Multi-microgrid system optimization method and device, and storage medium

Through the multi-micro grid system optimization method, the problems of low energy storage utilization rate and model uncertainty of a single microgrid are solved, efficient scheduling accuracy and energy utilization efficiency are achieved, and the microgrid, shared energy storage and distribution networks are coordinated. Power interaction improves the overall performance of the new energy power supply system.

CN118965656AActive Publication Date: 2024-11-15CHINA UNIV OF GEOSCIENCES (WUHAN)

Patent Information

Application Number
CN202411110904.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-15
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

In the existing new energy power supply system, the utilization rate of a single microgrid energy storage form is low, and the model lacks uncertainty regarding power generation and user side, resulting in insufficient scheduling accuracy.

Method used

The multi-micro grid system optimization method is adopted, including determining the topological structure, establishing an economic scheduling model and source-load uncertainty model, solving the fuzzy opportunity constraints and game model, optimizing the scheduling process of the multi-micro grid system, coordinating the microgrid and sharing energy storage Power interaction with the distribution network.

Benefits of technology

It improves the scheduling accuracy of the multi-micro grid system, meets load needs, coordinates the power interaction between the microgrid and the shared energy storage and distribution network, and improves energy utilization efficiency and rate of return.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965656A_ABST
    Figure CN118965656A_ABST
Patent Text Reader

Abstract

The invention provides a multi-micro-grid system optimization method and device and a storage medium, and relates to the field of new energy power supply, and the method comprises the steps: determining a topological structure of a multi-micro-grid system in a shared energy storage mode, building an economic dispatching model based on the optimization dispatching process of the multi-micro-grid system, a source load uncertainty model and constraint conditions are determined, a fuzzy opportunity constraint is established based on the source load uncertainty model, a game model is constructed to solve an economic dispatching model under the fuzzy opportunity constraint, and an optimization result of the multi-microgrid system is obtained; the equipment and the storage medium are used for implementing the method. The method has the beneficial effects that the source load uncertainty in the multi-micro-grid system is considered, the scheduling precision is improved, and the method has important theoretical and application values for solving the optimization problem of the multi-micro-grid system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of renewable energy power supply, and in particular to a multi-microgrid system optimization method, device and storage medium. Background Art

[0002] The new energy power supply system is a power supply system that is mainly powered by new energy, supplemented by energy storage systems and distribution networks. New energy is often based on solar energy and wind energy, and energy conversion is achieved through photovoltaic and wind turbine power generation devices to power the load. In the power supply process, since a single new energy power supply is greatly affected by the weather, it is often a combination of multiple new energy sources that complement each other. At the same time, due to the volatility of new energy power generation, energy storage systems will also be added to the new energy power supply system. When the new energy power generation meets the load demand, the excess electricity can be stored through the energy storage system. When the new energy power generation cannot meet the load demand, the energy storage system meets the load demand by discharging. At the same time, when the weather environment is relatively bad and the energy storage system is insufficient, power transactions can be carried out through the distribution network to meet the load demand. In recent years, with the increasing acuteness of energy and environmental protection issues, the development and utilization of renewable energy represented by light energy and wind energy has attracted the attention of more and more countries. The new energy power supply system has become a new energy comprehensive utilization method with a huge development market due to its high utilization rate of renewable energy and low environmental pollution.

[0003] The existing technology often uses separate energy storage in a single microgrid, but this form of energy storage has low energy utilization and a low rate of return for both the microgrid and the user.

[0004] In the prior art, when modeling the entire microgrid system, the uncertainties on the power generation and user sides are rarely considered, so the constructed model lacks the ability to accurately describe the real energy exchange. Summary of the invention

[0005] The purpose of the present invention is to solve the problem of difficulty in scheduling a multi-microgrid system under a shared energy storage mode and insufficient accuracy caused by uncertainty factors. The present invention provides a multi-microgrid system optimization method, device and storage medium. A multi-microgrid system optimization method mainly includes the following steps: S1. Determine the topology of a multi-microgrid system in a shared energy storage mode; S2. Establish an economic dispatch model based on the optimal dispatch process of the multi-microgrid system, and determine the source-load uncertainty model and constraint conditions; S3, establish fuzzy chance constraints based on source-load uncertainty model; S4. Construct a game model to solve the economic dispatch model under fuzzy chance constraints and obtain the optimization results of the multi-microgrid system.

