Advanced early warning system and method for uneven consolidation settlement caused by construction rainfall

By combining the seepage calculation of pumping wells and the consolidation settlement calculation method of layered sum method in specifications, the soil settlement value and the impact range of consolidation settlement are derived, and early warning value is set to avoid uneven settlement, which solves the problem of precipitation caused by precipitation during construction. The problem of uneven consolidation and settlement is difficult to warning in advance, ensuring the safety of the building structure.

CN118882591APending Publication Date: 2024-11-01ROAD & BRIDGE INT CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410951570.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The existing technology is difficult to warning in advance for uneven consolidation and settlement caused by precipitation during construction, resulting in damage or damage to the building structure.

Method used

The consolidation settlement calculation method combined with the seepage calculation method of the pumping well and the layered sum method in the specifications are derived, and the soil settlement value at any position in the radius of the precipitation well is calculated, and the consolidation settlement impact range brought by the pumping well is calculated. Set the warning value according to the groundwater level, and issue an early warning through the data reception and warning terminal to avoid damage.

Benefits of technology

A forward warning of uneven consolidation and settlement caused by construction precipitation is achieved, and the damage or damage to the building structure caused by uneven settlement is avoided, ensuring construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118882591A_ABST
    Figure CN118882591A_ABST
Patent Text Reader

Abstract

The invention discloses an advanced early warning system and method for non-uniform consolidation settlement caused by construction precipitation, and relates to the field of engineering monitoring, the advanced early warning system comprises a ground surface and a neighborhood building structure arranged on the ground surface, a precipitation well is arranged under the ground surface, an observation hole with the diameter of 300-400 mm is formed between the precipitation well and the neighborhood building structure, and the observation hole is communicated with the precipitation well. A water level gauge is arranged at the bottom of the observation hole, the water level gauge is connected to a data receiving and early warning terminal arranged on the ground surface through a sensor data transmission line, and the bottoms of the precipitation well and the observation hole are non-compression layers. According to the method, a seepage calculation method of a pumping well and a consolidation settlement calculation method of a stratified summation method in specifications are combined, a soil body settlement value at any position of the radius of the dewatering well is deduced, and the uneven settlement distribution condition of the building structure foundation can be obtained. And under the condition that the permeability coefficient and the flow of the pumping well are given, the influence range of consolidation settlement caused by the pumping well can be calculated through the calculation method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of engineering monitoring, and in particular to an advance warning system and method for uneven consolidation settlement caused by construction precipitation. Background Art

[0002] The efficient use of urban space has led to an increasing number of close-range construction projects. The close-range construction between foundation pits and buildings in water-rich strata is one of the most urgent problems to be solved. In various close-range construction cases in water-rich strata, there are often two ways to treat groundwater. One is non-precipitation construction, which is to intercept water by using underground continuous walls or support structures + water-stop curtains, combined with the method of combing the pit to achieve a dry state in the pit. This non-precipitation construction method for treating groundwater is often expensive, and it is difficult to achieve good results in high-pressure water-rich strata. The other is precipitation construction, which achieves a drying effect in the foundation pit by arranging precipitation wells around the foundation pit and drainage wells inside the foundation pit. This method is relatively low in cost, but it is often prone to uneven consolidation and settlement of the building foundation caused by precipitation, causing damage or even destruction to the neighboring structure.

[0003] At present, uneven settlement warning is often carried out by directly monitoring displacement values ​​or inclination values. However, when the monitoring value exceeds the warning value, uneven settlement of the building has often occurred, causing irreversible damage or destruction.

[0004] Therefore, it is necessary to provide an advance warning system and method for uneven consolidation settlement caused by construction precipitation to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide an advanced warning system and method for uneven consolidation settlement caused by construction precipitation, combining the seepage calculation method of the pumping well and the consolidation settlement calculation method of the layered summation method in the specification, and deriving the soil settlement value at any position of the precipitation well radius, so as to obtain the uneven settlement distribution of the building structure foundation. And under the condition of a given permeability coefficient and pumping well flow, the above calculation method is used to calculate the influence range of the consolidation settlement caused by the pumping well.

