By obtaining and calculating quantitative indicators and weight values ​​of key links in the ICT supply chain, combined with anomaly detection algorithms and expert evaluations, the problem of insufficient supply chain risk assessment accuracy in the existing technology is solved, and more accurate risk identification and management are achieved.

CN118798628APending Publication Date: 2024-10-18CHINA MOBILE GROUP DESIGN INST +1

Patent Information

Application Number
CN202410243581.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-03-04
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

The existing supply chain risk threat assessment method is too simple in terms of weight value calculation and cannot objectively reflect the weight difference of each risk threat assessment index, resulting in a decrease in the accuracy of risk assessment.

Method used

By obtaining the quantitative indicators of the preset key links of the ICT supply chain, the weight values ​​of the key links and quantitative indicators are determined, the anomaly probability and risk threat score are determined based on the anomaly detection algorithm, and the overall risk value is calculated based on expert evaluation and fuzzy judgment matrix, fully considering The weight difference of each risk threat evaluation index.

Benefits of technology

It improves the accuracy of supply chain risk measurement, ensures the objectivity and accuracy of risk assessment, and can more effectively identify and manage risk threats in the supply chain.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798628A_ABST
    Figure CN118798628A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of supply chain safety, and provides a supply chain risk measurement method and device, equipment, a medium and a program product, and the method comprises the steps: obtaining a quantitative index of an ICT supply chain in a preset key link, the quantitative indexes comprise at least one of the qualification-debt ratio, the cash flow rate, the demand deviation degree, the performance timeliness rate, the stockout frequency and the operation and maintenance processing duration; determining the weight value of the key link and the weight value of the quantitative index; determining an abnormal probability of the quantitative index based on a preset abnormal detection algorithm, and determining a risk threat score of the quantitative index according to the abnormal probability and a preset scoring standard; and determining the overall risk value of the ICT supply chain according to the weight value of the key link, the weight value of the quantitative index and the risk threat score. According to the method, the key links and the quantitative indexes are subjected to weight value assignment, the weight difference of the risk threat evaluation indexes is fully considered, and the accuracy of risk measurement is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of supply chain security technology, and in particular to a supply chain risk measurement method, device, equipment, medium and program product. Background Art

[0002] Information and Communications Technology (ICT) supply chain risk refers to the supply chain risk caused by problems in any link of the supply chain, which occurs when all communication equipment or application software flows through numerous production and distribution companies to users, generating business flow, logistics flow, and information flow, and involves many processes such as transportation, storage, loading and unloading, handling, packaging, circulation processing, distribution, and information processing. It is very necessary to measure the ICT supply chain risk.

[0003] However, the quantitative evaluation method of the existing supply chain risk threat assessment method in terms of weight value calculation is too simple and cannot objectively reflect the weight differences of various risk threat assessment indicators, thereby reducing the accuracy of risk assessment. Summary of the invention

[0004] The present application provides a supply chain risk measurement method, device, equipment, medium and program product to solve the defect that the existing quantitative evaluation method is too simple and cannot objectively reflect the weight difference of each risk threat evaluation index, thereby reducing the accuracy of risk assessment.

[0005] In a first aspect, the present application provides a supply chain risk measurement method, comprising:

[0006] Obtaining quantitative indicators of the ICT supply chain at preset key links, wherein the quantitative indicators include at least one of asset-liability ratio, cash flow ratio, demand deviation, timely fulfillment rate, out-of-stock frequency, and operation and maintenance processing time;

[0007] Determining the weight values ​​of the key links and the weight values ​​of the quantitative indicators;

[0008] Determine the abnormal probability of the quantitative indicator based on a preset abnormality detection algorithm, and determine the risk threat score of the quantitative indicator according to the abnormal probability and a preset scoring standard;

[0009] The overall risk value of the ICT supply chain is determined based on the weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat score.

[0010] In one embodiment, the anomaly detection algorithm is a COPOD algorithm, and the abnormal probability of the quantitative indicator is determined based on a preset anomaly detection algorithm, and the risk threat score of the quantitative indicator is determined according to the abnormal probability and a preset scoring standard, including:

[0011] Divide the quantitative indicators into positive indicators and negative indicators;

[0012] Determine the left tail probability of the positive indicator based on the COPOD algorithm and determine the right tail probability of the negative indicator based on the COPOD algorithm;

[0013] Determining the risk threat score of the positive indicator according to the left-tail probability and the preset positive indicator scoring standard;

[0014] Determine the risk threat score of the reverse indicator according to the right tail probability and the preset reverse indicator scoring standard;

[0015] The positive index scoring standard is negatively correlated with the abnormal threshold of the COPOD algorithm, and the negative index scoring standard is positively correlated with the abnormal threshold of the COPOD algorithm.