[0006] Furthermore, the topological structure of the multi-microgrid system under the shared energy storage mode is composed of three main bodies, namely, active distribution network, shared energy storage and multi-microgrid.

[0007] Furthermore, the dispatching process of the multi-microgrid system is divided into two stages, namely: The first stage of single grid optimization dispatch: a single microgrid obtains its charging and discharging power with the goal of minimizing net load fluctuation and minimizing the cost of leasing shared energy storage; The second stage of dispatching of multi-grid integration: After the microgrids form an alliance, they merge their respective charging and discharging demands to form the net charging and discharging demand of the multi-microgrid system, and meet the charging and discharging demands of each microgrid by providing energy storage services to shared energy storage operators.

[0008] Furthermore, the economic dispatch model is established based on the objective function of the optimal dispatch process of the multi-microgrid system, which is: The objective function of the first stage of scheduling is:

[0009]

[0010] in, For microgrid The cost of using energy storage; and Microgrid The charging and discharging costs of leasing energy storage and the cost of using the capacity; For microgrid Equivalent load mean square error after using energy storage services; For microgrid At the moment The net load; , Microgrid The charging and discharging power at time t; For microgrid The equivalent load average after using energy storage services; The objective function of the second stage of scheduling is as follows:

[0011] In the formula, is the total power generation cost of the multi-microgrid system; Profit from electricity purchase and sales for multiple microgrid systems and active distribution networks; Cost of electricity generation from micro-turbines in multi-microgrid systems; The source-load uncertainty model is the contradiction between the two optimization objectives in the first stage of scheduling.

[0012] Furthermore, the constraints include: The constraints of the dispatching process of multi-microgrid systems, the constraints when shared energy storage operators participate in the dispatching process, and the constraints when active distribution networks participate in the optimized dispatching process.

[0013] Furthermore, the standard form of the model for solving uncertainty problems using fuzzy chance constrained programming is as follows:

[0014] In the formula, is the decision variable, is a fuzzy variable, is the objective function, As constraints, express Credibility of establishment, The confidence level for the setting.

[0015] Furthermore, the game model adopts a one-master-multiple-slave game, and the game participants are active distribution networks, shared energy storage systems, and multiple microgrid systems; The game strategy of the active distribution network is its peak-shaving power purchase and sales strategy and frequency-regulation power purchase strategy. The game strategy of the shared energy storage system is its peak-shaving power purchase and sales strategy and the power participating in frequency regulation services. The game strategy of the multi-microgrid system is the power purchase and sales strategy for peak-shaving.

[0016] Furthermore, the working process of the game model is divided into two parts, namely, the single microgrid charging and discharging power solution process and the one-master-multiple-slave game model solution, specifically: S41, adopting non-dominated sorting genetic algorithm with elite strategy, using partial small fuzzy set decision theory to construct fuzzy membership function to screen compromise solutions and obtain the optimal charging and discharging strategy for each microgrid; S42, taking the charge and discharge power under the optimal charge and discharge strategy of each microgrid as the initial condition into the one-master-multiple-slave game model for solution, and obtaining the optimal dispatch strategy of each subject. A storage medium, wherein the storage medium stores instructions and data for implementing a multi-microgrid system optimization method.

[0017] A computer device comprises: a processor and a storage medium; the processor loads and executes instructions and data in the storage medium to implement a multi-microgrid system optimization method.

