Fracturing crack main liquid inlet point depth calculation method based on wellhead water hammer signal

Through the calculation method of frequency difference method based on wellhead water strike signal, the error problem of liquid injection point position detection in the existing technology is solved, more accurate liquid injection point information is provided, and the efficiency and accuracy of fracturing operations are improved. It is applicable Deep shale gas development under complex geological conditions.

CN119025840AInactive Publication Date: 2024-11-26CHENGDU UNIVERSITY OF TECHNOLOGY

Patent Information

Application Number
CN202411151670.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The detection method for the injection point position in the existing fracturing operation is complicated to operate, high equipment costs, harsh landform requirements and is susceptible to external interference, resulting in large errors in the calculation results, making it difficult to provide accurate injection point position under complex geological conditions. information.

Method used

The calculation method of the main inlet point of the fracturing fracture based on the wellhead water strike signal is adopted. By collecting the oscillation curve of the stop pump water strike, the DC processing and high-frequency noise filtering are performed. After the window processing, the water strike is hit by the frequency difference method. The pressure wave signal is converted into a frequency domain amplitude-frequency curve, and the depth of the main inlet point is calculated by combining spectrum analysis.

Benefits of technology

Provide more accurate liquid injection point position information under complex geological conditions, improve the real-time adjustment ability of fracturing process parameters, enhance the efficiency and accuracy of fracturing operations, and is suitable for the development of deep shale gas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119025840A_ABST
    Figure CN119025840A_ABST
Patent Text Reader

Abstract

The invention discloses a fracturing crack main liquid inlet point depth calculation method based on a wellhead water hammer signal, which comprises the following steps: S1, collecting field data, generating an oscillation curve of pump stop water hammer in a fracturing process, and selecting an area with most obvious water hammer oscillation; s2, direct current removal processing is conducted on the selected data, meanwhile, filtering processing is conducted on high-frequency noise, and accurate wellhead pressure data are obtained; s3, performing windowing processing on the wellhead pressure data to obtain a water hammer time domain signal; and S4, performing frequency difference method calculation on the water hammer time domain signal, converting the water hammer pressure wave signal from a pressure-time curve to an amplitude-frequency curve on a frequency domain, and calculating the depth of a main liquid inlet point by using a spectral analysis method. According to the invention, more accurate liquid injection point position information can be provided under complex geological conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oil and gas reservoir development, and in particular to a method for calculating the depth of a main liquid inlet point of a fracturing crack based on a wellhead water hammer signal. Background Art

[0002] Energy is the lifeblood of modern society and plays an irreplaceable role in promoting the economy, ensuring national security and improving people's living standards. However, with the gradual depletion of conventional oil and gas resources and the continuous aggravation of environmental problems, the development of unconventional oil and gas reservoirs has become particularly important. The growth in unconventional oil and gas production is due to the application of large-scale horizontal well staged fracturing technology, which forms a complex fracture network through hydraulic fracturing, increases the oil leakage area, and improves the oil and gas seepage capacity. In horizontal well staged fracturing, hydraulic fractures can provide channels for underground oil and gas flow, and the formation of fractures directly affects the production and recovery rate. By detecting the location of the injection point, the distribution and extension of the fracturing fluid in the formation can be monitored, so as to more effectively design the fracturing plan, control the distribution of fractures, increase the channels for oil and gas flow, and thus improve the recoverability and recovery rate of oil and gas. The location information of the injection point can also help engineers optimize the fracturing design, including fracture length, direction, distribution density, etc., to adapt to the special properties and geological conditions of the reservoir, which helps to achieve more efficient fracturing operations. In summary, detecting the location of injection points is crucial to achieving efficient, safe and environmentally friendly operation of horizontal well fracturing technology, and is one of the key factors in improving the efficiency and economic benefits of oil and gas development.

