Switching method and device
By sending path switching request messages to core network devices in advance in the non-terrestrial network communication system, the frequent switching of terminal devices caused by movement of non-terrestrial network devices is solved, the switching efficiency and system stability are improved, and signaling congestion is reduced.
Patent Information
- Application Number
- CN202310541400.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-12
- Publication Date
- 2024-11-12
AI Technical Summary
In non-terrestrial network communication systems, due to the mobility of non-terrestrial network devices, terminal devices frequently switch service cells, causing a large number of signaling interactions, resulting in network processing burden and signaling congestion, affecting handover efficiency.
After receiving the handover request message, the path handover request message is sent to the core network device in advance, so that the core network device can handle the handover request in advance, reduce the handover delay, and reduce signaling overhead through preset messages or uplink packets.
It improves the switching efficiency of terminal devices, reduces switching delay, avoids signaling congestion, and enhances system stability and resource utilization.
Smart Images

Figure CN118945752A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of communication technology, and in particular to a switching method and device. Background Art
[0002] Non-terrestrial network (NTN) communication refers to communication achieved with the help of non-terrestrial network equipment. NTN systems can include satellite systems, etc. Introducing NTN communication into mobile network communication, such as the fifth-generation (5G) communication, can improve user experience. On the one hand, NTN can provide communication services for areas that are difficult to cover by terrestrial networks, such as oceans, forests, deserts or remote areas; on the other hand, NTN can enhance the reliability of mobile communications, such as providing more stable communication services for users in high-speed mobile scenarios such as trains and airplanes; in addition, NTN can also provide more data transmission resources and support the connection of a larger number of terminal devices.
[0003] In mobile communication networks, the movement of terminal devices will cause the signal quality of the current service cell to deteriorate, and it is necessary to switch to a neighboring cell with better signal quality. In the NTN system, the high-speed movement of non-terrestrial network devices relative to the ground makes the coverage duration of non-terrestrial network devices in a certain area on the ground very short, causing terminal devices to frequently change service cells. Therefore, in the NTN system, the mobility of non-terrestrial network devices is the main reason for terminal devices to switch cells.
[0004] Since the coverage area of NTN cells is very large (coverage radius is tens to hundreds of kilometers), the number of terminal devices included in a cell is also very large, so the movement of non-terrestrial network devices will cause a large number of terminal devices to need cell switching at the same time. During the cell switching process, a large number of signaling interactions will be generated. Therefore, processing a large number of cell switching requests from terminal devices in a short period of time will cause network processing burden and even cause signaling congestion. Summary of the invention
[0005] The present application provides a switching method and device for improving the efficiency of a network in processing cell switching of a terminal device.
[0006] In a first aspect, the present application provides a switching method, which can be performed by a first access network device or a device for the first access network device, such as a chip. The method includes: receiving a switching request message from a second access network device; sending a path switching request message to a core network device; in the case of receiving a switching completion message from a terminal device, sending first indication information to the core network device, the first indication information is used to instruct the terminal device to switch to the first access network device; wherein the path switching request message is sent between receiving the switching request message and the switching completion message.
[0007] Through the above method, after the first access network device receives the switching request message, it sends a path switching request message to the core network device before receiving the switching completion message, so that the core network device can process the path switching request message in advance, reduce the switching delay caused by processing the path switching request message, and improve the switching efficiency of the terminal device.
[0008] In a possible implementation method, the path switching request message includes time information when the terminal device switches to the first access network device.
[0009] In a possible implementation method, the time information includes a time point when the terminal device switches to the first access network device;
[0010] Alternatively, the time information includes a time range for the terminal device to switch to the first access network device.
[0011] In a possible implementation method, the method further includes: receiving a path switching request confirmation message from a core network device.
[0012] In a possible implementation method, the first indication information is a preset message; or, the first indication information is a first uplink data packet from a terminal device.
[0013] In the above scheme, when the first indication information is a preset message, the terminal device can be directly instructed to access the first access network device to the core network device. When the first indication information is a first uplink data packet, the terminal device can be instructed to access the first access network device in an indirect manner without the need for a separate message for instruction, thereby reducing the signaling overhead between the access network device and the core network device.
[0014] In a possible implementation method, the method further includes: sending second indication information to the core network device, the second indication information being used to indicate cancellation of switching the data transmission path of the terminal device to the first access network device.
[0015] In a possible implementation method, the first access network device includes a non-terrestrial network device.
[0016] The above solution is applied in the NTN communication system. When a large number of terminal devices need to be switched at the same time due to the movement of non-ground network devices, the core network equipment can obtain the path switching request messages corresponding to these terminal devices in advance, so that the core network equipment has enough time to process a large number of path switching request messages before triggering the path switching, thereby reducing the switching delay, avoiding signaling congestion, and improving the system stability.
[0017] In a second aspect, the present application provides a switching method, which can be performed by a core network device or a device for a core network device, such as a chip. The method includes: receiving a path switching request message from a first access network device; receiving first indication information from the first access network device, the first indication information being used to instruct a terminal device to switch to the first access network device; triggering switching of a data transmission path of the terminal device to the first access network device according to the path switching request message and the first indication information.
[0018] In a possible implementation method, the method further includes: sending a path switching request confirmation message to the first access network device.
[0019] In a possible implementation method, the first indication information is a preset message; or, the first indication information is a first uplink data packet from a terminal device.
[0020] In a possible implementation method, the method also includes: receiving second indication information from the first access network device, the second indication information is used to indicate cancellation of switching the data transmission path of the terminal device to the first access network device; triggering cancellation of switching the data transmission path of the terminal device to the first access network device according to the second indication information.
[0021] In a third aspect, the present application provides a switching method, which can be performed by a first access network device or a device for the first access network device, such as a chip. The method includes: receiving a switching request message from a second access network device, the switching request message including time information of the terminal device switching to the first access network device; sending a path switching request message to a core network device, the switching request message including time information; wherein the path switching request message is sent between receiving the switching request message and the switching completion message.
[0022] Through the above method, after the first access network device receives the switching request message, it sends a path switching request message to the core network device before receiving the switching completion message, so that the core network device can process the path switching request message in advance, reduce the switching delay caused by processing the path switching request message, and improve the switching efficiency of the terminal device, which is particularly suitable for NTN communication systems. Further, the path switching request message includes time information, so that the core network device can determine when the terminal device accesses the first access network device according to the time information, so as to trigger the switching of the data transmission path of the terminal device to the first access network device according to the time information, thereby reducing the signaling overhead between the core network device and the access network device, improving resource utilization, and avoiding signaling storms.
[0023] In a possible implementation method, the time information is the time point when the terminal device switches to the first access network device; or, the time information is the time range when the terminal device switches to the first access network device.
[0024] In a possible implementation method, the method further includes: receiving a switching completion message from the terminal device.
[0025] In a possible implementation method, the method also includes: upon receiving a switching cancellation request message from a second access network device, sending second indication information to the core network device, the second indication information being used to indicate cancellation of switching the data transmission path of the terminal device to the first access network device; the switching cancellation request message being used to indicate cancellation of switching the terminal device to the first access network device.
[0026] In a possible implementation method, the method further includes: sending second indication information to the core network device, the second indication information being used to indicate cancellation of switching the data transmission path of the terminal device to the first access network device.
[0027] In a possible implementation method, the first access network device includes a non-terrestrial network device.
[0028] In a fourth aspect, the present application provides a switching method, which can be performed by a core network device or a device for a core network device, such as a chip. The method includes: receiving a path switching request message from a first access network device, the path switching request message including time information of the terminal device switching to the first access network device; triggering switching of the data transmission path of the terminal device to the first access network device according to the path switching request message and the time information.