[0018] The beneficial effects of the technical solution provided by the present invention are as follows: the present invention establishes fuzzy chance constraints based on the source-load uncertainty model, takes into account the source-load uncertainty in the multi-microgrid system, improves the scheduling accuracy, constructs a game model to solve the economic scheduling model under the fuzzy chance constraints, obtains the optimization results of the multi-microgrid system, and coordinates the power interaction between the microgrid-shared energy storage-distribution network and between microgrids while meeting the load requirements of the multi-microgrid system, which has important theoretical and application value for solving the optimization problems of the multi-microgrid system. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which: Figure 1 is a flow chart of a multi-microgrid system optimization method in an embodiment of the present invention; Figure 2 is a schematic diagram of an embodiment of the present invention; Figure 3 is a schematic diagram of an embodiment of the present invention; Figure 4 It is a schematic diagram of the operation of the hardware device in the embodiment of the present invention. DETAILED DESCRIPTION

[0020] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.

[0021] Embodiments of the present invention provide a multi-microgrid system optimization method, device and storage medium.

[0022] Please refer to Figure 1 , Figure 1 1 is a flow chart of a multi-microgrid system optimization method according to an embodiment of the present invention, which specifically includes the following steps: The first step is to determine the topology of the multi-microgrid system under the shared energy storage mode.

[0023] The topological structure of the multi-microgrid system under the shared energy storage mode is mainly composed of three main bodies, namely active distribution network, shared energy storage and multi-microgrid.

[0024] In the second step, an economic dispatch model is established based on the optimal dispatch process of the multi-microgrid system, and the source-load uncertainty model and constraints are determined.

[0025] The optimal dispatch of multi-microgrid system is divided into two stages: Dispatching stage 1: A single microgrid optimizes its charging and discharging power by minimizing net load fluctuation and minimizing the cost of leasing shared energy storage.

[0026] When a microgrid leases a large amount of energy storage services in order to minimize net load fluctuations, its leasing costs will increase significantly, and there is a contradiction between the two optimization goals.

[0027] Based on the optimal dispatching process of multi-microgrid systems, a multi-objective optimization economic dispatch model of multi-microgrids is constructed, weights are set for the two optimization objectives, and energy storage services are leased according to the preferences of the microgrids.

[0028] First, the minimum energy storage cost is taken as the first optimization goal, and the objective function is established as follows:

[0029] In the formula, For microgrid The cost of using energy storage; and Microgrid The charging and discharging costs and capacity usage costs of leasing energy storage are expressed as follows:

[0030]

[0031] In the formula, is the unit charge and discharge cost; , Microgrid The charging and discharging power at time t; The cost of leasing power capacity per unit for shared energy storage; The cost of leasing energy capacity per unit for shared energy storage; , Microgrid The power and energy capacity requirements for the microgrid The maximum values ​​of charging and discharging power in one day are expressed as follows:

[0032]

[0033] In the formula, is the energy storage capacity margin coefficient, and They are respectively the microgrids in a dispatching cycle The maximum and minimum energy storage capacity are calculated as follows:

[0034]

[0035] in, It represents the energy storage capacity of the microgrid at time t, and the calculation formula is as follows:

[0036] In the formula, , are the charging and discharging efficiency of the shared energy storage power station, , It is a 0-1 variable for charge and discharge.

[0037] Secondly, the minimum mean square error of equivalent load after using energy storage is taken as the second optimization goal, and the objective function is as follows:

[0038]

[0039]

[0040] In the formula, For microgrid Equivalent load mean square error after using energy storage services; For microgrid At the moment The net load of , , Represents microgrid In the moment ; For microgrid The equivalent average load after using energy storage services.

[0041] Dispatching stage 2: After multiple microgrids form an alliance, they merge their respective charging and discharging demands to form a net charging and discharging demand of the multi-microgrid system, and meet the charging and discharging demands of each microgrid by providing energy storage services to shared energy storage operators.

[0042] After the charging and discharging services, each microgrid obtains its own equivalent load. At this time, the multi-microgrid system coordinates the power interaction between the microgrids. After the power interaction, the power-deficient microgrid achieves power balance by responding to the peak-shaving dispatch of the active distribution network and controlling its own controllable units, thereby maximizing the total operating benefit of the multi-microgrid system. The objective function is:

[0043] In the formula, Profit from electricity purchase and sales for multiple microgrid systems and active distribution networks; Cost of electricity generation from micro-turbines in multi-microgrid systems; Cost of using shared energy storage services for multi-microgrid systems.

