Short-circuit fault-based voltage tolerance test method and system for network-building type energy storage system
By using the grid simulation source and variable impedance to simulate grid faults in the grid-type energy storage system, and setting the transient Thevenin equivalent voltage and active power state, the problem of incomplete simulation of grid faults is solved, and the grid-type energy storage system is realized. The system's efficient voltage withstand test reduces the risk and operational difficulty of manual short-circuit tests.
Patent Information
- Application Number
- CN202410862731.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-18
AI Technical Summary
The simulation of power grid faults in the existing technology is not comprehensive, resulting in the inability to fully simulate the response characteristics of network-type energy storage under power grid faults. In addition, artificial short-circuit tests have safety risks and operational difficulties, and the power grid simulation source cannot accurately reflect the real power grid conditions.
Using the voltage withstand test method of the grid-type energy storage system based on short-circuit fault, by connecting the grid simulation source and variable impedance to the grid-type energy storage system, setting the transient Thevenin equivalent voltage amplitude and active power state, and obtaining The grid-side transient Thevenin equivalent voltage amplitude is used as the transient PCC point voltage amplitude. After satisfying the constraints, the variable impedance and the output voltage amplitude during the power grid simulation source fault are set to conduct a voltage withstand test.
It realizes the test of the response characteristics of the networked energy storage system under real power grid faults, enhances the diversity and flexibility of fault simulation, can more accurately reflect the performance of the system under power grid faults, and reduces the safety of artificial short-circuit tests. Risks and operational difficulty.
Smart Images

Figure CN118795290A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of grid-connected energy storage testing, and relates to a voltage tolerance testing method and system for a grid-connected energy storage system based on a short-circuit fault. Background Art
[0002] Grid-connected energy storage usually adopts a power synchronization strategy that simulates synchronous generators. It can achieve synchronization without the help of a phase-locked loop, which can improve the stability and flexibility of the system after a high proportion of new energy generators are connected to the grid. Since it does not rely on the grid phase, it can operate stably in both grid-connected and off-grid modes. In addition, since the grid-connected converter simulates the characteristics of the synchronous generator, it can provide sufficient inertial support and has good stability performance under weak grids.
[0003] Currently, low-voltage and zero-voltage tolerance tests for grid-connected energy storage systems are mainly carried out in two ways: artificial short-circuit tests and grid simulation sources.
[0004] The artificial short-circuit test can verify the short-circuit current tolerance of the grid-type energy storage system by artificially creating a symmetrical / asymmetrical short circuit in the transmission line, determine whether its protection action is correct after the short circuit is grounded, and the active and reactive current support capacity of the grid-type energy storage system, to ensure that it can effectively support the grid voltage and frequency during a fault, and ensure the safe and reliable operation of the power system. However, the artificial short-circuit test has the following limitations: (1) Large environmental impact: In some scenarios, flying devices or shooting through metal arc wires are used to create artificial short circuits, which are easily affected by wind at high altitudes, making the operation difficult and unable to accurately determine the contact time; (2) High safety risks: Artificial short circuits are created by winding copper wires on the ground, which poses a threat to personnel safety. At the same time, the use of flying devices or shooting methods may lead to contact with non-test lines, inadequate traction, etc. If the metal arc does not fuse normally, it may also cause a long-term short circuit, causing power system accidents; (3) There are limitations: artificial circuits are generally realized by creating metallic short circuits. The voltage phase jump at the point of common coupling (PCC) is inductive, while in reality, the short-circuit current is capacitive under conditions such as ground capacitance. Artificial circuits cannot fully reflect the specific conditions of the grid-type energy storage system under various voltage disturbances; at the same time, for the sake of grid safety, the number of artificial circuits should not be set too much and the number of short-circuit points should be selected less, which can only partially reflect the actual situation of the grid-type energy storage system being affected by the short circuit.
