Earthwork balance optimization method and device under complex topographic conditions
By establishing a three-dimensional model of complex terrain and comparing multiple design solutions, the balanced design of earth and stone is optimized, and the economic and sustainability problems of earth and stone projects under complex terrain conditions are solved, and efficient planning and cost savings of earth and stone projects are achieved.
Patent Information
- Application Number
- CN202411523446.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology lacks a method for optimizing the earth and stone balance under complex terrain conditions, resulting in low efficiency and poor accuracy in design elevation and earth quantity calculation, which affects the economic and sustainability of the project.
By obtaining the measured topographic map of the original terrain, establishing a three-dimensional model, conducting elevation, slope, and slope direction analysis, formulating multiple vertical design plans, calculating road slope and site engineering volume, comparing technical indicators, and selecting the best earth-rock balance design plan , using FastTFT and SketchUp software to convert data and generate renderings.
On the premise of meeting production needs, reduce the amount of earth excavation and filling, avoid the outbound transportation of earthworks, significantly reduce the investment cost of earthwork projects, and improve economic benefits.
Smart Images

Figure CN119047212A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of earthwork engineering, and in particular to an earthwork balance optimization method and device under complex terrain conditions. Background Art
[0002] When planning a project under complex terrain conditions, the optimal design of earthwork excavation and filling balance is particularly important. It is not only related to the economy of the construction project, but also affects the feasibility of the project and the sustainability of the environment.
[0003] Earthwork balance engineering is an important part of vertical design in general layout design, among which design elevation and earthwork volume calculation are of great significance to general layout design and investment budget. The determination of design elevation directly affects the earthwork volume, and the calculation method of earthwork volume not only affects the efficiency of the calculation process and the accuracy of the calculation results, but also has a direct impact on the project construction progress and cost control. At present, the existing technology lacks research on the optimization method of earthwork balance under complex terrain conditions. Summary of the invention
[0004] In view of this, it is necessary to provide an earthwork balance optimization method for complex terrain conditions to solve the above-mentioned defects of the prior art.
[0005] In order to solve the above problems, in a first aspect, an embodiment of the present invention provides an earthwork balance optimization method under complex terrain conditions, comprising: Obtain the measured topographic map of the original terrain area and establish a three-dimensional model of the original terrain; Based on the three-dimensional model, determine the site boundary, platform elevation and road entrance; Based on different design requirements, formulate multiple vertical design schemes, calculate the road slope and site engineering quantity of each scheme, and compare the technical indicators of each scheme; According to the comparison results of technical indicators and considering the economy of earthwork engineering, the optimal earthwork balance design scheme is determined.
[0006] Preferably, the step of obtaining a measured topographic map of the original topographic area and establishing a three-dimensional model of the original topography includes: Obtaining a measured topographic map of the original topographic area, importing the measured topographic map into FastTFT software, and establishing a three-dimensional model of the original topography; Conduct elevation analysis, slope analysis and slope aspect analysis on the original terrain to obtain comprehensive site analysis results.
[0007] Preferably, based on the three-dimensional model, determining the site boundary, platform elevation and road entrance includes: Determine the land boundary of the site in the three-dimensional model. When planning the land boundary, consider the horizontal distance required for platform sloping and reserve sufficient space for building retaining walls and slope protection; Determine the access point of the site access road and ensure that the site road is connected to the existing road; Determine the elevation of the site road according to the elevation of the existing road; The slope of the site road is determined based on the comprehensive site analysis results.
[0008] Preferably, the method of determining the optimal earthwork balance design scheme based on the technical index comparison results and taking into account the economic efficiency of the earthwork project includes: Choose a design with a reasonable road slope, small site engineering volume, and balanced earthwork; Among them, the site engineering volume includes the site fill volume, the site excavation volume, the maximum excavation depth, and the maximum backfill height; earthwork balance refers to the balance between the site excavation volume and the site fill volume in the earthwork project.
[0009] Preferably, after determining the optimal earthwork balance design solution, the method further comprises: The FastTFT software is used to convert the three-dimensional model data corresponding to the determined vertical design scheme into a file format recognizable by the SketchUp software, and the converted file is imported into the SketchUp software to obtain the design rendering.
