Active power distribution network operation state information mining and predicting system and method

By adopting the information mining system of distributed measurement and TFAHP-anti-entropy weight method combination method in the active distribution network, combined with pseudo-measurement and virtual collection, the problem of data redundancy and noise interference is solved, and the distribution network is realized. Accurate prediction and evaluation of operating status improves the reliability of the power grid and the effectiveness of operation and maintenance decisions.

CN118761487AActive Publication Date: 2024-10-11STATE GRID FUJIAN ELECTRIC POWER CO LTD +3
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410725703.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-10-11
Estimated Expiration
2044-06-06

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively mine and analyze the operating status information of active distribution networks, especially when faced with problems such as data redundancy, noise interference, and poor quality. It lacks a systematic and practical evaluation and prediction system, which increases the number of problems. It is difficult to analyze the safety and stability of distribution network.

Method used

Provides an active distribution network operating status information mining and prediction system, including a collection module, a processing module, an evaluation module and a prediction module. It collects and processes operating status information through the distributed measurement principle and uses the TFAHP-anti-entropy weight method combination method. Establish index weights, combine pseudo measurement and virtual collection methods to improve data redundancy, and use LSSVM-RBF to predict load and new energy output.

Benefits of technology

It achieves accurate evaluation and prediction of the operating status of the active distribution network, improves data quality and analysis accuracy, provides flexible grid architecture optimization and operation and maintenance decision support, and enhances the reliability and economy of the distribution network.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761487A_ABST
    Figure CN118761487A_ABST
Patent Text Reader

Abstract

The invention provides an active power distribution network operation state information mining and prediction system and method, and the system at least comprises an acquisition module which is used for collecting the operation state information of electronic equipment at different nodes of a power distribution network based on a distributed measurement principle, and collecting the static information of power grid topology and line impedance; the processing module is used for processing the running state information, including extraction of effective data and identification and cleaning of bad data; key features of the static information are searched, and the state is updated; and the prediction module is used for performing state prediction through the operation state information obtained by the processing module, and the state prediction at least comprises one of load prediction, new energy output prediction and power distribution network operation state prediction. And the optimal state of the distributed power supply access in the power distribution network can be predicted according to the analysis result.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electrical automation technology, and in particular to a system and method for mining and predicting operating status information of an active distribution network. Background Art

[0002] The distribution network is the intermediate bridge between the large power grid and the power users. It has the most direct impact on the reliability of power supply to users. Most power outages of users are caused by distribution network failures. Therefore, its reliable and economical operation has an important impact on the stability of the entire power system. Active distribution network refers to a distribution network with a large number of distributed power sources connected and bidirectional power grid flow, also known as active distribution network. At present, with the access of new energy equipment and power electronic equipment, the grid structure of the distribution network is constantly changing. At the same time, with the development of sensor technology and communication technology, a large number of sensor, monitoring, and communication equipment are connected to the active distribution network. While being able to efficiently obtain information on the operating status of the distribution network, it is also vulnerable to external network attacks, which increases the difficulty of security and stability analysis of the distribution network.

[0003] The data directly collected by the measurement system has problems such as redundancy, noise interference, and poor quality. The access of new energy equipment in different distributed complex nodes increases the difficulty of mining and analyzing the operation status of the distribution network. At the same time, there is a lack of a systematic and practical operation status evaluation and prediction system that can be directly used for power grid analysis. Therefore, a new solution for mining and analyzing the operation status information of active distribution networks is urgently needed. Summary of the invention

[0004] In order to solve the problems existing in the above-mentioned prior art and meet the actual needs of distribution network operation, the present invention provides an active distribution network operation status information mining and prediction system and method. Based on the current status of the active distribution network, a distribution network operation status information mining and analysis method is proposed. At the same time, the optimal state of distributed power source access in the distribution network can be predicted according to the analysis results. Grid dispatching and operation and maintenance personnel can judge the current grid operation status according to the method of the present invention, and compile relevant grid operation and maintenance and engineering plans, thereby optimizing the grid architecture. The present invention is applicable to various types of active distribution networks, including medium voltage and low voltage active distribution networks.

[0005] The present invention specifically adopts the following technical solutions:

[0006] An active distribution network operation status information mining and prediction system, comprising:

[0007] Acquisition module: used to collect the operating status information of electronic equipment at different nodes of the distribution network and collect static information including grid topology and line impedance based on the principle of distributed measurement;

[0008] Processing module: used to process the operation status information, including extraction of valid data and identification and cleaning of bad data; search for key features of static information and update the status;

[0009] Prediction module: used to perform status prediction based on the operating status information obtained by the processing module, and the status prediction includes at least one of load prediction, new energy output prediction and distribution network operating status prediction.

[0010] As a better choice, it generally also includes: an evaluation module; used to classify the operating status information and static information processed by the processing module to form an indicator system. On the basis of rationality verification, the weights of each indicator are established based on the TFAHP-anti-entropy weight method combination method, and then the variable weight theory method is used to optimize the weights to evaluate the operation of the distribution network.

