Control method and device of hydrogen production system and hydrogen production system
Through the coordinated control of predicting the hydrogen production amount and load, the switches of the hydrogen production unit are reasonably managed, and the problem of frequent switches of the electrolytic cell in the hydrogen production system is solved, the safety and efficiency of the system are improved, the equipment life is extended and the cost is reduced.
Patent Information
- Application Number
- CN202410948842.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-19
AI Technical Summary
In existing hydrogen production systems, the frequent turn-on and shutdown of electrolytic cells lead to performance attenuation, shortening service life, increasing hydrogen production costs, and it is difficult to effectively deal with new energy volatility and intermittent energy input.
By predicting the first predicted hydrogen production and the second predicted hydrogen production volume of the hydrogen production system and the predicted hydrogen production load, we will coordinately consider the hydrogen production capacity and demand of the energy input side and the output side, determine the target control information, and reasonably control the hydrogen production unit. The input or cutting out reduces switching frequency, extends service life and reduces costs.
It has achieved the improvement of the operating safety and production efficiency of the hydrogen production system, extended the service life of the hydrogen production unit, reduced the cost of hydrogen production, and adapted to energy volatility and intermittent input in new energy scenarios.
Smart Images

Figure CN118979280A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of hydrogen production, and in particular, relates to a control method and device for a hydrogen production system, and a hydrogen production system. Background Art
[0002] Hydrogen production by water electrolysis is a technology that decomposes hydrogen and oxygen by electrolyzing water. It is one of the important directions for the development of hydrogen energy. In recent years, with the rapid development of renewable energy technology, hydrogen production by water electrolysis has received more and more attention and application. The equipment status and service life of hydrogen production units such as electrolyzers are of great significance to the operational safety of hydrogen production systems, improving hydrogen production efficiency and reducing hydrogen production costs.
[0003] The hydrogen production system mostly uses constant power and other control methods during the hydrogen production process. The electrolyzer is put into operation and cut out only according to the conditions at the energy input end (for example, the volatility and intermittency of new energy). The electrolyzer is often frequently turned on and off, resulting in performance degradation of the electrolyzer, affecting the operational safety and production efficiency of the hydrogen production system. Frequent switching of the electrolyzer will also shorten the service life of the electrolyzer, requiring frequent maintenance and replacement of equipment, and increasing the cost of hydrogen production. Summary of the invention
[0004] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a control method, device and hydrogen production system for a hydrogen production system, which can reduce the switching frequency of the hydrogen production unit, extend the service life, ensure the operation safety and production efficiency of the hydrogen production system, and reduce the cost of hydrogen production.
[0005] In a first aspect, the present application provides a control method for a hydrogen production system, the method comprising:
[0006] Obtaining a first predicted hydrogen production, a second predicted hydrogen production, and a predicted hydrogen production load of a hydrogen production system, wherein the first predicted hydrogen production is the predicted hydrogen production corresponding to a hydrogen production unit currently in operation of the hydrogen production system, and the second predicted hydrogen production is the predicted hydrogen production corresponding to an operable hydrogen production unit of the hydrogen production system;
[0007] comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, wherein the target control information includes at least one of the number of hydrogen production units and the identification of the hydrogen production units;
[0008] Based on the target control information, the hydrogen production unit in the hydrogen production system is controlled to be put into operation or cut out.
[0009] According to the control method of the hydrogen production system of the present application, by predicting the first predicted hydrogen production, the second predicted hydrogen production and the predicted hydrogen production load, the hydrogen production capacity on the energy input side and the hydrogen production demand on the energy output side of the hydrogen production system are collaboratively considered, and according to the comparison result of the predicted hydrogen production load with the first predicted hydrogen production and / or the second predicted hydrogen production, target control information for controlling the reasonable input or output of the hydrogen production unit in the hydrogen production system is obtained, and different control strategies of the hydrogen production system are adapted. It can also flexibly respond to energy volatility and intermittent input in new energy hydrogen production scenarios, meet the hydrogen production demand, reduce the switching frequency of the hydrogen production unit, extend the service life, ensure the operation safety and production efficiency of the hydrogen production system, and reduce the hydrogen production cost.
[0010] According to one embodiment of the present application, comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, includes:
[0011] comparing the predicted hydrogen production load with the first predicted hydrogen production;
[0012] When the first predicted hydrogen production is greater than the predicted hydrogen production load, obtaining a third predicted hydrogen production corresponding to the hydrogen production system switching out the hydrogen production unit, the third predicted hydrogen production being the predicted hydrogen production corresponding to a combination of different hydrogen production units running in the hydrogen production system;
[0013] The target control information is determined with the goal that the third predicted hydrogen production is greater than the predicted hydrogen production load and the number of hydrogen production units in operation in the hydrogen production system is minimal.
[0014] According to an embodiment of the present application, when the first predicted hydrogen production is greater than the predicted hydrogen production load, obtaining a third predicted hydrogen production corresponding to the hydrogen production system switching out the hydrogen production unit includes:
[0015] When the first predicted hydrogen production is greater than the predicted hydrogen production load and the duration is greater than the first target duration, the third predicted hydrogen production corresponding to the hydrogen production system switching off the hydrogen production unit is obtained.
[0016] According to one embodiment of the present application, comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, includes:
[0017] comparing the predicted hydrogen production load with the first predicted hydrogen production;
[0018] When the first predicted hydrogen production is less than the predicted hydrogen production load, obtaining a fourth predicted hydrogen production corresponding to the hydrogen production unit put into operation in the hydrogen production system, wherein the fourth predicted hydrogen production is a predicted hydrogen production corresponding to a combination of different hydrogen production units operated by the hydrogen production system;
[0019] The target control information is determined with the goal that the fourth predicted hydrogen production is greater than the predicted hydrogen production load and the number of hydrogen production units in operation of the hydrogen production system is minimal.
[0020] According to an embodiment of the present application, when the first predicted hydrogen production is less than the predicted hydrogen production load, obtaining a fourth predicted hydrogen production corresponding to the hydrogen production unit put into operation in the hydrogen production system includes:
[0021] When the first predicted hydrogen production is less than the predicted hydrogen production load and the duration is greater than the second target duration, the fourth predicted hydrogen production corresponding to the hydrogen production system switching off the hydrogen production unit is obtained.
[0022] According to one embodiment of the present application, the hydrogen production system includes a hydrogen storage device, and the predicted hydrogen production load is compared with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and target control information of the hydrogen production system is determined according to the comparison result, including:
[0023] comparing the predicted hydrogen production load with the first predicted hydrogen production and the second predicted hydrogen production;
[0024] When the predicted hydrogen production load is greater than the first predicted hydrogen production amount and less than the second predicted hydrogen production amount, obtaining a releasable amount of hydrogen from the hydrogen storage device;
[0025] When the releasable amount of hydrogen is greater than the current hydrogen difference, the target control information is determined, and the target control information is used to instruct the currently operating hydrogen production unit of the hydrogen production system to keep running, and the current hydrogen difference is equal to the difference between the predicted hydrogen production load and the first predicted hydrogen production.
[0026] According to one embodiment of the present application, comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, includes:
[0027] comparing the predicted hydrogen production load with the second predicted hydrogen production;
[0028] When the predicted hydrogen production load is greater than the second predicted hydrogen production, all operative hydrogen production units of the hydrogen production system are put into operation.
[0029] According to one embodiment of the present application, the hydrogen production system includes a hydrogen storage device and an electrical energy storage device. After comparing the predicted hydrogen production load with the second predicted hydrogen production, the method further includes:
[0030] When the predicted hydrogen production load is greater than the second predicted hydrogen production, the operable hydrogen production units of the hydrogen production system are controlled to be put into operation, the hydrogen storage device is controlled to release hydrogen, and the electric energy storage device is controlled to release electric energy for the hydrogen production units to produce hydrogen.
[0031] According to one embodiment of the present application, the hydrogen production system includes a hydrogen storage device and an electrical energy storage device. Before comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining the target control information of the hydrogen production system according to the comparison result, the method further includes:
[0032] Acquiring a current hydrogen storage state of the hydrogen storage device and a current energy storage state of the electric energy storage device;
[0033] Based on the current hydrogen storage state and the current energy storage state, at least one operation of the hydrogen storage device and the electric energy storage device is controlled, and the predicted hydrogen production load is re-acquired.
[0034] According to one embodiment of the present application, the method further includes:
[0035] Obtaining predicted energy supply information of energy supply equipment of the hydrogen production system;
[0036] Based on the predicted energy supply information, and in accordance with a control strategy of the hydrogen production system and a hydrogen production unit model, predicted operation information of each hydrogen production unit in the hydrogen production system is obtained.
[0037] According to one embodiment of the present application, after obtaining the predicted operation information of each hydrogen production unit in the hydrogen production system, the method further includes:
[0038] Based on the downtime information of the hydrogen production unit in the predicted operation information, a maintenance plan of the hydrogen production unit is determined.
[0039] According to an embodiment of the present application, determining target control information of the hydrogen production system according to the comparison result includes:
[0040] Determine the target control information according to the comparison result within the target judgment time;
[0041] After obtaining the predicted operation information of each hydrogen production unit in the hydrogen production system, the method further includes:
[0042] When the number of starts and stops of the hydrogen production unit in the predicted operation information is greater than the target number threshold, the value of the target judgment time is increased.
[0043] According to an embodiment of the present application, the start and stop times of the hydrogen production unit in the predicted operation information are adjusted based on a target mapping relationship, and the target mapping relationship is used to characterize the correspondence between the predicted start and stop times and the actual start and stop times in the same time period.