[0003] At present, the methods for detecting the location of the injection point in fracturing operations mainly include micro-seismic monitoring technology, fiber optic sensing technology, tracer technology, and acoustic / ultrasonic monitoring technology. These technologies use different physical principles and monitoring methods to detect the location of the injection point during the fracturing process, as well as information such as crack generation, expansion, and fluid distribution, in order to evaluate the fracturing effect. However, in practical applications, the above methods have many limitations, such as cumbersome operation, high equipment cost, strict topographic requirements, and susceptibility to external interference, which lead to large errors in their calculation results. Summary of the invention

[0004] In view of the above technical problems, the present invention provides a method for calculating the depth of the main liquid inlet point of a fracturing crack based on a wellhead water hammer signal.

[0005] The present invention is implemented by adopting the following technical scheme: a method for calculating the depth of the main liquid inlet point of a fracturing crack based on a wellhead water hammer signal, comprising the following steps:

[0006] S1: Collect field data, generate an oscillation curve of water hammer during pump stop during fracturing, and select the area with the most obvious water hammer oscillation;

[0007] S2: Remove DC from the selected data and filter the high-frequency noise to obtain accurate wellhead pressure data;

[0008] S3: Window processing is performed on the wellhead pressure data to obtain a water hammer time domain signal;

[0009] S4: The water hammer time domain signal is calculated by the frequency difference method, the water hammer pressure wave signal is converted from the pressure-time curve to the amplitude-frequency curve in the frequency domain, and the depth of the main liquid entry point is obtained by using the spectrum analysis method.

[0010] Furthermore, step S1 is specifically as follows: obtaining water hammer pressure wave data generated by stopping the pump through a high-frequency pressure sensor, generating an oscillation curve of water hammer during pump stopping during fracturing according to the water hammer pressure wave data, and selecting a region with the largest water hammer oscillation amplitude as pre-selected data.

[0011] Furthermore, the pre-selected data is subjected to Hilbert-Huang transform, sliding time window, original signal minus average value, empirical mode analysis or detrend algorithm to obtain pressure data without direct current component.

[0012] Furthermore, the Hilbert-Huang transform is as follows: intercepting the upper envelope and the lower envelope of the preselected data water hammer pressure, calculating the average value according to the upper and lower envelopes, subtracting the average value from the original water hammer pressure signal, and obtaining the pressure data without the DC component;

[0013] The sliding time window is: the window shift step length is the pressure sampling interval, the average value in the sliding time window is calculated, and the first pressure value in the selected time window is subtracted from the average value in the time window to obtain the pressure data of the entire pressure time domain curve without the DC signal;

[0014] The original signal minus the average value is: calculate the average value of the entire pressure time domain curve, and then subtract the average value from the original pressure curve to obtain the pressure data without the DC component;

[0015] The empirical mode analysis is as follows: the empirical mode decomposition is performed on the pressure time domain curve, and according to the decomposition result of the pressure data, the 2nd or 3rd order pressure data is selected to remove the direct current;

[0016] The detrend algorithm is: perform a first, second or third fitting curve on the pre-selected data, subtract the fitted curve from the original data, and obtain the pressure data without the DC component.

[0017] Furthermore, a first-order Gaussian filter, a second-order Gaussian filter, or a mask filter is used to filter the high-frequency noise while removing the DC component.

[0018] Furthermore, a window function selected from the group consisting of Hamming window, Hanning window, Gaussian window, Kaiser window, triangular window, tapered cosine window, Parzen window, flat-top window, chebwin window, Bohmanwin window, Blackman window and Baetlett window is used to perform window processing on the pressure data to obtain a water hammer time domain signal.

[0019] Furthermore, step S4 includes the following sub-steps:

[0020] S41: Calculate the water hammer wave period based on the water hammer time domain signal to obtain the water hammer wave velocity;

[0021] S42: Compare the water hammer wave velocity with the theoretical value of the wave velocity, enhance the water hammer signal, perform spectrum analysis, calculate the frequency difference, and finally calculate the main liquid entry point depth.

