Building industry full life cycle management system based on AI algorithm analysis

Through the full life cycle management system of the construction industry based on AI algorithm analysis, data is collected and processed in real time, AI models are built and optimized, predictive analysis and intelligent management are solved, and the existing systems cannot be monitored and managed in real time, and the construction is improved Industry management effectiveness and data quality.

CN119027057AInactive Publication Date: 2024-11-26QINGDAO FEIYU CHANGXING INTELLIGENT ENG CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411141553.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing construction industry management system cannot conduct real-time monitoring and management of the entire life cycle of the construction industry, resulting in poor management results and cannot meet the management needs of the construction industry.

Method used

Adopt the full life cycle management system of the construction industry based on AI algorithm analysis, including data acquisition, data processing, model construction, model optimization, predictive analysis and comprehensive management modules. By collecting and processing data in real time, building and optimizing AI algorithm analysis models, and conducting Predictive analysis and intelligent comprehensive management.

Benefits of technology

Real-time monitoring and management of the entire life cycle of the construction industry is achieved, management effect is improved, management needs can be better met in the construction industry, and data quality and decision-making efficiency are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119027057A_ABST
    Figure CN119027057A_ABST
Patent Text Reader

Abstract

The invention discloses a building industry full life cycle management system based on AI algorithm analysis, which belongs to the technical field of building industry management systems and comprises a data acquisition module, a data processing module, a model construction module, a model optimization module, a prediction analysis module and a comprehensive management module. According to the invention, the problems that the whole life cycle of the building industry cannot be monitored and managed in real time in the prior art, so that the whole life cycle management effect of the building industry is poor, and the management requirements of the building industry cannot be well met are solved. According to the invention, prediction analysis is carried out on the building industry full-life-cycle characteristic data, a building industry full-life-cycle prediction analysis result based on AI algorithm analysis is determined, a building industry full-life-cycle management scheme is formulated, and intelligent comprehensive management is carried out on the building industry full-life cycle based on the building industry full-life-cycle management scheme. Real-time monitoring and management can be carried out on the whole life cycle of the building industry, the management effect of the whole life cycle of the building industry can be improved, and the management requirements of the building industry can be well met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction management systems, and specifically to a construction full life cycle management system based on AI algorithm analysis. Background Art

[0002] The construction industry refers to the material production sector in the national economy that is engaged in the survey, design, construction of building and installation projects, as well as the maintenance of existing buildings; according to the National Economic Industry Classification Catalogue, the construction industry, as one of the 20 classified industries of the national economy, consists of the following four major categories: housing construction, civil engineering construction, construction and installation, building decoration, renovation and other construction industries. The function of the construction industry is mainly to carry out construction and installation activities for various building materials and components, machinery and equipment, etc., and to build productive and non-productive fixed assets for the national economy; the development of the construction industry is closely related to the scale of fixed asset investment, which promotes and restricts each other.

[0003] The Chinese patent with publication number CN104200320A discloses a construction industry personnel information and attendance management system, including a headquarters server, a server program, terminal equipment, and attendance terminals at each construction site. The headquarters server has a public IP address, and the server program is deployed on the headquarters server in a B / S architecture mode. The attendance terminal pushes attendance record data to the headquarters server via the Internet. Managers can log in to the server program through the browser of various types of terminal devices to upload and manage detailed information of laborers; it has the functions of multi-type, multi-centralization, automatic analysis and summary of attendance records, and multi-mode graphic display, which is suitable for personnel access and vehicle channels of various construction sites, greatly facilitating the control and attendance management of personnel and vehicles. However, the patent has the following defects:

[0004] The existing system is unable to conduct real-time monitoring and management of the entire life cycle of the construction industry, resulting in poor management results for the entire life cycle of the construction industry and failing to meet the management needs of the construction industry. Summary of the invention

[0005] The purpose of the present invention is to provide a full life cycle management system for the construction industry based on AI algorithm analysis, which can perform real-time monitoring and management of the entire life cycle of the construction industry, improve the management effect of the entire life cycle of the construction industry, better meet the management needs of the construction industry, and solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] A full life cycle management system for the construction industry based on AI algorithm analysis, including:

[0008] Data collection module, used to collect real-time data throughout the life cycle of the construction industry;

[0009] Based on the real-time collection of material procurement, production capacity, sales capacity and production inventory of the entire life cycle of the construction industry, the construction industry procurement information, construction industry production information, construction industry sales information and construction industry inventory information are obtained to determine the real-time data of the entire life cycle of the construction industry;

[0010] Data processing module, used to process real-time data of the entire life cycle of the construction industry;

[0011] Based on the retrieval, classification and feature extraction of real-time data of the entire life cycle of the construction industry, the characteristic data of the entire life cycle of the construction industry is determined;

[0012] Model building module, used to build AI algorithm analysis model for the entire life cycle of the construction industry;

[0013] According to the full life cycle management needs of the construction industry based on AI algorithm analysis, the AI ​​algorithm analysis model for the full life cycle of the construction industry is determined;

[0014] Model optimization module, used to optimize the AI ​​algorithm analysis model of the entire life cycle of the construction industry;

[0015] Based on the optimization of the AI ​​algorithm analysis model for the entire life cycle of the construction industry, the optimal AI algorithm analysis model for the entire life cycle of the construction industry is determined;

[0016] Prediction and analysis module, used to conduct prediction and analysis on characteristic data of the entire life cycle of the construction industry;

[0017] Based on the optimal AI algorithm analysis model for the entire life cycle of the construction industry, predict and analyze the characteristic data of the entire life cycle of the construction industry, and determine the prediction and analysis results of the entire life cycle of the construction industry based on AI algorithm analysis;

[0018] Comprehensive management module, used for intelligent and comprehensive management of the entire life cycle of the construction industry;

[0019] Based on the full life cycle management solution of the construction industry, intelligent management of procurement, production, sales and inventory status throughout the life cycle of the construction industry is carried out.

[0020] Preferably, the data acquisition module includes:

[0021] The procurement collection unit is used to collect the material procurement situation of the entire construction process of the construction industry in real time and determine the procurement information of the construction industry;

[0022] The production collection unit is used to collect the production capacity of the entire construction process of the construction industry in real time and determine the production information of the construction industry;

[0023] The sales collection unit is used to collect the sales capacity of the entire construction process of the construction industry in real time and determine the sales information of the construction industry;

[0024] The inventory collection unit is used to collect the production inventory of the entire construction process of the construction industry in real time and determine the inventory information of the construction industry;

[0025] Among them, real-time data of the entire life cycle of the construction industry is determined based on construction industry procurement information, construction industry production information, construction industry sales information and construction industry inventory information.

