Project post-evaluation review management system

By establishing a review expert group and generating work evaluation values ​​in the project post-evaluation system, and selecting experts, the problems of low review efficiency and poor objectivity in the existing technology are solved, and efficient and objective review management is achieved.

CN118798592AInactive Publication Date: 2024-10-18HUANENG INFORMATION TECH CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411273833.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing post-project evaluation through expert scoring has the problems of wasting time and money, slow progress, and limited objectivity.

Method used

A review management system for project post-evaluation is designed. By adding a central control unit, a review expert group is established to evaluate expert abilities in real time, generate work evaluation values ​​and related evaluation models, select experts, avoid mutual influence between experts, and communicate through the terminal The unit generates review task instructions to reduce review time.

Benefits of technology

It improves review efficiency and quality, enhances the objectivity of scoring results, and reduces review time and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798592A_ABST
    Figure CN118798592A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of project post-evaluation, in particular to a project post-evaluation review management system. Comprising a central control unit used for establishing a review expert group according to a to-be-reviewed project and setting a review feedback time node and a review task instruction according to the to-be-reviewed project; the monitoring unit is used for correcting the review feedback time node according to the real-time review state of each expert in the review expert group; the terminal unit comprises a plurality of terminal modules, and the terminal modules are used for receiving review task instructions; the to-be-reviewed project is analyzed, the initial review duration is set, and the review duration is corrected in time according to the review completion degree of each expert, so that the review efficiency is improved, the review duration of a single project is reduced, meanwhile, a terminal unit is additionally arranged, a review task instruction is generated according to the to-be-reviewed project and sent to terminal equipment of each expert, and the review efficiency is improved. Therefore, the review efficiency is improved, and the review time is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of post-project evaluation, and in particular to a review and management system for post-project evaluation. Background Art

[0002] Post-project evaluation refers to a technical and economic activity that systematically and objectively analyzes and summarizes the purpose, implementation process, benefits, effects and impacts of a project after it has been completed and run for a period of time. It is an important stage in the investment project cycle and an important part of project management.

[0003] Through investigation and research on the project implementation process, results and impacts and comprehensive and systematic review, we can compare them with the goals and technical, economic, environmental and social indicators determined when the project was decided, find out the differences and changes, analyze the reasons and summarize the results. Experience, draw lessons, get inspiration, put forward countermeasures and suggestions, improve investment management and decision-making through information feedback, and achieve the goal of improving investment efficiency.

[0004] Existing post-project evaluations are all conducted through expert scoring. Bringing together many experts not only wastes a lot of time and money, but also slows down the entire evaluation process. The scoring experts will influence each other, which limits the objectivity of the scoring results. Summary of the invention

[0005] The purpose of this application is: to solve the above technical problems, this application provides a review management system for post-project evaluation, aiming to improve the review efficiency and review quality of post-project evaluation.

[0006] In some embodiments of the present application, by adding a central control unit, a corresponding review expert group is established according to different projects to be reviewed, and real-time capability evaluation is performed on each expert. By generating corresponding work evaluation values ​​and establishing an associated evaluation model, corresponding experts are selected to avoid mutual influence between experts, thereby improving the objectivity of the scoring results.

[0007] In some embodiments of the present application, by analyzing the projects to be reviewed, setting the initial review duration, and timely correcting the review duration based on the review completion of each expert, the review efficiency is improved and the review duration of a single project is reduced. At the same time, a terminal unit is added to generate review task instructions for each expert's terminal device based on the projects to be reviewed, without the need to gather experts, thereby improving the review efficiency and reducing the review time.

[0008] In some embodiments of the present application, a review management system for post-project evaluation is provided, including: The central control unit is used to establish a review expert group according to the items to be reviewed, and set the review feedback time node and review task instructions according to the items to be reviewed; A monitoring unit is used to modify the review feedback time node according to the real-time review status of each expert in the review expert group; A terminal unit, comprising a plurality of terminal modules, wherein the terminal modules are used to receive review task instructions; The central control unit comprises: The first processing module is used to obtain the initial review results of each expert in the review expert group according to the review feedback time node, and generate the first-level review results according to all the initial review results.

