Configuration method for on-line monitoring and intelligent diagnosis substation system of secondary equipment of intelligent substation
By establishing the device monitoring information configuration model and the device secondary virtual loop description model, and configuring the whole station physical loop model, the problem of insufficient monitoring information and difficulty in operation and maintenance of the secondary equipment online monitoring and intelligent diagnosis substations of the smart substation is solved, and the Efficient configuration and operation and maintenance ensure the correctness and safety of the system, and support rapid analysis of power grid faults and equipment status diagnosis.
Patent Information
- Application Number
- CN202410876220.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-22
AI Technical Summary
The online monitoring of secondary equipment in smart substations and the intelligent diagnostic substation do not collect monitoring information in place, the status monitoring configuration information has integrity and correctness security risks, operation and maintenance is difficult, and the lack of a self-describing maintenance mechanism for the online monitoring information model makes the system unable to To function effectively, there are safety hazards and long construction period issues.
By collecting the capability description files of the secondary equipment in the substation and the whole-station system configuration files, we establish the device monitoring information configuration model and the device secondary virtual circuit description model, configure the whole-station physical loop model, and use sub-station configuration tools to complete the information model integration. , realizing source-side maintenance of online monitoring information model of smart substation secondary equipment online monitoring and intelligent diagnosis substations.
It greatly improves the efficiency of online monitoring of secondary equipment in smart substations and the configuration efficiency of smart diagnostic substations, ensures the correctness of information models and data accuracy, reduces man-hours, and enables rapid analysis and analysis of relay protection online monitoring and smart diagnosis systems. Equipment status diagnosis provides technical support for power grid fault analysis and operation risk analysis.
Smart Images

Figure CN118826286A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of relay protection of power system substations, and in particular to a method for configuring an online monitoring and intelligent diagnosis substation system for secondary equipment of an intelligent substation. Background Art
[0002] During the construction of the smart substation secondary equipment online monitoring and intelligent diagnosis substation (hereinafter referred to as the "substation"), some problems were exposed: First, a large amount of monitoring information of the relay protection equipment could not be monitored, such as the lack of physical port light intensity, process layer CRC code, device operating voltage, board operating temperature, etc., which directly led to the relay protection online monitoring and intelligent diagnosis system being difficult to effectively play its role and unable to achieve the construction goals; second, there were safety risks in the integrity and correctness of the substation status monitoring configuration information. Since the manufacturer did not self-describe the device hardware configuration, the relevant industry specifications lacked the soft pressure plate for secondary equipment. The formal specifications of control relationships, broken chain alarm correlation relationships, and static descriptions of secondary equipment anomalies require substation construction personnel to manually infer and supplement based on the substation construction process data, resulting in the inability to guarantee the accuracy of substation data, potential safety hazards, and a long construction period. Third, the operation and maintenance of the substation after it is put into operation according to manual configuration is difficult, and the substation construction process data lacks consistency verification methods. In addition, the subsequent substation renovation and expansion requires the continuous participation of the substation, and there is an overall lack of self-describing maintenance mechanism for online monitoring information models. If we do not start with simple and easy configuration of source modeling, the equipment will fall into an "operation and maintenance quagmire." Summary of the invention
[0003] The purpose of the present invention is to provide a method for configuring a system of online monitoring and intelligent diagnosis substation for secondary equipment of a smart substation, which can achieve the goal of a "source-end maintenance" mechanism for online monitoring of secondary equipment of a smart substation and online monitoring information model of an intelligent diagnosis substation by setting requirements on the equipment capability of the status monitoring information model of the station-end relay protection equipment, the formalization of the self-description of the monitoring information, and the integration capability of the substation manufacturer information model.
[0004] In order to achieve the above object, the present invention is implemented through the following technical solutions: A method for configuring a smart substation secondary equipment online monitoring and smart diagnosis substation system, comprising the steps of: S1. Collect the ICD file of the capability description of the secondary equipment in the substation that needs to be configured with the online monitoring and intelligent diagnosis substation of the smart substation secondary equipment and the SCD file of the whole station system configuration file; S2. Establish a device monitoring information configuration model including hardware instantiation configuration of a single device, correspondence between light intensity and physical port, device abnormality and alarm information; S3. Establish a device secondary virtual circuit description model including the correspondence between the soft pressure plate and the virtual terminal of a single device, the process layer disconnection alarm and the link alarm and the subscription service relationship; S4. Configure the physical loop configuration model of the entire station; S5. Use the substation configuration tool to complete the integration of the whole station information model, and the substation will be officially operated according to the SMCD full model file of the substation intelligent operation and maintenance online monitoring information description file.