[0011] Furthermore, in the acquisition module, if there is a problem of insufficient measurement configuration of the distribution network, pseudo measurement or virtual acquisition methods are used to improve measurement redundancy:

[0012] For active distribution networks, the specific method of virtual collection is:

[0013] If the node voltage and branch current at one end of the branch are known, the node voltage at the other end of the branch is virtually measured;

[0014] If the node voltages at both ends of the branch are known, the branch current is virtually measured;

[0015] When all the adjacent node voltage vectors of the unknown injection node are known, the voltage of this node can be virtually measured by the node equation;

[0016] When the currents of all branches except one of the branches of a node are known, the currents of the branches with unknown currents are virtually measured;

[0017] The pseudo-measurement includes: load prediction pseudo-measurement and distributed power output prediction pseudo-measurement.

[0018] Furthermore, the method for identifying and cleaning bad data in the processing module is specifically as follows:

[0019] Use the backtracking method to identify bad data, which includes empty data, abnormal data and duplicate data;

[0020] For empty data, use one of the following two methods;

[0021] Remove empty: delete directly from the data set;

[0022] Completion: Use Lagrange interpolation method for interpolation: According to the empty data x iThe first two records and the last record are used to establish a second-order equidistant Lagrange interpolation equation to interpolate the empty data.

[0023] For abnormal data, the Wright test method is used to judge the data value. If |V i |>3σ, the error is a gross error, and the data is considered abnormal and deleted;

[0024] Directly merge duplicate data;

[0025] After cleaning the original data, the data quality of the entire data set is tested. The Wright test method is used to repeat the processing of abnormal data until the data quality Q meets the preset accuracy.

[0026] Furthermore, the specific steps of the TFAHP-anti-entropy weight combination method in the evaluation module are as follows:

[0027] Construct a fuzzy judgment matrix for the constructed index system;

[0028] For a factor in the k-1 layer, compare its subordinate indicators in the kth layer pairwise, and use triangular fuzzy numbers to quantitatively express it to obtain the fuzzy judgment matrix The element a of the fuzzy judgment matrix ij =(l ij ,m ij ,u ij ) is a ij is a closed interval of median, n k is the size of the matrix, i and j are the coordinates of the elements, l≤m≤u, l and u are the lower and upper bounds of the support a respectively;

[0029] Calculate the comprehensive degree value:

[0030] The comprehensive triangular fuzzy number of the kth layer is:

[0031]

[0032] In the formula, X is the number of experts, and the comprehensive judgment matrix of all factors in the kth layer on each factor in the k-1th layer is obtained;

[0033]

[0034] Hierarchical single sorting:

[0035] According to the basic properties of triangular fuzzy numbers, we can obtain Possibilities:

[0036]

[0037] but

[0038]

[0039] represents the single ranking of the factors on the kth level to the hth factor on the k-1th level, represents the i-th factor on the k-th layer, obtained from the above After normalization, we get:

[0040]

[0041] That is, the relative weight of each factor in the kth layer to the hth factor in the k-1th layer is the subjective weight;

[0042] The anti-entropy weight method determines the objective weight:

[0043] Suppose the evaluation problem has m evaluation objects, n evaluation indicators, and the indicator value is x ij (i=1,2,...,n;j=1,2,...,m), the evaluation matrix is ​​X=(x ij )n×m; According to the evaluation matrix X, determine the anti-entropy of each indicator;

[0044]

[0045] In the formula, The objective weight of each indicator is further determined based on the anti-entropy value:

[0046]

[0047] The combined weight

[0048] ω i =sP i +(1-s)Q i

[0049] Where s is the subjective coefficient, which takes values ​​between 0 and 1.

[0050] Furthermore, rationality check is used in the process of weight optimization. The standard is that the indicators retained by screening can reflect more than 90% of the initial indicator information. The information contribution rate is used to measure it. The calculation formula is:

[0051]

[0052] Where: j is the variance of the indicator; m is the total number of indicators in the indicator system after screening; h represents the total number of initial indicators, and the threshold of IN is 90%;

[0053] If the distribution network is transformed or abnormal, the variable weight theory method is used for further optimization. The calculation formula is as follows:

[0054]

[0055] In the formula, ω i is the variable weight value of the i-th indicator, is the original weight value of the i-th indicator, x i is the normalized value of the i-th indicator, n is the number of indicators; μ is the balancing factor.

[0056] Furthermore, the prediction module performs status prediction for the three types of source, load and network respectively;

[0057] The load forecasting uses LSSVM-RBF for ultra-short-term forecasting. First, the data is trained by the least squares support vector machine LSSVM; then the RBF neural network is used to predict the prediction error of the LSSVM prediction value;

[0058] The prediction error of the same time three days before the prediction day is used as input to predict the error of the same time on the current day; the prediction error of LSSVM is collected as the sample of RBF neural network for further training, and the load forecast at time t is carried out on this basis;

[0059] For the prediction of renewable energy output and distribution network operating status, the historical data of renewable energy output and distribution network operating status are used in combination with the same LSSVM-RBF method to predict short-term renewable energy output and distribution network operating status.