[0010] In a second aspect, an embodiment of the present invention provides an earthwork balance optimization device for complex terrain conditions, comprising: A model building module is used to obtain the measured topographic map of the original terrain area and build a three-dimensional model of the original terrain; A boundary determination module, used to determine the site boundary, platform elevation and road entrance based on the three-dimensional model; The scheme comparison module is used to formulate multiple vertical design schemes based on different design requirements, calculate the road slope and site engineering quantity of each scheme, and compare the technical indicators of each scheme; The scheme determination module is used to determine the optimal earthwork balance design scheme based on the comparison results of technical indicators and taking into account the economic efficiency of earthwork projects.
[0011] In a third aspect, the present invention further provides an electronic device, including a memory and a processor, wherein: The memory is used to store programs; The processor is coupled to the memory and is used to execute the program stored in the memory to implement the steps in the earthwork balance optimization method for complex terrain conditions as described in the embodiment of the first aspect of the present invention.
[0012] In a fourth aspect, the present invention also provides a computer-readable storage medium for storing computer-readable programs or instructions, which, when executed by a processor, can implement the steps in the earthwork balance optimization method for complex terrain conditions as described in the embodiment of the first aspect of the present invention.
[0013] The earthwork balance optimization method and device for complex terrain conditions provided by the present invention establishes a three-dimensional model of the original terrain through FastTFT software, performs reasonable planning and layout in the process of terrain analysis (elevation, slope, slope direction) and scheme comparison, reduces the amount of earthwork excavation and filling, and avoids earthwork transportation under the premise of meeting production needs, saves investment funds for earthwork engineering, and improves the economic benefits of earthwork engineering. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A flow chart of the earthwork balance optimization method for complex terrain conditions provided by the present invention; Figure 2 An elevation analysis diagram of the original terrain provided by the present invention; Figure 3 A cross-sectional view of the site provided for the present invention; Figure 4 A slope analysis diagram provided by the present invention; Figure 5 A site division diagram provided by the present invention; Figure 6 A three-dimensional model and a schematic diagram of the platform elevation of the vertical design solution 1 provided by the present invention; Figure 7 A three-dimensional model and a schematic diagram of the platform elevation of the second vertical design solution provided by the present invention; Figure 8 A complete flow chart of the earthwork balance optimization method provided by the present invention; Fig. 9 A structural block diagram of the earthwork balance optimization device for complex terrain conditions provided by the present invention; Fig.10 This is a structural block diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION
[0015] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of this application and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not used to limit the scope of the present invention.
[0016] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0017] Earthwork balance engineering is an important part of vertical design in general layout design, among which design elevation and earthwork volume calculation are of great significance to general layout design and investment budget. The determination of design elevation directly affects the earthwork volume, and the calculation method of earthwork volume not only affects the efficiency of the calculation process and the accuracy of the calculation results, but also has a direct impact on the project construction progress and cost control. At present, the existing technology lacks research on the optimization method of earthwork balance under complex terrain conditions.
[0018] In view of this, the present invention provides an earthwork balance optimization method for complex terrain conditions, which establishes a three-dimensional model of the original terrain through FastTFT software, performs reasonable planning and layout in the process of terrain analysis (elevation, slope, slope direction) and scheme comparison, and reduces the amount of earthwork excavation and filling and avoids earthwork transportation under the premise of meeting production needs. The following will be explained and introduced through multiple embodiments.
[0019] Figure 1 The flow chart of the earthwork balance optimization method for complex terrain conditions provided by the present invention. Figure 1 As shown in FIG. 1 , the earthwork balance optimization method for complex terrain conditions includes steps S1 to S4, wherein: Step S1, obtaining a measured topographic map of the original topographic area and establishing a three-dimensional model of the original topography; Specifically, first, a measured topographic map of the original topographic area is obtained, and the measured topographic map is obtained by conducting an on-site survey of the site in advance.
[0020] Then, the measured topographic map is imported into FastTFT software to establish a three-dimensional model of the original terrain. FastTFT is a professional earthwork calculation software based on the CAD platform, which is widely used in the field of earthwork calculation in the construction industry.
[0021] Next, the original terrain is analyzed, including elevation analysis, slope analysis and aspect analysis, to obtain comprehensive site analysis results.
[0022] Figure 2 This is an elevation analysis diagram of the original terrain provided by the present invention. In the terrain analysis process, first, FastTFT is used to perform elevation analysis on the original terrain to obtain a plot elevation range table, as shown in Table 1 below.
[0023] Table 1
[0024] Figure 3 The site profile provided by the present invention uses FastTFT to slice the original terrain, and the following is obtained after the slice: Figure 3 The site cross-section shown is from Figure 3 You can understand the elevation range and undulations of the site.