[0006] To achieve the above-mentioned purpose, the present invention provides an advance warning system for uneven consolidation settlement caused by construction precipitation, including a surface and neighboring structures arranged on the surface, a precipitation well is arranged under the surface, an observation hole with a diameter of 300mm to 400mm is arranged between the precipitation well and the neighboring structures, a water level meter is arranged at the bottom of the observation hole, the water level meter is connected to a data receiving and early warning terminal arranged on the surface through a sensor data transmission line, and the bottom of the precipitation well and the observation hole are non-compressible layers.

[0007] Preferably, a first settlement observation point and a second settlement observation point are respectively provided at both ends where the neighborhood building contacts the ground.

[0008] A method for an advanced warning system for uneven consolidation settlement caused by construction precipitation combines the seepage calculation method of precipitation wells and the consolidation settlement calculation method of the layered summation method in the specification to deduce the soil settlement value at any position of the precipitation well radius, and obtain the uneven settlement distribution of neighboring buildings and structures; specifically, the following steps are included:

[0009] S1: Under the given permeability coefficient and precipitation well flow rate, the consolidation settlement influence range brought by the precipitation well is calculated by combining the seepage calculation method of the precipitation well and the consolidation settlement calculation method of the layered summation method in the specification;

[0010] S2: According to the risk level classification of neighboring buildings and structures, the influence range of the precipitation well and the maximum allowable differential settlement value of neighboring buildings and structures are specified, and the lowest groundwater level corresponding to each precipitation well is reversely calculated. When the groundwater level is lower than the warning value, an early warning is issued;

[0011] S3: Since it takes a certain amount of time for the consolidation settlement of precipitation to occur, the data receiving and warning terminal issues a warning and restores the water level during this period to prevent damage or destruction of neighboring structures due to uneven consolidation settlement caused by precipitation.

[0012] Preferably, the distance between the precipitation well and the observation hole is r 1 ; The distance from the precipitation well to any position on the ground surface is r; The height of the groundwater level corresponding to the precipitation well is the distance from the non-compressible layer to the groundwater level surface; The height of the groundwater level corresponding to the observation hole is h 1 ; There is a precipitation well at any distance from the precipitation well, and the corresponding groundwater level is h above the non-compressible layer; the distance between the No. 1 settlement observation point of the neighboring building and the precipitation well is r 2 ; The groundwater level at the No. 1 settlement observation point is h 2 ; The groundwater level at the second settlement observation point is h 3 , the distance between the second settlement observation point of the neighboring building and the precipitation well is r 3 ;

[0013] According to Darcy's law, the flow rate q when pumping water from a precipitation well is expressed as:

[0014]

[0015] Where k is the average permeability coefficient of the soil layer; H is the initial groundwater level; γ is the natural density of the soil; γ' is the floating density of the soil; E s is the soil compression modulus;

[0016] For two points on the same straight line at any distance from the precipitation well, taking the observation hole and another arbitrary point as an example, there is the following relationship:

[0017]

[0018] On the basis of known flow rate and soil permeability coefficient, the influence range of the maximum consolidation settlement of the precipitation well is:

[0019]

[0020] In formula (3), r e Represents the maximum consolidation settlement influence range of the precipitation well;

[0021] The height of the groundwater level at any location is expressed as:

[0022]

[0023] The precipitation height at any location is:

[0024]

[0025] For a given precipitation height, the maximum consolidation settlement of the soil layer at this location is calculated as:

[0026]

[0027] In formula (6), E s is the compression modulus of soil, γ is the natural density of soil, and γ' is the floating density of soil.

[0028] Preferably, for the No. 1 settlement observation point adjacent to the building, the maximum critical settlement of the No. 1 settlement observation point is s * , the critical precipitation height of the No. 1 settlement observation point is:

[0029]

[0030] The critical groundwater level is:

[0031]

[0032] Let h = h * , substituting into formula (4), according to the critical groundwater level height of the No. 1 settlement observation point, the warning water level at the observation hole is reversely calculated as:

[0033]

[0034] When the groundwater level in the observation hole is lower than the warning value, the data receiving and warning terminal will randomly issue a warning to ensure that the groundwater level is restored before consolidation settlement occurs.