[0016] In one embodiment, determining the weight value of the key link and the weight value of the quantitative index includes:

[0017] Obtaining expert evaluations of the key links, and constructing a first fuzzy judgment matrix corresponding to the key links according to the expert evaluations of the key links;

[0018] Determining the weight values ​​of the key links according to the first fuzzy judgment matrix;

[0019] Obtaining expert evaluations of the quantitative indicators, and constructing a second fuzzy judgment matrix corresponding to the quantitative indicators according to the expert evaluations of the quantitative indicators;

[0020] According to the second fuzzy judgment matrix, a weight value of the quantitative index is determined.

[0021] In one embodiment, it further includes:

[0022] If the matrix elements of the first fuzzy judgment matrix do not meet the preset metric values, converting the first fuzzy judgment matrix into a first fuzzy consistency matrix, and determining the weight values ​​of the key links according to the first fuzzy consistency matrix;

[0023] If the matrix elements of the second fuzzy judgment matrix do not meet the preset metric values, the second fuzzy judgment matrix is ​​converted into a second fuzzy consistency matrix, and the weight values ​​of the key links are determined according to the second fuzzy consistency matrix.

[0024] In one embodiment, determining the overall risk value of the ICT supply chain according to the weight values ​​of the key links, the weight values ​​of the quantitative indicators, and the risk threat score includes:

[0025] Determining the risk score of the key link according to the weight value of the quantitative indicator and the risk threat score;

[0026] The overall risk value of the ICT supply chain is determined based on the risk score and the weight values ​​of the key links.

[0027] In one embodiment, it further includes:

[0028] The overall risk value of the ICT supply chain is uploaded to the blockchain.

[0029] In a second aspect, the present application also provides a supply chain risk measurement device, comprising:

[0030] A data input module, used to obtain quantitative indicators of the ICT supply chain in preset key links, wherein the quantitative indicators include at least one of asset-liability ratio, cash flow ratio, demand deviation, timely fulfillment rate, out-of-stock frequency, and operation and maintenance processing time;

[0031] A risk threat measurement module is used to determine the weight values ​​of the key links and the weight values ​​of the quantitative indicators; determine the abnormal probability of the quantitative indicators based on a preset abnormality detection algorithm, and determine the risk threat score of the quantitative indicators according to the abnormal probability and a preset scoring standard;

[0032] The result output module is used to output the overall risk value of the ICT supply chain according to the weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat score.

[0033] In a third aspect, the present application also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, a supply chain risk measurement method as described above is implemented.

[0034] In a fourth aspect, the present application provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements any of the supply chain risk measurement methods described above.

[0035] In a fifth aspect, the present invention further provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the supply chain risk measurement method as described above is implemented.

[0036] The supply chain risk measurement method, device, equipment, medium and program product provided in the present application obtain the quantitative indicators of the ICT supply chain in the preset key links, determine the weight values ​​of the key links and the weight values ​​of the quantitative indicators, determine the abnormal probability of the quantitative indicators based on a preset anomaly detection algorithm, determine the risk threat score of the quantitative indicators according to the abnormal probability and the preset scoring criteria, assign weight values ​​to the key links and quantitative indicators respectively, fully consider the weight differences of each risk threat evaluation indicator, and improve the accuracy of risk measurement. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solutions in the present application or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0038] Figure 1 It is a flowchart of the supply chain risk measurement method provided by this application;

[0039] Figure 2 It is a schematic diagram of the structural model of the ICT supply chain provided by this application;

[0040] Figure 3 It is a schematic diagram of the determination process of the quantitative indicators provided in this application;

[0041] Figure 4 It is a schematic diagram of the ICT supply chain attack tree model provided by this application;

[0042] Figure 5 It is a principle block diagram of the supply chain risk measurement device provided by this application;

[0043] Figure 6 It is a functional architecture diagram of the supply chain risk measurement system provided by this application;

[0044] Figure 7 This is a functional architecture diagram of the blockchain-based supply chain risk measurement system provided by this application;

[0045] Figure 8 is a structural schematic diagram of an embodiment of an electronic device provided by the present application;

[0046] Fig. 9 It is a structural schematic diagram of another embodiment of the electronic device provided by the present application. DETAILED DESCRIPTION

[0047] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0048] Figure 1 is a flow chart of the supply chain risk measurement method provided by this application, such as Figure 1 As shown, the present application provides a supply chain risk measurement method, including:

[0049] Step S100, obtaining quantitative indicators of the ICT supply chain in preset key links, wherein the quantitative indicators include at least one of asset-liability ratio, cash flow ratio, demand deviation, timely fulfillment rate, out-of-stock frequency, and operation and maintenance processing time;

[0050] Figure 2 This is a schematic diagram of the structural model of the ICT supply chain provided by this application, such as Figure 2 As shown in Figure 1, the ICT supply chain is a network structure formed by upstream and downstream suppliers that provide ICT products and services to end users. Unlike the traditional manufacturing supply chain, the ICT supply chain involves not only physical products but also ICT service products. The ICT supply chain involves direct suppliers, indirect suppliers and customer demanders of products and services. Direct suppliers of products are responsible for R&D, design, production, maintenance and other links directly related to product supply. Indirect suppliers provide intellectual property, design tools, materials, production, testing tools, warehouses, transportation and other technologies, products and services; the demander is the end user, who is responsible for the use and scrapping of the products.