[0044] According to one embodiment of the present application, the energy supply equipment of the hydrogen production system includes a new energy supply equipment, and the first predicted hydrogen production amount and the second predicted hydrogen production amount are determined by the following steps:
[0045] Acquire first predicted energy supply information of the new energy supply equipment;
[0046] Determining the first predicted hydrogen production based on the first predicted energy supply information and operation information of the hydrogen production unit currently operating in the hydrogen production system;
[0047] The second predicted hydrogen production is determined based on the first predicted energy supply information and the operation information of the operable hydrogen production unit of the hydrogen production system.
[0048] In a second aspect, the present application provides a control device for a hydrogen production system, the device comprising:
[0049] An acquisition module, used to acquire a first predicted hydrogen production, a second predicted hydrogen production and a predicted hydrogen production load of a hydrogen production system, wherein the first predicted hydrogen production is the predicted hydrogen production corresponding to a hydrogen production unit currently in operation of the hydrogen production system, and the second predicted hydrogen production is the predicted hydrogen production corresponding to an operable hydrogen production unit of the hydrogen production system;
[0050] a processing module, configured to compare the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determine target control information of the hydrogen production system according to the comparison result, wherein the target control information includes at least one of the number of hydrogen production units and the identification of the hydrogen production units;
[0051] A control module is used to control the input or output of the hydrogen production unit in the hydrogen production system based on the target control information.
[0052] In a third aspect, the present application provides a hydrogen production system, comprising:
[0053] A plurality of hydrogen production units, an energy supply device and a control device of the hydrogen production system as described in the second aspect above, wherein the energy supply device is connected to the plurality of hydrogen production units, the energy supply device is used to provide energy for the hydrogen production units to produce hydrogen, and the control device is connected to the plurality of hydrogen production units, and the control device is used to control the operation of the hydrogen production units.
[0054] According to one embodiment of the present application, the energy supply equipment includes new energy supply equipment.
[0055] According to one embodiment of the present application, it also includes:
[0056] A hydrogen storage device and an electric energy storage device, wherein the hydrogen storage device is connected to the hydrogen production unit and is used to store hydrogen, and the electric energy storage device is connected to the energy supply device and is used to store electric energy.
[0057] In a fourth aspect, the present application provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the control method for the hydrogen production system as described in the first aspect above is implemented.
[0058] In a fifth aspect, the present application provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the control method of the hydrogen production system as described in the first aspect above is implemented.
[0059] In a sixth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the control method of the hydrogen production system as described in the first aspect above.
[0060] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0062] Figure 1 is a flow chart of a control method for a hydrogen production system provided in an embodiment of the present application;
[0063] Figure 2 is a schematic diagram of the predicted hydrogen production and hydrogen production load of the hydrogen production system provided in the embodiment of the present application;
[0064] Figure 3 is a structural schematic diagram of a control device for a hydrogen production system provided in an embodiment of the present application;
[0065] Figure 4 It is one of the structural schematic diagrams of the hydrogen production system provided in the embodiment of the present application;
[0066] Figure 5 This is the second structural schematic diagram of the hydrogen production system provided in the embodiment of the present application;
[0067] Figure 6 It is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application.
[0068] Reference numerals:
[0069] Control device 300, acquisition module 310, new energy power prediction module 311, hydrogen production load prediction module 312, processing module 320, online calculation unit 321, control module 330, hydrogen production control unit 331,
[0070] Hydrogen production unit 400, energy supply equipment 500, hydrogen production station 610, new energy station 620, hydrogen use station 630
[0071] Electrical energy storage equipment 640 , hydrogen storage equipment 650 . DETAILED DESCRIPTION
[0072] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application belong to the scope of protection of this application.
[0073] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.
[0074] In conjunction with the accompanying drawings, the control method of the hydrogen production system, the control device 300 of the hydrogen production system, the electronic device and the readable storage medium provided in the embodiments of the present application are described in detail through specific embodiments and their application scenarios.
[0075] The control method of the hydrogen production system provided in the embodiment of the present application is applied to the hydrogen production system. The hydrogen production system may include multiple hydrogen production units 400 and an energy supply device 500. The energy supply device 500 is connected to the multiple hydrogen production units 400, and the energy supply device 500 is used to provide energy for the hydrogen production units 400 to produce hydrogen.
[0076] The hydrogen production unit 400 is a device for decomposing hydrogen and oxygen by electrolyzing water, and the hydrogen production unit 400 may be an electrolyzer.
[0077] The energy supply device 500 may be a new energy energy supply device, a grid energy supply device, or a combination of a new energy energy supply device and a grid energy supply device.
[0078] The control method of the hydrogen production system provided in the embodiment of the present application can be executed by an electronic device or a functional module or functional entity in the electronic device that can implement the control method of the hydrogen production system.
[0079] like Figure 1 As shown, the control method of the hydrogen production system includes: step 110, step 120 and step 130.
[0080] Step 110: Obtain a first predicted hydrogen production, a second predicted hydrogen production, and a predicted hydrogen production load of the hydrogen production system.
[0081] It can be understood that the predicted hydrogen production is the amount of hydrogen that is expected to be produced by operating a certain number of hydrogen production units 400 under certain energy supply conditions in the future period of the hydrogen production system. The predicted hydrogen production is related to the energy supply conditions of the hydrogen production system and the operating hydrogen production units 400. The predicted hydrogen production can be calculated based on the predicted energy supply conditions and the expected hydrogen production status.
[0082] The first predicted hydrogen production is the predicted hydrogen production corresponding to the hydrogen production unit 400 currently in operation in the hydrogen production system, and the second predicted hydrogen production is the predicted hydrogen production corresponding to the hydrogen production unit 400 that can be operated in the hydrogen production system.
[0083] When the hydrogen production system keeps the currently operating hydrogen production unit 400 unchanged (ie, the hydrogen production unit 400 is not put into operation or cut out), and operates under certain energy supply conditions, the amount of hydrogen that can be produced is expected to be the first predicted hydrogen production.
[0084] For example, the hydrogen production system includes N hydrogen production units 400, M hydrogen production units 400 are currently in operation, 0<M<N, and the second predicted hydrogen production is the predicted hydrogen production corresponding to the M hydrogen production units 400 currently in operation.
[0085] When the hydrogen production system puts into operation all the operable hydrogen production units 400 in the system and operates under certain energy supply conditions, the amount of hydrogen that can be produced is expected to be the second predicted hydrogen production.
[0086] For example, the hydrogen production system includes N hydrogen production units 400, N>1, one hydrogen production unit 400 is damaged, and N-1 operable hydrogen production units 400 remain. The second predicted hydrogen production is the predicted hydrogen production corresponding to the N-1 operable hydrogen production units 400.
[0087] In actual implementation, for predicting hydrogen production, time can be used as a variable. According to the predicted real-time energy supply and the operating hydrogen production unit 400, a hydrogen production prediction curve matching the predicted hydrogen production can be obtained to characterize the predicted hydrogen production of the hydrogen production system in the future period.
[0088] For example, Figure 2 As shown, the first predicted hydrogen production is F1, the second predicted hydrogen production is F3, and the predicted hydrogen production of the hydrogen production system in the future period fluctuates with the fluctuation of the energy supply situation.
[0089] It should be noted that when the number of hydrogen production units 400 currently operating in the hydrogen production system is less than all the operable hydrogen production units 400 in the system, the first predicted hydrogen production is less than the second predicted hydrogen production; when the number of hydrogen production units 400 currently operating in the hydrogen production system is all the operable hydrogen production units 400 in the system, the first predicted hydrogen production is equal to the second predicted hydrogen production.
[0090] It can be understood that the hydrogen production load refers to the amount of hydrogen that the hydrogen production system needs to process, that is, the external hydrogen demand for the hydrogen production system. The predicted hydrogen production load is the hydrogen demand of the hydrogen production system in the future period. The predicted hydrogen production load can be calculated based on the production plan of the hydrogen production system and the real-time hydrogen production feedback from the system.
[0091] In actual implementation, for the hydrogen production load, time can be used as a variable to obtain a hydrogen production load prediction curve that matches the predicted hydrogen production load, thereby representing the predicted hydrogen production load of the hydrogen production system in the future period.
[0092] For example, Figure 2 As shown, the predicted hydrogen production load is F2, and the predicted hydrogen production load of the hydrogen production system in the future period changes with the production plan and real-time hydrogen production.
[0093] Step 120: compare the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determine target control information of the hydrogen production system according to the comparison result.
[0094] It can be understood that the first predicted hydrogen production can characterize the current hydrogen production capacity of the energy input side of the hydrogen production system, the second predicted hydrogen production can characterize the maximum hydrogen production capacity of the energy input side of the hydrogen production system, and the predicted hydrogen production load can characterize the hydrogen production demand on the energy output side of the hydrogen production system.
[0095] In this embodiment, the predicted hydrogen production load is compared with at least one of the first predicted hydrogen production and the second predicted hydrogen production to determine the relationship between the hydrogen production demand and the current hydrogen production capacity and the maximum hydrogen production capacity, and the target control information for controlling the hydrogen production system is determined in coordination with the energy input side and the energy output side based on the comparison result.
[0096] It is understandable that when all operable hydrogen production units 400 of the hydrogen production system are not fully put into use, the first predicted hydrogen production is less than the second predicted hydrogen production. The predicted hydrogen production load can be compared with the first predicted hydrogen production first. When the predicted hydrogen production load is greater than the first predicted hydrogen production, the predicted hydrogen production load can be compared with the second predicted hydrogen production. The predicted hydrogen production load can also be compared with the first predicted hydrogen production and at the same time compared with the second predicted hydrogen production.
[0097] It should be noted that the target control information is the information for controlling the input or output of the hydrogen production unit 400 in the hydrogen production system. The on / off operation of the hydrogen production unit 400 during input or output has a significant impact on the performance of the hydrogen production unit 400. By comparing the hydrogen production capacity on the energy input side and the hydrogen production demand on the energy output side, target control information suitable for different control strategies can be obtained, and the input or output of the hydrogen production unit 400 can be reasonably controlled to meet the control requirements of different control strategies.