[0009] In some embodiments of the present application, the central control unit includes: The first expert management module is used to establish an expert database according to all expert parameters; The first expert management module is further used to generate a review start time node according to the parameters of the project to be reviewed, and obtain experts without review tasks according to the review start time node; According to the types of projects to be reviewed and the experts without review tasks, the number of experts to be selected A is established, and A=(a1, a2…a n) , where ai is the i-th expert to be selected, and n is the number of experts to be selected; The second expert management module is used to generate the work evaluation value of each expert to be selected, and establish a work evaluation value sequence B, B = (b1, b2...bn), where bi is the work evaluation value of the i-th expert to be selected; The second expert management module is also used to select the expert with the highest work evaluation value as the first expert; The second expert management module is also used to set the number of experts in the review expert group and generate the review expert group according to the first expert and the number of experts.

[0010] In some embodiments of the present application, the second expert management module is further used to: Establish a correlation evaluation model; Generate the correlation evaluation value interval C between the first expert and each expert to be selected according to the correlation evaluation model, C=(c1,c2…cn), where ci is the correlation evaluation value between the i-th expert to be selected and the first expert; Preset a first correlation evaluation value threshold C1; If ci>C2, eliminate the i-th expert to be selected, and generate the second expert sequence A1 according to the elimination result, A1=(a1,a2…a n-n1 ), where n1 is the number of experts to be selected; Generate the selection order of each expert to be selected in the second expert to be selected sequence A1 according to the work evaluation value sequence B; Generate a review expert group.

[0011] In some embodiments of the present application, when generating the work evaluation value of each expert to be selected, it includes: Select the target experts to be selected in sequence according to the expert sequence A to be selected; Obtain the historical review project parameters of the target expert to be selected, generate the result similarity between the review results of the target expert to be selected and the actual results in sequence, and establish a similarity sequence F, F = (f1, f2...fm), where m is the number of historical review projects of the target expert to be selected, and fi is the result similarity of the i-th historical review project; Obtain the overdue evaluation value d of the target expert to be selected, and set the compensation coefficient h according to the number of overdue evaluation values ​​d; Generate a weighted value sequence G according to the level of each historical review project, G= (g1, g2…gm) Generate the target expert's work evaluation value b, b=h*( ).

[0012] In some embodiments of the present application, when setting the compensation coefficient h, it includes: Generate an overdue evaluation value d based on the ratio between the number of historical review projects n and the number of overdue times of the target expert to be selected; Preset a first overdue evaluation value interval (D1, D2), a second overdue evaluation value interval (D2, D3) and a third overdue evaluation value interval (D3, D4); If the overdue evaluation value d is within the preset first overdue evaluation value interval, the compensation coefficient h is set to the preset first compensation coefficient h1, that is, h=h1; If the overdue evaluation value d is within the preset second overdue evaluation value interval, the compensation coefficient h is set to the preset second compensation coefficient h2, that is, h=h2; If the overdue evaluation value d is within the preset third overdue evaluation value interval, the compensation coefficient h is set to the preset third compensation coefficient h3, that is, h=h3.

[0013] In some embodiments of the present application, the central control unit further includes: The second processing module is used to obtain the project level and engineering quantity of the project to be reviewed; Generate a first reference evaluation value K1 according to the project level; Generate a second reference evaluation value K2 based on the engineering volume; Generate a project evaluation value j for the project to be reviewed based on the first reference evaluation value K1 and the second reference evaluation value K2; j=e1*K1+e2*K2, where e1 is the preset first weight coefficient and e2 is the preset second weight coefficient; The initial review duration t is set according to the project evaluation value j, and the review feedback time node is set according to the initial review duration t.