[0051] The ICT supply chain has the characteristics of long life cycle, globalized production, and complex products and services. Supply chain risks may exist in every link, and the risks it faces mainly come from security threats and vulnerabilities. Vulnerabilities mainly include the vulnerabilities of the supply chain life cycle and the vulnerabilities of the supply chain infrastructure, such as design defects, failure to follow the security development process, failure to strictly control product or component changes, and the use of unreliable or unsafe suppliers.

[0052] Figure 3 This is a schematic diagram of the determination process of the quantitative indicators provided in this application, such as Figure 3As shown, ICT supply chain risk identification is based on the ICT supply chain structure and focuses on suppliers in key links of the ICT supply chain to identify risk points that may pose threats. ICT supply chain security threats include poor supplier management, insufficient R&D capabilities, serious deviation of products from demand, supply interruptions, malicious attacks, etc. Based on the identified risks, a risk quantification indicator system is determined. The following table shows an example of the quantitative indicator system provided in this application, and the risk threats may increase or decrease according to actual conditions.

[0053] Table 1 ICT supply chain risk quantitative indicator system

[0054]

[0055] Step S200, determine the weight value of the key link and the weight value of the quantitative index; specifically, the weight value can be calculated by combining expert evaluation with fuzzy evaluation. Expert evaluation combined with fuzzy evaluation specifically refers to obtaining expert scores of key links and quantitative indicators respectively, and obtaining the importance of a key link / quantitative indicator compared with another key link / quantitative indicator through pairwise comparison. A fuzzy judgment matrix or a fuzzy consistency matrix is ​​constructed according to the importance, and then the weight value is calculated according to the fuzzy judgment matrix or the fuzzy consistency matrix.

[0056] Step S300, based on a preset anomaly detection algorithm, determine the abnormal probability of the quantitative indicator, and determine the risk threat score of the quantitative indicator according to the abnormal probability and a preset scoring standard; specifically, the anomaly detection algorithm can realize multi-dimensional data outlier determination through data distribution, and the scoring standard includes multiple abnormal probability intervals and risk threat scores corresponding to the abnormal probability intervals. The higher the risk threat score, the greater the risk.

[0057] Step S400, determining the overall risk value of the ICT supply chain according to the weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat score.

[0058] This application constructs an ICT supply chain risk threat model based on the principle of the attack tree model. The ICT supply chain risk threat model is a tree model. The weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat scores are substituted into the ICT supply chain risk threat model to calculate the overall risk value of the ICT supply chain.

[0059] It can be understood that the present application assigns weight values ​​to key links and quantitative indicators respectively, fully considering the weight differences of various risk threat assessment indicators and improving the accuracy of risk measurement.

[0060] Based on the above embodiment, as an optional embodiment, the determining the weight value of the key link and the weight value of the quantitative index includes:

[0061] Step S210, obtaining expert evaluations of the key links, and constructing a first fuzzy judgment matrix corresponding to the key links according to the expert evaluations of the key links;

[0062] Step S220, determining the weight value of the key link according to the first fuzzy judgment matrix;

[0063] Step S230, obtaining expert evaluations of the quantitative indicators, and constructing a second fuzzy judgment matrix corresponding to the quantitative indicators according to the expert evaluations of the quantitative indicators;

[0064] Step S240: determining the weight value of the quantitative index according to the second fuzzy judgment matrix.

[0065] Specifically, the order of step S210 and step S230 can be adjusted.

[0066] In step S210 and step S230, by obtaining expert evaluations of the key links and quantitative indicators, the expert evaluations can be given in the form of scores. The higher the score, the higher the importance. A fuzzy consistency matrix can be established for the importance of each key link and quantitative indicator.

[0067] For element e i and e j , this application adopts r ij Represents element e i E j The importance of r ij The larger the e i E j The more important it is, ij The smaller the e i E j The less important the element e i and e j It is a key link or quantitative indicator. The specific comparison scale is shown in Table 2.

[0068] Table 2 Comparison scale

[0069]

[0070] Note: Scale 0.7 represents e i E j Obviously important, the scale 0.3 indicates negative comparison, indicating e j E i Obviously important.

[0071] After comparing the elements pairwise, a fuzzy judgment matrix C is constructed:

[0072]

[0073] Where n is the number of elements. If the element is a key link, the fuzzy judgment matrix is ​​the first fuzzy judgment matrix, and if the element is a quantitative indicator, the fuzzy judgment matrix is ​​the second fuzzy judgment matrix.