[0005] The grid-connected energy storage test method based on the grid simulation source is to connect one or more energy storage units in the grid-connected energy storage power station to the grid simulation source, and use the grid simulation source to set the voltage change, so as to test the low and high voltage tolerance of the energy storage unit. This method is safer, but there are still some shortcomings: it does not consider the adaptability of the grid strength: the equivalent impedance of the grid simulation source on the grid side is usually not adjustable or is not set according to the equivalent impedance of the grid when the energy storage unit is actually connected to the grid, resulting in a deviation between the grid simulation source and the artificial short-circuit test data; the grid fault simulation is not comprehensive: the existing grid simulation source test method usually tests the low and high voltage tolerance of the energy storage unit by changing the voltage amplitude. When a metallic short circuit or a capacitive grounding short circuit occurs in the system, the existing test method does not consider the impact of the voltage jump at the PCC point, resulting in the inability to fully simulate the response characteristics of the grid-connected energy storage under the condition of a grid fault. Summary of the invention
[0006] The purpose of the present invention is to solve the problem that the power grid fault simulation in the prior art is not comprehensive, resulting in the inability to fully simulate the response characteristics of the grid-connected energy storage under power grid fault conditions, and to provide a voltage tolerance test method and system for a grid-connected energy storage system based on a short-circuit fault.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] The present invention proposes a voltage tolerance test method for a grid-connected energy storage system based on a short-circuit fault, comprising the following steps:
[0009] Connect the grid simulation source and the variable impedance to the grid-type energy storage system to be tested, and set the transient Thevenin equivalent voltage amplitude and the active power state of the grid-type energy storage system to be tested;
[0010] Obtain the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage system to be tested, and the equivalent short-circuit impedance during a short-circuit fault;
[0011] According to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault, the grid-side transient Thevenin equivalent voltage amplitude is obtained as the transient PCC point voltage amplitude;
[0012] The voltage amplitude of the transient PCC point meets the constraint conditions. After setting the variable impedance and the output voltage amplitude during the grid simulation source fault, the voltage tolerance test is carried out to obtain data that meets the full active power release state during the fault period, thereby realizing the voltage tolerance test.
[0013] Preferably, the grid-side equivalent impedance of the grid-type energy storage system to be tested is obtained, specifically:
[0014] Z g =R g +jXg
[0015] Among them, Z g is the grid-side equivalent impedance of the grid-type energy storage system to be tested, R g is the resistance of the equivalent impedance on the grid side, j is an imaginary number, X g is the inductive reactance of the equivalent impedance on the grid side.
[0016] Preferably, the equivalent short-circuit impedance during a short-circuit fault is obtained, specifically:
[0017] Z sc =R sc +jX sc
[0018] Among them, Z sc is the equivalent short-circuit impedance during a short-circuit fault, R sc is the resistance of the short-circuit impedance, X sc is the reactance of the short-circuit impedance, and j is an imaginary number.
[0019] Preferably, the step of obtaining the grid-side transient Thevenin equivalent voltage amplitude as the transient PCC point voltage amplitude according to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault is specifically as follows:
[0020]
[0021] Among them, U t ' h is the transient Thevenin equivalent voltage amplitude on the grid side, U g is the steady-state output voltage of the power grid simulation source, Z g is the equivalent impedance of the energy storage grid to be tested, Z sc is the equivalent short-circuit impedance during a short-circuit fault.
[0022] Preferably, the setting of the transient Thevenin equivalent voltage amplitude and the active power state of the grid-connected energy storage system to be tested is specifically: setting the transient Thevenin equivalent voltage amplitude to 0 and the active power of the grid-connected energy storage system to be tested to a fully charged state.
[0023] Preferably, the transient PCC point voltage amplitude satisfies the constraint conditions, specifically:
[0024] If the voltage amplitude at the transient PCC point is within the range of ±5% of the steady-state output voltage of the power grid simulation source, the voltage amplitude at the transient PCC point satisfies the constraint condition;
[0025] If the transient PCC voltage amplitude is not within the range of ±5% of the steady-state output voltage of the power grid simulation source, the equivalent short-circuit impedance Z during the reacquisition short-circuit fault is sc , calculate the transient Thevenin equivalent voltage amplitude U on the grid sidet ' h As the transient PCC point voltage amplitude, until the obtained transient PCC point voltage amplitude is within the range of ±5% of the steady-state output voltage of the power grid simulation source.
[0026] Preferably, the voltage withstand test is performed after setting the variable impedance and the output voltage amplitude during the power grid simulation source fault, specifically:
[0027] Set variable impedance to Z th =R th +jX th ; Among them, R th is the Thevenin equivalent resistance, X th is the Thevenin equivalent inductive reactance, j is an imaginary number; the output voltage amplitude during the grid simulation source fault is set to the amplitude of the no-load grid side voltage.
