total mass of goods of different qualities (ore, mud and stone, and mud) loaded in a truck varies greatly, resulting in differences in driver scores.

[0004] Through the above analysis, the problems and defects of the prior art are as follows:

[0005] The prior art does not consider multiple driving standards in many aspects because of the different loading and unloading routes of mining trucks in the mining area, which makes it difficult to dispatch mining trucks. Summary of the invention

[0006] The embodiments of the present application provide a mining truck scheduling method, equipment and medium for mining areas, which can solve the problem in the prior art that it is difficult to schedule mining trucks because multiple driving standards are not considered in many aspects due to the different loading and unloading routes of mining trucks in the mining area.

[0007] In a first aspect, an embodiment of the present application provides a mining truck scheduling method for a mining area, the method comprising: obtaining driving data and transported cargo data of a mining truck driver on a corresponding path, the path comprising flat road transportation, uphill transportation and downhill transportation, the driving data comprising fuel consumption, transportation time and number of transportation trips, and the transported cargo data comprising the type of transported cargo; calculating the transportation time and number of transportation trips to obtain a basic score for the mining truck driver, performing comparative calculation on the fuel consumption to obtain a skill score for the mining truck driver; and scheduling the mining truck corresponding to the mining truck driver according to the basic score and the skill score.

[0008] In one implementation of the present application, before calculating the transportation time and the number of transportation trips, the method also includes: presetting mileage coefficients for the mileage corresponding to flat road transportation, uphill transportation and downhill transportation respectively; presetting a timetable for the actual transportation time; presetting a transportation trip correction coefficient for the number of transportation trips based on the waiting time for loading and unloading; and presetting a standard fuel consumption range for fuel consumption.

[0009] In one implementation of the present application, a comparative calculation is performed on the fuel consumption, specifically including: if the actual fuel consumption is within the standard fuel consumption range, it is a preset initial skill score; if the actual fuel consumption is greater than the maximum value of the standard fuel consumption range, the initial skill score is reduced by a second preset value; if the actual fuel consumption is less than the minimum value of the standard fuel consumption range, the initial skill score is increased by a second preset value.

[0010] In one implementation of the present application, a mining truck corresponding to a mining truck driver is dispatched according to a basic score and a skill score, specifically including: when the basic score is lower than a first preset threshold, the mining truck is dispatched for flat road transportation; when the skill score is higher than a second preset threshold, the mining truck is dispatched for uphill transportation and downhill transportation, and the distance of uphill transportation and downhill transportation is greater than the distance of flat road transportation.

[0011] In one implementation of the present application, when the basic score is lower than a first preset threshold, the mining truck is dispatched for flat road transportation, specifically including: acquiring a video image of the flat road transportation route to determine whether congestion occurs or whether there is a queue at the loading point; if there is no congestion and there is no queue at the loading point, notifying the driver whose current basic score is lower than the first preset threshold to go to the loading point.

[0012] In one implementation of the present application, before obtaining actual driving data and cargo data of a mining truck on different paths, the method also includes: obtaining historical data through a random forest model, the historical data including driving data, cargo data, driver fatigue and climate data, and the cargo data also including excavator location, quantity and ore output; the random forest model learns the relationship between the historical data to obtain the standard fuel consumption range, timetable, mileage coefficient, transport trip correction coefficient and fatigue on different paths, as well as a first preset threshold and a second preset threshold.

[0013] In one implementation of the present application, after the random forest model learns the relationship between historical data, the method also includes: obtaining historical data and corresponding real-time data; predicting the demand for mining trucks on different routes based on the real-time data, with fatigue priority being greater than demand priority; scheduling mining trucks based on demand, adding loading points to high-demand routes to avoid congestion and queues, and in the case of high demand for flat road transportation, the priority of the basic score below the first preset threshold is the highest.

[0014] In one implementation of the present application, after predicting the demand for mining trucks on different routes based on real-time data, the method also includes: real-time monitoring and collecting the actual operating conditions of mining trucks, changes in production demand and feedback data to make real-time adjustments; and adjusting key features and parameters of the random forest model based on the feedback data.

