Coal injection compressed air station monitoring platform

By classifying and analyzing the monitoring data of the coal-injection compressed air station, the operation evaluation value and credibility are generated, which solves the problem of inaccurate operating status evaluation of the compressed air station in the existing technology, and achieves the minimization of energy consumption and the maximization of energy efficiency. The control ensures the continuous optimized operation and energy saving effect of the equipment.

CN118759945AInactive Publication Date: 2024-10-11CHANGSHU LONGTENG SPECIAL STEEL CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410908248.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology lacks a comprehensive assessment of the operating status, energy consumption and energy efficiency of the compressed air station, resulting in the inability to accurately reflect the comprehensive operating status of the equipment, the inability to ensure the continuous optimized operation of the compressed air station, and the waste of unnecessary energy consumption.

Method used

By classifying and analyzing the monitoring data of the coal-injection compressed air station, the operation evaluation values ​​of energy efficiency, energy consumption and status evaluation indicators are generated, the credibility of the evaluation values ​​is calculated, and the control that minimizes energy consumption and maximizes energy efficiency is selected. Plan, realize intelligent control and energy-saving diagnosis.

Benefits of technology

It improves the evaluation accuracy of equipment evaluation indicators, achieves continuous optimized operation and energy saving and consumption reduction of coal-injection compressed air stations, and ensures control of minimizing energy consumption and maximizing energy efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118759945A_ABST
    Figure CN118759945A_ABST
Patent Text Reader

Abstract

The invention discloses a coal injection compressed air station monitoring platform, and the platform comprises a generation module which is used for generating a monitoring data set of a coal injection compressed air station according to a preset monitoring time node; the evaluation module is used for performing classification processing on the monitoring data in the monitoring data set to obtain initial monitoring data of different evaluation indexes, and inputting the initial monitoring data into a preset evaluation model to obtain an operation evaluation value; the control module is used for adjusting monitoring parameters according to the operation evaluation value, acquiring corresponding real-time monitoring data, generating the credibility of the operation evaluation value, and judging whether to send a control instruction or not according to the credibility; operation evaluation values of an energy efficiency evaluation index, an energy consumption evaluation index and a state evaluation index are obtained through monitoring data of the coal injection compressed air station, a control plan with the minimum energy consumption and the maximum energy efficiency is selected according to the operation evaluation values and credibility, and continuous optimized operation of the coal injection compressed air station is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of monitoring technology, and in particular to a coal injection compressed air station monitoring platform. Background Art

[0002] Compressed air stations have important and extensive applications in the industrial field. At present, most industrial compressed air stations are composed of multiple box-mounted oil-injected screw air compressors. The operating energy consumption of screw air compressors accounts for about 5% of the total national electricity consumption. The operating efficiency of screw air compressors is generally low. Accurate monitoring and efficient operation of compressed air stations are imperative.

[0003] In the existing technology, there is a lack of comprehensive evaluation of the operating status, operating energy consumption and operating energy efficiency of the compressed air station, which cannot accurately reflect the comprehensive operating status of the equipment in the compressed air station, cannot ensure the continuous optimized operation of the compressed air station, and wastes a lot of unnecessary energy. Summary of the invention

[0004] In order to solve the above technical problems, the present application provides a coal-injected compressed air station monitoring platform, which classifies and analyzes the monitoring data of the coal-injected compressed air station, obtains the operating evaluation values ​​of the energy efficiency evaluation index, energy consumption evaluation index and status evaluation index, calculates the credibility of the operating evaluation value, improves the evaluation accuracy of each evaluation indicator of the equipment in the coal-injected compressed air station, and selects a control plan that minimizes energy consumption and maximizes energy efficiency based on the operating evaluation value and credibility, thereby realizing intelligent control and energy-saving diagnosis, providing technical support for energy saving and consumption reduction of the coal-injected compressed air station, and ensuring the continuous optimization operation of the coal-injected compressed air station.

[0005] In some embodiments of the present application, a coal injection compressed air station monitoring platform is provided, comprising:

[0006] A generation module, used to generate a monitoring data set of a coal injection compressed air station according to a preset monitoring time node;

[0007] An evaluation module is used to classify the monitoring data in the monitoring data set, obtain the initial monitoring data of different evaluation indicators of each device, input the initial monitoring data into the preset evaluation model of the corresponding evaluation indicator, and obtain the operation evaluation value;

[0008] The control module is used to adjust the monitoring parameters according to the operation evaluation value, obtain the corresponding real-time monitoring data according to the adjusted monitoring parameters, generate the credibility of the operation evaluation value according to the real-time monitoring data, and determine whether to issue a control instruction according to the credibility.