[0028] The present invention proposes a short-circuit fault-based grid-type energy storage system voltage tolerance test system, comprising:
[0029] The system initialization module is used to connect the grid simulation source and the variable impedance to the grid-type energy storage system to be tested, and to set the transient Thevenin equivalent voltage amplitude and the active power state of the grid-type energy storage system to be tested;
[0030] The first data acquisition module is used to obtain the steady-state output voltage of the power grid simulation source, the grid-side equivalent impedance of the grid-type energy storage system to be tested, and the equivalent short-circuit impedance during a short-circuit fault;
[0031] The second data acquisition module is used to obtain the grid-side transient Thevenin equivalent voltage amplitude as the transient PCC point voltage amplitude according to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault;
[0032] The voltage tolerance test module is used to ensure that the voltage amplitude of the transient PCC point meets the constraint conditions, set the variable impedance and the output voltage amplitude during the grid simulation source fault, and then perform the voltage tolerance test to obtain the data that meets the full active power release state during the fault period to realize the voltage tolerance test.
[0033] An electronic device includes a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the steps of a method for voltage tolerance testing of a grid-connected energy storage system based on a short-circuit fault are implemented.
[0034] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of a voltage tolerance test method for a grid-connected energy storage system based on a short-circuit fault.
[0035] Compared with the prior art, the present invention has the following beneficial effects:
[0036] The present invention proposes a voltage tolerance test method for a grid-type energy storage system based on a short-circuit fault. By connecting a grid simulation source and a variable impedance to a grid-type energy storage system, the method allows the user to set the transient Thevenin equivalent voltage amplitude and the active power state, thereby simulating different types of grid faults, and increasing the diversity and flexibility of fault simulation. By obtaining the transient Thevenin equivalent voltage amplitude of the grid side as the transient PCC point voltage amplitude, the voltage amplitude during the simulated grid fault is accurately controlled, so that the test results are more accurate and can better reflect the response characteristics of the grid-type energy storage system under a real grid fault. After the transient PCC point voltage amplitude meets the constraint conditions, the variable impedance and the output voltage amplitude during the grid simulation source fault are set, which can simulate a more realistic grid fault scenario, including the development, duration and recovery process of the fault. Finally, the data that satisfies the full active power state during the fault period can be obtained to comprehensively analyze the response characteristics of the grid-type energy storage system under a grid fault. Therefore, the method proposed in the present invention can solve the problem that the grid fault simulation in the prior art is not comprehensive, resulting in the inability to fully simulate the response characteristics of the grid-type energy storage under the condition of a grid fault. The method calculates the Thevenin equivalent circuit under a short-circuit fault, sets the grid-side voltage amplitude, phase angle and grid-side equivalent impedance at the time of the fault, so that the method can simulate the artificial short-circuit test conditions of the grid-type energy storage system without conducting an artificial short-circuit test, and verify the low-voltage tolerance of the grid-type energy storage system. It is suitable for the test and testing of the grid-type energy storage system / energy storage power station, especially the high and low voltage tolerance test of the grid-type energy storage system / energy storage power station. The artificial short-circuit test conditions can be simulated using a grid simulation source without conducting an artificial short-circuit test, and the response characteristics of the grid-type energy storage under the artificial short-circuit test can be obtained. It has a wider range of high and low voltage tolerance tests for grid-type energy storage than the artificial short-circuit test, and can effectively ensure the safety of personnel, equipment and the power grid.
[0037] The present invention proposes a short-circuit fault-based grid-type energy storage system voltage tolerance test system, which implements voltage tolerance test by dividing the system into a system initialization module, a first data acquisition module, a second data acquisition module and a voltage tolerance test module. The modular concept is adopted to make each module independent of each other, which is convenient for unified management of each module. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0039] Figure 1 The present invention is a flow chart of a voltage tolerance test method for a grid-type energy storage system based on a short-circuit fault.
[0040] Figure 2 is the transient PCC point voltage amplitude U during the test process of the present invention pcc , phase angle θ pcc Calculation diagram of .
[0041] Figure 3 It is a detailed flow chart of the high and low voltage tolerance test method of the grid-type energy storage system of the present invention.
[0042] Figure 4 The diagrams of the voltage amplitude and phase angle of the power grid simulation source of the present invention are shown in FIG. 1 (a) is the voltage amplitude result diagram; and (b) is the phase angle result diagram).