[0044] in, The specific expression is as follows:

[0045] In the formula, , They are the peak-shaving purchase and sales prices of active distribution networks; , Microgrid exist Always sell and purchase electricity from active distribution networks.

[0046] also, The specific expression is as follows:

[0047]

[0048]

[0049] In the formula, , They are gas turbine fuel cost and environmental pollution control cost respectively; , , is the pollution parameter, For microgrid Gas turbine at the time of power generation; , They are the unit pollution emission cost and unit pollutant emission respectively; is the type of pollutant; is the total amount of pollutants.

[0050] at last, The expression is as follows

[0051]

[0052]

[0053] In the formula, , They are the net charging and discharging costs and net capacity costs of leasing shared energy storage for multiple microgrid systems; , For shared energy storage systems at all times The net charge and discharge capacity; It is the maximum value of net charging and discharging power of the multi-microgrid system in one day; The net charging and discharging capacity of the multi-microgrid system in one day is calculated as follows:

[0054]

[0055]

[0056]

[0057] In the formula, , They are respectively the maximum and minimum values ​​of energy storage capacity of the multi-microgrid system within a scheduling cycle.

[0058] In the first stage of the scheduling process, the charge and discharge capacity of each microgrid has been solved. Based on the charge and discharge capacity of each microgrid, it can be calculated , is a constant. Therefore, in the second stage of scheduling, the final simplified objective function of the multi-microgrid system is as follows:

[0059] Shared energy storage operators provide energy storage services to multiple microgrid systems through shared energy storage power stations. After meeting the energy storage needs of multiple microgrid systems, shared energy storage operators use the remaining capacity to participate in the peak load scheduling of the active distribution network and provide frequency regulation services to the active distribution network to maximize their own operating benefits. Therefore, the benefits of shared energy storage operators are As shown below:

[0060] In the formula, , They are the revenues of shared energy storage operators participating in active distribution network peak load regulation and frequency regulation services; is the charging, discharging and maintenance cost of the shared energy storage power station; the expressions of each parameter are as follows:

[0061]

[0062]

[0063] In the formula, Time-of-use and frequency-adjusted electricity prices for active distribution networks; The power reported for the shared energy storage system participating in the frequency regulation service; It is the unit charging and discharging operation and maintenance cost of the energy storage power station.

[0064] The active distribution network encourages the shared energy storage system and the multi-microgrid system to actively participate in its peak-shaving dispatch. The active distribution network encourages the shared energy storage system and the multi-microgrid system to participate in the peak-shaving dispatch by formulating time-of-use electricity prices. Due to the problem of power fluctuation in the active distribution network, the active distribution network will formulate time-of-use frequency regulation electricity prices to encourage the shared energy storage system to participate in the frequency regulation service to meet its own frequency regulation needs. Its operating benefits are shown in the following formula:

[0065] In the formula, is the power interaction benefit between the active distribution network and the multi-microgrid system, Profit from peak-shaving dispatch for active distribution networks and shared energy storage systems; Cost of using shared energy storage systems for frequency regulation services for active distribution networks; Find the main grid power purchase cost for the active distribution network; the expressions of various benefits are as follows:

[0066]

[0067]

[0068]

[0069] In the formula, The electricity price for the main grid; The active distribution network purchases electric power from the main grid.

[0070] By analyzing the above formula, the objective function of the active distribution network is: .

[0071] The constraints of the multi-microgrid system are as follows: In the first stage of scheduling, the following constraints must be met: Microgrid The total charge and discharge amount of energy storage in a scheduling cycle must remain consistent:

[0072] Microgrids at the same time The storage energy cannot provide charging and discharging services at the same time:

[0073] Microgrid The energy storage capacity used must be within the upper and lower limits of the shared energy storage capacity:

[0074] In the formula, , They are the minimum and maximum charge states of the shared energy storage power station respectively.

[0075] State of charge calculation method for shared energy storage power station and microgrid The upper and lower limits of the charge and discharge power are:

[0076]

[0077] In the formula, is the state of charge of the shared energy storage power station, The amount of electricity generated by the shared energy storage power station; The upper limit of the power consumption of the shared energy storage power station; It is the upper limit of the charging and discharging power of the shared energy storage power station.