[0029] In one possible implementation method, the time information is the time point when the terminal device switches to the first access network device; triggering the switching of the data transmission path of the terminal device to the first access network device according to the path switching request message and the time information includes: triggering the switching of the data transmission path of the terminal device to the first access network device according to the path switching request message at the time point.
[0030] In one possible implementation method, the time information is the time range for the terminal device to switch to the first access network device; the data transmission path of the terminal device is switched to the first access network device according to the path switching request message and the time information, including: at the maximum moment of the time range, the data transmission path of the terminal device is triggered to switch to the first access network device according to the path switching request message.
[0031] In a fifth aspect, an embodiment of the present application provides a communication device, which may be a first access network device, or a module (such as a chip) for the first access network device. The device has the function of implementing any implementation method in the first aspect or the third aspect above. The function may be implemented by hardware, or may be implemented by hardware executing corresponding software. The hardware or software includes one or more modules corresponding to the above functions.
[0032] In a sixth aspect, an embodiment of the present application provides a communication device, which may be a core network device, or a module (such as a chip) for a core network device. The device has the function of implementing any implementation method in the second aspect or the fourth aspect above. The function may be implemented by hardware, or may be implemented by hardware executing corresponding software. The hardware or software includes one or more modules corresponding to the above functions.
[0033] In the seventh aspect, an embodiment of the present application provides a communication device, including a processor and a memory; the memory is used to store computer instructions, and when the device is running, the processor executes the computer instructions stored in the memory to enable the device to execute any implementation method in the above-mentioned first to fourth aspects.
[0034] In an eighth aspect, an embodiment of the present application provides a communication device, comprising a unit or means for executing each step of any implementation method in the first to fourth aspects above.
[0035] In a ninth aspect, an embodiment of the present application provides a communication device, including a processor and an interface circuit, wherein the processor is used to communicate with other devices through the interface circuit and execute any implementation method in the first to fourth aspects above. The processor includes one or more.
[0036] In a tenth aspect, an embodiment of the present application provides a communication device, including a processor coupled to a memory, the processor being used to call a program stored in the memory to execute any implementation method in the first to fourth aspects above. The memory may be located inside the device or outside the device. And the processor may be one or more.
[0037] In the eleventh aspect, an embodiment of the present application further provides a computer-readable storage medium, in which instructions are stored, and when the computer-readable storage medium is run on a communication device, any implementation method in the above-mentioned first to fourth aspects is executed.
[0038] In the twelfth aspect, an embodiment of the present application further provides a computer program product, which includes a computer program or instructions. When the computer program or instructions are executed by a communication device, any implementation method in the above-mentioned first to fourth aspects is executed.
[0039] In the thirteenth aspect, an embodiment of the present application also provides a chip system, including: a processor, used to execute any implementation method of the first to fourth aspects above.
[0040] In the fourteenth aspect, an embodiment of the present application also provides a communication system, including: a first access network device for executing any implementation method of the above-mentioned first aspect and a core network device for executing any implementation method of the above-mentioned second aspect.
[0041] In a fifteenth aspect, an embodiment of the present application further provides a communication system, comprising: a first access network device for executing any implementation method of the second aspect above and a core network device for executing any implementation method of the fourth aspect above. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 A schematic diagram of an NTN scenario provided in an embodiment of the present application;
[0043] Figure 2 A schematic diagram of another NTN scenario provided in an embodiment of the present application;
[0044] Figure 3 A schematic diagram of the structure of an access network device provided in an embodiment of the present application;
[0045] Figure 4 A schematic diagram of a geostationary cell provided in an embodiment of the present application;
[0046] Figure 5 A schematic diagram of a ground mobile cell provided in an embodiment of the present application;
[0047] Figure 6 A schematic diagram of a switching method flow chart provided in an embodiment of the present application;
[0048] Figure 7 A schematic diagram of a switching method flow chart provided in an embodiment of the present application;
[0049] Figure 8 A schematic diagram of a switching method flow chart provided in an embodiment of the present application;
[0050] Fig. 9 A schematic diagram of the structure of a communication device provided in an embodiment of the present application;
[0051] Fig.10 A schematic diagram of the structure of a communication device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0052] The embodiments of the present application are described in detail below in conjunction with the accompanying drawings.
[0053] The communication method provided in the embodiment of the present application can be applied to NTN communication scenarios. NTN communication can include networking using non-ground network devices such as drones, high altitude platform stations (HAPS), satellites, etc. to provide data transmission, voice communication and other services for terminal devices. In addition, the NTN system can also include other non-ground network devices, which are not limited in the present application.
[0054] The NTN system can also support various mobile communication systems, such as: new radio (NR) system, long term evolution (LTE) system or other communication systems such as future communication systems, but the specific ones are not limited here.
[0055] Taking the satellite system as an example of the NTN system, according to the satellite altitude, that is, the orbital altitude of the satellite, the satellite can be divided into geostationary earth orbit (GEO) satellite, medium earth orbit (MEO) satellite and low earth orbit (LEO) satellite. GEO is a synchronous earth satellite orbit. Satellites operating in this orbit are stationary relative to the ground. The orbital altitude of GEO is generally 35786 kilometers (km). LEO and MEO are collectively referred to as non-geostationary orbit (NGSO). Satellites operating in this orbit move at high speed relative to the ground. Among them, the orbital altitude of LEO is generally 160 to 2000 km, and the orbital altitude of MEO is generally 2000 to 35786 km. For NGSO, according to whether the satellite beam moves with the satellite, it can be further divided into earth moving cells and geostationary cells. For earth moving cells, the cell moves relative to the ground, and the satellite's beam pointing follows the satellite's movement; for earth fixed cells, the cell is fixed relative to the ground for a certain period of time, and the satellite antenna can use its beamforming capability to point the beam to a certain area fixed on the ground for a certain period of time.
[0056] In NTN communication, the working modes of NTN equipment may include: transparent mode and regenerative mode. According to the working mode of NTN equipment, the architecture of NTN communication can be divided into the following two categories: one is the transparent forwarding architecture, in which the NTN equipment can be a relay or amplifier, and can perform radio frequency filtering, amplification, etc., to regenerate the physical layer signal. The NTN equipment can be responsible for layer 1 (layer1, L1) relay, which is used for physical layer forwarding, and the upper layer is invisible. The second is the regenerative architecture, in which the NTN equipment has the processing function of the access network equipment. Exemplarily, in the regenerative working mode, the satellite can be divided into a regenerative satellite without an inter-satellite link, that is, there is no inter-satellite link (ISL) between satellites; or a regenerative satellite with an inter-satellite link, that is, there is an interface between satellites to directly exchange data, where the inter-satellite link is an Xn port; or a regenerative satellite with a distributed unit (DU) processing function of an access network device, in which the satellite acts as a DU.
[0057] For example, Figure 1 A schematic diagram of an NTN scenario applicable to the embodiment of the present application is shown, and the NTN scenario can be an application scenario of a transparent forwarding architecture. Figure 1 In the scenario shown, the terminal device can communicate with the 5G core network (CN) through the access network, and then connect to the data network (DN) through the 5G CN. The satellite and NTN gateway can act as relay devices between the terminal device and the access network device or as the remote radio unit (RRU) of the access network device.