[0009] In some embodiments of the present application, a monitoring data set of a coal injection compressed air station is generated according to a preset monitoring time node, including:

[0010] Establish a monitoring cycle for the coal-injected compressed air station and set preset monitoring time nodes based on the monitoring results of the previous monitoring cycle;

[0011] Obtain monitoring data for preset monitoring time nodes;

[0012] Presetting evaluation indicators, wherein the evaluation indicators include a first evaluation indicator, a second evaluation indicator and a third evaluation indicator;

[0013] Calculating the correlation between the monitoring data and the first evaluation index, the second evaluation index and the third evaluation index to obtain a first correlation coefficient, a second correlation coefficient and a third correlation coefficient;

[0014] The monitoring data whose first correlation coefficient, second correlation coefficient or third correlation coefficient is greater than a preset correlation coefficient threshold are screened out, and a monitoring data set is generated.

[0015] In some embodiments of the present application, data in the monitoring data set is classified and processed to obtain different types of initial monitoring data for each device, including:

[0016] Performing a first classification process on the monitoring data in the monitoring data set according to the data source to obtain the monitoring data of each device;

[0017] Analyze the first correlation coefficient, the second correlation coefficient, and the third correlation coefficient of the monitoring data of each device to obtain the first coefficient difference, the second coefficient difference, and the third coefficient difference between the first correlation coefficient, the second correlation coefficient, and the third correlation coefficient and the preset strong correlation coefficient;

[0018] The monitoring data of each device is subjected to a second classification according to the relationship between the first coefficient difference, the second coefficient difference, the third coefficient difference and the preset coefficient difference threshold, to obtain the first initial monitoring data of the first evaluation indicator, the second initial monitoring data of the second evaluation indicator and the third initial monitoring data of the third evaluation indicator in the same device.

[0019] In some embodiments of the present application, the initial monitoring data is input into the corresponding preset evaluation model to obtain the operation evaluation value, including:

[0020] Set target initial monitoring data;

[0021] Obtain the target initial monitoring data of the same device at the current preset monitoring time node;

[0022] Input the target initial monitoring data into the preset evaluation model of the corresponding evaluation index to obtain multiple sub-operation evaluation values, and establish a sub-operation evaluation value sequence M, M = (m1, m2, ...m n1 ), where n1 is the number of target initial monitoring data, m n1is the sub-run evaluation value of the initial monitoring data of the i-th target;

[0023] Generate an operation evaluation value H of the corresponding evaluation index of the target initial monitoring data at the current preset monitoring time node according to the sub-operation evaluation value data M;

[0024]

[0025] Among them, ai is the weight coefficient of the initial monitoring data of the i-th target, and s0 is the error correction coefficient of the corresponding evaluation index of the initial monitoring data of the target at the current preset monitoring time node.

[0026] In some embodiments of the present application, the historical operation evaluation values ​​of different evaluation indicators of the target initial monitoring data in the previous monitoring cycle are obtained, and the historical operation evaluation value series U of the corresponding evaluation indicators are established according to the time sequence of the preset monitoring time nodes in the previous monitoring cycle. z , U z (U z1 , U z2 , …U ze ), where U zj is the jth historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle, e is the total number of preset monitoring time nodes in the previous monitoring cycle, and z=1, 2, 3, j=1, 2, ..., e;

[0027] Calculate the actual operation evaluation values ​​of different evaluation indicators of the target initial monitoring data in the previous monitoring cycle, and establish the actual operation evaluation value series U0 of the corresponding evaluation indicators in the previous monitoring cycle z , U0 z (U0 z1 , U0 z2 ,…U0 ze ), where U0 zj is the jth actual operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle;

[0028] Based on the historical operation evaluation value series and the actual operation evaluation value series, the historical operation evaluation value and the actual operation evaluation value at the same preset monitoring time node in the same evaluation indicator are subtracted to obtain the operation evaluation value difference;

[0029] According to the difference in the operation evaluation value, the error correction coefficient of the historical operation evaluation value of the corresponding evaluation indicator at the preset monitoring time node in the previous monitoring cycle is set, and the error correction coefficient sequence S is established. Z , S Z (S Z1 , S Z2 ,…S Ze ), where Szj is the error correction coefficient of the jth historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle;

[0030] According to the preset monitoring time nodes of the target initial monitoring data in the current monitoring cycle, determine the node proportion of the target initial monitoring data corresponding to the preset monitoring time nodes, and select the error correction coefficient set with the same proportion in the error correction coefficient sequence S according to the node proportion;

[0031] The error correction coefficients in the error correction coefficient set are averaged to obtain characteristic error correction coefficients, and the characteristic error correction coefficients are set as the error correction coefficients of the corresponding evaluation indicators of the target initial monitoring data at the current preset monitoring time node.

