Water-cooled wall temperature optimization method for regulating and controlling coal feeding amount based on working medium dryness

Through the method of controlling the coal feeding volume by working fluid dryness, the problem of water-cooled wall overheating during the rapid load change process of coal-fired units is solved, and the variable load rate is increased and the stability of water-cooled wall is enhanced without overheating. Effect.

CN119004772AActive Publication Date: 2024-11-22XI AN JIAOTONG UNIV
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410991143.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-22
Estimated Expiration
2044-07-23

AI Technical Summary

Technical Problem

The prior art is difficult to effectively control the temperature of the metal pipe wall of the water-cooled wall during the rapid loading of the coal-fired unit, resulting in the risk of ultra-temperature pipe bursting and cannot meet the flexibility needs of the coal-fired unit.

Method used

By regulating the coal feed volume based on the working fluid dryness, an improved fuel supply control strategy is initiated, and the coal feed volume is increased when the working fluid dryness exceeds the critical value, so that the working fluid can quickly convert from wet saturated steam to superheated steam, and reduce metal pipes wall temperature and stop improving the strategy when the working fluid dryness is restored, using conventional control strategies.

Benefits of technology

It is achieved to increase the variable load rate of the unit without overtemperature of the water-cooled wall metal pipe, reduce the metal wall temperature peak, and enhance the safety and stability of the water-cooled wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119004772A_ABST
    Figure CN119004772A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coal-fired power generation, and discloses a water-cooled wall temperature optimization method for regulating and controlling the coal feeding amount based on the dryness of a working medium. When a supercritical once-through boiler or an ultra-supercritical once-through boiler operates at a low load, especially in a rapid load changing process, due to the fact that the flow of a working medium in a water cooling wall is reduced, and the phenomenon of water-coal imbalance can occur in the rapid load changing process, the heat exchange coefficient is remarkably reduced due to the fact that the pipe wall in an evaporation drying area is not cooled by enough liquid; and the temperature of the pipe wall rises sharply. According to the method, a certain amount of coal is additionally supplemented, so that the working medium in the evaporation drying area is quickly converted into superheated steam from high-dryness wet saturated steam, the peak temperature of the metal pipe wall in the variable load process is reduced, and the variable load rate of the unit is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coal-fired power generation, and in particular to a method for optimizing the temperature of a water-cooled wall based on the dryness of a working medium to control the amount of coal fed, so as to improve the operating flexibility of a coal-fired unit without overheating the water-cooled wall. Background Art

[0002] Renewable energy represented by wind and solar energy is developing rapidly to implement carbon peak and carbon neutrality policies. Coal-fired power plants must give up part of their power generation share to renewable energy power plants to achieve sustainable energy development and the transition to high-quality economic development. However, the instability, intermittency and unpredictability of renewable energy power generation pose a huge threat to the safe operation of the power grid. This means that existing coal-fired power plants will have to undertake a large number of peak-shaving tasks, including increasing the load change rate and operating load range of the units. Therefore, coal-fired power plants will continue to play an irreplaceable role for a long time.

[0003] According to survey data, 80% of forced shutdowns in coal-fired power plants are related to furnace pipe failures, of which 40% are caused by water-cooled wall tube bursts. The once-through boilers of supercritical coal-fired power plants usually adopt variable pressure operation. During the deep peak regulation of the unit, the temperature, pressure, enthalpy and other physical parameters of the working fluid in the water-cooled wall will change dramatically. Especially during the low-load operation of the unit, due to the uneven flame distribution in the furnace, insufficient fluid power and low working fluid pressure, the metal tube wall may overheat or even burst. Therefore, the safety and stability of the water-cooled wall are the key to the reliable operation of deep peak regulation of coal-fired power plants.

