Apparatus and method for elegant cell shutdown
By using an adaptive power reduction mechanism and proactive handover, the power reduction steps are dynamically adjusted, which solves the problems of long duration and high call drop rate during base station cell shutdown, and achieves more efficient network shutdown and handover.
Patent Information
- Application Number
- CN202280094421.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-31
- Publication Date
- 2024-11-22
AI Technical Summary
Existing technologies have problems such as long duration, impact on network performance indicators and high call drop rate during base station cell shutdown, especially when parameter configuration is complex and relies on operator experience.
An adaptive power reduction mechanism is adopted, which combines active and passive cell handover to dynamically adjust each power reduction step. By receiving measurement reports from terminal devices, the amount of power reduction and the cell handover process are optimized to reduce the shutdown window time.
It achieves the shortest cell shutdown window, reduces service downtime and call drop rate, simplifies parameter configuration, and improves the automation and efficiency of network operations.
Smart Images

Figure CN119014044A_ABST
Abstract
Description
Technical Field
[0001] Various example embodiments described herein relate generally to communication technology, and more particularly, to apparatus and methods for supporting graceful cell shutdown. Background Art
[0002] Certain abbreviations that may appear in the specification and / or drawings are defined as follows:
[0003] ANR Automatic Neighbor Relation
[0004] BTS Base Transceiver Station
[0005] CP Control Plane
[0006] HO Handover
[0007] KPI Key Performance Indicator
[0008] LTE Long Term Evolution
[0009] MP Management Plane
[0010] NR New Radio
[0011] OAM Operation Administration and Maintenance
[0012] RSRP Reference Signal Received Power
[0013] RSRQ Reference Signal Received Quality
[0014] RRC Radio Resource Control
[0015] SINR Signal to Interference and Noise Ratio
[0016] UE User Equipment
[0017] UP User Plane
[0018] In a communication network, a base station (also called a base transceiver station (BTS)) may deactivate one or more cells served by the base station due to various scenarios such as power saving, cell congestion, site upgrade, etc. The deactivation of one or more cells may be performed with the aid of a graceful cell shutdown procedure to avoid or minimize the impact on ongoing services and improve the end-user experience. Summary of the invention
[0019] A brief summary of exemplary embodiments is provided below to provide a basic understanding of some aspects of various embodiments. It should be noted that this summary is not intended to identify key features of essential elements or define the scope of the embodiments, and its sole purpose is to introduce some concepts in a simplified form as a prelude to the more detailed description provided below.
[0020] In a first aspect, an example embodiment of a network device is provided. The network device may include at least one processor and at least one memory including computer program code. The at least one memory and the computer program code may be configured to, together with the at least one processor, cause the network device to receive at least a first measurement report from a plurality of terminal devices connected to the network device in a serving cell, and determine a power reduction amount and a terminal device group associated with the power reduction amount based at least in part on the first measurement report. The first measurement report may indicate neighboring cells for the plurality of terminal devices. The network device may reduce the downlink transmission power for the serving cell by the determined power reduction amount, and handover the terminal device group to their neighboring cells. The determination, reduction and handover operations may be repeated on the remaining terminal devices in the plurality of terminal devices until the downlink transmission power for the serving cell is lower than or equal to a predetermined target level, or the plurality of terminal devices are handed over to their neighboring cells.
[0021] In a second aspect, an example embodiment of a method implemented at a network device is provided. The method may include: receiving a first measurement report from a plurality of terminal devices connected to the network device in a serving cell; and determining a power reduction amount and a terminal device group associated with the power reduction amount based at least in part on the first measurement report. The first measurement report may indicate neighboring cells for the plurality of terminal devices. The method may also include: reducing the downlink transmission power for the serving cell by the determined power reduction amount, and handing over the terminal device group to their neighboring cells. The determination, reduction, and handover operations may be repeated on the remaining terminal devices in the plurality of terminal devices until the downlink transmission power of the serving cell is lower than or equal to a predetermined target level, or the plurality of terminal devices are handed over to their neighboring cells.
[0022] In a third aspect, an example embodiment of a device is provided. The device may include: a device for receiving a first measurement report at a network device from a plurality of terminal devices connected to the network device in a serving cell; and a device for determining a power reduction amount and a terminal device group associated with the power reduction amount based at least in part on the first measurement report. The first measurement report may indicate neighboring cells for the plurality of terminal devices. The device may also include: a device for reducing the downlink transmission power of the serving cell by the determined power reduction amount; a device for handing over the terminal device group to their neighboring cells; and a device for repeating the determination, reduction and handover operations on the remaining terminal devices in the plurality of terminal devices until the downlink transmission power of the serving cell is lower than or equal to a predetermined target level, or the plurality of terminal devices are handed over to their neighboring cells.
[0023] In a fourth aspect, an example embodiment of a computer program product is provided. The computer program product may be embodied in at least one computer-readable medium and includes instructions that, when executed by at least one processor of a network device, cause the network device to receive a first measurement report from at least a plurality of terminal devices connected to the network device in a serving cell, and determine a power reduction amount and a terminal device group associated with the power reduction amount based at least in part on the first measurement report. The first measurement report may indicate neighboring cells for the plurality of terminal devices. The instructions may also cause the network device to reduce the downlink transmission power for the serving cell by the determined power reduction amount, and handover the terminal device group to their neighboring cells, and repeat the determination, reduction, and handover operations on the remaining terminal devices in the plurality of terminal devices until the downlink transmission power for the serving cell is lower than or equal to a predetermined target level or the plurality of terminal devices handover to their neighboring cells.
[0024] Other features and advantages of the exemplary embodiments of the present application will also be apparent from the following description of specific embodiments when read in conjunction with the accompanying drawings, which illustrate, by way of example, the principles of the exemplary embodiments of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Some example embodiments will now be described, by way of non-limiting examples, with reference to the accompanying drawings.
[0026] Figure 1 is a schematic diagram illustrating a cellular communication network in which example embodiments of the present application may be implemented.
[0027] Figure 2 is a schematic diagram illustrating power reduction based on configuration parameters.
[0028] Figure 3 is a schematic diagram illustrating dynamic power reduction according to an exemplary embodiment of the present application.
[0029] Figure 4 is a flow chart illustrating a graceful shutdown process according to an example embodiment of the present application.
[0030] Figure 5 is a schematic diagram showing a stepped rate curve as a function of the number of UEs scheduled for handover in the previous step.
[0031] Figure 6 is a schematic diagram showing UE sorting in descending order of reference signal received power (RSRP) gap according to an exemplary embodiment of the present application.
[0032] Figure 7 Detailed description is a flow chart showing an operation of determining a UE group to be handed over according to an exemplary embodiment of the present application.
[0033] Figure 8 is a schematic message sequence diagram illustrating a graceful shutdown process according to an exemplary embodiment of the present application.
[0034] Fig. 9 is a functional block diagram showing an apparatus for graceful cell shutdown according to an exemplary embodiment of the present application.
[0035] Fig.10 It is a schematic structural block diagram showing a device in a communication system in which an exemplary embodiment of the present application can be implemented.
[0036] Throughout the drawings, the same or similar reference numerals denote the same or similar elements, and repeated description of the same elements will be omitted. DETAILED DESCRIPTION
[0037] Hereinafter, some example embodiments will be described in detail with reference to the accompanying drawings. The following description includes specific details for the purpose of providing a thorough understanding of the various concepts. However, it will be apparent to those skilled in the art that these concepts can be practiced without these specific details. In some cases, well-known circuits, techniques, and components are shown in block diagram form to avoid obscuring the concepts and features described.
[0038] As used herein, the term "network equipment" refers to any suitable equipment or entity capable of providing a cell or coverage, through which a terminal device can access a network or receive a service. Network equipment may be generally referred to as a base transceiver station (BTS), a base station (BS), or some other suitable term. The term "base station" or "base transceiver station" used herein may represent a node B (NodeB or NB), an evolved node B (eNodeB or eNB), a next generation node B (gNB), or a next generation enhanced node B (ng-eNB). A base station may be embodied as a macro base station, a relay node, or a low power node such as a micro base station or a femto base station. A base station may also include or may be referred to as a RAN (radio access network) node, and may be composed of several distributed network units, such as a central unit (CU), one or more distributed units (DU), one or more remote radio heads (RRH), or a remote radio unit (RRU). The number and functionality of these distributed units depends on the selected split RAN architecture.
