Control method, device and equipment of battery energy storage system and readable storage medium
By obtaining the open circuit voltage and state of charge of the battery cell, using Kalman filtering and proportional integral control algorithms, the switch of the energy storage converter is controlled to achieve the state of charge equalization between the battery cells, and the stable operation of the battery energy storage system is solved by connecting to the grid. The poor performance problem improves the stability and security of the system.
Patent Information
- Application Number
- CN202410925001.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-01
AI Technical Summary
The existing battery energy storage systems have poor stability during grid-connected operation, resulting in the volatility of new energy power generation affecting the grid frequency and voltage and increasing operation and maintenance costs.
By obtaining the open circuit voltage of each battery cell, determining the state of charge and the target value of the equalization, using Kalman filtering and proportional integral control algorithm to generate current correction values, controlling the on-off of the switch tube of the energy storage converter, and realizing the charge between the battery cells Status balanced to improve system stability.
It improves the grid-connected operation stability of the battery energy storage system, avoids the risks of overcharge and overdischarge, improves the quality and safety of power, reduces the cost of grid operation and maintenance, and increases the state of charge balance speed.
Smart Images

Figure CN118889600A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power systems, and in particular to a control method, device, equipment and readable storage medium for a battery energy storage system. Background Art
[0002] In recent years, the proportion of renewable energy connected to the grid has continued to increase. However, renewable energy power generation is easily affected by factors such as climate conditions, seasonal changes and geographical location, resulting in increased volatility in power generation capacity. The volatility of renewable energy power generation may cause system frequency instability, voltage fluctuations or overloads, which has an adverse impact on the power system.
[0003] Currently, the battery energy storage system (BESS) connected to the DC side has become the most widely used energy storage device due to its high energy density and good dynamic characteristics. The battery energy storage system can effectively suppress the unstable harmonics in the power generation of new energy to a certain extent and reduce the impact of harmonics on the power grid.
[0004] However, the current grid-connected operation stability of battery energy storage systems is poor. Therefore, how to improve the grid-connected operation stability of battery energy storage systems has become a technical problem that needs to be solved urgently. Summary of the invention
[0005] In view of this, the present invention provides a control method, device, equipment and readable storage medium of a battery energy storage system, which can improve the grid-connected operation stability of the battery energy storage system.
[0006] To solve the above technical problems, on the one hand, the present invention provides a control method for a battery energy storage system, the battery energy storage system comprising a plurality of energy storage units connected in parallel, each energy storage unit comprising a battery unit and an energy storage converter connected to each other, the control method comprising the following steps: obtaining the open circuit voltage of each battery unit; determining the battery state of charge based on the open circuit voltage; determining a state of charge balancing target value based on the battery state of charge of each battery unit; obtaining a current correction value based on the battery state of charge and the state of charge balancing target value; correcting a current control reference value output by a voltage outer loop control module based on the current correction value to obtain a target current control reference value; and controlling the on and off of a switch tube in each energy storage converter based on the target current control reference value.
[0007] According to some embodiments of the present invention, the step of determining the battery state of charge based on the open circuit voltage includes: determining the battery charge state corresponding to the open circuit voltage based on a hysteresis relationship between the open circuit voltage and the battery state of charge.
[0008] According to some embodiments of the present invention, the step of determining a state of charge balancing target value based on the battery state of charge of each battery cell includes: using a Kalman filter algorithm to predict the battery charge state at the next moment based on the battery charge state to obtain a battery charge estimation value; summing and averaging the battery charge estimation values corresponding to each battery cell to obtain a state of charge balancing target value.
[0009] According to some embodiments of the present invention, the step of obtaining a current correction value based on a battery state of charge and a state of charge equalization target value includes: determining a difference between the battery state of charge of each battery cell and the state of charge equalization target value; and generating a current correction value corresponding to each battery cell based on each difference using a proportional-integral controller.
[0010] According to some embodiments of the present invention, the step of controlling the on and off of the switch tubes in each energy storage converter based on the target current control reference value includes: using a current inner loop control module to generate a control duty cycle based on the target current control reference value and the switching sequence; outputting a control pulse under the control duty cycle to the energy storage converter to control the on and off of the switch tubes in the energy storage converter.
[0011] According to some embodiments of the present invention, a switching sequence is obtained through the following steps: constructing a prediction model for a battery energy storage system; constructing an objective function based on the prediction model, the battery state of charge, and the state of charge balance target value; obtaining a voltage vector set; based on the objective function, determining the optimal two voltage vectors from the voltage vector set; and generating a switching sequence based on the optimal two voltage vectors.
[0012] According to some embodiments of the present invention, based on the objective function, the step of determining the optimal two voltage vectors from the voltage vector set includes: optimizing the objective function using a gradient descent method to obtain an optimized objective function; substituting each voltage vector in the voltage vector set into the optimized objective function to obtain a calculated value; and determining the voltage vectors corresponding to the two calculated values with the smallest numerical values as the optimal two voltage vectors.
[0013] According to some embodiments of the present invention, the step of generating a switching sequence based on the optimal two voltage vectors includes: generating a switching sequence based on the optimal two voltage vectors using a multi-objective optimization algorithm based on a Pareto front.
[0014] In a second aspect, an embodiment of the present invention provides a control device for a battery energy storage system, wherein the battery energy storage system comprises a plurality of energy storage units connected in parallel, each energy storage unit comprises a battery unit and an energy storage converter connected to each other, and the control device comprises:
[0015] The acquisition module is used to acquire the open circuit voltage of each battery cell.