[0014] In some embodiments of the present application, when the initial review time t is set, it includes: Preset the first project evaluation value interval (J1, J2), the second project evaluation value interval (J2, J3) and the third project evaluation value interval (J3, J4) If the project evaluation value j is within the preset first project evaluation value interval, the initial review duration t is set to the preset first review duration T1, ie t=T1; If the project evaluation value j is within the preset second project evaluation value interval, the initial review duration t is set to the preset second review duration T2, ie t=T2; If the project evaluation value j is within the preset third project evaluation value interval, the initial review time t is set to the preset third review time T3, that is, t=T3, and T1 <T2<T3。

[0015] In some embodiments of the present application, the monitoring unit includes: The first correction module, when the first processing module receives the initial review result of each expert in the review expert group, The first correction module obtains the number of unfinished experts q and sets a correction coefficient p according to the number of unfinished experts q; The second correction module is used to obtain the remaining review time t1, and correct the remaining review time t1 according to the correction coefficient p, and the corrected remaining review time t2=p*t1; The third correction module is used to update the review feedback time node according to the corrected remaining review time and send a correction instruction.

[0016] In some embodiments of the present application, the setting of the correction coefficient p includes: Preset the first unfinished expert quantity interval (Q1, Q2), the second unfinished expert quantity interval (Q2, Q3) and the third unfinished expert quantity interval (Q3, Q4) If the number of unfinished experts q is within the preset first unfinished expert number interval, the correction coefficient p is set to the preset first correction coefficient p1; If the number of unfinished experts q is within the preset second number of unfinished experts interval, the correction coefficient p is set to the preset second correction coefficient p2; If the number of unfinished experts q is within the preset third unfinished expert number interval, the correction coefficient p is set to the preset third correction coefficient p3; and p1 <p2<p3<1。

[0017] In some embodiments of the present application, the first processing module is further used to: Generate an expert overdue data package based on the time when each expert in the review expert group receives the initial review results; The real-time work evaluation value of each expert in the review expert group is corrected according to the expert overdue data packet.

[0018] Compared with the prior art, the review management system for post-project evaluation in the embodiment of the present application has the following beneficial effects: By adding a central control unit, corresponding review expert groups are established according to different projects to be reviewed, and real-time capability evaluation is conducted on each expert. By generating corresponding work evaluation values ​​and establishing an associated evaluation model, corresponding experts are selected to avoid mutual influence between experts and improve the objectivity of the scoring results.

[0019] By analyzing the projects to be reviewed, setting the initial review duration, and timely revising the review duration based on the review completion of each expert, the review efficiency is improved and the review duration of a single project is reduced. At the same time, terminal units are added to generate review task instructions for each expert's terminal device based on the projects to be reviewed, without the need to gather experts, thereby improving the review efficiency and reducing the review time. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural diagram of a review management system for post-project evaluation in the preferred embodiment of the present application. DETAILED DESCRIPTION

[0021] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.

[0022] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0023] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0024] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0025] like Figure 1 As shown, a review management system for post-project evaluation in a preferred embodiment of the present application includes: The central control unit is used to establish a review expert group according to the items to be reviewed, and set the review feedback time node and review task instructions according to the items to be reviewed; A monitoring unit is used to modify the review feedback time node according to the real-time review status of each expert in the review expert group; The terminal unit includes a plurality of terminal modules, and the terminal modules are used to receive review task instructions; The central control unit includes: The first processing module is used to obtain the initial review results of each expert in the review expert group according to the review feedback time node, and generate the first-level review results according to all the initial review results.

[0026] Specifically, the terminal module is the terminal device of each expert.

[0027] Specifically, when the central control unit generates a review task instruction, if a team leader is needed, it will generate a team leader appointment instruction and determine whether there is an expert from the specified department in the review expert group. If so, the expert from the corresponding department is set as the expert team leader. If not, the first expert is set as the expert team leader.

[0028] The review tasks are generated according to the review task instructions and sent to the corresponding experts' terminal devices. If there is a team leader, a team leader task is also generated and sent to the expert team leader's terminal device.

