Coal mine laneway support deformation monitoring and early warning system and method based on sensor network

Through the coal mine tunnel support deformation monitoring and early warning system based on the sensor network, machine learning models and real-time data analysis are used, combined with personnel density and replaceable quantity, to achieve intelligent early warning of coal mine tunnel support deformation and solve the existing problems. The problem of technology being unable to provide accurate security warnings has improved security and intelligence.

CN118757231APending Publication Date: 2024-10-11SHANXI JINGUANTONG METAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411123014.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The existing coal mine tunnel support deformation monitoring methods cannot provide accurate safety warnings based on personnel distribution and tunnel paths, making it difficult to effectively monitor potential safety hazards.

Method used

A coal mine tunnel support deformation monitoring and early warning system based on sensor networks is used to train the machine learning model by collecting historical data in advance, obtain the abnormal probability and personnel density of the support in real time, and determine the level of early warning instructions based on alternative quantities to improve the intelligence and intelligence of early warning. Security.

Benefits of technology

It achieves more accurate and intelligent early warning of coal mine tunnel support deformation, comprehensively considers the interaction between personnel density and sub-lanes, and improves the safety and intelligence of the entire early warning system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757231A_ABST
    Figure CN118757231A_ABST
Patent Text Reader

Abstract

The invention discloses a coal mine laneway support deformation monitoring and early warning system and method based on a sensor network, and relates to the technical field of safety monitoring, historical early warning data is collected in advance, and a machine learning model for predicting an abnormal probability is trained based on the historical early warning data; the method comprises the following steps: pre-establishing a coal mine laneway network diagram, and dividing i sub laneways by taking adjacent nodes as one sub laneway in the network diagram; real-time early warning data of the i sub-laneways are obtained, the predicted abnormal probability of the i sub-laneways is obtained based on the real-time early warning data and a machine learning model, the abnormal probability is compared with a preset abnormal probability threshold value, and whether an early warning instruction is generated or not is judged; and obtaining the alternative quantity of the i sub-laneways and the personnel density in the i sub-laneways. By integrating the underground personnel density and the mutual influence between the i intricate sub-laneways, the grade of the early warning instruction is adjusted, so that the whole early warning system is more intelligent, and the safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of safety monitoring, and in particular relates to a coal mine tunnel support deformation monitoring and early warning system and method based on a sensor network. Background Art

[0002] The support structure of coal mine shafts and tunnels is an important facility to ensure the safety of miners. As time goes by and mining activities change, the support structure may deform, shift or even fail, which poses a major hidden danger to the safe operation of the mine.

[0003] At present, the monitoring method of support safety relies on manual inspection or single-point monitoring followed by coupling analysis to give early warning of support deformation. For example, the Chinese patent with authorization announcement number CN117780446B discloses a safety performance monitoring method and system for coal mine support. The method includes: obtaining a tunnel support object and a working face support object; obtaining monitoring data of the tunnel support object and monitoring data of the working face support object; obtaining safety performance indicators of the tunnel support object; obtaining safety performance indicators of the working face support object; obtaining coupling safety performance indicators; and generating a support safety early warning signal based on the coupling safety performance indicators. The patent predicts the danger of support by coupling analysis of different working face supports.

[0004] However, with the mining of coal mines, the shafts and tunnels are intertwined, and the distribution of personnel is complex. Only by analyzing the geometric data or three-dimensional data of the support to analyze the safety level and issue warnings, it is impossible to give more accurate safety warnings to personnel in the shafts and tunnels based on the distribution of personnel and the shaft and tunnel paths.

[0005] To this end, the present invention proposes a coal mine tunnel support deformation monitoring and early warning system and method based on a sensor network. Summary of the invention

[0006] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention proposes a coal mine shaft and tunnel support deformation monitoring and early warning system and method based on a sensor network, which improves the intelligence and safety of early warning.