[0005] Furthermore, the device monitoring information configuration model described in step S2 is modeled using the device monitoring information configuration description file IMCD file. The configVersion attribute value of the "Unit" tag of the IMCD file remains consistent with the configVersion attribute value of the "IED" tag of the ICD file. The device monitoring information configuration description file describes the hardware instantiation configuration of a single device, the correspondence between light intensity and physical ports, and equipment abnormalities and alarm information.
[0006] Further, the hardware instantiation configuration description reflects the instantiation of all boards and port configurations of the device engineering; The slot attribute value of the board "Board" tag in the IMCD file includes a digital code that reflects the board slot. When the digital code is inconsistent with the logical board code in the SCD file, the device manufacturer provides a mapping relationship.
[0007] Furthermore, the object describing the correspondence between light intensity and physical port is the light intensity monitoring signal of the process layer optical fiber connection port, including the light intensity monitoring signal of the longitudinal channel. The association relationship is configured under the corresponding port "Port" tag of the IMCD configuration file, and is expressed by referencing the light intensity information model with the attribute scliRef attribute value. The light intensity information model refers to the object of the device information sending data set management.
[0008] Furthermore, the equipment abnormality and alarm information reflects the static configuration information of the alarm, including the configuration instructions of the defect level, associated board, impact range, and processing suggestions corresponding to the device abnormality and alarm information. The interval layer device abnormality and alarm information description configuration includes all data model objects managed by the abnormality and alarm data set sent by the device MMS. The process layer device abnormality and alarm information description table includes all device self-test alarms or abnormality information data model objects sent by GOOSE.
[0009] Furthermore, the object describing the correspondence between the soft pressure plate and the virtual terminal includes the correspondence between the soft pressure plate sent by GOOSE and the virtual terminal sent, and the description of associating the soft pressure plate object and the virtual terminal object includes an object reference and an object description.
[0010] Furthermore, the association relationship between the link-broken alarm data model reference and the subscription service control block of the sending end is exported from the SCD file. The object associated with the link-broken alarm is the subscribed GOOSE and SV service control blocks. The object description includes the sending device, the reference of the subscribed control block, and the control block APPID.
[0011] Furthermore, the physical loop configuration model of the entire site includes area and panel cabinet information, and establishes an association between devices and panel cabinets.
[0012] Furthermore, when configuring the online monitoring of the secondary equipment of the smart substation and the integrated intelligent diagnosis substation, the system configuration files SCD, IMCD and IVLD files, and the physical loop configuration model of the entire station based on the on-site construction data and verified for consistency are imported into the substation configuration tool respectively to generate the SMCD file, an online monitoring information description file for the intelligent operation and maintenance of the substation, so as to realize the rapid and automatic configuration of the substation model.
[0013] Furthermore, the configuration process of the SMCD file in the smart substation is: Get the ICD file and generate the IMCD file using the IED configuration tool and the ICD file; Complete the construction of substation system integration configuration file SCD; Generate device instance IVLD file based on system integration configuration file SCD and device function realization logic; The on-site system configuration SCD, device model IMCD file, device instance IVLD file, and other technical data of the substation on-site construction process are integrated. The substation enters the physical ID and equipment identification code of the secondary equipment in the substation, and completes the consistency correspondence with the IEDName of each secondary equipment in the SCD file. After the other information buses are verified for engineering consistency, the SMCD file construction is completed, and the substation is officially operated according to the SMCD full model file.
[0014] The advantages of the present invention are: it greatly improves the efficiency of online monitoring of secondary equipment in smart substations and configuration of smart diagnosis substations, and the information model verification is simpler, which greatly reduces the man-hours for configuring information points and information point tables, and realizes substation function construction only through model configuration, thus ensuring the correctness of the substation configuration model. By requiring the equipment capability of the station-side relay protection equipment status monitoring information model, requiring the self-description formalization of monitoring information, and requiring the substation manufacturer information model integration capability, the goal of the "source-end maintenance" mechanism of the online monitoring information model of the secondary equipment in smart substations and the online monitoring information model of the smart diagnosis substation is achieved, which provides a technical support foundation for promoting the construction of online monitoring and smart diagnosis systems for relay protection, and realizing rapid analysis of power grid faults, equipment status diagnosis, and power grid and equipment operation risk analysis. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a flow chart of SMCD file configuration in Example 1 of the present invention; Figure 2 This is a schematic diagram of physical loop information configuration according to Embodiment 2 of the present invention. DETAILED DESCRIPTION
[0016] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0017] Example 1 A method for configuring an online monitoring and intelligent diagnosis substation system for secondary equipment of an intelligent substation includes the following steps.