[0026] Preferably, the data processing module includes:

[0027] Data retrieval unit, used to retrieve real-time data of the entire life cycle of the construction industry;

[0028] Obtain real-time data on the entire life cycle of the construction industry;

[0029] Based on the sequential retrieval method, real-time data of the entire life cycle of the construction industry is retrieved;

[0030] Conduct consistency checks on real-time data throughout the construction industry life cycle;

[0031] Check whether the real-time data of the entire life cycle of the construction industry meets the requirements according to the reasonable value range and mutual relationship of each variable in the real-time data of the entire life cycle of the construction industry;

[0032] Remove inconsistent data that is beyond the normal range, logically unreasonable or contradictory in the real-time data of the entire life cycle of the construction industry;

[0033] Process invalid and missing values ​​in real-time data of the entire life cycle of the construction industry;

[0034] Remove invalid and missing data that are of no value to the full life cycle management of the construction industry from the real-time data of the construction industry’s full life cycle;

[0035] Identify real-time data on the entire life cycle of the construction industry that is valuable for the management of the entire life cycle of the construction industry;

[0036] A data classification unit, used to classify the retrieved real-time data of the entire life cycle of the construction industry;

[0037] Obtain real-time data on the entire life cycle of the construction industry that is valuable for the management of the entire life cycle of the construction industry;

[0038] Based on the mutual exclusivity principle, the retrieved real-time data of the entire life cycle of the construction industry that are valuable for the entire life cycle management of the construction industry are classified;

[0039] Identify real-time data sets of the entire life cycle of the construction industry with different categories;

[0040] A feature extraction unit is used to extract features from real-time data sets over the entire life cycle of the construction industry;

[0041] Obtain real-time data sets of the entire life cycle of the construction industry with different categories;

[0042] Feature extraction of real-time datasets of the entire life cycle of the construction industry with different categories;

[0043] Determine the characteristic data of the entire life cycle of the construction industry.

[0044] Preferably, invalid and missing values ​​are processed for real-time data of the entire life cycle of the construction industry, including:

[0045] Extracting a preset data processing time period, wherein the data processing time period is used as a unit time for dividing the data acquisition time of the real-time data of the entire life cycle of the construction industry;

[0046] Segment the real-time data of the entire life cycle of the construction industry according to the data processing time period to generate multiple data information groups;

[0047] Screen invalid values ​​and missing values ​​for each data information group, and obtain the data volume corresponding to the invalid values ​​and missing values ​​corresponding to each data information group;

[0048] The data quality index coefficient corresponding to each data information group is obtained by using the data amount of invalid values ​​and missing values ​​corresponding to each data information group; wherein the data quality index coefficient is obtained by the following formula:

[0049]

[0050] Among them, K represents the data quality index coefficient; C w Indicates the amount of invalid and missing values ​​corresponding to the data information group; C z represents the amount of data corresponding to the data information group; x represents the number of data types contained in the invalid values ​​and missing values ​​in the data information group; w i Indicates the weight value corresponding to the i-th data type; w h Indicates the weights and values ​​of the data types included in invalid values ​​and missing values; C i Indicates the amount of data corresponding to the i-th data type;

[0051] When the data quality index coefficient exceeds a preset coefficient threshold, the data information group corresponding to the data quality index coefficient exceeding the preset coefficient threshold is used as the target data information group;

[0052] Determine whether the target information group contains a data information group whose data processing time period is later in chronological order, and perform data quality detection on the real-time data of the entire life cycle of the construction industry based on the judgment result.

[0053] Preferably, judging whether the target information group has a data information group with a later data processing time period in the time sequence, and performing data quality detection of the real-time data of the whole life cycle of the construction industry according to the judgment result, including:

[0054] Determine whether the target information group has a data information group whose data processing time period is later in the time sequence;

[0055] When the target information group does not have a data information group whose data processing time period is later than the target information group in time sequence, then extracting n data information groups that are earlier than the target information group in time sequence; wherein n is a preset number of information groups, and the value range of n is 10-100;

[0056] The data quality evaluation coefficient is obtained by using the data quality index coefficients of the n data information groups combined with the data quality index coefficients of the target information group combined with the first data anomaly determination model; wherein the structure of the first data anomaly determination model is as follows:

[0057]

[0058] Among them, Q 01 represents the data quality evaluation coefficient obtained by the first data anomaly determination model; n represents the number of data information groups preceding the target information group in chronological order; K x Represents the data quality evaluation coefficient of the target information group; K i represents the data quality evaluation coefficient of the data information group preceding the i-th target information group in chronological order; w maxi represents the maximum weight corresponding to the data type of the data information group preceding the i-th target information group in chronological order; w maxi-1 represents the maximum weight corresponding to the data type of the data information group preceding the i-1th target information group in chronological order; C maxi The amount of data corresponding to the data type with the maximum weight of the data information group preceding the i-th target information group in chronological order; C maxi-1 The amount of data corresponding to the data type with the maximum weight of the data information group preceding the i-1th target information group in chronological order;

[0059] When the target information group has a data information group whose data processing time period is later than the target information group in time sequence, all m data information groups whose data processing time period is later than the target information group in time sequence are extracted;

[0060] The data quality evaluation coefficient is obtained by using the data quality index coefficients of the m data information groups combined with the data quality index coefficients of the target information group combined with the second data anomaly determination model; wherein the structure of the second data anomaly determination model is as follows:

[0061]

[0062] Among them, Q 02 represents the data quality evaluation coefficient obtained by the second data anomaly determination model; m represents the number of all data information groups that exist after the data processing time period in the target information group in chronological order; K x Represents the data quality evaluation coefficient of the target information group; K j represents the data quality evaluation coefficient of the data information group following the jth target information group in chronological order; w maxj represents the maximum weight corresponding to the data type of the data information group preceding the jth target information group in chronological order; w maxj-1 represents the maximum weight corresponding to the data type of the data information group following the j-1th target information group in chronological order; C maxj The amount of data corresponding to the data type with the maximum weight of the data information group following the jth target information group in chronological order; C maxj-1 represents the amount of data corresponding to the data type with the maximum weight of the data information group following the j-1th target information group in chronological order; y represents the number of all data information groups preceding the target information group in chronological order; w maxg represents the maximum weight corresponding to the data type of the data information group preceding the g-th target information group in chronological order; w maxg-1 represents the maximum weight corresponding to the data type of the data information group preceding the g-1th target information group in chronological order; C maxg The amount of data corresponding to the data type with the maximum weight of the data information group following the g-th target information group in chronological order; C maxg-1 The amount of data corresponding to the data type with the maximum weight of the data information group following the g-1th target information group in chronological order;

[0063] Comparing the data quality evaluation coefficient with a preset quality evaluation coefficient threshold;

[0064] When the data quality evaluation coefficient is lower than the preset quality evaluation coefficient threshold, it is determined that there is a risk of abnormal data quality in the real-time data of the entire life cycle of the construction industry, and a risk warning is issued.