[0035] Therefore, the present invention adopts the above-mentioned advanced warning system and method for uneven consolidation settlement caused by construction precipitation, which has the following beneficial effects:

[0036] (1) The present invention combines the seepage calculation method of the pumping well with the consolidation settlement calculation method of the layered summation method in the specification to deduce the soil settlement value at any position of the pumping well radius, and thus obtains the uneven settlement distribution of the building structure foundation.

[0037] (2) The present invention calculates the consolidation settlement influence range caused by the pumping well by the above calculation method under the condition of a given permeability coefficient and pumping well flow rate.

[0038] (3) The present invention classifies the risk levels of neighboring buildings and structures, specifies the impact range of the pumping wells, and the maximum allowable differential settlement value of the buildings and structures, and reversely calculates the lowest groundwater level of each pumping well. When the groundwater level is lower than the warning value, the data receiving and warning terminal can issue a warning.

[0039] (4) In the present invention, since it takes a certain amount of time for the consolidation settlement of precipitation to occur, issuing an early warning and restoring the water level at this time can prevent damage or destruction of neighboring structures due to uneven consolidation settlement caused by precipitation.

[0040] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a schematic diagram of an advance warning system method for uneven consolidation settlement caused by construction precipitation according to the present invention;

[0042] Figure Annotation

[0043] 1. Dewatering well; 2. Observation hole; 3. Settlement observation point No. 1; 4. Settlement observation point No. 2; 5. Sensor data transmission line; 6. Groundwater level corresponding to observation point No. 1; 7. Groundwater level corresponding to observation point No. 2; 8. Groundwater level corresponding to dewatering well; 9. Groundwater level corresponding to observation hole; 10. Non-compressible layer; 11. Ground surface; 12. Water level meter; 13. Data receiving and early warning terminal; 14. Neighboring buildings. DETAILED DESCRIPTION

[0044] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.

[0045] Unless otherwise defined, technical or scientific terms used in the present invention shall have the common meanings understood by one having ordinary skills in the field to which the present invention belongs.

[0046] The words "include" or "comprises" and the like used in the present invention mean that the elements before the word include the elements listed after the word, and do not exclude the possibility of also including other elements. The orientation or position relationship indicated by the terms "inside", "outside", "upper", "lower", etc. is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation of the present invention. When the absolute position of the described object changes, the relative position relationship may also change accordingly. In the present invention, unless otherwise clearly specified and limited, the terms "attachment" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral body; it can be directly connected, or indirectly connected through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] like Figure 1 As shown, the present invention provides an advance warning system for uneven consolidation settlement caused by construction precipitation, including a surface 11 and a neighborhood structure 14 arranged on the surface of the surface 11, a precipitation well 1 is arranged under the surface 11, an observation hole with a diameter of 300mm to 400mm is arranged between the precipitation well 1 and the neighborhood structure 14, a water level meter 12 is arranged at the bottom of the observation hole 2, the water level meter 12 is connected to a data receiving and warning terminal 13 arranged on the surface of the surface 11 through a sensor data transmission line 5, and the bottom of the precipitation well 1 and the observation hole 2 is a non-compressible layer 10.

[0048] A first settlement observation point 3 and a second settlement observation point 4 are respectively arranged at the two ends where the neighborhood building 14 contacts the ground surface 11 .

[0049] A method for an advanced warning system for uneven consolidation settlement caused by construction precipitation combines the seepage calculation method of precipitation wells and the consolidation settlement calculation method of the layered summation method in the specification to deduce the soil settlement value at any position of the precipitation well radius, and obtain the uneven settlement distribution of neighboring buildings and structures; specifically, the following steps are included:

[0050] S1: Under the given permeability coefficient and precipitation well flow rate, the consolidation settlement influence range brought by the precipitation well is calculated by combining the seepage calculation method of the precipitation well and the consolidation settlement calculation method of the layered summation method in the specification;

[0051] S2: According to the risk level classification of neighboring buildings and structures, the influence range of the precipitation well and the maximum allowable differential settlement value of neighboring buildings and structures are specified, and the lowest groundwater level corresponding to each precipitation well is reversely calculated. When the groundwater level is lower than the warning value, an early warning is issued;

[0052] S3: Since it takes a certain amount of time for the consolidation settlement of precipitation to occur, the data receiving and warning terminal issues a warning and restores the water level during this period to prevent damage or destruction of neighboring structures due to uneven consolidation settlement caused by precipitation.