[0074] If the matrix elements of the first fuzzy judgment matrix do not meet the preset metric values, converting the first fuzzy judgment matrix into a first fuzzy consistency matrix, and determining the weight values ​​of the key links according to the first fuzzy consistency matrix;

[0075] If the matrix elements of the second fuzzy judgment matrix do not meet the preset metric values, the second fuzzy judgment matrix is ​​converted into a second fuzzy consistency matrix, and the weight values ​​of the key links are determined according to the second fuzzy consistency matrix.

[0076] Specifically, the expression of the preset measurement value is:

[0077] r ij =r ik -r jk +0.5

[0078] In the formula, i, j, k = 1, 2, 3 ... n, the formula represents the element e i E f Absolutely important.

[0079] If the fuzzy judgment matrix satisfies the calculation formula of the absolute important measurement value, the weight values ​​of each key link and quantitative index are calculated directly according to the fuzzy judgment matrix. The weight value calculation formula is as follows:

[0080]

[0081] Among them, W is the weight value, n is the number of key links or risk threats, Represents the weight difference.

[0082] If the first fuzzy judgment matrix or the second fuzzy judgment matrix does not conform to the calculation formula of the absolute importance metric value, the fuzzy judgment matrix is ​​transformed based on the absolute importance metric value to obtain the first fuzzy consistency matrix or the second fuzzy consistency matrix.

[0083] The calculation formula for matrix transformation is as follows:

[0084]

[0085] The expression of the first fuzzy consistency matrix or the second fuzzy consistency matrix is ​​as follows:

[0086]

[0087] Among them, C′ is the fuzzy consistency matrix, and n is the number of key links or risk threats.

[0088] Substituting the matrix elements of the fuzzy consistency matrix into the weight value calculation formula can obtain the weight values ​​of each key link and quantitative index.

[0089] It can be understood that the present application provides a calculation scheme for the weight values ​​of each key link and quantitative indicator, and uses a method of combining expert evaluation with fuzzy evaluation to assign weight values ​​to key links and quantitative indicators, fully considering the differences in importance between attack tree nodes and improving the accuracy of risk measurement.

[0090] Based on the above embodiment, as an optional embodiment, the anomaly detection algorithm is a COPOD algorithm, and the abnormal probability of the quantitative indicator is determined based on a preset anomaly detection algorithm, and the risk threat score of the quantitative indicator is determined according to the abnormal probability and a preset scoring standard, including:

[0091] Step S310, dividing the quantitative indicators into positive indicators and negative indicators;

[0092] Step S320, determining the left tail probability of the positive indicator based on the COPOD algorithm and determining the right tail probability of the negative indicator based on the COPOD algorithm;

[0093] Step S330, determining the risk threat score of the positive indicator according to the left tail probability and a preset positive indicator scoring standard;

[0094] Step S340, determining the risk threat score of the reverse indicator according to the right tail probability and the preset reverse indicator scoring standard;

[0095] The positive index scoring standard is negatively correlated with the abnormal threshold of the COPOD algorithm, and the negative index scoring standard is positively correlated with the abnormal threshold of the COPOD algorithm.

[0096] Specifically, the order of step S330 and step S340 can be adjusted.

[0097] The COPOD (Copula-based Outlier Detector) algorithm is an anomaly detection method based on statistical probability functions. It supports efficient data modeling. The COPOD algorithm does not require model training, has optimal detection efficiency, does not require adjustment of hyperparameters, and has good calculation speed and actual effect.

[0098] This application improves the COPOD algorithm, divides the quantitative indicators into two categories, forward and reverse, calculates only the left tail probability and the right tail probability, omits the overall tail probability, and has a higher calculation efficiency.

[0099] In order to quantify the risk threat score, this application uses risk quantification indicators instead of risk threats for quantitative scoring. The quantitative indicator system is shown in Table 1. According to the characteristics of quantitative indicators, quantitative indicators are divided into positive and negative indicators. The larger the value of the positive indicator, the smaller the risk, such as supplier profitability, customer satisfaction, etc.; the larger the value of the negative indicator, the greater the risk, such as supplier asset-liability ratio, demand deviation, etc. Then the improved COPOD algorithm is used to evaluate the classified indicator scores, and finally the risk level is determined and scored according to the scoring results.

[0100] For positive indicators, this application uses the left-side empirical cumulative distribution function The calculation formula is as follows:

[0101]

[0102] Among them, x ij Represents a positive indicator.

[0103] For the reverse indicator, this application uses the right-hand empirical cumulative distribution function The calculation formula is as follows:

[0104]

[0105] Among them, x ij Represents a contrarian indicator.