[0065] Preferably, the model building module includes:

[0066] Data collection unit, used to collect historical data of the entire life cycle of the construction industry;

[0067] According to the full life cycle management needs of the construction industry based on AI algorithm analysis, a large amount of historical data on the full life cycle of the construction industry is collected;

[0068] Data division unit, used to divide the historical data of the entire life cycle of the construction industry;

[0069] Obtain historical data on the entire life cycle of the construction industry;

[0070] Divide the historical data of the entire life cycle of the construction industry;

[0071] Determine the training set and test set;

[0072] Model training unit, used to train AI algorithm analysis models for the entire life cycle of the construction industry;

[0073] According to the full life cycle management needs of the construction industry based on AI algorithm analysis, select a deep learning model framework suitable for the full life cycle management of the construction industry;

[0074] Based on the training set, the selected deep learning model framework suitable for the full life cycle management of the construction industry is trained;

[0075] Determine the AI ​​algorithm analysis model for the entire life cycle of the construction industry.

[0076] Preferably, the model optimization module includes:

[0077] Performance testing unit, used to perform performance testing on AI algorithm analysis models throughout the construction industry life cycle;

[0078] Obtain AI algorithm analysis model for the entire life cycle of the construction industry;

[0079] Based on the test set, the performance of the AI ​​algorithm analysis model for the entire life cycle of the construction industry is tested;

[0080] Determine the performance test results based on the AI ​​algorithm analysis model of the construction industry's full life cycle;

[0081] Optimization and adjustment unit, used to optimize and adjust the AI ​​algorithm analysis model for the entire life cycle of the construction industry;

[0082] Obtain performance test results based on AI algorithm analysis models for the entire life cycle of the construction industry;

[0083] Mining and analyzing the performance test results based on the AI ​​algorithm analysis model of the entire life cycle of the construction industry;

[0084] Determine the optimization and adjustment plan based on the AI ​​algorithm analysis model of the entire life cycle of the construction industry;

[0085] Optimize and adjust the AI ​​algorithm analysis model for the entire life cycle of the construction industry according to the optimization and adjustment plan based on the AI ​​algorithm analysis model for the entire life cycle of the construction industry;

[0086] Determine the optimal AI algorithm analysis model for the entire life cycle of the construction industry.

[0087] Preferably, the prediction analysis module includes:

[0088] A data extraction unit, used to extract characteristic data of the entire life cycle of the construction industry;

[0089] According to the full life cycle management needs of the construction industry based on AI algorithm analysis, the characteristic data of the full life cycle of the construction industry is extracted;

[0090] Prediction and analysis unit, used to conduct prediction and analysis on characteristic data of the entire life cycle of the construction industry;

[0091] Obtain the best AI algorithm analysis model for the entire life cycle of the construction industry;

[0092] Input the characteristic data of the entire life cycle of the construction industry into the optimal AI algorithm analysis model of the entire life cycle of the construction industry;

[0093] Based on the optimal AI algorithm analysis model for the entire life cycle of the construction industry, predictive analysis is performed on the characteristic data of the entire life cycle of the construction industry;

[0094] Determine the forecast analysis results of the entire life cycle of the construction industry based on AI algorithm analysis;

[0095] The storage and display unit is used to store and visualize the characteristic data of the entire life cycle of the construction industry and the prediction and analysis results of the entire life cycle of the construction industry.

[0096] Preferably, the comprehensive management module includes:

[0097] The program development unit is used to develop a full life cycle management plan for the construction industry;

[0098] Obtain forecast analysis results for the entire life cycle of the construction industry based on AI algorithm analysis;

[0099] Mining and analyzing the forecast analysis results of the entire life cycle of the construction industry based on AI algorithm analysis;

[0100] Determine the full life cycle management plan for the construction industry;

[0101] Comprehensive management unit, used for intelligent and comprehensive management of the entire life cycle of the construction industry;

[0102] Get the full life cycle management solution for the construction industry;

[0103] Intelligent and comprehensive management of the entire life cycle of the construction industry is carried out based on the full life cycle management solution of the construction industry.

[0104] Preferably, the comprehensive management unit includes:

[0105] The procurement management module is used to intelligently manage procurement throughout the construction industry’s life cycle;

[0106] According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis;

[0107] Develop a full life cycle procurement management plan for the construction industry;

[0108] Intelligent management of procurement in the entire life cycle of the construction industry based on the procurement management solution for the entire life cycle of the construction industry;

[0109] The production management module is used to intelligently manage the production situation of the entire life cycle of the construction industry;

[0110] According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis;

[0111] Formulate a full life cycle production management plan for the construction industry;

[0112] Intelligent management of the production situation of the entire life cycle of the construction industry based on the full life cycle production management solution of the construction industry;

[0113] Sales management module, used for intelligent management of sales in the entire life cycle of the construction industry;

[0114] According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis;

[0115] Develop a full life cycle sales management plan for the construction industry;

[0116] Intelligently manage the sales situation of the construction industry throughout its life cycle based on the sales management solution for the construction industry throughout its life cycle;

[0117] Inventory management module, used for intelligent management of inventory status throughout the life cycle of the construction industry;

[0118] According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis;

[0119] Develop a full life cycle inventory management plan for the construction industry;

[0120] Based on the full life cycle inventory management solution for the construction industry, intelligent management of the inventory situation throughout the entire life cycle of the construction industry is carried out.