[0007] To achieve the above purpose, a coal mine tunnel support deformation monitoring and early warning method based on a sensor network is proposed according to Embodiment 1 of the present invention, comprising:

[0008] Collect historical warning data in advance and train a machine learning model to predict abnormal probability based on the historical warning data;

[0009] A coal mine tunnel network diagram is pre-established, and i sub-tunnels are divided into tunnels with adjacent nodes as a tunnel;

[0010] Real-time warning data of i sub-shafts are obtained respectively, and based on the real-time warning data and the machine learning model, the abnormal probability predicted for the i sub-shafts is obtained, and the abnormal probability is compared with the preset abnormal probability threshold to determine whether to generate a warning instruction;

[0011] The replaceable quantity of the i-th sub-tunnel and the density of people in the i-th sub-tunnel are obtained, and the warning instruction level is determined based on the replaceable quantity and the density of people.

[0012] Preferably, the historical warning data includes the collected warning feature vectors and the corresponding detection result labels determined by the detection personnel;

[0013] The early warning feature vector includes: the strain, displacement and inclination of each support in the i-th sub-shaft lane;

[0014] iThe ambient temperature and humidity of the mine tunnel.

[0015] Preferably, the method of dividing i sub-tunnels comprises:

[0016] Establish the main shaft lane, which is the sub-shaft lane leading to the safe area;

[0017] The main shaft is used as the trunk to radiate outwards, and i sub-shafts are divided according to two adjacent nodes as a sub-shaft.

[0018] Preferably, the method for determining whether to generate an early warning instruction includes:

[0019] If the abnormal probability is less than the preset abnormal probability threshold, no warning instruction is generated;

[0020] If the abnormal probability is greater than or equal to the preset abnormal probability threshold, an early warning instruction is generated.

[0021] Preferably, the i sub-shafts are numbered in sequence of Z1, Z2, Z3, ..., Zi, and i and Z are both integers greater than 1.

[0022] Preferably, the method for determining the warning instruction level based on the replaceable quantity and the personnel density includes:

[0023] The warning instruction levels include primary, intermediate and advanced levels, comparing the population density with the preset population density threshold, and comparing the replaceable quantity with the preset replaceable quantity threshold;

[0024] If the population density is less than the preset population density threshold, and the replaceable quantity is greater than or equal to the preset replaceable quantity threshold, the warning instruction is primary;

[0025] If the population density is less than the preset population density threshold, and the replaceable quantity is less than the preset replaceable quantity threshold, the warning instruction is medium;

[0026] If the population density is greater than or equal to the preset population density threshold, and the replaceable quantity is greater than or equal to the preset replaceable quantity threshold, the warning instruction is medium;

[0027] If the population density is greater than or equal to the preset population density threshold, and the replaceable quantity is less than or equal to the preset replaceable quantity threshold, the warning instruction is high level.

[0028] Preferably, the specific method of training a machine learning model for predicting abnormality probability includes:

[0029] Each group of warning feature vectors in the historical warning data is used as the input of the machine learning model. The machine learning model takes the predicted deformation abnormality probability of each group of warning feature vectors as the output, and takes the detection result label corresponding to the warning feature vector in the historical warning data as the prediction target, and takes minimizing the sum of the prediction errors between all deformation abnormality probabilities and the detection result labels as the training goal; the machine learning model is trained until the sum of the prediction errors converges, and the training is stopped to train a machine learning model that outputs the predicted deformation abnormality probability based on the warning feature vector; the machine learning model is any one of a polynomial regression model or an SVR model.

[0030] The coal mine tunnel support deformation monitoring and early warning system based on the sensor network proposed in Embodiment 2 of the present invention includes a first acquisition module, a second acquisition module, a model training module, an analysis module and a grade adjustment module; wherein each module is connected via a wired and / or wireless network;

[0031] The first acquisition module is used to collect the historical warning data of each support in each sub-shaft lane, and send the historical warning data to the model training module;

[0032] The second acquisition module is used to collect the real-time warning data of each support in each sub-shaft lane, and send the real-time warning data to the analysis module;

[0033] The model training module is used to train a machine learning model for predicting abnormal probability based on the historical warning data of each support in each sub-shaft lane, and send the trained machine learning model to the analysis module;

[0034] The analysis module is used to input the real-time warning data into the machine learning model, output the predicted abnormal probability, compare the abnormal probability with the preset abnormal probability threshold, determine whether to generate a warning instruction, and send the determination result to the level adjustment module;

[0035] The level adjustment module is used to collect the replaceable quantity of i sub-shafts and the density of personnel in the i sub-shafts and tunnels, and adjust the warning instruction level based on the judgment result.