[0016] The state of charge determination module is used to determine the battery state of charge based on the open circuit voltage; and determine the state of charge balancing target value based on the battery state of charge of each battery cell.
[0017] The correction value determination module is used to obtain a current correction value based on the battery state of charge and the state of charge balance target value.
[0018] The current correction module is used to correct the current control reference value output by the voltage outer loop control module based on the current correction value to obtain a target current control reference value.
[0019] The control module is used to control the on and off of the switch tubes in each energy storage converter based on the target current control reference value.
[0020] In a third aspect, an embodiment of the present invention provides an electronic device, comprising: a processor; and a memory, wherein computer program instructions are stored in the memory.
[0021] Wherein, when the computer program instructions are executed by the processor, the processor executes the control method of the battery energy storage system as described in the above technical solution.
[0022] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program. When the computer program is executed by a processor, the processor executes the control method of the battery energy storage system as described in the above technical solution.
[0023] The above technical solution of the present invention has at least one of the following beneficial effects:
[0024] The battery state of charge and the target value of state of charge balance are determined by the open circuit voltage, and then the current correction value is obtained based on the battery state of charge and the target value of state of charge balance. Finally, the current control reference value output by the voltage outer loop control module is corrected based on the current correction value to obtain the target current control reference value to control the on and off of each switch tube in the energy storage converter. On the one hand, considering the aging differences of each battery cell, the state of charge of each battery cell is compensated to improve the stability of grid-connected operation, while also avoiding risks such as overcharging and over-discharging, improving the quality and safety of grid-connected power, and reducing the cost of grid operation and maintenance. On the other hand, through the simple and effective control method of current control reference value correction, the speed of charge state balance can be increased, further ensuring the safe and stable grid-connected operation of the battery energy storage system.
[0025] In addition, by considering the hysteresis effect, the estimation accuracy of the battery state of charge can be improved, thereby improving the accuracy of the subsequent current correction value and further improving the operating stability of the battery energy storage system.
[0026] In addition, the partial derivative of the objective function is obtained by the gradient descent method, the gradient of the objective function is reduced, and the optimized objective function under low power is generated. Then, the voltage vector is optimized by using the optimized objective function, which can not only improve the optimization efficiency, but also reduce the computational complexity and the hardware requirements for the implementation of the scheme. In addition, by selecting two optimal voltage vectors in each switching cycle, the problem of capacitor voltage imbalance caused by the use of one voltage vector in the traditional control scheme can be avoided, and the problems existing in the traditional control scheme, such as low control accuracy, inaccurate grid-side current reference value tracking, poor system steady-state performance, large current harmonics, and non-fixed switching frequency, can be overcome, which improves the current steady-state accuracy, fixes the switching frequency, and improves the dynamic response efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a flow chart of a control method for a battery energy storage system according to an embodiment of the present invention;
[0028] Figure 2 A control logic block diagram of a battery energy storage system according to an embodiment of the present invention;
[0029] Figure 3 A curve diagram showing the relationship between open circuit voltage and battery state of charge in an embodiment of the present invention;
[0030] Figure 4 It is a structural diagram of a single-phase cascade H-bridge battery energy storage system in an embodiment of the present invention;
[0031] Figure 5 A flowchart of the steps of generating a switch sequence in a control method for a battery energy storage system according to an embodiment of the present invention;
[0032] FIG6( a ) is a diagram showing the change in battery charge state generated using a conventional control scheme;
[0033] FIG6( b ) is a diagram of the total harmonic distortion generated using a conventional control scheme;
[0034] FIG. 7( a ) is a diagram showing a change in a battery charge state generated by a control method for a battery energy storage system according to an embodiment of the present invention;
[0035] FIG7( b ) is a total harmonic distortion diagram generated by the control method of the battery energy storage system according to an embodiment of the present invention;
[0036] Figure 8 A schematic diagram of a control device for a battery energy storage system according to an embodiment of the present invention;
[0037] Fig. 9 Schematic diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0038] The specific implementation of the present invention will be further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0039] In recent years, the proportion of renewable energy connected to the grid has continued to increase. However, renewable energy power generation is easily affected by factors such as climate conditions, seasonal changes and geographical location, resulting in increased volatility in power generation capacity. The volatility of renewable energy power generation may cause system frequency instability, voltage fluctuations or overloads, which has an adverse impact on the power system.
[0040] At present, the battery energy storage system (BESS) connected to the DC side has become the most widely used energy storage device due to its high energy density and good dynamic characteristics. The battery energy storage system can effectively suppress the unstable harmonics in the power generation of new energy to a certain extent and reduce the impact of harmonics on the power grid.
[0041] However, the current grid-connected operation stability of battery energy storage systems is poor. Therefore, how to improve the grid-connected operation stability of battery energy storage systems has become a technical problem that needs to be solved urgently.
[0042] In order to solve the technical problem of poor grid-connected operation stability of the above-mentioned battery energy storage system, the present application proposes a control method for a battery energy storage system, which determines the charge state balance target value as the balance control standard for the battery capacity and performance of each battery unit. During the charge and discharge process of each battery unit, the charge and discharge amount of each battery unit can be balanced to achieve the working balance of each battery unit, avoiding the impact on the battery life and performance due to the difference in battery capacity and performance of each battery unit, thereby improving the grid-connected operation stability of the battery energy storage system.
[0043] The following is a detailed introduction to a control method for a battery energy storage system proposed in this application.