[0106] This application evaluates the degree of abnormality by calculating the probability of the tail end of the data. For suppliers with supply risk threats, their indicator data will fall on the left or right side of the cumulative distribution. Therefore, for positive indicators, this application calculates the left tail probability, and for negative indicators, calculates the right tail probability.

[0107] For positive indicators, the left tail probability p l,i The calculation formula is as follows:

[0108]

[0109] in, is the empirical cumulative distribution function on the left.

[0110] For the reverse indicator, the right tail probability p r,i The calculation formula is as follows:

[0111]

[0112] in, is the empirical cumulative distribution function on the right.

[0113] The smaller the left-tail probability value of the positive indicator, the greater the supply abnormality and the greater the risk of normal supply; the larger the value, the smaller the risk of normal supply. The larger the right-tail probability value of the reverse indicator, the greater the risk of normal supply; the smaller the value, the smaller the risk of normal supply.

[0114] The abnormal threshold of the COPOD algorithm is set to T, and the probability values ​​calculated by the positive and negative indicators are compared with the abnormal threshold. If the threshold is exceeded, it can be determined as an abnormal probability, and the risk threat score is determined according to the exceeded range.

[0115] Table 3 Positive evaluation index scoring system

[0116] Judgment criteria >T <80%T <60%T <40%T <20%T Risk Threat Score 1 2 3 4 5

[0117] Note: The threshold T can be set according to actual conditions.

[0118] Table 4 Reverse evaluation index scoring system

[0119] Judgment criteria <T >120%T >140%T >160%T >180%T Risk Threat Score 1 2 3 4 5

[0120] Note: The threshold T can be set according to actual conditions.

[0121] It is understandable that the present application provides a calculation scheme for risk threat scores of quantitative indicators. By improving the COPOD algorithm, the indicators are divided into two categories: positive and reverse, and only the left tail probability and the right tail probability are calculated, omitting the overall tail probability, and the calculation efficiency is more efficient. The use of the improved COPOD algorithm can also solve the problem of multi-dimensional data brought by multiple subjects and multiple evaluation indicators, and solve the problem that the original COPOD algorithm does not distinguish the directionality of indicators, is relatively blind when identifying abnormal points, and has a reduced accuracy.

[0122] Based on the above embodiment, as an optional embodiment, determining the overall risk value of the ICT supply chain according to the weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat score includes:

[0123] Step S410, determining the risk score of the key link according to the weight value of the quantitative indicator and the risk threat score;

[0124] Step S420: determining the overall risk value of the ICT supply chain according to the risk score and the weight values ​​of the key links.

[0125] This application conducts ICT supply chain risk threat modeling based on the attack tree model principle. This model describes the threats of various risks to the supply chain through a tree structure, using the root node to represent the final threat target, and then refining it layer by layer until the leaf node represents the specific risk threat. This application uses quantitative indicators instead of risk threats.

[0126] Figure 4 This is a schematic diagram of the ICT supply chain attack tree model provided by this application, such as Figure 4 As shown in the figure, Z is the root node, Y is the intermediate node, and X is the leaf node. Z represents the ultimate goal of the threat, that is, to achieve ICT supply chain attacks. The child nodes of Z are the intermediate nodes Y1, U2, Y3, Y4…, and the child nodes representing Y are the leaf nodes X1, X2, X3….

[0127] In order to evaluate the overall risk threat level of the ICT supply chain, S Z is the overall score of the target supply chain, is the score of each key link under its child nodes, It is the score of each leaf node, that is, each quantitative indicator.

[0128] Defining the overall ICT supply chain risk score S Z The calculation formula is as follows:

[0129]

[0130] In the formula, The weight of each key link.

[0131] Define the scores for each key aspect The calculation formula is as follows:

[0132]

[0133] In the formula, is the weight of each quantitative indicator, Score the risk threat for quantitative indicators.

[0134] The calculation formula for the overall risk score of the ICT supply chain and the calculation formula for the scores of key links are combined to form the ICT supply chain risk threat model.

[0135] The score values ​​of each leaf node in Tables 3 and 4, i.e., the quantitative indicators and weight value By inserting it into the formula, we can get the scores of each key link. The scores of each key link and weight value By plugging the formula into the ICT supply chain, we can obtain the overall risk threat score of the ICT supply chain, thereby assisting risk managers in formulating corresponding threat mitigation measures for the risk threats of the ICT supply chain.

[0136] It is understandable that in terms of the construction of the ICT supply chain risk threat model, the model construction rules of the existing technology are too simple, such as only taking the maximum value of the scores of each child node as the score of the parent node, without considering the importance differences between leaf nodes; in addition, most of the existing technologies determine the overall risk score through a single-layer risk assessment, which is difficult to accurately describe the impact of the supply chain layer by layer in reality. This application provides an ICT supply chain risk threat model based on an attack tree, which takes into account the importance differences between leaf nodes and can accurately describe the impact of the supply chain layer by layer in reality.