[0036] According to Embodiment 3 of the present invention, an electronic device is provided, comprising: a processor and a memory, wherein:

[0037] The memory stores a computer program that can be called by the processor;

[0038] The processor executes the above-mentioned coal mine tunnel support deformation monitoring and early warning method based on the sensor network by calling the computer program stored in the memory.

[0039] According to a fourth embodiment of the present invention, a computer-readable storage medium is provided, on which a rewritable computer program is stored;

[0040] When the computer program is executed on a computer device, the computer device executes the above-mentioned coal mine tunnel support deformation monitoring and early warning method based on a sensor network.

[0041] Compared with the prior art, the present invention has the following beneficial effects:

[0042] The present invention adjusts the level of early warning instructions by comprehensively considering the density of underground personnel and the mutual influence between i complex sub-shafts and tunnels, making the entire early warning system more intelligent and improving safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a flow chart of the coal mine tunnel support deformation monitoring and early warning method based on sensor network in embodiment 1 of the present invention;

[0044] Figure 2 This is a module connection relationship diagram of a coal mine tunnel support deformation monitoring and early warning system based on a sensor network in Example 2 of the present invention;

[0045] Figure 3 This is an example diagram of sub-shaft lane numbering and nodes in Example 1 of the present invention;

[0046] Figure 4 This is a schematic diagram of the structure of an electronic device in Embodiment 4 of the present invention;

[0047] Figure 5 This is a schematic diagram of the computer-readable storage medium structure in implementation 5 of the present invention. DETAILED DESCRIPTION

[0048] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] Example 1

[0050] See also Figure 1 and Figure 3 As shown, the coal mine tunnel support deformation monitoring and early warning method based on the sensor network includes the following steps:

[0051] Step 1: Collect historical warning data in advance and train a machine learning model to predict abnormal probability based on the historical warning data;

[0052] Step 2: Pre-establish a coal mine tunnel network diagram, divide the network diagram into i sub-tunnels with adjacent nodes as a sub-tunnel, and divide the i sub-tunnels into Z1, Z2, Z3, ..., Z i Sequential numbering, i and Z are both integers greater than 1, and for example, the adjacent nodes refer to Figure 3 The mark j shown is the confluence of multiple sub-shafts and lanes. This embodiment takes a single-layer coal mine as an example. If a multi-layer coal mine is considered, the vertical shaft is also divided as a sub-shaft and lane, and the numbering principle is the same;

[0053] Step 3: respectively obtain the real-time warning data of the i-sub-mines, obtain the abnormal probability predicted for the i-sub-mines based on the real-time warning data and the machine learning model, and compare the abnormal probability with the preset abnormal probability threshold to determine whether to generate a warning instruction. If a warning instruction is generated, proceed to step 4;

[0054] Step 4: Obtain the replaceable quantity of i sub-tunnels and the density of personnel in i sub-tunnels, and determine the warning instruction level based on the replaceable quantity and the density of personnel; for example, Figure 3 As shown in the figure, the replaceable amount can avoid the sub-tunnels that generate warning instructions. For example, Z1 is the exit far away from the end of Z3. If Z1 generates a warning instruction, the personnel in the entire coal mine tunnel can only go out through Z1, so the replaceable amount of Z1 is 0. If Z3 generates a warning instruction, except for the personnel in Z3 who need to go out from Z3 to Z1, the other sub-tunnels can bypass Z3 to Z1. For example, Z4 can go through Z6, Z 11 , Z9 and Z2 to Z1, then the substitutability of Z3 is 1.

[0055] It should be noted that the personnel density in the i-th sub-shaft can be obtained from the work plan and personnel positioning system in the daily personnel management system.

[0056] For details, see Figure 3 As shown, the method of dividing i sub-shaft lanes includes: establishing a main shaft lane, the main shaft lane is a sub-shaft lane leading to the safe area, that is, Figure 3 As shown in Z1, this embodiment takes a coal mine with a single exit as an example. If the coal mine has multiple exits, each sub-shaft lane passing through the safety zone can be used as the main shaft lane; the main shaft lane is used as the trunk to radiate outward, and i sub-shaft lanes are divided according to two adjacent nodes as a sub-shaft lane.