[0029] Specifically, the central control unit includes: The first expert management module is used to establish an expert database according to all expert parameters; The first expert management module is also used to generate a review start time node according to the parameters of the project to be reviewed, and obtain experts without review tasks according to the review start time node; According to the types of projects to be reviewed and the experts without review tasks, the number of experts to be selected A is established, and A=(a1, a2…a n ), where ai is the i-th expert to be selected and n is the number of experts to be selected; The second expert management module is used to generate the work evaluation value of each expert to be selected, and establish a work evaluation value sequence B, B = (b1, b2...bn), where bi is the work evaluation value of the i-th expert to be selected; The second expert management module is also used to select the expert with the highest work evaluation value as the first expert; The second expert management module is also used to set the number of experts in the review expert group and generate the review expert group according to the first expert and the number of experts.

[0030] Specifically, the number of experts in the review expert group is set according to the project evaluation value of the project to be reviewed. The higher the project evaluation value, the higher the corresponding project evaluation value.

[0031] Specifically, experts who can conduct the review are selected according to the type of project to be reviewed, and it is determined whether each expert has a review task when the current project to be reviewed begins to be reviewed. If so, the corresponding experts are eliminated, and a sequence of experts to be selected is established based on the remaining experts.

[0032] Specifically, by establishing a series of work evaluation values, each expert to be selected is analyzed, and the best experts are selected for review, thereby improving the quality of the review.

[0033] Specifically, the second expert management module is also used for: Establish a correlation evaluation model; Generate the correlation evaluation value interval C between the first expert and each expert to be selected according to the correlation evaluation model, C=(c1,c2…cn), where ci is the correlation evaluation value between the i-th expert to be selected and the first expert; Preset a first correlation evaluation value threshold C1; If ci>C2, eliminate the i-th expert to be selected, and generate the second expert sequence A1 according to the elimination result, A1=(a1,a2…a n-n1 ), where n1 is the number of experts to be selected; Generate the selection order of each expert to be selected in the second expert to be selected sequence A1 according to the work evaluation value sequence B; Generate a review expert group.

[0034] Specifically, according to the correlation model, the correlation evaluation value between the first expert and each expert is determined. The higher the correlation, the higher the homogeneity of the evaluation results among the experts, and the greater the mutual influence among the experts.

[0035] Specifically, the correlation evaluation value is set by comparing the similarity between the evaluation results of the first expert's historical review items and the review results of other experts. The higher the similarity, the higher the corresponding correlation evaluation value.

[0036] Specifically, by presetting the first correlation evaluation value threshold, experts who have a high correlation with the first expert are eliminated from the experts to be selected, thereby reducing the influence between experts and ensuring the objectivity of the review results.

[0037] In a preferred embodiment of the present application, when generating the work evaluation value of each expert to be selected, it includes: Select the target experts to be selected in sequence according to the expert sequence A to be selected; Obtain the historical review project parameters of the target expert to be selected, generate the result similarity between the review results of the target expert to be selected and the actual results in sequence, and establish a similarity sequence F, F = (f1, f2...fm), where m is the number of historical review projects of the target expert to be selected, and fi is the result similarity of the i-th historical review project; Obtain the overdue evaluation value d of the target expert to be selected, and set the compensation coefficient h according to the number of overdue evaluation values ​​d; Generate a weighted value sequence G according to the level of each historical review project, G= (g1, g2…gm) Generate the target expert's work evaluation value b, b=h*( ).

[0038] Specifically, actual results are generated based on the parameters after the actual operation of the project, and the capabilities of each expert are analyzed by comparing them with the expert review results.

[0039] Specifically, the weighting value is set according to the level of the historical review project. The higher the project evaluation value of the historical review project, the higher the corresponding level, and the higher the level, the higher the corresponding weighting value.