[0015] In a second aspect, an embodiment of the present application also provides a mining truck dispatching device for a mining area, the device comprising at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can: obtain driving data and transported cargo data of a mining truck driver on a corresponding path, the path comprising flat road transportation, uphill transportation and downhill transportation, the driving data comprising fuel consumption, transportation time and number of transportation trips, and the transported cargo data comprising types of transported cargo; calculate the transportation time and number of transportation trips to obtain a basic score for the mining truck driver, and perform comparative calculations on the fuel consumption to obtain a skill score for the mining truck driver; and dispatch the mining truck corresponding to the mining truck driver according to the basic score and the skill score.

[0016] On the third aspect, the embodiment of the present application also provides a non-volatile computer storage medium for scheduling mining trucks in mining areas, storing computer executable instructions, and the computer executable instructions are set to: obtain driving data and transported cargo data of the mining truck driver on the corresponding path, the path includes flat road transportation, uphill transportation and downhill transportation, the driving data includes fuel consumption, transportation time and number of transportation trips, and the transported cargo data includes the type of transported cargo; calculate the transportation time and number of transportation trips to obtain the basic score of the mining truck driver, and compare and calculate the fuel consumption to obtain the skill score of the mining truck driver; dispatch the mining truck corresponding to the mining truck driver according to the basic score and the skill score.

[0017] The embodiment of the present application provides a mining truck dispatching method, equipment and medium for mining areas, which combines the differences in loading and unloading paths and energy consumption, and reasonably dispatches different drivers to complete different tasks, thereby improving the overall greening and intelligence of the mine; providing a unified evaluation standard for the work of mining area drivers, and improving the overall operational efficiency of the mine; at the same time, it can also improve the enthusiasm of drivers and improve their own driving skills; for the mining trucks corresponding to the dispatching drivers, according to the accumulation of big data, the characteristics of the mine are statistically analyzed, and the most direct data source is provided for the development of unmanned driving technology. This application is intended to combine the enthusiasm and driving level of the driver to work, score the driver through the calculation of VCU, and display the driver's score through the instrument. The scoring system is updated after each unloading of materials. After the vehicle is powered off at the end of the day, the total number of loading and unloading trips and the total amount of loaded and unloaded goods of the driver for the day, as well as today's score, are displayed, and this is used as an important evaluation method for assessing the driver's salary, as well as a means of scheduling mining trucks. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0019] Figure 1 A flowchart of a mining truck dispatching method for a mining area provided in an embodiment of the present application;

[0020] Figure 2 A schematic diagram of the internal structure of a mining truck dispatching device for mining areas provided in an embodiment of the present application. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in combination with the specific embodiments of the present application and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.

[0022] The embodiments of the present application provide a mining truck scheduling method, equipment and medium for mining areas, which solves the problem in the prior art that it is difficult to schedule mining trucks because multiple driving standards are not considered in many aspects due to the different loading and unloading routes of mining trucks in the mining area.

[0023] The technical solution proposed in the embodiments of the present application is described in detail below with reference to the accompanying drawings.

[0024] Figure 1 A flow chart of a mining truck dispatching method for a mining area provided in an embodiment of the present application. Figure 1 As shown, a mining truck dispatching method for a mining area provided in an embodiment of the present application specifically includes the following steps:

[0025] Step 10: Obtain the driving data and cargo transport data of the mining truck driver on the corresponding path. The path includes flat road transportation, uphill transportation and downhill transportation. The driving data includes fuel consumption, transportation time and number of transportation trips. The cargo transport data includes the types of transported cargo.

[0026] For example, in the process of ore mining, different types of ores and unwanted waste materials, such as soil, are dug up; in the embodiment of the present application, flat road transportation can be short-distance transportation, in which the excavated soil is transported over a short distance to an appropriate location for processing, and the number of cargo trips is frequent; uphill transportation can be earthwork stripping, in which soil and ore are pulled to a slope at the same time for unloading to obtain the required ore; downhill transportation can be unloading at the machine mouth, in which ore is pulled for long-distance transportation. In other words, different paths correspond to different types of cargo, and different types of cargo correspond to different qualities.