[0058] For example, Figure 2 Another NTN scenario schematic diagram applicable to the embodiment of the present application is shown, and the NTN scenario can be an application scenario of a regeneration architecture. Figure 2 In the scenario shown, the satellite can be used as an access network device to form an access network with the NTN gateway and communicate with the core network through the NTN gateway. In addition, the satellite can also provide wireless access services for terminal devices. Figure 2 A regenerative satellite architecture without intersatellite links is illustrated.
[0059] It should be noted that Figure 1 and Figure 2Only one satellite and one NTN gateway are shown. In actual use, a plurality of satellites and / or a plurality of NTN gateways may be used as required. Each satellite may provide services to one or more terminal devices, each NTN gateway may correspond to one or more satellites, and each satellite may correspond to one or more NTN gateways, which are not specifically limited in the embodiments of the present application.
[0060] It should be noted that Figure 1 and Figure 2 It is only an example of an NTN scenario. The NTN scenario may also include other specific scenarios, which are not limited in this application.
[0061] The devices involved in the embodiments of the present application include terminal devices, access network devices and core network devices. Among them:
[0062] Terminal equipment, also known as user equipment (UE), mobile station (MS), mobile terminal (MT), etc., refers to equipment that provides voice and / or data connectivity to users. For example, the terminal equipment may be a handheld device, a vehicle-mounted device, etc. with a wireless connection function. At present, some examples of terminal equipment may be: mobile phones, tablet computers, laptop computers, PDAs, mobile internet devices (MID), wearable devices, virtual reality (VR) devices, augmented reality (AR) devices, wireless terminals in industrial control, wireless terminals in self driving, wireless terminals in remote medical surgery, wireless terminals in smart grids, wireless terminals in transportation safety, wireless terminals in smart cities, wireless terminals in smart homes, etc.
[0063] The access network device may refer to a radio access network (RAN) node (or device) that connects a terminal device to a wireless network, such as a base station. Some examples of RAN nodes may include: a gNB, a transmission reception point (TRP), an evolved NodeB (eNB), a radio network controller (RNC), a NodeB (NB), a base station controller (BSC), a base transceiver station (BTS), a home evolved NodeB (e.g., home NodeB, or home NodeB, HNB), a base band unit (BBU), or a wireless fidelity (Wifi) access point (AP).
[0064] In addition, in a network structure, the access network device may include a centralized unit (CU) node, a distributed unit (DU) node, or a CU node and a DU node. The RAN device including the CU node and the DU node splits the protocol layer of the gNB in the NR system, places the functions of some protocol layers in the CU for centralized control, and distributes the functions of the remaining part or all of the protocol layers in the DU, which is centrally controlled by the CU, such as Figure 3As shown. Furthermore, CU can also be divided into control plane (CU-CP) and user plane (CU-UP). CU-CP is responsible for control plane functions, mainly including radio resource control (RRC) and packet data convergence protocol (PDCP) (i.e. PDCP-C) corresponding to the control plane. PDCP-C is mainly responsible for encryption and decryption, integrity protection, data transmission, etc. of control plane data. CU-UP is responsible for user plane functions, mainly including service data adaptation protocol (SDAP) and PDCP corresponding to the user plane (i.e. PDCP-U). SDAP is mainly responsible for processing the data of the core network and mapping the flow to the bearer. PDCP-U is mainly responsible for encryption and decryption, integrity protection, header compression, sequence number maintenance, data transmission, etc. of the data plane. CU-CP and CU-UP are connected through the E1 interface. CU-CP represents that gNB is connected to the core network through the NG interface, and is connected to DU through the F1 interface control plane (i.e. F1-C). CU-UP is connected to DU via F1 interface user plane (i.e. F1-U). Of course, another possible implementation is that PDCP-C is also in CU-UP.
[0065] It can be understood that in different systems, CU (including CU-CP or CU-UP) or DU may have different names, but those skilled in the art can understand their meanings. For example, in an open radio access network (O-RAN) system, CU may also be referred to as O-CU (open CU), DU may also be referred to as O-DU, CU-CP may also be referred to as O-CU-CP, and CU-UP may also be referred to as O-CU-UP. For the convenience of description, this application takes CU, CU-CP, CU-UP and DU as examples for description.
[0066] Core network equipment refers to equipment in the core network that provides service support for terminal equipment. At present, some examples of core network equipment are: access and mobility management function (AMF) entity, session management function (SMF) entity, user plane function (UPF) entity, etc., which are not listed here one by one. Among them, the AMF entity can be responsible for access management and mobility management of terminal equipment; the SMF entity can be responsible for session management, such as user session establishment, etc.; the UPF entity can be a functional entity of the user plane, mainly responsible for connecting to the external network. In this application, "entity" can also be referred to as a network element or a functional entity. For example, an AMF entity can also be referred to as an AMF network element or an AMF functional entity. For another example, an SMF entity can also be referred to as an SMF network element or an SMF functional entity, etc.
[0067] In the NTN system, the mobility of non-terrestrial network equipment will cause a large number of terminal devices to need cell switching at the same time. Figure 4 As shown, for a geostationary cell, within a certain period of time, the satellite moves from position 1 to position 2, and the cell does not move with the satellite. When the satellite moves out of the coverage of the cell, all terminal devices in the cell need to switch to the next satellite. In this scenario, since the terminal device is in the cell switching process, after the switching is executed, the target satellite will send a path transfer request to the core network, requesting the core network to switch the data transmission path of the terminal device to the target satellite. Therefore, sending a large number of path transfer requests to the core network in a short period of time will cause a processing burden on the core network and lead to signaling congestion. In addition, in the feeder link switching scenario, the feeder link switching will also cause all terminal devices in the cell to switch to the next cell, which will also cause the above problems.
[0068] For ground mobile cells, the cells move with the non-ground network equipment, and terminal equipment is constantly switched in and out during the movement of the non-ground network equipment. Figure 5 As shown in the figure, the dotted cell indicates the cell position when the satellite is at position 1, and the solid cell indicates the cell position when the satellite is at position 2. The two partially overlap, and the terminal devices outside the overlapping area in the dotted cell need to switch. Therefore, in this scenario, frequent cell switching of a large number of terminal devices will also lead to a large signaling overhead.
[0069] Based on this, an embodiment of the present application proposes a switching method to improve the efficiency of the network in processing cell switching of terminal equipment.
[0070] The network architecture and business scenarios described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application, and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. A person of ordinary skill in the art can appreciate that with the evolution of the network architecture and the emergence of new business scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0071] In this application, the names of the messages in the following processes are only used as examples. With the evolution of communication technology, the names of the messages in the following processes may change, but no matter how the names change, as long as their meanings are the same as the functions or meanings of the messages in this application, they all fall within the protection scope of this application. For example, the handover complete message in this application can also be replaced by a message such as an RRC reconfiguration complete message or an RRC connection reconfiguration complete message.
[0072] The order of steps in the following processes is only an example. In actual applications, the execution order of steps in each process can be adjusted.
[0073] It can be understood that the present application does not particularly limit the specific structure of the execution subject of the method provided in the embodiment of the present application. As long as it is possible to communicate according to the method provided in the embodiment of the present application by running a program that records the code of the method provided in the embodiment of the present application, the interaction between the terminal device, the access network device and the core network device will be used as an example for explanation below.
[0074] like Figure 6 FIG. 1 is a flow chart of a switching method provided in an embodiment of the present application, the method comprising:
[0075] Step 601: The second access network device sends a handover request message to the first access network device.
[0076] Correspondingly, the first access network device receives a switching request message from the second access network device.
[0077] The switching request message is used to request to switch the terminal device to the first access network device, wherein the second access network device may be a source access network device, and the first access network device may be a target access network device.