[0137] In one embodiment, the supply chain risk measurement method provided by the present application further includes:

[0138] The overall risk value of the ICT supply chain is uploaded to the blockchain.

[0139] Optionally, expert reviews can also be uploaded to the blockchain.

[0140] It is understandable that this application uploads the overall risk value of the ICT supply chain to the blockchain to ensure that the information cannot be tampered with and the data is highly credible, which solves the shortcomings of traditional information management systems such as centralized data storage and easy data tampering.

[0141] To sum up, this application takes risk identification and quantitative risk analysis as the main line. By constructing an ICT supply chain risk threat model and a quantitative analysis model, it assists supply chain risk managers in strengthening security risk analysis and control of the ICT supply chain, and achieving security goals such as confidentiality, integrity, and availability of the ICT supply chain.

[0142] The supply chain risk measurement device provided in the present application is described below. The supply chain risk measurement device described below and the supply chain risk measurement method described above can be referenced to each other.

[0143] Figure 5 is a principle block diagram of the supply chain risk measurement device provided by this application, such as Figure 5 As shown, the present application also provides a supply chain risk measurement device, including:

[0144] The data input module 510 is used to obtain quantitative indicators of the ICT supply chain in preset key links, wherein the quantitative indicators include at least one of asset-liability ratio, cash flow ratio, demand deviation, timely fulfillment rate, out-of-stock frequency, and operation and maintenance processing time;

[0145] Specifically, the data input module 510 provides a visual data input page for the user, and the data input interface contains asset components and data flow components that can be dragged by the user.

[0146] The risk threat measurement module 520 is used to determine the weight values ​​of the key links and the weight values ​​of the quantitative indicators; determine the abnormal probability of the quantitative indicators based on a preset abnormality detection algorithm, and determine the risk threat score of the quantitative indicators according to the abnormal probability and a preset scoring standard;

[0147] Specifically, the risk threat measurement module 520 receives data input by the data input module, uses the module's built-in ICT supply chain risk threat quantification model to automatically generate a supply chain risk threat model structure, and calculates the risk threat score value of each leaf node.

[0148] The result output module 530 is used to output the overall risk value of the ICT supply chain according to the weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat score.

[0149] Specifically, the result output module 530 combines the input data stream, the risk threat model structure and the risk threat score value of each leaf node to feed back the risk threat measurement result to the user.

[0150] In one embodiment, the risk threat measurement module 520 is further used to:

[0151] Divide the quantitative indicators into positive indicators and negative indicators;

[0152] Determine the left tail probability of the positive indicator based on the COPOD algorithm and determine the right tail probability of the negative indicator based on the COPOD algorithm;

[0153] Determining the risk threat score of the positive indicator according to the left-tail probability and the preset positive indicator scoring standard;

[0154] Determine the risk threat score of the reverse indicator according to the right tail probability and the preset reverse indicator scoring standard;

[0155] The positive index scoring standard is negatively correlated with the abnormal threshold of the COPOD algorithm, and the negative index scoring standard is positively correlated with the abnormal threshold of the COPOD algorithm.

[0156] In one embodiment, the risk threat measurement module 520 is further used to:

[0157] Obtaining expert evaluations of the key links, and constructing a first fuzzy judgment matrix corresponding to the key links according to the expert evaluations of the key links;

[0158] Determining the weight values ​​of the key links according to the first fuzzy judgment matrix;

[0159] Obtaining expert evaluations of the quantitative indicators, and constructing a second fuzzy judgment matrix corresponding to the quantitative indicators according to the expert evaluations of the quantitative indicators;

[0160] According to the second fuzzy judgment matrix, a weight value of the quantitative index is determined.

[0161] In one embodiment, the risk threat measurement module 520 is further used to:

[0162] If the matrix elements of the first fuzzy judgment matrix do not meet the preset metric values, converting the first fuzzy judgment matrix into a first fuzzy consistency matrix, and determining the weight values ​​of the key links according to the first fuzzy consistency matrix;

[0163] If the matrix elements of the second fuzzy judgment matrix do not meet the preset metric values, the second fuzzy judgment matrix is ​​converted into a second fuzzy consistency matrix, and the weight values ​​of the key links are determined according to the second fuzzy consistency matrix.

[0164] In one embodiment, the result output module 530 is further used to:

[0165] Determining the risk score of the key link according to the weight value of the quantitative indicator and the risk threat score;

[0166] The overall risk value of the ICT supply chain is determined based on the risk score and the weight values ​​of the key links.

[0167] In one embodiment, the result output module 530 is further used to:

[0168] The overall risk value of the ICT supply chain is uploaded to the blockchain.

