Method for calculating length of compensation section of vertical shaft GIL

By calculating the deformation of the GIL busbar shell and conductor in the lower section of the shaft, and designing the compensation section length, the problem of the difference between the design length and the actual length during autonomous controllable GIL replacement is solved, and the accurate installation of the shaft section is achieved.

CN119066903AActive Publication Date: 2024-12-03CHINA YANGTZE POWER
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410731068.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-12-03
Estimated Expiration
2044-06-06

AI Technical Summary

Technical Problem

When replacing the shaft section with an autonomous controllable GIL, there is a difference between the design length of the GIL and the actual installation length, which makes it difficult to calculate the compensation section length.

Method used

By determining the calculation parameters of the length of the GIL bus compensation segment, calculate the shell shape variable and conductor shape variable of the GIL busbar down section during operation, the shell length of the compensation segment is designed to eliminate the length difference. Specific steps include calculating the ambient temperature thermal expansion and contraction amount, the axial elongation amount of the lifting section housing and the conductor shape variable, and using ANSYS software for finite element analysis to determine the final length of the compensation section.

Benefits of technology

The problem of the difference between the GIL design length and the actual installation length is effectively solved. By calculating the reasonable setting of the compensation section length, the length difference is eliminated, ensuring the installation accuracy and stability of the shaft section.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119066903A_ABST
    Figure CN119066903A_ABST
Patent Text Reader

Abstract

The invention discloses a vertical shaft GIL compensation section length calculation method. The method comprises the steps that GIL bus compensation section length calculation parameters are determined; calculating the deformation quantity of the GIL bus shell at the lower section of the vertical shaft during operation; calculating the shell length of the compensation section; the maximum deformation quantity of the conductor is calculated, so that the length of the compensation section is designed according to the deformation quantity of the compensation section shell and the maximum deformation quantity of the conductor; according to the method, the problem that the generated GIL design length is different from the actual installation length when the independent controllable GIL replaces different gas chambers of the vertical shaft section GIL is solved, the length of the compensation section can be reasonably set through calculation, and therefore the length difference is eliminated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of GIL pipeline maintenance, in particular to an overhead LNG pipeline supporting structure with settlement compensation adjustment. Background Art

[0002] Factors that cause deformation of the GIL shell include axial compression of the shell caused by the deadweight of the GIL, heat generated by the current flowing through the internal conductor of the GIL causing the shell to rise in temperature and expand along the axial direction, and the axial force caused by the SF6 gas inside the shell, namely the blind plate force, causing the shell to stretch along the axial direction. When an autonomous and controllable GIL is used to replace different air chambers of the shaft section GIL, the above factors will cause the design length of the GIL to differ from the actual installation length. Therefore, it is necessary to design a method for calculating the length of the compensation section of the shaft GIL to solve the above problems. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a method for calculating the length of the compensation section of a shaft GIL, so as to solve the problem that when an autonomously controllable GIL replaces different air chambers of a shaft section GIL, the design length of the GIL and the actual installation length are different. The length of the compensation section can be reasonably set by calculation, thereby eliminating the length difference.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0005] The calculation method of the length of the GIL compensation section of the shaft includes:

[0006] S1, determine the calculation parameters of the GIL bus compensation section length;

[0007] S2, calculates the deformation of the GIL busbar shell in the lower section of the shaft during operation;

[0008] S3, calculate the shell length of the compensation section;

[0009] S4, calculating the maximum deformation of the conductor, thereby designing the length of the compensation section according to the deformation of the compensation section shell and the maximum deformation of the conductor.

[0010] Preferably, in step S1, the calculation parameters of the GIL busbar compensation section length include the thermal expansion and contraction of the ambient temperature during installation, the axial elongation of the hoisting section shell under its own gravity, and the compression of the shell after the hoisting is removed.