[0057] More specifically, the method for determining whether to generate a warning instruction includes: if the abnormal probability is less than a preset abnormal probability threshold, no warning instruction is generated; if the abnormal probability is greater than or equal to the preset abnormal probability threshold, a warning instruction is generated. The preset abnormal probability threshold in this embodiment is determined by technical personnel in this field based on a large amount of experimental data. If the preset abnormal probability threshold is set to a larger value, the condition for generating the warning instruction is higher; if the preset abnormal probability threshold is set to a smaller value, the condition for generating the warning instruction is lower, the alarm is more sensitive, and it is also more likely to give a false alarm.

[0058] Specifically, the method for determining the warning instruction level based on the replaceable quantity and personnel density includes:

[0059] The warning instruction levels include primary, intermediate and advanced levels, and the personnel density and the replaceable quantity are compared with the preset personnel density threshold and the preset replaceable quantity threshold respectively to determine the warning instruction level; exemplarily, the primary, intermediate and advanced levels correspond to the execution scheme: if it is primary level, when an alarm occurs, all the personnel underground are notified of the sub-shaft number where the warning instruction occurs, and the personnel in the sub-shaft where the warning instruction occurs need to leave immediately, and professional maintenance personnel will come to check and repair the support; if it is intermediate level, when an alarm occurs, all the personnel underground are notified of the sub-shaft number where the warning instruction occurs, and the personnel in the sub-shaft where the warning instruction occurs, as well as the relevant sub-shaft personnel who must pass through the sub-shaft where the warning instruction occurs to leave the mine, need to leave immediately, and professional maintenance personnel will come to check and repair the support, refer to Figure 3 As shown, if Z4 issues an early warning command, Z4 personnel will evacuate. 12 and Z 13 Personnel can only evacuate through Z4, that is, if Z4 collapses, it will affect more than one sub-shaft, so the warning level of Z4 is upgraded to intermediate; if it is advanced, an alarm will be issued, and all personnel underground will be notified of the sub-shaft number where the warning instruction is issued, and all personnel underground will leave immediately. Figure 3 As shown, if Z1 is warned, once a collapse occurs, all personnel in the sub-shafts will be in danger, so the warning instruction level is raised to the highest level;

[0060] It is worth mentioning that the elementary, intermediate and advanced levels provided in this embodiment are only basic definitions, and those skilled in the art can set them according to actual conditions.

[0061] If the personnel density is less than the preset personnel density threshold, and the replaceable quantity is greater than or equal to the preset replaceable quantity threshold, the early warning instruction is primary, that is, the scope of the impact can be controlled within a single sub-shaft;

[0062] If the population density is less than the preset population density threshold, and the replaceable quantity is less than the preset replaceable quantity threshold, the warning instruction is intermediate, that is, the scope of influence diverges to the surrounding of the sub-shaft lane where the warning instruction is issued;

[0063] If the personnel density is greater than or equal to the preset personnel density threshold, and the replaceable quantity is greater than or equal to the preset replaceable quantity threshold, the warning instruction is intermediate, that is, the scope of the impact can be controlled within a single sub-shaft, but the personnel density is large and the work situation is complicated. For safety reasons, the surrounding personnel can evacuate first and resume work after professional personnel come to check;

[0064] If the population density is greater than or equal to the preset population density threshold, and the replaceable quantity is less than or equal to the preset replaceable quantity threshold, the early warning instruction is high-level, that is, the scope of the impact spreads to the surrounding area of ​​the sub-shaft where the early warning instruction is issued, and tends to the entire coal mine shaft and tunnel, and all personnel in the entire coal mine shaft and tunnel need to evacuate.

[0065] It should be noted that the preset personnel density threshold and the preset replaceable quantity threshold are determined by technical personnel in this field based on the actual conditions of the coal mine shafts and tunnels. For example, the number of safe exits and the depth of the coal mine shafts and tunnels are all within the consideration of technical personnel in this field.