[0027] Step 20: Calculate the transportation time and the number of transportation trips to obtain the basic score of the mining truck driver, and compare and calculate the fuel consumption to obtain the skill score of the mining truck driver;

[0028] For example, when transporting the same type of goods, that is, on the same route and with the same transport quality (within the tolerance range), some drivers drive slowly or deliberately take a long detour, which takes a long time and results in fewer actual loading and unloading times, and the basic score is low. In this way, by combining the differences in loading and unloading routes and energy consumption, it is possible to distinguish which drivers are hardworking and which drivers are skilled in driving, and reasonably dispatch different drivers to complete different tasks, thereby improving the overall greening and intelligence of the mine.

[0029] Step 03: Preset the mileage coefficients for the mileage corresponding to flat road transportation, uphill transportation and downhill transportation;

[0030] For ease of understanding, steps 03-06 are placed here. For example, the round-trip mileage for reverse transportation is short, while the round-trip mileage for unloading at the machine port is long, so it needs to be multiplied by the mileage coefficient.

[0031] Step 04: preset a timetable for the actual transportation time; Step 05: preset a transportation trip correction factor for the number of transportation trips based on the waiting time for loading and unloading; Step 06: preset a standard fuel consumption range for fuel consumption.

[0032] Furthermore, the driver has more loading and unloading times when working in a shorter period of time, and spends more time waiting for loading and unloading than in other working conditions. At this time, it cannot be said that the driver has not worked, so the transport trip correction factor needs to be multiplied; the mileage factor and the transport trip correction factor are both obtained in steps 01-02.

[0033] In this way, the basic score = transportation time points of path 1 (flat road transportation, uphill transportation or downhill transportation) * number of transportation trips on path 1 * correction coefficient of number of transportation trips on path 1 * mileage coefficient of path 1 + path 2...; average transportation time points of path 1 = ∑ transportation time points of path 1 / number of transportation trips on path 1; mileage coefficient of path 1 = round-trip mileage of path 1 / sum of transportation mileage of all sections of the mine; correction coefficient of number of transportation trips on path 1 is calculated as follows: loading and unloading waiting time * average speed of the driver on the path / round-trip mileage of the path.

[0034] For example, the transportation time score of path 1 is based on the situation where the specified route (reverse short transport) is completed within the specified time limit of 10 minutes. If the loading and unloading tasks are completed within the specified time, the transportation time score of path 1 is full marks, that is, the standard timetable for obtaining the actual basic score through steps 01 and 02.

[0035] Furthermore, the fuel consumption is compared and calculated, which may specifically include:

[0036] Step 201: If the actual fuel consumption is within the standard fuel consumption range, it is a preset initial skill score;

[0037] In this step, the specific fuel consumption score is comprehensively evaluated based on vehicle characteristics such as full load weight, range extender power generation, and power generation per kilogram of the range extender. First, a standard fuel consumption range can be obtained through historical experience. For example, the fuel consumption of path 1 is 20L-30L / (per 100 kilometers*per 100 tons), and the preset skill score is 5.

[0038] Step 202: if the actual fuel consumption is greater than the maximum value of the standard fuel consumption range, the initial skill score is reduced by a second preset value;

[0039] In this step, if the actual fuel consumption is 32, subtract 1 point from 5.

[0040] Step 203: If the actual fuel consumption is less than the minimum value of the standard fuel consumption range, the initial skill score is increased by a second preset value.

[0041] In this step, if the actual fuel consumption is 18, add 1 point on the basis of 5.

[0042] Step 30: Dispatch the mining truck corresponding to the mining truck driver according to the basic score and the skill score.

[0043] In this step, different mining trucks in the mine are divided into different paths according to the basic scores and skill scores, so as to macro-schedule the operation and management of the mine and achieve the optimal management cost.