[0078] The handover request message may be a handover request message in a conditional handover (CHO) process, or a handover request message in other types of handover processes, which is not limited in the present application.
[0079] In one implementation, the switching request message includes the time information when the terminal device switches to the first access network device, and information such as the identification of the terminal device. Exemplarily, the time information may be the time point or time range when the terminal device disconnects from the second access network device, or the time information may be the time point or time range when the terminal device accesses the first access network device. The time information may be a specific time point, for example, the time point included in the time information may be universal time coordinated (UTC). Alternatively, the time point included in the time information may be a time offset value, which is the offset between the time point when the terminal device switches to the first access network device and the time reference point, and the time reference point may be preset, for example, the time reference point is the receiving time of the receiving path switching request message. For another example, the time information includes the time range when the terminal device switches to the first access network device, for example, the time range included in the time information is [t1, t2], indicating that the terminal device switches to the first access network device within the time range between time point t1 and time point t2.
[0080] Exemplarily, the identifier of the terminal device may be a cell radio network temporary identity (C-RNTI) of the terminal device in the second access network device.
[0081] In one implementation, the first access network device includes a non-terrestrial network device. For example, a DU of the first access network device is a non-terrestrial network device, or the first access network device is a non-terrestrial network device.
[0082] In one implementation, the second access network device includes a non-terrestrial network device.
[0083] The non-terrestrial network equipment mentioned above includes but is not limited to satellite and other equipment.
[0084] This application does not limit under what circumstances the second access network device sends a handover request message. For example, the second access network device configures the terminal device to perform measurements, and the measurement configuration information is sent via an RRC reconfiguration message (RRCReconfiguration). The terminal device performs neighboring cell measurements according to the configuration and reports the measurement results to the second access network device. The second network device selects a target cell based on the measurement results reported by the terminal device, for example, selects the cell of the first access network device as the target cell, and sends a handover request message to the first access network device.
[0085] The above is only an example, and the second access network device may also send a handover request message in other situations, such as performing a blind handover, that is, the second network device does not rely on the measurement result when determining the target cell.
[0086] Optionally, the second access network device may determine multiple cells as candidate target cells, and the multiple candidate target cells may come from the same access network device or from different access network devices. The second access network device may send a handover request message to multiple access network devices. In this specification, the first access network device refers to all target access network devices.
[0087] Step 602: The first access network device sends a handover request confirmation (ACK) message to the second access network device. The handover request confirmation message includes the configuration information of the target cell. Before sending the handover request confirmation message, the first access network device will perform access control. If the second access network device decides to accept the handover request, it will send the handover request confirmation message.
[0088] Step 603: The second access network device sends an RRC reconfiguration message to the terminal device.
[0089] Exemplarily, the RRC reconfiguration message includes a handover request confirmation message.
[0090] Exemplarily, the RRC reconfiguration message also includes relevant information of the target cell in the first access network device and relevant configuration parameters required for the terminal device to access the target cell. The relevant information of the target cell may include, for example, the physical-layer cell identity (PCI) of the target cell; the frequency information corresponding to the target cell. The relevant configuration parameters may include, for example, the C-RNTI allocated by the first access network device to the terminal device; the random access channel (RACH) resource information required to access the target cell, etc.
[0091] The terminal device receives the RRC reconfiguration message, obtains the configuration information of the first access network device, and then uses the configuration information to synchronize to the first access network device. The specific process is not repeated here. It should be pointed out that the terminal device can access the first access network device through a random access process, or can access the first access network device through a random access-free method, which is not limited in this application.
[0092] Step 604: The first access network device sends a path switch request message to the core network device.
[0093] Correspondingly, the core network device receives a path switching request message from the first access network device. The core network device may be an AMF network element.
[0094] Among them, the path switching request message is used to request that the downlink data transmission path of the terminal device be switched to the first access network device. Optionally, the path switching request message may include time information, and the time information may come from the switching request message. Exemplarily, if the time information is a specific time point, for example, the time information is UTC time, the core network device triggers the path switching at this time point after receiving the path switching request message; or, the time information may be a time offset value, and the time offset value is the time interval for performing the path switching after receiving the path switching request message. For example, the time when the path switching request message is received is T0, and the time information carried by the path switching request message is ΔT. After the core network device receives the path switching request message, it triggers the path switching at T0+ΔT. Alternatively, the time information may be a time range, and the core network device may determine the processing order of the path switching request message or decide whether to perform the path switching according to the time range when the terminal device accesses the first network device. The specific process is not limited in this application.
[0095] The path switching request message may also include an identifier of the terminal device, an identifier of the protocol data unit (PDU) session of the terminal device, and a first address of the PDU session of the terminal device at the first access network device, for example, the first address is an IP address and a general packet radio service (GPRS) tunneling protocol (GPRS Tunnelling Protocol, GTP) tunnel endpoint identifier (Tunnel Endpoint Identifier). Using the first address, the UPF network element can transfer the PDU session path of the terminal device to the first access network device. In addition, the path switching request message may also include other information, which is not listed here one by one.
[0096] In the present application, the path switching request message is sent between the first access network device receiving the switching request message and the switching completion message. It can also be considered that the path switching request message is sent after the first access network device receives the switching request message. Specifically, after receiving the switching request message, the first access network device does not need to wait for receiving the switching completion message, but sends the path switching request message before receiving the switching completion message. That is, the sending of the path switching request message does not depend on whether the switching completion message is received. The first access network device can send the path switching request message without receiving the switching completion message. Alternatively, the sending condition of the path switching request message is to receive the switching request message, that is, the first access network device receives the switching request message and determines that the path switching request message can be sent. Alternatively, the sending condition of the path switching request message is that the first access network device completes access control and sends a switching request confirmation message to the second access network device, that is, the first access network device sends a switching request confirmation message and determines that the path switching request message can be sent. In another implementation, the sending time of the path switching request message is between the receiving time of the switching request message and the receiving time of the switching completion message. The handover completion message is used to indicate that the air interface handover has been completed. Exemplarily, the handover completion message may be an RRC message such as an RRC reconfiguration complete (RRCreconfigurationcomplete) message.
[0097] Correspondingly, after receiving the path switching request message, the core network device does not immediately trigger the switching of the downlink data transmission path of the terminal device to the first access network device. The core network device may first parse the information in the path switching request message, such as obtaining at least one of the time information, the terminal device identifier, the PDU session identifier of the terminal device, and the first address of the PDU session in the path switching request message.
[0098] Optionally, the method further includes step 605: the core network device sends a path switching request confirmation message to the first access network device.
[0099] The path switching request confirmation message may include at least one of the following information: the identifier of the terminal device, the uplink PDU session identifier of the terminal device, and the second address of the uplink PDU session of the terminal device at the UPF network element. For example, the second address is an IP address and a GTP tunnel endpoint identifier (GTP Tunnel Endpoint Identifier). Using the second address, the first access network device can send the PDU data packet of the terminal device to the UPF network element.
[0100] When step 605 is performed, step 605 may be performed after step 608 .
[0101] Step 606: The terminal device sends a switching completion message to the first access network device.
[0102] Correspondingly, the first access network device receives a switching completion message from the terminal device, for example, the switching completion message may be an RRCReconfigurationcomplete message.
[0103] Exemplarily, when the terminal device receives the RRC reconfiguration message in step 603, it can be synchronized to the first access network device. For example, the UE can access the first access network device by initiating a random access process, or can access the target access network device by a random access-free process. After the synchronization is completed, a switching completion message can be sent to indicate that the switching from the second access network device to the first access network device is completed.