[0066] This embodiment adjusts the level of the warning instructions by comprehensively considering the density of underground personnel and the mutual influence between i complex sub-shafts and tunnels, making the entire warning system more intelligent and improving safety.

[0067] The historical warning data includes the collected warning feature vectors and the corresponding test result labels determined by the test personnel. The test result labels are the results of each regular test by the test personnel, and the test result labels are one of 0 and 1. Specifically, when the test result is that maintenance is required, the test result label is 1; when the test result is that maintenance is not required, the test result label is 0.

[0068] The early warning feature vector includes: the strain, displacement and inclination of each support in the i-th sub-shaft lane;

[0069] The ambient temperature and humidity of the i-th sub-shaft; for example, when the inspection personnel judge that the inspection result label is 1, the warning feature vector is collected, the strain is 500με, the displacement is 2mm, the inclination is 1.5°, the ambient temperature is 20℃ and the ambient humidity is 75%. Then, when the sensors installed on the support subsequently obtain data in real time and input the training to complete the machine learning model, the abnormal probability can be determined in real time to improve the timeliness of the warning.

[0070] Specifically, the specific methods for training a machine learning model to predict abnormal probability include:

[0071] Each group of warning feature vectors in the historical warning data is used as the input of the machine learning model. The machine learning model takes the predicted deformation anomaly probability of each group of warning feature vectors as the output, and takes the detection result label corresponding to the warning feature vector in the historical warning data as the prediction target. The training goal is to minimize the sum of the prediction errors between all deformation anomaly probabilities and the detection result labels; the machine learning model is trained until the sum of the prediction errors converges, and the training is stopped to train a machine learning model that predicts the deformation anomaly probability according to the warning feature vector output; the machine learning model is any one of a polynomial regression model or an SVR model.

[0072] It should be noted that the calculation formula of the prediction error is: uc = (y c -w c ) 2 , where c is the number of the warning feature vector, uc is the prediction error, and w c is the predicted detection result label corresponding to the warning feature vector of group c, y c is the actual detection result label corresponding to the c-th group of feature data.

[0073] Embodiment 2

[0074] like Figure 2 As shown, based on the above embodiment, the coal mine tunnel support deformation monitoring and early warning system based on the sensor network includes a first acquisition module, a second acquisition module, a model training module, an analysis module and a grade adjustment module; wherein each module is connected through a wired and / or wireless network;

[0075] Among them, the first acquisition module is used to collect the historical warning data of each support in each sub-shaft lane, and send the historical warning data to the model training module;

[0076] The second acquisition module is used to collect the real-time warning data of each support in each sub-shaft lane, and send the real-time warning data to the analysis module;

[0077] The model training module is used to train a machine learning model for predicting abnormal probability based on the historical warning data of each support in each sub-shaft lane, and send the trained machine learning model to the analysis module;

[0078] The analysis module is used to input the real-time warning data into the machine learning model, output the predicted abnormal probability, and compare the abnormal probability with the preset abnormal probability threshold to determine whether to generate a warning instruction, and send the determination result to the level adjustment module;

[0079] Among them, the level adjustment module is used to collect the replaceable quantity of i sub-mines and the density of personnel in i sub-mines, and adjust the warning instruction level based on the judgment results.

[0080] It should be noted that the second acquisition module of this embodiment can be understood as a data receiving unit and multiple sensors with different functions, specifically including strain gauges, laser rangefinders, angle sensors, temperature sensors and humidity sensors, among which the strain gauges, laser rangefinders and angle sensors are arranged on the support, and the temperature sensors and humidity sensors are arranged in the shafts.

[0081] More specifically, the strain amount is obtained in real time using a strain gauge, which can be installed on the lower surface of the support. As the object deforms, the strain gauge will also produce corresponding strain, causing the resistance value inside the strain gauge to change, and then generate an electrical signal. By measuring the electrical signal output by the strain gauge, the degree of strain applied to the support can be determined.

[0082] The displacement is obtained in real time using a laser rangefinder. The laser rangefinder is installed on the support and a fixed detection point is set, such as a foundation pile on the ground. If the detection data of the laser rangefinder changes, it can be determined that the support has been displaced.