[0044] As an optional embodiment, the mining truck corresponding to the mining truck driver is dispatched according to the basic score and the skill score, which may specifically include: Step 301: when the basic score is lower than the first preset threshold, the mining truck is dispatched for flat road transportation; when the basic score is lower than the first preset threshold, the mining truck is dispatched for flat road transportation, which may specifically include: Step 3011: acquiring a video image of the flat road transportation route to determine whether congestion occurs or whether there is a queue at the loading point.

[0045] In this step, before dispatching the truck, first determine whether the road is congested. The congestion may be caused by individual vehicles breaking down on the road. Whether there is a queue at the loading point depends not only on the current queue phenomenon, but also on whether other vehicles may arrive at the same loading point at the same time and thus queue. Taking the same loading point as an example, for the vehicles that have completed loading and the vehicles within the 2KM TBD (To Be Defined, calibrable parameter) range near this loading point (the vehicle is heading to this loading point for loading), the scores under a certain unloading path are compared. Furthermore, it can be used to determine the vehicles that can be selected within a specific range, and to compare the scores of vehicles within a specific range, so as to reasonably dispatch vehicles.

[0046] Step 3012: In the case where there is no congestion and no queue at the loading point, notify the drivers whose current basic scores are lower than the first preset threshold to go to the loading point.

[0047] In this step, if the basic score is low, it means that the driver is not very motivated and likes to drive slowly or take a long detour. In this case, he will be arranged to transport short distances, which is conducive to letting the goods wait for people instead of wasting time on the road. Taking the same unloading point as an example, the scores of vehicles that have completed unloading and vehicles within 2KM (TBD) of this unloading point (the vehicle is heading to this unloading point for unloading) under a certain loading path are compared.

[0048] Step 302: when the skill score is higher than the second preset threshold, the mining truck is dispatched to perform uphill transportation and downhill transportation, and the distance of uphill transportation and downhill transportation is greater than the distance of flat road transportation.

[0049] In this step, if the driver's skill score is high, he will be arranged to load and unload materials on the route with higher fuel consumption. At this time, a driver may have a low basic score and a high skill score. In step 05, it can be seen that when the demand for flat road transportation is large, the priority of drivers with a basic score lower than the first preset threshold is the highest. In other words, if there is no congestion in the current flat road transportation and there is no queue at the loading point, drivers with a basic score lower than the first preset threshold will be arranged to carry out flat road transportation first.

[0050] Furthermore, before calculating the transportation time and the number of transportation trips, the method may also include:

[0051] It is understandable that before obtaining the actual driving data and cargo data of the mining truck under different paths, the method may also include: Step 01: Obtaining historical data through a random forest model, the historical data including driving data, cargo data, driver fatigue and climate data, and the cargo data also including excavator location, quantity and ore output.

[0052] In this step, the data is first preprocessed to obtain the data set to be applied, and new features are created based on the staff's business knowledge and data characteristics. For example, the average speed of flat road transportation can be calculated, the importance of features can be evaluated, and redundant features can be deleted or merged. The data set is divided into a training set and a test set. In the specific implementation, a validation set can also be set for model parameter adjustment.

[0053] Step 02: The random forest model learns the relationship between historical data to obtain the standard fuel consumption range, timetable, mileage coefficient, transportation trip correction coefficient and fatigue degree under different routes, as well as the first preset threshold and the second preset threshold.

[0054] In this step, the random forest model can be used to analyze which features have the greatest impact on the model's prediction results.

[0055] Furthermore, after the random forest model learns the relationship between historical data, the method may also include: Step 07: obtaining historical data and corresponding real-time data; Step 08: predicting the demand for mining trucks on different routes based on the real-time data, with fatigue priority being greater than demand priority.

[0056] In the embodiment of the present application, the driver and the corresponding mining truck are dispatched to ensure that the driver is not fatigued.

[0057] Step 09: Dispatch mining trucks according to demand, add loading points for routes with high demand to avoid congestion and queues, and when there is high demand for flat road transportation, the priority of those with a basic score below the first preset threshold is the highest.

[0058] Preferably, after predicting the demand for mining trucks on different routes based on real-time data, the method may further include: Step 10: real-time monitoring and collection of actual operating conditions of mining trucks, changes in production demand and feedback data to make real-time adjustments.