[0004] In order to solve the problem of safe and stable operation of the water-cooled wall, a boiler hydrodynamic calculation method is needed. "A General Hydrodynamic Calculation Method for Ultra-Supercritical Boilers" (patent application number CN201710028121.0) proposes a flow network system method composed of nonlinear models for boiler water-cooled wall flow and metal wall temperature safety verification. "A Boiler Hydrodynamic Calculation Method, System, Equipment and Medium" (patent application number CN202310418097.7) proposes a hydrodynamic calculation method that divides a complex water-cooled wall structure into multiple equivalent water-cooled wall tubes to improve the accuracy of hydrodynamic calculations. The above only considers the hydrodynamic characteristics of the water-cooled wall of coal-fired units under steady-state conditions. However, the current requirements for the flexibility of coal-fired units are getting higher and higher. During the rapid load change process, the metal tube wall of the water-cooled wall will overheat. It is far from enough to complete the safety verification of the water-cooled wall flow and metal wall temperature only under steady-state conditions. Therefore, there is a need for a method that can online calculate the temperature and pressure of the working fluid in the water-cooled wall and the inner and outer wall temperatures of the metal during the rapid load change process of the coal-fired unit, as well as an improved control strategy to reduce the metal wall temperature and thus increase the load change rate of the unit. Summary of the invention

[0005] In order to overcome the difficulties in the above-mentioned prior art, the purpose of the present invention is to provide a water-cooled wall temperature optimization method based on the working fluid dryness to control the coal feed amount, thereby increasing the unit's load change rate while ensuring that the water-cooled wall temperature is within the allowable range of the material, thereby improving the unit's flexibility.

[0006] In order to achieve the above object, the present invention adopts the following technical solution:

[0007] A water-cooled wall temperature optimization method based on the control of coal feed amount by working medium dryness, when the water-cooled wall is in the high dryness region of 0.8 to 1.0 during low-load operation of a supercritical direct-flow boiler or an ultra-supercritical direct-flow boiler, the water-cooled wall will experience evaporation, i.e., the second type of heat transfer deterioration phenomenon, when the working medium is in the high dryness region of 0.8 to 1.0, and the metal tube wall temperature in this region, i.e., the water-cooled wall wall temperature, rises sharply, especially in the process of rapid load change, it will exceed the allowable temperature of the metal tube material; when the working medium dryness exceeds the critical value, the improved fuel supply control strategy is started, and the improved fuel supply control strategy is to multiply the deviation between the working medium enthalpy value and the dry saturated steam enthalpy value at the same pressure by a coefficient as the supplementary amount of coal feed amount of the coal-fired unit, so that the evaporation, i.e., the second type of heat transfer deterioration region, quickly passes through the second type of heat transfer deterioration process, i.e., the working medium is quickly converted from wet saturated steam to superheated steam, thereby reducing the metal tube wall temperature, i.e., reducing the water-cooled wall temperature; when the working medium in the evaporation, dryness region is converted from wet saturated steam to superheated steam, the improved fuel supply control strategy is stopped, and the conventional fuel supply control strategy is continued; the supplementary amount of coal feed amount of the coal-fired unit is calculated as follows:

[0008]

[0009] Where: B add Indicates the additional coal supply, kg / s; h d-sat Indicates the enthalpy of dry saturated steam corresponding to the current working fluid pressure, kJ / kg; h real Indicates the real-time enthalpy value of the working fluid, kJ / kg; M indicates the mass flow rate of the working fluid in the water-cooled wall, kg / s; LHV indicates the low calorific value of the fuel used in the coal-fired unit, kJ / kg; R Q It indicates the share of heat load on the flue gas side in the entire water-cooled wall where the temperature of the second type of heat transfer deterioration area is the highest due to evaporation in the water-cooled wall.

[0010] When a supercritical direct-current boiler or an ultra-supercritical direct-current boiler operates at low load, the flow rate of the working fluid in the water-cooled wall decreases, and the heat transfer coefficient decreases as the working fluid dryness increases; the metal material used in the water-cooled wall pipe is 15GrMoG. When the working fluid dryness is 0.995, the metal wall temperature reaches 528°C. The upper limit of the allowable operating temperature of 15GrMoG is 550°C. In order to increase the safety margin, 0.995 is set as the critical value. When the working fluid dryness exceeds 0.995 during the variable load process, the improved fuel supply control strategy begins to be enabled.

