Whole-width rotary hoisting construction process for indoor super-large wall panel
By using the floor assembly of wall panel units, the combination of hanging point keels and pulley installation, and the wire rope hoisting machine in wall construction, the overall rotary hoisting of wall panels is realized, solving the problem of horizontal joints in traditional construction, and improving the construction quality and Efficiency enhances shielding efficiency and construction safety.
Patent Information
- Application Number
- CN202411220252.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-29
AI Technical Summary
The traditional wall segmented and step-by-step assembly construction technology is difficult to adapt to the high-demand wall construction of large projects, especially when installing indoors, which cannot avoid horizontal joints, resulting in reduced shielding efficiency and difficult construction.
The integrated rotary lifting construction technology of the extra-large indoor wall panel is adopted. Through the combination of the floor assembly of the wall panel unit, the hanging point keel installation, pulley installation, and wire rope hoist, the overall rotation lifting and positioning of the wall panel unit is achieved, and horizontal assembly is avoided. improve construction quality and efficiency.
The overall wall panel is realized, the construction quality and efficiency are improved, the shielding efficiency is enhanced, the construction difficulty and material waste are reduced, and the construction process is safe and reliable, reducing high-altitude hazardous operations.
Smart Images

Figure CN119038416A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and more specifically to a whole-width rotary hoisting construction process for an indoor super-large wall panel. Background Art
[0002] In industrial buildings, walls generally have the functions of separation, decoration, sound absorption, heat insulation, and energy isolation. Some walls have higher architectural functional requirements. For example, the walls of large art exhibition halls, large halls, and special industrial plants all emphasize the integrity of the walls to enhance spatial continuity, improve decorative effects, improve sound insulation, enhance thermal insulation performance, improve safety, and facilitate cleaning.
[0003] The walls of the high-voltage experimental hall have a high shielding effectiveness index. The shielding plate of the wall is the main part of the shielding, and its integrity is crucial to the shielding effectiveness. Horizontal joints will destroy the continuity of the shielding layer, leading to the leakage of electromagnetic waves or the penetration of external electromagnetic interference, thereby reducing the shielding effect. In order to ensure the shielding effectiveness of the wall, modern construction technology often uses seamless splicing technology to reduce or eliminate the horizontal joints of the shielding plate. Because the steel structure grid roof has been installed before the wall panels are installed, when installing the wall panels indoors, it is impossible to use lifting equipment such as car cranes for installation. Only equipment such as articulated arm trucks and lifting hoists can be used for small-piece assembly. The installation work surface is narrow and vertical installation is difficult.
[0004] The traditional wall segmentation and step-by-step assembly construction technology is generally only suitable for wall facades with smaller heights or lower requirements, and is difficult to adapt to the construction of high-requirement walls in large projects. Summary of the invention
[0005] The purpose of the present invention is to provide a whole-width rotary hoisting construction process for indoor super-large wall panels, which can realize the wall panels being mounted on the wall as a whole, avoid horizontal joints, and improve construction quality and efficiency.
[0006] In order to achieve the above technical purpose, the technical solution of the present invention is:
[0007] A construction process for the whole-piece rotating hoisting of an indoor super-large wall panel comprises the following steps:
[0008] Step 1: Ground assembly of wall panel units
[0009] According to relevant design requirements, several wall panels are spliced into a large wall panel unit, and the bottom end of the wall panel unit is placed at the root of the wall at the wall panel unit installation position, and the wall panel unit rotates with the bottom end of the wall panel unit as the rotation fulcrum.
[0010] Step 2: Installation of wall panel unit hanging point keel
[0011] According to the overall height of the wall panel unit and the lifted weight, a main hanging point transverse keel and several balancing hanging point transverse keels are installed on the back of the wall panel unit. The distance between the main hanging point transverse keel and the top of the wall panel unit (the end of the wall panel unit away from the wall root) is L, and the distance L is 1 / 7 to 1 / 9 of the height of the wall panel unit. Preferably, the distance L is 1 / 8 of the height of the wall panel unit.
[0012] The spacing between adjacent balancing suspension point transverse keels and the spacing between the balancing suspension point transverse keels adjacent to the main suspension point transverse keels and the main suspension point transverse keels is 2L.