[0043] Figure 5 The figure is an experimental result diagram of the invention effect based on the measured data and simulation data of the grid-type energy storage in Linzhou, Tibet ((a) is the instantaneous value of the high-voltage side voltage of the transformer measured by the grid-type energy storage in Linzhou, Tibet; (b) is the instantaneous value of the high-voltage side voltage of the transformer in the simulation data; (c) is the active current of the energy storage converter measured by the grid-type energy storage in Linzhou, Tibet; (d) is the active current of the energy storage converter in the simulation data; (e) is the reactive current of the energy storage converter measured by the grid-type energy storage in Linzhou, Tibet; (f) is the reactive current of the energy storage converter in the simulation data).
[0044] Figure 6 This is a diagram of a voltage tolerance test system for a grid-type energy storage system based on a short-circuit fault according to the present invention.
[0045] Figure 7 The figure is a schematic structural diagram of an electronic device of the present invention. DETAILED DESCRIPTION
[0046] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0047] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0048] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0049] In the description of the embodiments of the present invention, it should be noted that if the terms "upper", "lower", "horizontal", "inner", etc. indicate an orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship in which the product of the invention is usually placed when in use, it is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0050] In addition, if the term "horizontal" appears, it does not mean that the component must be absolutely horizontal, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", which does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0051] The present invention is further described in detail below in conjunction with the accompanying drawings:
[0052] The present invention proposes a voltage tolerance test method for a grid-connected energy storage system based on a short-circuit fault, such as Figure 1 and Figure 2 As shown, the following steps are included:
[0053] S1. Connect the grid simulation source and the variable impedance to the grid-type energy storage system to be tested, and set the transient Thevenin equivalent voltage amplitude and the active power state of the grid-type energy storage system to be tested;
[0054] The setting of the transient Thevenin equivalent voltage amplitude and the active power state of the grid-connected energy storage system to be tested is specifically: setting the transient Thevenin equivalent voltage amplitude to 0 and the active power of the grid-connected energy storage system to be tested to a fully charged state.
[0055] S2, obtaining the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage system to be tested, and the equivalent short-circuit impedance during a short-circuit fault;
[0056] Obtain the grid-side equivalent impedance of the grid-type energy storage system to be tested, specifically:
[0057] Z g =R g +jX g
[0058] Among them, Z g is the grid-side equivalent impedance of the grid-type energy storage system to be tested, R gis the resistance of the equivalent impedance on the grid side, j is an imaginary number, X g is the inductive reactance of the equivalent impedance on the grid side.
[0059] Get the equivalent short-circuit impedance during a short-circuit fault, specifically:
[0060] Z sc =R sc +jX sc
[0061] Among them, Z sc is the equivalent short-circuit impedance during a short-circuit fault, R sc is the resistance of the short-circuit impedance, X sc is the reactance of the short-circuit impedance, and j is an imaginary number.
[0062] S3, according to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault, the grid-side transient Thevenin equivalent voltage amplitude is obtained as the transient PCC point voltage amplitude;
[0063] The step of obtaining the grid-side transient Thevenin equivalent voltage amplitude as the transient PCC point voltage amplitude according to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault is specifically as follows:
[0064]
[0065] Among them, U t ' h is the transient Thevenin equivalent voltage amplitude on the grid side, U g is the steady-state output voltage of the power grid simulation source, Z g is the equivalent impedance of the energy storage grid to be tested, Z sc is the equivalent short-circuit impedance during a short-circuit fault.
[0066] S4. The voltage amplitude at the transient PCC point meets the constraint conditions. After setting the variable impedance and the output voltage amplitude during the grid simulation source fault, a voltage tolerance test is performed to obtain data that meets the full active power release state during the fault period to implement the voltage tolerance test.
[0067] The transient PCC point voltage amplitude satisfies the constraint conditions, specifically:
[0068] If the voltage amplitude at the transient PCC point is within the range of ±5% of the steady-state output voltage of the power grid simulation source, the voltage amplitude at the transient PCC point satisfies the constraint condition;
[0069] If the transient PCC voltage amplitude is not within the range of ±5% of the steady-state output voltage of the power grid simulation source, the equivalent short-circuit impedance Z during the reacquisition short-circuit fault is sc , calculate the transient Thevenin equivalent voltage amplitude U on the grid sidet ' h As the transient PCC point voltage amplitude, until the obtained transient PCC point voltage amplitude is within the range of ±5% of the steady-state output voltage of the power grid simulation source.