[0011] In order to reasonably control the metal wall temperature of the water-cooled wall, it is necessary to accurately calculate the metal wall temperature of the water-cooled wall. The temperature distribution along the radial direction of the metal tube wall is obtained by the one-dimensional unsteady-state heat conduction differential equation, as shown in the following formula:

[0012]

[0013] Where ρ is the density of the working fluid, kg / m 3 ;c p Indicates the specific heat capacity of the metal tube wall, J (kg K) -1 ; τ is time, s; r represents the radius of the water-cooled wall metal pipe, m; T w is the temperature of the metal pipe, °C; λ is the thermal conductivity of the metal pipe, W / (m°C);

[0014] According to the basic theory of heat transfer, it is necessary to determine the temperature at the boundary. The following equation is the boundary equation of the inner wall of the water-cooled wall tube:

[0015]

[0016] Where, T in is the inner wall temperature of the metal pipe, °C; J n is the heat flux non-uniformity coefficient of the inner wall of the water-cooled wall tube furnace side; β is the ratio of the outer diameter to the inner diameter of the water-cooled wall tube; Q out Indicates the heat load on the furnace side, W / m 2 ; T f is the working fluid temperature, °C; α in is the heat transfer coefficient of the working fluid in the pipeline, W / (m 2 ℃);

[0017] For the outer wall of the water-cooled wall tube, the heat flux density on the boundary is specified, and the boundary equation of the outer wall of the water-cooled wall tube is as follows:

[0018]

[0019] Where, T out is the outer wall temperature of the metal pipe, °C.

[0020] The conventional fuel supply control strategy is as follows: the boiler main control command is fitted with the steady-state operation data to obtain the initial steady-state fuel supply command; in addition, the load change and the load command during the load change process are used as the feedforward of the fuel supply command; the deviation between the set value and the actual value of the water-cooled wall outlet steam temperature is used as PID to adjust the fuel-water ratio; at the same time, the deviation of the main steam and reheat steam temperatures is multiplied by a coefficient as a feedforward signal; finally, the actual fuel supply command is obtained.

[0021] The improved fuel supply control strategy is applicable to supercritical once-through boilers or ultra-supercritical once-through boilers under low-load operating conditions, that is, the working fluid pressure in the water-cooled wall is in the high pressure to subcritical range of 10 MPa to 17 MPa.

[0022] This optimization method is applicable to both internally threaded tubes and smooth tubes in water-cooled walls.

[0023] Compared with the prior art, the present invention has the following advantages:

[0024] 1) Compared with the hydrodynamic calculation method that can only calculate the temperature and pressure of the working fluid in the water-cooled wall under steady-state conditions, the present invention realizes the online calculation of thermal parameters such as the temperature and pressure of the working fluid in the water-cooled wall during the transient process, and at the same time takes into account the metal heat storage of the water-cooled wall, and can calculate the inner and outer wall temperatures of the metal pipe in real time during the unit's load change process.

[0025] 2) The present invention proposes a control strategy for regulating the amount of coal fed based on the working fluid dryness, which can reduce the peak temperature of the tube wall in the evaporation area of ​​the water-cooled wall during the load change process, thereby increasing the load change rate of the unit without overheating the water-cooled wall metal pipes. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 The figure is a comparison of the metal tube wall temperature of the water-cooled wall (in the second type of heat transfer deterioration area) under the improved control strategy and the original control strategy during the load increase process from 30% THA to 50% THA. DETAILED DESCRIPTION

[0027] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. The solutions in the embodiments are not intended to limit the protection scope of the present invention, and any equivalent implementation or modification that does not depart from the present invention is included in the protection scope of the present invention.