[0039] As used herein, the term "terminal device" or "user equipment" (UE) refers to any device or entity capable of wirelessly communicating with network devices or each other. Examples of terminal devices may include mobile phones, mobile terminals, mobile stations (MS), user stations, portable user stations, access terminals, personal digital assistants (PDAs), computers, wearable devices, vehicle-mounted communication devices, machine type communication (MTC) devices, D2D communication devices, V2X communication devices, sensors, etc. The term "terminal device" may be used interchangeably with UE, user terminal, mobile terminal, mobile station, or wireless device.
[0040] Figure 1 A schematic diagram of a wireless communication network 100 in which an example embodiment of the present application may be implemented is shown. The wireless communication network 100 may be implemented as a cellular network, such as a 4G LTE network, an LTE-A network, a 5G NR network, or any 3GPP cellular network or system, which may employ one or more multiple access schemes capable of supporting communications with multiple users sharing available time and frequency resources. Examples of multiple access schemes may include time division multiple access (TDMA), code division multiple access (CDMA), time division synchronous code division multiple access (TD-SCDMA), frequency division multiple access (FDMA), orthogonal frequency division multiple access (OFDMA), single carrier frequency division multiple access (SC-FDMA), etc. These multiple access schemes may be formulated in 4G Long Term Evolution (LTE), 5G New Radio (NR), or beyond 5G radio standards.
[0041] Reference Figure 1, the wireless communication network 100 may include multiple base stations 120 and multiple user equipment (UE) 110 connected to the base stations 120. The multiple base stations 120 may form a so-called random access network (RAN) that provides network access to the multiple UEs 110. Each base station 120 may be configured with one or more transceivers that are used to provide wireless signal coverage for one or more geographical areas called cells 122. One or more UEs 110 may reside in one or more cells 122, establish a radio resource control (RRC) connection with one or more base stations 120 serving the one or more cells 122, and communicate with the connected base stations 120 on uplink and downlink channels. As an example, Figure 1 Three UEs 110a, 110b, 110c and three base stations 120a, 120b, 120c are shown, each base station supporting three cells 122a, 122b, 122c. Cell 122 is shown as having a hexagonal shape, but it is understood that cell 122 can have, for example, a circular, elliptical or other shape, and adjacent cells can overlap each other. Two adjacent cells 122 supported by one base station or supported by two different base stations can operate at the same or different frequencies. It should be understood that when the description herein indicates that a "cell" performs functions, the base station serving the cell will perform these functions.
[0042] For various reasons, the base station 120 may need to shut down one or more cells 122 served by the base station 120. For example, the operator may need to periodically upgrade the software / hardware of the base station 120 in order to introduce new features or expand site capacity. The operator may also shut down one or more cells 122 served by the base station 120 for maintenance, cell locking, or block operations, etc. If the number of UEs 110 that require the network service of the base station 120 at a specific time and area is small, it is also desirable to shut down one or more cells or the entire base station 120 to save power. In addition, a specific cell may be temporarily unable to provide services to users in the service area due to an unexpected equipment failure, and may cause an automatic recovery reset.
[0043] The ongoing service impact and the duration of the process are two major factors that need to be considered in the design of a cell shutdown solution. The number of ongoing services (e.g., actively connected users) varies greatly from system to system and at different times, and the duration of the shutdown process will result in service downtime for shutting down the cell. Without a good solution, ongoing services will be adversely affected or the shutdown process will be long. Therefore, it is beneficial to develop a graceful shutdown solution that can achieve reliable and fast shutdown in order to improve the end-user experience and guarantee the shortest service downtime.
[0044] Figure 2FIG. 4 shows a schematic diagram of power reduction based on configuration parameters during a traditional graceful shutdown process. Figure 2 As shown, the base station 120 can shut down the cell 122 by gradually reducing the downlink transmission power of the cell 122 from the initial power level to the target power level. As the downlink transmission power decreases, the signal quality of the cell 122 deteriorates, and a handover process can be triggered to handover the UE 110 residing in the cell 122 to a neighboring cell. After each power reduction step, the base station 120 waits for a predetermined delay interval before the next round of power reduction. Each step has the same power reduction and delay interval. The power reduction step size, the number of power reduction steps, and the total shutdown window are configurable parameters that need to be manually configured before the graceful shutdown procedure depending on the cell service situation at runtime.
[0045] Figure 2 The graceful shutdown procedure shown has several disadvantages. The duration (total shutdown window) is quite long, which seriously affects the network operation, administration and maintenance (OAM) key performance indicators (KPIs), such as service downtime for activities such as site reset, upgrade, etc. The long duration cannot guarantee the handover KPI. The decisive factor for configuring the parameters of the graceful shutdown procedure is the number of UEs connected to the cell to be shut down. The larger the number of UEs, the more steps should be configured and the longer the time window. The handover KPI depends entirely on how well the operator configures the parameters. Without good knowledge and experience in parameter configuration, the handover KPI will deteriorate even if a long time window is configured. The shutdown parameter configuration is complex. As mentioned above, the parameter configuration is highly dependent on the amount of ongoing services. The operator needs to know the number of UEs connected to the cell / BTS to be shut down. It is complex for the operator to calculate the shutdown parameters based on the amount of ongoing services before the cell shutdown operation, and the amount of ongoing services varies significantly over time. In addition, the traditional cell shutdown procedure will result in a large number of dropped calls. For example, UEs close to a base station or base station antenna may have adequate signal quality when the cell power is reduced to a target level which may not be zero, and such UEs will experience dropped calls when, for example, the operator resets the cell.
[0046] Example embodiments described herein may address one or more of the above-mentioned issues by implementing adaptive power reduction during cell shutdown along with a parallel active handoff mechanism. Figure 3 The adaptive power reduction process is schematically illustrated, where the power reduction amount of each step can be dynamically adjusted. By adapting to the signal conditions of real users and the feedback of previous power reduction steps, the power reduction amount of each step can be continuously optimized, which will eliminate inappropriate power reduction strategies, for example, the continuous use of a fixed power reduction amount will lead to poor KPI during the graceful cell shutdown process, or the duration of the graceful shutdown process is unnecessarily longer than actually needed.
[0047] In addition to passive UE handover triggered in response to power reduction, various example embodiments can also utilize active handover to accelerate the entire graceful cell shutdown process. Parallel passive handover and active handover can achieve the shortest cell shutdown window and minimize service downtime. The delay interval after each power reduction step can reflect the real needs of the active handover process and avoid blind waiting based on operator configuration parameters. The graceful shutdown process can automatically calculate the shutdown parameters at runtime, without the need to manually configure the shutdown parameters, which makes the operation of the operator very simple. In addition, because the UE can be actively handed over to its neighboring cell, the dropped calls of UEs close to the base station or base station antenna can be avoided or minimized.
[0048] Figure 4 is a flow chart showing a graceful cell shutdown method 200 according to an example embodiment of the present application. Method 200 may be performed, for example, at base station 120 to shut down a cell served by base station 120. If two or more cells of base station 120 need to be shut down, graceful shutdown method 200 may be performed in parallel on the two or more cells to avoid a ping-pong effect. For example, a UE connected to a first shut-down cell is handed over to a second shut-down cell. In some example embodiments, base station 120 may include or be configured with a plurality of components, modules, devices, or elements to perform the operations in method 200, and these components, modules, devices, or elements may be implemented in various ways including, but not limited to, for example, software, hardware, firmware, or any combination thereof.
[0049] refer to Figure 4 , method 200 may start at operation 210 at which a graceful shutdown procedure at base station 120 is triggered. Base station 120 may trigger a graceful cell shutdown procedure for cell 122 when, for example, the cell management state changes to "shutdown". An operator may change the cell management state of cell 122 to "shutdown" via a plan file download and activation. If multiple cells should be shut down with one plan file, a graceful shutdown procedure may be triggered and performed in parallel for multiple cells. When a normal shutdown procedure is triggered for cell 122, base station 120 may reject new connections and handover requests to cell 122. Base station 120 may also remove cell 122 from a handover target cell list (e.g., a neighbor relation table (NRT) of any other cell).