[0098] It is understandable that frequent startup and shutdown of the hydrogen production unit may cause the hydrogen production performance to decay. For example, during the shutdown operation, the reverse current may cause the cathode electrode to decay. During the startup operation, the current may cause impact on the electrodes, seals and other components of the hydrogen production unit. The startup and shutdown operations affect the life and durability of the hydrogen production unit.
[0099] For example, the control strategy of the hydrogen production system may be a balanced standby and hydrogen production mode, a life priority mode, or a hydrogen production priority mode.
[0100] For the balanced standby and hydrogen production modes, the target control information determined according to the comparison results coordinates the energy input side and the energy output side to meet the hydrogen production demand while reducing the switching frequency of the hydrogen production unit 400 in the hydrogen production system.
[0101] For the life priority mode, the target control information determined according to the comparison result gives priority to satisfying the energy input side, controlling the input or output of the hydrogen production unit 400, and reducing the switching frequency of the hydrogen production unit 400 in the hydrogen production system as much as possible to extend the operating time and life of the hydrogen production unit 400.
[0102] For the hydrogen production priority mode, the target control information determined according to the comparison result gives priority to satisfying the energy output side, and controls the input or output of the hydrogen production unit 400 to meet the hydrogen production demand.
[0103] The target control information includes at least one of the number of hydrogen production units and the identification of the hydrogen production units.
[0104] In this embodiment, the hydrogen production system includes multiple hydrogen production units 400. The hydrogen production power of each hydrogen production unit 400 can be the same or different. A corresponding identifier can be set for each hydrogen production unit 400. According to the hydrogen production unit identifier of a hydrogen production unit 400, the hydrogen production power information of the hydrogen production unit 400 can be obtained.
[0105] In actual implementation, the predicted hydrogen production power corresponding to the predicted hydrogen production load can be obtained based on the comparison result. According to the predicted hydrogen production power and the current hydrogen production power of the hydrogen production system and the difference between the two hydrogen production powers, it can be determined how many hydrogen production units 400 need to be put into operation or cut out, and it can also be determined which hydrogen production units 400 need to be put into operation or cut out, and put into operation or cut in according to the hydrogen production unit identification.
[0106] For example, according to the comparison result, the predicted hydrogen production power is 20P, the hydrogen production system includes 10 hydrogen production units 400 with the same hydrogen production power, the power of each hydrogen production unit 400 is 5P, the hydrogen production system currently runs 2 hydrogen production units 400, the current hydrogen production power is 10P, and the number of hydrogen production units in the target control information is 4. According to the target control information, the hydrogen production system is controlled to put into use 2 hydrogen production units 400, so that the total hydrogen production power of the hydrogen production system can reach 20P.
[0107] For another example, according to the comparison result, the predicted hydrogen production power is 20P. The hydrogen production system includes four hydrogen production units 400, which are labeled A, B, C, and D respectively. The hydrogen production power corresponding to A and D is 5P, and the hydrogen production power corresponding to B and C is 10P. The hydrogen production system is currently running A, and the current hydrogen production power is 5P. The hydrogen production units of the target control information are labeled B and D (or C and D). According to the target control information, the hydrogen production system is controlled to put into operation the hydrogen production units 400 labeled B and D (or C and D), so that the total hydrogen production power of the hydrogen production system can reach 20P.
[0108] Step 130: Based on the target control information, control the input or output of the hydrogen production unit 400 in the hydrogen production system.
[0109] In this embodiment, the hydrogen production unit 400 in the hydrogen production system is controlled to be put into operation or cut out according to the number of hydrogen production units or the hydrogen production unit identifier in the target control information, so as to meet different control strategies, balance the life of the hydrogen production unit 400 and the hydrogen production, and ensure efficient and safe operation of the hydrogen production system.
[0110] In the related art, the electrolyzer is put into operation and cut out only according to the conditions at the energy input end (for example, the volatility and intermittency of new energy), and the electrolyzer is often turned on and off frequently, resulting in performance degradation of the electrolyzer, affecting the operational safety and production efficiency of the hydrogen production system. Frequent switching of the electrolyzer will also shorten the service life of the electrolyzer, requiring frequent maintenance and replacement of equipment, and increasing the cost of hydrogen production.
[0111] In the embodiment of the present application, by predicting the first predicted hydrogen production, the second predicted hydrogen production and the predicted hydrogen production load, the hydrogen production capacity on the energy input side and the hydrogen production demand on the energy output side are considered in a coordinated manner, and different control strategies are adapted. The reasonable input or output of the hydrogen production unit 400 in the hydrogen production system is controlled according to the target control information. This can flexibly respond to energy volatility and intermittent input in new energy hydrogen production scenarios, ensure efficient and safe operation of the hydrogen production system, extend the service life of the hydrogen production unit 400, and help reduce hydrogen production costs.
[0112] According to the control method of the hydrogen production system provided in the embodiment of the present application, by predicting the hydrogen production amount and the hydrogen production load, coordinating the energy input side and the energy output side, the input or output of the hydrogen production unit 400 is controlled, and while meeting the hydrogen production demand, the switching frequency of the hydrogen production unit 400 is reduced, the service life is extended, the operational safety and production efficiency of the hydrogen production system are ensured, and the hydrogen production cost is reduced.
[0113] In some embodiments, step 120, comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, includes:
[0114] comparing the predicted hydrogen production load with the first predicted hydrogen production;
[0115] When the first predicted hydrogen production is greater than the predicted hydrogen production load, a third predicted hydrogen production corresponding to the hydrogen production system switching out the hydrogen production unit 400 is obtained, where the third predicted hydrogen production is the predicted hydrogen production corresponding to the combination of different hydrogen production units 400 operated by the hydrogen production system;
[0116] The target control information is determined with the goal that the third predicted hydrogen production amount is greater than the predicted hydrogen production load and the number of hydrogen production units 400 in operation in the hydrogen production system is minimal.
[0117] In this embodiment, the predicted hydrogen production load is compared with the first predicted hydrogen production. When the first predicted hydrogen production is greater than the predicted hydrogen production load, it indicates that the current hydrogen production capacity can meet the hydrogen production demand. Some of the currently operating hydrogen production units 400 can be cut out to save energy. At the same time, maintenance can be carried out when the hydrogen production unit 400 is cut out and stopped to avoid shutdown for maintenance.
[0118] When the first predicted hydrogen production is greater than the predicted hydrogen production load, the third predicted hydrogen production corresponding to the hydrogen production unit 400 cut out one by one from the current operating state of the hydrogen production system is obtained, and the currently operating hydrogen production units 400 are traversed to obtain the third predicted hydrogen production of the combination of different hydrogen production units 400.
[0119] It is understandable that when obtaining the third predicted hydrogen production amount, the calculation is performed based on the expected hydrogen production state of the combined operation of different hydrogen production units 400 in combination with the predicted energy supply situation.
[0120] For example, the hydrogen production system currently operates four hydrogen production units 400 with different hydrogen production powers, A, B, C, and D. When the first predicted hydrogen production is greater than the predicted hydrogen production load, the third predicted hydrogen production corresponding to cutting out the hydrogen production units 400 one by one from the current operating state is obtained.
[0121] In this embodiment, the third predicted hydrogen production corresponding to A, B, and C when D is cut out is obtained; the third predicted hydrogen production corresponding to A, B, and D when C is cut out is obtained, and so on to obtain a data set of the third predicted hydrogen production when one hydrogen production unit 400 is cut out.
[0122] The third predicted hydrogen production corresponding to A and B when C and D are cut out is obtained; the third predicted hydrogen production corresponding to A and D when B and C are cut out is obtained, and so on to obtain the data set of the third predicted hydrogen production when two hydrogen production units 400 are cut out.
[0123] Obtain the third predicted hydrogen production corresponding to A when B, C, and D are cut out; obtain the third predicted hydrogen production corresponding to B when A, C, and D are cut out, and so on to obtain a data set of the third predicted hydrogen production when the three hydrogen production units 400 are cut out.
[0124] It can be understood that when the hydrogen production power of the hydrogen production units 400 of the hydrogen production system is the same, the obtained third predicted hydrogen production is the third predicted hydrogen production corresponding to the operation of different numbers of hydrogen production units 400.
[0125] For example, when the first predicted hydrogen production is greater than the predicted hydrogen production load, a judgment is made to cut out the hydrogen production unit 400. The hydrogen production system currently operates N hydrogen production units 400 with the same hydrogen production power. The number of operating hydrogen production units 400 is set to N-1, N-2, ... and 1, and the third predicted hydrogen production F4 is calculated, including F4(N-1), F4(N-2), ... and F4(1).
[0126] After obtaining the third predicted hydrogen production of different combinations of hydrogen production units 400, the third predicted hydrogen production of each combination of hydrogen production units 400 is compared with the predicted hydrogen production load, with the goal of the third predicted hydrogen production being greater than the predicted hydrogen production load, so that the hydrogen production after cutting out the hydrogen production unit 400 can meet the hydrogen production load, while also satisfying the condition that the hydrogen production system operates the least number of hydrogen production units 400, so that the system operates the least number of hydrogen production units 400, which is beneficial to energy saving and system maintenance.
[0127] For example, the hydrogen production system currently operates N hydrogen production units 400 with the same hydrogen production power, the predicted hydrogen production load is F2, the first predicted hydrogen production is F1, and F1>F2.
[0128] The third predicted hydrogen production F4 of the combination of different hydrogen production units 400 is obtained, including F4(N-1), F4(N-2), ... and F4(1). When F4(N-1)>F2>F4(N-2), one hydrogen production unit 400 is cut out.