[0053] The distance between precipitation well 1 and observation hole 2 is r 1 ; The distance from the precipitation well 1 to any position on the ground surface 11 is r; The height of the groundwater level 8 corresponding to the precipitation well is the distance from the non-compressed layer 10 to the groundwater level surface; The height of the groundwater level 9 corresponding to the observation hole is h 1 ; There is a corresponding groundwater level 8 of the precipitation well 1 at any distance from the precipitation well 1, and the height above the non-compressible layer 10 is h; the distance between the No. 1 settlement observation point 3 of the neighborhood building 14 and the precipitation well 1 is r 2 ; The groundwater level at the No. 1 settlement observation point 3 is h 2 ; The groundwater level at the second settlement observation point 4 is h 3 , the distance between the second settlement observation point 4 of the neighboring building 14 and the precipitation well 1 is r 3 ;

[0054] According to Darcy's law, the flow rate q when pumping water from a precipitation well is expressed as:

[0055]

[0056] Where k is the average permeability coefficient of the soil layer; H is the initial groundwater level; γ is the natural density of the soil; γ' is the floating density of the soil; E s is the soil compression modulus;

[0057] For two points on the same straight line at any distance from the precipitation well, taking the observation hole and another arbitrary point as an example, there is the following relationship:

[0058]

[0059] On the basis of known flow rate and soil permeability coefficient, the influence range of the maximum consolidation settlement of the precipitation well is:

[0060]

[0061] In formula (3), r e Represents the maximum consolidation settlement influence range of the precipitation well;

[0062] The height of the groundwater level at any location is expressed as:

[0063]

[0064] The precipitation height at any location is:

[0065]

[0066] For a given precipitation height, the maximum consolidation settlement of the soil layer at this location is calculated as:

[0067]

[0068] In formula (6), E s is the compression modulus of soil, γ is the natural density of soil, and γ' is the floating density of soil.

[0069] For the No. 1 settlement observation point adjacent to the building, the maximum critical settlement of the No. 1 settlement observation point is s * , the critical precipitation height of the No. 1 settlement observation point is:

[0070]

[0071] The critical groundwater level is:

[0072]

[0073] Let h = h * , substituting into formula (4), according to the critical groundwater level height of the No. 1 settlement observation point, the warning water level at the observation hole is reversely calculated as:

[0074]

[0075] When the groundwater level in the observation hole is lower than the warning value, the data receiving and warning terminal will randomly issue a warning to ensure that the groundwater level is restored before consolidation settlement occurs.

[0076] In the actual construction process, by 1 By laying out observation holes 2 at the locations and burying water level gauges 12, the effect of advanced warning can be achieved, and the safety of neighboring buildings 14 can be guaranteed to the maximum extent. Multiple monitoring points can be set at any location, and the critical observation water level of each monitoring point can be calculated according to the formula. Once there is an early warning at one point, the flow rate of the pumping well can be reduced in time to restore the groundwater level and avoid excessive soil consolidation and settlement.

[0077] Therefore, the present invention adopts the above-mentioned advanced warning system and method for uneven consolidation settlement caused by construction precipitation, combines the seepage calculation method of the pumping well and the consolidation settlement calculation method of the layered summation method in the specification, and derives the soil settlement value at any position of the precipitation well radius, so as to obtain the uneven settlement distribution of the building structure foundation. And under the condition of a given permeability coefficient and pumping well flow, the above calculation method can be used to calculate the consolidation settlement influence range brought by the pumping well.

[0078] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.