[0013] The wall panel unit adopts the assembly process and has low lateral rigidity. The installation of transverse keels can enhance the rigidity of the wall panel unit, withstand the lateral bending moment generated by its own weight, and avoid bending and damage of the wall panel unit.
[0014] In order to avoid deformation of the bottom end of the wall panel unit and improve the rigidity of the bottom end and the rotation fulcrum of the wall panel unit, a plurality of longitudinal keels are arranged on the back of the wall panel unit and at the bottom end of the wall panel unit.
[0015] Step 3: Installation of the wall panel unit lifting point pulley
[0016] According to the overall height of the wall panel unit and the number of hanging points, a main hanging point guide pulley and multiple balancing hanging point guide pulleys are arranged on the wall surface where the wall panel unit is installed. The balancing hanging point guide pulley is located between the main hanging point guide pulley and the ground. The height of the main hanging point guide pulley is higher than the overall height of the wall panel unit.
[0017] Preferably, the height of the guide pulley at the main suspension point is 1 to 2 meters higher than the height of the entire wall panel unit, so that the wall panel can be lifted up and down for fine adjustment after it is in place.
[0018] The guide pulleys of the balancing suspension points are sequentially located between the guide pulleys of the main suspension points and the ground, and the height of the guide pulleys of the balancing suspension points is higher than the height of the transverse keels of the corresponding balancing suspension points.
[0019] The main suspension point guide pulley and the balance suspension point guide pulley are arranged on the wall or inside the wall, and the guide pulleys are tied to steel columns or wall purlins and other positions with steel wire ropes.
[0020] Step 4: Installation of wire rope
[0021] The winch includes a main lifting point winch and multiple balancing lifting point winches. The main lifting wire rope of the main lifting point winch is connected to the main lifting point transverse keel via the main lifting point guide pulley; the balancing wire rope of the balancing lifting point winch is connected to the corresponding balancing lifting point transverse keel via the balancing lifting point guide pulley.
[0022] In order to balance the force on the transverse keel of the main lifting point and reduce the deformation of the transverse keel of the main lifting point, the head end of the main lifting wire rope and the transverse keel of the main lifting point are connected at multiple points.
[0023] A left main lifting connecting rope and a right main lifting connecting rope are set at the head end of the main lifting wire rope, one end of the left main lifting connecting rope is connected to the head end of the main lifting wire rope, and the other end is connected to the transverse keel of the main lifting point on the left side of the wall panel unit, and one end of the right main lifting connecting rope is connected to the head end of the main lifting wire rope, and the other end is connected to the transverse keel of the main lifting point on the right side of the wall panel unit.
[0024] The balance wire rope and the balance suspension point transverse keel are connected at a single point or multiple points to avoid deformation of the wall panel unit.
[0025] A left-side balancing connecting rope and a right-side balancing connecting rope are set at the head end of the balancing wire rope, one end of the left-side balancing connecting rope is connected to the head end of the balancing wire rope, and the other end is connected to the horizontal keel of the balancing hanging point on the left side of the wall panel unit, and one end of the right-side balancing connecting rope is connected to the head end of the balancing wire rope, and the other end is connected to the horizontal keel of the balancing hanging point on the right side of the wall panel unit.
[0026] The winch uses a CNC winch that can control the winding speed of the wire rope.
[0027] Step 5: Rotate and lift the wall panel unit
[0028] Main hoisting point winch working speed:
[0029] Among them, a is the distance between the horizontal keel of the main suspension point and the rotation support, A is the vertical distance between the guide pulley of the main suspension point and the rotation support, and t is the rotation and lifting working time of the wall panel unit;
[0030] Balanced hoisting point winch working speed:
[0031] Wherein, b is the distance between the horizontal keel of the balance hanging point and the rotating fulcrum, B is the vertical distance between the guide pulley of the balance hanging point and the rotating fulcrum, and t is the rotating lifting working time of the wall panel unit;
[0032] The working speeds of the main hoisting point winch and the balance hoisting point winch are set and started. The main hoisting point winch and the balance hoisting point winch synchronously lift the wall panel unit, and the wall panel unit rotates toward the wall surface with the rotation fulcrum as the axis until the wall panel unit is located on the wall surface.
[0033] In order to ensure that the wall panel unit remains straight and is positioned against the wall surface and to avoid deformation of the wall panel unit, the rotation and beveling process of the wall panel unit can be carried out in stages to partially adjust the straightness of the wall panel unit and ensure that the wall panel unit remains straight and is positioned against the wall surface.