[0121] Compared with the prior art, the present invention has the following beneficial effects:

[0122] The present invention collects real-time data of the entire life cycle of the construction industry, processes the real-time data of the entire life cycle of the construction industry, determines the characteristic data of the entire life cycle of the construction industry, constructs an AI algorithm analysis model for the entire life cycle of the construction industry according to the management needs of the entire life cycle of the construction industry based on AI algorithm analysis, optimizes the AI ​​algorithm analysis model for the entire life cycle of the construction industry, determines the optimal AI algorithm analysis model for the entire life cycle of the construction industry, predicts and analyzes the characteristic data of the entire life cycle of the construction industry based on the optimal AI algorithm analysis model for the entire life cycle of the construction industry, determines the prediction and analysis results of the entire life cycle of the construction industry based on the AI ​​algorithm analysis, formulates a management plan for the entire life cycle of the construction industry, and conducts intelligent and comprehensive management of the entire life cycle of the construction industry based on the management plan for the entire life cycle of the construction industry. The entire life cycle of the construction industry can be monitored and managed in real time, the management effect of the entire life cycle of the construction industry can be improved, and the management needs of the construction industry can be better met. BRIEF DESCRIPTION OF THE DRAWINGS

[0123] Figure 1 This is a structural diagram of the construction industry full life cycle management system based on AI algorithm analysis of the present invention. DETAILED DESCRIPTION

[0124] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0125] In order to solve the existing problem that the entire life cycle of the construction industry cannot be monitored and managed in real time, resulting in poor management effect of the entire life cycle of the construction industry and failing to meet the management needs of the construction industry, please refer to Figure 1 , this embodiment provides the following technical solutions:

[0126] A full life cycle management system for the construction industry based on AI algorithm analysis, including: data acquisition module, data processing module, model building module, model optimization module, prediction analysis module and comprehensive management module.

[0127] It should be noted that through the interactive communication between the data acquisition module, data processing module, model building module, model optimization module, prediction analysis module and comprehensive management module, the entire life cycle of the construction industry can be monitored and managed in real time, the management effect of the entire life cycle of the construction industry can be improved, and the management needs of the construction industry can be better met.

[0128] Among them, the data collection module is used to collect real-time data of the entire life cycle of the construction industry;

[0129] In this embodiment, the data acquisition module includes:

[0130] The procurement collection unit is used to collect the material procurement situation of the entire construction process of the construction industry in real time and determine the procurement information of the construction industry;

[0131] The production collection unit is used to collect the production capacity of the entire construction process of the construction industry in real time and determine the production information of the construction industry;

[0132] The sales collection unit is used to collect the sales capacity of the entire construction process of the construction industry in real time and determine the sales information of the construction industry;

[0133] The inventory collection unit is used to collect the production inventory of the entire construction process of the construction industry in real time and determine the inventory information of the construction industry;

[0134] Among them, real-time data of the entire life cycle of the construction industry is determined based on construction industry procurement information, construction industry production information, construction industry sales information and construction industry inventory information.

[0135] Among them, the data processing module is used to process real-time data of the entire life cycle of the construction industry;

[0136] In this embodiment, the data processing module includes:

[0137] Data retrieval unit, used to retrieve real-time data of the entire life cycle of the construction industry;

[0138] Obtain real-time data on the entire life cycle of the construction industry;

[0139] Based on the sequential retrieval method, real-time data of the entire life cycle of the construction industry is retrieved;

[0140] Conduct consistency checks on real-time data throughout the construction industry life cycle;

[0141] Check whether the real-time data of the entire life cycle of the construction industry meets the requirements according to the reasonable value range and mutual relationship of each variable in the real-time data of the entire life cycle of the construction industry;

[0142] Remove inconsistent data that is beyond the normal range, logically unreasonable or contradictory in the real-time data of the entire life cycle of the construction industry;

[0143] Process invalid and missing values ​​in real-time data of the entire life cycle of the construction industry;

[0144] Remove invalid and missing data that are of no value to the full life cycle management of the construction industry from the real-time data of the construction industry’s full life cycle;

[0145] Identify real-time data on the entire life cycle of the construction industry that is valuable for the management of the entire life cycle of the construction industry;

[0146] A data classification unit, used to classify the retrieved real-time data of the entire life cycle of the construction industry;

[0147] Obtain real-time data on the entire life cycle of the construction industry that is valuable for the management of the entire life cycle of the construction industry;

[0148] Based on the mutual exclusivity principle, the retrieved real-time data of the entire life cycle of the construction industry that are valuable for the entire life cycle management of the construction industry are classified;

[0149] Identify real-time data sets of the entire life cycle of the construction industry with different categories;

[0150] A feature extraction unit is used to extract features from real-time data sets over the entire life cycle of the construction industry;

[0151] Obtain real-time data sets of the entire life cycle of the construction industry with different categories;

[0152] Feature extraction of real-time datasets of the entire life cycle of the construction industry with different categories;

[0153] Determine the characteristic data of the entire life cycle of the construction industry.

[0154] Among them, the model building module is used to build an AI algorithm analysis model for the entire life cycle of the construction industry;

[0155] Specifically, invalid and missing values ​​are processed for real-time data throughout the life cycle of the construction industry, including:

[0156] Extracting a preset data processing time period, wherein the data processing time period is used as a unit time for dividing the data acquisition time of the real-time data of the entire life cycle of the construction industry;

[0157] Segment the real-time data of the entire life cycle of the construction industry according to the data processing time period to generate multiple data information groups;

[0158] Screen invalid values ​​and missing values ​​for each data information group, and obtain the data volume corresponding to the invalid values ​​and missing values ​​corresponding to each data information group;

[0159] The data quality index coefficient corresponding to each data information group is obtained by using the data amount of invalid values ​​and missing values ​​corresponding to each data information group; wherein the data quality index coefficient is obtained by the following formula:

[0160]

[0161] Among them, K represents the data quality index coefficient; C wIndicates the amount of invalid and missing values ​​corresponding to the data information group; C z represents the amount of data corresponding to the data information group; x represents the number of data types contained in the invalid values ​​and missing values ​​in the data information group; w i Indicates the weight value corresponding to the i-th data type; w h Indicates the weights and values ​​of the data types included in invalid values ​​and missing values; C i Indicates the amount of data corresponding to the i-th data type;

[0162] When the data quality index coefficient exceeds a preset coefficient threshold, the data information group corresponding to the data quality index coefficient exceeding the preset coefficient threshold is used as the target data information group;

[0163] Determine whether the target information group contains a data information group whose data processing time period is later in chronological order, and perform data quality detection on the real-time data of the entire life cycle of the construction industry based on the judgment result.

[0164] The technical effect of the above technical solution is: by identifying and screening invalid values ​​and missing values ​​of real-time data, erroneous data can be removed or corrected, and the accuracy and reliability of data can be improved. This is crucial for data-based decision-making and model building. During data processing, by data segmentation and calculation of corresponding data quality index coefficients, the data quality of each data segment can be quantified, and incomplete parts of the data can be discovered and processed in a timely manner, thereby enhancing the integrity of the data. By presetting the data processing time period for data segmentation, data processing can be carried out in parallel or in batches, thereby improving the efficiency of data processing. At the same time, the problem data segment can be quickly located according to the data quality index coefficient, reducing the invalid data processing time. The introduction of the data quality index coefficient provides a quantitative indicator for the continuous monitoring of data quality. By regularly calculating and evaluating these indicators, data quality fluctuations can be discovered in a timely manner, and corresponding measures can be taken to adjust and optimize. Setting weight values ​​(wi) for different data types can more finely evaluate data quality, especially for the missing or errors of key data types, which can be given higher attention, thereby ensuring the quality of core data. By improving data quality, this technical solution provides a more solid data foundation for the full life cycle management of the construction industry, supports a more accurate and efficient data-driven decision-making process, and helps improve the overall operational efficiency and competitiveness of the enterprise.