[0050] At operation 212, the base station 120 may configure one or more measurements for the UE 110 connected to the cell 122 to be powered off. The base station 120 may send a measurement configuration to the UE 110 via one or more RRC reconfiguration requests, which may configure one or more event measurements for the UE 110. In some example embodiments, the base station 120 may configure an event A4 measurement for the UE 110 at operation 212. Event A4 may be triggered when the signal quality of a neighboring cell, such as a reference signal received power (RSRP), a reference signal received quality (RSRQ), or a signal-to-noise plus interference ratio (SINR), becomes better than or equal to a threshold. At operation 212, the base station 120 may configure a minimum threshold for the event A4 measurement for the UE 110, so that the base station 120 may obtain event A4 measurement reports from as many UEs 110 as possible. The advantage is that the base station 120 may have a full picture of the UEs 110 that may be handed off from the serving cell 122, and facilitate optimal planning of further batch handoffs. For example, the minimum threshold of the signal quality represented by RSRP may have a value less than or equal to -100 dBm, preferably less than or equal to -110 dBm. On the other hand, the minimum threshold of the signal quality is sufficient for the handover process. That is, UE 110 can successfully handover to a neighboring cell with a minimum threshold signal quality. In this regard, the minimum threshold of the event A4 measurement report may have a value greater than or equal to -150 dBm, preferably greater than or equal to -140 dBm. In one example, the minimum threshold of the event A4 measurement report may be set to approximately -120 dBm.
[0051] The base station 120 may configure the UE 110 connected to the cell 122 to be powered off to perform event A4 measurements for inter-frequency and co-frequency neighboring cells. Inter-frequency neighboring cells operate at a different frequency than the serving cell 122 of the UE 110, and co-frequency neighboring cells operate at the same frequency as the serving cell 122. Inter-frequency and co-frequency neighboring cells may be provided in a neighboring cell list (e.g., a cell list based on automatic neighbor relation (ANR)). In the case where the entire base station 120 is to be powered off, the neighboring cells supported by the base station 120 may be excluded / deleted from the neighboring cell list for the cell 122 to be powered off.
[0052] The base station 120 may also configure multiple parameters for measurement reports triggered by event A4 measurements. For example, the base station 120 may configure a trigger time parameter for event A4 measurement reports. The trigger time parameter specifies the time interval that satisfies the event A4 trigger condition before sending the event A4 measurement report. The trigger time parameter may be appropriately set to ensure that the measurement report is reliable and fast. The reporting interval parameter may be configured for periodic scheduling (e.g., semi-persistent scheduling (SPS)) of measurement reports so that the report is updated from time to time with acceptable overhead. In addition, the departure report parameter may also be configured to enable departure reporting, which indicates that the trigger condition is no longer met or the departure condition is met. It is understood that the base station 120 may also configure additional parameters for event A4 measurements, such as measurement gaps, reporting amounts, and the like. Using these configured parameters, when the trigger condition is met, that is, when the signal quality of at least one neighboring cell becomes better than or equal to the configured minimum threshold, the UE 110 may perform event A4 measurements and periodically transmit measurement reports to the base station 120.
[0053] In some example embodiments, base station 120 may also configure event A3 measurement to UE 110 connected to cell 122 at operation 212. Event A3 may be triggered when the signal quality of the neighboring cell becomes better than the signal quality of serving cell 122 by a threshold value Dm or higher. Base station 120 may configure an appropriate event A3 threshold value Dm to UE 110 to prompt event A3 measurement reporting. Unlike event A4 threshold values having an absolute value (e.g., -120 dBm), event A3 threshold value Dm may have a relative value (e.g., 5 dB, 3 dB, 1 dB, or other values). In some example embodiments, when the graceful cell shutdown process is triggered, base station 120 may configure event A3 threshold value Dm with a minimum value (e.g., 3 dB, 1 dB, or zero) for UE 110 to trigger event A3 measurement reporting early before the signal quality of serving cell 122 becomes too poor and to ensure a radio link with UE 110. Furthermore, event A3 measurement can be configured for inter-frequency and co-frequency neighboring cells, and related parameters such as trigger time, reporting interval, report on departure, etc. can be configured for event A3 measurement. In some example embodiments, event A3 measurement can be configured before triggering the graceful cell shutdown process.
[0054] When one or more measurement configurations are used for UE 110, base station 120 may collect measurement reports from these UEs 110 at operation 214. As described above, UE 110 may measure the signal quality (such as RSRP, RSRQ, or SINR) of serving cell 122 and neighboring cells, and send measurement reports to base station 120 when one or more configured events are triggered. The measurement report may include signal quality information of serving cell 122 and signal quality information of at least one neighboring cell that meets the triggering conditions of the configured event. In some example embodiments, base station 120 may start a timer when configuring the measurement to monitor the reception of the measurement report.
[0055] If the base station 120 determines at operation 216 that an event A3 measurement report is received from a certain UE 110, the base station 120 may handover the UE 110 to the neighboring cell indicated in the event A3 measurement report at operation 218 in response to the received event A3 measurement report. If two or more neighboring cells are indicated in the event A3 measurement report, the base station 120 may handover the UE 110 to the best neighboring cell with the best signal quality, or select a target neighboring cell from the two or more indicated neighboring cells for handover of the UE 110. The handover target cell may be selected considering, for example, the load of the two or more neighboring cells. The handover process triggered by event A3 may be performed in a conventional manner, which will not be described in detail herein.
[0056] If the base station 120 determines at operation 216 that an event A4 measurement report is received from a certain UE 110, the base station 120 may further determine at operation 220 whether the event A4 measurement report indicates an inter-frequency neighbor cell or an intra-frequency neighbor cell of the UE 110. In the case that the UE 110 has an inter-frequency neighbor cell indicated in the event A4 measurement report, the base station 120 may handover the UE 110 to the inter-frequency neighbor cell at operation 222. If the UE 110 has both inter-frequency and intra-frequency neighbor cells indicated in the event A4 measurement report, the base station 120 may determine at operation 220 that the UE 110 has an inter-frequency neighbor cell and handover the UE 110 to the inter-frequency neighbor cell at operation 222. The UE 110 connected to the inter-frequency neighbor cell after the handover will have little or no interference with the remaining UEs connected to the serving cell 122 because they operate at different frequencies, so at operation 222, the base station 120 may immediately initiate a handover procedure for the UE with the inter-frequency neighbor cell. The inter-frequency handover process triggered by the event A4 measurement report can be executed in a traditional manner, which will not be described in detail here.
[0057] As described above, the base station 120 may start a timer at operation 212 and wait for a period of time to receive a measurement report from the UE 110. If the timer expires at operation 224 or the base station 120 has received measurement reports from all connected UEs 110, the method 200 may proceed to the next operation 226. It should be understood that since measurement reports are periodically transmitted from the UE 110 as long as the event triggering condition is met, the base station 120 may receive further measurement reports after operation 224, so if the relevant conditions are determined as in operations 216, 220, operations 218, 222 may also be performed after operation 224.
[0058] At operation 226, the base station 120 may determine the power reduction amount of the power reduction step and the group of UEs associated with the power reduction step based on the event A4 measurement report received from the UE 110. Since the UE 110 that triggered the event A3 measurement report or the inter-frequency event A4 measurement report at steps 218 and 222 has been handed over from the serving cell 122, the UE group determined at step 226 is selected from the UE 110 that triggered the intra-frequency event A4 measurement report. In the specific case where there is no UE with an available intra-frequency event A4 measurement report, that is, all connected UEs 110 have triggered the event A3 measurement report or the inter-frequency event A4 measurement report and have been handed over from the serving cell 122, the base station 120 may decide to directly reduce the downlink transmission power of the cell 122 to the target power level at operation 226, and the operation of determining the UE group may be omitted.
[0059] As mentioned above about Figure 3 As described, the downlink transmission power of the cell 122 to be powered off can be gradually reduced from the initial power to the target power, and the power reduction amount of each step can be dynamically determined based on, for example, the number of connected UEs, the signal quality of the connected UEs, and feedback from the previous power reduction step. At operation 226, the base station 120 can determine the power reduction amount based at least on the measurement report received from the UE 110 and optionally on one or more additional considerations discussed below.