[0070] The voltage withstand test is performed after setting the variable impedance and the output voltage amplitude during the power grid simulation source fault, specifically:
[0071] Set variable impedance to Z th =R th +jX th ; Among them, R th is the Thevenin equivalent resistance, X th is the Thevenin equivalent inductive reactance, j is an imaginary number; the output voltage amplitude during the grid simulation source fault is set to the amplitude of the no-load grid side voltage.
[0072] Combine the following Figure 3 The test method is described in detail:
[0073] 1) Under no-load condition, measure the current grid-side voltage amplitude U g and phase angle θ g , denoted as U g =U g ∠θ g ;
[0074] 2) Obtain the grid-side equivalent impedance resistance R of the grid-type energy storage system to be tested through grid-side impedance testing, grid strength historical data record query, etc. g With inductive reactance X g , denoted as the grid-side equivalent impedance Z of the grid-type energy storage system to be tested g =R g +jX g ;
[0075] Set the steady-state output voltage of the grid simulation source to U g =U g ∠θ g ;
[0076] 3) Carry out zero voltage tolerance test of the grid-connected energy storage system to be tested, that is, the transient Thevenin equivalent voltage amplitude U pcc is 0;
[0077] 4) Set the active power output of the grid-connected energy storage system to be tested to 100% P N ;
[0078] 5) Obtain the equivalent short-circuit impedance Z during short-circuit fault sc is a combination of a resistor and an inductor with a very small impedance value, namely Z sc =R sc +jX sc ;
[0079] 6) The transient Thevenin equivalent voltage amplitude U on the grid side is calculated by the following formula: t ' h , phase angle θ' th , the transient Thevenin equivalent voltage amplitude U t ' h As the transient PCC point voltage amplitude, denoted as U' th =U' th ∠θ' th ;
[0080]
[0081] 7) Verify whether the calculated transient PCC voltage amplitude is within the error range; the error is the steady-state output voltage amplitude U of the grid simulation source g ±5% (under zero voltage tolerance test, the error is +5% of the steady-state output voltage amplitude of the grid simulation source), that is, ±0.05U g (Zero voltage withstand test is +0.05U g ). If it is within the error range, proceed to the next step, otherwise return to step 5) and re-value the equivalent short-circuit impedance Z sc ;
[0082] 8) Set the variable impedance value to Z th =R th +jX th ; Set the output voltage amplitude and phase angle of the grid simulation source at time t0 from the initial value U g ∠θ g Jump to U' th ∠θ' th ; At time t1, the grid simulation source voltage returns to the initial value U g ∠θ g The voltage curve is shown in the attached Figure 4 As shown, then start the test;
[0083] 9) Record the changes in terminal voltage, active current and reactive current of the grid-type energy storage system in the interval t0 to t1;
[0084] 10) Set the output active power of the grid-connected energy storage system to be tested to -100%P N , repeat steps 6) to 9);
[0085] 11) Change the metallic short-circuit equivalent impedance Z sc , respectively, U t ' h Value is U g 20%, 40%, 60%, 80%, repeat steps 5) to 10);
[0086] 12) Carry out the high voltage tolerance test of the grid-connected energy storage system to be tested. First, t ' h Value is U g 115%;
[0087] 13) At this time, take the equivalent short-circuit impedance Z during the fault sc A large capacitive impedance R sc -jX sc , repeat steps 5) to 10);
[0088] 14) Change the equivalent short-circuit impedance Z sc , respectively, U t ' h Value is U g 120%, 125%, 130%, repeat step 13).
[0089] In order to prove the effectiveness of the proposed high and low voltage tolerance test method of the grid-connected energy storage system simulating the actual short-circuit fault of the power grid, simulation and measured data analysis were carried out. The simulation model was built with reference to the grid-connected energy storage power station in Linzhou, Tibet, and the zero voltage tolerance test process based on the grid simulation source and the artificial short circuit was simulated and compared with the measured data. According to the above method, the simulation parameters are set as follows:
[0090] 1. Extract the short-circuit ratio (SCR, also known as grid strength) data of the grid-connected point of the Linzhou grid-connected energy storage power station in Tibet, take the estimated value of SCR = 4.0, the grid-connected point voltage level is 35kV, record X / R = 10, that is, the grid-side equivalent impedance is Z g =3.0625+j30.625Ω;
[0091] 2. The generator side impedance data refers to the typical grid-connected energy storage impedance data, and the estimated value is about Z. c =0.1225+j1.225Ω;
[0092] 3. The grid-side no-load voltage is estimated to be 1∠0° according to the per-unit value of the grid-side line voltage;
[0093] 4. The voltage at the machine side under full charge and full discharge conditions is calculated according to the rated capacity of the energy storage unit, and the estimated value (per unit value) of the machine side line voltage of the grid-type energy storage unit is taken as 1∠-0.75° (full load charging) and 1∠0.75° (full load discharge). There are 20 grid-type energy storage units in total.