[0165] In summary, this technical solution significantly improves the quality of real-time data throughout the entire life cycle of the construction industry through a systematic data processing process, providing strong support for the company's data management and decision-making.

[0166] Specifically, it is determined whether the target information group has a data information group with a later data processing time period in the time sequence, and data quality detection of the real-time data of the entire life cycle of the construction industry is performed according to the determination result, including:

[0167] Determine whether the target information group has a data information group whose data processing time period is later in the time sequence;

[0168] When the target information group does not have a data information group whose data processing time period is later than the target information group in time sequence, then extracting n data information groups that are earlier than the target information group in time sequence; wherein n is a preset number of information groups, and the value range of n is 10-100;

[0169] The data quality evaluation coefficient is obtained by using the data quality index coefficients of the n data information groups combined with the data quality index coefficients of the target information group combined with the first data anomaly determination model; wherein the structure of the first data anomaly determination model is as follows:

[0170]

[0171] Among them, Q 01 represents the data quality evaluation coefficient obtained by the first data anomaly determination model; n represents the number of data information groups preceding the target information group in chronological order; K x Represents the data quality evaluation coefficient of the target information group; K i represents the data quality evaluation coefficient of the data information group preceding the i-th target information group in chronological order; w maxi represents the maximum weight corresponding to the data type of the data information group preceding the i-th target information group in chronological order; w maxi-1 represents the maximum weight corresponding to the data type of the data information group preceding the i-1th target information group in chronological order; C maxi The amount of data corresponding to the data type with the maximum weight of the data information group preceding the i-th target information group in chronological order; C maxi-1 The amount of data corresponding to the data type with the maximum weight of the data information group preceding the i-1th target information group in chronological order;

[0172] When the target information group has a data information group whose data processing time period is later than the target information group in time sequence, all m data information groups whose data processing time period is later than the target information group in time sequence are extracted;

[0173] The data quality evaluation coefficient is obtained by using the data quality index coefficients of the m data information groups combined with the data quality index coefficients of the target information group combined with the second data anomaly determination model; wherein the structure of the second data anomaly determination model is as follows:

[0174]

[0175] Among them, Q 02 represents the data quality evaluation coefficient obtained by the second data anomaly determination model; m represents the number of all data information groups that exist after the data processing time period in the target information group in chronological order; K x Represents the data quality evaluation coefficient of the target information group; K j represents the data quality evaluation coefficient of the data information group following the jth target information group in chronological order; w maxj represents the maximum weight corresponding to the data type of the data information group preceding the jth target information group in chronological order; w maxj-1 represents the maximum weight corresponding to the data type of the data information group following the j-1th target information group in chronological order; C maxj The amount of data corresponding to the data type with the maximum weight of the data information group following the jth target information group in chronological order; C maxj-1 represents the amount of data corresponding to the data type with the maximum weight of the data information group following the j-1th target information group in chronological order; y represents the number of all data information groups preceding the target information group in chronological order; w maxg represents the maximum weight corresponding to the data type of the data information group preceding the g-th target information group in chronological order; w maxg-1 represents the maximum weight corresponding to the data type of the data information group preceding the g-1th target information group in chronological order; C maxg The amount of data corresponding to the data type with the maximum weight of the data information group following the g-th target information group in chronological order; C maxg-1 The amount of data corresponding to the data type with the maximum weight of the data information group following the g-1th target information group in chronological order;

[0176] Comparing the data quality evaluation coefficient with a preset quality evaluation coefficient threshold;

[0177] When the data quality evaluation coefficient is lower than the preset quality evaluation coefficient threshold, it is determined that there is a risk of abnormal data quality in the real-time data of the entire life cycle of the construction industry, and a risk warning is issued.

[0178] The technical effect of the above technical solution is: by judging the position of the target information group in the time series (i.e., whether there is a subsequent or previous data information group), and selecting different data anomaly determination models (first model or second model) accordingly, a dynamic and multi-dimensional evaluation of data quality is achieved. This method not only takes into account the quality of the target information group itself, but also incorporates the time factor, making the evaluation result more comprehensive and accurate. By introducing the time-sequential data information group for data quality evaluation, the changing trend and abnormal fluctuation of the data in the time dimension can be captured. This is crucial for timely discovery and processing of data anomaly problems due to time accumulation or in a specific time period, and helps to avoid the accumulation and amplification of data quality problems. In the data anomaly determination model, by considering the maximum weight corresponding to the data type and the amount of data corresponding to the data type with the maximum weight, the importance of the data type is refined. This method can ensure that key data types receive more attention during the evaluation process, thereby improving the accuracy and pertinence of the evaluation results. By comparing the data quality evaluation coefficient with the preset quality evaluation coefficient threshold, when the evaluation coefficient is lower than the threshold, the system can automatically determine that there is a data quality anomaly risk in the real-time data of the entire life cycle of the construction industry, and issue a risk warning. This mechanism helps to timely discover and respond to potential data quality issues, reducing their negative impact on business decisions and operational management. Through the application of the above technical solutions, the quality level of real-time data throughout the life cycle of the construction industry can be significantly improved, providing more reliable and accurate data support for data-based decision-making. This helps companies make more scientific and reasonable decisions and improve operational efficiency and competitiveness. This technical solution provides powerful tools and methodological support for data governance, helps companies establish and improve data governance systems, and realizes full life cycle management of data. By continuously optimizing data quality assessment models and risk warning mechanisms.

[0179] In this embodiment, the model building module includes:

[0180] Data collection unit, used to collect historical data of the entire life cycle of the construction industry;

[0181] According to the full life cycle management needs of the construction industry based on AI algorithm analysis, a large amount of historical data on the full life cycle of the construction industry is collected;

[0182] Data division unit, used to divide the historical data of the entire life cycle of the construction industry;

[0183] Obtain historical data on the entire life cycle of the construction industry;

[0184] Divide the historical data of the entire life cycle of the construction industry;

[0185] Determine the training set and test set;

[0186] Model training unit, used to train AI algorithm analysis models for the entire life cycle of the construction industry;

[0187] According to the full life cycle management needs of the construction industry based on AI algorithm analysis, select a deep learning model framework suitable for the full life cycle management of the construction industry;

[0188] Based on the training set, the selected deep learning model framework suitable for the full life cycle management of the construction industry is trained;

[0189] Determine the AI ​​algorithm analysis model for the entire life cycle of the construction industry.