[0034] When the main lifting point winch and the balance lifting point winch stop lifting the wall panel unit, check the straightness of the wall panel unit and make local adjustments to the deformed position by separately starting and stopping the winch at the deformed position.
[0035] By setting the working speed of the winch, the wall panels can be positioned on the wall in a straight and uniform manner, thus avoiding deformation of the wall panel units, ensuring the installation quality and reducing the difficulty of lifting construction.
[0036] Step 6: Adjust the position of the wall panel unit
[0037] After the wall panel unit is positioned on the wall as a whole, put the wall panel unit in a suspended state and check whether the wall panel unit is correctly in the installation position on the wall; if there is any deviation, adjust it through the hoist.
[0038] The hoist is fixed on the steel structure column, and the hook of the hoist is connected to the wall panel unit. The wall panel unit is displaced by pulling the hoist to achieve the adjustment of the position of the wall panel unit.
[0039] Step 7: Fixing the wall panel unit
[0040] After the wall panel unit is correctly located at the installation position on the wall, the wall panel unit is welded to the purlin on the wall to achieve installation of the wall panel unit on the wall.
[0041] In order to facilitate the installation of the wall panel units on the entire wall, the winches are arranged at the corners of the wall.
[0042] In order to change the tensioning direction of the wire rope and facilitate adaptation to on-site working conditions, a wire rope steering pulley is provided between the winch and the guide pulley (the main lifting point or the balance lifting point guide pulley).
[0043] The present invention assembles the wall panel units on the ground, with a large working surface and low working difficulty. It takes about 15 minutes to hoist a single wall panel unit into place, and the installation speed is fast. There is no need to use equipment such as a boom crane, and the construction investment is small. There are fewer panel joints, saving materials.
[0044] The invention can speed up the construction progress, improve the integrity and molding quality of the wall, and greatly improve the shielding efficiency of the wall of the high-voltage experimental hall. The construction process is safe and reliable with little danger.
[0045] The present invention divides the facade wall panel into a number of large-area wall panel units, and each wall panel unit is assembled on the ground to avoid horizontal joints. Through the arrangement and use of hanging points, pulleys, and winches, the winch synchronously tensions the steel wire rope, and the pulley makes the tensioning direction of the steel wire rope consistent with the pulling direction of the wall panel unit, thereby realizing the lifting and positioning of the entire wall panel.
[0046] The present invention utilizes a combination of a numerically controlled winch, a fixed pulley, a steel wire rope, and a hoist to achieve the overall lifting of large wall panels by changing the direction of mechanical tensioning, thereby avoiding horizontal joints. The present invention has the characteristics of reasonable and advanced technology, high-quality and beautiful wall forming, reliable performance, short construction period, high work efficiency, reduction of dangerous high-altitude operations, safety, reliability, and economic savings. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0048] Figure 1 It is a schematic diagram of the present invention.
[0049] Figure 2 It is a schematic diagram of the oblique-stayed state of the present invention.
[0050] Figure 3 Schematic diagram of the overall rotation of the wall panel unit. DETAILED DESCRIPTION
[0051] The research and development room at a construction site is an 8-story steel frame structure with a clear indoor height of 39 meters. The shielding wall panel installation height is 38 meters. The wall surface is divided into multiple longitudinal shielding wall panel installation units to reduce the difficulty of hoisting and construction of the shielding wall panel. Then, each shielding wall panel installation unit is hoisted separately. In order to facilitate the hoisting of the wall panel units one by one to the shielding wall panel installation unit, the winch 9 is set at the corner of the wall surface 1 and fixed to the steel column of the steel structure by a wire rope clamp.
[0052] Example 1
[0053] like Figure 1-3 As shown, a construction process for the whole-piece rotating hoisting of an indoor super-large wall panel includes the following steps:
[0054] Step 1: Ground assembly of wall panel units
[0055] After the single-width fixed-length shielding wall panels are pressed and formed, multiple single-width fixed-length wall panels are spliced into a large wall panel unit 2 on the ground corresponding to the wall base of the shielding wall panel installation unit. After the adjacent wall panels are engaged and connected, they are welded using an automatic spot welding machine.