[0094] After analyzing and fitting the artificial short-circuit data, the artificial short-circuit impedance Z is taken sc=0.011+j0.0079Ω, the phase angle jump is about -47.8° under this short-circuit impedance value. Comparing the simulation data with the measured data, the waveforms of the simulation and measured data are almost the same, such as Figure 5 Shown as solid line.
[0095] According to the artificial short-circuit impedance Z sc The calculated value of U' th =12.54∠-48.7447°, Z th =0.011+j0.0079Ω, set the variable impedance value and output voltage value of the power grid simulation source according to step 8, and get the simulation data as follows Figure 5 The dotted line shows that the artificial short circuit simulation data is compared with the analog source simulation data, and the results are basically consistent, which proves the effectiveness of this test method.
[0096] It should be noted that Z th It is calculated as a transient parameter, and in the steady state before entering the disturbance, it is still connected in series to the power grid simulation source side, acting as the equivalent short-circuit impedance of the power grid simulation source side. th With line impedance Z g The significant difference will cause the potential amplitude and phase angle in the grid-type energy storage to be different from those in normal conditions during steady-state operation, while the transient process can simulate an artificial short circuit.
[0097] Example 2
[0098] The present invention proposes a voltage tolerance test system for a grid-connected energy storage system based on a short-circuit fault, such as Figure 6 As shown, including:
[0099] The system initialization module is used to connect the grid simulation source and the variable impedance to the grid-type energy storage system to be tested, and to set the transient Thevenin equivalent voltage amplitude and the active power state of the grid-type energy storage system to be tested;
[0100] The setting of the transient Thevenin equivalent voltage amplitude and the active power state of the grid-connected energy storage system to be tested is specifically: setting the transient Thevenin equivalent voltage amplitude to 0 and the active power of the grid-connected energy storage system to be tested to a fully charged state.
[0101] The first data acquisition module is used to obtain the steady-state output voltage of the power grid simulation source, the grid-side equivalent impedance of the grid-type energy storage system to be tested, and the equivalent short-circuit impedance during a short-circuit fault;
[0102] Obtain the grid-side equivalent impedance of the grid-type energy storage system to be tested, specifically:
[0103] Z g =R g +jX g
[0104] Among them, Zg is the grid-side equivalent impedance of the grid-type energy storage system to be tested, R g is the resistance of the equivalent impedance on the grid side, j is an imaginary number, X g is the inductive reactance of the equivalent impedance on the grid side.
[0105] Get the equivalent short-circuit impedance during a short-circuit fault, specifically:
[0106] Z sc =R sc +jX sc
[0107] Among them, Z sc is the equivalent short-circuit impedance during a short-circuit fault, R sc is the resistance of the short-circuit impedance, X sc is the reactance of the short-circuit impedance, and j is an imaginary number.
[0108] The second data acquisition module is used to obtain the grid-side transient Thevenin equivalent voltage amplitude as the transient PCC point voltage amplitude according to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault;
[0109] The step of obtaining the grid-side transient Thevenin equivalent voltage amplitude as the transient PCC point voltage amplitude according to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault is specifically as follows:
[0110]
[0111] Among them, U t ' h is the transient Thevenin equivalent voltage amplitude on the grid side, U g is the steady-state output voltage of the power grid simulation source, Z g is the equivalent impedance of the energy storage grid to be tested, Z sc is the equivalent short-circuit impedance during a short-circuit fault.
[0112] The voltage tolerance test module is used to ensure that the voltage amplitude of the transient PCC point meets the constraint conditions, set the variable impedance and the output voltage amplitude during the grid simulation source fault, and then perform the voltage tolerance test to obtain the data that meets the full active power release state during the fault period to realize the voltage tolerance test.