[0022] The beneficial effect of the present invention is that the present invention can provide more accurate injection point location information under complex geological conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0024] Figure 1 It is a flow chart of the present invention;

[0025] Figure 2 Time domain characteristic diagram of water hammer signal;

[0026] Figure 3 It is the diagram of the continuous equation infinitesimal model;

[0027] Figure 4 It is the infinitesimal model diagram of the equation of motion;

[0028] Figure 5 Time domain window diagram of water hammer signal;

[0029] Figure 6 This is the frequency domain characteristic diagram of the water hammer signal. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0031] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0032] Some embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.

[0033] See also Figure 1 A method for calculating the depth of the main liquid inlet point of a fracturing crack based on a wellhead water hammer signal comprises the following steps:

[0034] S1: Collect field data, generate an oscillation curve of water hammer during pump stop during fracturing, and select the area with the most obvious water hammer oscillation;

[0035] S2: Remove DC from the selected data and filter the high-frequency noise to obtain accurate wellhead pressure data;

[0036] S3: Window processing is performed on the wellhead pressure data to obtain a water hammer time domain signal;

[0037] S4: The water hammer time domain signal is calculated by the frequency difference method, the water hammer pressure wave signal is converted from the pressure-time curve to the amplitude-frequency curve in the frequency domain, and the depth of the main liquid entry point is obtained by using the spectrum analysis method.

[0038] In this embodiment, step S1 is specifically as follows: obtaining water hammer pressure wave data generated by stopping the pump through a high-frequency pressure sensor, generating an oscillation curve of water hammer during pump stopping during fracturing according to the water hammer pressure wave data, and selecting a section with the largest water hammer oscillation amplitude as pre-selected data. After the fracturing construction is completed, the sudden change in the wellhead displacement will generate water hammer pressure waves in the wellbore. After the water hammer wave is excited from the wellhead, it propagates along the wellbore. When it propagates to the underground cracks and bridge plugs, part of the energy is reflected back to the wellhead and collected by the ground pressure sensor. Among them, the water hammer pressure wave data generated by stopping the pump is collected by the high-frequency pressure sensor and high-frequency signal acquisition device arranged at the wellhead to excite the water hammer pressure signal. The water hammer wave carries rich underground crack information and often presents specific changes. By analyzing its time / frequency domain characteristics, the precise positioning of the liquid inlet point can be achieved.

[0039] In this embodiment, the Hilbert-Huang transform, or the sliding time window, or the original signal minus the average value, or the empirical mode analysis, or the detrend algorithm are used to obtain the pressure data without the DC component on the pre-selected data.

[0040] The Hilbert-Huang transform is as follows: intercepting the upper envelope and the lower envelope of the preselected data water hammer pressure, calculating the average value according to the upper and lower envelopes, subtracting the average value from the original water hammer pressure signal, and obtaining the pressure data without the DC component;

[0041] The sliding time window is: the window shift step length is the pressure sampling interval, the average value in the sliding time window is calculated, and the first pressure value in the selected time window is subtracted from the average value in the time window to obtain the pressure data of the entire pressure time domain curve without the DC signal;

[0042] The original signal minus the average value is: calculate the average value of the entire pressure time domain curve, and then subtract the average value from the original pressure curve to obtain the pressure data without the DC component;

[0043] The empirical mode analysis is as follows: the empirical mode decomposition is performed on the pressure time domain curve, and according to the decomposition result of the pressure data, the 2nd or 3rd order pressure data is selected to remove the direct current;

[0044] The detrend algorithm is: perform a first, second or third fitting curve on the pre-selected data, subtract the fitted curve from the original data, and obtain the pressure data without the DC component.

[0045] Furthermore, a first-order Gaussian filter, a second-order Gaussian filter, or a mask filter is used to filter the high-frequency noise while removing the DC component. It should be noted that the process of mask filtering is: short-time Fourier transform is performed on the wellhead time-pressure curve, 0-5 or 0-10 Hz signals are retained, and the remaining signals are set to zero, and then inverse Fourier transform is performed to obtain a time domain curve.