[0104] Step 607: When the first access network device receives a switching completion message from the terminal device, the first indication information is sent to the core network device. The first indication information is used to instruct the terminal device to switch to the first access network device. The first indication information is associated with the terminal device. For example, the first indication information includes an identifier of the terminal device.
[0105] In one implementation, the first indication information is a preset message. In this implementation, the preset message can be a message pre-agreed between the first access network device and the core network device, and when the core network device receives the preset message, it determines that the terminal device is switched to the first access network device.
[0106] The preset message may be a newly defined message or an existing message. For example, a path switching request message may be used as a preset message. The difference between the path switching request message at this time and the path switching message in step 604 is that the path switching request message in this step does not include information such as the address of the PDU session, and is only used to instruct the terminal device to switch to the first access network device.
[0107] In another implementation, the first indication information is the first uplink data packet from the terminal device. In this implementation, since the terminal device has been connected to the first access network device, the terminal device can send an uplink data packet to the first access network device. If the terminal device has no uplink data to send, the first access network device can send an empty data packet. In this case, the first uplink data packet is an empty data packet. When the first access network device receives the first uplink data packet from the terminal device, the first uplink data packet can be forwarded to the core network device. When the core network device receives the first uplink data packet, it can determine that the terminal device has switched to the first access network device. In this implementation, since the sending of the uplink data packet requires the uplink PDU session identifier included in the path switching request confirmation message and the second address of the PDU session at the UPF network element, step 605 is executed before step 607.
[0108] Step 608: The core network device triggers switching of the data transmission path of the terminal device to the first access network device according to the path switching request message and the first indication information.
[0109] For example, taking the core network device as an AMF network element, the AMF network element triggers a path switch after receiving a path switch request. The path switch request includes the first address of the PDU session of the terminal device at the first access network device. The UPF network element switches the data transmission path of the terminal device to the first access network device according to the first address, and the UPF network element can also release the user plane resources or transport network layer (TNL) resources with the second access network device.
[0110] In one implementation, if the path switching request confirmation message in step 605 is executed after step 608, the first indication information in step 607 is implemented using a preset message. If the path switching request confirmation message in step 605 is executed before step 608, the first indication information in step 607 can be a preset message or a first uplink data packet.
[0111] In one implementation, if the switching process of the terminal device is canceled or the switching fails, step 607 and step 608 may also be replaced by the following steps:
[0112] The first access network device sends second indication information to the core network device, where the second indication information is used to indicate cancellation of switching the data transmission path of the terminal device to the first access network device.
[0113] In one implementation, the first access network device sends second indication information to the core network device when receiving a handover cancellation request message from the second access network device, wherein the handover cancellation request message is used to indicate the cancellation of handover of the terminal device to the first access network device.
[0114] In one implementation, the first access network device decides to cancel the switching process and sends second indication information to the core network device.
[0115] In one implementation, when the first access network device does not receive a switching completion message, it can determine that the terminal device switching has failed, and thus send a second indication message to the core network device.
[0116] Exemplarily, the second indication information may include at least one of the following information: an identifier of the terminal device, a downlink PDU session identifier of the terminal device, and the like.
[0117] Correspondingly, the core network device triggers the cancellation of switching the data transmission path of the terminal device to the first access network device according to the second indication information, and the specific process is not repeated here.
[0118] Through the above method, after the first access network device receives the switching request message, it sends a path switching request message to the core network device before receiving the switching completion message, so that the core network device can process the path switching request message in advance, reduce the switching delay caused by processing the path switching request message, and improve the switching efficiency of the terminal device. In particular, in the NTN communication system, when a large number of terminal devices need to be switched at the same time due to the movement of non-terrestrial network devices, since the core network device can obtain the path switching request messages corresponding to these terminal devices in advance, the core network device has enough time to process a large number of path switching request messages before triggering the path switching, which reduces the switching delay, avoids the occurrence of signaling congestion, and improves the stability of the system.
[0119] In the previous process, the source access network device (i.e., the second access network device) configures a candidate target cell for the terminal device as an example. In actual applications, the source access network device can configure multiple candidate target cells for the terminal device, and the terminal device can select a cell from the multiple candidate target cells as the target cell after switching. These multiple candidate target cells can belong to the same access network device or to multiple access network devices. The following description takes two candidate target cells as an example.
[0120] In the following process, the second access network device configures a first candidate target cell and a second candidate target cell for the terminal device, the first candidate target cell belongs to the first access network device, and the second candidate target cell belongs to the third access network device.
[0121] like Figure 7 FIG. 1 is a flow chart of a switching method provided in an embodiment of the present application, the method comprising:
[0122] Step 701a: The second access network device sends a first switching request message to the first access network device.
[0123] Correspondingly, the first access network device receives the first switching request message from the second access network device.
[0124] Optionally, the method further includes step 702a: the first access network device sends a first switching request confirmation message to the second access network device. The first switching request message is used to request to switch the terminal device to the first access network device.
[0125] In one implementation, the first switching request message includes an identifier of the terminal device, configuration information for the terminal device to access a target cell, and may also include first time information when the terminal device switches to the first access network device.
[0126] In one implementation, the first time information includes the time point when the terminal device switches to the first access network device, and the terminal device switches to the first access network device at this time point. Exemplarily, the first time information may be the time point or time range when the terminal device disconnects from the second access network device, or the first time information may be the time point or time range when the terminal device accesses the first access network device. The time information may be a specific time point, for example, the time point included in the first time information may be UTC. Alternatively, the time point included in the first time information may be a time offset value. In another implementation, the first time information includes the time range when the terminal device switches to the first access network device. Regarding the time information, please refer to the description in step 601 for details, which will not be repeated here.
[0127] Step 701b: The second access network device sends a second switching request message to the third access network device.
[0128] Optionally, the method further includes step 702b: the third access network device sends a second switching request confirmation message to the second access network device. The second switching request message is used to request to switch the terminal device to the third access network device.
[0129] In one implementation, the second switching request message includes identification information of the terminal device, configuration information of the terminal device accessing the target cell, and may also include second time information of the terminal device switching to the third access network device.
[0130] The first time information may be the same as or different from the second time information, and this application does not limit this. The first time information may be different from the second time information, which may mean that the time point included in the first time information is different from the time point included in the second time information, or the time range included in the first time information is different from the time range included in the second time information, and this application does not limit this.
[0131] It can be understood that the above steps 701a and 701b do not distinguish the order of precedence. When steps 702a and 702b are executed, steps 701a-702a and steps 701b-702b do not distinguish the order of precedence either.
[0132] Step 703a: The second access network device sends a first RRC reconfiguration message to the terminal device.
[0133] The first RRC reconfiguration message includes a first handover request confirmation message. The first RRC reconfiguration message may also include relevant information of the first candidate target cell and relevant configuration parameters required for the terminal device to access the first candidate target cell.
[0134] If the second access network device configures the third candidate target cell in the first access network device to the terminal device, the first RRC reconfiguration message may also include relevant information of the third candidate target cell and relevant configuration parameters required for the terminal device to access the third candidate target cell.
[0135] Step 703b: The second access network device sends a second RRC reconfiguration message to the terminal device.
[0136] The second RRC reconfiguration message includes a second handover request confirmation message. The second RRC reconfiguration message may also include relevant information of the second candidate target cell and relevant configuration parameters required for the terminal device to access the second candidate target cell.
[0137] It should be noted that, in one implementation, the first RRC reconfiguration message and the second RRC reconfiguration message may be the same message. Specifically, the second access network device may send an RRC reconfiguration message to the terminal device, the RRC reconfiguration message including relevant information of the second candidate target cell and the third candidate target cell, and relevant configuration information required for the terminal device to access the second candidate target cell and the third candidate target cell.