[0056] The bottom end of the wall panel unit 2 is placed at the root of the wall where the wall panel unit is installed, and the wall panel unit will rotate with the bottom end of the wall panel unit 2 as a rotation fulcrum.
[0057] Rock wool strips and small square tubes at equal intervals are installed on the back of the wall panel unit 2. The small square tubes form a grid to fix the rock wool strips on the back of the wall panel unit 2 to prevent them from falling off during hoisting.
[0058] Step 2: Installation of wall panel unit hanging point keel
[0059] According to the overall height of the wall panel unit and the lifted weight, the main suspension point transverse keel 31, the first balance suspension point transverse keel 32, the second balance suspension point transverse keel 33 and the third balance suspension point transverse keel 34 are installed on the back of the wall panel unit 2. The main suspension point transverse keel 31, the first balance suspension point transverse keel 32, the second balance suspension point transverse keel 33 and the third balance suspension point transverse keel 34 are arranged in sequence on the back of the wall panel unit 2. The distance between the center of the main suspension point transverse keel 31 and the bottom end of the wall panel unit 2 (located at one end of the wall root) is 33.25 meters, the distance between the center of the first balance suspension point transverse keel 32 and the bottom end of the wall panel unit 2 is 23.75 meters, the distance between the second balance suspension point transverse keel 33 and the bottom end of the wall panel unit 2 is 14.35 meters, and the distance between the third balance suspension point transverse keel 34 and the bottom end of the wall panel unit 2 is 4.75 meters.
[0060] A plurality of longitudinal keels 35 are arranged at the bottom end of the wall panel unit 2, one end of the longitudinal keel 35 is used as a rotation fulcrum between the wall panel unit 2 and the ground, and the other end is connected to the third balance suspension point transverse keel 34. The longitudinal keel 35 is used to prevent deformation of the bottom of the wall panel unit and to improve the rigidity of the bottom and fulcrum of the wall panel unit.
[0061] Step 3: Installation of the wall panel unit lifting point pulley
[0062] Correspondingly, at the shielding wall panel installation unit, the wall surface 1 is sequentially provided with a main suspension point guide pulley, a first balance suspension point guide pulley, a second balance suspension point guide pulley and a third balance suspension point guide pulley.
[0063] The installation height of the main hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is 39 meters, the installation height of the first balance hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is 29.5 meters, the installation height of the second balance hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is 20 meters, and the installation height of the third balance hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is 10.5 meters.
[0064] The main suspension point guide pulley includes a guide pulley 41 and a guide pulley 42, which are arranged on the left and right sides of the wall panel installation unit; the first balance suspension point guide pulley includes a guide pulley 43, which is located at the center of the wall panel installation unit; the second balance suspension point guide pulley includes a guide pulley 44 and a guide pulley 45, which are arranged on the left and right sides of the wall panel installation unit; the third balance suspension point guide pulley includes a guide pulley 46, which is located at the center of the wall panel installation unit.
[0065] Each guide pulley is arranged on the inner side of the steel structure wall and is tied to the steel column or the wall purlin through a steel wire rope.
[0066] Step 4: Installation of wire rope
[0067] The hoist 9 includes a first main hoisting point hoist, a second main hoisting point hoist, a first balancing hoisting point hoist, a second balancing hoisting point hoist, a third balancing hoisting point hoist and a fourth balancing hoisting point hoist;
[0068] The first main lifting wire rope 61 of the first main lifting point winch is connected to the main lifting point transverse keel 31 via the guide pulley 41, the second main lifting wire rope 62 of the second main lifting point winch is connected to the main lifting point transverse keel 31 via the guide pulley 42, the first main lifting wire rope 61 is provided with a first left main lifting connecting rope 711 and a first right main lifting connecting rope 712 at the head end, the second main lifting wire rope 62 is provided with a second left main lifting connecting rope 721 and a second right main lifting connecting rope 722 at the head end, and the main lifting point transverse keel 31 is provided with a first main lifting connecting rope 711 and a first main lifting connecting rope 712 at the head end. The first wire rope connection point, the second wire rope connection point and the third wire rope connection point are arranged, the second wire rope connection point is located between the first wire rope connection point and the third wire rope connection point, and is located at the center of the main lifting point transverse keel 31, the head end of the first right main lifting connection rope 712 and the head end of the second left main lifting connection rope 721 are connected to the second wire rope connection point, the head end of the first left main lifting connection rope 711 is connected to the first wire rope connection point, and the head end of the second right main lifting connection rope 722 is connected to the third wire rope connection point.