[0078] During the second-stage scheduling process, the following constraints must be met: Microgrid Power balance constraints to be met:

[0079]

[0080] In the formula, , Microgrid At the moment A 0-1 variable for purchasing and selling electricity to active distribution networks, For microgrid At the moment Transfer to microgrid Power; Microgrid exist Time to microgrid Power; For microgrid Equivalent power at that moment.

[0081] Microgrid At the moment It is not possible to purchase and sell electricity to the active distribution network at the same time:

[0082] Microgrid Tie line constraints that need to be met when purchasing and selling electricity to ADN and interacting with other microgrids:

[0083] Microgrid Output constraints of micro gas turbines:

[0084] Microgrid The constraints that need to be met when interacting with other microgrids are that the amount of power that a microgrid with surplus power can transfer to a microgrid with insufficient power cannot exceed its own surplus power.

[0085] When a shared energy storage operator participates in the dispatching process, the following constraints must be met: Charging and discharging power constraints of shared energy storage power stations:

[0086] Constraints on charging and discharging behavior of shared energy storage power stations:

[0087] Power constraints of shared energy storage power stations:

[0088] The energy calculation formula of the shared energy storage power station and the energy loss calculation formula caused by the shared energy storage power station participating in frequency regulation are:

[0089]

[0090] In the formula, Energy loss for shared energy storage power stations participating in frequency regulation; Continuous cycle for frequency modulation service.

[0091] Power balance constraints of shared energy storage power stations:

[0092] Constraints on the purchase and sale of electricity by shared energy storage power stations:

[0093] Power reporting constraints for frequency regulation services:

[0094] In the formula, The power limit for shared energy storage power stations to participate in frequency regulation.

[0095] Frequency modulation demand constraints:

[0096] In the formula, is the frequency regulation demand coefficient caused by net load, , , They are respectively the active distribution network at time load electricity, wind power generation and photovoltaic power generation; In the process of active distribution network participating in optimal dispatching, the following constraints must be met: The active distribution network purchase and sales prices are constrained, that is, different electricity prices should correspond to different time periods:

[0097]

[0098] In the formula, , , They are the off-peak electricity price, normal electricity price and peak electricity price of the active distribution network. , , They are off-peak hours, normal hours, and peak hours. , , They are the off-peak electricity price, normal electricity price and peak electricity price of the active distribution network respectively.

[0099] The power purchased by the active distribution network should be less than its power sold:

[0100] To prevent the active distribution network from maliciously setting electricity prices to increase revenue and setting electricity price constraints:

[0101] In the formula, The upper limit of electricity price Power balance constraints of active distribution networks:

[0102] The third step is to establish fuzzy chance constraints based on the source-load uncertainty model.

[0103] In the process of solving fuzzy chance-constrained programming, processing chance constraints is the key point. There are two methods: for simple problems, the fuzzy parameters in the constraints can be separated from the decision variables, or when there is a linear relationship between the two, they can be converted into clear equivalence classes for processing, and then calculated using traditional solution methods; for more complex problems, random simulation technology is used. Simulation is an approximate process, the results are not accurate, and it is difficult to grasp the size of the sample capacity. Therefore, this application adopts the first processing method.

[0104] The standard form of the model for solving uncertainty problems using fuzzy chance constrained programming can be described as:

[0105] In the formula, is the decision variable, is a fuzzy variable, is the objective function, As constraints, express Credibility of establishment, is the confidence level set. As can be seen from the above formula, the fuzzy chance constraint strategy based on credibility theory not only effectively manages the uncertainty problem introduced by fuzzy variables, but also provides decision makers with the ability to deal with potential extreme situations of the system when faced with constraint violations, thereby improving the flexibility and adaptability of the decision-making process. When the first method is used, the system has high security requirements during operation, so the confidence level should not be too low. When α ≥ 1 / 2, the chance constraint The clear equivalence class of is:

[0106] The expression of trapezoidal fuzzy parameters is:

[0107] The power balance constraint is converted into the corresponding clear equivalence class according to the transformation method of trapezoidal parameters, which is expressed as follows:

[0108]

[0109] In the formula, , Microgrid Membership function of load; , Microgrid Membership function of fan output; , Microgrid Membership function of photovoltaic output; , is the membership function of the load in the active distribution network; , is the membership function of wind power output in active distribution network; , is the membership function of photovoltaic output in the active distribution network.