[0129] When F4(N-1)>F4(N-2)>F2>F4(N-3), F4(N-2) is the third predicted hydrogen production that satisfies the third predicted hydrogen production that is greater than the predicted hydrogen production load and the hydrogen production system has the least number of operating hydrogen production units 400. At this time, 2 hydrogen production units 400 are cut out.
[0130] In some embodiments, when the first predicted hydrogen production is greater than the predicted hydrogen production load, obtaining the third predicted hydrogen production corresponding to the hydrogen production system switching out the hydrogen production unit 400 may include:
[0131] When the first predicted hydrogen production is greater than the predicted hydrogen production load and the duration is greater than the first target duration, a third predicted hydrogen production corresponding to the hydrogen production system switching out the hydrogen production unit 400 is obtained.
[0132] In this embodiment, a first target duration is set for timing, and when the first predicted hydrogen production is greater than the predicted hydrogen production load, timing starts. When the first predicted hydrogen production is greater than the predicted hydrogen production load for a period greater than the first target duration, the third predicted hydrogen production is obtained, and a judgment is made to cut out the hydrogen production unit 400.
[0133] The first target duration is a preset timing duration threshold, which can be adjusted according to the equipment conditions and energy supply conditions of the hydrogen production unit 400 of the hydrogen production system.
[0134] For example, the first target duration is T1, the predicted hydrogen production load is F2, the first predicted hydrogen production is F1, and F1>F2 occurs, and timing t1 starts.
[0135] In this embodiment, t1>T1, the third predicted hydrogen production amount is obtained, and the decision to switch off the hydrogen production unit 400 is executed.
[0136] It should be noted that the first target duration of the preset timing can avoid frequent calculation of the third predicted hydrogen production or cutting out of the hydrogen production unit 400 due to fluctuations in the first predicted hydrogen production and the predicted hydrogen production load. In view of the energy volatility and intermittent input in the new energy hydrogen production scenario, it can effectively ensure the efficient and safe operation of the hydrogen production system and extend the life of the equipment.
[0137] In some embodiments, step 120, comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, may include:
[0138] comparing the predicted hydrogen production load with the first predicted hydrogen production;
[0139] When the first predicted hydrogen production is less than the predicted hydrogen production load, a fourth predicted hydrogen production corresponding to the hydrogen production unit 400 put into operation in the hydrogen production system is obtained, where the fourth predicted hydrogen production is the predicted hydrogen production corresponding to the combination of different hydrogen production units 400 operated by the hydrogen production system;
[0140] The target control information is determined with the goal that the fourth predicted hydrogen production amount is greater than the predicted hydrogen production load and the number of hydrogen production units 400 in operation in the hydrogen production system is the minimum.
[0141] In this embodiment, the predicted hydrogen production load is compared with the first predicted hydrogen production. When the first predicted hydrogen production is less than the predicted hydrogen production load, it indicates that the current hydrogen production capacity cannot meet the hydrogen production demand, and the hydrogen production unit 400 can be put into use to meet the hydrogen production demand.
[0142] When the first predicted hydrogen production is less than the predicted hydrogen production load, the fourth predicted hydrogen production corresponding to the hydrogen production units 400 put into operation one by one in the hydrogen production system from the current operating state is obtained, and the remaining non-operating and operable hydrogen production units 400 in the hydrogen production system are traversed to obtain the fourth predicted hydrogen production of the combination of different hydrogen production units 400.
[0143] It is understandable that when obtaining the fourth predicted hydrogen production amount, the calculation is performed based on the expected hydrogen production state of the combined operation of different hydrogen production units 400 in combination with the predicted energy supply situation.
[0144] For example, the hydrogen production system currently operates two hydrogen production units 400 A and B, and the remaining two hydrogen production units 400 C and D are not in operation and can be operated. The fourth predicted hydrogen production corresponding to each of the hydrogen production units 400 put into operation is obtained.
[0145] In this embodiment, the fourth predicted hydrogen production corresponding to A, B, and D when D is put into operation is obtained; the third predicted hydrogen production corresponding to A, B, and C when C is put into operation is obtained, and a data set of the fourth predicted hydrogen production when one hydrogen production unit 400 is put into operation is obtained.
[0146] The fourth predicted hydrogen production corresponding to A, B, C, and D when C and D are put into operation is obtained, and the fourth predicted hydrogen production when two hydrogen production units 400 are put into operation is obtained.
[0147] It can be understood that when the hydrogen production power of the hydrogen production units 400 of the hydrogen production system is the same, the fourth predicted hydrogen production amount obtained is the fourth predicted hydrogen production amount corresponding to the operation of different numbers of hydrogen production units 400.
[0148] For example, when the first predicted hydrogen production is less than the predicted hydrogen production load, a judgment is made to put the hydrogen production unit 400 into operation. The hydrogen production system currently operates N hydrogen production units 400 with the same hydrogen production power. The number of operating hydrogen production units 400 is set to N+1, N+2, N+3 and N+4, and the fourth predicted hydrogen production F5 is calculated, including F5(N+1), F5(N+2), F5(N+3) and F5(N+4).
[0149] After obtaining the fourth predicted hydrogen production of different combinations of hydrogen production units 400, the fourth predicted hydrogen production of each combination of hydrogen production units 400 is compared with the predicted hydrogen production load, with the goal of the fourth predicted hydrogen production being greater than the predicted hydrogen production load, so that the hydrogen production after the hydrogen production units 400 are put into operation can meet the hydrogen production load, while also satisfying the condition that the hydrogen production system operates the least number of hydrogen production units 400, so that the system operates the least number of hydrogen production units 400, which is beneficial to energy saving.
[0150] For example, the hydrogen production system currently operates N hydrogen production units 400 with the same hydrogen production power, the predicted hydrogen production load is F2, and the first predicted hydrogen production is F1, and F1 is less than F2.
[0151] The fourth predicted hydrogen production F5 of the combination of different hydrogen production units 400 is obtained, including F5(N+1), F5(N+2), F5(N+3) and F5(N+4). When F5(N+1)>F2, one hydrogen production unit 400 is put into use.
[0152] When F5(N+3)>F5(N+2)>F2>F5(N+1), F5(N+2) is the fourth predicted hydrogen production that satisfies the fourth predicted hydrogen production that is greater than the predicted hydrogen production load and the hydrogen production system has the least number of hydrogen production units 400 operating. At this time, 2 hydrogen production units 400 are put into operation.
[0153] In some embodiments, when the first predicted hydrogen production is less than the predicted hydrogen production load, obtaining a fourth predicted hydrogen production corresponding to the hydrogen production unit 400 of the hydrogen production system includes:
[0154] When the first predicted hydrogen production is less than the predicted hydrogen production load and the duration is greater than the second target duration, a fourth predicted hydrogen production corresponding to the hydrogen production system switching out the hydrogen production unit 400 is obtained.
[0155] In this embodiment, a second target duration is set for timing. When the first predicted hydrogen production is less than the predicted hydrogen production load, timing starts. When the first predicted hydrogen production is less than the predicted hydrogen production load for a period greater than the second target duration, the fourth predicted hydrogen production is obtained and the judgment of investing in the hydrogen production unit 400 is executed.
[0156] The second target duration is a preset timing duration threshold, which can be adjusted according to the equipment conditions and energy supply conditions of the hydrogen production unit 400 of the hydrogen production system.
[0157] For example, the second target duration is T2, the predicted hydrogen production load is F2, the first predicted hydrogen production is F1, and F1<F2 occurs, then timing t2 starts.
[0158] In this embodiment, t2>T2, the fourth predicted hydrogen production is obtained, and the determination of investing in the hydrogen production unit 400 is executed.
[0159] It should be noted that the second target duration of the preset timing can avoid frequent calculation of the second predicted hydrogen production or input into the hydrogen production unit 400 due to fluctuations in the first predicted hydrogen production and the predicted hydrogen production load. In view of the energy volatility and intermittent input in the new energy hydrogen production scenario, it can effectively ensure the efficient and safe operation of the hydrogen production system and extend the life of the equipment.
[0160] It can be understood that when the predicted hydrogen production load is compared with the first predicted hydrogen production, when the predicted hydrogen production load is equal to the first predicted hydrogen production, or the difference between the predicted hydrogen production load and the first predicted hydrogen production is within a preset range, it indicates that the hydrogen production unit 400 currently operating in the hydrogen production system can meet the hydrogen production demand, and there is no need to make a judgment on whether to put the hydrogen production unit 400 into operation or cut it out.
[0161] In some embodiments, the hydrogen production system includes a hydrogen storage device 650, and step 120, comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, includes:
[0162] comparing the predicted hydrogen production load with the first predicted hydrogen production and the second predicted hydrogen production;
[0163] When the predicted hydrogen production load is greater than the first predicted hydrogen production amount and less than the second predicted hydrogen production amount, obtaining the releasable amount of hydrogen from the hydrogen storage device 650;
[0164] When the releasable amount of hydrogen is greater than the current hydrogen difference, target control information is determined, which is used to instruct the currently operating hydrogen production unit 400 of the hydrogen production system to keep running, and the current hydrogen difference is equal to the difference between the predicted hydrogen production load and the first predicted hydrogen production.
[0165] The hydrogen storage device 650 is used to store hydrogen. When the hydrogen production of the hydrogen production system exceeds the hydrogen production load, the excess hydrogen can be placed in the hydrogen storage device 650 for storage, or a certain amount of hydrogen can be produced according to a certain production plan and placed in the hydrogen storage device 650 for storage.
[0166] It can be understood that the releasable amount of hydrogen is the amount of hydrogen stored in the hydrogen storage device 650 that can be released, and the hydrogen stored in the hydrogen storage device 650 can be released to meet the hydrogen production demand.