[0069] The first balancing steel wire rope 73 of the first balancing suspension point winch is connected to the first balancing suspension point transverse keel 32 via the guide pulley 43 .
[0070] The second balancing steel wire rope 74 of the second balancing hanging point winch is connected to the second balancing hanging point transverse keel 33 via the guide pulley 44, the third balancing steel wire rope 75 of the third balancing hanging point winch is connected to the second balancing hanging point transverse keel 33 via the guide pulley 45, the second balancing steel wire rope 74 is connected to the left side of the second balancing hanging point transverse keel 33, and the third balancing steel wire rope 75 is connected to the right side of the second balancing hanging point transverse keel 33.
[0071] The fourth balance wire rope 76 of the fourth balance suspension point winch is connected to the third balance suspension point transverse keel 34 via the guide pulley 46 .
[0072] In order to facilitate the application of on-site working conditions and change the tensioning direction of the wire rope, the first main hoisting wire rope 71 is provided with a first steering pulley 61 and a third steering pulley 63, the first steering pulley 61 is located at the top of the wall, and the third steering pulley 63 is located at the root of the wall, next to the winch; the second main hoisting wire rope 71 is provided with a second steering pulley 62 and a fourth steering pulley 64, the second steering pulley 62 is located at the top of the wall, and the fourth steering pulley 64 is located at the root of the wall, next to the winch;
[0073] The first balancing steel wire rope 73 is provided with a fifth steering pulley 65, which is located at the root of the wall, next to the winch; the second balancing steel wire rope 74 is provided with a sixth steering pulley 66, which is located at the root of the wall, next to the winch; the third balancing steel wire rope 75 is provided with a seventh steering pulley 67, which is located at the root of the wall, next to the winch; the fourth balancing steel wire rope 76 is provided with an eighth steering pulley 68, which is located at the root of the wall, next to the winch.
[0074] Step 5: Rotate and lift the wall panel unit
[0075] Main hoisting point winch working speed:
[0076] Balanced hoisting point winch working speed:
[0077] Among them, a is the distance between the transverse keel of the main hanging point and the rotating fulcrum, A is the vertical distance between the guide pulley of the main hanging point and the rotating fulcrum, b is the distance between the transverse keel of the balance hanging point and the rotating fulcrum, B is the vertical distance between the guide pulley of the balance hanging point and the rotating fulcrum, and t is the rotating and lifting working time of the wall panel unit.
[0078] The rotation and lifting working time of the wall panel unit is assumed to be 15 minutes. According to the above formula, the working speed of the first main lifting point winch and the second main lifting point winch is 3.03 m / min, the working speed of the first balance lifting point winch is 2.14 m / min, the working speed of the second balance lifting point winch and the third balance lifting point winch is 1.25 m / min, and the working speed of the fourth balance lifting point winch is 0.38 m / min.
[0079] The working speeds of the first main lifting point winch, the second main lifting point winch, the first balancing lifting point winch, the second balancing lifting point winch, the third balancing lifting point winch and the fourth balancing lifting point winch are set and started respectively, and each winch synchronously lifts the wall panel unit 2, and the wall panel unit 2 rotates toward the wall surface with the rotating fulcrum as the axis.
[0080] During the rotation and diagonal pulling process of the wall panel unit, if the wall panel unit is deformed, the pulling of the wall panel unit is stopped, and local adjustments are made by starting and stopping the winch at the deformed position separately to keep the wall panel unit in a straight state; after the wall panel unit is adjusted, the rotation and diagonal pulling of the wall panel unit is continued until the wall panel unit is located on the wall surface.
[0081] Step 6: Adjust the position of the wall panel unit
[0082] After the wall panel unit 2 is completely located on the wall 1, the winch continues to work to put the wall panel unit 2 in a suspended state; then, check whether the wall panel unit 2 is correctly located at the installation position of the wall 1; if there is any deviation, adjust it through the hoist.
[0083] The hoist is fixed on the steel structure column, and the hook of the hoist is connected to the wall panel unit 2. The wall panel unit is pulled by the hoist to move so as to adjust the position of the wall panel unit.