[0110] The fourth step is to construct a game model to solve the economic dispatch model under fuzzy chance constraints and obtain the optimization results of the multi-microgrid system.

[0111] The game model constructed in this paper is divided into two steps. The first step is to solve the optimal charging and discharging problem of a single microgrid. This part involves two opposing objective functions, thus constituting a multi-objective optimization problem. A non-dominated sorting genetic algorithm with an elite strategy is used to solve the optimization problem of the charging and discharging strategy of a single microgrid. The fuzzy membership function is constructed using the partial small fuzzy set decision theory to screen and obtain the optimal compromise solution. The fuzzy membership function is shown as follows:

[0112] In the formula, , , For the The objective function value and its maximum and minimum values, and the satisfaction function are as follows:

[0113] In the formula, is the number of objective functions, is the weight value of the objective function.

[0114] The first stage solution flow chart is as follows Figure 2 shown.

[0115] After the optimal charging and discharging power of each microgrid is obtained, it is taken as the initial condition and brought into the one-master-multiple-slave game model for solution. The one-master-multiple-slave game model can be expressed as follows:

[0116]

[0117] In the solution process of this stage, the particle swarm algorithm is first used to generate the time-of-use frequency regulation and peak-shaving electricity prices formulated by the active distribution network. After the shared energy storage system and the multi-microgrid system receive the electricity price strategy, the CPLEX solver is used to solve their optimal peak-shaving power purchase and sales and frequency regulation power strategies, and the benefits of the active distribution network under the strategy are calculated and compared with the previous benefits. The frequency regulation and peak-shaving electricity prices of the active distribution network under the optimal benefit, and the peak-shaving power purchase and sales and frequency regulation power strategies of the shared energy storage system and the multi-microgrid system are retained until the iteration limit is reached, thereby obtaining the optimal scheduling strategy of the system. The flowchart of this process is shown in Figure 3 shown.

[0118] See also Figure 4 , Figure 4 40 is a schematic diagram of the working of the hardware device of an embodiment of the present invention, wherein the hardware device specifically comprises: a computer device 401, a processor 402 and a storage medium 403.

[0119] A computer device 401: The computer device 401 implements the multi-microgrid system optimization method.

[0120] Processor 402: The processor 402 loads and executes the instructions and data in the storage medium 403 to implement the multi-microgrid system optimization method.

[0121] Storage medium 403: The storage medium 403 stores instructions and data; the storage medium 403 is used to implement the multi-microgrid system optimization method.

[0122] The beneficial effects of the present invention are as follows: the present invention establishes fuzzy chance constraints based on the source-load uncertainty model, takes into account the source-load uncertainty in the multi-microgrid system, improves the scheduling accuracy, constructs a game model to solve the economic scheduling model under the fuzzy chance constraints, obtains the optimization results of the multi-microgrid system, and coordinates the power interaction between the microgrid-shared energy storage-distribution network and between microgrids while meeting the load requirements of the multi-microgrid system, which has important theoretical and application value for solving the optimization problem of the multi-microgrid system.

[0123] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A multi-microgrid system optimization method, It is characterized in that The specific steps include: S1. Determine the topology of a multi-microgrid system in a shared energy storage mode; S2. Establish an economic dispatch model based on the optimal dispatch process of the multi-microgrid system, and determine the source-load uncertainty model and constraint conditions; S3, establish fuzzy chance constraints based on source-load uncertainty model; S4. Construct a game model to solve the economic dispatch model under fuzzy chance constraints and obtain the optimization results of the multi-microgrid system.

2. A multi-microgrid system optimization method as claimed in claim 1, It is characterized in that The topological structure of the multi-microgrid system under the shared energy storage mode is composed of three main bodies, namely, active distribution network, shared energy storage and multi-microgrid.