[0011] Preferably, in step S2, calculating the deformation amount of the busbar shell of the lower section of the shaft during operation includes:

[0012] S201, calculate the axial thermal expansion and contraction of the shell caused by changes in ambient temperature during installation:

[0013] ΔL shell- Environment = α(t2-t1)L;

[0014] In the formula, α is the linear expansion coefficient of aluminum alloy material, t2 is the on-site ambient temperature during installation, t1 is the reference temperature, i.e. the turning temperature at which the shell undergoes thermal expansion and contraction, and L represents the calculated length of the GIL shell in the lower section of the shaft;

[0015] S202, calculating the axial elongation of all shells above the compensation segment shell, i.e., the hoisting segment shell, under the action of its own gravity;

[0016] S203, measuring the compression amount of the shell after the upper part of the GIL is hoisted and removed, so as to calculate the axial elongation of the shell under the gravity of the GIL that needs to be compensated by the compensation section.

[0017] Preferably, in step S202, calculating the axial elongation of all shells above the compensation section shell, i.e., the hoisting section shell under the action of its own weight includes calculating the axial elongation of the shell under the action of its own weight when the bridge crane lifts the hoisting section shell, specifically as follows:

[0018] Calculate the hoisting shell length L of the hoisting section shell 吊装段 :

[0019] L 吊装段 =LL n ;

[0020] Where, L 吊装段 It indicates the length of the hoisting shell of the hoisting section after removing all the shells below the hoisting shell of the GIL section; L indicates the calculated length of the GIL shell in the lower section of the shaft; L n It represents the sum of the lengths of all shells below the shell of the hoisting section;

[0021] Calculate the mass M of the lifting section 吊装 :

[0022] M 吊装 =MM n -M SF6 -M 绝缘子 ;

[0023] Where M represents the total mass of the GIL phase, M n It represents the sum of the masses of all shells below the shell of the hoisting section, M SF6 Indicates the mass of SF6 gas filled in GIL, M 绝缘子 It represents the sum of the masses of the insulators installed in all the shells below the shell of the hoisting section;

[0024] Hang the top of the hoisting section shell on the bridge crane hook, and adjust the length L of the hoisting shell calculated above. 吊装段 And the mass of the lifting section M 吊装Input into ANSYS software, and calculate through ANSYS software to obtain the axial elongation ΔL of the shell under its own gravity during hoisting. 壳体自重拉伸 .

[0025] Preferably, in step S203, after the hook is removed, only the lower end of the entire shell is fixed. At this time, it is only affected by the gravity of the GIL itself, and the shell will be compressed and deformed along the axial direction. The maximum axial compression deformation ΔL of the GIL shell under the action of its own weight is measured. 壳体自重压缩 .

[0026] Preferably, in step S203, the axial elongation of the shell under the action of the GIL gravity that needs to be compensated by the compensation section shell is calculated as follows:

[0027] ΔL weight =ΔL 壳体自重拉伸 +ΔL 壳体自重压缩 ;

[0028] Here, positive values ​​indicate stretching and negative values ​​indicate shrinking.

[0029] Preferably, in step S3, the shell length of the compensation section is calculated as follows:

[0030] S301, using a laser rangefinder to measure the actual length L of the outer casing of the compensation section pipeline at this time 实际 ;

[0031] S302, calculate the final length of the compensation section shell:

[0032] L 补偿段 =L 实际 +ΔL weight +ΔL shell-环境 ;

[0033] Where, ΔL shell-环境 The calculated length L of the GIL shell of the lower section of the shaft is calculated. The calculated length L of the GIL shell of the lower section of the shaft includes the sum of the length of the hoisting section, the length below the hoisting section and the final compensation section length.

[0034] Preferably, in step S3, the deformation amount of the conductor is calculated as follows:

[0035] ΔL 导体 =ΔL 导体自重 +ΔL 导体温升 ;

[0036] Where, ΔL 导体自重 Indicates the axial deformation caused by the conductor's gravity, which is directly calculated by inputting the measured conductor length into the ANSYS software; ΔL 导体温升The axial deformation caused by the temperature rise of the conductor is calculated by inputting the above data into ANSYS software through the measured conductor length, linear expansion coefficient of aluminum alloy material and allowable temperature rise under the rated current of the conductor.