[0044] like Figure 1 As shown, the control method of the battery energy storage system of the embodiment of the present invention, wherein the battery energy storage system includes a plurality of parallel energy storage units, each energy storage unit includes an interconnected battery unit and a power conversion system (PCS), and the power conversion system is used to control the charging and discharging process of the battery unit. The control method of the battery energy storage system in this embodiment includes:
[0045] Step 110: Obtain the open circuit voltage of each battery cell.
[0046] The open circuit voltage (OCV) of a battery cell refers to the potential difference between the positive and negative electrodes of the battery when no load is applied, which can reflect the equilibrium state of the chemical reaction inside the battery cell. Generally, the open circuit voltage of a battery cell can be obtained by collecting the voltage value at both ends of the battery cell.
[0047] Step 120: Determine the battery state of charge based on the open circuit voltage.
[0048] The battery state of charge (SOC) is the ratio of the remaining capacity of a battery after it has been used for a period of time or has been left unused for a long time to its capacity in a fully charged state, usually expressed as a percentage. The open circuit voltage of a battery cell has a specific relationship with the battery state of charge of the battery cell, and the open circuit voltage of the battery cell can be used to determine the battery state of charge of the battery cell.
[0049] Step 130: Determine a SOC equalization target value based on the SOC of each battery cell.
[0050] The state of charge balancing target value refers to the state of charge target value used as a reference for balancing the state of charge of each battery cell. In one embodiment, a Kalman filter algorithm can be used to predict the battery charge state at the next moment based on the battery charge state to obtain a battery charge estimation value. The Kalman filter algorithm is a conventional algorithm in the technical field and is not described in detail here. Then, the battery charge estimation values corresponding to each battery cell are summed and averaged to obtain a state of charge balancing target value, as shown in the following formula (1):
[0051]
[0052] In the above formula (1), n is the number of battery cells, SOC' bi (k) is the estimated battery charge value corresponding to each battery cell, is the charge state balance target value.
[0053] Step 140: Obtain a current correction value based on the battery state of charge and the state of charge balance target value.
[0054] In one embodiment, the above step 140, i.e., the step of obtaining the current correction value based on the battery state of charge and the state of charge equalization target value, may specifically include: determining the difference between the battery state of charge of each battery cell and the state of charge equalization target value, and generating the current correction value corresponding to each battery cell based on each difference using a proportional integral controller.
[0055] Step 150: Correct the current control reference value output by the voltage outer loop control module based on the current correction value to obtain a target current control reference value.
[0056] The current control reference value output by the voltage outer loop control module is corrected based on the current correction value to obtain a target current control reference value. In one embodiment, the current correction value and the current control reference value output by the voltage outer loop control module can be added to obtain the target current control reference value.
[0057] Step 160: Based on the target current control reference value, control the on and off of the switch tubes in each energy storage converter.
[0058] Based on the target current control reference value, the on-off of the switch tube in each energy storage converter is controlled. In one embodiment, based on the target current control reference value, the on-off of the switch tube in each energy storage converter can be controlled by the current inner loop control module, so as to adjust the charge / discharge behavior and power of each battery unit, realize fast balancing of the charge state of the battery energy storage system, and improve the grid-connected operation stability of the battery energy storage system.
[0059] This embodiment determines the battery state of charge and the state of charge balance target value through the open circuit voltage, and then obtains the current correction value based on the battery state of charge and the state of charge balance target value. Finally, the current control reference value output by the voltage outer loop control module is corrected based on the current correction value to obtain the target current control reference value to control the on and off of each switch tube in the energy storage converter. On the one hand, taking into account the aging differences of each battery cell, the state of charge of each battery cell is compensated, thereby improving the stability of grid-connected operation, while also avoiding the risks of overcharging and over-discharging, improving the quality and safety of grid-connected power, and reducing the cost of grid operation and maintenance. On the other hand, through the simple and effective control method of current control reference value correction, the speed of charge state balance can be increased, further ensuring the safe and stable grid-connected operation of the battery energy storage system.
[0060] In one embodiment, the control module of the battery energy storage system can be specifically divided into a voltage outer loop control module, a current inner loop control module and a SOC compensation module. The voltage outer loop control module is used to generate a current control reference value, and the SOC compensation module is used to generate a current correction value. Then, the current control reference value is corrected based on the current correction value to obtain a target current control reference value. Finally, the current inner loop control module is used to generate a control pulse under a control duty cycle based on the target current control reference value, thereby adjusting the battery charge / discharge behavior and power to control the charge / discharge process of the battery energy storage system.
[0061] Refer to the following Figure 2 The control logic block diagram of the battery energy storage system shown illustrates the control process under an example of a battery energy storage system.
[0062] like Figure 2 As shown, the voltage outer loop control module is used to support the DC side capacitor voltage U based on the battery energy storage system. dciWith capacitor voltage reference value U dc * Generate voltage difference ΔU dci , and then through the proportional integral controller (i.e. Figure 2 The "PI" shown in dci Processing to generate current control reference value I i * The SOC compensation module is used to implement the above step 140, that is, based on the battery state of charge SOC i and charge state balance target value Get the current correction value ΔI i * Specifically, the SOC compensation module can first determine the battery state of charge SOC of the battery cell. i and charge state balance target value The difference between ΔSOC i , using a proportional-integral controller based on the difference SOC i Generate current correction value ΔI i * . Current correction value ΔI i * For current control reference value I i * Correction is performed to generate the target current control reference value I bi * The current inner loop control module is used to control the current I output by the battery cell. bi and the target current control reference value I bi * Generate target current control reference value ΔI bi The proportional-integral controller controls the target current reference value ΔI bi Processing is performed to generate a control pulse (i.e., a charging pulse or a discharging pulse) under a control duty cycle. bi * When it is greater than zero, a charging pulse is output; when the target current control reference value I bi * When it is less than or equal to zero, a discharge pulse is output.
