Revenue data measuring and calculating method and device, terminal equipment and storage equipment

By acquiring asset project information and calculating configuration parameters, combined with settlement dates and risk factors, the problem of incomplete revenue data calculation for asset securitization projects has been solved, enabling dynamic revenue forecasting and real-time updates for asset securitization projects, and providing more meaningful quantitative calculation results.

CN118982431AInactive Publication Date: 2024-11-19KINCHENG BANK OF TIANJIN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411472220.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies cannot perform real-world project calculations for asset-backed financial asset projects. The generated revenue data cannot analyze unexpected situations and cannot predict the impact of asset changes, resulting in calculation results that lack foresight.

Method used

By acquiring project information for asset projects, including total assets, settlement plans, and profit ratios, and combining the settlement date and calculation configuration parameters, the project calculates the predicted profit data from the start of the calculation to the settlement date, taking into account the risks of early repayment and default. It supports custom configuration and the introduction of actual profit data for real-time updates.

Benefits of technology

It enables dynamic return calculation for asset securitization projects, predicts return changes in various scenarios, provides more meaningful quantitative calculation results, and meets the needs of investors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982431A_ABST
    Figure CN118982431A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of revenue data measurement and calculation, and discloses a revenue data measurement and calculation method and device, terminal equipment and storage equipment, and the method comprises the steps: obtaining the project information of an asset project, and the project information comprises the total amount of assets, a settlement plan, a packaging date and a revenue proportion; according to the settlement plan, determining a settlement date during settlement, and according to the packaging date, determining the calculation starting time of the income data of the asset project; and acquiring set measurement and calculation configuration parameters, and calculating predicted income data of the asset project from the calculation starting time to the last settlement date according to the total amount of assets, the measurement and calculation configuration parameters and the income proportion. Therefore, investors can flexibly determine income data under various situations according to measurement and calculation configuration parameters.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of revenue data calculation, and in particular to a revenue data calculation method, apparatus, terminal device and storage device. Background Art

[0002] For financial asset projects of asset securitization, the current income estimation can only be performed based on the imported simulation data, and it is impossible to estimate the actual projects. The currently generated income data is static, and it is impossible to analyze unexpected situations. The factors that affect the income data cannot be analyzed. In addition, new assets flow in and out every day, and the impact of these asset changes cannot be predicted. As a result, the current income estimation data does not have forward-looking significance for investors, and it is impossible to provide quantitative estimation results. Summary of the invention

[0003] In view of this, the embodiments of the present application provide a revenue data calculation method, apparatus, terminal device and storage device, which can effectively solve the problem of incomplete revenue data calculation.

[0004] In a first aspect, an embodiment of the present application provides a method for calculating revenue data, including: Obtaining project information of the selected asset project, the project information including total assets, settlement plan, package date and income ratio; Determine the settlement date at the time of settlement according to the settlement plan, and determine the start time of calculating the income data of the asset item according to the package date; The set calculation configuration parameters are obtained, and the income data forecast value of the asset item from the start calculation time to the last settlement date is calculated according to the total assets, the calculation configuration parameters and the income ratio.

[0005] In one embodiment, the settlement plan includes a settlement period and a settlement interval; Determining the settlement date according to the settlement plan includes: The settlement date for each repayment period is calculated and determined based on the settlement period number and the settlement interval.

[0006] In one embodiment, the measured configuration parameters include a first risk parameter and a second risk parameter; The calculation of the forecasted revenue data from the start calculation time to the settlement date includes: Calculate first risk data based on the total amount of assets to be settled on the day and the first risk parameter, and calculate second risk data based on the total amount of assets to be settled on the day and the second risk parameter; Calculate the actual income for the current period according to the first risk data, the second risk data and the income ratio, and calculate the total amount of remaining assets as the total amount of assets to be settled on the next day; Repeat the step of calculating the first risk data according to the total amount of assets to be settled on the day and the first risk parameter until the predicted value of the income data on the settlement date is calculated; The first risk parameter is the probability of early repayment, and the second risk parameter is the probability of default.

[0007] In one embodiment, the step of obtaining the set measurement configuration parameters includes: Obtaining a calculation configuration parameter form configured on a configuration page, wherein a calculation parameter input area is provided on the configuration page to receive the calculation configuration parameters input by the user, and when obtaining a configuration command, generating a calculation configuration parameter form with the input calculation configuration parameters; Obtain each of the calculation parameters from the calculation configuration parameter form.