[0037] The beneficial effects of the present invention are as follows:

[0038] The present invention provides a method for calculating the compensation section GIL when the shaft section is replaced, taking into account the influence of the GIL's own weight and temperature. When using the autonomous GIL for replacement, this method and the final calculation result can be used to determine the length of the replacement compensation section, thereby solving the problem of the difference between the GIL design length and the actual installation length when the autonomous controllable GIL replaces different air chambers of the shaft section GIL. The length of the compensation section can be reasonably set through calculation, thereby eliminating the length difference. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 is a flow chart of the method of the present invention;

[0040] Figure 2 It is a schematic diagram of a finite element analysis model of a conductor in a single standard section in an embodiment of the present invention;

[0041] Figure 3 Schematic diagram of the load and constraint application method of the conductor in an embodiment of the present invention;

[0042] Figure 4 Schematic diagram of the temperature load and constraint application method of the conductor in an embodiment of the present invention;

[0043] Figure 5 This is a schematic diagram of the maximum axial deformation of the conductor after thermal expansion calculated using ANSYS software in an embodiment of the present invention;

[0044] Figure 6 It is a schematic diagram of the load and constraint application method when the deadweight of the GIL causes axial compression of the shell in an embodiment of the present invention;

[0045] Figure 7 It is a shell deformation cloud diagram when the shell is axially compressed due to the deadweight of the GIL in the embodiment of the present invention;

[0046] Figure 8 It is a schematic diagram of the shell temperature load and constraint application method for the shell axial elongation caused by temperature rise in an embodiment of the present invention;

[0047] Fig. 9 This is a shell deformation cloud diagram of the axial elongation of the shell caused by temperature rise in an embodiment of the present invention;

[0048] Fig.10 This is a schematic diagram of treating two independent air chambers as one air chamber in an embodiment of the present invention;

[0049] Fig.11 It is a deformation cloud diagram of the shell caused by the axial force of the SF6 gas inside the shell in the embodiment of the present invention;

[0050] Fig.12 It is a schematic diagram of the load and constraint application method of the hoisting section shell when calculating the axial elongation of the shell under the action of its own gravity when the bridge crane lifts the hoisting section shell in an embodiment of the present invention;

[0051] Fig.13 It is a cloud diagram of the axial deformation of the shell in the embodiment of the present invention for calculating the axial elongation of the shell under the action of its own gravity when the bridge crane lifts the hoisting section shell. DETAILED DESCRIPTION

[0052] Embodiment 1:

[0053] like Figure 1 As shown, the method for calculating the length of the vertical shaft GIL compensation section includes:

[0054] S1, determine the calculation parameters of the GIL bus compensation section length;

[0055] S2, calculates the deformation of the GIL busbar shell in the lower section of the shaft during operation;

[0056] S3, calculate the shell length of the compensation section;

[0057] S4, calculating the maximum deformation of the conductor, thereby designing the length of the compensation section according to the deformation of the compensation section shell and the maximum deformation of the conductor.

[0058] Preferably, in step S1, the calculation parameters of the GIL busbar compensation section length include the thermal expansion and contraction of the ambient temperature during installation, the axial elongation of the hoisting section shell under its own gravity, and the compression of the shell after the hoisting is removed.

[0059] Preferably, in step S2, calculating the deformation amount of the busbar shell of the lower section of the shaft during operation includes:

[0060] S201, calculate the axial thermal expansion and contraction of the shell caused by changes in ambient temperature during installation:

[0061] ΔL shell- Environment = α(t2-t1)L;

[0062] In the formula, α is the linear expansion coefficient of aluminum alloy material, t2 is the on-site ambient temperature during installation, t1 is the reference temperature, i.e. the turning temperature at which the shell undergoes thermal expansion and contraction, and L represents the calculated length of the GIL shell in the lower section of the shaft;

[0063] S202, calculating the axial elongation of all shells above the compensation segment shell, i.e., the hoisting segment shell, under the action of its own gravity;

[0064] S203, measuring the compression amount of the shell after the upper part of the GIL is hoisted and removed, so as to calculate the axial elongation of the shell under the gravity of the GIL that needs to be compensated by the compensation section.