[0167] In this embodiment, the predicted hydrogen production load is compared with the first predicted hydrogen production and the second predicted hydrogen production. When the predicted hydrogen production load is greater than the first predicted hydrogen production and less than the second predicted hydrogen production, it indicates that the current hydrogen production capacity cannot meet the hydrogen production demand and the maximum hydrogen production capacity exceeds the hydrogen production demand.
[0168] The difference between the predicted hydrogen production load and the first predicted hydrogen production (i.e., the current hydrogen difference) can be calculated, and the releasable hydrogen amount of the hydrogen storage device 650 and the current hydrogen difference can be compared to determine whether the released hydrogen stored in the hydrogen storage device 650 can meet the hydrogen production demand.
[0169] When the amount of hydrogen that can be released is greater than the current hydrogen difference, the hydrogen production unit 400 currently in operation is controlled to keep running in the hydrogen production system. Without putting a new hydrogen production unit 400 into operation, the hydrogen production demand can be met by the hydrogen stored in the hydrogen storage device 650. This can avoid the need to shut down the hydrogen production unit 400 after it is put into operation, thereby reducing the number of starts and stops of the hydrogen production unit 400.
[0170] For example, Figure 2 As shown, the predicted hydrogen production load is F2, the first predicted hydrogen production is F1, the second predicted hydrogen production is F3, and the area between the two curves corresponds to the hydrogen gap between the hydrogen production capacity and the hydrogen production demand.
[0171] In Part 2, the predicted hydrogen production load F2 is greater than the first predicted hydrogen production F1 and less than the second predicted hydrogen production F3. At this time, the hydrogen storage device 650 can be judged. If the releasable amount of hydrogen from the hydrogen storage device 650 is greater than the current hydrogen difference S1, the hydrogen production unit 400 does not need to be put into operation, thereby avoiding the possible shutdown of the hydrogen production unit 400 in Part 3 and reducing the number of starts and stops of the hydrogen production unit 400.
[0172] In some embodiments, step 120, comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, includes:
[0173] comparing the predicted hydrogen production load with the second predicted hydrogen production;
[0174] When the predicted hydrogen production load is greater than the second predicted hydrogen production, all the operative hydrogen production units 400 of the hydrogen production system are put into operation.
[0175] In this embodiment, the predicted hydrogen production load is compared with the second predicted hydrogen production. When the predicted hydrogen production load is greater than the second predicted hydrogen production, it indicates that the maximum hydrogen production capacity of the hydrogen production system cannot meet the hydrogen production demand. At this time, all the hydrogen production units 400 that can be operated in the hydrogen production system are put into operation to increase the hydrogen production.
[0176] It can be understood that when the predicted hydrogen production load is equal to the second predicted hydrogen production, all the hydrogen production units 400 that are put into operation in the hydrogen production system can meet the hydrogen production demand.
[0177] In some embodiments, the hydrogen production system includes a hydrogen storage device 650 and an electric energy storage device 640 . The hydrogen storage device 650 is used to store hydrogen, and the electric energy storage device 640 is used to store electric energy.
[0178] It is understandable that when the hydrogen production system produces more hydrogen than the hydrogen production load, the excess hydrogen can be placed in the hydrogen storage device 650 for storage; the electric energy storage device 640 can store the excess electric energy generated by the new energy energy supply equipment or the low-cost electric energy purchased from the power grid.
[0179] In this embodiment, after comparing the predicted hydrogen production load with the second predicted hydrogen production, the control method of the hydrogen production system may further include:
[0180] When the predicted hydrogen production load is greater than the second predicted hydrogen production, the hydrogen production system controls the operation of the hydrogen production unit 400, controls the hydrogen storage device 650 to release hydrogen, and controls the electric energy storage device 640 to release electric energy for the hydrogen production unit 400 to produce hydrogen.
[0181] When the predicted hydrogen production load is greater than the second predicted hydrogen production, it indicates that the maximum hydrogen production capacity of the hydrogen production system cannot meet the hydrogen production demand. The hydrogen stored in the hydrogen storage device 650 is released, and the electric energy stored in the electric energy storage device 640 is released to supply hydrogen to the hydrogen production unit 400 to increase hydrogen production.
[0182] In actual implementation, for a hydrogen production system powered by new energy energy supply equipment, when the predicted hydrogen production load is greater than the second predicted hydrogen production, the hydrogen production unit 400 can also be powered by electricity from the grid to produce hydrogen.
[0183] It should be noted that the predicted hydrogen production load is compared with the second predicted hydrogen production. When the predicted hydrogen production load is greater than the second predicted hydrogen production, the hydrogen storage device 650 can be controlled to release hydrogen first. If it still cannot meet the hydrogen production demand, all operable hydrogen production units 400 can be put into operation. Alternatively, the hydrogen storage device 650 can be controlled to release hydrogen while all operable hydrogen production units 400 are put into operation to maximize the hydrogen production of the hydrogen production system.
[0184] In some embodiments, before comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, the control method of the hydrogen production system may further include:
[0185] Acquire the current hydrogen storage state of the hydrogen storage device 650 and the current energy storage state of the electric energy storage device 640;
[0186] Based on the current hydrogen storage state and the current energy storage state, at least one of the hydrogen storage device 650 and the electric energy storage device 640 is controlled to operate, and the predicted hydrogen production load is re-acquired.
[0187] In this embodiment, before making a judgment on whether to put the hydrogen production unit 400 into operation or to cut off the hydrogen production unit 400, the action (hydrogen storage, hydrogen release, energy storage, energy release) of the hydrogen storage device 650 or the electric energy storage device 640 is controlled according to the current hydrogen storage state of the hydrogen storage device 650 and the current energy storage state of the electric energy storage device 640, and the predicted hydrogen production load is updated. Based on the new predicted hydrogen production load, it is determined whether it is necessary to make a judgment on whether to put the hydrogen production unit 400 into operation or to cut off the hydrogen production unit 400. This can save computing resources for the judgment on whether to put the hydrogen production unit 400 into operation or to cut off the hydrogen production unit 400, reduce the putting the hydrogen production unit 400 into operation or to cut off the hydrogen production unit 400, and reduce the switching frequency.
[0188] For example, before making a decision to cut off the hydrogen production unit 400, the hydrogen storage device 650 and the electric energy storage device 640 may be operated to the upper limit of storage safety to store the excess hydrogen or electric energy, and then a decision may be made whether to cut off the hydrogen production unit 400.
[0189] For example, before making a decision on whether to invest in the hydrogen production unit 400, the hydrogen storage device 650 and the electric energy storage device 640 may be operated to the storage safety lower limit to release the excess hydrogen or electric energy, and then a decision may be made on whether to invest in the hydrogen production unit 400.
[0190] A specific embodiment is described below.
[0191] like Figure 2 As shown, the predicted hydrogen production load is F2, the first predicted hydrogen production is F1, the second predicted hydrogen production is F3, and the area between the two curves corresponds to the hydrogen gap between the hydrogen production capacity and the hydrogen production demand.
[0192] In parts 1, 3, and 5, the first predicted hydrogen production F1 is greater than the predicted hydrogen production load F2. At this time, it is determined that the hydrogen production unit 400 is cut out, which can avoid the hydrogen production unit 400 from running for a long time and shortening its life.
[0193] In the second part, the predicted hydrogen production load F2 is greater than the first predicted hydrogen production F1 and less than the second predicted hydrogen production F3. At this time, the hydrogen storage device 650 can be judged. If the releasable amount of hydrogen is greater than S1, the hydrogen production unit 400 does not need to be put into operation, thereby avoiding the possible shutdown of the hydrogen production unit 400 in the third part and reducing the number of starts and stops of the hydrogen production unit 400.
[0194] In Part 4, if the predicted hydrogen production load F2 is greater than the predicted second predicted hydrogen production F3, all hydrogen production units 400 are put into operation, and the electric energy of the electric energy storage device is released or the hydrogen stored in the hydrogen storage device 650 is released. If the increase in hydrogen volume is less than S2, the bottleneck of the hydrogen production system is reached.
[0195] In some embodiments, the energy supply device 500 of the hydrogen production system includes a new energy supply device, and the first predicted hydrogen production amount and the second predicted hydrogen production amount are determined by the following steps:
[0196] Obtaining first predicted energy supply information of new energy supply equipment;
[0197] Determine a first predicted hydrogen production amount based on the first predicted energy supply information and the operation information of the hydrogen production unit 400 currently operating in the hydrogen production system;
[0198] Based on the first predicted energy supply information and the operating information of the hydrogen production unit 400 that can be operated in the hydrogen production system, a second predicted hydrogen production amount is determined.
[0199] In this embodiment, the data required for the prediction of new energy power generation and the operating power related to the real-time hydrogen production of the hydrogen production system are used as input to calculate the first predicted energy supply information of the new energy energy supply equipment, and the first predicted hydrogen production or the second predicted hydrogen production is calculated based on the first predicted energy supply information and the operating information of the currently operating hydrogen production unit 400 or the operating information of the operable hydrogen production unit 400.
[0200] The control method of the hydrogen production system in the embodiment of the present application controls the input and output of the hydrogen production unit 400 through prediction information, and can also predict the operating status of the hydrogen production unit 400 in the future period.
[0201] In some embodiments, the control method of the hydrogen production system may further include:
[0202] Acquire predicted energy supply information of the energy supply device 500 of the hydrogen production system;
[0203] Based on the predicted energy supply information, the predicted operation information of each hydrogen production unit 400 in the hydrogen production system is obtained according to the control strategy of the hydrogen production system and the hydrogen production unit 400 model.
[0204] In this embodiment, based on the predicted energy supply information of the energy supply equipment 500 in the future period, combined with the control strategy of the hydrogen production system and the hydrogen production unit 400 model that simulates the operation of each hydrogen production unit 400, the predicted operation information of each hydrogen production unit 400 in the future period can be obtained.