[0018] S1. Collect the capability description files (IEDCapability Description, ICD files) and the whole station system configuration files (Substation ConfigurationDescription, SCD files) of the secondary equipment such as relay protection and safety automatic devices, intelligent terminals, merging units, and integrated intelligent devices in the substation that need to be configured with the online monitoring and intelligent diagnosis substation of the secondary equipment of the intelligent substation.
[0019] S2. Before substation integration configuration, establish a device monitoring information configuration model for each type of device, using the device monitoring information configuration description file (IED Monitoring Information Configuration Description, IMCD file) to model. The configVersion attribute value of the "Unit" tag of the IMCD file should be kept consistent with the configVersion attribute value of the "IED" tag of the ICD file. The device monitoring information configuration description file (IMCD) should describe the hardware instantiation configuration of a single device, the correspondence between light intensity and physical ports, and equipment abnormalities and alarm information.
[0020] S201. Device hardware instantiation configuration. The device hardware instantiation configuration description should reflect the configuration of all boards and ports instantiated in the device engineering. The slot attribute value of the board "Board" tag in the IMCD file should include the digital code reflecting the board slot. When the digital code is inconsistent with the logical board code in the SCD file, the equipment manufacturer should provide a mapping relationship (BoardMap). The device hardware instantiation configuration description should comply with the requirements of GB / T 37755, and expand the dependency relationship between light intensity and ports. The optional values of the device port usage attribute "usage" include "SV", "GS", "ZL", and "MMS". "SV" indicates the transmission of protection sampling value information messages, "GS" indicates the transmission of GOOSE information messages, "ZL" indicates the transmission of optical fiber longitudinal channel information, and "MMS" indicates the station control layer network communication. Multiple uses are separated by " / ". The format description is shown in Table 1.
[0021] Table 1 Attribute extension description S202. The correspondence between light intensity and physical port. The correspondence description object is the light intensity monitoring signal of the process layer optical fiber connection port, including the light intensity monitoring signal of the longitudinal channel. The association relationship is configured under the corresponding port "Port" tag of the IMCD configuration file, and the attribute scliRef attribute value refers to the light intensity information model expression, and the light intensity information model refers to the object of the device information sending data set management.
[0022] S203. Equipment abnormality and alarm information. It can reflect the static configuration information of alarms, including the configuration descriptions of the defect level, associated boards, impact range, and processing suggestions corresponding to the device abnormality (Warning) and alarm (Alarm) information. The description configuration of the device abnormality and alarm information at the interval layer should include all data model objects managed by the abnormality and alarm data set sent by the device MMS. The device abnormality and alarm information description table at the process layer should include all device self-test alarms or abnormality information data model objects sent by GOOSE. The static description information configuration label attribute definition description of device abnormalities and alarms is shown in Table 2.
[0023] Table 2 Configuration tags and attribute definitions for static description information such as device anomalies and alarms S3. After completing the system integration commissioning and acceptance, generate the secondary virtual circuit description configuration of the device according to the SCD file configuration, and use the device secondary virtual circuit description file (IED Virtual Line Description, IVLD file) to model. The IEDVirtualCRC attribute value of the "Unit" tag in the IVLD file should be consistent with the "IED virtualterminal connection CRC" value of the corresponding IED in the SCD file. The device secondary virtual circuit description file (IVLD) should describe the correspondence between the soft pressure plate and the virtual terminal of a single device, the process layer disconnection alarm and the link alarm and subscription service relationship.
[0024] S301. Description of the correspondence between soft pressure plates and virtual terminals. The objects described in the correspondence description should include the correspondence between the soft pressure plates sent by GOOSE and the virtual terminals sent. The description of the associated soft pressure plate objects and virtual terminal objects should include object references and object descriptions.