[0063] The following is a detailed description of step 120 in the above embodiment, ie, the step of determining the battery state of charge based on the open circuit voltage.
[0064] In one embodiment, based on the type of battery cell, an open circuit voltage-battery state of charge relationship curve corresponding to the battery cell can be obtained, and then the battery state of charge corresponding to the open circuit voltage can be found in the open circuit voltage-battery state of charge relationship curve.
[0065] In one embodiment, the battery charge state corresponding to the open circuit voltage can be determined based on the hysteresis relationship between the open circuit voltage and the battery charge state (or the hysteresis effect of the battery). The "hysteresis effect" can reflect the aging state of the battery to a certain extent. The "hysteresis effect" can be specifically manifested as the battery having different equilibrium potentials under the same battery charge state; or, the battery charge state corresponding to the same voltage during the charging process and the discharging process is different. By considering the hysteresis effect, the estimation accuracy of the battery charge state can be improved, thereby improving the accuracy of the subsequent current correction value, and further improving the operating stability of the battery energy storage system.
[0066] In one example, refer to Figure 3 The open circuit voltage-battery state of charge relationship curve shown in FIG. Figure 3 In the example, the "hysteresis effect" of the battery cell is manifested as: the relationship curve between the open circuit voltage and the battery state of charge corresponding to the battery in the charging state is different from the relationship curve between the open circuit voltage and the battery state of charge corresponding to the discharge state. Figure 3 The corresponding battery state of charge can be found in the open circuit voltage-battery state of charge relationship curve shown in FIG.
[0067] For example, the battery charge state of the battery cell when it starts to charge or discharge can be collected first, and then the current of the battery cell when charging and discharging can be recorded, and the charge and discharge state of the battery cell can be determined based on the current change. Figure 3 Then obtain the open circuit voltage of the battery cell and calculate the curve based on the open circuit voltage. Figure 3 The battery state of charge is determined in the relationship curve diagram shown in FIG. Among them, if the battery state of charge when the battery cell starts to charge or discharge is SOC b or SOC a , the battery state of charge is determined by referring to the curve corresponding to the main charging loop or the main discharging loop; if the battery state of charge when the battery cell starts charging or discharging is not SOC b and SOC a , the battery state of charge is determined by referring to the charging curve or discharging curve corresponding to the secondary loop.
[0068] The following is a detailed description of step 160 in the above embodiment, i.e., the step of controlling the on and off of the switch tubes in each energy storage converter based on the target current control reference value.
[0069] In one embodiment, step 160 in the above embodiment may specifically include: using the current inner loop control module to generate a control duty cycle based on the target current control reference value and the switch sequence, and outputting a control pulse under the control duty cycle to the energy storage converter to control the on and off of the switch tube in the energy storage converter.
[0070] The following takes a single-phase cascade H-bridge battery energy storage system as an example to introduce the method for generating the switch sequence in the above step 160.
[0071] like Figure 4 As shown, Figure 4 is a structural diagram of a single-phase cascade H-bridge battery energy storage system 10 . The structure of the single-phase cascade H-bridge battery energy storage system 10 is first introduced below.
[0072] The single-phase cascade H-bridge battery energy storage system 10 includes N parallel energy storage units, a grid-side equivalent resistor Rs and a grid-side equivalent inductor Ls, wherein each energy storage unit includes a battery unit 11 connected in sequence, a DC side support capacitor C dci (i=1, 2...N) and an H-bridge energy storage converter 12, wherein the H-bridge energy storage converter 12 includes a switch tube S i1 -S i4 (i=1, 2,...N).
[0073] Specifically, the DC side support capacitor C dci The positive electrode of the battery cell 11 and the switch tube S i1 , S i3 The collector connection, DC side support capacitor C dci The negative electrode of the battery cell 11 and the switch tube S i2 , S i4 The emitter of the switch tube S i1 , S i3 The emitter of the switch tube S i2 , S i4 The collector connection of the switch tube S i4 The collector and the switch tube S in the next energy storage unit i2 The emitter of the switch tube S i1 The emitter of is connected to one end of the grid-side equivalent resistor Rs, and the other end of the grid-side equivalent resistor Rs is connected to one end of the grid-side equivalent inductor Ls. The other end of the grid-side equivalent inductor Ls is connected to the positive electrode of the grid side. The switch tube S in the Nth energy storage unit N4 The collector of the switch tube S is connected to the negative electrode of the grid side. i1 -S i4 Refers to an insulated gate bipolar transistor (IGBT) containing an anti-parallel diode, or in other words, a switch tube Si1 -S i4 It includes an IGBT and a diode connected in anti-parallel with the IGBT.
[0074] Below Figure 4 The signals identified in the following are explained: bi is the voltage output by the i-th battery cell 11, I bi is the current output by the i-th battery cell 11, U dci is the voltage of the ith DC side support capacitor, u abi is the output voltage of the i-th H-bridge energy storage converter 12, u ab is the output voltage of the cascaded H-bridge energy storage converter 12, u s is the grid-side voltage, i s is the grid side current.
[0075] It should be noted that, for the sake of convenience, the following embodiment is described with a single-phase cascade H-bridge battery energy storage system 10 including three energy storage units, that is, the above N is taken as 3. It is understandable that the present application is not limited to this. The following takes a single-phase cascade H-bridge battery energy storage system 10 including three energy storage units as an example to describe in detail the generation process of the switch sequence in step 160 in the above embodiment.