[0083] The inclination angle is obtained in real time by an angle sensor installed on the support. The angle perpendicular to the ground is used as the initial angle. If the angle changes, the inclination angle of the support can be determined. The inclination angle between parts in the support can also be collected, such as between the support column and the beam column. No specific limitation is made here.

[0084] Ambient humidity can be obtained in real time using a humidity sensor;

[0085] The ambient temperature can be obtained in real time using a temperature sensor.

[0086] Example 3

[0087] Based on the above embodiments, the difference of this embodiment is that the abnormal probability can be dynamically calculated based on the personnel density in the sub-tunnel, the replaceable quantity of the sub-tunnel, and the length of the replaceable sub-tunnel, where the personnel density in the sub-tunnel is marked as ρ, the replaceable quantity of the sub-tunnel is marked as n, and the length of the replaceable sub-tunnel is marked as L v ;

[0088] The specific calculation expression of abnormal probability is: P is the abnormal probability, α, β and γ are weighting coefficients, and the weights depend on the actual application scenario. Those skilled in the art can determine them through optimization and training based on historical data.

[0089] It is worth mentioning that in actual situations, the greater the density of people in the sub-tunnel, the higher the potential risk. Therefore, the density of people in the sub-tunnel directly weights the probability of abnormality. The higher the sub-tunnel's alternative quantity, the more potential solutions there are to the problem, which reduces the probability of abnormality. Therefore, the reciprocal of the sub-tunnel's alternative quantity is taken. The shorter the length of the alternative sub-tunnel, the easier it is to avoid the problem area through other routes, reducing the probability of abnormality. Therefore, the reciprocal of the length of each alternative sub-tunnel is accumulated.

[0090] By combining the above factors and using weighted coefficients to comprehensively calculate the abnormal probability, the actual risk can be reflected more dynamically and accurately.

[0091] For example, assuming that the density of people in the sub-tunnel is ρ = 5 people / square meter; the number of sub-tunnel alternatives n = 3, the number of sub-tunnel alternatives is the number of alternative routes, the lengths of the three alternative sub-tunnels are L1 = 2km, L2 = 3km, L3 = 5km, α = 0.4, β = 0.3 and γ = 0.3; the abnormal probability P can be calculated, The calculated result is P=2.4098.

[0092] Example 4

[0093] Figure 4 1 is a schematic diagram of the structure of an electronic device provided by an embodiment of the present application. Figure 4 As shown, according to another aspect of the present application, an electronic device 100 is also provided. The electronic device 100 may include one or more processors and one or more memories. The memories store computer readable codes, and when the computer readable codes are executed by one or more processors, the above-mentioned coal mine tunnel support deformation monitoring and early warning method based on the sensor network can be executed.

[0094] The method or system according to the embodiment of the present application can also be used by Figure 4 The electronic device architecture shown in FIG. Figure 4As shown, the electronic device 100 may include a bus 101, one or more CPUs 102, a read-only memory (ROM) 103, a random access memory (RAM) 104, a communication port 105 connected to a network, an input / output component 106, a hard disk 107, etc. The storage device in the electronic device 100, such as the ROM 103 or the hard disk 107, may store the coal mine tunnel support deformation monitoring and early warning method based on the sensor network provided in the present application. The coal mine shaft and tunnel support deformation monitoring and early warning method based on the sensor network may, for example, include the following steps: Step 1: Collect historical early warning data, and train a machine learning model for predicting abnormal probability based on the historical early warning data; Step 2: Collect the coal mine shaft and tunnel route map, and establish a coal mine shaft and tunnel network diagram, and divide i sub-shafts into i sub-shafts with adjacent nodes as a sub-shaft in the network diagram; Step 3: Obtain real-time early warning data for i sub-shafts respectively, and obtain the predicted abnormal probability of i sub-shafts based on the real-time early warning data and the machine learning model, and compare the abnormal probability with the preset abnormal probability threshold to determine whether to generate an early warning instruction. If an early warning instruction is generated, go to step 4; otherwise, continue monitoring; Step 4: Obtain the replaceable quantity of i sub-shafts and tunnels and the personnel density in the i sub-shafts, and determine the level of early warning instructions based on the replaceable quantity and personnel density.