[0040] Specifically, when setting the compensation coefficient h, it includes: Generate an overdue evaluation value d based on the ratio between the number of historical review projects n and the number of overdue times of the target expert to be selected; Preset a first overdue evaluation value interval (D1, D2), a second overdue evaluation value interval (D2, D3) and a third overdue evaluation value interval (D3, D4); If the overdue evaluation value d is within the preset first overdue evaluation value interval, the compensation coefficient h is set to the preset first compensation coefficient h1, that is, h=h1; If the overdue evaluation value d is within the preset second overdue evaluation value interval, the compensation coefficient h is set to the preset second compensation coefficient h2, that is, h=h2; If the overdue evaluation value d is within the preset third overdue evaluation value interval, the compensation coefficient h is set to the preset third compensation coefficient h3, that is, h=h3.

[0041] Specifically, by generating the overdue evaluation value of the expert and dynamically setting the compensation coefficient, the expert's work evaluation value is corrected, making the expert's work evaluation value more accurate, thereby facilitating the subsequent selection of experts based on the work evaluation value and ensuring the review efficiency and quality.

[0042] In a preferred embodiment of the present application, the central control unit further includes: The second processing module is used to obtain the project level and engineering quantity of the project to be reviewed; Generate a first reference evaluation value K1 according to the project level; Generate a second reference evaluation value K2 based on the engineering volume; Generate a project evaluation value j for the project to be reviewed based on the first reference evaluation value K1 and the second reference evaluation value K2; j=e1*K1+e2*K2, where e1 is the preset first weight coefficient and e2 is the preset second weight coefficient; The initial review duration t is set according to the project evaluation value j, and the review feedback time node is set according to the initial review duration t.

[0043] Specifically, the first reference evaluation value and the second reference evaluation value have the same value range. The higher the project level, the higher the corresponding first reference evaluation value. The larger the project volume, the higher the corresponding second reference evaluation value.

[0044] Specifically, when setting the initial review duration t, it includes: Preset the first project evaluation value interval (J1, J2), the second project evaluation value interval (J2, J3) and the third project evaluation value interval (J3, J4) If the project evaluation value j is within the preset first project evaluation value interval, the initial review duration t is set to the preset first review duration T1, ie t=T1; If the project evaluation value j is within the preset second project evaluation value interval, the initial review duration t is set to the preset second review duration T2, ie t=T2; If the project evaluation value j is within the preset third project evaluation value interval, the initial review time t is set to the preset third review time T3, that is, t=T3, and T1 <T2<T3。

[0045] Specifically, the higher the project evaluation value, the longer the review time required for the current project to be reviewed.

[0046] Specifically, the monitoring unit includes: The first correction module, when the first processing module receives the initial review results of each expert in the review expert group, The first correction module obtains the number of unfinished experts q and sets a correction coefficient p according to the number of unfinished experts q; The second correction module is used to obtain the remaining review time t1, and correct the remaining review time t1 according to the correction coefficient p, and the corrected remaining review time t2=p*t1; The third correction module is used to update the review feedback time node according to the corrected remaining review time and send a correction instruction.

[0047] Specifically, every time an initial review result from an expert is received, the remaining review time t1 is generated according to the time interval between the receiving time node and the current review feedback time node.

[0048] Specifically, the review feedback time node is reset according to the revised remaining review time t2, and the new review feedback time node is sent to the terminal devices of the experts who have not completed the review through a revision instruction.

[0049] Specifically, when setting the correction coefficient p, it includes: Preset the first unfinished expert quantity interval (Q1, Q2), the second unfinished expert quantity interval (Q2, Q3) and the third unfinished expert quantity interval (Q3, Q4) If the number of unfinished experts q is within the preset first unfinished expert number interval, the correction coefficient p is set to the preset first correction coefficient p1; If the number of unfinished experts q is within the preset second number of unfinished experts interval, the correction coefficient p is set to the preset second correction coefficient p2; If the number of unfinished experts q is within the preset third unfinished expert number interval, the correction coefficient p is set to the preset third correction coefficient p3; and p1 <p2<p3<1。

[0050] In a preferred embodiment of the present application, the first processing module is also used for: Generate an expert overdue data package based on the time when each expert in the review expert group receives the initial review results; The real-time work evaluation value of each expert in the review expert group is corrected according to the expert overdue data packet.