[0059] In this step, real-time monitoring is also required after the scheduling is completed to promptly discover and resolve potential problems and avoid situations such as queuing.

[0060] Step 11: Adjust the key features and parameters of the random forest model based on the feedback data.

[0061] In this step, the establishment of the random forest model is not static, but dynamically adjusted according to the actual situation.

[0062] In specific implementation, the basic score and skill score of the driver can be displayed on the instrument, and updated after each unloading of materials. After the vehicle is powered off at the end of the day, the total number of loading and unloading trips and the total amount of loaded and unloaded goods of the driver that day can be displayed, and this can be used as an important assessment method for evaluating the driver's salary.

[0063] The above is an embodiment of the method proposed in this application. Based on the same inventive concept, the embodiment of this application also provides a mining truck dispatching device for mining areas, the structure of which is as follows: Figure 2 shown.

[0064] Figure 2 The internal structure diagram of a mining truck dispatching device for mining areas provided in the embodiment of the present application is shown in FIG. Figure 2 As shown, the device includes:

[0065] at least one processor 201;

[0066] and, a memory 202 communicatively connected to the at least one processor;

[0067] Among them, the memory 202 stores instructions that can be executed by at least one processor, and the instructions are executed by at least one processor 201 so that at least one processor 201 can: obtain the driving data and transported cargo data of the mine truck driver on the corresponding path, the path includes flat road transportation, uphill transportation and downhill transportation, the driving data includes fuel consumption, transportation time and number of transportation trips, and the transported cargo data includes the type of transported cargo; calculate the transportation time and number of transportation trips to obtain the basic score of the mine truck driver, and compare and calculate the fuel consumption to obtain the skill score of the mine truck driver; dispatch the mining truck corresponding to the mine truck driver according to the basic score and the skill score.

[0068] Some embodiments of the present application provide corresponding Figure 1 A non-volatile computer storage medium for dispatching mining trucks in mining areas stores computer executable instructions, wherein the computer executable instructions are configured to: obtain driving data and transported cargo data of a mining truck driver on a corresponding path, wherein the path includes flat road transportation, uphill transportation, and downhill transportation, wherein the driving data includes fuel consumption, transportation time, and number of transportation trips, and the transported cargo data includes types of transported cargo; calculate the transportation time and number of transportation trips to obtain a basic score for the mining truck driver, and perform comparative calculation on the fuel consumption to obtain a skill score for the mining truck driver; and dispatch the mining truck corresponding to the mining truck driver according to the basic score and the skill score.

[0069] Each embodiment in this application is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the IoT device and medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiments.

[0070] The system and medium provided in the embodiments of the present application correspond one-to-one to the method. Therefore, the system and medium also have similar beneficial technical effects to the corresponding methods. Since the beneficial technical effects of the methods have been described in detail above, the beneficial technical effects of the system and medium will not be repeated here.

[0071] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0072] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0073] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0074] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0075] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0076] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0077] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0078] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0079] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims

1. A mining truck dispatching method for a mining area, characterized in that: The method comprises: Acquire the driving data and cargo transport data of the mining truck driver on the corresponding path, wherein the path includes flat road transportation, uphill transportation and downhill transportation, the driving data includes fuel consumption, transportation time and number of transportation trips, and the cargo transport data includes the type of cargo transported; The transportation time and the number of transportation trips are calculated to obtain the basic score of the mining truck driver, and the fuel consumption is compared and calculated to obtain the skill score of the mining truck driver; The mining truck corresponding to the mining truck driver is dispatched according to the basic score and the skill score.

2. A mining truck dispatching method for mining areas according to claim 1, characterized in that: Before calculating the transportation time and the number of transportation trips, the method further includes: Presetting mileage coefficients for the mileage corresponding to the flat road transportation, uphill transportation and downhill transportation respectively; Preset schedule for actual shipping times; Presetting a transport trip correction factor for the transport trips according to the waiting time for loading and unloading; A standard fuel consumption range is preset for the fuel consumption.