[0032] In some embodiments of the present application, the error correction coefficient of the historical operation evaluation value of the corresponding evaluation indicator at the preset monitoring time node in the previous monitoring cycle is set according to the operation evaluation value difference, including:

[0033] Presetting a first preset operation evaluation value difference interval, a second preset operation evaluation value difference interval, a third preset operation evaluation value difference interval and a fourth preset operation evaluation value difference interval;

[0034] When the operation evaluation value difference is within the first preset operation evaluation value difference interval, the fourth preset error correction coefficient d4 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d4;

[0035] When the operation evaluation value difference is within the second preset operation evaluation value difference interval, the third preset error correction coefficient d3 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d3;

[0036] When the operation evaluation value difference is within the third preset operation evaluation value difference interval, the second preset error correction coefficient d2 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d2;

[0037] When the operation evaluation value difference is in the fourth preset operation evaluation value difference interval, the first preset error correction coefficient d1 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle.zj , that is, S zj =d1;

[0038] Among them, 0.75<d1<d2<1<d3<d4<1.25.

[0039] In some embodiments of the present application, adjusting monitoring parameters according to the operation evaluation value includes:

[0040] The monitoring parameters include the monitoring frequency of the preset monitoring time node and the number of collection groups of the target initial monitoring data;

[0041] Presetting a first preset operation evaluation value threshold and a second preset operation evaluation value threshold;

[0042] When the operation evaluation value is less than the first preset operation evaluation value threshold, the monitoring frequency of the preset monitoring time node is increased and the number of collection groups of the target initial monitoring data is set to the second preset number of collection groups;

[0043] When the operation evaluation value is between the first preset operation evaluation value threshold and the second preset operation evaluation value threshold, setting the number of collection groups of the target initial monitoring data to the first preset number of collection groups;

[0044] When the operation evaluation value is greater than the second preset operation evaluation value, the monitoring parameter is not adjusted.

[0045] In some embodiments of the present application, generating the credibility of the operation evaluation value according to the real-time monitoring data includes:

[0046] Generate a first operation evaluation value corresponding to each preset number of collection groups according to the real-time monitoring data, and obtain an average of the operation evaluation values ​​of the real-time monitoring data according to the multiple first operation evaluation values;

[0047] Generate a first difference value according to the operation evaluation value mean and the operation evaluation value;

[0048] Presetting a first preset difference threshold;

[0049] If the first difference is less than the first preset difference threshold, the credibility is greater than the preset credibility threshold; if the first difference is greater than the first preset difference threshold, the credibility is less than the preset credibility threshold.

[0050] In some embodiments of the present application, judging whether to issue a control instruction according to the credibility includes:

[0051] When the credibility is greater than a preset credibility threshold, multiple preset control instructions are generated, and multiple first-level control plans are generated according to the preset control instructions and the operation evaluation value;

[0052] Establish an optimization model, and generate the expected energy efficiency and expected energy consumption of each first-level control plan corresponding to the equipment according to the optimization model;

[0053] Set the first-level control plan with the highest expected energy efficiency and the lowest preset energy consumption as the second-level control plan;

[0054] Set control instructions according to the secondary control plan, and control the corresponding equipment according to the control instructions.

[0055] Compared with the prior art, the monitoring platform for a coal injection compressed air station in the embodiment of the present application has the following beneficial effects:

[0056] By classifying and analyzing the monitoring data of the coal-injected compressed air station, the operating evaluation values ​​of the energy efficiency evaluation index, energy consumption evaluation index and status evaluation index are obtained respectively, and the credibility of the operating evaluation value is calculated. The assessment accuracy of each evaluation index of the equipment in the coal-injected compressed air station is improved, and a control plan that minimizes energy consumption and maximizes energy efficiency is selected according to the operating evaluation value and credibility, thereby realizing intelligent control and energy-saving diagnosis, providing technical support for energy conservation and consumption reduction of the coal-injected compressed air station, and ensuring the continuous optimization operation of the coal-injected compressed air station. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1 It is a schematic diagram of a coal injection compressed air station monitoring platform in the preferred embodiment of the present application. DETAILED DESCRIPTION

[0058] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.