[0190] Among them, the model optimization module is used to optimize the AI ​​algorithm analysis model for the entire life cycle of the construction industry;

[0191] In this embodiment, the model optimization module includes:

[0192] Performance testing unit, used to perform performance testing on AI algorithm analysis models throughout the construction industry life cycle;

[0193] Obtain AI algorithm analysis model for the entire life cycle of the construction industry;

[0194] Based on the test set, the performance of the AI ​​algorithm analysis model for the entire life cycle of the construction industry is tested;

[0195] Determine the performance test results based on the AI ​​algorithm analysis model of the construction industry's full life cycle;

[0196] Optimization and adjustment unit, used to optimize and adjust the AI ​​algorithm analysis model for the entire life cycle of the construction industry;

[0197] Obtain performance test results based on AI algorithm analysis models for the entire life cycle of the construction industry;

[0198] Mining and analyzing the performance test results based on the AI ​​algorithm analysis model of the entire life cycle of the construction industry;

[0199] Determine the optimization and adjustment plan based on the AI ​​algorithm analysis model of the entire life cycle of the construction industry;

[0200] Optimize and adjust the AI ​​algorithm analysis model for the entire life cycle of the construction industry according to the optimization and adjustment plan based on the AI ​​algorithm analysis model for the entire life cycle of the construction industry;

[0201] Determine the optimal AI algorithm analysis model for the entire life cycle of the construction industry.

[0202] Among them, the prediction and analysis module is used to predict and analyze the characteristic data of the entire life cycle of the construction industry;

[0203] In this embodiment, the prediction analysis module includes:

[0204] A data extraction unit, used to extract characteristic data of the entire life cycle of the construction industry;

[0205] According to the full life cycle management needs of the construction industry based on AI algorithm analysis, the characteristic data of the full life cycle of the construction industry is extracted;

[0206] Prediction and analysis unit, used to conduct prediction and analysis on characteristic data of the entire life cycle of the construction industry;

[0207] Obtain the best AI algorithm analysis model for the entire life cycle of the construction industry;

[0208] Input the characteristic data of the entire life cycle of the construction industry into the optimal AI algorithm analysis model of the entire life cycle of the construction industry;

[0209] Based on the optimal AI algorithm analysis model for the entire life cycle of the construction industry, predictive analysis is performed on the characteristic data of the entire life cycle of the construction industry;

[0210] Determine the forecast analysis results of the entire life cycle of the construction industry based on AI algorithm analysis;

[0211] The storage and display unit is used to store and visualize the characteristic data of the entire life cycle of the construction industry and the prediction and analysis results of the entire life cycle of the construction industry.

[0212] Among them, the comprehensive management module is used for intelligent and comprehensive management of the entire life cycle of the construction industry.

[0213] In this embodiment, the comprehensive management module includes:

[0214] The program development unit is used to develop a full life cycle management plan for the construction industry;

[0215] Obtain forecast analysis results for the entire life cycle of the construction industry based on AI algorithm analysis;

[0216] Mining and analyzing the forecast analysis results of the entire life cycle of the construction industry based on AI algorithm analysis;

[0217] Determine the full life cycle management plan for the construction industry;

[0218] Comprehensive management unit, used for intelligent and comprehensive management of the entire life cycle of the construction industry;

[0219] Get the full life cycle management solution for the construction industry;

[0220] Intelligent and comprehensive management of the entire life cycle of the construction industry is carried out based on the full life cycle management solution of the construction industry.

[0221] In this embodiment, the comprehensive management unit includes:

[0222] The procurement management module is used to intelligently manage procurement throughout the construction industry’s life cycle;

[0223] According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis;

[0224] Develop a full life cycle procurement management plan for the construction industry;

[0225] Intelligent management of procurement in the entire life cycle of the construction industry based on the procurement management solution for the entire life cycle of the construction industry;

[0226] The production management module is used to intelligently manage the production situation of the entire life cycle of the construction industry;

[0227] According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis;

[0228] Formulate a full life cycle production management plan for the construction industry;

[0229] Intelligent management of the production situation of the entire life cycle of the construction industry based on the full life cycle production management solution of the construction industry;

[0230] Sales management module, used for intelligent management of sales in the entire life cycle of the construction industry;

[0231] According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis;

[0232] Develop a full life cycle sales management plan for the construction industry;

[0233] Intelligently manage the sales situation of the construction industry throughout its life cycle based on the sales management solution for the construction industry throughout its life cycle;

[0234] Inventory management module, used for intelligent management of inventory status throughout the life cycle of the construction industry;

[0235] According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis;

[0236] Develop a full life cycle inventory management plan for the construction industry;

[0237] Based on the full life cycle inventory management solution for the construction industry, intelligent management of the inventory situation throughout the entire life cycle of the construction industry is carried out.

[0238] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0239] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A full life cycle management system for the construction industry based on AI algorithm analysis, characterized in that: include: Data collection module, used to collect real-time data throughout the life cycle of the construction industry; Based on the real-time collection of material procurement, production capacity, sales capacity and production inventory of the entire life cycle of the construction industry, the construction industry procurement information, construction industry production information, construction industry sales information and construction industry inventory information are obtained to determine the real-time data of the entire life cycle of the construction industry; Data processing module, used to process real-time data of the entire life cycle of the construction industry; Based on the retrieval, classification and feature extraction of real-time data of the entire life cycle of the construction industry, the characteristic data of the entire life cycle of the construction industry is determined; Model building module, used to build AI algorithm analysis model for the entire life cycle of the construction industry; According to the full life cycle management needs of the construction industry based on AI algorithm analysis, the AI ​​algorithm analysis model for the full life cycle of the construction industry is determined; Model optimization module, used to optimize the AI ​​algorithm analysis model of the entire life cycle of the construction industry; Based on the optimization of the AI ​​algorithm analysis model for the entire life cycle of the construction industry, the optimal AI algorithm analysis model for the entire life cycle of the construction industry is determined; Prediction and analysis module, used to conduct prediction and analysis on characteristic data of the entire life cycle of the construction industry; Based on the optimal AI algorithm analysis model for the entire life cycle of the construction industry, predict and analyze the characteristic data of the entire life cycle of the construction industry, and determine the prediction and analysis results of the entire life cycle of the construction industry based on AI algorithm analysis; Comprehensive management module, used for intelligent and comprehensive management of the entire life cycle of the construction industry; Based on the full life cycle management solution of the construction industry, intelligent management of procurement, production, sales and inventory status throughout the life cycle of the construction industry is carried out.