Claims

1. An early warning system for uneven consolidation settlement caused by construction precipitation. Features: It includes the ground surface and neighboring structures arranged on the ground surface. A precipitation well is arranged under the ground surface. An observation hole with a diameter of 300mm to 400mm is arranged between the precipitation well and the neighboring structures. A water level meter is arranged at the bottom of the observation hole. The water level meter is connected to a data receiving and early warning terminal arranged on the ground surface through a sensor data transmission line. The bottom of the precipitation well and the observation hole is a non-compressible layer.

2. According to claim 1, an early warning system for uneven consolidation settlement caused by construction precipitation, Features: Settlement observation point No. 1 and settlement observation point No. 2 are set at the two ends where the neighborhood structures contact the ground surface.

3. A method for an early warning system for uneven consolidation settlement caused by construction precipitation according to any one of claims 1 to 2, Features: Combining the seepage calculation method of the precipitation well and the consolidation settlement calculation method of the layered summation method in the specification, the soil settlement value at any position of the precipitation well radius is derived, and the uneven settlement distribution of the neighboring buildings and structures is obtained; specifically, the following steps are included: S1: Under the given permeability coefficient and precipitation well flow rate, the consolidation settlement influence range brought by the precipitation well is calculated by combining the seepage calculation method of the precipitation well and the consolidation settlement calculation method of the layered summation method in the specification; S2: According to the risk level classification of neighboring buildings and structures, the influence range of the precipitation well and the maximum allowable differential settlement value of neighboring buildings and structures are specified, and the lowest groundwater level corresponding to each precipitation well is reversely calculated. When the groundwater level is lower than the warning value, an early warning is issued; S3: Since it takes a certain amount of time for the consolidation settlement of precipitation to occur, the data receiving and warning terminal issues a warning and restores the water level during this period to prevent damage or destruction of neighboring structures due to uneven consolidation settlement caused by precipitation.

4. The method for early warning of uneven consolidation settlement caused by construction precipitation according to claim 3, Features: The distance between the precipitation well and the observation hole is r 1 ; The distance from the precipitation well to any position on the ground surface is r; The height of the groundwater level corresponding to the precipitation well is the distance from the non-compressible layer to the groundwater level surface; The height of the groundwater level corresponding to the observation hole is h 1 ; There is a precipitation well at any distance from the precipitation well, and the corresponding groundwater level is h above the non-compressible layer; the distance between the No. 1 settlement observation point of the neighboring building and the precipitation well is r 2 ; The groundwater level at the No. 1 settlement observation point is h 2 ; The groundwater level at the second settlement observation point is h 3 , the distance between the second settlement observation point of the neighboring building and the precipitation well is r 3 ; According to Darcy's law, the flow rate q when pumping water from a precipitation well is expressed as: Where k is the average permeability coefficient of the soil layer; H is the initial groundwater level; γ is the natural density of the soil; γ' is the floating density of the soil; E s is the soil compression modulus; For two points on the same straight line at any distance from the precipitation well, taking the observation hole and another arbitrary point as an example, there is the following relationship: On the basis of known flow rate and soil permeability coefficient, the influence range of the maximum consolidation settlement of the precipitation well is: In formula (3), r e Represents the maximum consolidation settlement influence range of the precipitation well; The height of the groundwater level at any location is expressed as: The precipitation height at any location is: For a given precipitation height, the maximum consolidation settlement of the soil layer at this location is calculated as: In formula (6), E s is the compression modulus of soil, γ is the natural density of soil, and γ' is the floating density of soil.

5. The method for early warning of uneven consolidation settlement caused by construction precipitation according to claim 4, Features: For the No. 1 settlement observation point adjacent to the building, the maximum critical settlement of the No. 1 settlement observation point is s * , the critical precipitation height of the No. 1 settlement observation point is: The critical groundwater level is: Let h = h * , substituting into formula (4), according to the critical groundwater level height of the No. 1 settlement observation point, the warning water level at the observation hole is reversely calculated as: When the groundwater level in the observation hole is lower than the warning value, the data receiving and warning terminal will randomly issue a warning to ensure that the groundwater level is restored before consolidation settlement occurs.