[0060] And, a method for mining and analyzing operating status information of an active distribution network, comprising the following steps:

[0061] Based on the principle of distributed measurement, it collects the operating status information of electronic equipment at different nodes of the distribution network and collects static information including grid topology and line impedance;

[0062] Process the collected status information, including extracting valid data and identifying and cleaning bad data; find key features of static information and update the status;

[0063] The obtained operating status information is processed to perform status prediction, wherein the status prediction includes at least one of load prediction, new energy output prediction and distribution network operating status prediction.

[0064] In general, the operation status information includes at least: the voltage of each node, the branch current, the active power and reactive power of the branch, the voltage, current, active power and reactive power of the distributed power grid connection point, and the load rate of the line and distribution transformer;

[0065] The static information at least includes: distribution network architecture, line parameters, line: switch protection action time, average power supply radius, commissioning period, insulation rate, automation coverage rate, contact rate, inter-station contact rate, equipment: commissioning period, type, power outage information, distributed power supply: parameters, type, installed capacity, grid connection rate, heavy and light load distribution transformer, line ratio, distribution transformer, line maximum load rate, FA correct action rate, FA commissioning rate, automation terminal coverage rate, automation terminal online rate, system power outage time, CO 2 with SO 2 Gas emissions;

[0066] The distribution network operation status information is obtained based on the collected operation status information and static information, including at least: line loss rate, proportion of low-voltage users, average three-phase imbalance rate, voltage qualification rate, low-voltage total harmonic distortion rate, voltage drop percentage, load transferability percentage, system average power outage frequency, equipment line failure rate, average power outage ratio due to failure, power outage operation on-time restoration rate, and power supply failure cure rate;

[0067] After processing, the distribution network operation status information is obtained by combining the collected operation status information with the static information, including at least: line loss rate, proportion of low-voltage users, average three-phase imbalance rate, voltage qualification rate, low-voltage total harmonic distortion rate, voltage drop percentage, load transferability percentage, system average power outage frequency, equipment line failure rate, average power outage ratio due to failures, on-time power restoration rate of power outage operations, and power supply failure cure rate.

[0068] Corresponding to the system, as a preferred embodiment, the method also includes the following steps: classifying the processed operating status information and static information to form an indicator system, establishing the weight of each indicator based on the TFAHP-anti-entropy weight method combination method on the basis of rationality verification, and then using the variable weight theory method to optimize the weight to evaluate the operation of the distribution network.

[0069] Furthermore, the load forecasting adopts LSSVM-RBF to perform ultra-short-term forecasting, firstly, the data is trained by the least squares support vector machine LSSVM; then the prediction error of the LSSVM prediction value is predicted by the RBF neural network;

[0070] The prediction error of the same time three days before the prediction day is used as input to predict the error of the same time on the current day; the prediction error of LSSVM is collected as the sample of RBF neural network for further training, and the load forecast at time t is carried out on this basis;

[0071] For the prediction of renewable energy output and distribution network operating status, the historical data of renewable energy output and distribution network operating status are used in combination with the same LSSVM-RBF method to predict short-term renewable energy output and distribution network operating status.

[0072] Compared with the prior art, the present invention and its preferred embodiments have at least the following beneficial effects and advantages:

[0073] 1. Based on the current status of active distribution networks, a system architecture and solution for mining and analyzing the operating status information of active distribution networks is provided, covering all types of existing distribution network architectures. Dispatching and operation and maintenance personnel can mine the operating status information of distribution networks according to the method of the present invention, and flexibly find the optimal and most reliable distribution network architecture, load, distributed energy penetration rate, and optimal solution for installation location.

[0074] 2. It is proposed that while collecting the operating status of the distribution network through distributed measurement, combined with static information such as line impedance and grid architecture, to address the problem of insufficient measurement configuration, pseudo-measurement, virtual collection and other methods are proposed to improve measurement redundancy, which can improve the accuracy of the distribution network status analysis method and the observability of the distribution network. In the process of processing information, Bessel's formula, Wright test method and other methods are proposed for different types of bad data, which can solve problems such as distribution network data redundancy, noise interference, and poor quality, and improve data reliability.

[0075] 3. In the evaluation of the status of the distribution network, the TFAHP-anti-entropy weight method combination method was adopted, which was improved on the basis of the traditional AHP and entropy weight method. The subjective weight and objective weight were combined to avoid the excessive subjectivity caused by human evaluation, while optimizing the independence and integrity of each indicator, and realizing the effective combination of expert experience and objective theory. On the basis of obtaining the preliminary weights, the variable weight theory was used for optimization, which can make up for the shortcoming that the original weights cannot change with the change of operating status, thereby improving the effectiveness and rationality of the output results of the evaluation module.