[0065] Preferably, in step S202, calculating the axial elongation of all shells above the compensation section shell, i.e., the hoisting section shell under the action of its own weight includes calculating the axial elongation of the shell under the action of its own weight when the bridge crane lifts the hoisting section shell, specifically as follows:

[0066] Calculate the hoisting shell length L of the hoisting section shell 吊装段 :

[0067] L 吊装段 =LL n ;

[0068] Where, L 吊装段 It indicates the length of the hoisting shell of the hoisting section after removing all the shells below the hoisting shell of the GIL section; L indicates the calculated length of the GIL shell in the lower section of the shaft; L n It represents the sum of the lengths of all shells below the shell of the hoisting section;

[0069] Calculate the mass M of the lifting section 吊装 :

[0070] M 吊装 =MM n -M SF6 -M 绝缘子 ;

[0071] Where M represents the total mass of the GIL phase, M n It represents the sum of the masses of all shells below the shell of the hoisting section, M SF6 Indicates the mass of SF6 gas filled in GIL, M 绝缘子 It represents the sum of the masses of the insulators installed in all the shells below the shell of the hoisting section;

[0072] Hang the top of the hoisting section shell on the bridge crane hook, and adjust the length L of the hoisting shell calculated above. 吊装段 And the mass of the lifting section M 吊装 Input into ANSYS software, and calculate through ANSYS software to obtain the axial elongation ΔL of the shell under its own gravity during hoisting. 壳体自重拉伸 .

[0073] Preferably, in step S203, after the hook is removed, only the lower end of the entire shell is fixed. At this time, it is only affected by the gravity of the GIL itself, and the shell will be compressed and deformed along the axial direction. The maximum axial compression deformation ΔL of the GIL shell under the action of its own weight is measured. 壳体自重压缩 .

[0074] Preferably, in step S203, the axial elongation of the shell under the action of the GIL gravity that needs to be compensated by the compensation section shell is calculated as follows:

[0075] ΔL weightt =ΔL 壳体自重拉伸 +ΔL 壳体自重压缩 ;

[0076] Here, positive values ​​indicate stretching and negative values ​​indicate shrinking.

[0077] Preferably, in step S3, the shell length of the compensation section is calculated as follows:

[0078] S301, using a laser rangefinder to measure the actual length L of the outer casing of the compensation section pipeline at this time 实际 ;

[0079] S302, calculate the final length of the compensation section shell:

[0080] L 补偿段 =L 实际 +ΔL weight +ΔL shell-环境 ;

[0081] In the formula, ΔL shell-环境 The calculated length L of the GIL shell of the lower section of the shaft is calculated. The calculated length L of the GIL shell of the lower section of the shaft includes the sum of the length of the hoisting section, the length below the hoisting section and the final compensation section length.

[0082] Preferably, in step S3, the deformation amount of the conductor is calculated as follows:

[0083] ΔL 导体 =ΔL 导体自重 +ΔL 导体温升 ;

[0084] In the formula, ΔL 导体自重 Indicates the axial deformation caused by the conductor's gravity, which is directly calculated by inputting the measured conductor length into the ANSYS software; ΔL 导体温升 The axial deformation caused by the temperature rise of the conductor is calculated by inputting the above data into ANSYS software through the measured conductor length, linear expansion coefficient of aluminum alloy material and allowable temperature rise under the rated current of the conductor.

[0085] Embodiment 2:

[0086] Taking the lower section of the 3# shaft of a certain unit as an example, the length of the shell of the compensation section when the shaft section is replaced is calculated. The specific steps are as follows:

[0087] Step 1: Determine the length of the GIL busbar shell when it expands and contracts due to heat:

[0088] The GIL busbar in the lower section of the 3# shaft consists of two upper and lower air chambers. The GIL busbar shell in the shaft is set with a "fixed point" at the bottom of the shaft, and a "sliding point" is set at an interval of 11.5m in the middle; when the GIL is in operation, the lower end of its shell is fixed at the "fixed point" and is constrained by the "sliding point". When the shell is heated and expanded, it can only extend upward along the shell axis, that is, along the shaft wall. The expansion of the vertical section GIL shell is compensated by the "angle compensation" expansion joint on the GIL arranged horizontally in the flat hole above the shaft; therefore, when the GIL shell changes temperature and undergoes thermal expansion and contraction deformation, the calculated length of the shell is the shell length above the fixed point, that is, L = 216360mm.