[0076] In one embodiment, if Figure 5 As shown, the switch sequence in the above step 160 is obtained by the following steps:
[0077] Step 161: Construct a prediction model for the battery energy storage system.
[0078] In one embodiment, a mathematical model of the battery energy storage system in an α-β stationary coordinate system may be constructed based on Kirchhoff's voltage law, and a prediction model may be further constructed based on the mathematical model.
[0079] Taking a single-phase cascade H-bridge battery energy storage system 10 including three energy storage units as an example, an example of step 161 is described in detail.
[0080] First, according to Kirchhoff's voltage law, the mathematical model of the single-phase cascade H-bridge battery energy storage system 10 in the α-β stationary coordinate system can be obtained, which is specifically shown in the following formula (2):
[0081]
[0082] In the above formula (2), i sα and i sβ They are the grid-side current i s The coordinate components on the α-axis and β-axis, u sα and u sβ is the grid side voltage us The coordinate components on the α-axis and the β-axis, S iα , S iβ is the switching function S i Coordinate components on the α and β axes.
[0083] The grid-side current change rate can be obtained from the above formula (2), as shown in the following formula (3):
[0084]
[0085] The Euler forward method is used to transform the above formula (3) to predict the state quantity in the next switching cycle and generate a prediction model, which is specifically shown in the following formula (4):
[0086]
[0087] Step 162: construct an objective function based on the prediction model, the battery state of charge, and the state of charge balance target value.
[0088] Based on the prediction model, battery state of charge and state of charge balance target value, an objective function is constructed, wherein the objective function can act on subsequent current control to achieve balanced control among energy storage units.
[0089] Still taking the single-phase cascade H-bridge battery energy storage system 10 including three energy storage units as an example, an example of step 162 is described in detail.
[0090] First, based on the prediction model, battery state of charge and state of charge balance target value, the level vector objective function shown in the following formula (5) is constructed:
[0091]
[0092] In the above formula (5), J lev (k) is the expression of the level vector objective function at time k, for i sα (k) reference quantity, for i sβ (k) Reference quantity, SOC b1 (k) SOC b2 (k) and SOC b3 (k) is the battery charge state of each battery cell at time k, is the average state of charge of each battery cell at time k+1. The single-phase cascade H-bridge battery energy storage system 10 may include 2N+1 level vectors, so lev=-N, -N+1, ..., N+1, N. In this example, N=3.
[0093] Substituting the prediction model shown in equation (4) into equation (5), the objective function at time k can be obtained, as shown in equation (6):
[0094]
[0095] It should be noted here that since the cascaded H-bridge energy storage converter is actually in the α-β coordinate system u ab The β-axis component of the voltage vector is always zero, so in the objective function shown in equation (6) above, u abα Represents a level vector.
[0096] Step 163: Obtain a voltage vector set.
[0097] The voltage vector set includes multiple voltage vectors, and the voltage vectors are used to synthesize the level vector to adjust the on-off state of each switch tube. For the cascaded H-bridge energy storage converter, it can be composed of N H-bridge energy storage converters, and each H-bridge energy storage converter can generate positive and negative output voltages. After each H-bridge energy storage converter is cascaded, the total number of voltage levels output by the cascaded H-bridge energy storage converter is 2N+1, thereby obtaining an output voltage that is approximately a sine wave. In the current control strategy, different voltage vectors can be formed by reasonably switching the switch tubes in each H-bridge energy storage converter, thereby generating a sine wave with the desired frequency and amplitude. Therefore, for the cascaded H-bridge energy storage converter, it can include 2N+1 level vectors.
[0098] In one embodiment, the voltage vectors in the voltage vector set may be simplified, thereby simplifying the control process, increasing the subsequent optimization speed, and further improving the control speed.
[0099] Still taking the above-mentioned single-phase cascade H-bridge battery energy storage system 10 including three energy storage units as an example, the single-phase cascade H-bridge battery energy storage system 10 may include 7 level vectors (V -3 、V -2 、V -1 、V 0 、V 1 、V 2 、V 3 ). The voltage vector set in the existing control scheme includes 27 voltage vectors. This embodiment can remove redundant voltage vectors, or repeated and invalid voltage vectors, in the voltage vector set while ensuring the control performance, thereby simplifying the voltage vectors. For details, see the comparison table of the voltage vector set before and after simplification shown in Table 1 below:
[0100] Table 1 Comparison of voltage vector sets before and after simplification
[0101]
[0102] It can be seen from Table 1 above that this embodiment can simplify 27 voltage vectors into 15 voltage vectors. 0 For example, there are 7 voltage vectors set in the existing control scheme: (000), (01-1), (0-11), (10-1), (-101), (1-10), (-110), among which the other 6 voltage vectors except (000) can be regarded as redundant voltage vectors, so this embodiment can only retain the valid voltage vector (000).
[0103] In one embodiment, this embodiment sets a voltage vector simplification strategy: when the level vector is greater than 0, only the voltage vectors containing the states of 0 and 1 are selected as candidate vectors; when the level vector is less than 0, only the voltage vectors containing the states of 0 and -1 are selected as candidate vectors; when the level vector is equal to 0, only the voltage vectors containing the states of all 0 are selected as candidate vectors. Thus, the simplified voltage vectors can still constitute all the level vectors, thereby further ensuring the control performance and control efficiency.
[0104] Step 164: Determine the optimal two voltage vectors from the voltage vector set based on the objective function.