[0060] For example, when determining the amount of power reduction in the current step, the number of UEs scheduled for handover (i.e., the previous group of UEs) and the handover performance of the scheduled UEs associated with the previous power reduction step (e.g., handover success rate) may be considered. If the handover success rate of the previous step is higher than a certain threshold, the power reduction amount of the current step may be increased to further speed up the shutdown process; conversely, if the handover success rate of the previous step is lower than the threshold, the power reduction amount of the current step may be reduced to improve the maintainability KPI of the shutdown process. When determining whether the handover success rate is reliable to adjust the power reduction amount in the current step, the number of UEs scheduled for handover in the previous step may be considered. For example, if the number of scheduled UEs is small, it may be unreliable to use the handover success rate for adjusting the power reduction amount.
[0061] In addition, when determining the amount of power reduction, base station 120 may also consider the handover processing capability of base station 120 to ensure that the determined UE group can be processed without timeouts due to processing delays. In some example embodiments, the amount of power reduction may be further limited to a predetermined range to avoid drastic power changes. If the determined amount of power reduction is higher than an upper limit of the predetermined range or lower than a lower limit of the predetermined range, base station 120 may apply the upper limit or lower limit of the power reduction.
[0062] Here, an example algorithm for determining the amount of power reduction for each power reduction step will be described in detail. However, it should be understood that the algorithm is described only as an example, and the algorithm may be modified or other algorithms may be used. In the example algorithm, the amount of power reduction Reduced_Power for each power reduction step may be calculated according to formula (1):
[0063]
[0064] In formula (1), Default_Power represents the default power reduction amount of the power reduction step, and it has an operator-specified value, such as 1 dB, 2 dB, 3 dB or other values. The operator can determine the default power reduction amount based on experiments to achieve fast and reliable power reduction. In some example embodiments, Default_Power can have a default value preconfigured at the base station 120. Adjust_Power represents the power reduction adjustment amount of the power reduction step, and it can be determined based on the number of UEs scheduled for handover and handover performance (e.g., the success rate of the UEs scheduled in the previous power reduction step). If in the previous power reduction step, the number of scheduled UEs is large and the handover success rate of the scheduled UEs is high, the power reduction adjustment amount can have a large positive value to increase the power reduction amount of the current step. If in the previous power reduction step, the number of scheduled UEs is small or the handover success rate of the scheduled UEs is low, the power reduction adjustment amount can have a small value, or even a negative value. The power reduction adjustment amount of the current step can also depend on the power reduction adjustment amount of the previous step. In one example, Adjust_Power can be calculated by formula (2):
[0065] Adjust_Power
[0066] =Prev_Adjust_Power+Default_Adjust_Power*Adjust_Coef
[0067] Formula (2)
[0068] In formula (2), Prev_Adjust_Power represents the power reduction adjustment amount of the previous step, which can have a zero value when calculating the Adjust_Power of the initial power reduction step. Default_Adjust_Power represents the default power adjustment amount, which can have a value specified by the operator, such as 0.5dB or other values. The operator can determine the default power adjustment amount in proportion to the default power reduction amount. The larger the default power reduction amount, the larger the default power adjustment amount. Adjust_Coef represents an adjustment coefficient that can be determined, for example, based on a step rate parameter. The following table (1) shows an example of the relationship between the adjustment coefficient and the step rate. For the initial power reduction step, Adjust_Coef and Adjust_Power can be zero.
[0069] Table 1
[0070] Adjust_Coef Step_Rate -1 0-0.2 -0.5 0.2-0.4 0 0.4-0.6 0.5 0.6-0.8 1 0.8-1.0
[0071] Step_Rate reflects the handover performance and reliability of the previous step. In one example, Step_Rate can be calculated by formula (3):
[0072]
[0073] Wherein, Prev_Success_Rate is the success rate of handover in the previous step, which can be obtained by dividing the number of UEs that successfully handover by the number of UEs scheduled for handover in the previous step. Prev_Scheduled_UE is the number of UEs scheduled for handover in the previous step, and Adj_Number is a predetermined value used to dilute the number of scheduled UEs and fine-tune the value of Step_Rate. When Prev_Scheduled_UE has a relatively small value, Prev_Success_Rate has low reliability, and the calculated value of Step_Rate will be much lower than Prev_Success_Rate. When Prev_Scheduled_UE has a relatively large value, Prev_Success_Rate has high reliability, and the calculated value of Step_Rate will be close to Prev_Success_Rate. In an example, Adj_Number can have, for example, 10, 20, 30 or other values. Figure 4 An example of a Step_Rate curve dependent on Prev_Scheduled_UE is shown, where Adj_Number is set to 20 and Prev_Success_Rate is set to 100%. When Prev_Scheduled_UE is 5, Step_Rate is approximately 0.5.
[0074] Referring again to formula (1), when calculating the power reduction amount Reduced_Power of each power reduction step, the maximum handover processing capability of the base station 120 is also considered. MaxReducedPower_HOProcessingCapability is the maximum power reduction amount corresponding to the maximum handover processing capability of the base station 120, which can be calculated from formula (4):
[0075] MaxReducedPowe_HOProcessingCapability
[0076] =RSRP_Gap_List [Zero_Index]
[0077] -RSRP_Gap_List [Max_Schedule_UE_Index]
[0078] Formula (4)
[0079] RSRP_Gap_List is a list of RSRP gap values of UE 110 from high to low. List index zero corresponds to the maximum RSRP gap value of UE 110, and the maximum list index corresponds to the minimum RSRP gap value of UE 110. RSRP is used as an example of UE 110 signal quality here, but other parameters such as RSRQ, SINR can also be used instead of RSRP. For the corresponding UE 110, the RSRP gap is calculated as the difference between the RSRP of the neighboring cell of UE 110 and the RSRP of the serving cell of UE 110, that is, RSRPgap=RSRPNeighboringCell-RSRPServingCell. The RSRP values of the neighboring cells and the serving cell of UE 110 can be obtained in the event A4 measurement report received from UE 110. If the event A4 measurement report indicates two or more neighboring cells of UE 110, the best neighboring cell can be used or the base station 120 can select one of the two or more neighboring cells for RSRP gap calculation and subsequent handover of UE 110.
[0080] Figure 6 An example of sorting UEs by RSRP gap from high to low is shown. Because the UE with an RSRP gap higher than or equal to the threshold Dm has triggered the event A3 measurement report and has handed over the serving cell 122 in operation 218, the maximum RSRP gap value (RSRP gap list index = 0) is lower than Dm (event A3 threshold, 3dB in the example). Considering the handover processing capability of the base station 120, the maximum number of UEs Max_Schedule_UE_Num for handover scheduling can be determined according to formula (5):
[0081] Max_Schedule_UE_Num=Max_Schedule_UE_Index+1
[0082] =Max_HO_UE_Per_Sec*UE_Signaling_Timeout*Ajd_Rate
[0083] Formula (5)
[0084] In formula (5), Max_HO_UE_Per_Sec represents the maximum handover capacity per second of the base station 120 based on the control plane (C-plane) event processing performance and the number of handover process messages. The maximum handover capacity per second can exclude the handover process triggered by potential event A3. UE_Signaling_Timeout represents the timeout value of the handover signaling process, after which the UE handover will fail and the UE will return to the RSRP gap list to wait for the next round of power reduction and handover process. Adj_Rate is an adjustment factor for adjusting the number of UEs used for handover based on the handover performance of the previous step, which can be obtained from formula (6):
[0085]
[0086] In formula (6), Prev_Success_UE represents the number of UEs that successfully completed the handover in the previous step, and Prev_Scheduled_UE represents the number of UEs scheduled for handover in the previous step. In some exemplary embodiments, the cause of the handover failure can be considered in formula (3) and formula (6) to determine the handover success rate Prev_Success_Rate in the previous step. For example, if the cause is related to the air interface, such as connection loss in the serving cell, the UE can be counted in determining the success rate. If the handover failure is due to an overload of a target neighboring cell, it can be ignored when determining the success rate. If the RSRP gap of the UE with the overloaded target neighboring cell has measurement results from other neighboring cells, they can be recalculated relative to the other neighboring cells. The overloaded neighboring cell can be blocked from the handover target cell list for a certain time interval, after which the handover to the overloaded neighboring cell can be attempted again.