[0008] In one embodiment, the measurement configuration parameters further include: a cyclic purchase start time and a cyclic purchase end time; After calculating the second risk data, the method further includes: Get the actual income of the previous period; Calculate the recovery amount generated by the cycle purchase amount in each period according to the income ratio to obtain the total cycle purchase recovery amount; The sum of the actual income and the total recycling purchase amount is taken as the current recycling purchase amount; Repeat the step of obtaining the actual income of the previous period until the end time of the circular purchase, generate circular purchase income data, and calculate the interest of each circular purchase amount separately in each period to generate circular purchase interest income data.

[0009] In one embodiment, the method further comprises: After the actual income data of the asset item is obtained, the actual income data is used to replace the estimated income data, and the estimated income data from the next settlement date to the last settlement date is calculated based on the actual income data.

[0010] In one embodiment, the method further includes: Setting a first change rate of the first risk parameter and a second change rate of the second risk parameter; Calculate the first line parameter and the second risk parameter on a daily basis according to the first change rate and the second change rate; When calculating the first risk data and the second risk data, the early repayment rate and the default rate of the day are determined to calculate the early repayment amount and the default amount.

[0011] In a second aspect, the present application also provides a revenue data calculation device, comprising: An information acquisition module, used to acquire project information of the selected asset project, the project information including total assets, settlement plan, package date and income ratio; An initialization module, used to determine the settlement date at the time of settlement according to the settlement plan, and to determine the start time of calculating the income data of the asset item according to the package date; The calculation module is used to obtain the set calculation configuration parameters, and calculate the predicted value of the income data of the asset project from the start calculation time to the last settlement date according to the total assets, the calculation configuration parameters and the income ratio.

[0012] In a third aspect, the present application also provides a terminal device, which includes a processor and a memory, wherein the memory stores a computer program, and the processor is used to execute the computer program to implement the revenue data calculation method.

[0013] In a fourth aspect, the present application also provides a computer-readable storage medium storing a computer program, which, when executed on a processor, implements the revenue data calculation method.

[0014] The embodiments of the present application have the following beneficial effects: According to the calculated measurement configuration parameters or customized settings, not only can the corresponding predicted income data be calculated according to user needs, but also real data can be introduced and the income data can be updated in real time, so that users can monitor income changes in real time and predict income to a certain extent. It can also cover a variety of scenarios and realize real simulation income data calculation, so that investors can obtain more meaningful measurement data. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 A flow chart of a method for calculating revenue data according to an embodiment of the present application is shown; Figure 2 Shows a project information of an embodiment of the present application; Figure 3 An asset-side cash in an embodiment of the present application is shown; Figure 4 The invention shows the revenue data considering early repayment and default in an embodiment of the present application; Figure 5 A circular purchase income data of an embodiment of the present application is shown; Figure 6 A schematic diagram of the structure of the revenue data calculation device according to an embodiment of the present application is shown. DETAILED DESCRIPTION

[0017] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

[0018] The components of the embodiments of the present application generally described and shown in the drawings herein may be arranged and designed in various configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.

[0019] Hereinafter, the terms "including", "having" and their cognates that can be used in various embodiments of the present application are intended only to indicate specific features, numbers, steps, operations, elements, components or a combination of the foregoing items, and should not be understood as first excluding the existence of one or more other features, numbers, steps, operations, elements, components or a combination of the foregoing items or increasing the possibility of one or more features, numbers, steps, operations, elements, components or a combination of the foregoing items. In addition, the terms "first", "second", "third" and the like are only used to distinguish descriptions and cannot be understood as indicating or implying relative importance.

[0020] Unless otherwise defined, all terms (including technical terms and scientific terms) used herein have the same meanings as those generally understood by those skilled in the art to which the various embodiments of the present application belong. The terms (such as those defined in generally used dictionaries) will be interpreted as having the same meanings as the contextual meanings in the relevant technical field and will not be interpreted as having idealized meanings or overly formal meanings unless clearly defined in the various embodiments of the present application.

[0021] The present application provides a method for calculating income data, which obtains project information, wherein the project information includes total assets, settlement plan, package date and income ratio; determines the settlement date according to the settlement plan, and determines the start calculation time of the income data according to the package date; obtains the set calculation configuration parameters, and calculates the predicted income data from the start calculation time to the settlement date according to the total assets, the calculation configuration parameters and the income ratio. The above-mentioned project information refers to the project information of the new city as a wealth management product after the securitization of debts such as loans. Banks usually securitize such debt assets and sell them to customers, and customers can obtain interest income from them. Through the above method, the present application allows users to see subsequent income data from the purchase of the product according to their own needs, so that they can have an intuitive expectation of the income.