[0046] In this embodiment, a window function selected from the group consisting of a Hamming window, a Hanning window, a Gaussian window, a Kaiser window, a triangular window, a tapered cosine window, a Parzen window, a flat-top window, a Chebwin window, a Bohmanwin window, a Blackman window and a Baetlett window is used to perform window processing on the pressure data. Figure 5 As shown, the water hammer time domain signal is obtained.

[0047] In this embodiment, step S4 includes the following sub-steps:

[0048] S41: Calculate the water hammer wave period based on the water hammer time domain signal to obtain the water hammer wave velocity;

[0049] S42: Compare the water hammer wave velocity with the theoretical value of the wave velocity, enhance the water hammer signal, perform spectrum analysis, calculate the frequency difference, and finally calculate the main liquid entry point depth.

[0050] Specifically, the depth of the main liquid inlet point is calculated based on the frequency domain characteristics, and the Fourier transform converts the collected signal from the time domain to the frequency domain, and decomposes the time domain signal into different frequency signal characteristics. After the fracturing pump is stopped, a water hammer time domain signal is generated. Through the Fourier transform, the collected water hammer pressure wave signal is converted from the pressure-time curve to the amplitude-frequency curve in the frequency domain. However, the high-frequency pressure signal components at the wellhead are complex, and the noise component will affect the positioning accuracy of the fracture liquid inlet point. Therefore, the original time domain data of the water hammer pressure wave is first detrended to achieve the purpose of suppressing the amplitude of the leakage frequency component. After the original data is detrended, the time domain characteristics of the water hammer signal are obtained as shown below: Figure 2 As shown in Figure 1, a is the simulated water hammer pressure curve, and b is the water hammer curve after signal enhancement. Then perform Fourier transform to obtain the frequency domain characteristics of the water hammer signal as shown in Figure 1. Figure 6 As shown, it can be seen from the spectrum that there are multiple peaks, which is consistent with the resonance wave behavior. Among them, the first peak is the fundamental frequency of the signal. Except for the first fundamental frequency, the subsequent peaks are the nth harmonics, n is the sequence number of the nth harmonic sequence, the boundary condition of the bottom hole fracture is an open boundary, and the fracturing fluid flows into the fracture. From the spectrum, it can be concluded that the difference between the first harmonic frequency and the fundamental frequency is equal to the difference between the second harmonic frequency and the first harmonic frequency. Therefore, the reflection time of the water hammer pressure wave generated by stopping the pump to reach the liquid inlet point can be calculated.

[0051] Based on the time domain waveform of the water hammer model, the water hammer wave period is calculated, and the water hammer wave velocity is obtained, which is compared with the theoretical value of the wave velocity of the water hammer model. After the water hammer signal is enhanced, the spectrum analysis is performed, and the frequency difference is calculated. Finally, the position of the liquid inlet point is calculated and compared with the theoretical position of the liquid inlet point of the water hammer model. The specific results are shown in Table 1 below. The error between the calculated wave velocity and the theoretical value is only 0.27%, and the error between the liquid inlet point depth and the theoretical position is 0.07%. The results show that the frequency difference method for locating the injection point depth is feasible, and the injection point positioning is very accurate. The application of this positioning method is conducive to the real-time adjustment of the fracturing process parameters during the on-site construction process, improving the transformation effect, and laying the foundation for the subsequent large-scale and efficient development of deep shale gas.