[0076] 4. In the prediction module, improved prediction methods are provided for the three situations of source, load and network, which improves the breadth and accuracy of the prediction of distribution network status information. The innovative integration of the contents of the four modules of status information acquisition module, processing module, evaluation module and prediction module, based on the active distribution network connected by a large number of distributed power sources, further proposed the operation status information mining and analysis method, which is highly practical and can be directly applied to the actual distribution network construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0077] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments:

[0078] Figure 1 This is a schematic diagram of the topological structure of the active power distribution network corresponding to the virtual acquisition in the first embodiment of the present invention;

[0079] Figure 2 Schematic diagram of a simple distribution network topology structure corresponding to pseudo measurement in Embodiment 1 of the present invention;

[0080] Figure 3 Schematic diagram of an active distribution network operation status information evaluation system proposed in Embodiment 2 of the present invention;

[0081] Figure 4 This is a flow chart of the method in Embodiment 2 of the present invention;

[0082] Figure 5 This is a workflow diagram of the prediction module in Embodiment 3 of the present invention. DETAILED DESCRIPTION

[0083] Hereinafter, the specific embodiments of the present application will be described in detail with reference to the accompanying drawings. According to these detailed descriptions, those skilled in the art can clearly understand the present application and can implement the present application. Without violating the principles of the present application, the features in the various embodiments can be combined to obtain new implementations, or certain features in certain embodiments can be replaced to obtain other preferred implementations.

[0084] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0085] In order to make the features and advantages of this patent more obvious and easy to understand, the following embodiments are specifically described in detail as follows:

[0086] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0087] First, the system solution provided in the embodiment of the present invention includes four modules: a state information collection module, a processing module, an evaluation module, and a prediction module, among which:

[0088] Acquisition module: Based on the principle of distributed measurement, it collects relevant operating status information of intelligent electronic devices at different nodes of the distribution network, and collects static information such as power grid topology and line impedance.

[0089] Processing module: processes the status information collected by the acquisition module, including the extraction of valid data, identification and cleaning of bad data; and searches for key features of static information (grid topology, line impedance, etc.) and updates the status in a timely manner.

[0090] Evaluation module: comprehensively classifies the status information and static information processed by the processing module to form an indicator system covering different aspects of the distribution network. At the same time, it conducts a rationality test and establishes the weight of each indicator based on the TFAHP-anti-entropy weight method combination method. On this basis, the variable weight theory method is finally used to optimize the weight, so as to comprehensively analyze the operation results of the distribution network and measure the operation of the distribution network.

[0091] Prediction module: The evaluation module mines the operating status information and conducts status prediction for the source, load and network, including load prediction, new energy output prediction and distribution network operating status prediction, to help dispatching and operation and maintenance personnel to control and dispatch in advance and improve the economy and reliability of active distribution network operation.

[0092] The evaluation module is a preferred module of the present invention. If this module is not available, the present invention can still achieve its basic purpose. The role of this module makes the function of the overall system more complete, and the output results have a stronger reference value for operation and maintenance personnel.

[0093] As a preferred solution of this embodiment, in the acquisition module, if there is a problem of insufficient measurement configuration of the distribution network, pseudo-measurement, virtual acquisition and other methods can be used to improve measurement redundancy and enhance the observability of the distribution network.

[0094] For active distribution networks, there are four types of virtual acquisition.

[0095] 1. If the node voltage and branch current at one end of the branch are known, the node voltage at the other end of the branch is virtually measured.

[0096] 2. If the node voltages at both ends of the branch are known, the branch current is virtually measured.

[0097] 3. When all the adjacent node voltage vectors of the unknown injection node are known, the voltage of this node can be virtually measured by the node equation.

[0098] 4. Except for one branch of the node, the currents of all other branches are known, so the currents of the unknown current branches are virtually measured.

[0099] Pseudo-measurements are mainly divided into two categories: load forecast pseudo-measurements and distributed power output forecast pseudo-measurements. Load forecast pseudo-measurements have certain errors due to the huge, complex and changeable load of the distribution network. Distributed power output forecast pseudo-measurements can be obtained through weather forecasts combined with historical data forecasts.

[0100] As a preferred solution of this embodiment, the method for identifying and cleaning bad data in the processing module is specifically as follows:

[0101] The backtracking method is used to identify bad data, which includes empty data (data not successfully recorded), abnormal data (data with recorded values ​​outside the normal range) and duplicate data (repetitive data).

[0102] There are two methods for empty data.

[0103] 1. Remove empty. Delete directly from the data set.

[0104] 2. Completion. If the corresponding data is important, use Lagrange interpolation method to interpolate: according to the empty data x i The first two records and the last record are used to establish the second-order equidistant Lagrange interpolation equation P 2 (x i ), and interpolate the empty data.

[0105]

[0106] For abnormal data, the Wright test method is used as follows:

[0107] Export the data value and obtain the data value (X 1 ,X 2 ,…,X n ) With the residual V i , and calculate the standard deviation σ according to Bessel's formula.

[0108]

[0109] Then judge the data value, if it satisfies |V i |>3σ, the error is a gross error and the data is considered abnormal and should be deleted.

[0110] For duplicate data, check and merge them directly.