[0051] Specifically, keywords are extracted from the initial review results of each expert to generate the first-level review results.

[0052] Specifically, when the time node of receiving the initial review result of the expert is after the final review feedback time node, the expert is set as an overdue expert, and an overdue data package is generated based on all overdue experts.

[0053] According to the first concept of the present application, by adding a central control unit, corresponding review expert groups are established according to different projects to be reviewed, and real-time capability evaluation is performed on each expert. By generating corresponding work evaluation values ​​and establishing an associated evaluation model, corresponding experts are selected to avoid mutual influence between experts, thereby improving the objectivity of the scoring results.

[0054] According to the second concept of the present application, by analyzing the projects to be reviewed, setting the initial review duration, and timely correcting the review duration based on the review completion of each expert, the review efficiency is improved and the review duration of a single project is reduced. At the same time, terminal units are added to generate review task instructions to the terminal devices of each expert based on the projects to be reviewed, without the need to gather experts, thereby improving the review efficiency and reducing the review time.

[0055] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.

Claims

1. A review management system for post-project evaluation, characterized in that: include: The central control unit is used to establish a review expert group according to the items to be reviewed, and set the review feedback time node and review task instructions according to the items to be reviewed; A monitoring unit is used to modify the review feedback time node according to the real-time review status of each expert in the review expert group; A terminal unit, comprising a plurality of terminal modules, wherein the terminal modules are used to receive review task instructions; The central control unit comprises: The first processing module is used to obtain the initial review results of each expert in the review expert group according to the review feedback time node, and generate the first-level review results according to all the initial review results.

2. The post-project evaluation review management system according to claim 1, characterized in that: The central control unit comprises: The first expert management module is used to establish an expert database according to all expert parameters; The first expert management module is further used to generate a review start time node according to the parameters of the project to be reviewed, and obtain experts without review tasks according to the review start time node; According to the types of projects to be reviewed and the experts without review tasks, the number of experts to be selected A is established, and A=(a1, a2…a n ), where ai is the i-th expert to be selected and n is the number of experts to be selected; The second expert management module is used to generate the work evaluation value of each expert to be selected, and establish a work evaluation value sequence B, B = (b1, b2...bn), where bi is the work evaluation value of the i-th expert to be selected; The second expert management module is also used to select the expert with the highest work evaluation value as the first expert; The second expert management module is also used to set the number of experts in the review expert group and generate the review expert group according to the first expert and the number of experts.

3. The post-project evaluation review management system according to claim 2, characterized in that: The second expert management module is also used for: Establish a correlation evaluation model; Generate the correlation evaluation value interval C between the first expert and each expert to be selected according to the correlation evaluation model, C=(c1,c2…cn), where ci is the correlation evaluation value between the i-th expert to be selected and the first expert; Preset a first correlation evaluation value threshold C1; If ci>C2, eliminate the i-th expert to be selected, and generate the second expert sequence A1 according to the elimination result, A1=(a1,a2…a n-n1 ), where n1 is the number of experts to be selected; Generate the selection order of each expert to be selected in the second expert to be selected sequence A1 according to the work evaluation value sequence B; Generate a review panel.

4. The post-project evaluation review management system according to claim 3, characterized in that: When generating the work evaluation values ​​of each expert to be selected, it includes: Select the target experts to be selected in sequence according to the expert sequence A to be selected; Obtain the historical review project parameters of the target expert to be selected, generate the result similarity between the review results of the target expert to be selected and the actual results in sequence, and establish a similarity sequence F, F = (f1, f2...fm), where m is the number of historical review projects of the target expert to be selected, and fi is the result similarity of the i-th historical review project; Obtain the overdue evaluation value d of the target expert to be selected, and set the compensation coefficient h according to the number of overdue evaluation values ​​d; Generate a weighted value sequence G according to the level of each historical review project, G= (g1, g2…gm) Generate the target expert's work evaluation value b, b=h*( ).