[0105] Based on the objective function, the optimal two voltage vectors are determined from the voltage vector set. Specifically, the optimal two voltage vectors can be selected based on the objective function in each switching cycle.
[0106] In one embodiment, step 164, i.e., the step of determining the optimal two voltage vectors from the voltage vector set based on the objective function, may specifically include: optimizing the objective function using a gradient descent method to obtain an optimized objective function. Substituting each voltage vector in the voltage vector set into the optimized objective function to obtain a calculated value. The voltage vectors corresponding to the two calculated values with the smallest numerical values are determined as the optimal two voltage vectors.
[0107] The partial derivative of the objective function is obtained by the gradient descent method, the gradient of the objective function is reduced, and the optimized objective function under low power is generated. Then, the voltage vector is optimized by using the optimized objective function, which can not only improve the optimization efficiency, but also reduce the computational complexity and the hardware requirements for the implementation of the scheme. In addition, by selecting two optimal voltage vectors in each switching cycle, the problem of capacitor voltage imbalance caused by the use of one voltage vector in the traditional control scheme can be avoided, and the problems of low control accuracy, inaccurate grid-side current reference value tracking, poor system steady-state performance, large current harmonics, and non-fixed switching frequency existing in the traditional control scheme can be overcome, which can improve the current steady-state accuracy, fix the switching frequency, and improve the dynamic response efficiency.
[0108] Step 165: Generate a switching sequence based on the optimal two voltage vectors.
[0109] In one embodiment, a multi-objective optimization algorithm based on the Pareto front can be used to generate a switch sequence based on the optimal two voltage vectors to achieve level vector switching and perform capacitor voltage balance control on the battery energy storage system. It can be understood that the multi-objective optimization algorithm based on the Pareto front is a conventional algorithm in the technical field and will not be described in detail here.
[0110] Taking Table 1 above as an example, an example of a switching sequence is introduced. According to Table 1, each level vector corresponds to a different voltage vector, and the basis for selecting the voltage vector is to achieve capacitor voltage balance between the energy storage units. This embodiment takes into account the influence of different switch state combinations on the charging and discharging of the DC side capacitor voltage, and ensures that the H-bridge energy storage converter of each energy storage unit switches once in each switching cycle. At the same time, considering the smooth movement of the voltage vector, when selecting the level vector, try to select adjacent level vectors to play a role in harmonic suppression. This embodiment uses the multi-objective optimization algorithm of the Pareto frontier to design a switching sequence as shown in Table 2 below:
[0111] Table 2 Switching sequence
[0112]
[0113] V in Table 2 above -2 →V -1 The level vector switching is used as an example to explain. -2 →V -1 The corresponding switching sequence can be expressed as: V -2 →V -1 →V -2 →V -1 →V -2 →V -1 →V -2 . Consider using adjacent voltage vectors for switching. If the capacitance relationship between the energy storage units is: energy storage unit 1 capacitance voltage > energy storage unit 2 capacitance voltage > average capacitance voltage > energy storage unit 3 capacitance voltage, then the corresponding voltage vector can be: (-1-10)→(0-10)→(0-1-1)→(00-1)→(-10-1)→(-100)→(-1-10). In a set of switching sequences, each H-bridge energy storage converter undergoes a switch switch, and through the alternating use of adjacent level vectors, a total of 6 level vector switches occur in one switching cycle. The grid-side current changes six times in one switching cycle, and each H-bridge energy storage converter contains 0, 1 or 0, -1 switching states.
[0114] The following simulation test is carried out by taking the above-mentioned single-phase cascade H-bridge battery energy storage system 10 including three energy storage units as an example to verify the effect of the control method of the battery energy storage system proposed in the above-mentioned embodiment of the present application. Among them, the operating parameters of the single-phase cascade H-bridge battery energy storage system in this simulation test are shown in Table 3 below:
[0115] Table 3 Single-phase cascade H-bridge battery energy storage system operating parameters
[0116] Operation parameters Numeric Battery capacity of each energy storage unit 50Ah DC side grid support capacitor 3.84mF AC side equivalent inductance 10mH AC side equivalent resistance 0.6Ω Grid side peak voltage 311V Sampling period 0.2ms Number of cascaded energy storage units 3
[0117] During the simulation test, a simulation model can be built for the single-phase cascade H-bridge battery energy storage system, and the battery charge state and total harmonic distortion of the traditional battery energy storage system control method and the battery energy storage system control method proposed in the above embodiment are tested respectively, to generate test results corresponding to the traditional control scheme as shown in Figures 6(a) and 6(b), and test results corresponding to the control scheme of the present application as shown in Figures 7(a) and 7(b).
[0118] Among them, Figure 6 (a) is a diagram of the change of the battery charge state generated by the traditional control scheme, and Figure 6 (b) is a fundamental amplitude-frequency relationship diagram (hereinafter referred to as "Total Harmonic Distortion (THD)") generated by the traditional control scheme. Figure 7 (a) is a diagram of the change of the battery charge state generated by the control scheme of the present application, and Figure 7 (b) is a diagram of the total harmonic distortion generated by the control scheme of the present application.
[0119] By comparing Figure 6(a) and Figure 7(a), it can be seen that the time required for the traditional control scheme to achieve charge state balance (i.e., the battery charge state difference ΔSOC between batteries 1-3 is ≤0.01%) is 13.8s, and the time required for the control scheme of the present application to achieve charge state balance is only 8.9s, which is 4.9s faster than the traditional scheme. This shows that the control scheme of the present application can achieve fast charge state balance.