[0089] Step 2: Determination of the temperature increment of the GIL busbar shell in the lower section of the shaft:

[0090] The GIL busbar housing in the lower section of the 3# shaft is placed in the shaft. It is an indoor product and the ambient temperature is little affected by the outside world. The temperature rise test is carried out based on the rated current of 5000A. The maximum allowable temperature rise is selected according to "the parts that can be touched by the operating personnel but do not need to be touched during normal operation are not greater than 40K", that is, the temperature rise △t=40K.

[0091] Step 3: Determination of the temperature increment of the GIL conductor in the lower section of the shaft:

[0092] The temperature rise of the GIL conductor in the lower section of the 3# shaft is determined based on the maximum allowable temperature rise of no more than 65K under the rated current of 5000A, that is, the temperature rise is △t=65K.

[0093] Step 4: Study on the physical properties of GIL shell and conductor materials:

[0094] GIL shell material EN AW5754 corresponds to domestic material 5754. If the conductor is the commonly used material 6A02-T6, the physical performance parameters of shell material 5754 and conductor material 6A02-T6 are shown in Table 1. The data in the table are from the fourth edition of the literature "Mechanical Design Manual" Volume 1:

[0095]

[0096] Table 1: Physical properties of shell and conductor materials.

[0097] Step 5: Determine the quality of the GIL busbar housing and conductors in the lower section of the shaft:

[0098] (1) Conductor quality:

[0099] The conductor is made of aluminum alloy tube. Based on the large aspect ratio of the conductor (length L = 11222mm, outer diameter 180mm, wall thickness 10mm), in order to simplify the calculation and take into account the calculation error, the conductor is approximated as a straight tube with an inner diameter of 160mm and an outer diameter of 180mm. The mass of 180×10 unit length of the aluminum tube is 14.4kg / m, and the mass of the aluminum conductor m = 11222×10-3×14.413=161.743kg.

[0100] (2) Quality of GIL busbar in the lower section of the shaft:

[0101] The quality of the GIL busbar in the lower section of the 3# shaft consists of four parts: shell quality, conductor quality, pot-type insulator quality and SF6 gas quality.

[0102] The mass of the shell, the mass of the pot-type insulator and the mass of the conductor can be classified into the various modules of the GIL busbar in the lower section of the 3# shaft. Each module consists of a shell, an insulator and a conductor. Among them, the shell adopts a 512×6 aluminum tube with a unit length mass of 25.739kg / m; the conductor adopts an aluminum tube of 180×10 with a unit length mass of 14.413kg / m; the insulator (airtight): 47.5kg, the insulator (airtight): 44.5kg.

[0103] GIL consists of 15 standard modules (shell length 11500mm, conductor length 11222mm), four non-standard modules (shell lengths are 8400mm, 10960mm, 11400mm and 13100mm; conductor lengths are 8122mm, 10682mm, 11122mm and 12822mm), 17 insulators (air-permeable) and 1 insulator (airtight).

[0104] Without considering the volume of insulators and conductors in the GIL, the volume of the GIL shell in the lower section of the 3# shaft is:

[0105] V = π / 4 × [(512-12) × 10 -3 ] 2 ×216360×10 -3 =42.461m 3 ;

[0106] The SF6 gas filled in the shell has a unit mass of 38.06 kg / m3 at rated pressure; the mass of SF6 gas is 42.461×38.06=1616.052 kg.

[0107] Then, the quality of GIL busbar in the lower section of 3# shaft is:

[0108] M=(15×11500+8400+10960+11400+13100)×10 -3×25.736+(15×11222+8122

[0109] +10682+11122+12822)×10 -3 ×14.413+17×44.5+47.5+1616.052=11030.56kg.

[0110] Step 6: Calculate the deformation of the GIL conductor:

[0111] The factors that cause the GIL conductor to deform during operation include: the conductor's gravity causes it to be stretched along the axis, and the conductor's heat caused by current flow causes it to expand (elongate) along the axis; since the conductor is a single-segment plug-in design, the conductor deformation only affects the segment it is in and has no effect on the adjacent segments, so it is sufficient to calculate the deformation of the conductor in the GIL standard vertical module.