[0095] Furthermore, the electronic device 100 may further include a user interface 108. Figure 4 The architecture shown is only exemplary and can be omitted according to actual needs when implementing different devices. Figure 4 One or more components of an electronic device are shown.

[0096] Example 5

[0097] Figure 5 Schematic diagram of a computer-readable storage medium structure provided by an embodiment of the present application. Figure 5 As shown, a computer-readable storage medium 200 according to an embodiment of the present application is shown. Computer-readable instructions are stored on the computer-readable storage medium 200. When the computer-readable instructions are executed by the processor, the coal mine tunnel support deformation monitoring and early warning method based on the sensor network according to the embodiment of the present application described with reference to the above figures can be executed. The computer-readable storage medium 200 includes, but is not limited to, for example, volatile memory and / or non-volatile memory. Volatile memory may include, for example, random access memory (RAM) and cache memory (cache), etc. Non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc.

[0098] In addition, according to the implementation mode of the present application, the process described in the above reference flow chart can be implemented as a computer software program. For example, the present application provides a non-temporary machine-readable storage medium, which stores machine-readable instructions, and the machine-readable instructions can be executed by a processor to execute instructions corresponding to the method steps provided in the present application, for example: collecting historical warning data, and training a machine learning model for predicting abnormal probability based on the historical warning data; establishing a coal mine shaft network diagram, and dividing i sub-shafts into i sub-shafts with adjacent nodes as a sub-shaft in the network diagram; obtaining real-time warning data of i sub-shafts respectively, and obtaining the abnormal probability predicted by i sub-shafts based on the real-time warning data and the machine learning model, and comparing the abnormal probability with the preset abnormal probability threshold to determine whether to generate an early warning instruction; obtaining the replaceable quantity of i sub-shafts and the personnel density in i sub-shafts, and determining the warning instruction level based on the replaceable quantity and the personnel density. When the computer program is executed by the central processing unit (CPU), the above functions defined in the method of the present application are executed.

[0099] The methods, apparatuses, and devices of the present application may be implemented in many ways. For example, the methods, apparatuses, and devices of the present application may be implemented by software, hardware, firmware, or any combination of software, hardware, and firmware. The above order of steps for the method is for illustration only, and the steps of the method of the present application are not limited to the order specifically described above unless otherwise specified. In addition, in some embodiments, the present application may also be implemented as programs recorded in a recording medium, which include machine-readable instructions for implementing the method according to the present application. Therefore, the present application also covers recording media storing programs for executing the method according to the present application.

[0100] In addition, the parts of the above-mentioned technical solutions provided in the embodiments of the present application that are consistent with the implementation principles of the corresponding technical solutions in the prior art are not described in detail to avoid excessive redundancy.

[0101] The specific implementation modes as described above further describe the purpose, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation mode of the present invention and is not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

[0102] The above preset parameters or preset thresholds are all set by technicians in this field according to actual conditions or obtained through large-scale data simulation.

[0103] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A coal mine tunnel support deformation monitoring and early warning method based on a sensor network, characterized in that: include: Collect historical warning data in advance and train a machine learning model to predict abnormal probability based on the historical warning data; A coal mine tunnel network diagram is pre-established, and i sub-tunnels are divided into tunnels with adjacent nodes as a tunnel; Real-time warning data of i sub-shafts are obtained respectively, and based on the real-time warning data and the machine learning model, the abnormal probability predicted for the i sub-shafts is obtained, and the abnormal probability is compared with the preset abnormal probability threshold to determine whether to generate a warning instruction; The replaceable quantity of the i-th sub-tunnel and the density of people in the i-th sub-tunnel are obtained, and the warning instruction level is determined based on the replaceable quantity and the density of people.

2. The method for monitoring and early warning of coal mine tunnel support deformation based on sensor network according to claim 1 is characterized in that: The historical warning data includes the collected warning feature vectors and the corresponding test result labels determined by the test personnel; The early warning feature vector includes: the strain, displacement and inclination of each support in the i-th sub-shaft lane; iThe ambient temperature and humidity of the mine tunnel.

3. The method for monitoring and early warning of coal mine tunnel support deformation based on sensor network according to claim 1 is characterized in that: Methods for dividing i sub-shafts include: Establish the main shaft lane, which is the sub-shaft lane leading to the safe area; The main shaft is used as the trunk to radiate outwards, and i sub-shafts are divided according to two adjacent nodes as a sub-shaft.