[0169] Figure 6 This is a functional architecture diagram of the supply chain risk measurement system provided by this application, such as Figure 6 As shown, the present application provides a supply chain risk measurement system, including a user management module, a scoring and evaluation module, a risk threat measurement module and a result output module. The functions of the user management module include registration and login, information and authority management, the functions of the scoring and evaluation module include key link weight value scoring, risk threat (i.e., quantitative indicator) weight value scoring and evaluation result chaining, the functions of the risk threat measurement module include weight value calculation, leaf node risk threat score calculation and overall risk threat score calculation, and the functions of the result output module include outputting risk threat score results and chaining result information.

[0170] The supply chain risk measurement system is implemented in software. In order to avoid the drawbacks of centralized data storage and easy data tampering in traditional information management systems and to ensure the objectivity of the scoring results, this system introduces blockchain technology. Expert scoring data and evaluation result information are automatically uploaded to the chain, making the information tamper-proof and the data highly credible.

[0171] Figure 7 This is a functional architecture diagram of the blockchain-based supply chain risk measurement system provided by this application. Figure 7 As shown in the figure, blockchain technology is introduced into the supply chain risk measurement system, and each user in the system has a corresponding smart contract. When the expert user's scoring data is added to the system, the smart contract is triggered, and then the data is stored in the blockchain. When the risk threat measurement module is completed and the results are output, the smart contract is automatically triggered, and the analysis results are automatically uploaded to the chain.

[0172] The supply chain risk measurement system can be developed as an independent information system, or embedded in the ERP system as a submodule with flexible configuration. It can be used for supply chain risk assessment of various large and medium-sized enterprises, with a wide range of applications and good market prospects.

[0173] Figure 8 is a schematic diagram of the structure of an embodiment of an electronic device provided by the present application, such as Figure 8 As shown, the measurement method described in this application can be implemented by software or by combining software with necessary hardware. This application provides an electronic device for measuring ICT supply chain risk threats, which includes a processing unit, a storage unit, a display unit, a network adapter, an I / O interface, and necessary external devices such as output and input devices.

[0174] The communication between the components of the electronic device is carried out through the bus structure shown in the figure. The storage unit is responsible for storing program codes, and its code can be executed by the processing unit. The electronic device can also communicate with multiple external devices, and such communication is performed through the I / O interface. In addition, the electronic device can also communicate with one or more networks (LAN, WAN, Internet, etc.) through a network adapter.

[0175] Fig. 9 An example of a physical structure diagram of an electronic device is shown in FIG. Fig. 9As shown, the electronic device may include: a processor 910, a communication interface 920, a memory 930 and a communication bus 940, wherein the processor 910, the communication interface 920 and the memory 930 communicate with each other through the communication bus 940. The processor 910 may call the logic instructions in the memory 930 to execute the supply chain risk measurement method, which includes:

[0176] Obtaining quantitative indicators of the ICT supply chain at preset key links, wherein the quantitative indicators include at least one of asset-liability ratio, cash flow ratio, demand deviation, timely fulfillment rate, out-of-stock frequency, and operation and maintenance processing time;

[0177] Determining the weight values ​​of the key links and the weight values ​​of the quantitative indicators;

[0178] Determine the abnormal probability of the quantitative indicator based on a preset abnormality detection algorithm, and determine the risk threat score of the quantitative indicator according to the abnormal probability and a preset scoring standard;

[0179] The overall risk value of the ICT supply chain is determined based on the weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat score.

[0180] In addition, the logic instructions in the above-mentioned memory 930 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art, and the computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk.

[0181] On the other hand, the present application also provides a computer program product, the computer program product includes a computer program, the computer program can be stored on a non-transitory computer-readable storage medium, when the computer program is executed by a processor, the computer can execute the supply chain risk measurement method provided by the above methods, the method includes:

[0182] Obtaining quantitative indicators of the ICT supply chain at preset key links, wherein the quantitative indicators include at least one of asset-liability ratio, cash flow ratio, demand deviation, timely fulfillment rate, out-of-stock frequency, and operation and maintenance processing time;

[0183] Determining the weight values ​​of the key links and the weight values ​​of the quantitative indicators;

[0184] Determine the abnormal probability of the quantitative indicator based on a preset abnormality detection algorithm, and determine the risk threat score of the quantitative indicator according to the abnormal probability and a preset scoring standard;

[0185] The overall risk value of the ICT supply chain is determined based on the weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat score.

[0186] In another aspect, the present application further provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the supply chain risk measurement method provided by the above methods is implemented, and the method includes:

[0187] Obtaining quantitative indicators of the ICT supply chain at preset key links, wherein the quantitative indicators include at least one of asset-liability ratio, cash flow ratio, demand deviation, timely fulfillment rate, out-of-stock frequency, and operation and maintenance processing time;

[0188] Determining the weight values ​​of the key links and the weight values ​​of the quantitative indicators;

[0189] Determine the abnormal probability of the quantitative indicator based on a preset abnormality detection algorithm, and determine the risk threat score of the quantitative indicator according to the abnormal probability and a preset scoring standard;

[0190] The overall risk value of the ICT supply chain is determined based on the weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat score.