[0112] (1) Axial deformation caused by conductor gravity:

[0113] like Figure 2 The figure shows the finite element analysis model of the conductor in a single standard section. The calculated length of the conductor (180×10) in a single 11.5m standard section is 11222mm. When the GIL is running, the conductor can be regarded as a suspended conductor with one end fixed and the other end freely retractable along the axial direction. The load and constraint application method of the conductor are shown in Figure 3 As shown, under the action of its own gravity, the conductor will stretch along the conductor axis.

[0114] The maximum axial deformation of the conductor under its own gravity is calculated using ANSYS software. 导体自重 =0.024091mm.

[0115] (2) Axial deformation caused by conductor temperature rise:

[0116] Conductor length L = 11222mm, linear expansion coefficient of aluminum alloy material α = 2.3 × 10 -5 K -1 , the allowable temperature rise of the conductor at the rated current of 5000A is △t=65K; the conductor is suspended at one end fixed and the other end free during operation. The temperature load and constraint application method of the conductor are shown in Figure 4 , the maximum axial deformation of the conductor after thermal expansion is calculated using ANSYS software. Figure 5 , △L 导体温升 =16.777mm.

[0117] (3) Maximum deformation of the conductor during operation of the GIL in the lower section of the 3# shaft:

[0118] When the GIL in the lower section of the 3# shaft is running, the maximum deformation of the conductor is the maximum deformation of the conductor in the GIL standard vertical module, which is composed of the maximum axial deformation of the conductor under its own gravity and the axial elongation of the conductor when the allowable temperature rise is 65K, that is, △L 导体 =△L 导体自重 +△L 导体温升 =0.024091+16.777=16.801mm.

[0119] Step 7: Calculation of deformation of GIL shell:

[0120] The factors that cause the deformation of the GIL shell include: the GIL's own weight causes the shell to be compressed axially; the current in the GIL's internal conductor causes the shell to heat up, causing the shell to expand (elongate) along the axis; the axial force (i.e., blind plate force) caused by the SF6 gas inside the shell causes the shell to elongate along the axis;

[0121] (1) The GIL deadweight causes axial compression of the shell. The mass of the GIL busbar in the lower section of the 3# shaft is M = 11030.56 kg. The constraint of the GIL shell by the horizontally installed angle compensation expansion joint at the upper end of the shaft is not considered. The GIL shell is regarded as a column with a cross-sectional size of 512 mm × 6 mm and a height of 216360 mm, which is fixed at the bottom and compressed only in the axial direction under the action of deadweight. The load and constraint application method are shown in Figure 6 ; Using ANSYS software, the maximum axial compression deformation of the GIL shell under its own weight is calculated. GIL自重-压缩 =-8.955mm, shell deformation cloud diagram see Figure 7 .

[0122] (2) Temperature rise causes axial elongation of the shell:

[0123] The calculated length of the GIL shell in the lower section of the shaft is L = 216360mm, the linear expansion coefficient of the aluminum alloy material is α = 2.3 × 10-5K-1, and the allowable temperature rise of the shell under the rated current of the conductor is 5000A. The constraint of the GIL shell on the angle compensation expansion joint installed horizontally at the upper end of the shaft is not considered. The GIL shell is regarded as a round tube with a cross-sectional size of 512mm × 6mm, which is fixed at the bottom and only extends along the axial direction after the shell is deformed by heat. The shell temperature load and constraint application method are shown in Figure 8 .

[0124] The axial deformation of the shell due to thermal expansion is calculated using ANSYS software. 壳体温升 =199.05mm, shell deformation cloud diagram see Fig. 9 .

[0125] (3) The axial force (i.e., blind plate force) caused by the SF6 gas inside the shell causes the shell to stretch along the axial direction:

[0126] The GIL shell of the lower section of the 3# shaft is composed of two independent air chambers. The constraint of the angle compensation expansion joint installed horizontally at the upper end of the shaft on the GIL shell is not considered. The GIL shell is treated as an air chamber with a fixed bottom and closed at both ends. Since the pressure on both sides of the air-separated insulator between the two independent air chambers is balanced, the air-separated insulator can be ignored to simplify the calculation, and the two independent air chambers are regarded as one air chamber. See Fig.10 ; Under the action of SF6 gas pressure p = 0.82MPa in the shell, the shell stretches along the axial direction; The maximum axial deformation of the shell under the action of internal pressure △L is calculated using ANSYS software 壳体内压 =7.3766mm; the deformation cloud diagram of the shell is shown in Fig.11 .