[0028] When the super / ultra-supercritical direct current boiler is running at low load, the heat load and working fluid flow rate of the water-cooled wall decrease, and at the same time, the working fluid in the water-cooled wall will be below the subcritical pressure. At this time, the second type of heat transfer deterioration occurs, which is called evaporation. This may cause the wall temperature to exceed the allowable value of the metal material, especially in the process of rapid load change. Therefore, the present invention proposes a water-cooled wall temperature optimization method based on the working fluid dryness to control the coal supply to reduce the metal wall temperature. First, it is necessary to calculate the thermal parameters such as the working fluid temperature, pressure and average temperature of the metal pipe along the height direction of the water-cooled wall based on the mass conservation equation, momentum conservation equation, energy conservation equation, state equation, metal heat storage equation and working fluid side heat transfer equation.

[0029] The present invention is a method for optimizing the temperature of a water-cooled wall based on the control of the amount of coal fed by the working fluid dryness. When the water-cooled wall is in a supercritical direct current boiler or an ultra-supercritical direct current boiler under low load operation, when the working fluid is in a high dryness region of 0.8 to 1.0, evaporation, i.e., the second type of heat transfer deterioration, will occur. The metal tube wall temperature in this region, i.e., the water-cooled wall wall temperature, rises sharply, especially in the process of rapid load change, it will exceed the allowable temperature of the metal tube material. When the working fluid dryness exceeds the critical value, the improved fuel supply control strategy is started. The improved fuel supply control strategy is to multiply the deviation between the enthalpy value of the working fluid and the enthalpy value of dry saturated steam at the same pressure by a coefficient as the supplementary amount of coal fed to the coal-fired unit, so that the evaporation, i.e., the second type of heat transfer deterioration region, quickly passes through the second type of heat transfer deterioration process, i.e., the working fluid is quickly converted from wet saturated steam to superheated steam, thereby reducing the metal tube wall temperature, i.e., reducing the water-cooled wall temperature. When the working fluid in the evaporation region is converted from wet saturated steam to superheated steam, the improved fuel supply control strategy is stopped, and the conventional fuel supply control strategy is continued. The supplementary amount of coal fed to the coal-fired unit is calculated as follows:

[0030]

[0031] Where: B add Indicates the additional coal supply, kg / s; h d-sat Indicates the enthalpy of dry saturated steam corresponding to the current working fluid pressure, kJ / kg; h real Indicates the real-time enthalpy value of the working fluid, kJ / kg; M indicates the mass flow rate of the working fluid in the water-cooled wall, kg / s; LHV indicates the low calorific value of the fuel used in the coal-fired unit, kJ / kg; R Q It indicates the share of heat load on the flue gas side in the entire water-cooled wall where the temperature of the second type of heat transfer deterioration area is the highest due to evaporation in the water-cooled wall.

[0032] When a supercritical direct-current boiler or an ultra-supercritical direct-current boiler operates at low load, the flow rate of the working fluid in the water-cooled wall decreases, and the heat transfer coefficient decreases as the working fluid dryness increases; the metal material used in the water-cooled wall pipe is 15GrMoG. When the working fluid dryness is 0.995, the metal wall temperature reaches 528°C. The upper limit of the allowable operating temperature of 15GrMoG is 550°C. In order to increase the safety margin, 0.995 is set as the critical value. When the working fluid dryness exceeds 0.995 during the variable load process, the improved fuel supply control strategy begins to be enabled.

[0033] In order to reasonably control the metal wall temperature of the water-cooled wall, it is necessary to accurately calculate the metal wall temperature of the water-cooled wall. The temperature distribution along the radial direction of the metal tube wall is obtained by the one-dimensional unsteady-state heat conduction differential equation, as shown in the following formula:

[0034]

[0035] Where ρ is the density of the working fluid, kg / m 3 ;cp Indicates the specific heat capacity of the metal tube wall, J (kg K) -1 ; τ is time, s; r represents the radius of the water-cooled wall metal pipe, m; T w is the temperature of the metal pipe, °C; λ is the thermal conductivity of the metal pipe, W / (m°C);

[0036] According to the basic theory of heat transfer, it is necessary to determine the temperature at the boundary. The following equation is the boundary equation of the inner wall of the water-cooled wall tube:

[0037]