4. The method for monitoring and early warning of coal mine tunnel support deformation based on sensor network according to claim 1 is characterized in that: The method for determining whether to generate an early warning instruction includes: If the abnormal probability is less than the preset abnormal probability threshold, no warning instruction is generated; If the abnormal probability is greater than or equal to the preset abnormal probability threshold, an early warning instruction is generated.

5. The method for monitoring and early warning of coal mine tunnel support deformation based on sensor network according to claim 1 is characterized in that: i sub-tunnel is divided into Z1, Z2, Z3, ..., Z i Sequential numbering, i and Z are both integers greater than 1.

6. The method for monitoring and early warning of coal mine tunnel support deformation based on sensor network according to claim 1 is characterized in that: Methods for determining the warning instruction level based on replaceable quantity and personnel density include: The warning instruction levels include primary, intermediate and advanced levels, comparing the population density with the preset population density threshold, and comparing the replaceable quantity with the preset replaceable quantity threshold; If the population density is less than the preset population density threshold, and the replaceable quantity is greater than or equal to the preset replaceable quantity threshold, the warning instruction is primary; If the population density is less than the preset population density threshold and the replaceable quantity is less than the preset replaceable quantity threshold, the warning instruction is medium; If the population density is greater than or equal to the preset population density threshold, and the replaceable quantity is greater than or equal to the preset replaceable quantity threshold, the warning instruction is medium; If the population density is greater than or equal to the preset population density threshold, and the replaceable quantity is less than or equal to the preset replaceable quantity threshold, the warning instruction is high level.

7. The method for monitoring and early warning of coal mine tunnel support deformation based on sensor network according to claim 1 is characterized in that: The specific methods for training a machine learning model to predict anomaly probability include: Each group of warning feature vectors in the historical warning data is used as the input of the machine learning model. The machine learning model takes the predicted deformation abnormality probability of each group of warning feature vectors as the output, and takes the detection result label corresponding to the warning feature vector in the historical warning data as the prediction target, and takes minimizing the sum of the prediction errors between all deformation abnormality probabilities and the detection result labels as the training goal; the machine learning model is trained until the sum of the prediction errors converges, and the training is stopped to train a machine learning model that outputs the predicted deformation abnormality probability based on the warning feature vector; the machine learning model is any one of a polynomial regression model or an SVR model.

8. A coal mine shaft and tunnel support deformation monitoring and early warning system based on a sensor network, which is used to implement the coal mine shaft and tunnel support deformation monitoring and early warning method based on a sensor network as described in any one of claims 1 to 7, characterized in that: It includes a first acquisition module, a second acquisition module, a model training module, an analysis module and a level adjustment module; wherein each module is connected via a wired and / or wireless network; The first acquisition module is used to collect the historical warning data of each support in each sub-shaft lane, and send the historical warning data to the model training module; The second acquisition module is used to collect the real-time warning data of each support in each sub-shaft lane, and send the real-time warning data to the analysis module; The model training module is used to train a machine learning model for predicting abnormal probability based on the historical warning data of each support in each sub-shaft lane, and send the trained machine learning model to the analysis module; The analysis module is used to input the real-time warning data into the machine learning model, output the predicted abnormal probability, compare the abnormal probability with the preset abnormal probability threshold, determine whether to generate a warning instruction, and send the determination result to the level adjustment module; The level adjustment module is used to collect the replaceable quantity of i sub-shafts and the density of personnel in the i sub-shafts and tunnels, and adjust the warning instruction level based on the judgment result.

9. An electronic device, characterized in that: include: processor and memory, wherein The memory stores a computer program that can be called by the processor; The processor executes the coal mine tunnel support deformation monitoring and early warning method based on sensor network as described in any one of claims 1 to 7 by calling the computer program stored in the memory.

10. A computer-readable storage medium, characterized in that: A rewritable computer program is stored thereon; When the computer program runs on a computer device, the computer device executes the coal mine tunnel support deformation monitoring and early warning method based on a sensor network as described in any one of claims 1 to 7.