[0127] Step 8: Determine the calculation parameters of the shell length of the compensation section when replacing the GIL on site in the lower section of the 3# shaft:

[0128] When the lower section of the 3# shaft GIL is replaced as a whole, all installation errors of the GIL shell are adjusted through the second-to-last section of the GIL shell below, which is called the compensation section shell. After the other GIL shells are reinstalled according to the standard length in the drawing, the installed shell above the compensation section shell is hoisted to the installation position before disassembly by a 20t bridge crane, and the actual length required for the compensation section shell at this time is measured by a laser rangefinder. Considering various factors that may affect the shell length during the shell hoisting process, the final installation length of the compensation section shell and conductor is determined, and the standard section shell and conductor are cut or lengthened to reach the final installation length and then the compensation section shell is reinstalled to complete the GIL replacement work. After the replaced GIL is filled with SF6 gas to the rated pressure and operated with power, the deformation of the vertical section shell cannot exceed the adjustment range of the universal expansion joint at the lowest ambient temperature of 0.3℃ and the highest temperature of 40℃, and the axial clearance after the moving contact of the vertical section conductor is inserted into the static contact is within the range of 35mm-50mm. Based on this, the accuracy of the length of the compensation section shell becomes the main factor affecting the installation quality of the entire GIL.

[0129] The following factors should be considered when calculating (checking) the length of the compensation section shell and conductor:

[0130] (1) The influence of ambient temperature during installation. According to the previous calculation, the reference temperature of 22°C is the turning point for thermal expansion and contraction of the shell and conductor. If the ambient temperature during installation is higher than this temperature, the shell and conductor will expand thermally. If the ambient temperature during installation is lower than this temperature, the shell and conductor will contract. Therefore, the thermal expansion and contraction of the shell and conductor must be calculated based on the ambient temperature during installation.

[0131] (2) The axial elongation of all the shells above it (referred to as the hoisting shell) that the compensation shell needs to compensate for under the action of its own weight. This elongation includes the axial elongation of the shell under the action of its own weight when the bridge crane lifts the hoisting shell, and the length shortening of the shell after the elastic deformation of the hoisting shell disappears and the entire shell is compressed under the action of its own weight after the hook is removed and the compensation shell is reinstalled.

[0132] (3) Adjustment range of the universal expansion joint at the top of the GIL. When the GIL is in operation, part of the current flowing through the conductor is consumed by the conductor resistance, generating heat that increases the temperature of the GIL conductor, SF6 gas and shell, causing axial thermal expansion of the conductor and shell. The axial thermal expansion of the conductor is compensated by the axial gap between the conductor contact and the contact seat, while the axial expansion of the shell must be compensated by the universal expansion joint at the top of the GIL. Therefore, it is necessary to ensure that the axial extension of the shell during GIL operation does not exceed the adjustment range of the universal expansion joint.

[0133] Step 9: Calculation of the axial thermal expansion and contraction of the shell caused by changes in ambient temperature during installation:

[0134] ΔL shell- Environment = α(t2-t1)L;

[0135] Where α is the linear expansion coefficient of aluminum alloy material, 2.3×10 -6 ℃ -1 , t2 is the on-site ambient temperature during installation, t1 is the reference temperature, i.e. the turning temperature at which the shell undergoes thermal expansion and contraction, 22°C, and L represents the calculated length of the GIL shell in the lower section of the 3# shaft.

[0136] Step 10: Calculate the axial elongation of the shell under its own gravity when the bridge crane lifts the hoisting section shell:

[0137] The length of the lower section of the 3# shaft is L4A. The length of the shell of the hoisting section refers to the calculated length of the GIL shell of the lower section of the 3# shaft after removing the first and second shells from the bottom of the GIL. The length of the shell of the hoisting section is:

[0138] L 吊装段 =LL -2 -L -1 =216360-10600-8400=197360mm, where L -2 , L -1 It is the length of the second to last section and the first to last section of the shell below the GIL.