[0111] After the original data is cleaned, the entire data set needs to be tested for data quality. The Wright test method is also used to repeat the processing of abnormal data until the data quality Q meets the corresponding accuracy. The accuracy value is set to 95% here.

[0112]

[0113] In the formula, N represents the total number of data that meet the Wright criterion, and M represents the total number of data.

[0114] The indicator system of different aspects in the evaluation module can start from the aspects of economy, power supply reliability, power quality, network robustness, sustainable development, and power grid security.

[0115] As a preferred solution of this embodiment, the evaluation module is based on the TFAHP-anti-entropy weight method combination method. The specific steps are as follows:

[0116] After establishing the indicator system, construct the fuzzy judgment matrix.

[0117] For a factor in the k-1 layer, compare its subordinate indicators in the kth layer two by two, and use triangular fuzzy numbers to quantitatively express it, and obtain the fuzzy judgment matrix The element a of the fuzzy judgment matrix ij =(l ij ,m ij ,u ij ) is a ij is a closed interval of median value, m ij Usually it is an integer between 1 and 9.

[0118] Calculate the comprehensive degree value.

[0119] The comprehensive triangular fuzzy number of the kth layer:

[0120]

[0121] In the formula, X is the number of experts, from which we can get the comprehensive judgment matrix of all factors in the kth layer on each factor in the k-1th layer.

[0122]

[0123] Hierarchical single sorting.

[0124] According to the basic properties of triangular fuzzy numbers, we can get Possibility

[0125]

[0126] but

[0127]

[0128] represents the single ranking of the factors on the kth level to the hth factor on the k-1th level, represents the i-th factor on the k-th layer, obtained from the above After normalization, we can get:

[0129]

[0130] That is, the relative weight of each factor in the kth layer to the hth factor in the k-1th layer, which is the subjective weight.

[0131] The anti-entropy weight method determines the objective weights.

[0132] Suppose the evaluation problem has m evaluation objects, n evaluation indicators, and the indicator value is x ij (i=1,2,...,n;j=1,2,...,m), the evaluation matrix is ​​X=(x ij )n×m. According to the evaluation matrix X, the anti-entropy of each indicator is determined.

[0133]

[0134] In the formula, The objective weight of each indicator is further determined based on the anti-entropy value

[0135]

[0136] The combined weight

[0137] ω i =sP i +(1-s)Q i

[0138] Where s is the subjective coefficient and can be 0-1.

[0139] As a preferred solution of this embodiment, the prediction module performs status prediction for three types: source, load, and network. Different methods are used for different aspects. The active distribution network includes a medium and low voltage distribution network connected to distributed power sources of different types, penetration rates, and capacities, including small hydropower, distributed photovoltaics, wind power, and energy storage power sources.

[0140] The specific process is described in detail in the following embodiment 3.

[0141] The key technical details of the solution of the present invention are further introduced through three specific embodiments below:

[0142] Embodiment 1

[0143] In the acquisition module, if there is insufficient configuration of distribution network measurement, the virtual acquisition method can be used to Figure 1 As shown in the figure, the distribution network of this example is an architecture diagram containing multiple different types of distributed power sources, then we can get:

[0144] 1) Known node voltage and branch current The node voltage It is a virtual quantity measurement.

[0145]

[0146] 2) Known node voltage and The branch current It is a virtual quantity measurement.

[0147]

[0148] 3) Known node voltage and Load injection current and photovoltaic power supply current The node voltage It is a virtual quantity measurement.

[0149]

[0150] 4) Known branch current Load injection current and The branch current It is a virtual quantity measurement.

[0151]

[0152] The above virtual measurement has high accuracy and can be treated as real-time measurement.

[0153] The pseudo-measurement method can also be combined. If there is no historical data, the following method can be used. Figure 2 As shown in the figure, the distribution network in this example is a simple distribution network topology diagram. G Inject measurements into the root node; P T1 , P T2 , P T3 , P T4 , P T5 , P T6 For load measurement:

[0154] PT1=KT1(t)PG(t)

[0155] Among them, K T1 (t) is the load distribution coefficient that changes with time and can be processed as follows.

[0156]

[0157] P T1 (t) can be determined by combining the capacity and load type of different distribution transformers. Since changes in time and seasons will cause changes in load types, the K corresponding to each load can be obtained through the load curves corresponding to different typical weather conditions.T1 (t).

[0158] The beneficial effect of the solution of this embodiment is that, considering that due to the different quality of acquisition equipment, data has problems such as redundancy, noise interference, and poor quality, virtual measurement and pseudo measurement can increase the rationality and applicability of data.

[0159] Embodiment 2

[0160] The present invention is applicable to various types of distribution networks, and is particularly applicable to active distribution networks connected to a large number of distributed power sources. Figure 3 and Figure 4 As shown, based on the system design of the overall scheme, a method for mining and analyzing the operating status information of the active distribution network is further provided, including the following steps:

[0161] A1. Based on the principle of distributed measurement, collect the relevant operating status information of intelligent electronic devices at different nodes of the distribution network, and collect static information such as power grid topology and line impedance based on equipment and records.