[0138] After receiving the first RRC reconfiguration message and the second RRC reconfiguration message, the terminal device can select a candidate target cell from the first candidate target cell and the second candidate target cell as the target cell after switching. This application does not limit how the terminal device selects the target cell, and will not be repeated here.
[0139] It can be understood that there is no order in which the above steps 703a and 703b are performed.
[0140] Step 704a: The first access network device sends a first path switching request message to the core network device.
[0141] The first path switching request message is used to request that the data transmission path of the terminal device be switched to the first access network device. Optionally, the first path switching request message may include first time information. Optionally, the first path switching request message may also include an identifier of the terminal device, a PDU session identifier of the terminal device, and a first address of the PDU session of the terminal device at the first access network device.
[0142] In one implementation, if the second access network device configures multiple cells in the first access network device as candidate target cells, the first access network device may only send one path switching request message to the core network device.
[0143] In the present application, the first path switching request message is sent between the first access network device receiving the first switching request message and the switching completion message. After receiving the first switching request message, the first access network device does not need to wait to receive the switching completion message, but sends the first path switching request message before receiving the switching completion message.
[0144] Step 704b: The third access network device sends a second path switching request message to the core network device.
[0145] The second path switching request message is used to request that the data transmission path of the terminal device be switched to the third access network device. Optionally, the third path switching request message may include the second time information, and may also include an identifier of the terminal device, a PDU identifier of the terminal device, and a first address of the PDU session of the terminal device at the first access network device.
[0146] In the present application, the second path switching request message is sent between the third access network device receiving the second switching request message and the switching completion message. After receiving the second switching request message, the third access network device does not need to wait to receive the switching completion message, but sends the second path switching request message before receiving the switching completion message.
[0147] Correspondingly, after receiving the first path switching request message and the second path switching request message, the core network device does not immediately trigger the switching of the data transmission path of the terminal device to the first access network device or the third access network device. The core network device may first parse the information in the first path switching request message and the second path switching request message, such as obtaining the first time information, the second time information, the terminal device identifier, the terminal device PDU identifier, the first address of the terminal device PDU session, and other information.
[0148] After step 704a is executed, optionally, the method further includes step 705a: the core network device sends a first path switching request confirmation message to the first access network device.
[0149] After step 704b is executed, optionally, the method further includes step 705b: the core network device sends a second path switching request confirmation message to the third access network device.
[0150] The first path switching request confirmation message and the second path switching request confirmation message may include an identifier of the terminal device, an uplink PDU session identifier of the terminal device, and a second address of the PDU session of the terminal device at the UPF network element.
[0151] It can be understood that the above steps 704a and 704b do not distinguish the order of precedence. When steps 705a and 705b are executed, steps 704a-705a and steps 704b-705b do not distinguish the order of precedence either.
[0152] In one implementation, assuming that the terminal device selects the first candidate target cell as the target cell after switching, step 706 may be included:
[0153] Step 706: The terminal device sends a switching completion message to the first access network device.
[0154] Correspondingly, the first access network device receives a switching completion message from the terminal device.
[0155] Here, since the example here is that the terminal device selects the first candidate target cell as the target cell after switching, the terminal device no longer sends a switching completion message to the third access network device.
[0156] The terminal device receives the first RRC reconfiguration message, obtains the configuration information for accessing the first access network device, and then uses the configuration information to synchronize to the first access network device. After the terminal device completes accessing the first access network device, it can send a handover completion message.
[0157] Step 707: Upon receiving a switching completion message from the terminal device, the first access network device sends first indication information to the core network device, where the first indication information is used to instruct the terminal device to switch to the first access network device.
[0158] Step 708: The core network device triggers switching of the data transmission path of the terminal device to the first access network device according to the path switching request message and the first indication information.
[0159] Optionally, the core network device cancels other path switching requests after receiving the first indication information. Exemplarily, when the core network device receives the first indication information from the first access network device, it indicates that the terminal device has accessed the first network device, and therefore, the second path switching request message from the third access network device can be canceled.
[0160] For the specific contents of step 707 to step 708, please refer to the description of step 607 to step 608, which will not be repeated here.
[0161] In one implementation, the first path switching request confirmation message in step 705a and the second path switching request confirmation message in step 705b may also be sent after step 708. If the first path switching request confirmation message and the second path switching request confirmation message are sent after step 708, then for the access network device that has not sent the first indication information to the core network device, the core network device may not send the path switching request confirmation message to it. For example, if the third access network device does not send the first indication information, then step 705b may not be performed again.
[0162] If the path switching request confirmation message in step 605 is executed after step 608, the first indication information in step 607 is implemented by a preset message. If the path switching request confirmation message in step 605 is executed before step 608, the first indication information in step 607 can be a preset message or a first uplink data packet.
[0163] In the present application, if the switching of the terminal device is canceled or fails, step 707 and step 708 may also be replaced by the following steps:
[0164] The first access network device sends a second indication message to the core network device, and the second indication message is used to indicate the cancellation of switching the data transmission path of the terminal device to the first access network device. Correspondingly, the core network device triggers the cancellation of switching the data transmission path of the terminal device to the first access network device according to the second indication message, and the specific process is not repeated here.
[0165] Among them, as to the circumstances under which the first access network device sends the second indication information, reference may be made to the previous description and will not be repeated here.
[0166] Through the above method, when the second access network device configures multiple candidate target cells for the terminal device, multiple access network devices corresponding to the multiple candidate target cells can send path switching request messages to the core network device in advance, so that the core network device can process multiple path switching request messages in advance, reduce the switching delay caused by processing the path switching request messages, and improve the switching efficiency of the terminal device.
[0167] In the previous process, when the terminal device switches to the first access network device, the first access network device indicates to the core network device through the first indication information that the terminal device has switched to the first access network device. In this application, the core network device can also determine whether the terminal device switches to the first access network device based on the time information in the path switching request message, which will be described in detail below.
[0168] like Figure 8 FIG. 1 is a flow chart of a switching method provided in an embodiment of the present application, the method comprising:
[0169] Step 801: The second access network device sends a switching request message to the first access network device.
[0170] Correspondingly, the first access network device receives a switching request message from the second access network device.
[0171] The switching request message is used to request to switch the terminal device to the first access network device.
[0172] In one implementation, the first switching request message includes time information when the terminal device switches to the first access network device, as well as information such as an identifier of the terminal device.
[0173] In one implementation, the time information includes the time point when the terminal device switches to the first access network device, and the terminal device switches to the first access network device at this time point. For example, the time point included in the time information may be UTC. Alternatively, the time point included in the time information may be a time offset value, and the offset value is the offset between the time point when the terminal device switches to the first access network device and the time reference point, and the time reference point may be preset, for example, the time reference point is the receiving time of the received path switching request message.
[0174] In another implementation, the time information includes the time range for the terminal device to switch to the first access network device. For example, the time range included in the time information is [t1, t2], indicating that the terminal device switches to the first access network device within the time range between time point t1 and time point t2.
[0175] For other contents of the time information, please refer to the description of the time information in step 601, which will not be repeated here.
[0176] Optionally, the method further includes step 802: the first access network device sends a switching request confirmation message to the second access network device.
[0177] Step 803: The second access network device sends an RRC reconfiguration message to the terminal device.
[0178] Step 804: The first access network device sends a path switching request message to the core network device.