[0205] The predicted operation information of the hydrogen production unit 400 represents the future operation status of the hydrogen production unit 400, and may include operation time information, downtime information, start and stop times, and other information.
[0206] It can be understood that for new energy energy supply equipment, the data required for new energy power generation prediction and the operating power related to the real-time hydrogen production of the hydrogen production system are used as input to calculate the first predicted energy supply information of the new energy energy supply equipment, and the predicted operation information of the hydrogen production unit 400 is obtained by combining the control strategy of the hydrogen production system and the hydrogen production unit 400 model.
[0207] In actual implementation, the predicted energy supply information is input, and the predicted operation curve of each hydrogen production unit 400 is predicted according to the control strategy of the hydrogen production system (balanced standby and hydrogen production mode, life priority mode or hydrogen production priority mode), and the preset hydrogen production unit 400 model (including the upper and lower limits of the operating power, energy consumption, life, etc. of the hydrogen production unit 400). The horizontal axis of the predicted operation curve can be time, and the vertical axis can be power. According to the predicted operation curve, information such as operating time, shutdown time, number of starts and stops, etc. can be obtained.
[0208] In some embodiments, after obtaining the predicted operation information of each hydrogen production unit 400 in the hydrogen production system, the control method of the hydrogen production system may further include:
[0209] Based on the downtime information of the hydrogen production unit 400 in the predicted operation information, a maintenance plan of the hydrogen production unit 400 is determined.
[0210] In this embodiment, based on the downtime information of the hydrogen production unit 400, the time period for maintenance operations on the hydrogen production unit 400 can be obtained. By using the time period when the shutdown would have been controlled to be cut out for maintenance, active shutdown for maintenance can be avoided, thereby reducing the losses caused by the shutdown of the hydrogen production unit 400.
[0211] In some embodiments, step 120, determining target control information of the hydrogen production system according to the comparison result, includes:
[0212] Determine target control information based on comparison results within the target judgment time;
[0213] After obtaining the predicted operation information of each hydrogen production unit 400 in the hydrogen production system, the control method of the hydrogen production system may further include:
[0214] When the number of starts and stops of the hydrogen production unit 400 in the predicted operation information is greater than the target number threshold, the value of the target judgment time is increased.
[0215] In this embodiment, when the predicted hydrogen production load is compared with at least one of the first predicted hydrogen production and the second predicted hydrogen production, a target judgment time (for example, the first target time and the second target time) is set in advance. When the size comparison result remains unchanged and the timing exceeds the target judgment time, the judgment of switching on and off the hydrogen production unit 400 is performed to avoid frequent calculation and switching on and off of the hydrogen production unit 400. In view of the energy volatility and intermittent input in the new energy hydrogen production scenario, the hydrogen production system can be effectively guaranteed to operate efficiently and safely, thereby extending the life of the equipment.
[0216] When the start and stop times of the hydrogen production unit 400 in the predicted operation information is greater than the target number threshold, it indicates that the hydrogen production system may be frequently switched on and off in the future (for example, new energy energy supply equipment operates in bad weather). At this time, the target judgment time value is appropriately increased to extend the judgment time, avoid frequent calculations or input of the hydrogen production unit 400, and ensure safe and efficient operation of the hydrogen production system.
[0217] In some embodiments, the start and stop times of the hydrogen production unit 400 in the predicted operation information are adjusted based on the target mapping relationship.
[0218] The target mapping relationship is used to characterize the correspondence between the predicted start and stop times and the actual start and stop times within the same period.
[0219] It should be noted that the predicted operation information has a certain time classification, and it is difficult to predict the operating status of the hydrogen production unit 400 every minute and every second. The predicted operation information is a prediction of the operating status of the hydrogen production unit 400 within a certain period of time, and there is an error between the actual operation of the hydrogen production unit 400 and the start and stop times of the predicted operation information under the predicted energy supply may be less than the actual start and stop times under the actual energy supply.
[0220] In this embodiment, the start and stop times of the predicted operation information under the predicted energy supply can be adjusted according to the target mapping relationship between the predicted start and stop times and the actual start and stop times in the same time period in the historical data, thereby improving the accuracy of the start and stop times of the predicted operation information and facilitating the adjustment of the target judgment duration.
[0221] The control method of the hydrogen production system of the embodiment of the present application controls the input or output of the hydrogen production unit 400 by predicting the hydrogen production amount and the hydrogen production load, coordinating the energy input side and the energy output side, and can flexibly cope with the intermittent and volatility of the new energy supply equipment, and achieve efficient and safe operation of the hydrogen production system. At the same time, the operation of the hydrogen production unit 400 is predicted, and a maintenance plan is formulated according to the predicted operation information, and the judgment time is extended to avoid the shutdown of the hydrogen production unit 400 for maintenance and frequent start and stop, thereby extending the service life of the hydrogen production unit 400.
[0222] The control method of the hydrogen production system provided in the embodiment of the present application may be executed by the control device 300 of the hydrogen production system. In the embodiment of the present application, the control device 300 of the hydrogen production system executing the control method of the hydrogen production system is taken as an example to illustrate the control device 300 of the hydrogen production system provided in the embodiment of the present application.
[0223] The embodiment of the present application also provides a control device 300 for a hydrogen production system.
[0224] like Figure 3 As shown, the control device 300 of the hydrogen production system includes:
[0225] An acquisition module 310 is used to acquire a first predicted hydrogen production, a second predicted hydrogen production, and a predicted hydrogen production load of the hydrogen production system, wherein the first predicted hydrogen production is the predicted hydrogen production corresponding to the hydrogen production unit 400 currently in operation of the hydrogen production system, and the second predicted hydrogen production is the predicted hydrogen production corresponding to the hydrogen production unit 400 that can be operated by the hydrogen production system;
[0226] A processing module 320, configured to compare the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determine target control information of the hydrogen production system according to the comparison result, wherein the target control information includes at least one of the number of hydrogen production units and the identification of the hydrogen production units;
[0227] The control module 330 is used to control the input or output of the hydrogen production unit 400 in the hydrogen production system based on the target control information.
[0228] According to the control device 300 of the hydrogen production system provided in the embodiment of the present application, by predicting the hydrogen production amount and the hydrogen production load, coordinating the energy input side and the energy output side, the input or output of the hydrogen production unit 400 is controlled, so as to meet the hydrogen production demand while reducing the switching frequency of the hydrogen production unit 400, extending the service life, ensuring the operational safety and production efficiency of the hydrogen production system, and reducing the hydrogen production cost.
[0229] In some embodiments, the processing module 320 is used to compare the predicted hydrogen production load with the first predicted hydrogen production;
[0230] When the first predicted hydrogen production is greater than the predicted hydrogen production load, a third predicted hydrogen production corresponding to the hydrogen production system switching out the hydrogen production unit 400 is obtained, where the third predicted hydrogen production is the predicted hydrogen production corresponding to the combination of different hydrogen production units 400 operated by the hydrogen production system;
[0231] The target control information is determined with the goal that the third predicted hydrogen production amount is greater than the predicted hydrogen production load and the number of hydrogen production units 400 in operation in the hydrogen production system is minimal.
[0232] In some embodiments, the processing module 320 is used to obtain a third predicted hydrogen production corresponding to the hydrogen production system switching out the hydrogen production unit 400 when the first predicted hydrogen production is greater than the predicted hydrogen production load and the duration is greater than the first target duration.
[0233] In some embodiments, the processing module 320 is used to compare the predicted hydrogen production load with the first predicted hydrogen production;
[0234] When the first predicted hydrogen production is less than the predicted hydrogen production load, a fourth predicted hydrogen production corresponding to the hydrogen production unit 400 put into operation in the hydrogen production system is obtained, where the fourth predicted hydrogen production is the predicted hydrogen production corresponding to the combination of different hydrogen production units 400 operated by the hydrogen production system;
[0235] The target control information is determined with the goal that the fourth predicted hydrogen production amount is greater than the predicted hydrogen production load and the number of hydrogen production units 400 in operation in the hydrogen production system is the minimum.
[0236] In some embodiments, the processing module 320 is used to obtain a fourth predicted hydrogen production corresponding to the hydrogen production system switching out the hydrogen production unit 400 when the first predicted hydrogen production is less than the predicted hydrogen production load and the duration is greater than the second target duration.
[0237] In some embodiments, the hydrogen production system includes a hydrogen storage device 650, a processing module 320, for comparing the predicted hydrogen production load with the first predicted hydrogen production and the second predicted hydrogen production;
[0238] When the predicted hydrogen production load is greater than the first predicted hydrogen production amount and less than the second predicted hydrogen production amount, obtaining the releasable amount of hydrogen from the hydrogen storage device 650;
[0239] In the case where the amount of hydrogen that can be released is greater than the current hydrogen difference, target control information is determined, and the target control information is used to instruct the hydrogen production unit 400 currently in operation of the hydrogen production system to keep operating, and the current hydrogen difference is equal to the difference between the predicted hydrogen production load and the first predicted hydrogen production. In some embodiments, the processing module 320 is used to compare the predicted hydrogen production load with the second predicted hydrogen production;
[0240] When the predicted hydrogen production load is greater than the second predicted hydrogen production, all the operative hydrogen production units 400 of the hydrogen production system are put into operation.
[0241] In some embodiments, the hydrogen production system includes a hydrogen storage device 650 and an electrical energy storage device 640, and the control module 330 is also used to control the operation of the hydrogen production unit 400 of the hydrogen production system, control the hydrogen storage device 650 to release hydrogen, and control the electrical energy storage device 640 to release electrical energy for the hydrogen production unit 400 to produce hydrogen when the predicted hydrogen production load is greater than the second predicted hydrogen production.