2. According to claim 1, a construction industry full life cycle management system based on AI algorithm analysis is characterized in that: The data acquisition module comprises: The procurement collection unit is used to collect the material procurement situation of the entire construction process of the construction industry in real time and determine the procurement information of the construction industry; The production collection unit is used to collect the production capacity of the entire construction process of the construction industry in real time and determine the production information of the construction industry; The sales collection unit is used to collect the sales capacity of the entire construction process of the construction industry in real time and determine the sales information of the construction industry; The inventory collection unit is used to collect the production inventory of the entire construction process of the construction industry in real time and determine the inventory information of the construction industry; Among them, real-time data of the entire life cycle of the construction industry is determined based on construction industry procurement information, construction industry production information, construction industry sales information and construction industry inventory information.

3. According to claim 2, a construction industry full life cycle management system based on AI algorithm analysis is characterized in that: The data processing module comprises: Data retrieval unit, used to retrieve real-time data of the entire life cycle of the construction industry; Obtain real-time data on the entire life cycle of the construction industry; Based on the sequential retrieval method, real-time data of the entire life cycle of the construction industry is retrieved; Conduct consistency checks on real-time data throughout the construction industry life cycle; Check whether the real-time data of the entire life cycle of the construction industry meets the requirements according to the reasonable value range and mutual relationship of each variable in the real-time data of the entire life cycle of the construction industry; Remove inconsistent data that is beyond the normal range, logically unreasonable or contradictory in the real-time data of the entire life cycle of the construction industry; Process invalid and missing values ​​in real-time data of the entire life cycle of the construction industry; Remove invalid and missing data that are of no value to the management of the entire life cycle of the construction industry from the real-time data of the entire life cycle of the construction industry; Identify real-time data on the entire life cycle of the construction industry that is valuable for the management of the entire life cycle of the construction industry; A data classification unit, used to classify the retrieved real-time data of the entire life cycle of the construction industry; Obtain real-time data on the entire life cycle of the construction industry that is valuable for the management of the entire life cycle of the construction industry; Based on the mutual exclusivity principle, the retrieved real-time data of the entire life cycle of the construction industry that are valuable for the entire life cycle management of the construction industry are classified; Identify real-time data sets of the entire life cycle of the construction industry with different categories; A feature extraction unit is used to extract features from real-time data sets over the entire life cycle of the construction industry; Obtain real-time data sets of the entire life cycle of the construction industry with different categories; Feature extraction of real-time datasets of the entire life cycle of the construction industry with different categories; Determine the characteristic data of the entire life cycle of the construction industry.

4. According to claim 2, a construction industry full life cycle management system based on AI algorithm analysis is characterized in that: Process invalid and missing values ​​for real-time data throughout the life cycle of the construction industry, including: Extracting a preset data processing time period, wherein the data processing time period is used as a unit time for dividing the data acquisition time of the real-time data of the entire life cycle of the construction industry; Segment the real-time data of the entire life cycle of the construction industry according to the data processing time period to generate multiple data information groups; Screen invalid values ​​and missing values ​​for each data information group, and obtain the data volume corresponding to the invalid values ​​and missing values ​​corresponding to each data information group; The data quality index coefficient corresponding to each data information group is obtained by using the data amount of invalid values ​​and missing values ​​corresponding to each data information group; wherein the data quality index coefficient is obtained by the following formula: Among them, K represents the data quality index coefficient; C w Indicates the amount of invalid and missing values ​​corresponding to the data information group; C z represents the amount of data corresponding to the data information group; x represents the number of data types contained in the invalid values ​​and missing values ​​in the data information group; w i Indicates the weight value corresponding to the i-th data type; w h Indicates the weights and values ​​of the data types included in invalid values ​​and missing values; C i Indicates the amount of data corresponding to the i-th data type; When the data quality index coefficient exceeds a preset coefficient threshold, the data information group corresponding to the data quality index coefficient exceeding the preset coefficient threshold is used as the target data information group; Determine whether the target information group contains a data information group whose data processing time period is later in chronological order, and perform data quality detection on the real-time data of the entire life cycle of the construction industry based on the judgment result.

5. According to claim 4, a construction industry full life cycle management system based on AI algorithm analysis is characterized in that: Determine whether the target information group has a data information group with a later data processing time period in the time sequence, and perform data quality detection of the real-time data of the entire life cycle of the construction industry according to the determination result, including: Determine whether the target information group has a data information group whose data processing time period is later in the time sequence; When the target information group does not have a data information group whose data processing time period is later than the target information group in time sequence, then extracting n data information groups that are earlier than the target information group in time sequence; wherein n is a preset number of information groups, and the value range of n is 10-100; The data quality evaluation coefficient is obtained by using the data quality index coefficients of the n data information groups combined with the data quality index coefficients of the target information group combined with the first data anomaly determination model; wherein the structure of the first data anomaly determination model is as follows: Among them, Q 01 represents the data quality evaluation coefficient obtained by the first data anomaly determination model; n represents the number of data information groups preceding the target information group in chronological order; K x Represents the data quality evaluation coefficient of the target information group; K i represents the data quality evaluation coefficient of the data information group preceding the i-th target information group in chronological order; w maxi represents the maximum weight corresponding to the data type of the data information group preceding the i-th target information group in chronological order; w maxi-1 represents the maximum weight corresponding to the data type of the data information group preceding the i-1th target information group in chronological order; C maxi The amount of data corresponding to the data type with the maximum weight of the data information group preceding the i-th target information group in chronological order; C maxi-1 The amount of data corresponding to the data type with the maximum weight of the data information group preceding the i-1th target information group in chronological order; When the target information group has a data information group whose data processing time period is later than the target information group in time sequence, all m data information groups whose data processing time period is later than the target information group in time sequence are extracted; The data quality evaluation coefficient is obtained by using the data quality index coefficients of the m data information groups combined with the data quality index coefficients of the target information group combined with the second data anomaly determination model; wherein the structure of the second data anomaly determination model is as follows: Among them, Q 02 represents the data quality evaluation coefficient obtained by the second data anomaly determination model; m represents the number of all data information groups that exist after the data processing time period in the target information group in chronological order; K x Represents the data quality evaluation coefficient of the target information group; K j represents the data quality evaluation coefficient of the data information group following the jth target information group in chronological order; w maxj represents the maximum weight corresponding to the data type of the data information group preceding the jth target information group in chronological order; w maxj-1 represents the maximum weight corresponding to the data type of the data information group following the j-1th target information group in chronological order; C maxj The amount of data corresponding to the data type with the maximum weight of the data information group following the jth target information group in chronological order; C maxj-1 represents the amount of data corresponding to the data type with the maximum weight of the data information group following the j-1th target information group in chronological order; y represents the number of all data information groups preceding the target information group in chronological order; w maxg represents the maximum weight corresponding to the data type of the data information group preceding the g-th target information group in chronological order; w maxg-1 represents the maximum weight corresponding to the data type of the data information group preceding the g-1th target information group in chronological order; C maxg The amount of data corresponding to the data type with the maximum weight of the data information group following the g-th target information group in chronological order; C maxg-1 The amount of data corresponding to the data type with the maximum weight of the data information group following the g-1th target information group in chronological order; Comparing the data quality evaluation coefficient with a preset quality evaluation coefficient threshold; When the data quality evaluation coefficient is lower than the preset quality evaluation coefficient threshold, it is determined that there is a risk of abnormal data quality in the real-time data of the entire life cycle of the construction industry, and a risk warning is issued.