[0087] From formulas (5) and (6), the maximum number Max_Schedule_UE_Num of UEs scheduled for handover can be calculated, thereby determining the UE index Max_Schedule_UE_Index in the RSRP gap list. Then, according to formula (4) and the RSRP gap list, the maximum power reduction amount MaxReducedPower_HOProcessingCapability depending on the maximum handover processing capability of the base station 120 can be calculated as the difference between the RSRP gap of the UE with index zero and the RSRP gap of the UE with index Max_Schedule_UE_Index. Figure 6An example of the maximum power reduction calculated from formula (4) and the RSRP gap list is shown. When the index Max_Schedule_UE_Index corresponding to the maximum handover processing capability of the base station 120 is determined, the maximum power reduction amount can be determined from the RSRP gap list using the index Max_Schedule_UE_Index.
[0088] Returning to formula (1), the smaller one of Default_Power plus Adjust_Power and MaxReducedPower_HOProcessingCapability is used as the calculated power reduction amount Reduced_Power, so that it does not cause the handover scheduling to exceed the processing capacity of the base station 120. Figure 6 In the example shown, the power reduction amount calculated by adding Default_Power to Adjust_Power (e.g., 8 dB in the example) is less than the maximum power reduction amount corresponding to the maximum handover processing capability of the base station 120 (e.g., 12 dB in the example), so the value of Default_Power plus Adjust_Power is used as the power reduction amount calculated from formula (1). In addition, the operator can predetermine the upper and lower limits of the power reduction amount, or the upper and lower limits of the power reduction amount can be preconfigured at the base station 120. The upper limit is set to avoid drastic changes in power, and the lower limit is set to ensure at least a small power reduction in each step and prevent the shutdown process from falling into an infinite loop. In one example, the upper and lower limits can be set according to the default power reduction amount Default_Power. For example, the upper limit can be set to Default_Power*3 and the lower limit to Default_Power / 3. Other upper and lower limit values may also be applicable. If the power reduction amount calculated from formula (1) violates the upper or lower limit, the base station 120 can apply the upper or lower limit of the power reduction amount.
[0089] In the above embodiment, multiple factors (including, for example, the success rate of handover, the number of UEs handover, and system processing capacity) can be considered to dynamically determine the amount of power reduction. The adaptive method for determining the amount of power reduction can obtain the optimal amount of power reduction in each step to ensure that all potential UE handovers can be fully processed in a timely manner, so that dropped calls can be minimized, the entire shutdown process has the least impact on the ongoing service, and the best balance between the process duration and the handover KPI can be achieved. In addition, the power reduction parameters are automatically calculated by the base station 120 during operation, and the operator does not need to calculate and configure the parameters of the power reduction step amount and the shutdown window. It makes the whole process very simple for the operator.
[0090] Continue to refer Figure 4 At operation 226, a group of UEs is also determined for handoff associated with the power reduction step. The group of UEs for handoff may be determined based on the power reduction amount. Figure 7 Example operations are illustrated for determining a group of UEs for handoff associated with a power reduction procedure.
[0091] refer to Figure 7 At operation 310, base station 110 may calculate a signal quality gap between a neighbor cell signal quality and a serving cell signal quality of corresponding UE 110. If the measurement report received from UE 110 indicates two or more neighbor cells, base station 120 may use the best neighbor cell or select one of the two or more neighbor cells for UE handover to calculate the signal quality gap of UE 110. In some example embodiments, RSRP is used to indicate signal quality. Figure 6 An example of an RSRP gap list calculated for UE 110 is shown. As described above, the RSRP gap list is also used to determine the amount of power reduction, and operation 310 may reuse the RSRP gap list to determine the UE group.
[0092] At operation 312, the base station 120 may determine a UE group whose signal quality gap falls within a range from Dm to Dm-Dn. Dm is a threshold of a measurement event that may trigger an intra-frequency handover, such as an event A3 threshold. If the UE has an RSRP of Dm from a neighboring cell that is higher than the RSRP from the serving cell, the UE will send an event A3 measurement report to the base station 120, and the base station 120 will handover the UE to the neighboring cell in response to the event A3 measurement report. Dn is the power reduction amount calculated for the current power reduction step. For example, if Dm is 3dB and Dn is 8dB, the base station 120 may determine a UE group whose RSRP gap is within a range of 3dB to -5dB. Since the power reduction amount Dn is determined taking into account the handover processing capability of the base station 120, the UE group determined at operation 312 will not exceed the handover processing capability of the base station 120.
[0093] Reference again Figure 4After determining the power reduction amount and the UE group, the base station 120 can reduce the downlink transmission power of the cell 122 to be shut down by the determined power reduction amount at operation 228, and handover the UE group to its neighboring cell at operation 230. The UE group can be handed over in descending order of signal quality gap (RSRP gap). Operation 228 and operation 230 can be performed in parallel with each other. This means that the base station 120 can actively handover the UE group to its neighboring cell at operation 230, and there is no need to wait for, for example, event A3 measurement reports from these UEs after the downlink transmission power of the cell 122 is reduced, and then handover these UEs in response to the event A3 measurement report as in the traditional way. The handover triggered by the event A3 measurement report here can be called passive handover.
[0094] By applying proactive handoff to UE groups, example embodiments can shorten the time delay interval associated with the power reduction step because the delay interval can reflect the real handoff demand. The delay interval associated with each power reduction step can be dynamically adapted to and fully spent on the handoff process, and blind waiting periods can be eliminated. Therefore, the duration of the entire shutdown process is reduced, which improves service downtime and energy efficiency.
[0095] It is understood that the base station 120 may also receive a new measurement report from the UE 110 during the time delay interval associated with the power reduction step. If the new measurement report received from the UE 110 is an event A3 measurement report or an inter-frequency event A4 measurement report, the base station 120 may handover the UE 110 to its neighboring cell as described above with respect to operation 218 or 222, as long as the handover of the UE 110 has not started. After the successful handover, the UE 110 may be removed from the current UE group or from the waiting UE list (i.e., the RSRP gap list). If the measurement report is an intra-frequency event A4 measurement report and the UE has not started handover, the base station 120 may recalculate the signal quality gap (e.g., RSRP gap) of the UE and update the signal quality gap list (e.g., RSRP gap list). If the UE is not in the group, but the RSRP gap updated by the UE falls within the RSRP gap range [Dm, Dm-Dn] corresponding to the group, the base station 120 may also place the UE in the current UE group for handover; or if the UE is in the group, but the RSRP gap updated by the UE is not within the RSRP gap range [Dm, Dm-Dn] corresponding to the group, the base station 120 may also remove the UE from the current UE group for handover. If the base station 120 has already started handover of the UE when receiving a new measurement report from the UE, the new measurement report may be ignored.
[0096] When the base station 120 completes the handover of the UE group, the base station 120 may delete the successful UE from the signal quality gap list. If the downlink transmission power of the cell 122 under shutdown is still higher than the target power and there are UEs left in the signal quality gap list, the base station 120 may repeat operations 226-230 for the remaining UEs in the signal quality gap list. When repeating operation 226, the base station 120 may update the signal quality gap list based on the power reduction performed at operation 228 and / or a new measurement report received from the UE 110 after the power reduction at operation 228.
[0097] In some example embodiments, when the power reduction amount determined at operation 226 is greater than or equal to the difference between the current power of the cell being powered off and the target power, base station 120 knows that this is the last power reduction step and can determine that the UE group for handover includes all remaining UEs with available measurement reports. It can further minimize the phenomenon of dropped calls during the power-off process. In some example embodiments, base station 120 can adjust the power reduction amount so that the power of the cell being powered off can be reduced to the target level.
[0098] When the power of the cell being shut down is reduced to or below the target level or there are no UEs with available measurement reports remaining at operation 232, the graceful cell shutdown process ends at operation 234. If there are no UEs with available measurement reports remaining, but the power of the cell is still above the target level, the base station 120 can directly reduce the power of the cell to the target level at operation 234. When the cell power reaches the target level, the cell 122 can be completely shut down, and the UEs without measurement reports and the UEs that failed the last step of handover will drop calls.