[0059] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0060] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0061] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0062] like Figure 1 As shown, a coal injection compressed air station monitoring platform according to a preferred embodiment of the present application includes:

[0063] A generation module, used to generate a monitoring data set of a coal injection compressed air station according to a preset monitoring time node;

[0064] An evaluation module is used to classify the monitoring data in the monitoring data set, obtain the initial monitoring data of different evaluation indicators of each device, input the initial monitoring data into the preset evaluation model of the corresponding evaluation indicator, and obtain the operation evaluation value;

[0065] The control module is used to adjust the monitoring parameters according to the operation evaluation value, obtain the corresponding real-time monitoring data according to the adjusted monitoring parameters, generate the credibility of the operation evaluation value according to the real-time monitoring data, and determine whether to issue a control instruction according to the credibility.

[0066] In this embodiment, the evaluation indicators include energy efficiency evaluation indicators, energy consumption evaluation indicators and status evaluation indicators. According to the monitoring platform, a comprehensive analysis of the energy consumption, energy efficiency and status of multiple equipment in the coal-injected compressed air station is realized, intelligent control and energy-saving diagnosis are realized, technical support is provided for energy saving and consumption reduction of the coal-injected compressed air station, and continuous optimized operation of the coal-injected compressed air station is ensured.

[0067] In some embodiments of the present application, a monitoring data set of a coal injection compressed air station is generated according to a preset monitoring time node, including:

[0068] Establish a monitoring cycle for the coal-injected compressed air station and set preset monitoring time nodes based on the monitoring results of the previous monitoring cycle;

[0069] Obtain monitoring data for preset monitoring time nodes;

[0070] Presetting evaluation indicators, wherein the evaluation indicators include a first evaluation indicator, a second evaluation indicator and a third evaluation indicator;

[0071] Calculating the correlation between the monitoring data and the first evaluation index, the second evaluation index and the third evaluation index to obtain a first correlation coefficient, a second correlation coefficient and a third correlation coefficient;

[0072] The monitoring data whose first correlation coefficient, second correlation coefficient or third correlation coefficient is greater than a preset correlation coefficient threshold are screened out, and a monitoring data set is generated.

[0073] In this embodiment, the monitoring cycle is set according to the operating cycle or circulation law of multiple equipment in the coal-injected compressed air station. If the monitoring result of the previous monitoring cycle is that the overall operating condition of the equipment is good, the monitoring frequency of the preset monitoring time node of the previous monitoring cycle is set as the preset monitoring time node of the next monitoring cycle; if the overall operating condition of the equipment is poor, the monitoring frequency of the preset monitoring time node of the previous monitoring cycle is increased and set as the preset monitoring time node of the next monitoring cycle.

[0074] In this embodiment, the first evaluation index is the energy efficiency evaluation index, the second evaluation index is the energy consumption evaluation index, and the third evaluation index is the status evaluation index. The monitoring data related to the energy consumption, energy efficiency and status of the equipment are screened out, and the monitoring data is classified and analyzed to obtain the operation evaluation value of each evaluation index, thereby ensuring the monitoring accuracy of the monitoring platform and thus ensuring the safe operation of the coal-injected compressed air station.

[0075] In some embodiments of the present application, data in the monitoring data set is classified and processed to obtain different types of initial monitoring data for each device, including:

[0076] Performing a first classification process on the monitoring data in the monitoring data set according to the data source to obtain the monitoring data of each device;

[0077] Analyze the first correlation coefficient, the second correlation coefficient, and the third correlation coefficient of the monitoring data of each device to obtain the first coefficient difference, the second coefficient difference, and the third coefficient difference between the first correlation coefficient, the second correlation coefficient, and the third correlation coefficient and the preset strong correlation coefficient;

[0078] The monitoring data of each device is subjected to a second classification according to the relationship between the first coefficient difference, the second coefficient difference, the third coefficient difference and the preset coefficient difference threshold, to obtain the first initial monitoring data of the first evaluation indicator, the second initial monitoring data of the second evaluation indicator and the third initial monitoring data of the third evaluation indicator in the same device.