[0242] In some embodiments, the hydrogen production system includes a hydrogen storage device 650 and an electrical energy storage device 640, and the processing module 320 is further used to obtain the current hydrogen storage state of the hydrogen storage device 650 and the current energy storage state of the electrical energy storage device 640;
[0243] Based on the current hydrogen storage state and the current energy storage state, at least one of the hydrogen storage device 650 and the electric energy storage device 640 is controlled to operate, and the predicted hydrogen production load is re-acquired.
[0244] In some embodiments, the processing module 320 is further used to obtain predicted energy supply information of the energy supply device 500 of the hydrogen production system;
[0245] Based on the predicted energy supply information, the predicted operation information of each hydrogen production unit 400 in the hydrogen production system is obtained according to the control strategy of the hydrogen production system and the hydrogen production unit 400 model.
[0246] In some embodiments, the processing module 320 is further used to determine a maintenance plan for the hydrogen production unit 400 based on the downtime information of the hydrogen production unit 400 in the predicted operation information.
[0247] In some embodiments, the processing module 320 is also used to determine the target control information according to the comparison result within the target judgment time; when the start and stop times of the hydrogen production unit 400 in the predicted operation information is greater than the target time threshold, the value of the target judgment time is increased.
[0248] In some embodiments, the start and stop times of the hydrogen production unit 400 in the predicted operation information are adjusted based on a target mapping relationship, and the target mapping relationship is used to characterize the correspondence between the predicted start and stop times and the actual start and stop times in the same time period.
[0249] In some embodiments, the energy supply equipment 500 of the hydrogen production system includes a new energy supply equipment, and the acquisition module 310 is used to obtain first predicted energy supply information of the new energy supply equipment; based on the first predicted energy supply information and the operating information of the hydrogen production unit 400 currently operating in the hydrogen production system, determine the first predicted hydrogen production; based on the first predicted energy supply information and the operating information of the hydrogen production unit 400 that can be operated in the hydrogen production system, determine the second predicted hydrogen production.
[0250] The control device 300 of the hydrogen production system in the embodiment of the present application may be an electronic device, or a component in an electronic device, such as an integrated circuit or a chip.
[0251] The control device 300 of the hydrogen production system provided in the embodiment of the present application can realize Figure 1 To avoid repetition, the various processes implemented by the method embodiment are not described here.
[0252] The embodiment of the present application also provides a hydrogen production system.
[0253] like Figure 4 As shown, the hydrogen production system includes: multiple hydrogen production units 400, an energy supply device 500 and a control device 300 of the hydrogen production system as described above, the energy supply device 500 is connected to the multiple hydrogen production units 400, the energy supply device 500 is used to provide energy for the hydrogen production units 400 to produce hydrogen, the control device 300 is connected to the multiple hydrogen production units 400, and the control device 300 is used to control the operation of the hydrogen production units 400.
[0254] According to the hydrogen production system provided in the embodiment of the present application, by predicting the hydrogen production amount and the hydrogen production load, coordinating the energy input side and the energy output side, the input or output of the hydrogen production unit 400 is controlled, and while meeting the hydrogen production demand, the switching frequency of the hydrogen production unit 400 is reduced, the service life is extended, the operational safety and production efficiency of the hydrogen production system are ensured, and the hydrogen production cost is reduced.
[0255] In some embodiments, the energy supply device 500 includes a new energy supply device.
[0256] The new energy energy supply equipment may be a photovoltaic power supply equipment 500, a wind power supply equipment 500, or a wind-solar power supply equipment 500.
[0257] For the new energy hydrogen production scenario of new energy energy supply equipment, the volatility of the new energy input side and the demand for hydrogen on the energy output side are considered in a coordinated manner, the input and output of the hydrogen production unit 400 are determined, and the hydrogen production system can be operated efficiently and safely. The operation status of the hydrogen production unit 400 is predicted to facilitate the formulation of maintenance plans and severe weather assessments, which can avoid shutdowns for maintenance and frequent starts and stops that affect hydrogen production.
[0258] In some embodiments, the hydrogen production system may further include a hydrogen storage device 650 and an electrical energy storage device 640 .
[0259] In this embodiment, the hydrogen storage device 650 is connected to the hydrogen production unit 400, and the hydrogen storage device 650 is used to store hydrogen. The electric energy storage device 640 is connected to the energy supply device 500, and the electric energy storage device 640 is used to store electric energy.
[0260] In this embodiment, before making a judgment on whether to put the hydrogen production unit 400 into operation or to cut off the hydrogen production unit 400, the action (hydrogen storage, hydrogen release, energy storage, energy release) of the hydrogen storage device 650 or the electric energy storage device 640 is controlled according to the current hydrogen storage state of the hydrogen storage device 650 and the current energy storage state of the electric energy storage device 640, and the predicted hydrogen production load is updated. Based on the new predicted hydrogen production load, it is determined whether it is necessary to make a judgment on whether to put the hydrogen production unit 400 into operation or to cut off the hydrogen production unit 400. This can save computing resources for the judgment on whether to put the hydrogen production unit 400 into operation or to cut off the hydrogen production unit 400, reduce the putting the hydrogen production unit 400 into operation or to cut off the hydrogen production unit 400, and reduce the switching frequency.
[0261] Taking the energy supply equipment 500 of the hydrogen production system as a new energy energy supply equipment as an example, a specific embodiment is introduced below.
[0262] like Figure 5 As shown, the hydrogen production system includes a plurality of hydrogen production units 400 arranged at a hydrogen production station 610 and a new energy energy supply device arranged at a new energy station 620. The new energy energy supply device supplies energy to the hydrogen production units 400, and the produced hydrogen is supplied to a hydrogen station 630.
[0263] The hydrogen produced by the hydrogen production unit 400 can also be stored in the hydrogen storage device 650 , and the electric energy generated by the new energy station 620 can also be stored in the electric energy storage device 640 .
[0264] In the control device 300 of the hydrogen production system, the acquisition module 310 may include a new energy power prediction module 311 and a hydrogen production load prediction module 312. The new energy power prediction module 311 is used to predict the predicted energy supply information of the new energy energy supply equipment, and the hydrogen production load prediction module 312 is used to obtain the predicted hydrogen production load. The processing module 320 may include an online calculation unit 321, and the control module 330 may include a hydrogen production control unit 331.
[0265] The data required for energy prediction and data such as the real-time operating power in the hydrogen production station 610 are used as inputs of the new energy power prediction module 311, and the new energy predicted power P1 is output.
[0266] Assume that the hydrogen production power of the hydrogen production unit 400 is equal, and use the new energy predicted power P1 and the real-time status of the operating hydrogen production unit 400 (such as temperature, efficiency, etc.) as the input of the online calculation unit 321. The number of operating hydrogen production units 400 is N, 0≤N≤M, M is the number of operable hydrogen production units 400 in the hydrogen production station 610, and output the first predicted hydrogen production F1. With time as a variable, the operating status is updated in real time, and a matching hydrogen production prediction curve can be obtained.
[0267] The predicted power P1 of new energy and the state of the operable hydrogen production unit 400 (such as temperature, efficiency, etc.) are used as inputs of the online calculation unit 321. The number of operable hydrogen production units 400 is M. The first predicted hydrogen production F3 is output. With time as a variable, the operating state is updated in real time, and a hydrogen production prediction curve matching it can be obtained.
[0268] The hydrogen production load prediction module 312 can take the real-time hydrogen production as input and output the predicted hydrogen production load F2 according to the hydrogen production plan, etc.
[0269] When F1>F2, timing t1>T1, a judgment is made to cut out the hydrogen production unit 400, and the online calculation unit 321 sets the number of operating hydrogen production units 400 to N-1, and N-2, ... and 1, and calculates the third predicted hydrogen production F4. When F4(N-1)>F2>F4(N-2), one hydrogen production unit 400 is cut out, and so on.
[0270] When F3>F2>F1, timing t2>T2, the determination of the hydrogen production unit 400 to be put into operation is performed. If the electric energy of the electric energy storage device 640 is released, F3>F2, the online calculation unit 321 will calculate how many hydrogen production units 400 to put into operation to meet the demand of the hydrogen production load.
[0271] In the online calculation unit 321, the number of operating hydrogen production units 400 is set to N+1, and N+2, ... and M, and the fourth predicted hydrogen production F5 is calculated. When F5(N+1)>F2>F5(N), one hydrogen production unit 400 is put into operation, and so on.
[0272] When F2>F3, the electric energy of the electric energy storage device 640 is released, and the hydrogen stored in the hydrogen storage device 650 is released and put into all electrolytic cells to maximize the hydrogen production.
[0273] According to the predicted energy supply information of new energy, the operation status of the hydrogen production unit 400 in the future can also be predicted for maintenance plan designation and screening of severe weather.
[0274] In this embodiment, for hydrogen production from new energy, the hydrogen production system jointly considers the volatility of the new energy side and the demand for hydrogen on the hydrogen user side, determines the input and output of the hydrogen production unit 400, realizes efficient and safe operation of the system, reasonably formulates maintenance plans, and evaluates severe weather assessments, which can avoid shutdowns for maintenance and ensure the hydrogen production of the hydrogen production system.
[0275] In some embodiments, Figure 6 As shown, an embodiment of the present application further provides an electronic device 600, including a processor 601, a memory 602, and a computer program stored in the memory 602 and executable on the processor 601. When the program is executed by the processor 601, each process of the control method embodiment of the above-mentioned hydrogen production system is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be described here.
[0276] It should be noted that the electronic devices in the embodiments of the present application include the mobile electronic devices and non-mobile electronic devices mentioned above.
[0277] An embodiment of the present application also provides a non-transitory computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the various processes of the above-mentioned control method embodiment of the hydrogen production system are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.