[0191] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0192] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0193] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A supply chain risk measurement method, characterized in that: include: Obtaining quantitative indicators of the ICT supply chain at preset key links, wherein the quantitative indicators include at least one of asset-liability ratio, cash flow ratio, demand deviation, timely fulfillment rate, out-of-stock frequency, and operation and maintenance processing time; Determining the weight values ​​of the key links and the weight values ​​of the quantitative indicators; Determine the abnormal probability of the quantitative indicator based on a preset abnormality detection algorithm, and determine the risk threat score of the quantitative indicator according to the abnormal probability and a preset scoring standard; The overall risk value of the ICT supply chain is determined based on the weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat score.

2. The supply chain risk measurement method according to claim 1, characterized in that: The anomaly detection algorithm is a COPOD algorithm. The abnormal probability of the quantitative indicator is determined based on a preset anomaly detection algorithm, and the risk threat score of the quantitative indicator is determined according to the abnormal probability and a preset scoring standard, including: Divide the quantitative indicators into positive indicators and negative indicators; Determine the left tail probability of the positive indicator based on the COPOD algorithm and determine the right tail probability of the negative indicator based on the COPOD algorithm; Determining the risk threat score of the positive indicator according to the left-tail probability and the preset positive indicator scoring standard; Determine the risk threat score of the reverse indicator according to the right tail probability and the preset reverse indicator scoring standard; The positive index scoring standard is negatively correlated with the abnormal threshold of the COPOD algorithm, and the negative index scoring standard is positively correlated with the abnormal threshold of the COPOD algorithm.

3. The supply chain risk measurement method according to claim 1, characterized in that: Determining the weight values ​​of the key links and the weight values ​​of the quantitative indicators includes: Obtaining expert evaluations of the key links, and constructing a first fuzzy judgment matrix corresponding to the key links according to the expert evaluations of the key links; Determining the weight values ​​of the key links according to the first fuzzy judgment matrix; Obtaining expert evaluations of the quantitative indicators, and constructing a second fuzzy judgment matrix corresponding to the quantitative indicators according to the expert evaluations of the quantitative indicators; According to the second fuzzy judgment matrix, a weight value of the quantitative index is determined.

4. The supply chain risk measurement method according to claim 3 is characterized in that: Also includes: If the matrix elements of the first fuzzy judgment matrix do not meet the preset metric values, converting the first fuzzy judgment matrix into a first fuzzy consistency matrix, and determining the weight values ​​of the key links according to the first fuzzy consistency matrix; If the matrix elements of the second fuzzy judgment matrix do not meet the preset metric values, the second fuzzy judgment matrix is ​​converted into a second fuzzy consistency matrix, and the weight values ​​of the key links are determined according to the second fuzzy consistency matrix.

5. The supply chain risk measurement method according to claim 1, characterized in that: Determining the overall risk value of the ICT supply chain according to the weight values ​​of the key links, the weight values ​​of the quantitative indicators, and the risk threat score includes: Determining the risk score of the key link according to the weight value of the quantitative indicator and the risk threat score; The overall risk value of the ICT supply chain is determined based on the risk score and the weight values ​​of the key links.

6. The supply chain risk measurement method according to claim 1, characterized in that: Also includes: The overall risk value of the ICT supply chain is uploaded to the blockchain.

7. A supply chain risk measurement device, characterized in that: include: A data input module, used to obtain quantitative indicators of the ICT supply chain in preset key links, wherein the quantitative indicators include at least one of asset-liability ratio, cash flow ratio, demand deviation, timely fulfillment rate, out-of-stock frequency, and operation and maintenance processing time; A risk threat measurement module, used to determine the weight values ​​of the key links and the weight values ​​of the quantitative indicators; Determine the abnormal probability of the quantitative indicator based on a preset abnormality detection algorithm, and determine the risk threat score of the quantitative indicator according to the abnormal probability and a preset scoring standard; The result output module is used to output the overall risk value of the ICT supply chain according to the weight values ​​of the key links, the weight values ​​of the quantitative indicators and the risk threat score.

8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the supply chain risk measurement method according to any one of claims 1 to 6 is implemented.

9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the supply chain risk measurement method according to any one of claims 1 to 6 is implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the supply chain risk measurement method according to any one of claims 1 to 6 is implemented.

Citation Information

Patent Citations

  • Supplier evaluation method based on fuzzy analytic hierarchy process-entropy weight method

    CN115239126A

  • Electricity selling company performance risk identification method and equipment based on flexible supervision strategy

    CN116151953A

  • Risk monitoring method and device for IT system supply chain

    CN116433099A

Cited By

  • Enterprise supply chain risk identification method and device, storage medium and program product

    CN120746261A