[0038] Where, T in is the inner wall temperature of the metal pipe, °C; J n is the heat flux non-uniformity coefficient of the inner wall of the water-cooled wall tube furnace side; β is the ratio of the outer diameter to the inner diameter of the water-cooled wall tube; Q out Indicates the heat load on the furnace side, W / m 2 ; T f is the working fluid temperature, °C; α in is the heat transfer coefficient of the working fluid in the pipeline, W / (m 2 ℃);

[0039] For the outer wall of the water-cooled wall tube, the heat flux density on the boundary is specified, and the boundary equation of the outer wall of the water-cooled wall tube is shown as follows:

[0040]

[0041] Where, T out is the outer wall temperature of the metal pipe, °C.

[0042] The conventional fuel supply control strategy is: fit the boiler main control command with the steady-state operation data to obtain the initial steady-state fuel supply command; in addition, the load change and load command during the load change process are used as feedforward for the fuel supply command; the deviation between the set value and the actual value of the water-cooled wall outlet steam temperature is used as PID to adjust the fuel-water ratio; at the same time, the deviation between the main steam and reheat steam temperatures is multiplied by a coefficient as a feedforward signal; finally, the actual fuel supply command is obtained.

[0043] The improved fuel supply control strategy is applicable to the low-load operation condition of the super / ultra-supercritical once-through boiler, that is, the working medium pressure in the water-cooled wall is in the high pressure to subcritical range of 10MPa to 17MPa.

[0044] This optimization method is applicable to both internally threaded tubes and smooth tubes in water-cooled walls.

[0045] During the load increase process of the coal-fired unit from 30% THA to 50% THA, the metal wall temperature changes in the water-cooled wall at the second type of heat transfer deterioration area after adopting the improved fuel supply control strategy and the original control strategy are as follows: Figure 1 It can be seen that under the same variable load rate, the peak value of the metal wall temperature is significantly reduced by adopting the improved fuel supply control strategy, and it is controlled within the allowable temperature of the material.

Claims

1. A method for optimizing water-cooled wall temperature by controlling coal feed rate based on working fluid dryness, characterized in that: When the water-cooled wall is in the low-load operation of a supercritical direct-flow boiler or an ultra-supercritical direct-flow boiler, when the working fluid is in the high dryness region of 0.8 to 1.0, the phenomenon of evaporation, i.e., the second type of heat transfer deterioration, will occur. The metal tube wall temperature in this region, i.e., the water-cooled wall wall temperature, rises sharply, especially in the process of rapid load change, it will exceed the allowable temperature of the metal tube material; when the working fluid dryness exceeds the critical value, the improved fuel supply control strategy is started, and the improved fuel supply control strategy is to multiply the deviation between the working fluid enthalpy value and the dry saturated steam enthalpy value at the same pressure by a coefficient as the supplementary amount of coal for the coal-fired unit, so that the evaporation, i.e., the second type of heat transfer deterioration region, quickly passes through the second type of heat transfer deterioration process, i.e., the working fluid is quickly converted from wet saturated steam to superheated steam, thereby reducing the metal tube wall temperature, i.e., reducing the water-cooled wall temperature; when the working fluid in the evaporation region is converted from wet saturated steam to superheated steam, the improved fuel supply control strategy is stopped, and the conventional fuel supply control strategy is continued; the supplementary amount of coal for the coal-fired unit is calculated as follows: Where: B add Indicates the additional coal supply, kg / s; h d-sat Indicates the enthalpy of dry saturated steam corresponding to the current working fluid pressure, kJ / kg; h real Indicates the real-time enthalpy value of the working fluid, kJ / kg; M indicates the mass flow rate of the working fluid in the water-cooled wall, kg / s; LHV indicates the low calorific value of the fuel used in the coal-fired unit, kJ / kg; R Q It indicates the share of heat load on the flue gas side in the entire water-cooled wall where the temperature of the second type of heat transfer deterioration area is the highest due to evaporation in the water-cooled wall.