5. The post-project evaluation review management system according to claim 4, characterized in that: When setting the compensation coefficient h, include: Generate an overdue evaluation value d based on the ratio between the number of historical review projects n and the number of overdue times of the target expert to be selected; Preset a first overdue evaluation value interval (D1, D2), a second overdue evaluation value interval (D2, D3) and a third overdue evaluation value interval (D3, D4); If the overdue evaluation value d is within the preset first overdue evaluation value interval, the compensation coefficient h is set to the preset first compensation coefficient h1, that is, h=h1; If the overdue evaluation value d is within the preset second overdue evaluation value interval, the compensation coefficient h is set to the preset second compensation coefficient h2, that is, h=h2; If the overdue evaluation value d is within the preset third overdue evaluation value interval, the compensation coefficient h is set to the preset third compensation coefficient h3, that is, h=h3.

6. The post-project evaluation review management system according to claim 4, characterized in that: The central control unit also includes: The second processing module is used to obtain the project level and engineering quantity of the project to be reviewed; Generate a first reference evaluation value K1 according to the project level; Generate a second reference evaluation value K2 based on the engineering volume; Generate a project evaluation value j for the project to be reviewed based on the first reference evaluation value K1 and the second reference evaluation value K2; j=e1*K1+e2*K2, where e1 is the preset first weight coefficient and e2 is the preset second weight coefficient; The initial review duration t is set according to the project evaluation value j, and the review feedback time node is set according to the initial review duration t.

7. The post-project evaluation review management system according to claim 6, characterized in that: When setting the initial review duration t, include: Preset the first project evaluation value interval (J1, J2), the second project evaluation value interval (J2, J3) and the third project evaluation value interval (J3, J4) If the project evaluation value j is within the preset first project evaluation value interval, the initial review duration t is set to the preset first review duration T1, ie t=T1; If the project evaluation value j is within the preset second project evaluation value interval, the initial review duration t is set to the preset second review duration T2, ie t=T2; If the project evaluation value j is within the preset third project evaluation value interval, the initial review time t is set to the preset third review time T3, that is, t=T3, and T1 <T2<T3。 8. The post-project evaluation review management system according to claim 6, characterized in that: The monitoring unit comprises: The first correction module, when the first processing module receives the initial review result of each expert in the review expert group, The first correction module obtains the number of unfinished experts q and sets a correction coefficient p according to the number of unfinished experts q; The second correction module is used to obtain the remaining review time t1, and correct the remaining review time t1 according to the correction coefficient p, and the corrected remaining review time t2=p*t1; The third correction module is used to update the review feedback time node according to the corrected remaining review time and send a correction instruction.

9. The post-project evaluation review management system according to claim 8, characterized in that: The setting of the correction coefficient p includes: Preset the first unfinished expert quantity interval (Q1, Q2), the second unfinished expert quantity interval (Q2, Q3) and the third unfinished expert quantity interval (Q3, Q4) If the number of unfinished experts q is within the preset first unfinished expert number interval, the correction coefficient p is set to the preset first correction coefficient p1; If the number of unfinished experts q is within the preset second number of unfinished experts interval, the correction coefficient p is set to the preset second correction coefficient p2; If the number of unfinished experts q is within the preset third unfinished expert number interval, the correction coefficient p is set to the preset third correction coefficient p3; and p1 <p2<p3<1。 10. The post-project evaluation review management system according to claim 8, characterized in that: The first processing module is also used for: Generate an expert overdue data package based on the time when each expert in the review expert group receives the initial review results; The real-time work evaluation value of each expert in the review expert group is corrected according to the expert overdue data packet.

Citation Information

Patent Citations

  • Expert recommendation method combining label construction and community relation avoidance

    CN111008215A

  • Expert review behavior evaluation method, device and computer storage medium

    CN111709604A

  • Intelligent review system based on semantic splitting and working method

    CN112801530A

  • Integrated bid evaluation field management platform

    CN117808326A

  • Expert extraction method based on smart talent review

    CN118115032A