[0179] In the present application, the path switching request message is sent between the first access network device receiving the switching request message and the switching completion message. That is, the sending of the path switching request message does not depend on whether the switching completion message is received, and the first access network device sends the path switching request message before receiving the switching completion message. Alternatively, the sending condition of the path switching request message is the reception of the switching request message, that is, the first access network device receives the switching request message and determines that the path switching request message can be sent. Alternatively, the sending condition of the path switching request message is the sending of the switching request confirmation message, that is, the first access network device sends the switching request confirmation message to the second network device, and then the path switching request message can be sent.
[0180] In another implementation, the sending time of the path switch request message is between the receiving time of the switch request message and the receiving time of the switch completion message.
[0181] Correspondingly, after receiving the first path switching request message and the second path switching request message, the core network device does not immediately trigger switching of the data transmission path of the terminal device to the first access network device.
[0182] Optionally, the method further includes step 805: the core network device sends a path switching request confirmation message to the first access network device.
[0183] Step 806: The terminal device sends a switching completion message to the first access network device.
[0184] For the specific contents of steps 801 to 806, please refer to the descriptions in steps 601 to 606, which will not be repeated here.
[0185] Step 807: The core network device triggers switching of the data transmission path of the terminal device to the first access network device according to the path switching request message and the time information.
[0186] In one implementation, the core network device triggers switching the data transmission path of the terminal device to the first access network device according to the path switching request message at the time point indicated by the time information. For example, if the time point included in the time information is t0, then the core network device triggers switching the data transmission path of the terminal device to the first access network device at the time point t0.
[0187] In one implementation, the core network device triggers switching the data transmission path of the terminal device to the first access network device according to the path switching request message at the maximum time of the time range indicated by the time information. For example, if the time range included in the time information is [t1, t2], then the core network device triggers switching the data transmission path of the terminal device to the first access network device at time point t2.
[0188] In this implementation, the maximum time of the time range may also be replaced by any time of the time range, for example, by the starting time of the time range.
[0189] In one implementation, when step 805 is executed, step 805 may be executed after step 807 .
[0190] In the present application, if the switching of the terminal device is canceled or fails, step 807 can also be replaced by the following steps: the first access network device sends a second indication message to the core network device, and the second indication message is used to indicate the cancellation of switching the data transmission path of the terminal device to the first access network device. Correspondingly, the core network device triggers the cancellation of switching the data transmission path of the terminal device to the first access network device according to the second indication message, and the specific process is not repeated here.
[0191] Through the above method, after the first access network device receives the switching request message, it sends a path switching request message to the core network device before receiving the switching completion message, so that the core network device can process the path switching request message in advance, reduce the switching delay caused by processing the path switching request message, and improve the switching efficiency of the terminal device, which is particularly suitable for NTN communication systems. Further, the core network device can determine when the terminal device accesses the first access network device according to the time information, so as to trigger the switching of the data transmission path of the terminal device to the first access network device according to the time information, thereby reducing the signaling overhead between the core network device and the access network device, improving resource utilization, and avoiding signaling storms.
[0192] It is understandable that in the embodiment of the present application, the first access network device or the core network device can perform some or all of the steps in the embodiment of the present application, and these steps or operations are only examples. The embodiment of the present application can also perform other operations or variations of various operations. In addition, the various steps can be performed in different orders presented in the embodiment of the present application, and it is possible that not all operations in the embodiment of the present application need to be performed.
[0193] It is understandable that, in order to implement the functions in the above embodiments, the first access network device or the core network device includes a hardware structure and / or software module corresponding to the execution of each function. Those skilled in the art should easily realize that, in combination with the units and method steps of each example described in the embodiments disclosed in this application, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application scenario and design constraints of the technical solution.
[0194] Fig. 9 and Fig.10 A schematic diagram of the structure of possible communication devices provided for embodiments of the present application. These communication devices can be used to implement the functions of the first access network device or the core network device in the above method embodiments, and thus can also achieve the beneficial effects possessed by the above method embodiments. In an embodiment of the present application, the communication device can be a first access network device or a core network device, and can also be a module (such as a chip) applied to the first access network device or the core network device.
[0195] Fig. 9 The communication device 900 shown includes a processing unit 910 and a communication unit 920. The communication device 900 is used to implement the function of the first access network device or the core network device in the above method embodiment.
[0196] When the communication device 900 is used to implement the function of the first access network device in the above embodiment:
[0197] A processing unit, configured to receive a switching request message from a second access network device through a communication unit;
[0198] The processing unit is used to send a path switching request message to the core network device through the communication unit; when receiving a switching completion message from the terminal device, send first indication information to the core network device, wherein the first indication information is used to instruct the terminal device to switch to the first access network device; wherein the path switching request message is sent between receiving the switching request message and the switching completion message.
[0199] When the communication device 900 is used to implement the functions of the core network device in the above embodiment: the communication unit is used to receive a path switching request message from a first access network device; receive first indication information from the first access network device, the first indication information is used to instruct the terminal device to switch to the first access network device;
[0200] A processing unit, used to trigger switching of the data transmission path of the terminal device to the first access network device according to the path switching request message and the first indication information.
[0201] When the communication device 900 is used to implement the function of the first access network device in the above embodiment:
[0202] A processing unit, configured to receive a switching request message from a second access network device through a communication unit, wherein the switching request message includes time information when the terminal device switches to the first access network device;
[0203] The processing unit is used to send a path switching request message to the core network device through the communication unit, and the switching request message includes the time information; wherein the path switching request message is sent between receiving the switching request message and receiving a switching completion message.
[0204] When the communication device 900 is used to implement the functions of the core network device in the above embodiment: a communication unit is used to receive a path switching request message from a first access network device, and the path switching request message includes time information for the terminal device to switch to the first access network device; a processing unit is used to trigger switching of the data transmission path of the terminal device to the first access network device according to the path switching request message and the time information.
[0205] For a more detailed description of the processing unit 910 and the communication unit 920, reference may be made to the relevant description in the above method embodiment, which will not be repeated here.
[0206] Fig.10 The communication device 1000 shown includes a processor 1010 and an interface circuit 1020. The processor 1010 and the interface circuit 1020 are coupled to each other. It is understood that the interface circuit 1020 can be a transceiver or an input-output interface. Exemplarily, the communication device 1000 may also include a memory 1030 for storing instructions executed by the processor 1010 or storing input data required by the processor 1010 to execute instructions or storing data generated after the processor 1010 executes instructions.
[0207] When the communication device 1000 is used to implement the above method embodiment, the processor 1010 is used to implement the function of the above processing unit 910 , and the interface circuit 1020 is used to implement the function of the above communication unit 920 .
[0208] When the above communication device is a chip applied to the first access network device, the chip of the first access network device implements the function of the first access network device in the above method embodiment. The chip of the first access network device receives information from other modules (such as a radio frequency module or an antenna) in the first access network device, and the information is sent by the network device to the first access network device; or, the chip of the first access network device sends information to other modules (such as a radio frequency module or an antenna) in the terminal device, and the information is sent by the first access network device to the network device.
[0209] When the above-mentioned communication device is a module applied to a core network device, the module of the core network device implements the functions of the core network device in the above-mentioned method embodiment. The module of the core network device receives information from other modules in the core network device (such as a radio frequency module or an antenna), and the information is sent by the first access network device to the core network device; or, the module of the core network device sends information to other modules in the core network device (such as a radio frequency module or an antenna), and the information is sent by the core network device to the first access network device. The module of the core network device here can be a chip of the core network device, or it can be a DU or other module, and the DU here can be a DU under the open radio access network (O-RAN) architecture.