[0099] Figure 8 A schematic message sequence diagram of an elegant cell shutdown process according to an exemplary embodiment of the present application is shown. The elegant cell shutdown process can be performed by a base station 120 serving a cell to be shut down and a UE 110 connected to the cell to be shut down. In some exemplary embodiments, the base station 120 can configure a shutdown scheduling process component, which can be a logical or physical entity, to implement at least one operation in the shutdown process. In some exemplary embodiments, the shutdown scheduling process can be implemented in a control plane (C-plane). As the above has discussed about Figures 1 to 7 The details of the shutdown process, therefore Figure 8 The operations shown in will be briefly described and the details thereof can be referred to the above description.
[0100] See also Figure 8When the shutdown process is triggered for cell 122 at operation 410, the shutdown scheduler can send a request to the C-plane to reject new connections and handover to cell 122 at operation 412, and send a request to block cell 122 from the neighbor cell list of other cells at operation 414, so that other cells do not need to measure the signal quality of cell 122.
[0101] At operation 416, the C-plane may send an RRC reconfiguration request to the UE 110 connected to the cell 122. The RRC reconfiguration request may include a measurement configuration for event A4 measurement, and optionally a measurement configuration for event A3 measurement. The measurement configuration may include a threshold for triggering an event A4 measurement report, and optionally a threshold for triggering an event A3 measurement report. The C-plane may also start a timer to monitor measurement reports received from the UE 110 in response to the measurement configuration. At operation 418, the UE 110 may apply the measurement configuration and send an RRC reconfiguration complete message to the C-plane.
[0102] UE 110 measures signal quality (e.g., RSRP of neighboring cells), and when the event A4 triggering condition is met, at operation 420, sends an event A4 measurement report to the C-plane of base station 120. The C-plane may decode the event A4 measurement report and send the RSRP measurement result of UE 110 to the shutdown scheduler at operation 422.
[0103] If the shutdown scheduler determines at operation 424 that a certain UE 110 has an inter-frequency neighboring cell with sufficient RSRP, the shutdown scheduler may send a request to the C-plane to handover the UE to the inter-frequency neighboring cell at operation 426. The C-plane may then initiate a handover procedure at operation 428 to handover the UE to its inter-frequency neighboring cell.
[0104] When the C-plane receives event A4 measurement reports from all connected UEs 110 or the timer for monitoring measurement report reception expires, the C-plane may send an all measurement reports received or timer expired indication to the shutdown scheduler at operation 430. In response to the indication, the shutdown scheduling process stops waiting for the measurement report and proceeds to the next step.
[0105] At operation 432, the shutdown scheduler may create an RSRP gap list based on the RSRP measurements of UE 110, and determine a power reduction amount and a group of UEs for handoff based at least in part on the RSRP gap list. Since the UE with the inter-frequency event A4 measurement report has already been handed off from cell 122 at operation 428, the RSRP gap list may be determined based on the intra-frequency event A4 measurement report. Various additional factors may also be considered when determining the power reduction amount and UE group for each power reduction step, including, for example, handoff processing capabilities, the number and success rate of handoff UEs in previous power reduction steps, and other factors.
[0106] Then, the shutdown scheduler may request the C-plane to handover the UE group to its neighboring cell at operation 434, and request the management plane (M-plane) and the user plane (U-plane) to reduce the downlink transmission power of the cell 122 at operation 436. Operations 434 and 436 may be performed in parallel with each other.
[0107] At operation 438, the C-plane may handover the UE group to its neighboring cell. The handover of the UE group may be performed in descending order of RSRP gap.
[0108] The C-plane may receive event A3 and / or A4 measurement reports from UE 110 from time to time at operation 440. If the UE's handover has already started when the C-plane receives the measurement report from the UE, the measurement report may be ignored. If the UE's handover has not yet started when the C-plane receives the measurement report, the measurement report may be processed at the C-plane. For example, if the received measurement report triggers event A3, at operation 442, the C-plane may immediately initiate a handover procedure for the UE that transmitted the measurement report. If the received measurement report triggers event A4, at operation 444, the C-plane may send an RSRP measurement update to the shutdown scheduler.
[0109] If the RSRP measurement update is associated with an inter-frequency neighbor cell, the power-off scheduler may request the C-plane to handover the UE to its inter-frequency neighbor cell, as described at operation 426. If the RSRP measurement update is associated with an intra-frequency neighbor cell, at operation 446, the power-off scheduler may update the RSRP gap of the UE based on the RSRP measurement update.
[0110] The shutdown scheduler can decide to add the UE to the handover group or remove the UE from the handover group based on the RSRP gap updated by the UE. Then at operation 448, the shutdown scheduler can send a handover add or cancel request to the C-plane. In response to the request, the C-plane can add the UE to the handover group, or if the handover of the UE has not yet started, remove the UE from the handover group. At operation 450, the C-plane can send a handover add or cancel result message to the shutdown scheduler. In response to the handover add or cancel result, the shutdown scheduler can update the UE group for handover at operation 452.
[0111] At operation 454, the C-plane may send a handover result indication to the shutdown scheduler. The handover result indication may indicate which UEs have successfully handed over and / or which UEs have failed to hand over. The shutdown scheduler may update the RSRP gap list based on the handover result indication, for example, removing successful UEs from the RSRP gap list and retaining failed UEs in the RSRP gap list. At operation 456, the shutdown scheduler may also evaluate the handover of the UE group. For example, the shutdown scheduler may calculate the handover success rate of the UE group, which may be used for the next power reduction step.
[0112] Operations 432-456 may be repeated to gradually reduce the downlink transmission power of the cell 122 until no UEs with measurements remain or the target power is reached at operation 458. If no UEs with measurements remain, but the power of the cell 122 is still higher than the target power, the shutdown scheduler may request the M / U-plane to reduce the power of the cell directly to the target power. Then, at operation 460, the shutdown scheduler may request the M / U-plane to completely shut down the cell 122.
[0113] Fig. 9 FIG. 5 is a functional block diagram of a device 500 for performing a graceful cell shutdown process according to an example embodiment. The device 500 may be implemented, for example, at a base station 120 to perform the above-mentioned Figure 1-8 Graceful cell shutdown process discussed. Since the graceful cell shutdown process has been discussed in detail above, each component of the device 500 will be briefly described here, and the details can be referred to the above description.
[0114] refer to Fig. 9, the device 500 may include a first device 510 for configuring a measurement for a UE 110 connected to a base station 120 in a cell 122 when a graceful shutdown process is triggered for the cell 122. In some example embodiments, the first device 510 may include a first sub-device 512 for configuring a first measurement (e.g., event A4) for the UE 110. For example, the first sub-device 512 may configure a first minimum threshold for the UE 110 to trigger a first measurement report. The first measurement report may be triggered when the signal quality of at least one neighboring cell is better than or equal to the first minimum threshold. In some example embodiments, the first minimum threshold may have a value less than or equal to -100 dBm and greater than or equal to -150 dBm, preferably less than or equal to -110 dBm and greater than or equal to -140 dBm. The first measurement report may indicate the signal quality of the at least one neighboring cell and the signal quality of the serving cell. In some example embodiments, optionally, the first device 510 may also include a second sub-device 514 for configuring a second measurement (e.g., event A3) for the UE 110. For example, the second sub-device 514 may configure a second threshold value for the UE 110 to trigger the second measurement report. When the signal quality of at least one neighboring cell is better than or equal to the second threshold value than the signal quality of the serving cell, the second measurement report may be triggered.
[0115] The apparatus 500 may further include a second means 520 for receiving a first measurement report from a UE 110 connected to the base station 120 in the cell 122. The first measurement report may indicate a signal quality (eg, RSRP) of at least one neighboring cell and a signal quality of the serving cell 122.
[0116] Optionally, the device 500 may further include a third means 530, configured to handover the one or more UEs to the neighboring cells when the neighboring cells of the one or more UEs and the serving cell operate at different frequencies.
[0117] The device 500 may also include a fourth device 540 for determining a power reduction amount and a UE group associated with the power reduction amount based at least in part on the first measurement report. In some example embodiments, the fourth device 540 may include a first sub-device 542 for determining the power reduction amount and a second sub-device 544 for determining the UE group associated with the power reduction amount. The first sub-device 542 may determine the power reduction amount based at least in part on a default power reduction amount and a power adjustment amount. The power adjustment amount may be calculated at least in part based on a previous power adjustment amount and a previous handover performance (e.g., a handover success rate). The first sub-device 542 may also determine the power reduction amount considering the handover processing capability of the base station 120. In some example embodiments, when the determined power reduction amount exceeds an upper or lower limit of a predetermined power reduction range, the first sub-device 542 may apply an upper or lower limit of a predetermined power reduction range as the power reduction amount.