2. The method for optimizing the water-cooled wall temperature by controlling the coal feed rate based on the working fluid dryness according to claim 1, characterized in that: When a supercritical direct-current boiler or an ultra-supercritical direct-current boiler operates at low load, the flow rate of the working fluid in the water-cooled wall decreases, and the heat transfer coefficient decreases as the working fluid dryness increases; the metal material used in the water-cooled wall pipe is 15GrMoG. When the working fluid dryness is 0.995, the metal wall temperature reaches 528°C. The upper limit of the allowable operating temperature of 15GrMoG is 550°C. In order to increase the safety margin, 0.995 is set as the critical value. When the working fluid dryness exceeds 0.995 during the variable load process, the improved fuel supply control strategy begins to be enabled.

3. The method for optimizing the water-cooled wall temperature by controlling the coal feed rate based on the working fluid dryness according to claim 1, characterized in that: In order to reasonably control the metal wall temperature of the water-cooled wall, it is necessary to accurately calculate the metal wall temperature of the water-cooled wall. The temperature distribution along the radial direction of the metal tube wall is obtained by the one-dimensional unsteady-state heat conduction differential equation, as shown in the following formula: Where ρ is the density of the working fluid, kg / m 3 ;c p Indicates the specific heat capacity of the metal tube wall, J (kg K) -1 ; τ is time, s; r represents the radius of the water-cooled wall metal pipe, m; T w is the temperature of the metal pipe, °C; λ is the thermal conductivity of the metal pipe, W / (m°C); According to the basic theory of heat transfer, it is necessary to determine the temperature at the boundary. The following equation is the boundary equation of the inner wall of the water-cooled wall tube: Where, T in is the inner wall temperature of the metal pipe, °C; J n is the heat flux non-uniformity coefficient of the inner wall of the water-cooled wall tube furnace side; β is the ratio of the outer diameter to the inner diameter of the water-cooled wall tube; Q out Indicates the heat load on the furnace side, W / m 2 ; T f is the working fluid temperature, °C; α in is the heat transfer coefficient of the working fluid in the pipeline, W / (m 2 ℃); For the outer wall of the water-cooled wall tube, the heat flux density on the boundary is specified, and the boundary equation of the outer wall of the water-cooled wall tube is shown as follows: Where, T out is the outer wall temperature of the metal pipe, ℃.

4. The method for optimizing the water-cooled wall temperature by controlling the coal feed rate based on the working medium dryness according to claim 1, characterized in that: The conventional fuel supply control strategy is: fitting the boiler main control command with the steady-state operation data to obtain an initial steady-state fuel supply command; In addition, the load change and load command during the load change process are used as feedforward of the fuel supply command; the deviation between the set value and the actual value of the water-cooled wall outlet steam temperature is used as PID to adjust the fuel-water ratio; at the same time, the deviation between the main steam and reheat steam temperatures is multiplied by a coefficient as a feedforward signal; finally, the actual fuel supply command is obtained.

5. The method for optimizing the water-cooled wall temperature by controlling the coal supply based on the working medium dryness according to claim 1, characterized in that: The improved fuel supply control strategy is applicable to supercritical once-through boilers or ultra-supercritical once-through boilers under low-load operating conditions, that is, the working fluid pressure in the water-cooled wall is in the high pressure to subcritical range of 10 MPa to 17 MPa.

6. The method for optimizing the water-cooled wall temperature by controlling the coal supply based on the working medium dryness according to claim 1, characterized in that: This optimization method is applicable to both internally threaded tubes and smooth tubes in water-cooled walls.

Citation Information

Patent Citations

  • Supercritical circulating fluidized bed boiler hearth heating surface

    CN101067490A

  • Temperature adjusting method and system for improving efficiency of ultra-supercritical boiler unit

    CN107631286A

  • Boiler furnace structure with heat transfer enhanced internally and heat resistance increased externally and supercritical carbon dioxide coal-fired boiler

    CN110260300A

  • Control method for overtemperature of water cooling wall of boiler of supercritical unit

    CN112856376A

  • Method, system and equipment for evaluating hydrodynamic phase change point of boiler

    CN116542172A