[0025] Figure 4 The slope analysis diagram provided by the present invention is as follows: Figure 4 As shown, through slope analysis, it can be seen that the middle of the site is relatively flat, and the terrain on the top of the mountain on the right is flat.
[0026] Next, the slope analysis of the site can show the sunlight conditions at various locations within the site, providing a basis for the layout and orientation of the buildings in the design site.
[0027] Figure 5 The site division map provided by the present invention divides the site into 5 parts according to the above terrain analysis results, such as Figure 5 shown.
[0028] The three-dimensional model established by the FastTFT software in the embodiment of the present invention can accurately reflect the complex features of the original terrain, including details such as elevation, slope, and aspect, providing a high-precision data basis for the subsequent vertical design scheme formulation.
[0029] Step S2, determining the site boundary, platform elevation and road entrance based on the three-dimensional model; Specifically, the land boundary of the site is determined in the three-dimensional model, and when planning the land boundary, the horizontal distance required for platform slope reduction needs to be fully considered. Platform slope reduction refers to setting a platform of a certain width on the slope in order to maintain the stability of the slope and prevent soil landslide or collapse during the earthwork excavation process, and adjusting the slope to achieve the purpose of stabilizing the slope.
[0030] Retaining walls and slope protection are important measures to protect the stability of slopes. When planning the boundary, sufficient space should be reserved for the construction of retaining walls and slope protection to ensure that they can play an effective role.
[0031] Determine the access point of the site road. When designing the road, ensure that the site road is connected to the existing road so that vehicles and personnel can enter and exit smoothly.
[0032] Determine the elevation of the site road based on the elevation of the existing road. The elevation of the site road can be determined based on the elevation of the existing road, the elevation changes within the site, and the requirements of the drainage system.
[0033] The slope of the site road is determined based on the comprehensive site analysis results in the above embodiment, that is, the results of the slope analysis and the slope aspect analysis.
[0034] Step S3, based on different design requirements, formulate multiple vertical design schemes, calculate the road slope and site engineering quantity of each scheme, and compare various technical indicators of each scheme.
[0035] It is understandable that in earthwork projects under complex terrain conditions, there are often diversified design requirements. For example, it may be necessary to meet multiple functional requirements such as transportation, residence, commerce, and landscape at the same time. By formulating multiple vertical design schemes, these diversified requirements can be met more flexibly and the comprehensive benefits of the project can be maximized. Among them, vertical design refers to the elevation design of the site in order to meet specific functional requirements, including the utilization and transformation of the terrain, as well as the planning and design of determining the slope, controlling the elevation, and balancing the earthwork.
[0036] In this embodiment, two different vertical design schemes are formulated to compare data in terms of road design, site engineering volume, site filling and excavation depth, etc. In actual operation, more than two schemes may be designed to compare technical indicators, and the present invention does not specifically limit this.
[0037] Figure 6 The three-dimensional model and platform elevation diagram of the vertical design solution 1 provided by the present invention are as follows: Figure 7 The three-dimensional model and platform elevation diagram of the vertical design solution 2 provided by the present invention are shown in Table 2. The technical indicators of solution 1 and solution 2 are compared.
[0038] Table 2
[0039] Step S4, based on the technical index comparison results and taking into account the economic efficiency of the earthwork project, determine the optimal earthwork balance design scheme.
[0040] In this embodiment, referring to Table 2, in terms of road design, this embodiment compares the maximum longitudinal slope of the roads of the two schemes, and it can be seen that the road slope of Scheme 2 is smaller. In terms of site engineering volume, from the perspective of site filling volume, site excavation volume, maximum excavation depth and maximum backfill height, the site engineering volume of Scheme 2 is smaller, and the total amount of filling and excavation of Scheme 2 is smaller. Scheme 2 has a larger net volume and a relatively small excavation volume, which means that the excavation and filling of earthwork inside the site can achieve earthwork balance, significantly reducing the amount of earthwork transported outside.
[0041] In summary, by comparing the technical indicators of Scheme 1 and Scheme 2, it can be seen that Scheme 2 has a smaller site engineering volume, a smaller road slope, and a balanced earthwork, which is relatively better. Therefore, this embodiment uses Scheme 2 as the optimal earthwork balance design scheme.