[0052] Table 1 Results of calculating the liquid entry point position based on the water hammer model

[0053]

[0055] It should be noted that the water hammer model is a basic equation of the water hammer effect established based on the transient flow theory. During the fracturing process of a vertical directional well or a horizontal well, when the construction displacement fluctuates greatly or at the moment of stopping the pump, due to the incompressible characteristics and large inertia of the liquid in the tubing, the flow rate of the liquid in the tubing will change sharply, causing a sudden change in the construction pressure, which propagates in the entire tubing in the form of a pressure wave. This feature is reflected in the construction pressure as a common water hammer phenomenon, also known as the water hammer phenomenon. The water hammer phenomenon occurs because mechanical oscillation waves are directly generated at the crack mouth of the well bottom and the ground pressure sensor, and multiple reciprocating movements are made between the well bottom and the ground. The wellhead acquisition device collects the water hammer pressure signal, performs data analysis on the water hammer signal, and obtains the injection point location information.

[0056] The process of building a mathematical model of the water hammer model: First, make the following assumptions: the wellbore is a one-dimensional propagation model; the wellbore fluid is an incompressible fluid; the physical properties, pressure and flow rate of each point in the same cross-section are evenly distributed; the diameter of each point in the wellbore is the same, and the energy loss at the joint can be ignored; the wellbore interacts with the surrounding formation only through the fracture interface; the inclination of the horizontal well section is a constant value.

[0057] The core theory of the water hammer model is the mass conservation equation and the momentum conservation equation. Based on the transient flow theory, the present invention establishes a water hammer mathematical model, which can be solved using the characteristic line method. To establish the model, first, define the control body 1-2 in the horizontal section of the wellbore, such as Figure 3 As shown, the liquid enters through section 1-1 and leaves through section 2-2. The distance between the two sections is set to dx, and the angle between the center line of the control body and the horizontal plane is set to θ. The cross-sectional area at section 1-1 is set to A. Within the time interval dt, according to the principle of mass conservation, the difference between the mass of the fluid flowing into section 1-1 and the mass of the fluid flowing out of section 2-2 is equal to the mass change in the control body, and the water hammer continuity equation is obtained:

[0058] Wherein, the flow velocity is v, and the liquid density is ρ, H is the water head, a is the water hammer wave velocity, and g is the gravitational acceleration.

[0059] Select the tiny cylinders around the pipe axis, such as Figure 4 As shown. The cross-sectional area of ​​the microelement is dA, the length is dx, the fluid flow direction is marked as x, its diameter is recorded as d, and the intersection angle between the axis of the control body and the horizontal plane is defined as θ. Based on the principle of conservation of momentum, ignoring the uneven distribution of flow velocity on the cross section of the pipeline, the average flow velocity v of the cross section is used to express it, and the motion equation of the one-dimensional unstable flow is obtained:

[0060]

[0061] Where τ is the average stress on the cylindrical surface, z is the average elevation of the total flow section, p is the average pressure of the total flow section, and D is the diameter of the total flow section. is the shear stress of the pipe wall, λ is the Darcy friction resistance, and by judging the range of the Reynolds number Re, the corresponding empirical formula can be used to determine the value of the hydraulic friction coefficient along the way. The water hammer motion equation considering the friction resistance is obtained:

[0062]

[0063] For the aforementioned embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the order of the actions described, because according to the present application, some steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are preferred embodiments, and the actions involved are not necessarily required by the present application.

[0064] The above embodiments describe the basic principles and main features of the present invention and the advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the changes and modifications made by those skilled in the art shall be within the scope of protection of the appended claims of the present invention without departing from the spirit and scope of the present invention.

Claims

1. A method for calculating the depth of the main liquid inlet point of a fracturing crack based on a wellhead water hammer signal, characterized in that: The steps include: S1: Collect field data, generate an oscillation curve of water hammer during pump stop during fracturing, and select the area with the most obvious water hammer oscillation; S2: Remove DC from the selected data and filter the high-frequency noise to obtain accurate wellhead pressure data; S3: Window processing is performed on the wellhead pressure data to obtain a water hammer time domain signal; S4: The water hammer time domain signal is calculated by the frequency difference method, the water hammer pressure wave signal is converted from the pressure-time curve to the amplitude-frequency curve in the frequency domain, and the depth of the main liquid entry point is obtained by using the spectrum analysis method.