[0025] S302. The GOOSE and SV data subscription disconnection alarm of the device process layer should be able to reflect whether the communication with each subscribed GOOSE and SV service is interrupted. The reference of the disconnection alarm data model and the subscription service control block of the sender should be exported by the SCD file. The corresponding relationship between the soft pressure plate and the virtual terminal is described in Table 3.
[0026] Table 3 Configuration labels and attribute definitions for the correspondence between soft pressure plates and virtual terminals Description of the relationship between the link break alarm and the subscribed service. The object associated with the link break alarm is the subscribed GOOSE and SV service control blocks. The object description includes the sending device, the reference to the subscribed control block, and the control block APPID. The corresponding relationship between the device link break alarm, link alarm signal and the service control block (GOOSE control block / SV control block) subscribed to the process layer, the configuration tag attribute definition in the IVLD file is shown in Table 4.
[0027] Table 4 Definition of labels and attributes for configuration of the relationship between link break alarm and subscription service S4. Before configuration, establish a physical loop configuration model for the entire site, including area and panel cabinet information, and establish the association between the device and the panel cabinet. The physical loop information model reflects a complete "optical" information transmission channel between secondary devices, between secondary devices and switches, and between switches.
[0028] S5. After obtaining the IMCD file, IVLD file, and the physical circuit configuration model of the entire station for each device in the substation, when configuring the online monitoring of the secondary equipment of the smart substation and the integrated configuration of the smart diagnosis substation, the system configuration files SCD, IMCD and IVLD files, and the physical circuit configuration model of the entire station that has been verified for consistency based on the on-site construction data are imported into the substation configuration tool (secondary equipment monitoring configuration tool) to generate the substation intelligent operation and maintenance online monitoring information description file (Substation Monitoring Information Configuration Description, SMCD file) to achieve rapid and automatic configuration of the substation model. The configuration process of the SMCD file in the smart substation is as follows: Figure 1 .
[0029] S501 obtains the ICD file, uses the IED configuration tool and the ICD file to generate the IMCD file; S502. Complete the substation system integration configuration file SCD construction; S503. Based on the system integration configuration file SCD, combined with the device function to achieve the logic generation device instance IVLD file; S504. Integrate the engineering site system configuration SCD, device model IMCD file, device instance IVLD file, and other technical data of the substation on-site construction process. The substation enters the physical ID and equipment identification code of the secondary equipment in the substation, completes the consistency correspondence with the IEDName of each secondary equipment in the SCD file, and completes the SMCD file construction after the other information buses are verified for engineering consistency. The substation is officially operated according to the SMCD full model file.
[0030] Example 2 Based on Example 1, this example provides a detailed configuration example of the physical loop configuration model for the entire station. Figure 2 .
[0031] For physical loops in the same cabinet, such as the physical loop from the protection device to the interval switch, the IntCore name of the fiber jumper can be named "device name-switch name".
[0032] If a fiber physical loop only contains a section of optical cable, the panel cabinet optical rack model is not built. PortA and portB of the physical loop are protection device ports, intelligent component ports, or switch ports.
[0033] For physical circuits such as busbar protection direct trip interval intelligent terminals, the busbar protection cabinet tail cable is connected to the interval protection and control cabinet optical distribution rack, and then the protection and control cabinet optical cable is connected to the intelligent control cabinet. The physical model of the protection and control cabinet optical distribution rack is supplemented. In this application scenario, the physical circuit is described by the two-segment connection Core.
[0034] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for configuring a smart substation secondary equipment online monitoring and smart diagnosis substation system, characterized in that: Includes steps: S1. Collect the ICD file of the capability description of the secondary equipment in the substation that needs to be configured with the online monitoring and intelligent diagnosis substation of the smart substation secondary equipment and the SCD file of the whole station system configuration file; S2. Establish a device monitoring information configuration model including hardware instantiation configuration of a single device, correspondence between light intensity and physical port, device abnormality and alarm information; S3. Establish a device secondary virtual circuit description model including the correspondence between the soft pressure plate and the virtual terminal of a single device, the process layer disconnection alarm and the link alarm and the subscription service relationship; S4. Configure the physical loop configuration model of the entire station; S5. Use the substation configuration tool to complete the integration of the whole station information model, and the substation will be officially operated according to the SMCD full model file of the substation intelligent operation and maintenance online monitoring information description file.