[0042] Figure 8 The complete flow chart of the earthwork balance optimization method provided by the present invention is shown in FIG. Figure 8 After determining the optimal earthwork balance design scheme, FastTFT software is used to convert the 3D model data corresponding to the determined vertical design scheme into a file format recognizable by SketchUp software, and the converted file is imported into SketchUp software to obtain the design rendering. SketchUp is a 3D design software.
[0043] The present invention formulates multiple vertical design schemes, accurately calculates the road slope and site engineering quantity of each scheme, and compares the various technical indicators of each scheme (such as the amount of earthwork excavation and filling, the rationality of the road slope, etc.), so as to select the optimal earthwork balance design scheme. This scheme comparison method helps to avoid unnecessary earthwork transportation, significantly reduce the amount of earthwork excavation and filling, and optimize the earthwork balance. By reducing the amount of earthwork excavation and filling and avoiding earthwork transportation, this scheme can significantly reduce the investment cost of earthwork engineering and improve economic benefits.
[0044] Fig. 9 The structural block diagram of the earthwork balance optimization device for complex terrain conditions provided by the present invention is shown in FIG. Fig. 9 , the earthwork balance optimization device for complex terrain conditions includes: Model building module 901, used to obtain the measured topographic map of the original topographic area and build a three-dimensional model of the original topography; A boundary determination module 902 is used to determine the site boundary, platform elevation and road entrance based on the three-dimensional model; The scheme comparison module 903 is used to formulate multiple vertical design schemes based on different design requirements, calculate the road slope and site engineering quantity of each scheme, and compare various technical indicators of each scheme; The scheme determination module 904 is used to determine the optimal earthwork balance design scheme based on the technical index comparison results and taking into account the economic efficiency of the earthwork project.
[0045] The earthwork balance optimization device for complex terrain conditions provided by the present invention executes the earthwork balance optimization method for complex terrain conditions provided by the above-mentioned embodiments through the above-mentioned modules. The earthwork balance optimization method for complex terrain conditions has been described in detail in the above-mentioned embodiments, and this embodiment will not be repeated here.
[0046] The earthwork balance optimization device for complex terrain conditions provided by the present invention establishes a three-dimensional model of the original terrain through FastTFT software, performs reasonable planning and layout in the process of terrain analysis (elevation, slope, slope direction) and scheme comparison, reduces the amount of earthwork excavation and filling, and avoids earthwork transportation under the premise of meeting production needs, saves the investment funds of earthwork engineering, and improves the economic benefits of earthwork engineering.
[0047] Fig.10 The structural block diagram of the electronic device provided by the present invention is as follows: Fig.10 As shown, the present invention also provides an electronic device, and the electronic device 1000 can be a computing device such as a mobile terminal, a desktop computer, a notebook, a palm computer, and a server. The electronic device 1000 includes a processor 1001 and a memory 1002, wherein the memory 1002 stores an earthwork balance optimization program 1003 for complex terrain conditions.
[0048] In some embodiments, the memory 1002 may be an internal storage unit of a computer device, such as a hard disk or memory of the computer device. In other embodiments, the memory 1002 may also be an external storage device of the computer device, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (SecureDigital, SD) card, a flash card (Flash Card), etc. equipped on the computer device. Furthermore, the memory 1002 may also include both an internal storage unit of the computer device and an external storage device. The memory 1002 is used to store application software and various types of data installed on the computer device, such as program codes installed on the computer device. The memory 1002 may also be used to temporarily store data that has been output or is to be output. In one embodiment, when the earthwork balance optimization program 1003 for complex terrain conditions is executed by the processor 1001, the following steps are implemented: Obtain the measured topographic map of the original terrain area and establish a three-dimensional model of the original terrain; Based on the three-dimensional model, determine the site boundary, platform elevation and road entrance; Based on different design requirements, formulate multiple vertical design schemes, calculate the road slope and site engineering quantity of each scheme, and compare the technical indicators of each scheme; According to the comparison results of technical indicators and considering the economy of earthwork engineering, the optimal earthwork balance design scheme is determined.
[0049] In some embodiments, the processor 1001 may be a central processing unit (CPU), a microprocessor or other data processing chip, used to run program codes or process data stored in the memory 1002, such as executing an earthwork balance optimization program for complex terrain conditions.