[0278] The processor is the processor in the electronic device described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory ROM, a random access memory RAM, a magnetic disk or an optical disk.
[0279] An embodiment of the present application also provides a computer program product, including a computer program, which implements the control method of the above-mentioned hydrogen production system when executed by a processor.
[0280] The processor is the processor in the electronic device described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory ROM, a random access memory RAM, a magnetic disk or an optical disk.
[0281] An embodiment of the present application further provides a chip, which includes a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the various processes of the above-mentioned control method embodiment of the hydrogen production system, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.
[0282] It should be understood that the chip mentioned in the embodiments of the present application can also be called a system-level chip, a system chip, a chip system or a system-on-chip chip, etc.
[0283] It should be noted that, in this article, the terms "comprise", "include" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise one..." do not exclude the presence of other identical elements in the process, method, article or device including the element. In addition, it should be pointed out that the scope of the methods and devices in the embodiments of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in reverse order according to the functions involved, for example, the described method may be performed in an order different from that described, and various steps may also be added, omitted, or combined. In addition, the features described with reference to certain examples may be combined in other examples.
[0284] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a computer software product, which is stored in a storage medium (such as ROM / RAM, a disk, or an optical disk), and includes a number of instructions for a terminal (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present application.
[0285] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.
[0286] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0287] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.
Claims
1. A control method for a hydrogen production system, characterized in that: include: Obtaining a first predicted hydrogen production, a second predicted hydrogen production, and a predicted hydrogen production load of a hydrogen production system, wherein the first predicted hydrogen production is the predicted hydrogen production corresponding to a hydrogen production unit currently in operation of the hydrogen production system, and the second predicted hydrogen production is the predicted hydrogen production corresponding to an operable hydrogen production unit of the hydrogen production system; comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, wherein the target control information includes at least one of the number of hydrogen production units and the identification of the hydrogen production units; Based on the target control information, the hydrogen production unit in the hydrogen production system is controlled to be put into operation or cut out.
2. The control method of the hydrogen production system according to claim 1, characterized in that: The step of comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, comprises: comparing the predicted hydrogen production load with the first predicted hydrogen production; When the first predicted hydrogen production is greater than the predicted hydrogen production load, obtaining a third predicted hydrogen production corresponding to the hydrogen production system switching out the hydrogen production unit, the third predicted hydrogen production being the predicted hydrogen production corresponding to a combination of different hydrogen production units running in the hydrogen production system; The target control information is determined with the goal that the third predicted hydrogen production is greater than the predicted hydrogen production load and the number of hydrogen production units in operation in the hydrogen production system is minimal.
3. The control method of the hydrogen production system according to claim 2, characterized in that: The step of obtaining a third predicted hydrogen production amount corresponding to switching out the hydrogen production unit of the hydrogen production system when the first predicted hydrogen production amount is greater than the predicted hydrogen production load includes: When the first predicted hydrogen production is greater than the predicted hydrogen production load and the duration is greater than the first target duration, the third predicted hydrogen production corresponding to the hydrogen production system switching off the hydrogen production unit is obtained.
4. The control method of the hydrogen production system according to claim 1, characterized in that: The step of comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, comprises: comparing the predicted hydrogen production load with the first predicted hydrogen production; When the first predicted hydrogen production is less than the predicted hydrogen production load, obtaining a fourth predicted hydrogen production corresponding to the hydrogen production unit put into operation in the hydrogen production system, wherein the fourth predicted hydrogen production is a predicted hydrogen production corresponding to a combination of different hydrogen production units operated by the hydrogen production system; The target control information is determined with the goal that the fourth predicted hydrogen production is greater than the predicted hydrogen production load and the number of hydrogen production units in operation of the hydrogen production system is minimal.
5. The control method of the hydrogen production system according to claim 4, characterized in that: When the first predicted hydrogen production is less than the predicted hydrogen production load, obtaining a fourth predicted hydrogen production corresponding to the hydrogen production unit put into operation in the hydrogen production system includes: When the first predicted hydrogen production is less than the predicted hydrogen production load and the duration is greater than the second target duration, the fourth predicted hydrogen production corresponding to the hydrogen production system switching off the hydrogen production unit is obtained.
6. The control method of the hydrogen production system according to claim 1, characterized in that: The hydrogen production system includes a hydrogen storage device, and the predicted hydrogen production load is compared with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and target control information of the hydrogen production system is determined according to the comparison result, including: comparing the predicted hydrogen production load with the first predicted hydrogen production and the second predicted hydrogen production; When the predicted hydrogen production load is greater than the first predicted hydrogen production amount and less than the second predicted hydrogen production amount, obtaining a releasable amount of hydrogen from the hydrogen storage device; When the releasable amount of hydrogen is greater than the current hydrogen difference, the target control information is determined, and the target control information is used to instruct the currently operating hydrogen production unit of the hydrogen production system to keep running, and the current hydrogen difference is equal to the difference between the predicted hydrogen production load and the first predicted hydrogen production.
7. The control method of the hydrogen production system according to claim 1, characterized in that: The step of comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, comprises: comparing the predicted hydrogen production load with the second predicted hydrogen production; When the predicted hydrogen production load is greater than the second predicted hydrogen production, all operative hydrogen production units of the hydrogen production system are put into operation.
8. The control method of the hydrogen production system according to claim 7, characterized in that: The hydrogen production system includes a hydrogen storage device and an electric energy storage device. After comparing the predicted hydrogen production load with the second predicted hydrogen production, the method further includes: When the predicted hydrogen production load is greater than the second predicted hydrogen production, the operable hydrogen production units of the hydrogen production system are controlled to be put into operation, the hydrogen storage device is controlled to release hydrogen, and the electric energy storage device is controlled to release electric energy for the hydrogen production units to produce hydrogen.
9. The control method of the hydrogen production system according to any one of claims 1 to 8, characterized in that: The hydrogen production system includes a hydrogen storage device and an electric energy storage device. Before comparing the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determining target control information of the hydrogen production system according to the comparison result, the method further includes: Acquiring a current hydrogen storage state of the hydrogen storage device and a current energy storage state of the electric energy storage device; Based on the current hydrogen storage state and the current energy storage state, at least one operation of the hydrogen storage device and the electric energy storage device is controlled, and the predicted hydrogen production load is re-acquired.
10. The control method of the hydrogen production system according to any one of claims 1 to 8, characterized in that: The method further comprises: Obtaining predicted energy supply information of energy supply equipment of the hydrogen production system; Based on the predicted energy supply information, and in accordance with a control strategy of the hydrogen production system and a hydrogen production unit model, predicted operation information of each hydrogen production unit in the hydrogen production system is obtained.
11. The control method of the hydrogen production system according to claim 10, characterized in that: After obtaining the predicted operation information of each hydrogen production unit in the hydrogen production system, the method further includes: Based on the downtime information of the hydrogen production unit in the predicted operation information, a maintenance plan of the hydrogen production unit is determined.
12. The control method of the hydrogen production system according to claim 10, characterized in that: Determining target control information of the hydrogen production system according to the comparison result includes: Determine the target control information according to the comparison result within the target judgment time; After obtaining the predicted operation information of each hydrogen production unit in the hydrogen production system, the method further includes: When the number of starts and stops of the hydrogen production unit in the predicted operation information is greater than the target number threshold, the value of the target judgment time is increased.
13. The control method of the hydrogen production system according to claim 10, characterized in that: The start and stop times of the hydrogen production unit in the predicted operation information are adjusted based on a target mapping relationship, and the target mapping relationship is used to characterize the correspondence between the predicted start and stop times and the actual start and stop times within the same time period.
14. The control method of the hydrogen production system according to any one of claims 1 to 8, characterized in that: The energy supply equipment of the hydrogen production system includes a new energy supply equipment, and the first predicted hydrogen production amount and the second predicted hydrogen production amount are determined by the following steps: Acquire first predicted energy supply information of the new energy supply equipment; Determining the first predicted hydrogen production based on the first predicted energy supply information and operation information of the hydrogen production unit currently operating in the hydrogen production system; The second predicted hydrogen production is determined based on the first predicted energy supply information and the operation information of the operable hydrogen production unit of the hydrogen production system.
15. A control device for a hydrogen production system, characterized in that: include: An acquisition module, used to acquire a first predicted hydrogen production, a second predicted hydrogen production and a predicted hydrogen production load of a hydrogen production system, wherein the first predicted hydrogen production is the predicted hydrogen production corresponding to a hydrogen production unit currently in operation of the hydrogen production system, and the second predicted hydrogen production is the predicted hydrogen production corresponding to an operable hydrogen production unit of the hydrogen production system; a processing module, configured to compare the predicted hydrogen production load with at least one of the first predicted hydrogen production and the second predicted hydrogen production, and determine target control information of the hydrogen production system according to the comparison result, wherein the target control information includes at least one of the number of hydrogen production units and the identification of the hydrogen production units; A control module is used to control the input or output of the hydrogen production unit in the hydrogen production system based on the target control information.
16. A hydrogen production system, characterized in that: include: A plurality of hydrogen production units, an energy supply device and a control device of the hydrogen production system as described in claim 15, wherein the energy supply device is connected to the plurality of hydrogen production units, the energy supply device is used to provide energy for the hydrogen production units to produce hydrogen, and the control device is connected to the plurality of hydrogen production units, and the control device is used to control the operation of the hydrogen production units.
17. The hydrogen production system according to claim 16, characterized in that: The energy supply equipment includes new energy supply equipment.
18. The hydrogen production system according to claim 16 or 17, characterized in that: Also includes: A hydrogen storage device and an electric energy storage device, wherein the hydrogen storage device is connected to the hydrogen production unit and is used to store hydrogen, and the electric energy storage device is connected to the energy supply device and is used to store electric energy.