[0120] By comparing FIG6(b) and FIG7(b), it can be seen that the total harmonic distortion of the traditional control scheme is 8.37%, and the total harmonic distortion of the control scheme of the present application is 3.25%, which is 5.12% lower than that of the traditional scheme. This shows that the control scheme of the present application has a strong anti-interference ability, and the battery energy storage system can achieve more stable grid-connected operation.
[0121] like Figure 8As shown, a control device 800 of a battery energy storage system of an embodiment of the present invention, wherein the battery energy storage system comprises a plurality of energy storage units connected in parallel, each energy storage unit comprises a battery unit and an energy storage converter connected to each other. The control device 800 comprises: an acquisition module 801, a state of charge determination module 802, a correction value determination module 803, a current correction module 804 and a control module 805.
[0122] The acquisition module 801 is used to acquire the open circuit voltage of each battery unit.
[0123] The state of charge determination module 802 is used to determine the battery state of charge based on the open circuit voltage; and determine the state of charge balancing target value based on the battery state of charge of each battery cell.
[0124] The correction value determination module 803 is used to obtain a current correction value based on the battery state of charge and the state of charge balance target value.
[0125] The current correction module 804 is used to correct the current control reference value output by the voltage outer loop control module based on the current correction value to obtain a target current control reference value.
[0126] The control module 805 is used to control the on and off of the switch tubes in each energy storage converter based on the target current control reference value.
[0127] Specifically, the control device 800 of the battery energy storage system may be a device integrating a processor and a memory (ie, a subsequent electronic device).
[0128] It should be noted that the control device 800 of the battery energy storage system provided in the above embodiment, when realizing its functions, only uses the division of the above functional modules as an example. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device provided in the above embodiment and the corresponding method embodiment belong to the same concept, and the specific implementation process is detailed in the corresponding method embodiment, which will not be repeated here.
[0129] An embodiment of the present invention also provides an electronic device, which includes a processor and a memory, wherein the memory stores at least one instruction or at least one program, and the at least one instruction or the at least one program is loaded and executed by the processor to implement a control method for a battery energy storage system provided in the above method embodiment.
[0130] The memory can be used to store software programs and modules. The processor executes various functional applications and data processing by running the software programs and modules stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, application programs required for functions, etc.; the data storage area can store data created according to the use of the device, etc. In addition, the memory can include a high-speed random access memory and can also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other volatile solid-state storage devices. Accordingly, the memory can also include a memory controller to provide the processor with access to the memory.
[0131] In a specific embodiment, Fig. 9 A schematic diagram of the structure of an electronic device for implementing the embodiment of the present invention is shown. The electronic device may be a computer terminal, a mobile terminal or other device. The electronic device may also participate in constituting or include a control device for a battery energy storage system provided in the embodiment of the present invention.
[0132] like Fig. 9 As shown, an embodiment of the present invention provides an electronic device 900, including: a processor 901 and a memory 902, wherein computer program instructions are stored in the memory 902, wherein when the computer program instructions are executed by the processor, the processor 901 executes the control method of the battery energy storage system as described in the above embodiment.
[0133] Furthermore, if Fig. 9 As shown, the electronic device 900 also includes a network interface 903 , an input device 904 , a hard disk 905 , and a display device 906 .
[0134] The above-mentioned interfaces and devices can be interconnected through a bus architecture. The bus architecture can be a bus and bridge that can include any number of interconnected buses. Specifically, one or more central processing units (CPUs) represented by processor 901 and various circuits of one or more memories represented by memory 902 are connected together. The bus architecture can also connect various other circuits such as peripheral devices, voltage regulators, and power management circuits together. It can be understood that the bus architecture is used to achieve connection and communication between these components. In addition to the data bus, the bus architecture also includes a power bus, a control bus, and a status signal bus, which are all well known in the art, so they are not described in detail herein.
[0135] The network interface 903 can be connected to a network (such as the Internet, a local area network, etc.), obtain relevant data from the network, and save it in the hard disk 905.
[0136] The input device 904 can receive various instructions input by the operator and send them to the processor 901 for execution. The input device 904 can include a keyboard or a pointing device, such as a mouse, a trackball, a touch pad or a touch screen.
[0137] The display device 906 can display the result obtained by the processor 901 executing the instruction.
[0138] The memory 902 is used to store programs and data necessary for the operation of the operating system, as well as data such as intermediate results during the calculation process of the processor 901.
[0139] It is understood that the memory 902 in the embodiment of the present invention may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. The memory 902 of the apparatus and method described herein is intended to include, but is not limited to, these and any other suitable types of memory.
[0140] In some embodiments, the memory 902 stores the following elements, executable modules or data structures, or a subset thereof, or an extended set thereof: an operating system 9021 and an application program 9022 .
[0141] The operating system 9021 includes various system programs, such as a framework layer, a core library layer, a driver layer, etc., which are used to implement various basic services and process hardware-based tasks. The application 9022 includes various application programs, such as a browser, etc., which are used to implement various application services. The program for implementing the method of the embodiment of the present invention can be included in the application 9022.
[0142] The processor 901 executes the control method of the battery energy storage system as described in the above embodiment when calling and executing the application and data stored in the memory 902, specifically, the program or instruction stored in the application 9022.
[0143] The method disclosed in the above embodiment of the present invention can be applied to the processor 901, or implemented by the processor 901. The processor 901 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit in the processor 901 or the instruction in the form of software. The above processor 901 can be a general processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, and can implement or execute the methods, steps and logic block diagrams disclosed in the embodiments of the present invention. The general processor can be a microprocessor or the processor can also be any conventional processor. The steps of the method disclosed in the embodiment of the present invention can be directly embodied as a hardware decoding processor to perform, or can be performed by a combination of hardware and software modules in the decoding processor. The software module can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 902, and the processor 901 reads the information in the memory 902 and completes the steps of the above method in combination with its hardware.