[0079] In some embodiments of the present application, the initial monitoring data is input into the corresponding preset evaluation model to obtain the operation evaluation value, including:

[0080] Set target initial monitoring data;

[0081] Obtain the target initial monitoring data of the same device at the current preset monitoring time node;

[0082] Input the target initial monitoring data into the preset evaluation model of the corresponding evaluation index to obtain multiple sub-operation evaluation values, and establish a sub-operation evaluation value sequence M, M = (m1, m2, ...m n1 ), where n1 is the number of target initial monitoring data, m n1 is the sub-run evaluation value of the initial monitoring data of the i-th target;

[0083] Generate an operation evaluation value H of the corresponding evaluation index of the target initial monitoring data at the current preset monitoring time node according to the sub-operation evaluation value data M;

[0084]

[0085] Among them, ai is the weight coefficient of the initial monitoring data of the i-th target, and s0 is the error correction coefficient of the corresponding evaluation index of the initial monitoring data of the target at the current preset monitoring time node.

[0086] In this embodiment, the target initial monitoring data includes first initial monitoring data, second initial monitoring data or third initial monitoring data, and the preset evaluation model includes a preset evaluation model of a first evaluation indicator, a preset evaluation model of a second evaluation indicator and a preset evaluation model of a third evaluation indicator. The preset evaluation model is constructed based on the historical monitoring data of the first evaluation indicator, the second evaluation indicator and the third evaluation indicator and the historical sub-operation evaluation values.

[0087] In this embodiment, the target initial monitoring data is selected, and the target initial monitoring data of the same equipment is input into the preset evaluation model of the corresponding evaluation index to obtain the sub-operation evaluation value and the operation evaluation value, which can accurately evaluate the operation results of the corresponding equipment in terms of energy efficiency, energy consumption and status evaluation indicators, and improve the monitoring accuracy of multiple equipment in the coal-injected compressed air station.

[0088] In some embodiments of the present application, the historical operation evaluation values ​​of different evaluation indicators of the target initial monitoring data in the previous monitoring cycle are obtained, and the historical operation evaluation value series U of the corresponding evaluation indicators are established according to the time sequence of the preset monitoring time nodes in the previous monitoring cycle. z , U z (U z1 , U z2 , …U ze ), where U zj is the jth historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle, e is the total number of preset monitoring time nodes in the previous monitoring cycle, and z=1, 2, 3, j=1, 2, ..., e;

[0089] Calculate the actual operation evaluation values ​​of different evaluation indicators of the target initial monitoring data in the previous monitoring cycle, and establish the actual operation evaluation value series U0 of the corresponding evaluation indicators in the previous monitoring cycle z , U0 z (U0 z1 , U0 z2 ,…U0 ze ), where U0 zj is the jth actual operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle;

[0090] Based on the historical operation evaluation value series and the actual operation evaluation value series, the historical operation evaluation value and the actual operation evaluation value at the same preset monitoring time node in the same evaluation indicator are subtracted to obtain the operation evaluation value difference;

[0091] According to the difference in the operation evaluation value, the error correction coefficient of the historical operation evaluation value of the corresponding evaluation indicator at the preset monitoring time node in the previous monitoring cycle is set, and the error correction coefficient sequence S is established. Z , S Z (S Z1 , S Z2 ,…S Ze ), where S zj is the error correction coefficient of the jth historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle;

[0092] According to the preset monitoring time nodes of the target initial monitoring data in the current monitoring cycle, determine the node proportion of the target initial monitoring data corresponding to the preset monitoring time nodes, and select the error correction coefficient set with the same proportion in the error correction coefficient sequence S according to the node proportion;

[0093] The error correction coefficients in the error correction coefficient set are averaged to obtain characteristic error correction coefficients, and the characteristic error correction coefficients are set as the error correction coefficients of the corresponding evaluation indicators of the target initial monitoring data at the current preset monitoring time node.

[0094] In this embodiment, the node proportion refers to the ratio of the current preset monitoring time node to the number of all preset monitoring time nodes in the current monitoring cycle. A set of error correction coefficients with the same proportion is obtained according to the node proportion, that is, a set of error correction coefficients corresponding to the same preset monitoring time node in the previous monitoring cycle is obtained. The error correction coefficient set includes at least three error correction coefficients. The characteristic error correction coefficient is obtained by taking the average of the error correction coefficients in the error correction coefficient set.

[0095] In this embodiment, the error correction coefficient series is determined based on the historical operation evaluation value series of the previous monitoring cycle and the actual operation evaluation value series, so as to obtain the error correction coefficient corresponding to the preset monitoring time node in the current monitoring cycle, thereby improving the accuracy of the operation evaluation value of the corresponding evaluation indicator and laying the foundation for the subsequent formulation of energy-saving and consumption-reducing control instructions.