[0162] The operating status information includes: the voltage of each node, the branch current, the active power and reactive power of the branch, the voltage, current, active power and reactive power of the distributed power grid connection point, the load rate of the line and distribution transformer, etc.

[0163] Static information includes: distribution network architecture, line parameters (line length and type in active distribution network (impedance and capacitance of each type of line are different)), line (switch protection action time, average power supply radius, operation life, insulation rate, automation coverage rate, communication rate, inter-station communication rate), equipment (operation life, type, power outage information), distributed power supply (parameters, type, installed capacity, grid connection rate), heavy and light load distribution transformer, line ratio, distribution transformer, line maximum load rate, FA correct action rate, FA operation rate, automation terminal coverage rate, automation terminal online rate, system power outage time, CO 2 with SO 2 Gas emissions, etc.

[0164] Combining the above operating status information with static information can derive other required distribution network operating status information, including line loss rate (theoretical line loss rate, rated line loss rate), proportion of low-voltage users, average three-phase imbalance rate, voltage qualification rate (busbar voltage qualification rate, substation voltage qualification rate, user voltage qualification rate), low-voltage total harmonic distortion rate, voltage drop percentage, load transferability percentage, system average power outage frequency, equipment line failure rate, average power outage ratio due to failures, on-time power restoration rate of power outage operations, power supply failure cure rate, etc.

[0165] A2. Process the collected status information, including extracting valid data, identifying and cleaning bad data; and find key features for static information (grid topology, line impedance, etc.) and update the status in a timely manner.

[0166] Identification and cleaning of bad data For different types of bad data, Lagrange interpolation method and Wright test method are used respectively. After cleaning by the above methods, the obtained data is once again subjected to Wright test method, and then the data accuracy value is set to 95%, so as to ensure that the obtained data meets the relevant requirements.

[0167] A3. Comprehensively classify the processed status information and static information to form an indicator system covering different aspects of the distribution network, and establish the weight of each indicator based on the TFAHP-anti-entropy weight method combination method. On this basis, the variable weight theory method is finally used to optimize the weight, so as to comprehensively analyze the distribution network operation results and measure the operation status of the distribution network.

[0168] The index system provided in the preferred embodiment of the present invention is as follows Figure 3 As shown in the figure, starting from the five categories of operation economy, power supply reliability, power quality, sustainable development and grid security, it is further subdivided into 22 evaluation indicators, and then the weight of each indicator is established by using the subjective weight statistics of triangular fuzzy hierarchical analysis method and the objective weight statistics of anti-entropy weight method.

[0169] At this time, it is possible to conduct a rationality check on the indicator system. The standard is that the indicators that are screened and retained can reflect more than 90% of the initial indicator information, that is, they are considered effective and reasonable. The information contribution rate can be used to measure it. The calculation formula is

[0170]

[0171] Where: j is the variance of the indicator; m is the total number of indicators in the indicator system after screening; h represents the total number of initial indicators, and the threshold of IN can be set to 90%.

[0172] If the above index weights cannot truly reflect the operating status of the distribution network due to the transformation or abnormality of the distribution network, the present invention adopts the variable weight theory method to perform the last step of optimization on this basis to improve the accuracy of the results. The calculation formula is as follows:

[0173]

[0174] In the formula, ω i is the variable weight value of the i-th indicator, is the original weight value of the i-th indicator, x i is the normalized value of the i-th indicator, n is the number of indicators; μ is the balancing factor, which is usually 0.5.

[0175] A4. Through the above-mentioned mining of the operating status information, status prediction is performed for the source, load, and network, including load prediction, new energy output prediction, and distribution network operating status prediction. The specific method can be seen in Example 3. Through status prediction, it can help dispatchers and operation and maintenance personnel to make relevant adjustments to the distribution network in advance, which can improve the economy and reliability of the operation of the active distribution network.

[0176] Embodiment 3

[0177] Furthermore, the load forecast in the forecast module of the solution of the present invention can use LSSVM-RBF for ultra-short-term forecasting. The least squares support vector machine (LSSVM) is excellent in training speed. The main process steps are as follows:

[0178] Given a training set S = {(x i ,y i ), i = 1, 2, ..., l}, where x i is the i-th input vector, y i Corresponding to x i The target value of l is the number of samples. The goal of the regression problem is to determine the optimal regression function f(x), where ω is the weight vector, b is the constant deviation, and x is the input variable matrix.

[0179] f(x)=ω T x+b

[0180] In the least squares support vector machine, the optimization problem corresponding to the regression problem is shown as follows, where e is the slack variable and γ is the penalty coefficient.

[0181]

[0182]

[0183] The Lagrangian function corresponding to the least squares support vector machine and its optimal value condition are as follows, where α is the Lagrangian coefficient:

[0184]

[0185] The Gaussian radial basis RBF kernel is selected as the kernel function, as shown below, and σ is the kernel function parameter.