[0084] Step 7: Fixing the wall panel unit
[0085] After the wall panel unit 2 is correctly located at the installation position of the wall surface 1, the wall panel unit 2 is welded to the purlins on the wall surface 1 to achieve the installation of the wall panel unit on the wall surface.
[0086] Example 2
[0087] The indoor net height is 39 meters, and the installation height of the shielding wall panel is 38 meters. Based on Example 1, the distance between the center of the main hanging point transverse keel 31 and the bottom end of the wall panel unit 2 (located at one end of the wall root) is adjusted to 37.8 meters, the distance between the center of the first balance hanging point transverse keel 32 and the bottom end of the wall panel unit 2 is adjusted to 27 meters, the distance between the second balance hanging point transverse keel 33 and the bottom end of the wall panel unit 2 is adjusted to 16.2 meters, and the distance between the third balance hanging point transverse keel 34 and the bottom end of the wall panel unit 2 is adjusted to 5.4 meters.
[0088] The installation height of the main hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is adjusted to 40 meters, the installation height of the first balance hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is adjusted to 29.2 meters, the installation height of the second balance hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is adjusted to 18.4 meters, and the installation height of the third balance hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is adjusted to 7.6 meters.
[0089] The rotation and lifting working time of the wall panel unit is assumed to be 20 minutes, the working speed of the first main lifting point winch and the second main lifting point winch is 2.64 m / min, the working speed of the first balance lifting point winch is 1.88 m / min, the working speed of the second balance lifting point winch and the third balance lifting point winch is 1.12 m / min, and the working speed of the fourth balance lifting point winch is 0.36 m / min.
[0090] Example 3
[0091] The indoor net height is 39 meters, and the installation height of the shielding wall panel is 38 meters. Based on Example 1, the distance between the center of the main hanging point transverse keel 31 and the bottom end of the wall panel unit 2 (located at one end of the wall root) is adjusted to 29.4 meters, the distance between the center of the first balance hanging point transverse keel 32 and the bottom end of the wall panel unit 2 is adjusted to 21 meters, the distance between the second balance hanging point transverse keel 33 and the bottom end of the wall panel unit 2 is adjusted to 12.6 meters, and the distance between the third balance hanging point transverse keel 34 and the bottom end of the wall panel unit 2 is adjusted to 4.2 meters.
[0092] The installation height of the main hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is adjusted to 39 meters, the installation height of the first balance hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is adjusted to 30.6 meters, the installation height of the second balance hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is adjusted to 22.2 meters, and the installation height of the third balance hanging point guide pulley (the vertical distance between the main hanging point guide pulley and the rotating fulcrum) is adjusted to 13.8 meters.
[0093] The rotation and lifting working time of the wall panel unit is assumed to be 15 minutes, the working speed of the first main lifting point winch and the second main lifting point winch is 2.64 m / min, the working speed of the first balance lifting point winch is 1.83 m / min, the working speed of the second balance lifting point winch and the third balance lifting point winch is 1.06 m / min, and the working speed of the fourth balance lifting point winch is 0.32 m / min.
[0094] After on-site operation, embodiments 1 to 3 can all rotate and lift the wall panel unit to the wall surface, thereby achieving the overall installation of the wall panel unit on the wall surface.
[0095] The above embodiments do not limit the present invention in any way, and any technical solutions obtained by equivalent replacement or equivalent transformation fall within the protection scope of the present invention.