[0050] This embodiment further provides a computer-readable storage medium, on which a soil-rock balance optimization program for complex terrain conditions is stored. When the soil-rock balance optimization program for complex terrain conditions is executed by a processor, the following steps are implemented: Obtain the measured topographic map of the original terrain area and establish a three-dimensional model of the original terrain; Based on the three-dimensional model, determine the site boundary, platform elevation and road entrance; Based on different design requirements, formulate multiple vertical design schemes, calculate the road slope and site engineering quantity of each scheme, and compare the technical indicators of each scheme; According to the comparison results of technical indicators and considering the economy of earthwork engineering, the optimal earthwork balance design scheme is determined.
[0051] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
[0052] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for optimizing earthwork balance under complex terrain conditions, characterized in that: include: Obtain the measured topographic map of the original terrain area and establish a three-dimensional model of the original terrain; Based on the three-dimensional model, determine the site boundary, platform elevation and road entrance; Based on different design requirements, formulate multiple vertical design schemes, calculate the road slope and site engineering quantity of each scheme, and compare the technical indicators of each scheme; According to the comparison results of technical indicators and considering the economy of earthwork engineering, the optimal earthwork balance design scheme is determined.
2. The earthwork balance optimization method for complex terrain conditions according to claim 1 is characterized in that: The step of obtaining a measured topographic map of the original topographic area and establishing a three-dimensional model of the original topography includes: Obtaining a measured topographic map of the original topographic area, importing the measured topographic map into FastTFT software, and establishing a three-dimensional model of the original topography; Conduct elevation analysis, slope analysis and slope aspect analysis on the original terrain to obtain comprehensive site analysis results.
3. The earthwork balance optimization method for complex terrain conditions according to claim 2 is characterized in that: Based on the three-dimensional model, determine the site boundaries, platform elevations, and road entrances, including: Determine the land boundary of the site in the three-dimensional model. When planning the land boundary, consider the horizontal distance required for platform sloping and reserve sufficient space for building retaining walls and slope protection; Determine the access point of the site access road and ensure that the site road is connected to the existing road; Determine the elevation of the site road according to the elevation of the existing road; The slope of the site road is determined based on the comprehensive site analysis results.
4. The earthwork balance optimization method for complex terrain conditions according to claim 1 is characterized in that: According to the comparison results of technical indicators, the economic efficiency of earthwork engineering is considered to determine the optimal earthwork balance design scheme, including: Choose a design with a reasonable road slope, small site engineering volume, and balanced earthwork; Among them, the site engineering volume includes the site fill volume, the site excavation volume, the maximum excavation depth, and the maximum backfill height; earthwork balance refers to the balance between the site excavation volume and the site fill volume in the earthwork project.
5. The earthwork balance optimization method for complex terrain conditions according to claim 1, characterized in that: After determining the optimal earthwork balance design solution, the method further includes: The FastTFT software is used to convert the three-dimensional model data corresponding to the determined vertical design scheme into a file format recognizable by the SketchUp software, and the converted file is imported into the SketchUp software to obtain the design rendering.
6. An earthwork balance optimization device for complex terrain conditions, characterized in that: include: A model building module is used to obtain the measured topographic map of the original terrain area and build a three-dimensional model of the original terrain; A boundary determination module, used to determine the site boundary, platform elevation and road entrance based on the three-dimensional model; The scheme comparison module is used to formulate multiple vertical design schemes based on different design requirements, calculate the road slope and site engineering quantity of each scheme, and compare the technical indicators of each scheme; The scheme determination module is used to determine the optimal earthwork balance design scheme based on the comparison results of technical indicators and taking into account the economic efficiency of earthwork projects.
7. An electronic device, It is characterized in that comprising a memory and a processor, wherein: The memory is used to store programs; The processor is coupled to the memory and is used to execute the program stored in the memory to implement the steps in the earthwork balance optimization method for complex terrain conditions as described in any one of claims 1 to 5 above.
8. A computer-readable storage medium, characterized in that: Used to store computer-readable programs or instructions, which, when executed by a processor, can implement the steps in the earthwork balance optimization method for complex terrain conditions as described in any one of claims 1 to 5 above.
Citation Information
Patent Citations
BIM-based vehicle base terrace earthwork balance design method
CN112347543A
Urban garden landscape vertical design method based on BIM technology
CN113204825A
Site vertical design method integrated with urban design thinking
CN117056998A
System of automatically calculating and displaying amount of earthwork materials based on three dimensional design
KR1020100116382A
Cited By
Computer-implemented methods and computing systems for generating an optimal grading design
WO2026043976A1