[0022] The revenue data calculation method is described below with reference to some specific embodiments.

[0023] Example 1 Figure 1 A flow chart of the revenue data calculation method of an embodiment of the present application is shown. Exemplarily, the revenue data calculation method includes the following steps: Step S100, obtaining the project information of the selected asset project, wherein the project information includes the total assets, settlement plan, package date and income ratio.

[0024] The asset items in this embodiment refer to various financial asset product packages provided by banks and other financial institutions to investors for purchase. After purchasing the assets, investors can obtain corresponding interest as income. These assets are actually financial products composed of loans issued by banks, so the repayments and interest paid by borrowers become the actual income of investors.

[0025] The lender's settlement plan, profit ratio and repayment start time are all known after the loan takes effect. Therefore, the repayment-related information for the lender will become the project information of the asset project, that is, the corresponding total assets, settlement plan, package date and profit ratio.

[0026] Step S200, determining the settlement date at the time of settlement according to the settlement plan, and determining the start time of calculating the income data of the asset item according to the package date.

[0027] The total assets are the amount that is left to be repaid, which is the loan amount before the first repayment. The settlement plan is the number of installments and the amount of money in each installment for repayment. The profit ratio is the interest calculated based on the total assets currently remaining. The interest ratio in each repayment can be calculated based on the calculated interest.

[0028] The package time refers to the time when the amount of the asset item has been determined and the package becomes an asset package. The package date is also the start time for calculating the income data.

[0029] For example, if an investor wants to purchase an asset project, the current time is July 2, and the package date is July 14, it means that the investor purchased the asset project today, but the income needs to be calculated from July 14.

[0030] Step S300, obtaining the set calculation configuration parameters, and calculating the predicted value of the income data of the asset item from the start calculation time to the last settlement date according to the total assets, the calculation configuration parameters and the income ratio.

[0031] The measurement configuration parameters are user-defined settings, which may be some setting parameters provided in the system. These parameters may be left unset to default, or may be set accordingly to determine the risk.

[0032] As mentioned above, the asset items in this embodiment are actually converted from debts. Users invest money to purchase debts to obtain interest income, and these incomes can only be realized after the debtors actually repay the debts. Therefore, there are certain risks. This embodiment can be set up with reference to these risks to calculate the income data.

[0033] Therefore, these measurement configuration parameters may include risk parameters, which in this embodiment include a first risk parameter and a second risk parameter.

[0034] Calculate first risk data based on the total amount of assets to be settled on the day and the first risk parameter, and calculate second risk data based on the total amount of assets to be settled on the day and the second risk parameter; Calculate the actual income for the current period according to the first risk data, the second risk data and the income ratio, and calculate the total amount of remaining assets as the total amount of assets to be settled on the next day; The step of calculating the first risk data according to the total amount of assets to be settled on the day and the first risk parameter is repeatedly performed until the predicted value of the income data on the settlement date is calculated.

[0035] Among them, these risks can be default or early repayment. Default means not making repayment, which will affect the income. Early repayment means that the time for collecting interest and the amount of interest calculated will be lower than expected. Both risks will affect the final income of investors. Therefore, by setting risks and corresponding measurement configuration parameters, investors can know the investment income to a certain extent.

[0036] The first risk parameter is the probability of early repayment, that is, the early repayment rate, and the second risk parameter is the probability of default, that is, the default rate.

[0037] The calculation configuration parameters can be guided by investors to input or set through a special configuration page. After the investor sets, the calculation configuration parameter form configured on the configuration page can be obtained. The configuration page is provided with a calculation parameter input area to receive the calculation parameters input by the user. These parameters will be transmitted from the front page to the back end in the form of a form, so that each of the calculation parameters can be obtained from the calculation configuration parameter form.

[0038] First, take the example of not setting the measurement configuration parameters and directly calculate the predicted income data. At this time, you only need to calculate the interest at each repayment based on the settlement plan on the asset side. At this time, the sum of the total assets and interest each time will become the principal and interest generated during the current repayment, that is, the current income.

[0039] Specifically, the current interest = the remaining principal at the beginning of the period·daily yield ratio·(package date-settlement plan interest accrual date).