3. A mining truck dispatching method for mining areas according to claim 2, characterized in that: The fuel consumption is compared and calculated, specifically including: If the actual fuel consumption is within the standard fuel consumption range, it is the preset initial skill score; If the actual fuel consumption is greater than the maximum value of the standard fuel consumption range, the initial skill score is reduced by a second preset value; If the actual fuel consumption is less than the minimum value of the standard fuel consumption range, the initial skill score is increased by a second preset value.

4. The method for dispatching mining trucks for mining areas according to claim 2, characterized in that: The mining truck corresponding to the mining truck driver is dispatched according to the basic score and the skill score, specifically including: When the basic score is lower than a first preset threshold, dispatching the mining truck for flat road transportation; When the skill score is higher than the second preset threshold, the mining truck is dispatched to perform uphill transportation and downhill transportation, and the distances of the uphill transportation and downhill transportation are greater than the distance of the flat road transportation.

5. A mining truck dispatching method for mining areas according to claim 4, characterized in that: When the basic score is lower than the first preset threshold, the mining truck is dispatched for flat road transportation, specifically including: Obtain video images of the flat road transport route to determine whether there is congestion or queues at the loading point; In the case where there is no congestion and no queue at the loading point, the drivers whose current basic scores are lower than the first preset threshold are notified to go to the loading point.

6. The method for dispatching mining trucks for mining areas according to claim 1, characterized in that: Before obtaining actual driving data and cargo data of the mining truck on different paths, the method further includes: Acquire historical data through a random forest model, wherein the historical data includes driving data, cargo data, driver fatigue and climate data, and the cargo data also includes excavator location, quantity and ore production; The random forest model learns the relationship between historical data to obtain standard fuel consumption ranges, timetables, mileage coefficients, transportation trip correction coefficients and fatigue under different routes, as well as a first preset threshold and a second preset threshold.

7. A mining truck dispatching method for mining areas according to claim 6, characterized in that: After the random forest model learns the relationship between historical data, the method further includes: Get historical data and corresponding real-time data; According to the real-time data, the demand for mining trucks on different routes is predicted, and the priority of fatigue is greater than the priority of demand; Mining trucks are dispatched according to the demand, and loading points are added to the routes with high demand to avoid congestion and queues. In the case of high demand for flat road transportation, the priority of the basic score below the first preset threshold is the highest.

8. The method for dispatching mining trucks for mining areas according to claim 7, characterized in that: After predicting the demand for mining trucks on different routes based on the real-time data, the method further includes: Real-time monitoring and collection of actual operation status of mining trucks, changes in production demand and feedback data to make real-time adjustments; According to the feedback data, key features and parameters of the random forest model are adjusted.

9. A mining truck dispatching device for mining areas, characterized in that: The device comprises: at least one processor; and, a memory communicatively coupled to the at least one processor; The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to: Acquire the driving data and cargo transport data of the mining truck driver on the corresponding path, wherein the path includes flat road transportation, uphill transportation and downhill transportation, the driving data includes fuel consumption, transportation time and number of transportation trips, and the cargo transport data includes the type of cargo transported; The transportation time and the number of transportation trips are calculated to obtain the basic score of the mining truck driver, and the fuel consumption is compared and calculated to obtain the skill score of the mining truck driver; The mining truck corresponding to the mining truck driver is dispatched according to the basic score and the skill score.

10. A non-volatile computer storage medium for dispatching mining trucks in a mining area, storing computer executable instructions, characterized in that: The computer executable instructions are configured to: Acquire the driving data and cargo transport data of the mining truck driver on the corresponding path, wherein the path includes flat road transportation, uphill transportation and downhill transportation, the driving data includes fuel consumption, transportation time and number of transportation trips, and the cargo transport data includes the type of cargo transported; The transportation time and the number of transportation trips are calculated to obtain the basic score of the mining truck driver, and the fuel consumption is compared and calculated to obtain the skill score of the mining truck driver; The mining truck corresponding to the mining truck driver is dispatched according to the basic score and the skill score.