Claims
1. A construction process for the whole-width rotary hoisting of an indoor super-large wall panel, characterized in that: The following steps are involved: Step 1: Ground assembly of wall panel units Splice multiple wall panels into a large wall panel unit, and place the bottom end of the wall panel unit at the root of the wall where the wall panel unit is installed. The wall panel unit will rotate with the bottom end of the wall panel unit as the rotation fulcrum; Step 2: Installation of wall panel unit hanging point keel According to the overall height of the wall panel unit and the weight of the lifting, a main suspension point transverse keel and several balance suspension point transverse keels are installed on the back of the wall panel unit. The distance between the main suspension point transverse keel and the top of the wall panel unit is L, and the distance L is 1 / 7 to 1 / 9 of the height of the wall panel unit; on the back of the wall panel unit, a plurality of longitudinal keels are arranged at the bottom end of the wall panel unit, and the longitudinal keels improve the rigidity of the bottom and the fulcrum of the wall panel unit; Step 3: Installation of the wall panel unit lifting point pulley According to the overall height of the wall panel unit and the number of hanging points, a main hanging point guide pulley and a plurality of balancing hanging point guide pulleys are arranged on the wall surface where the wall panel unit is installed. The balancing hanging point guide pulley is located between the main hanging point guide pulley and the ground. The height of the main hanging point guide pulley is higher than the overall height of the wall panel unit. Step 4: Installation of wire rope The winch includes a main hoisting point winch and multiple balance hoisting point winches; the main hoisting wire rope of the main hoisting point winch is connected to the main hoisting point transverse keel via the main hoisting point guide pulley, and the head end of the main hoisting wire rope is connected to the main hoisting point transverse keel by multiple points; the balance wire rope of the balance hoisting point winch is connected to the corresponding balance hoisting point transverse keel via the balance hoisting point guide pulley; Step 5: Rotate and lift the wall panel unit Main hoisting point winch working speed: Balanced hoisting point winch working speed: Among them, a is the distance between the horizontal keel of the main suspension point and the rotation fulcrum, A is the vertical distance between the guide pulley of the main suspension point and the rotation fulcrum, b is the distance between the horizontal keel of the balance suspension point and the rotation fulcrum, B is the vertical distance between the guide pulley of the balance suspension point and the rotation fulcrum, and t is the rotation and lifting working time of the wall panel unit; The working speeds of the main hoisting point winch and the balance hoisting point winch are set and started. The main hoisting point winch and the balance hoisting point winch synchronously lift the wall panel unit, and the wall panel unit rotates toward the wall surface with the rotation fulcrum as the axis until the wall panel unit is located on the wall surface.
2. The whole-width rotating hoisting construction process for indoor super-large wall panels according to claim 1 is characterized in that: Step five is carried out in stages to locally adjust the straightness of the wall panel units.
3. The whole-width rotating hoisting construction process for indoor super-large wall panels according to claim 1 is characterized in that: It also includes adjusting the position of the wall panel unit. After the wall panel unit is positioned on the wall as a whole, the wall panel unit is placed in a suspended state to check whether the wall panel unit is correctly positioned on the wall; If there is any deviation, adjust it through the hoist.
4. The whole-width rotating hoisting construction process for indoor super-large wall panels according to claim 1 is characterized in that: The method also includes fixing the wall panel unit. After the wall panel unit is correctly located at the installation position on the wall, the wall panel unit is welded to the purlins on the wall.
5. The whole-width rotating hoisting construction process for indoor super-large wall panels according to claim 1 is characterized in that: The spacing L is 1 / 8 of the height of the wall panel unit.
6. The whole-width rotating hoisting construction process for indoor super-large wall panels according to claim 1 is characterized in that: The spacing between adjacent balancing suspension point transverse keels and the spacing between the balancing suspension point transverse keels adjacent to the main suspension point transverse keels and the main suspension point transverse keels is 2L.
7. The whole-width rotating hoisting construction process for indoor super-large wall panels according to claim 1 is characterized in that: The height of the main suspension point guide pulley is 1 to 2 meters higher than the overall height of the wall panel unit.
8. The whole-width rotating hoisting construction process for indoor super-large wall panels according to claim 1 is characterized in that: The guide pulleys of the balancing suspension points are sequentially located between the guide pulleys of the main suspension points and the ground, and the height of the guide pulleys of the balancing suspension points is higher than the height of the transverse keels of the corresponding balancing suspension points.
9. The whole-width rotating hoisting construction process for indoor super-large wall panels according to claim 1 is characterized in that: A left main lifting connecting rope and a right main lifting connecting rope are set at the head end of the main lifting wire rope, one end of the left main lifting connecting rope is connected to the head end of the main lifting wire rope, and the other end is connected to the transverse keel of the main lifting point on the left side of the wall panel unit, and one end of the right main lifting connecting rope is connected to the head end of the main lifting wire rope, and the other end is connected to the transverse keel of the main lifting point on the right side of the wall panel unit.
10. The whole-width rotating hoisting construction process for indoor super-large wall panels according to claim 1 is characterized in that: A wire rope steering pulley is arranged between the winch and the guide pulley.