[0040] like Figure 2 As shown in the figure, it is a project information. According to the project information, the first income data can be calculated on the first repayment date of 2024-06-10. The income data is as follows: Figure 3 As shown, the income data for the three-phase repayment can be calculated by analogy. It can be found that if the plan is followed completely, the income data on the asset side will be the same as Figure 2 The same as in.

[0041] In actual situations, early repayment and default situations also need to be taken into consideration. To this end, the corresponding early repayment rate and default rate can be set by measuring the configuration parameters. These two parameters can be automatically calculated by the system based on the algorithm. For example, the corresponding early repayment rate and default rate can be calculated based on the debtor's deposits, etc. Investors can also enter custom data for predictive calculations.

[0042] For example Figure 4 As shown, this is the income data formed by setting the default rate and early repayment rate. Because of the existence of the early repayment rate, the theoretical early repayment amount needs to be calculated every day, and the default rate is applied to the income data after the normal repayment period.

[0043] To this end, the early repayment amount will be calculated based on the total amount of assets to be settled on that day and the early repayment rate, and the default amount will be calculated based on the total amount of assets to be settled on that day and the default rate.

[0044] The actual income for the current period is calculated based on the early repayment amount, the default amount and the interest, and the total amount of remaining assets is calculated as the total amount of assets to be settled on the next day.

[0045] from Figure 4 As can be seen from the table, in order to take into account the early repayment situation, it is necessary to calculate the early repayment amount for each day of early repayment. The specific calculation method is: early repayment amount = MIN [early repayment benchmark · early repayment rate · early repayment rate multiple (corresponding period number + number of days from the start of early repayment rate calculation), actual principal balance at the beginning of the period - default amount].

[0046] The penalty for breach of contract is calculated after a certain period of time. Therefore, the penalty for breach of contract is always 0 in the initial stage of repayment. When the time exceeds the planned repayment time, the penalty for breach of contract will begin to be calculated.

[0047] The planned repayment is monthly, so the default rate will also be obtained and calculated on a monthly basis, where the default amount = MIN [default benchmark·default rate·(project monthly default rate / simulated monthly default rate), actual principal balance].

[0048] In this way, the income data that takes into account the default and early repayment situations can be formed. The income data calculation method of this embodiment is based on the data of the asset project itself, and provides the consideration of the relevant parameters of default and early repayment, so that investors can consider the relevant risks, and provide a way to customize the setting parameters, so that investors can view the income data under the relevant risks according to their own ideas to determine their own income.

[0049] In addition, this embodiment also supports the introduction of actual data to calculate revenue data.

[0050] That is, after the package is sealed, the debtor will begin to generate corresponding income data, such as early repayment or repayment on time. These actual income data can be directly imported after they occur, and subsequent income data calculation work can be carried out based on the actual income data. In other words, after investors buy asset projects, the calculated income data will be updated in real time as time goes by.

[0051] This embodiment realizes the calculation of income data, taking into account both default and early repayment situations, and can provide corresponding calculated income data based on these situations, so that investors can simply see the changes in their own income and the composition of the income in risky situations.

[0052] Example 2 This embodiment is a further improvement based on step S100, step S200 and step S300 of embodiment 1.

[0053] The steps of this embodiment are similar to those of Embodiment 1 and will not be repeated here. Compared with Embodiment 1, the calculated configuration parameters further consider the situation of circular buying.

[0054] Circular buying means that after investors receive returns, they can reinvest the returns to perform an "increase in positions" operation. It can be understood that according to the above description, after the return data generates interest income, the interest will not be re-purchased to calculate the return for investors. Therefore, investors cannot obtain the benefits of compound interest at this time. Generally speaking, investors will choose to re-purchase the returns, so circular buying is a scenario that needs to be considered.

[0055] Therefore, the calculation configuration parameters of this embodiment include the early repayment rate and the default rate, as well as the cycle purchase start time and the cycle purchase end time. The default purchase is to purchase the new income in full.

[0056] It is understandable that after taking into account the revolving purchases, in addition to the original early repayments and defaults that need to be calculated, it is also necessary to calculate the revolving purchases and the interest brought by the revolving purchases based on the income calculated every day.

[0057] Specifically, you will need to obtain the actual principal repayment of the previous period. The actual principal repayment is Figure 4 The actual total repayment is the predicted amount to be repaid on the previous day.

[0058] The recovery amount generated by each period of circular purchase amount in the current period is calculated based on the interest to obtain the total circular purchase recovery amount.