[0113] The transient PCC point voltage amplitude satisfies the constraint conditions, specifically:
[0114] If the voltage amplitude at the transient PCC point is within the range of ±5% of the steady-state output voltage of the power grid simulation source, the voltage amplitude at the transient PCC point satisfies the constraint condition;
[0115] If the transient PCC voltage amplitude is not within the range of ±5% of the steady-state output voltage of the power grid simulation source, the equivalent short-circuit impedance Z during the reacquisition short-circuit fault is sc , calculate the transient Thevenin equivalent voltage amplitude U on the grid side t ' h As the transient PCC point voltage amplitude, until the obtained transient PCC point voltage amplitude is within the range of ±5% of the steady-state output voltage of the power grid simulation source.
[0116] The voltage withstand test is performed after setting the variable impedance and the output voltage amplitude during the power grid simulation source fault, specifically:
[0117] Set variable impedance to Z th =R th +jX th ; Among them, R th is the Thevenin equivalent resistance, X th is the Thevenin equivalent inductive reactance, j is an imaginary number; the output voltage amplitude during the grid simulation source fault is set to the amplitude of the no-load grid side voltage.
[0118] Example 3
[0119] See also Figure 7 As shown, the present invention also provides an electronic device 100 for a voltage tolerance test method of a grid-type energy storage system based on a short-circuit fault; the electronic device 100 includes a memory 101, at least one processor 102, a computer program 103 stored in the memory 101 and executable on the at least one processor 102, and at least one communication bus 104.
[0120] The memory 101 can be used to store the computer program 103, and the processor 102 implements the steps of the voltage tolerance test method of the grid-type energy storage system based on short-circuit fault described in Example 1 by running or executing the computer program stored in the memory 101 and calling the data stored in the memory 101. The memory 101 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data (such as audio data) created according to the use of the electronic device 100, etc. In addition, the memory 101 may include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.
[0121] The at least one processor 102 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The processor 102 may be a microprocessor or any conventional processor, etc. The processor 102 is the control center of the electronic device 100, and uses various interfaces and lines to connect various parts of the entire electronic device 100.
[0122] The memory 101 in the electronic device 100 stores a plurality of instructions to implement a voltage tolerance test method for a grid-type energy storage system based on a short-circuit fault, and the processor 102 can execute the plurality of instructions to implement:
[0123] Connect the grid simulation source and the variable impedance to the grid-type energy storage system to be tested, and set the transient Thevenin equivalent voltage amplitude and the active power state of the grid-type energy storage system to be tested;
[0124] Obtain the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage system to be tested, and the equivalent short-circuit impedance during a short-circuit fault;
[0125] According to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault, the grid-side transient Thevenin equivalent voltage amplitude is obtained as the transient PCC point voltage amplitude;
[0126] The voltage amplitude of the transient PCC point meets the constraint conditions. After setting the variable impedance and the output voltage amplitude during the grid simulation source fault, the voltage tolerance test is carried out to obtain data that meets the full active power release state during the fault period, and realize the voltage tolerance test.
[0127] Example 4
[0128] If the module / unit integrated in the electronic device 100 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the process in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device that can carry the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory and read-only memory (ROM, Read-Only Memory).
[0129] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0130] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0131] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0132] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0133] The present invention proposes a voltage tolerance test method for a grid-connected energy storage system based on a short-circuit fault. The method can effectively simulate the active and reactive current responses of the grid-connected energy storage system under an actual grid short-circuit fault based on a grid simulation source. There is no need to perform testing through an artificial short circuit, which greatly ensures the safety of testers and reduces the impact on the grid during the testing of the grid-connected energy storage system.
[0134] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A voltage tolerance test method for a grid-connected energy storage system based on a short-circuit fault, characterized in that: The steps include: Connect the grid simulation source and the variable impedance to the grid-type energy storage system to be tested, and set the transient Thevenin equivalent voltage amplitude and the active power state of the grid-type energy storage system to be tested; Obtain the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage system to be tested, and the equivalent short-circuit impedance during a short-circuit fault; According to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault, the grid-side transient Thevenin equivalent voltage amplitude is obtained as the transient PCC point voltage amplitude; The voltage amplitude of the transient PCC point meets the constraint conditions. After setting the variable impedance and the output voltage amplitude during the grid simulation source fault, the voltage tolerance test is carried out to obtain data that meets the full active power release state during the fault period, thereby realizing the voltage tolerance test.