[0144] It is understood that the embodiments described herein can be implemented in hardware, software, firmware, middleware, microcode or a combination thereof. For hardware implementation, the processing unit can be implemented in one or more application specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), field programmable gate arrays (FPGAs), general purpose processors, controllers, microcontrollers, microprocessors, other electronic units for performing the functions described in the present application or a combination thereof.
[0145] For software implementation, the techniques described herein can be implemented by modules (e.g., procedures, functions, etc.) that perform the functions described herein. The software code can be stored in a memory and executed by a processor. The memory can be implemented in the processor or outside the processor.
[0146] In addition, an embodiment of the present invention further provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the processor executes the control method of the battery energy storage system as described in the above embodiment.
[0147] In the several embodiments provided in the present application, it should be understood that the disclosed methods and devices can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0148] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may be physically included separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional units.
[0149] The above-mentioned integrated unit implemented in the form of a software functional unit can be stored in a computer-readable storage medium. The above-mentioned software functional unit is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform some steps of the sending and receiving method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, referred to as ROM), random access memory (RandomAccess Memory, referred to as RAM), disk or optical disk and other media that can store program codes.
[0150] The above is a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A control method for a battery energy storage system, characterized in that: The battery energy storage system includes multiple parallel energy storage units, each of which includes interconnected battery cells and energy storage converters. The control method includes the following steps: Obtaining the open circuit voltage of each battery cell; determining a battery state of charge based on the open circuit voltage; Determining a state of charge balancing target value based on the battery state of charge of each battery cell; obtaining a current correction value based on the battery state of charge and the state of charge balancing target value; Correcting the current control reference value output by the voltage outer loop control module based on the current correction value to obtain a target current control reference value; Based on the target current control reference value, the on and off of the switch tubes in each energy storage converter are controlled.
2. The control method of the battery energy storage system according to claim 1, characterized in that: The step of determining the battery state of charge based on the open circuit voltage includes: Based on a hysteresis relationship between the open circuit voltage and the battery state of charge, the battery state of charge corresponding to the open circuit voltage is determined.
3. The control method of the battery energy storage system according to claim 1, characterized in that: The step of determining a state of charge equalization target value based on the battery state of charge of each battery cell includes: Using a Kalman filter algorithm to predict the battery charge state at a next moment based on the battery charge state to obtain a battery charge estimation value; The battery charge estimation values corresponding to each battery unit are summed and averaged to obtain the state of charge balancing target value.
4. The control method of the battery energy storage system according to claim 1, characterized in that: The step of obtaining a current correction value based on the battery state of charge and the state of charge balancing target value includes: determining a difference between a battery state of charge of each battery cell and the state of charge equalization target value; A proportional-integral controller is used to generate a current correction value corresponding to each battery cell based on each difference.
5. The control method of the battery energy storage system according to claim 1, characterized in that: The step of controlling the on and off of the switch tubes in each energy storage converter based on the target current control reference value includes: generating a control duty cycle based on the target current control reference value and the switching sequence using a current inner loop control module; Outputting a control pulse under the control duty cycle to the energy storage converter to control the on and off of the switch tube in the energy storage converter.
6. The control method of the battery energy storage system according to claim 5, characterized in that: The switching sequence is obtained by the following steps: Constructing a prediction model for the battery energy storage system; constructing an objective function based on the prediction model, the battery state of charge, and the state of charge balancing target value; Get voltage vector set; determining two optimal voltage vectors from the voltage vector set based on the objective function; The switching sequence is generated based on the optimal two voltage vectors.
7. The control method of the battery energy storage system according to claim 6, characterized in that: The step of determining the optimal two voltage vectors from the voltage vector set based on the objective function includes: Optimizing the objective function using a gradient descent method to obtain an optimized objective function; Substituting each voltage vector in the voltage vector set into the optimization objective function to obtain a calculated value; The voltage vectors corresponding to the two smallest operation values are determined as the optimal two voltage vectors.
8. The control method of the battery energy storage system according to claim 6, characterized in that: The step of generating the switching sequence based on the optimal two voltage vectors includes: The switching sequence is generated based on the optimal two voltage vectors using a multi-objective optimization algorithm based on the Pareto front.
9. A control device for a battery energy storage system, characterized in that: The battery energy storage system includes multiple parallel energy storage units, each of which includes interconnected battery cells and energy storage converters. The control device includes: An acquisition module, used to obtain the open circuit voltage of each battery cell; a state of charge determination module, configured to determine a battery state of charge based on the open circuit voltage; and determine a state of charge equalization target value based on the battery state of charge of each battery cell; a correction value determination module, configured to obtain a current correction value based on the battery state of charge and the state of charge balance target value; a current correction module, configured to correct the current control reference value output by the voltage outer loop control module based on the current correction value to obtain a target current control reference value; The control module is used to control the on and off of the switch tubes in each energy storage converter based on the target current control reference value.
10. An electronic device, characterized in that: include: processor; and a memory having computer program instructions stored therein, When the computer program instructions are executed by the processor, the processor executes the control method for the battery energy storage system according to any one of claims 1 to 8.
11. A computer-readable storage medium, characterized in that The computer-readable storage medium stores computer program instructions, and when the computer program instructions are executed by a processor, the processor executes the control method for the battery energy storage system according to any one of claims 1 to 8.