[0059] It is understandable that in addition to repaying the money on the previous day, there is also additional interest. If it is the first day, no interest will be calculated, but starting from the second day, interest will be calculated. The interest plus the original repayment is the total recovery amount of the revolving purchase.

[0060] The sum of the actual principal repayment and the total recycling purchase recovery amount is taken as the current recycling purchase amount.

[0061] Repeat the step of obtaining the actual principal repayment of the previous period until the end time of the cyclical purchase, generate cyclical purchase income data, and calculate the interest of each cyclical purchase amount separately in each period to generate cyclical purchase interest income data.

[0062] Cyclic purchases can be set, for example, to start from the first day and repeat for 10 days, or to repeat indefinitely, and the time of each cycle purchase is different, and the interest at the time of purchase is also different, so for each purchase, the interest needs to be calculated separately. In this way, the corresponding interest income can be calculated for each cycle purchase, and finally these incomes can be added together to get the overall income.

[0063] Continue with Figure 4 The revenue data shown is as follows: Figure 5As shown, it can be seen that the initial actual interest is Figure 4 The actual total assets calculated in the calculation, the principal recovered by the circular purchase in the middle, refers to the amount of the previous circular purchase, and the predicted recovery amount in the current repayment. For example, the transaction flow on 2024-5-21 shows that the 1545.5136 yuan purchased on the previous day can be recovered by 5.26 yuan after one day, which means that there will be an additional profit of 5.26 yuan compared to the original amount. Then this part of the profit and the repayment on the 21st will form a new profit, and then re-purchase to become the principal of a new round of circular purchases. By analogy, the interest of each circular purchase can be recorded, and then calculated separately to form the corresponding income data.

[0064] For investors, seeing Figure 5 The income data shown can intuitively feel the compound interest benefits brought by cyclical purchases, that is, Figure 5 The column of mid-cycle purchase and recovery of principal reflects the additional profits compared to the original initial capital.

[0065] It is understandable that the currently displayed revenue data are all predicted revenue data, not actual revenue data. Therefore, the revenue data may be different in actual situations. Therefore, this embodiment also supports updating the predicted revenue data according to the actual revenue data after the actual revenue data is generated, so as to update the revenue data in the case of circular buying in real time.

[0066] Example 3 like Figure 6 As shown, the present application also provides a revenue data calculation device, including: The information acquisition module 10 is used to acquire project information, including total assets, settlement plan, package date and income ratio; Initialization module 20, used to determine the settlement date according to the settlement plan, and determine the start time of calculating the revenue data according to the package date; The calculation module 30 is used to obtain the set calculation configuration parameters, and calculate the predicted income data from the start time of calculation to the settlement date according to the total assets, the calculation configuration parameters and the income ratio.

[0067] The present application also provides a terminal device, which includes a processor and a memory, wherein the memory stores a computer program, and the processor is used to execute the computer program to implement the revenue data calculation method.

[0068] The present application also provides a computer-readable storage medium storing a computer program, which implements the revenue data calculation method when executed on a processor.

[0069] It can be understood that the device of this embodiment corresponds to the method of the above embodiment, and the options in the above embodiment are also applicable to this embodiment, so they will not be described repeatedly here.

[0070] The present application also provides a terminal device. Exemplarily, the terminal device includes a processor and a memory, wherein the memory stores a computer program, and the processor runs the computer program, thereby enabling the terminal device to execute the functions of each module in the above method or the above apparatus.

[0071] Among them, the processor can be an integrated circuit chip with signal processing capabilities. The processor can be a general-purpose processor, including a central processing unit (CPU), a graphics processing unit (GPU), a network processor (NP), a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or at least one of other programmable logic devices, discrete gates or transistor logic devices, and discrete hardware components. The general-purpose processor can be a microprocessor or the processor can also be any conventional processor, etc., which can implement or execute the methods, steps and logic block diagrams disclosed in the embodiments of the present application.

[0072] The memory may be, but is not limited to, a random access memory (RAM), a read only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electric erasable programmable read-only memory (EEPROM), etc. The memory is used to store a computer program, and the processor may execute the computer program accordingly after receiving an execution instruction.

[0073] The present application also provides a computer-readable storage medium for storing the computer program used in the above terminal device. For example, the computer-readable storage medium may include but is not limited to: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.