2. The voltage tolerance test method of a grid-connected energy storage system based on a short-circuit fault according to claim 1 is characterized in that: Obtain the grid-side equivalent impedance of the grid-type energy storage system to be tested, specifically: Z g =R g +jX g Among them, Z g is the grid-side equivalent impedance of the grid-type energy storage system to be tested, R g is the resistance of the equivalent impedance on the grid side, j is an imaginary number, X g is the inductive reactance of the equivalent impedance on the grid side.
3. The voltage tolerance test method of a grid-connected energy storage system based on a short-circuit fault according to claim 1 is characterized in that: Get the equivalent short-circuit impedance during a short-circuit fault, specifically: Z sc =R sc +jX sc Among them, Z sc is the equivalent short-circuit impedance during a short-circuit fault, R sc is the resistance of the short-circuit impedance, X sc is the reactance of the short-circuit impedance, and j is an imaginary number.
4. The voltage tolerance test method of a grid-connected energy storage system based on a short-circuit fault according to claim 1 is characterized in that: The step of obtaining the grid-side transient Thevenin equivalent voltage amplitude as the transient PCC point voltage amplitude according to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault is specifically as follows: Among them, U t ' h is the transient Thevenin equivalent voltage amplitude on the grid side, U g is the steady-state output voltage of the power grid simulation source, Z g is the equivalent impedance of the energy storage grid to be tested, Z sc is the equivalent short-circuit impedance during a short-circuit fault.
5. The voltage tolerance test method of a grid-connected energy storage system based on a short-circuit fault according to claim 1 is characterized in that: The setting of the transient Thevenin equivalent voltage amplitude and the active power state of the grid-connected energy storage system to be tested is specifically: setting the transient Thevenin equivalent voltage amplitude to 0 and the active power of the grid-connected energy storage system to be tested to a fully charged state.
6. The voltage tolerance test method of a grid-connected energy storage system based on a short-circuit fault according to claim 1 is characterized in that: The transient PCC point voltage amplitude satisfies the constraint conditions, specifically: If the voltage amplitude at the transient PCC point is within the range of ±5% of the steady-state output voltage of the power grid simulation source, the voltage amplitude at the transient PCC point satisfies the constraint condition; If the transient PCC voltage amplitude is not within the range of ±5% of the steady-state output voltage of the power grid simulation source, the equivalent short-circuit impedance Z during the reacquisition short-circuit fault is sc , calculate the transient Thevenin equivalent voltage amplitude U on the grid side t ' h As the transient PCC point voltage amplitude, until the obtained transient PCC point voltage amplitude is within the range of ±5% of the steady-state output voltage of the power grid simulation source.
7. The voltage tolerance test method of a grid-connected energy storage system based on a short-circuit fault according to claim 1 is characterized in that: The voltage withstand test is performed after setting the variable impedance and the output voltage amplitude during the power grid simulation source fault, specifically: Set variable impedance to Z th =R th +jX th ; Among them, R th is the Thevenin equivalent resistance, X th is the Thevenin equivalent inductive reactance, j is an imaginary number; the output voltage amplitude during the grid simulation source fault is set to the amplitude of the no-load grid side voltage.
8. A voltage tolerance test system for a grid-connected energy storage system based on a short-circuit fault, characterized in that: include: The system initialization module is used to connect the grid simulation source and the variable impedance to the grid-type energy storage system to be tested, and to set the transient Thevenin equivalent voltage amplitude and the active power state of the grid-type energy storage system to be tested; The first data acquisition module is used to obtain the steady-state output voltage of the power grid simulation source, the grid-side equivalent impedance of the grid-type energy storage system to be tested, and the equivalent short-circuit impedance during a short-circuit fault; The second data acquisition module is used to obtain the grid-side transient Thevenin equivalent voltage amplitude as the transient PCC point voltage amplitude according to the steady-state output voltage of the grid simulation source, the grid-side equivalent impedance of the grid-type energy storage to be tested, and the equivalent short-circuit impedance during a short-circuit fault; The voltage tolerance test module is used to ensure that the voltage amplitude of the transient PCC point meets the constraint conditions, set the variable impedance and the output voltage amplitude during the grid simulation source fault, and then perform the voltage tolerance test to obtain the data that meets the full active power release state during the fault period to realize the voltage tolerance test.
9. An electronic device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the voltage tolerance test method of the grid-connected energy storage system based on short-circuit fault are implemented as described in any one of claims 1 to 7.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the voltage tolerance test method of a grid-connected energy storage system based on a short-circuit fault are implemented as described in any one of claims 1 to 7.