3. A multi-microgrid system optimization method as claimed in claim 1, It is characterized in that The dispatching process of the multi-microgrid system is divided into two stages, namely: The first stage of single grid optimization dispatch: a single microgrid obtains its charging and discharging power with the goal of minimizing net load fluctuation and minimizing the cost of leasing shared energy storage; The second stage of dispatching of multi-grid integration: After the microgrids form an alliance, they merge their respective charging and discharging demands to form the net charging and discharging demands of the multi-microgrid system, and meet the charging and discharging demands of each microgrid by providing energy storage services to shared energy storage operators.

4. A multi-microgrid system optimization method as claimed in claim 3, It is characterized in that The economic dispatch model is established based on the objective function of the optimization dispatch process of the multi-microgrid system, specifically: The objective function of the first stage of scheduling is: in, For microgrid The cost of using energy storage; and Microgrid The charging and discharging costs of leasing energy storage and the cost of using the capacity; For microgrid Equivalent load mean square error after using energy storage services; For microgrid At the moment The net load; , Microgrid The charging and discharging power at time t; For microgrid The equivalent load average after using energy storage services; The objective function of the second stage of scheduling is as follows: In the formula, is the total power generation cost of the multi-microgrid system; Profit from electricity purchase and sales for multiple microgrid systems and active distribution networks; Cost of electricity generation from micro-turbines in multi-microgrid systems; The source-load uncertainty model is the contradiction between the two optimization objectives in the first stage of scheduling.

5. A multi-microgrid system optimization method as claimed in claim 4, It is characterized in that The constraints include: The constraints of the dispatching process of multi-microgrid systems, the constraints when shared energy storage operators participate in the dispatching process, and the constraints when active distribution networks participate in the optimized dispatching process.

6. A multi-microgrid system optimization method as claimed in claim 1, It is characterized in that The standard form of the model for solving uncertainty problems using fuzzy chance-constrained programming is as follows: In the formula, is the decision variable, is a fuzzy variable, is the objective function, As constraints, express Credibility of establishment, The confidence level for the setting.

7. A multi-microgrid system optimization method as claimed in claim 1, It is characterized in that The game model adopts a one-master-multiple-slave game, and the game participants are active distribution networks, shared energy storage systems, and multiple microgrid systems; The game strategy of the active distribution network is its peak-shaving power purchase and sales strategy and frequency-regulation power purchase strategy. The game strategy of the shared energy storage system is its peak-shaving power purchase and sales strategy and the power participating in frequency regulation services. The game strategy of the multi-microgrid system is the power purchase and sales strategy for peak-shaving.

8. A multi-microgrid system optimization method as claimed in claim 7, It is characterized in that The working process of the game model is specifically as follows: S41, adopting non-dominated sorting genetic algorithm with elite strategy, using partial small fuzzy set decision theory to construct fuzzy membership function to screen compromise solutions and obtain the optimal charging and discharging strategy for each microgrid; S42. The charging and discharging power under the optimal charging and discharging strategy of each microgrid is brought into the one-master-multiple-slave game model as the initial condition for solving, and the optimal dispatching strategy of each subject is obtained.

9. A storage medium, Features: The storage medium stores instructions and data for implementing a multi-microgrid system optimization method as described in any one of claims 1 to 8.

10. A computer device, Features: include: Processor and storage medium; the processor loads and executes instructions and data in the storage medium to implement a multi-microgrid system optimization method as described in any one of claims 1 to 8.

Citation Information

Patent Citations

  • Microgrid group two-layer optimization scheduling method under incomplete information

    CN115759404A

  • Cross-regional power grid flexibility resource optimization scheduling method considering mutual assistance of flexibility

    CN116914748A

  • Micro-grid group optimization scheduling method and device, terminal and medium

    CN116937588A

  • Regional integrated energy system-main power distribution network game optimization scheduling method

    CN117096864A

  • Multi-microgrid system capacity optimization configuration method based on master-slave game

    CN117526445A

Cited By

  • Industrial and commercial energy storage system and energy storage scheduling method thereof

    CN120297710A