[0074] In several embodiments provided in the present application, it should be understood that the disclosed devices and methods can also be implemented in other ways. The device embodiments described above are merely schematic. For example, the flowcharts and structure diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices, methods and computer program products according to multiple embodiments of the present application. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in an alternative implementation, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the structure diagram and / or the flow diagram, and the combination of boxes in the structure diagram and / or the flow diagram, can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.

[0075] In addition, the functional modules or units in the various embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.

[0076] If the functions are implemented in the form of software function modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for enabling a computer device (which can be a smart phone, a personal computer, a server, or a network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present application.

[0077] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.

Claims

1. A method for calculating revenue data, characterized in that: include: Obtaining project information of the selected asset project, the project information including total assets, settlement plan, package date and income ratio; Determine the settlement date at the time of settlement according to the settlement plan, and determine the start time of calculating the income data of the asset item according to the package date; The set calculation configuration parameters are obtained, and the income data forecast value of the asset item from the start calculation time to the last settlement date is calculated according to the total assets, the calculation configuration parameters and the income ratio.

2. The method for calculating revenue data according to claim 1, characterized in that: The calculated configuration parameters include a first risk parameter and a second risk parameter; The calculation of the forecasted revenue data from the start calculation time to the settlement date includes: Calculate first risk data based on the total amount of assets to be settled on the day and the first risk parameter, and calculate second risk data based on the total amount of assets to be settled on the day and the second risk parameter; Calculate the actual income for the current period according to the first risk data, the second risk data and the income ratio, and calculate the total amount of remaining assets as the total amount of assets to be settled on the next day; Repeat the step of calculating the first risk data according to the total amount of assets to be settled on the day and the first risk parameter until the predicted value of the income data on the settlement date is calculated; The first risk parameter is the probability of early repayment, and the second risk parameter is the probability of default.

3. The method for calculating revenue data according to claim 1, characterized in that: The obtaining of the set calculation configuration parameters includes: Obtaining a calculation configuration parameter form configured on a configuration page, wherein a calculation parameter input area is provided on the configuration page to receive the calculation configuration parameters input by the user, and when obtaining a configuration command, generating a calculation configuration parameter form with the input calculation configuration parameters; Obtain each of the calculation parameters from the calculation configuration parameter form.

4. The method for calculating revenue data according to claim 2, characterized in that: The measurement configuration parameters also include: the cyclic purchase start time and the cyclic purchase end time; After calculating the second risk data, the method further includes: Get the actual income of the previous period; Calculate the recovery amount generated by the cycle purchase amount in each period according to the income ratio to obtain the total cycle purchase recovery amount; The sum of the actual income and the total recycling purchase amount is taken as the current recycling purchase amount; Repeat the step of obtaining the actual income of the previous period until the end time of the circular purchase, generate circular purchase income data, and calculate the interest of each circular purchase amount separately in each period to generate circular purchase interest income data.

5. The method for calculating revenue data according to claim 2, characterized in that: Also includes: Setting a first change rate of the first risk parameter and a second change rate of the second risk parameter; Calculate the first line parameter and the second risk parameter on a daily basis according to the first change rate and the second change rate; When calculating the first risk data and the second risk data, the early repayment rate and the default rate of the day are determined to calculate the early repayment amount and the default amount.

6. The method for calculating revenue data according to claim 1, characterized in that: Also includes: After the actual income data of the asset item is obtained, the actual income data is used to replace the estimated income data, and the estimated income data from the next settlement date to the last settlement date is calculated based on the actual income data.

7. The method for calculating revenue data according to claim 1, characterized in that: The settlement plan includes the number of settlement periods and the settlement interval; Determining the settlement date according to the settlement plan includes: The settlement date for each repayment period is calculated and determined based on the settlement period number and the settlement interval.

8. A revenue data calculation device, characterized in that: include: An information acquisition module, used to acquire project information of the selected asset project, the project information including total assets, settlement plan, package date and income ratio; An initialization module, used to determine the settlement date at the time of settlement according to the settlement plan, and to determine the start time of calculating the income data of the asset item according to the package date; The calculation module is used to obtain the set calculation configuration parameters, and calculate the predicted value of the income data of the asset project from the start calculation time to the last settlement date according to the total assets, the calculation configuration parameters and the income ratio.

9. A terminal device, characterized in that: The terminal device includes a processor and a memory, the memory stores a computer program, and the processor is used to execute the computer program to implement the revenue data calculation method described in any one of claims 1-7.

10. A computer-readable storage medium, characterized in that: It stores a computer program, which, when executed on a processor, implements the revenue data calculation method according to any one of claims 1-7.