[0186]

[0187] Writing the above formula in matrix form and eliminating ω and e, we can get the least squares support vector machine regression model:

[0188]

[0189] Then the RBF neural network is used to predict the prediction error of the LSSVM prediction value.

[0190] RBF neural network is usually divided into three layers: input layer, hidden layer and output layer. The input layer is composed of the input nodes of the sample, which only transmits the sample data. The hidden layer is generally composed of neurons with Gaussian radial basis function G(x) as the kernel function. The kernel function can map the sample from low-dimensional linear inseparable to high-dimensional linear separable space. The number of neurons is determined by the specific problem and network type, and is generally set to (N+2) times the input layer data type. The output layer is generally described by a simple linear function. The final prediction result is obtained by linearly weighting the output of the hidden layer neurons.

[0191] The core of the RBF neural network lies in the hidden layer. The kernel function generally used in the hidden layer is the Gaussian function, and its formula is as follows:

[0192]

[0193] In the formula, R i is the output value of the i-th unit of the hidden layer neuron, x is the input sample, is the center vector of the basis function of the i-th unit with the same dimension as the input sample, σ is the width of the basis function, ||xc i || is the vector xc i The Euclidean norm of .

[0194] The prediction error of the same time three days before the prediction day is used as input to predict the error of the same time on the current day. The prediction error of LSSVM is collected as a sample of RBF neural network for a large number of training. On this basis, load forecasting is performed at time t. The basic process is as follows: Figure 5 shown.

[0195] The prediction method of renewable energy output and distribution network operating status is similar to load prediction. The historical data of renewable energy output and distribution network operating status can also be combined with the LSSVM-RBF method to predict short-term renewable energy output and distribution network operating status.

[0196] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. For those skilled in the art, various changes, modifications, substitutions and variations of these embodiments are made without departing from the principles and spirit of the present invention, and still fall within the scope of protection of the present invention.

[0197] The above system and method provided in this embodiment can be stored in a computer-readable storage medium in a coded form and implemented in the form of a computer program, and the basic parameter information required for calculation is input through computer hardware, and the calculation result is output.

[0198] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0199] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0200] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0201] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0202] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

[0203] This patent is not limited to the above-mentioned optimal implementation mode. Anyone can derive other forms of active distribution network operation status information mining and prediction systems and methods under the inspiration of this patent. All equal changes and modifications made according to the scope of the patent application of the present invention should be covered by this patent.

Claims

1. An active distribution network operation status information mining and prediction system, characterized in that: include: Acquisition module: used to collect the operating status information of electronic equipment at different nodes of the distribution network and collect static information including grid topology and line impedance based on the principle of distributed measurement; Processing module: used to process the operation status information, including extraction of valid data and identification and cleaning of bad data; Find key features of static information and update the status; Prediction module: used to perform status prediction based on the operating status information obtained by the processing module, and the status prediction includes at least one of load prediction, new energy output prediction and distribution network operating status prediction.

2. The active distribution network operation status information mining and prediction system according to claim 1 is characterized in that: Also includes: Evaluation module; It is used to classify the operating status information and static information processed by the processing module to form an indicator system. On the basis of rationality verification, the weights of each indicator are established based on the TFAHP-anti-entropy weight method combination method, and then the variable weight theory method is used to optimize the weights to evaluate the operation of the distribution network.

3. The active distribution network operation status information mining and prediction system according to claim 1, characterized in that: In the acquisition module, if there is a problem of insufficient distribution network measurement configuration, pseudo measurement or virtual acquisition methods are used to improve measurement redundancy: For active distribution networks, the specific method of virtual collection is: If the node voltage and branch current at one end of the branch are known, the node voltage at the other end of the branch is virtually measured; If the node voltages at both ends of the branch are known, the branch current is virtually measured; When all the adjacent node voltage vectors of the unknown injection node are known, the voltage of this node can be virtually measured by the node equation; When the currents of all branches except one of the branches of a node are known, the currents of the branches with unknown currents are virtually measured; The pseudo-measurement includes: load prediction pseudo-measurement and distributed power output prediction pseudo-measurement.

4. The active distribution network operation status information mining and prediction system according to claim 1, characterized in that: The method for identifying and cleaning bad data in the processing module is specifically as follows: Use the backtracking method to identify bad data, which includes empty data, abnormal data and duplicate data; For empty data, use one of the following two methods; Remove empty: delete directly from the data set; Completion: Use Lagrange interpolation method for interpolation: According to the empty data x i The first two records and the last record are used to establish a second-order equidistant Lagrange interpolation equation to interpolate the empty data. For abnormal data, the Wright test method is used to judge the data value. If |V i |>3σ, the error is a gross error, and the data is considered abnormal and deleted; Directly merge duplicate data; After cleaning the original data, the data quality of the entire data set is tested. The Wright test method is used to repeat the processing of abnormal data until the data quality Q meets the preset accuracy.