[0096] In some embodiments of the present application, the error correction coefficient of the historical operation evaluation value of the corresponding evaluation indicator at the preset monitoring time node in the previous monitoring cycle is set according to the operation evaluation value difference, including:

[0097] Presetting a first preset operation evaluation value difference interval, a second preset operation evaluation value difference interval, a third preset operation evaluation value difference interval and a fourth preset operation evaluation value difference interval;

[0098] When the operation evaluation value difference is within the first preset operation evaluation value difference interval, the fourth preset error correction coefficient d4 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d4;

[0099] When the operation evaluation value difference is within the second preset operation evaluation value difference interval, the third preset error correction coefficient d3 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d3;

[0100] When the operation evaluation value difference is within the third preset operation evaluation value difference interval, the second preset error correction coefficient d2 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d2;

[0101] When the operation evaluation value difference is in the fourth preset operation evaluation value difference interval, the first preset error correction coefficient d1 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d1;

[0102] Among them, 0.75<d1<d2<1<d3<d4<1.25.

[0103] In this embodiment, the operation evaluation value difference = the historical operation evaluation value of the same evaluation indicator at the same preset monitoring time node - the actual operation evaluation value, the first preset operation evaluation value difference interval < the second preset operation evaluation value difference interval < 0 < the third preset operation evaluation value difference interval < the fourth preset operation evaluation value difference interval.

[0104] In this embodiment, a reasonable error correction coefficient is selected according to the difference in the operating evaluation values, thereby improving the accuracy of the operating evaluation values ​​of the equipment in the next monitoring cycle, conducting a comprehensive analysis of the energy consumption, energy efficiency and status evaluation indicators of the equipment, and monitoring the operating energy efficiency of multiple devices in the coal-injected compressed air station in real time, thereby providing precise energy-saving control.

[0105] In some embodiments of the present application, adjusting monitoring parameters according to the operation evaluation value includes:

[0106] The monitoring parameters include the monitoring frequency of the preset monitoring time node and the number of collection groups of the target initial monitoring data;

[0107] Presetting a first preset operation evaluation value threshold and a second preset operation evaluation value threshold;

[0108] When the operation evaluation value is less than the first preset operation evaluation value threshold, the monitoring frequency of the preset monitoring time node is increased and the number of collection groups of the target initial monitoring data is set to the second preset number of collection groups;

[0109] When the operation evaluation value is between the first preset operation evaluation value threshold and the second preset operation evaluation value threshold, setting the number of collection groups of the target initial monitoring data to the first preset number of collection groups;

[0110] When the operation evaluation value is greater than the second preset operation evaluation value, the monitoring parameter is not adjusted.

[0111] In this embodiment, when the operation evaluation value is smaller, it means that the operation status of the corresponding evaluation index of the equipment is worse, and the monitoring frequency and the number of collection groups of the preset monitoring time node should be increased. When the operation evaluation value is larger, it means that the operation status of the corresponding evaluation index of the equipment is better, and there is no need to adjust the monitoring parameters.

[0112] In this embodiment, by adjusting the monitoring parameters, real-time initial monitoring data of target initial monitoring data with different monitoring frequencies and different preset numbers of collection groups are obtained. Based on the real-time initial monitoring data, the credibility of the operation evaluation value of the corresponding evaluation indicator of the same equipment can be obtained, thereby improving the accuracy of the operation evaluation value and laying the foundation for the subsequent formulation of control instructions.

[0113] In some embodiments of the present application, generating the credibility of the operation evaluation value according to the real-time monitoring data includes:

[0114] Generate a first operation evaluation value corresponding to each preset number of collection groups according to the real-time monitoring data, and obtain an average of the operation evaluation values ​​of the real-time monitoring data according to the multiple first operation evaluation values;

[0115] Generate a first difference value according to the operation evaluation value mean and the operation evaluation value;

[0116] Presetting a first preset difference threshold;

[0117] If the first difference is less than the first preset difference threshold, the credibility is greater than the preset credibility threshold; if the first difference is greater than the first preset difference threshold, the credibility is less than the preset credibility threshold.

[0118] In some embodiments of the present application, judging whether to issue a control instruction according to the credibility includes:

[0119] When the credibility is greater than a preset credibility threshold, multiple preset control instructions are generated, and multiple first-level control plans are generated according to the preset control instructions and the operation evaluation value;

[0120] Establish an optimization model, and generate the expected energy efficiency and expected energy consumption of each first-level control plan corresponding to the equipment according to the optimization model;

[0121] Set the first-level control plan with the highest expected energy efficiency and the lowest preset energy consumption as the second-level control plan;

[0122] Set control instructions according to the secondary control plan, and control the corresponding equipment according to the control instructions.