[0118] The second sub-device 544 for determining a UE group associated with a power reduction amount may include: a first module 545 for calculating a signal quality gap between a neighboring cell and a serving cell of the UE based on a first measurement report received from the UE; and a second module 547 for determining a UE group whose signal quality gap is in a range from Dm to Dm-Dn, where Dm is a threshold for triggering intra-frequency handover (e.g., a threshold for triggering a second measurement report, which in turn triggers intra-frequency handover), and Dn is a determined power reduction amount. In the case where the downlink transmission power of the serving cell 122 is higher than a predetermined target power level of the cell shutdown process by an amount less than or equal to the determined power reduction amount, the second module 547 may determine that the UE group includes all UEs with available measurement reports. In some exemplary embodiments, the second sub-device 544 may also include a third module 549 for updating the signal quality gap of the UE based on the previously reduced downlink transmission power of the serving cell 122 and / or the new first measurement report before the UE handover begins. In some example embodiments, when the signal quality gap of the UE is updated based on a new first measurement report received from the UE, if the handover of the UE has not yet started, the third module 549 may further update the UE group for handover by adding the UE to the group or removing the UE from the group based on the updated UE signal quality.
[0119] The device 500 may also include: a fifth device 550 for reducing the downlink transmission power of the serving cell 122 according to the determined power reduction amount; and a sixth device 560 for handing off the UE group to its neighboring cell. In some example embodiments, the handing off of the UE group may be performed in parallel with the reduction of the downlink transmission power of the serving cell 122. The fifth device 550 may hand off the UE group to its neighboring cell in descending order of the signal quality gap of the UE.
[0120] Optionally, the device 500 may also include: a seventh device 570, used to receive a second measurement report from the UE, which indicates the signal quality of at least one neighboring cell and the signal quality of the UE's serving cell; and an eighth device 580, used to handover the UE to its neighboring cell in response to the received second measurement report.
[0121] The device 500 may also include a ninth device 590 for determining whether the downlink transmission power of the serving cell 122 is lower than or equal to a predetermined target level, or whether a plurality of UEs are handed over to its neighboring cells. If the downlink transmission power of the serving cell 122 is higher than the predetermined target level, and one or more UEs with available measurement values are still connected to the serving cell 122, the ninth device 590 may instruct the fourth device 540, the fifth device 550, and the sixth device 560 to perform their functions until the power of the serving cell 122 reaches the predetermined target level or no UE with available measurement values is connected to the serving cell 122.
[0122] Fig.10 6 is a block diagram of an example communication system 600 in which embodiments of the present application may be implemented. Fig.10 As shown, the communication system 600 may include: a terminal device 610, which may be implemented as the above-mentioned UE 110; and a network device 620, which may be implemented as any one of the above-mentioned base stations 120. Fig.10 One terminal device 610 is shown, but it will be appreciated that the communication system 600 may include a plurality of terminal devices 610 connected to the network device 620 in a serving cell.
[0123] See also Fig.10 , the terminal device 610 may include one or more processors 611, one or more memories 612, and one or more transceivers 613 interconnected by one or more buses 614. The one or more buses 614 may be address, data, or control buses, and may include any interconnection mechanism, such as a series of lines on a motherboard or integrated circuit, optical fibers, optical devices, or other optical communication devices, etc. Each of the one or more transceivers 613 may include a receiver and a transmitter, which are connected to one or more antennas 616. The terminal device 610 may communicate wirelessly with the network device 620 via the one or more antennas 616. The one or more memories 612 may include computer program code 615. The one or more memories 612 and the computer program code 615 may be configured to, when executed by the one or more processors 611, cause the terminal device 610 to perform operations and processes related to the UE 110 as described above.
[0124] The network device 620 may include one or more processors 621, one or more memories 622, one or more transceivers 623, and one or more network interfaces 627 interconnected by one or more buses 624. The one or more buses 624 may be address, data, or control buses, and may include any interconnection mechanism, such as a series of lines on a motherboard or integrated circuit, optical fiber, optical devices, or other optical communication devices. Each of the one or more transceivers 623 may include a receiver and a transmitter, which are connected to one or more antennas 626. The network device 620 may act as a base station for the terminal device 610, and wirelessly communicate with the terminal device 610 through one or more antennas 626. The one or more network interfaces 627 may provide a wired or wireless communication link, through which the network device 620 can communicate with other network devices, entities, elements, or functions. The one or more memories 622 may include computer program code 625. The one or more memories 622 and the computer program code 625 may be configured to, when executed by the one or more processors 621, cause the network device 620 to perform operations and processes related to any one of the base stations 120.
[0125] The one or more processors 611, 621 may be any suitable type suitable for the local technical network, and may include one or more of a general-purpose processor, a dedicated processor, a microprocessor, a digital signal processor (DSP), one or more of a processor based on a multi-core processor architecture, and a dedicated processor such as a processor developed based on a field programmable gate array (FPGA) and an application-specific integrated circuit (ASIC). The one or more processors 611, 621 may be configured to control other elements of the UE / network device and operate in conjunction with them to implement the processes discussed above.
[0126] The one or more memories 612, 622 may include at least one storage medium in various forms, such as volatile memory and / or non-volatile memory. Volatile memory may include, but is not limited to, for example, random access memory (RAM) or cache. Non-volatile memory may include, but is not limited to, for example, read-only memory (ROM), hard disk, flash memory, etc. In addition, the one or more memories 612, 622 may include, but are not limited to, electrical, magnetic, optical, electromagnetic, infrared or semiconductor systems, devices or equipment or any combination of the above.
[0127] It should be understood that the blocks in the drawings can be implemented in a variety of ways, including software, hardware, firmware, or any combination thereof. In some embodiments, one or more blocks can be implemented using software and / or firmware (e.g., machine executable instructions stored in a storage medium). In addition to or in place of machine executable instructions, some or all of the blocks in the drawings can be implemented at least in part by one or more hardware logic components. For example, but not limited to, illustrative types of hardware logic components that can be used include field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), etc.
[0128] Some example embodiments also provide computer program codes or instructions that, when executed by one or more processors, can cause a device or apparatus to perform the above-described processes. The computer program code for performing the processes of the example embodiments can be written in any combination of one or more programming languages. The computer program code can be provided to one or more processors or controllers of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, causes the functions / operations specified in the flowchart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine as a stand-alone software package, partially on the machine and partially on a remote machine, or entirely on a remote machine or server.
[0129] Some example embodiments also provide a computer program product or computer readable medium in which computer program code or instructions are stored. A computer readable medium may be any tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or apparatus. A machine readable medium may be a machine readable signal medium or a machine readable storage medium. A machine readable medium may include, but is not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or device, or any suitable combination of the foregoing. More specific examples of machine readable storage media would include an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0130] In addition, although the operation is depicted in a specific order, it should not be understood that it requires to perform such operations in the specific order shown or in a continuous order, or to perform all illustrated operations, to achieve the desired result. In some cases, multitasking and parallel processing may be advantageous. Similarly, although several specific implementation details are included in the above discussion, these should not be interpreted as limitations on the scope of the application, but rather descriptions of features that may be specific to a particular embodiment. Some of the features described in the context of a separate embodiment may also be implemented in combination in a single embodiment. On the contrary, the various features described in the context of a single embodiment may also be implemented in multiple embodiments individually or in any suitable sub-combination.
[0131] Although the subject matter has been described in language specific to structural features and / or methodological acts, it should be understood that the subject matter defined in the appended claims is not limited to the specific features or acts described above. Rather, the specific features and acts described above are disclosed as examples of implementing the claims.
Claims
1. A network device, comprising: at least one processor; as well as at least one memory including computer program code, the at least one memory and the computer program code being configured, together with the at least one processor, to cause the network device to at least: receiving a first measurement report from a plurality of terminal devices connected to the network device in a serving cell, the first measurement report indicating neighboring cells for the plurality of terminal devices; determining a power reduction amount and a group of terminal devices associated with the power reduction amount based at least in part on the first measurement report; reducing the downlink transmission power for the serving cell by the determined power reduction amount; Handover the terminal device group to its adjacent cell; as well as The determination, reduction and handover operations are repeated on the remaining terminal devices among the plurality of terminal devices until the downlink transmission power for the serving cell is lower than or equal to a predetermined target level, or the plurality of terminal devices are handed over to their neighboring cells.