2. A method for calculating the depth of the main liquid inlet point of a fracturing crack based on a wellhead water hammer signal according to claim 1, characterized in that: Step S1 specifically includes: obtaining water hammer pressure wave data generated by pump stop through a high-frequency pressure sensor, generating an oscillation curve of water hammer during pump stop in the fracturing process according to the water hammer pressure wave data, and selecting a region with the largest water hammer oscillation amplitude as pre-selected data.

3. A method for calculating the depth of the main liquid inlet point of a fracturing crack based on a wellhead water hammer signal according to claim 2, characterized in that: The pre-selected data are subjected to Hilbert-Huang transform, sliding time window, original signal minus average value, empirical mode analysis or detrend algorithm to obtain pressure data without direct current component.

4. A method for calculating the depth of the main liquid inlet point of a fracturing crack based on a wellhead water hammer signal according to claim 3, characterized in that: The Hilbert-Huang transform is as follows: intercepting the upper envelope and the lower envelope of the preselected data water hammer pressure, calculating the average value according to the upper and lower envelopes, subtracting the average value from the original water hammer pressure signal, and obtaining the pressure data without the DC component; The sliding time window is: the window shift step length is the pressure sampling interval, the average value in the sliding time window is calculated, and the first pressure value in the selected time window is subtracted from the average value in the time window to obtain the pressure data of the entire pressure time domain curve without the DC signal; The original signal minus the average value is: calculate the average value of the entire pressure time domain curve, and then subtract the average value from the original pressure curve to obtain the pressure data without the DC component; The empirical mode analysis is as follows: the empirical mode decomposition is performed on the pressure time domain curve, and according to the decomposition result of the pressure data, the 2nd or 3rd order pressure data is selected to remove the direct current; The detrend algorithm is: perform a first, second or third fitting curve on the pre-selected data, subtract the fitted curve from the original data, and obtain the pressure data without the DC component.

5. A method for calculating the depth of the main liquid inlet point of a fracturing crack based on a wellhead water hammer signal according to claim 4, characterized in that: A first-order Gaussian filter, a second-order Gaussian filter, or a mask filter is used to filter high-frequency noise while removing the DC component.

6. A method for calculating the depth of the main liquid inlet point of a fracturing crack based on a wellhead water hammer signal according to claim 5, characterized in that: The pressure data is processed by using one of the window functions selected from the group consisting of Hamming window, Hanning window, Gaussian window, Kaiser window, triangular window, tapered cosine window, Parzen window, flat-top window, chebwin window, Bohmanwin window, Blackman window and Baetlett window to obtain the water hammer time domain signal.

7. A method for calculating the depth of the main liquid inlet point of a fracturing crack based on a wellhead water hammer signal according to claim 6, characterized in that: Step S4 includes the following sub-steps: S41: Calculate the water hammer wave period based on the water hammer time domain signal to obtain the water hammer wave velocity; S42: Compare the water hammer wave velocity with the theoretical value of the wave velocity, enhance the water hammer signal, perform spectrum analysis, calculate the frequency difference, and finally calculate the main liquid entry point depth.

Citation Information

Patent Citations

  • Sound signal processing method used for measuring oil well working fluid level depth

    CN103821499A

  • Rotary mechanical product residual life prediction system

    CN110991055A

  • Water hammer pressure wave signal simulation system

    CN111413206A

  • Signal processing method for eliminating direct-current components and trend terms of acceleration sensor

    CN111650399A

  • Surge pressure wave velocity determination method and device, and electronic equipment

    CN113987972A

Cited By

  • Experimental simulation system and data processing method for fracturing pump stop water hammer waves

    CN120142025A

  • Method for determining position of liquid inlet point by using hydraulic fracturing water hammer signal

    CN120159397A

  • A method for determining the liquid inlet point position by using hydraulic fracturing water hammer signals

    CN120159397B

  • Method for determining monitoring position of pressure sensor and related assembly

    CN121595097A