[0123] In this embodiment, the preset control instructions are generated based on the historical control strategy corresponding to the historical operation evaluation value of the current equipment. Through the optimization model, a control plan that minimizes the energy consumption of the equipment and maximizes the energy efficiency is obtained in multiple first-level control plans, providing strong support for the safe operation and continuous optimized operation of the coal-injected compressed air station.

[0124] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.

Claims

1. A coal injection compressed air station monitoring platform, characterized in that: include: A generation module, used to generate a monitoring data set of a coal injection compressed air station according to a preset monitoring time node; An evaluation module is used to classify the monitoring data in the monitoring data set, obtain the initial monitoring data of different evaluation indicators of each device, input the initial monitoring data into the preset evaluation model of the corresponding evaluation indicator, and obtain the operation evaluation value; The control module is used to adjust the monitoring parameters according to the operation evaluation value, obtain the corresponding real-time monitoring data according to the adjusted monitoring parameters, generate the credibility of the operation evaluation value according to the real-time monitoring data, and determine whether to issue a control instruction according to the credibility.

2. The coal injection compressed air station monitoring platform according to claim 1, characterized in that: Generate monitoring data sets for coal injection compressed air stations based on preset monitoring time nodes, including: Establish a monitoring cycle for the coal-injected compressed air station and set preset monitoring time nodes based on the monitoring results of the previous monitoring cycle; Obtain monitoring data for preset monitoring time nodes; Presetting evaluation indicators, wherein the evaluation indicators include a first evaluation indicator, a second evaluation indicator and a third evaluation indicator; Calculating the correlation between the monitoring data and the first evaluation index, the second evaluation index and the third evaluation index to obtain a first correlation coefficient, a second correlation coefficient and a third correlation coefficient; The monitoring data whose first correlation coefficient, second correlation coefficient or third correlation coefficient is greater than a preset correlation coefficient threshold are screened out, and a monitoring data set is generated.

3. The coal injection compressed air station monitoring platform according to claim 2, characterized in that: The data in the monitoring data set is classified and processed to obtain different types of initial monitoring data for each device, including: Performing a first classification process on the monitoring data in the monitoring data set according to the data source to obtain the monitoring data of each device; Analyze the first correlation coefficient, the second correlation coefficient, and the third correlation coefficient of the monitoring data of each device to obtain the first coefficient difference, the second coefficient difference, and the third coefficient difference between the first correlation coefficient, the second correlation coefficient, and the third correlation coefficient and the preset strong correlation coefficient; The monitoring data of each device is subjected to a second classification according to the relationship between the first coefficient difference, the second coefficient difference, the third coefficient difference and the preset coefficient difference threshold, to obtain the first initial monitoring data of the first evaluation indicator, the second initial monitoring data of the second evaluation indicator and the third initial monitoring data of the third evaluation indicator in the same device.

4. The coal injection compressed air station monitoring platform according to claim 3, characterized in that: Input the initial monitoring data into the corresponding preset evaluation model to obtain the operation evaluation value, including: Set target initial monitoring data; Obtain the target initial monitoring data of the same device at the current preset monitoring time node; Input the target initial monitoring data into the preset evaluation model of the corresponding evaluation index to obtain multiple sub-operation evaluation values, and establish a sub-operation evaluation value sequence M, M = (m1, m2, ...m n1 ), where n1 is the number of target initial monitoring data, m n1 is the sub-run evaluation value of the initial monitoring data of the i-th target; Generate an operation evaluation value H of the corresponding evaluation index of the target initial monitoring data at the current preset monitoring time node according to the sub-operation evaluation value data M; Among them, ai is the weight coefficient of the initial monitoring data of the i-th target, and s0 is the error correction coefficient of the corresponding evaluation index of the initial monitoring data of the target at the current preset monitoring time node.