6. The construction industry full life cycle management system based on AI algorithm analysis according to claim 3 is characterized in that: The model building module includes: Data collection unit, used to collect historical data of the entire life cycle of the construction industry; According to the full life cycle management needs of the construction industry based on AI algorithm analysis, a large amount of historical data on the full life cycle of the construction industry is collected; Data division unit, used to divide the historical data of the entire life cycle of the construction industry; Obtain historical data on the entire life cycle of the construction industry; Divide the historical data of the entire life cycle of the construction industry; Determine the training set and test set; Model training unit, used to train AI algorithm analysis models for the entire life cycle of the construction industry; According to the full life cycle management needs of the construction industry based on AI algorithm analysis, select a deep learning model framework suitable for the full life cycle management of the construction industry; Based on the training set, the selected deep learning model framework suitable for the full life cycle management of the construction industry is trained; Determine the AI ​​algorithm analysis model for the entire life cycle of the construction industry.

7. The construction industry full life cycle management system based on AI algorithm analysis according to claim 4 is characterized in that: The model optimization module includes: Performance testing unit, used to perform performance testing on AI algorithm analysis models throughout the construction industry life cycle; Obtain AI algorithm analysis model for the entire life cycle of the construction industry; Based on the test set, the performance of the AI ​​algorithm analysis model for the entire life cycle of the construction industry is tested; Determine the performance test results based on the AI ​​algorithm analysis model of the construction industry's full life cycle; Optimization and adjustment unit, used to optimize and adjust the AI ​​algorithm analysis model for the entire life cycle of the construction industry; Obtain performance test results based on AI algorithm analysis models for the entire life cycle of the construction industry; Mining and analyzing the performance test results based on the AI ​​algorithm analysis model of the entire life cycle of the construction industry; Determine the optimization and adjustment plan based on the AI ​​algorithm analysis model of the entire life cycle of the construction industry; Optimize and adjust the AI ​​algorithm analysis model for the entire life cycle of the construction industry according to the optimization and adjustment plan based on the AI ​​algorithm analysis model for the entire life cycle of the construction industry; Determine the optimal AI algorithm analysis model for the entire life cycle of the construction industry.

8. The construction industry full life cycle management system based on AI algorithm analysis according to claim 5 is characterized in that: The prediction analysis module includes: A data extraction unit, used to extract characteristic data of the entire life cycle of the construction industry; According to the full life cycle management needs of the construction industry based on AI algorithm analysis, the characteristic data of the full life cycle of the construction industry is extracted; Prediction and analysis unit, used to conduct prediction and analysis on characteristic data of the entire life cycle of the construction industry; Obtain the best AI algorithm analysis model for the entire life cycle of the construction industry; Input the characteristic data of the entire life cycle of the construction industry into the optimal AI algorithm analysis model of the entire life cycle of the construction industry; Based on the optimal AI algorithm analysis model for the entire life cycle of the construction industry, predictive analysis is performed on the characteristic data of the entire life cycle of the construction industry; Determine the forecast analysis results of the entire life cycle of the construction industry based on AI algorithm analysis; The storage and display unit is used to store and visualize the characteristic data of the entire life cycle of the construction industry and the prediction and analysis results of the entire life cycle of the construction industry.

9. The construction industry full life cycle management system based on AI algorithm analysis according to claim 6 is characterized in that: The comprehensive management module includes: The program development unit is used to develop a full life cycle management plan for the construction industry; Obtain forecast analysis results for the entire life cycle of the construction industry based on AI algorithm analysis; Mining and analyzing the forecast analysis results of the entire life cycle of the construction industry based on AI algorithm analysis; Determine the full life cycle management plan for the construction industry; Comprehensive management unit, used for intelligent and comprehensive management of the entire life cycle of the construction industry; Get the full life cycle management solution for the construction industry; Intelligent and comprehensive management of the entire life cycle of the construction industry is carried out based on the full life cycle management solution of the construction industry.

10. The construction industry full life cycle management system based on AI algorithm analysis according to claim 7 is characterized in that: The comprehensive management unit comprises: The procurement management module is used to intelligently manage procurement throughout the construction industry’s life cycle; According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis; Develop a full life cycle procurement management plan for the construction industry; Intelligent management of procurement in the entire life cycle of the construction industry based on the procurement management solution for the entire life cycle of the construction industry; The production management module is used to intelligently manage the production situation of the entire life cycle of the construction industry; According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis; Formulate a full life cycle production management plan for the construction industry; Intelligent management of the production situation of the entire life cycle of the construction industry based on the full life cycle production management solution of the construction industry; Sales management module, used for intelligent management of sales in the entire life cycle of the construction industry; According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis; Develop a full life cycle sales management plan for the construction industry; Intelligently manage the sales situation of the construction industry throughout its life cycle based on the sales management solution for the construction industry throughout its life cycle; Inventory management module, used for intelligent management of inventory status throughout the life cycle of the construction industry; According to the forecast analysis results of the construction industry's full life cycle based on AI algorithm analysis; Develop a full life cycle inventory management plan for the construction industry; Based on the full life cycle inventory management solution for the construction industry, intelligent management of the inventory situation throughout the entire life cycle of the construction industry is carried out.

Citation Information

Patent Citations

  • Oil chromatography monitoring data quality evaluation method

    CN113672606A

  • Building construction optimization system based on big data and cloud computing

    CN116862199A

  • Enterprise production data processing system based on artificial intelligence big data analysis

    CN116992346A

  • Gravel system operation dynamic management method based on intelligent platform

    CN117237000A

  • Manufacturing enterprise supply chain digital transformation decision support system

    CN118313774A