[0210] It is understandable that the processor in the embodiments of the present application may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field programmable gate arrays (FPGA) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. The general-purpose processor may be a microprocessor or any conventional processor.
[0211] The method steps in the embodiments of the present application can be implemented by hardware or by a processor executing software instructions. The software instructions can be composed of corresponding software modules, and the software modules can be stored in a random access memory, a flash memory, a read-only memory, a programmable read-only memory, an erasable programmable read-only memory, an electrically erasable programmable read-only memory, a register, a hard disk, a mobile hard disk, a compact disc read-only memory (compact disc read-only memory, CD-ROM) or any other form of storage medium known in the art. An exemplary storage medium is coupled to the processor so that the processor can read information from the storage medium and write information to the storage medium. Of course, the storage medium can also be a component of the processor. The processor and the storage medium can be located in an ASIC. In addition, the ASIC can be located in a first access network device or a core network device. Of course, the processor and the storage medium can also be present in the first access network device or the core network device as discrete components.
[0212] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, optical storage, etc.) that contain computer-usable program code.
[0213] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0214] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0215] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A switching method, characterized in that: The method is applied to a first access network device, and the method includes: Receiving a handover request message from a second access network device; Sending a path switching request message to a core network device; Upon receiving a switching completion message from a terminal device, first indication information is sent to the core network device, wherein the first indication information is used to instruct the terminal device to switch to the first access network device; wherein the path switching request message is sent between receiving the switching request message and the switching completion message.
2. The method according to claim 1, characterized in that The path switching request message includes time information when the terminal device switches to the first access network device.
3. The method according to claim 2, characterized in that The time information includes the time point when the terminal device switches to the first access network device; Alternatively, the time information includes the time range for the terminal device to switch to the first access network device.
4. The method according to any one of claims 1 to 3, characterized in that: The method further comprises: Receive a path switching request confirmation message from the core network device.
5. The method according to any one of claims 1 to 4, characterized in that: The first indication information is a preset message; Alternatively, the first indication information is a first uplink data packet from the terminal device.
6. The method according to claim 1, characterized in that The method further comprises: Send second indication information to the core network device, where the second indication information is used to indicate cancellation of switching the data transmission path of the terminal device to the first access network device.
7. The method according to any one of claims 1 to 6, characterized in that: The first access network equipment includes non-terrestrial network equipment.
8. A switching method, characterized in that: The method is applied to a core network device, and the method includes: Receiving a path switching request message from a first access network device; Receiving first indication information from the first access network device, where the first indication information is used to instruct the terminal device to switch to the first access network device; The data transmission path of the terminal device is switched to the first access network device according to the path switching request message and the first indication information.
9. The method according to claim 8, characterized in that The method further comprises: Send a path switching request confirmation message to the first access network device.
10. The method according to claim 8 or 9, characterized in that: The first indication information is a preset message; Alternatively, the first indication information is a first uplink data packet from the terminal device.
11. The method according to claim 8, characterized in that The method further comprises: receiving second indication information from the first access network device, where the second indication information is used to indicate cancellation of switching the data transmission path of the terminal device to the first access network device; Trigger cancellation of switching the data transmission path of the terminal device to the first access network device according to the second indication information.
12. A switching method, characterized in that: The method is applied to a first access network device, and the method includes: Receiving a switching request message from a second access network device, the switching request message including time information of the terminal device switching to the first access network device; A path switching request message is sent to a core network device, wherein the switching request message includes the time information; wherein the path switching request message is sent between receiving the switching request message and receiving a switching completion message.
13. The method according to claim 12, characterized in that The time information is the time point when the terminal device switches to the first access network device; Alternatively, the time information is the time range for the terminal device to switch to the first access network device.
14. The method according to claim 13, characterized in that The method further comprises: Receive the switching completion message from the terminal device.
15. The method according to claim 14, characterized in that The method further comprises: Upon receiving a switching cancellation request message from the second access network device, a second indication message is sent to the core network device, wherein the second indication information is used to indicate cancellation of switching the data transmission path of the terminal device to the first access network device; the switching cancellation request message is used to indicate cancellation of switching the terminal device to the first access network device.
16. The method according to claim 14, characterized in that The method further comprises: Send second indication information to the core network device, where the second indication information is used to indicate cancellation of switching the data transmission path of the terminal device to the first access network device.
17. The method according to any one of claims 12 to 16, characterized in that: The first access network equipment includes non-terrestrial network equipment.
18. A switching method, characterized in that: The method is applied to a core network device, and the method includes: Receiving a path switching request message from a first access network device, wherein the path switching request message includes time information when the terminal device switches to the first access network device; The data transmission path of the terminal device is switched to the first access network device according to the path switching request message and the time information.
19. The method according to claim 18, characterized in that The time information is the time point when the terminal device switches to the first access network device; The triggering, according to the path switching request message and the time information, to switch the data transmission path of the terminal device to the first access network device includes: At the time point, triggering the switching of the data transmission path of the terminal device to the first access network device according to the path switching request message.
20. The method according to claim 18, characterized in that The time information is the time range for the terminal device to switch to the first access network device; The triggering, according to the path switching request message and the time information, to switch the data transmission path of the terminal device to the first access network device includes: At the maximum moment of the time range, the data transmission path of the terminal device is switched to the first access network device according to the path switching request message.
21. A communication device, characterized in that: include: A processing unit, configured to receive a switching request message from a second access network device through a communication unit; The processing unit is used to send a path switching request message to the core network device through the communication unit; when receiving a switching completion message from the terminal device, send first indication information to the core network device, wherein the first indication information is used to instruct the terminal device to switch to the first access network device; wherein the path switching request message is sent between receiving the switching request message and the switching completion message.
22. A communication device, characterized in that: include: A communication unit, configured to receive a path switching request message from a first access network device; Receiving first indication information from the first access network device, where the first indication information is used to instruct the terminal device to switch to the first access network device; A processing unit, used to trigger switching of the data transmission path of the terminal device to the first access network device according to the path switching request message and the first indication information.
23. A communication device, characterized in that: include: A processing unit, configured to receive a switching request message from a second access network device through a communication unit, wherein the switching request message includes time information when the terminal device switches to the first access network device; The processing unit is used to send a path switching request message to the core network device through the communication unit, and the switching request message includes the time information; wherein the path switching request message is sent between receiving the switching request message and receiving a switching completion message.
24. A communication device, characterized in that: include: A communication unit, configured to receive a path switching request message from a first access network device, wherein the path switching request message includes time information when the terminal device switches to the first access network device; A processing unit is used to trigger switching of the data transmission path of the terminal device to the first access network device according to the path switching request message and the time information.
25. A communication device, characterized in that: including a processor and a memory; The processor is used to execute the computer program or instructions stored in the memory, so that the communication device implements the method according to any one of claims 1 to 20.
26. A communication device, characterized in that: It includes a processor and an interface circuit, wherein the interface circuit is used to receive signals from other communication devices outside the communication device and transmit them to the processor or send signals from the processor to other communication devices outside the communication device, and the processor is used to implement the method as described in any one of claims 1 to 20 through a logic circuit or executing code instructions.
27. A computer-readable storage medium, characterized in that: The storage medium stores a computer program or an instruction, and when the computer program or the instruction is executed by the communication device, the method according to any one of claims 1 to 20 is implemented.
28. A communication system, characterized in that: include: A first access network device for executing the method as claimed in any one of claims 1 to 7 and 12 to 17 and a core network device for executing the method as claimed in any one of claims 8 to 11 and 18 to 20.
Citation Information
Cited By
Switching method and apparatus
EP4697804A1