5. The coal injection compressed air station monitoring platform according to claim 4, characterized in that: Obtain the historical operation evaluation values ​​of different evaluation indicators of the target initial monitoring data in the previous monitoring cycle, and establish the historical operation evaluation value sequence U of the corresponding evaluation indicator according to the time sequence of the preset monitoring time nodes in the previous monitoring cycle z , U z (U z1 , U z2 , …U ze ), where U zj is the jth historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle, e is the total number of preset monitoring time nodes in the previous monitoring cycle, and z=1, 2, 3, j=1, 2, ..., e; Calculate the actual operation evaluation values ​​of different evaluation indicators of the target initial monitoring data in the previous monitoring cycle, and establish the actual operation evaluation value series U0 of the corresponding evaluation indicators in the previous monitoring cycle z , U0 z (U0 z1 , U0 z2 ,…U0 ze ), where U0 zj is the jth actual operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle; Based on the historical operation evaluation value series and the actual operation evaluation value series, the historical operation evaluation value and the actual operation evaluation value at the same preset monitoring time node in the same evaluation indicator are subtracted to obtain the operation evaluation value difference; According to the difference in the operation evaluation value, the error correction coefficient of the historical operation evaluation value of the corresponding evaluation index at the preset monitoring time node in the previous monitoring cycle is set, and the error correction coefficient sequence S is established. Z , S Z (S Z1 , S Z2 ,…S Ze ), where S zj is the error correction coefficient of the jth historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle; According to the preset monitoring time nodes of the target initial monitoring data in the current monitoring cycle, determine the node proportion of the target initial monitoring data corresponding to the preset monitoring time nodes, and select the error correction coefficient set with the same proportion in the error correction coefficient sequence S according to the node proportion; The error correction coefficients in the error correction coefficient set are averaged to obtain characteristic error correction coefficients, and the characteristic error correction coefficients are set as the error correction coefficients of the corresponding evaluation indicators of the target initial monitoring data at the current preset monitoring time node.

6. The coal injection compressed air station monitoring platform according to claim 5, characterized in that: The error correction coefficient of the historical operation evaluation value of the corresponding evaluation indicator at the preset monitoring time node in the previous monitoring cycle is set according to the difference in the operation evaluation value, including: Presetting a first preset operation evaluation value difference interval, a second preset operation evaluation value difference interval, a third preset operation evaluation value difference interval and a fourth preset operation evaluation value difference interval; When the operation evaluation value difference is within the first preset operation evaluation value difference interval, the fourth preset error correction coefficient d4 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d4; When the operation evaluation value difference is within the second preset operation evaluation value difference interval, the third preset error correction coefficient d3 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d3; When the operation evaluation value difference is within the third preset operation evaluation value difference interval, the second preset error correction coefficient d2 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d2; When the operation evaluation value difference is in the fourth preset operation evaluation value difference interval, the first preset error correction coefficient d1 is selected as the error correction coefficient S of the historical operation evaluation value of the zth evaluation indicator at the jth preset monitoring time node in the previous monitoring cycle. zj , that is, S zj =d1; Among them, 0.75<d1<d2<1<d3<d4<1.

25.

7. The coal injection compressed air station monitoring platform according to claim 6, characterized in that: Adjust monitoring parameters based on operational evaluation values, including: The monitoring parameters include the monitoring frequency of the preset monitoring time node and the number of collection groups of the target initial monitoring data; Presetting a first preset operation evaluation value threshold and a second preset operation evaluation value threshold; When the operation evaluation value is less than the first preset operation evaluation value threshold, the monitoring frequency of the preset monitoring time node is increased and the number of collection groups of the target initial monitoring data is set to the second preset number of collection groups; When the operation evaluation value is between the first preset operation evaluation value threshold and the second preset operation evaluation value threshold, setting the number of collection groups of the target initial monitoring data to the first preset number of collection groups; When the operation evaluation value is greater than the second preset operation evaluation value, the monitoring parameter is not adjusted.

8. The coal injection compressed air station monitoring platform according to claim 7, characterized in that: The credibility of the operational evaluation values ​​generated based on real-time monitoring data includes: Generate a first operation evaluation value corresponding to each preset number of collection groups according to the real-time monitoring data, and obtain an average of the operation evaluation values ​​of the real-time monitoring data according to the multiple first operation evaluation values; Generate a first difference value according to the operation evaluation value mean and the operation evaluation value; Presetting a first preset difference threshold; If the first difference is less than the first preset difference threshold, the credibility is greater than the preset credibility threshold; if the first difference is greater than the first preset difference threshold, the credibility is less than the preset credibility threshold.

9. The coal injection compressed air station monitoring platform according to claim 8, characterized in that: Determine whether to issue a control instruction based on the credibility, including: When the credibility is greater than a preset credibility threshold, multiple preset control instructions are generated, and multiple first-level control plans are generated according to the preset control instructions and the operation evaluation value; Establish an optimization model, and generate the expected energy efficiency and expected energy consumption of each first-level control plan corresponding to the equipment according to the optimization model; Set the first-level control plan with the highest expected energy efficiency and the lowest preset energy consumption as the second-level control plan; Set control instructions according to the secondary control plan, and control the corresponding equipment according to the control instructions.

Citation Information

Cited By

  • Diesel mechanical carbon emission determination method

    CN120910385A