2. According to the method for configuring the smart substation secondary equipment online monitoring and smart diagnosis substation system in claim 1, it is characterized in that: The device monitoring information configuration model described in step S2 is modeled using the device monitoring information configuration description file IMCD file. The configVersion attribute value of the "Unit" tag of the IMCD file is kept consistent with the configVersion attribute value of the "IED" tag of the ICD file. The device monitoring information configuration description file describes the hardware instantiation configuration of a single device, the correspondence between light intensity and physical ports, and equipment abnormalities and alarm information.
3. According to claim 2, the method for configuring the smart substation secondary equipment online monitoring and smart diagnosis substation system is characterized in that: The hardware instantiation configuration description reflects the instantiation of all boards and port configurations of the device engineering; The slot attribute value of the "Board" tag of the board in the IMCD file includes a digital code that reflects the board slot. When the digital code is inconsistent with the logical board code in the SCD file, the device manufacturer provides a mapping relationship.
4. According to claim 1, the configuration method of the smart substation secondary equipment online monitoring and smart diagnosis substation system is characterized in that: The object describing the correspondence between light intensity and physical port is the light intensity monitoring signal of the process layer optical fiber connection port, including the light intensity monitoring signal of the longitudinal channel. The association relationship is configured under the corresponding port "Port" tag of the IMCD configuration file, and is expressed by referencing the light intensity information model with the attribute scliRef attribute value. The light intensity information model refers to the object managed by the device information sending data set.
5. According to claim 1, the configuration method of the smart substation secondary equipment online monitoring and smart diagnosis substation system is characterized in that: The equipment exception and alarm information reflects the alarm static configuration information, including the defect level, associated board, impact scope, and configuration instructions for processing suggestions corresponding to the device exception and alarm information. The interval layer device exception and alarm information description configuration includes all data model objects managed by the exception and alarm data set sent by the device MMS. The process layer device exception and alarm information description table includes all device self-test alarms or exception information data model objects sent by GOOSE.
6. According to claim 1, the method for configuring the smart substation secondary equipment online monitoring and smart diagnosis substation system is characterized in that: The object describing the correspondence between the soft pressure plate and the virtual terminal includes the correspondence between the soft pressure plate sent by GOOSE and the virtual terminal sent, and the description of associating the soft pressure plate object and the virtual terminal object includes an object reference and an object description.
7. According to claim 1, the configuration method of the smart substation secondary equipment online monitoring and smart diagnosis substation system is characterized in that: The association relationship between the link-broken alarm data model reference and the subscription service control block of the sender is exported from the SCD file. The object associated with the link-broken alarm is the subscribed GOOSE and SV service control blocks. The object description includes the sending device, the reference of the subscribed control block, and the control block APPID.
8. According to claim 1, the configuration method of the smart substation secondary equipment online monitoring and smart diagnosis substation system is characterized in that: The physical loop configuration model of the entire station includes area and panel cabinet information, and establishes an association relationship between devices and panel cabinets.
9. The method for configuring the online monitoring and intelligent diagnosis substation system of the secondary equipment of the intelligent substation according to claim 1 is characterized in that: When configuring the online monitoring and intelligent diagnosis substation integration of secondary equipment in smart substations, the system configuration files SCD, IMCD and IVLD files, and the physical circuit configuration model of the entire station based on on-site construction data and verified for consistency are imported into the substation configuration tool to generate the SMCD file, an online monitoring information description file for intelligent operation and maintenance of the substation, to achieve rapid and automatic configuration of the substation model.
10. The method for configuring the online monitoring and intelligent diagnosis substation system of the secondary equipment of the intelligent substation according to claim 9 is characterized in that: The configuration process of SMCD file in smart substation is as follows: Get the ICD file and generate the IMCD file using the IED configuration tool and the ICD file; Complete the construction of substation system integration configuration file SCD; Generate device instance IVLD file based on system integration configuration file SCD and device function realization logic; The on-site system configuration SCD, device model IMCD file, device instance IVLD file, and other technical data of the substation on-site construction process are integrated. The substation enters the physical ID and equipment identification code of the secondary equipment in the substation, and completes the consistency correspondence with the IEDName of each secondary equipment in the SCD file. After the other information buses are verified for engineering consistency, the SMCD file construction is completed, and the substation is officially operated according to the SMCD full model file.
Citation Information
Cited By
SMCD file generation method and system suitable for stock substation
CN120804038A