5. The active distribution network operation status information mining and prediction system according to claim 2, characterized in that: The specific steps of the TFAHP-anti-entropy weight combination method in the evaluation module are as follows: Construct a fuzzy judgment matrix for the constructed index system; For a factor in the k-1 layer, compare its subordinate indicators in the kth layer pairwise, and use triangular fuzzy numbers to quantitatively express it to obtain the fuzzy judgment matrix The element a of the fuzzy judgment matrix ij =(l ij ,m ij ,u ij ) is a ij is a closed interval of median, n k is the size of the matrix, i and j are the coordinates of the elements, l≤m≤u, l and u are the lower and upper bounds of the support a respectively; Calculate the comprehensive degree value: The comprehensive triangular fuzzy number of the kth layer is: In the formula, X is the number of experts, and the comprehensive judgment matrix of all factors in the kth layer on each factor in the k-1th layer is obtained; Hierarchical single sorting: According to the basic properties of triangular fuzzy numbers, we can obtain Possibilities: but represents the single ranking of the factors on the kth level to the hth factor on the k-1th level, represents the i-th factor on the k-th layer, obtained from the above After normalization, we get: That is, the relative weight of each factor in the kth layer to the hth factor in the k-1th layer is the subjective weight; The anti-entropy weight method determines the objective weight: Suppose the evaluation problem has m evaluation objects, n evaluation indicators, and the indicator value is x ij (i=1,2,...,n;j=1,2,...,m), the evaluation matrix is ​​X=(x ij )n×m; According to the evaluation matrix X, determine the anti-entropy of each indicator; In the formula, The objective weight of each indicator is further determined based on the anti-entropy value: The combined weight ω i =sP i +(1-s)Q i Where s is the subjective coefficient, which takes values ​​between 0 and 1.

6. The active distribution network operation status information mining and prediction system according to claim 5, characterized in that: In the process of weight optimization, rationality check is adopted. The standard is that the indicators retained by screening can reflect more than 90% of the initial indicator information. The information contribution rate is used to measure. The calculation formula is: Where: j is the variance of the indicator; m is the total number of indicators in the indicator system after screening; h represents the total number of initial indicators, and the threshold of IN is 90%; If the distribution network is transformed or abnormal, the variable weight theory method is used for further optimization. The calculation formula is as follows: In the formula, ω i is the variable weight value of the i-th indicator, is the original weight value of the i-th indicator, x i is the normalized value of the i-th indicator, n is the number of indicators; μ is the balancing factor.

7. The active distribution network operation status information mining and prediction system according to claim 1, characterized in that: The prediction module performs status prediction for the three types of source, load and network respectively; The load forecasting uses LSSVM-RBF for ultra-short-term forecasting. First, the data is trained by the least squares support vector machine LSSVM; then the RBF neural network is used to predict the prediction error of the LSSVM prediction value; The prediction error of the same time three days before the prediction day is used as input to predict the error of the same time on the current day; the prediction error of LSSVM is collected as the sample of RBF neural network for further training, and the load forecast at time t is carried out on this basis; For the prediction of renewable energy output and distribution network operating status, the historical data of renewable energy output and distribution network operating status are used in combination with the same LSSVM-RBF method to predict short-term renewable energy output and distribution network operating status.

8. A method for mining and analyzing operating status information of an active distribution network, characterized in that: The following steps are involved: Based on the principle of distributed measurement, it collects the operating status information of electronic equipment at different nodes of the distribution network and collects static information including grid topology and line impedance; Process the collected status information, including extracting valid data and identifying and cleaning bad data; Find key features of static information and update the status; The obtained operating status information is processed to perform status prediction, wherein the status prediction includes at least one of load prediction, new energy output prediction and distribution network operating status prediction.

9. The active distribution network operation status information mining and prediction system according to claim 8, characterized in that: The following steps are also included: The processed operating status information and static information are classified to form an indicator system. On the basis of rationality test, the weight of each indicator is established based on the TFAHP-anti-entropy weight method combination method, and then the variable weight theory method is used to optimize the weight to evaluate the operation of the distribution network.

10. The method for mining and analyzing the operating status information of the active power distribution network according to claim 8, characterized in that: The load forecasting adopts LSSVM-RBF to perform ultra-short-term forecasting. First, the data is trained by the least squares support vector machine LSSVM; then the prediction error of the LSSVM prediction value is predicted by the RBF neural network; The prediction error of the same time three days before the prediction day is used as input to predict the error of the same time on the current day; the prediction error of LSSVM is collected as the sample of RBF neural network for further training, and the load forecast at time t is carried out on this basis; For the prediction of renewable energy output and distribution network operating status, the historical data of renewable energy output and distribution network operating status are used in combination with the same LSSVM-RBF method to predict short-term renewable energy output and distribution network operating status.

Citation Information

Patent Citations

  • Power distribution network fault prediction system and method based on big data technology

    CN113902164A

  • OS2-based power grid intelligent splicing model

    CN117833370A

  • Distributed state estimation method and system for power distribution network

    CN117973894A

  • Method and system for comprehensive evaluation of resilience of power distribution network

    WO2023035499A1

  • AU2020104000A4