2. The network device according to claim 1, wherein: The at least one memory and the computer program code are further configured to, with the at least one processor, cause the network device to at least: When a neighboring cell of at least one terminal device operates at a different frequency from the serving cell, the at least one terminal device is handed over to its neighboring cell before determining the terminal device group.
3. The network device according to claim 1, wherein: The power reduction amount is determined based at least in part on a default power reduction amount and a power adjustment amount, and the power adjustment amount is calculated based at least in part on a previous power adjustment amount and a previous handoff performance.
4. The network device as claimed in claim 3, wherein: The power reduction amount is further determined in consideration of the handoff processing capability of the network device.
5. The network device as claimed in claim 3, wherein: In response to the determined power reduction amount exceeding an upper limit or a lower limit of a predetermined power reduction range, the upper limit or the lower limit of the predetermined power reduction range is applied as the power reduction amount.
6. The network device according to claim 1, wherein: Determining the terminal device group includes: Based on the first measurement report, calculating a signal quality gap between the neighboring cell and the serving cell for the corresponding terminal device; and The terminal device group whose signal quality gap is in the range from Dm to Dm-Dn is determined, wherein Dm is a threshold for triggering intra-frequency handover, and Dn is a determined power reduction amount.
7. The network device according to claim 6, wherein: Before handover of the terminal device begins, the signal quality gap calculated for the terminal device is updated based on the previously reduced downlink transmission power of the serving cell and / or a new first measurement report received from the terminal device.
8. The network device according to claim 6, wherein: When the downlink transmission power of the serving cell is higher than the predetermined target level by an amount less than or equal to the determined power reduction amount, it is determined that the terminal device group includes the terminal device having an available measurement report.
9. The network device according to claim 6, wherein: The terminal device group is handed over to its adjacent cell in descending order of the signal quality gap.
10. The network device according to claim 1, wherein: The handover of the terminal device group is performed in parallel with the reduction of the downlink transmission power of the serving cell.
11. The network device according to claim 1, wherein: The at least one memory and the computer program code are further configured to, with the at least one processor, cause the network device to at least: A first minimum threshold is configured for a terminal device connected to the network device in the service cell to trigger a first measurement report, wherein the first measurement report is triggered when the signal quality of at least one neighboring cell is higher than or equal to the first minimum threshold, and the first measurement report indicates the signal quality of the at least one neighboring cell and the signal quality of the service cell.
12. The network device according to claim 11, wherein: The first minimum threshold has a value less than or equal to -100 dBm and higher than or equal to -150 dBm, preferably less than or equal to -110 dBm and higher than or equal to -140 dBm.
13. The network device according to claim 11, wherein: The at least one memory and the computer program code are further configured to, with the at least one processor, cause the network device to at least: Configuring a second threshold for a terminal device connected to the network device in the serving cell to trigger a second measurement report, wherein the second measurement report is triggered when the signal quality of at least one neighboring cell is better than the signal quality of the serving cell and is higher than or equal to the second threshold; receiving the second measurement report from the terminal device, the second measurement report indicating the signal quality of the at least one neighboring cell and the signal quality of the serving cell; and The terminal device is handed over in response to the received second measurement report.
14. A method implemented on a network device, comprising: receiving a first measurement report from a plurality of terminal devices connected to the network device in a serving cell, the first measurement report indicating neighboring cells for the plurality of terminal devices; determining a power reduction amount and a group of terminal devices associated with the power reduction amount based at least in part on the first measurement report; reducing the downlink transmission power for the serving cell by the determined power reduction amount; Handover the terminal device group to its adjacent cell; as well as The determination, reduction and handover operations are repeated on the remaining terminal devices among the multiple terminal devices until the downlink transmission power of the serving cell is lower than or equal to a predetermined target level, or the multiple terminal devices are handed over to their adjacent cells.
15. The method of claim 14, further comprising: When a neighboring cell of at least one terminal device operates at a different frequency from the serving cell, the at least one terminal device is handed over to its neighboring cell before determining the terminal device group.
16. The method of claim 14, wherein: The power reduction amount is determined based at least in part on a default power reduction amount and a power adjustment amount, and the power adjustment amount is calculated based at least in part on a previous power adjustment amount and a previous handoff performance.
17. The method of claim 16, wherein: The power reduction amount is further determined in consideration of the handoff processing capability of the network device.
18. The method of claim 16, wherein: In response to the determined power reduction amount exceeding an upper limit or a lower limit of a predetermined power reduction range, the upper limit or the lower limit of the predetermined power reduction range is applied as the power reduction amount.
19. The method of claim 14, wherein: Determining the terminal device group includes: Based on the first measurement report, calculating a signal quality gap between the neighboring cell and the serving cell for the corresponding terminal device; and The terminal device group whose signal quality gap is in the range from Dm to Dm-Dn is determined, wherein Dm is a threshold for triggering intra-frequency handover, and Dn is a determined power reduction amount.
20. The method of claim 19, wherein: Before handover of the terminal device begins, the signal quality gap calculated for the terminal device is updated based on the previously reduced downlink transmission power of the serving cell and / or a new first measurement report received from the terminal device.
21. The network device according to claim 19, wherein: When the downlink transmission power of the serving cell is higher than the predetermined target level by an amount less than or equal to the determined power reduction amount, it is determined that the terminal device group includes the terminal device having an available measurement report.
22. The method of claim 19, wherein: The terminal device group is handed over to its adjacent cell in descending order of the signal quality gap.
23. The method of claim 14, wherein: The handover of the terminal device group is performed in parallel with the reduction of the downlink transmission power of the serving cell.
24. The method of claim 14, further comprising: A first minimum threshold is configured for a terminal device connected to the network device in the service cell to trigger a first measurement report, wherein the first measurement report is triggered when the signal quality of at least one neighboring cell is higher than or equal to the first minimum threshold, and the first measurement report indicates the signal quality of the at least one neighboring cell and the signal quality of the service cell.
25. The method of claim 24, wherein: The first minimum threshold has a value less than or equal to -100 dBm and higher than or equal to -150 dBm, preferably less than or equal to -110 dBm and higher than or equal to -140 dBm.
26. The method of claim 24, further comprising: Configuring a second threshold for a terminal device connected to the network device in the serving cell to trigger a second measurement report, wherein the second measurement report is triggered when the signal quality of at least one neighboring cell is better than the signal quality of the serving cell and is higher than or equal to the second threshold; receiving the second measurement report from the terminal device, the second measurement report indicating the signal quality of the at least one neighboring cell and the signal quality of the serving cell; and The terminal device is handed over in response to the received second measurement report.
27. An apparatus comprising: means for receiving, at a network device, a first measurement report from a plurality of terminal devices connected to the network device in a serving cell, the first measurement report indicating neighboring cells for the plurality of terminal devices; means for determining a power reduction amount and a group of terminal devices associated with the power reduction amount based at least in part on the first measurement report; means for reducing the downlink transmission power of the serving cell according to the determined power reduction amount; Means for handing over the terminal equipment group to its adjacent cell; as well as A device is used to repeat the determination, reduction and handover operations of the remaining terminal devices among the multiple terminal devices until the downlink transmission power of the serving cell is lower than or equal to a predetermined target level, or the multiple terminal devices are handed over to their adjacent cells.
28. A computer program product embodied in at least one computer-readable medium and comprising instructions that, when executed by at least one processor of a network device, cause the network device to at least: receiving a first measurement report from a plurality of terminal devices connected to the network device in a serving cell, the first measurement report indicating neighboring cells for the plurality of terminal devices; determining a power reduction amount and a group of terminal devices associated with the power reduction amount based at least in part on the first measurement report; reducing the downlink transmission power for the serving cell by the determined power reduction amount; Handover the terminal device group to its adjacent cell; as well as The determination, reduction and handover operations are repeated on the remaining terminal devices among the plurality of terminal devices until the downlink transmission power for the serving cell is lower than or equal to a predetermined target level, or the plurality of terminal devices are handed over to their neighboring cells.