[0139] Lifting section mass: M 吊装段 =MM -2 -M -1 -M SF6 -M 绝缘子 ;

[0140] 11030.56-(10600+8400)×10-3×25.739-1616.052-(44.5+47.5)=8836.5kg.

[0141] Where, M = 11030.56 kg, which is the total mass of the 4A phase GIL; M -2 =10600×10-3×25.739kg, which is the mass of the second-to-last shell; M -1 =8400×10-3×25.739kg, which is the mass of the penultimate shell; M SF6 =1616.052kg, is the mass of SF6 gas filled in GIL; M 绝缘子 =(44.5+47.5)kg, which is the mass of the insulators installed in the second to last section and the first to last section of the GIL. The top of the hoisting section shell is hung on the bridge crane hook. Using ANSYS software to calculate, the axial elongation of the shell under its own gravity when the hoisting section shell is obtained is:

[0142] △L 壳体自重拉伸 =7.4513mm. The load and constraint application method of the hoisting section shell is shown in Fig.12 , the shell axial deformation cloud diagram is shown in Fig.13 .

[0143] Step 11: Calculate the shortening of the entire shell of the lower section of the 3# shaft GIL after the hook is removed and under the pressure of its own gravity:

[0144] After the compensation section shell, the hoisting section shell and the penultimate section shell (i.e. the fixed section shell) are welded together to form the lower section shell of the 3# shaft, the hook is removed and only the lower end of the entire section shell is fixed, like a column. At this time, it is only affected by the gravity of the GIL itself, and the shell will be compressed and deformed along the axial direction. The maximum axial compression deformation of the GIL shell under the action of its own weight is △L 壳体自重压缩 =-8.955mm.

[0145] Step 12: Calculate the axial elongation of the shell under the gravity of the GIL that needs to be compensated by the compensation section shell:

[0146] When determining the length of the compensation section shell, it is necessary to consider the axial expansion and contraction of the entire shell of the lower section of the 3# shaft GIL under its own gravity:

[0147] ΔL weight =ΔL 壳体自重拉伸 +ΔL 壳体自重压缩 ;

[0148] The calculation is -8.955+7.4513=-1.504 mm.

[0149] Step 13: Determine the length of the compensation section shell:

[0150] Before welding the shell of the compensation section, all the pipes above the compensation section pipeline are hoisted to the installation position before disassembly using a 20t bridge crane on site, and the actual length L required for the shell of the compensation section pipeline is measured using a laser rangefinder. 实际 Take the actual length as the reference, and add the axial extension of the shell under the gravity of the GIL to be compensated △L weight , plus the axial thermal expansion and contraction of the shell ΔL caused by the change in ambient temperature during installation shell-环境 , which is the final length of the compensation section shell:

[0151] L 补偿段 =L 实际 +ΔL weight +ΔL shell-环境 ;

[0152] If the ambient temperature of the compensation section shell is 35℃ when it is installed, the axial thermal expansion and contraction of the shell caused by the change of ambient temperature during installation is:

[0153] ΔL shell-环境 =α(t2-t1)L=2.3×10-6(35-22)×216360=6.469mm;

[0154] Note: The shell length L is the calculated length of the GIL shell in the lower section of the 3# shaft (i.e., L=216360mm), which includes the length of the hoisting section, the length of the penultimate shell section, and the final compensation section length.

[0155] The axial expansion and contraction of the entire shell of the lower section of the 3# shaft GIL under its own gravity:

[0156] ΔL weightt =ΔL 壳体自重拉伸 +ΔL 壳体自重压缩 =-8.955+7.4513=-1.504mm;

[0157] The measured length of the compensation section pipe shell is L 实际 , the final length of the compensation section shell:

[0158] L 补偿段 =L 实际 +ΔL weightt +ΔL shell-环境 =L 实际 +(-1.504)+6.469=L 实际 +4.965mm.

[0159] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. Calculation method of the length of the GIL compensation section of the shaft, It is characterized in that include: S1, determine the calculation parameters of the GIL bus compensation section length; S2, calculates the deformation of the GIL busbar shell in the lower section of the shaft during operation; S3, calculate the shell length of the compensation section; S4, calculating the maximum deformation of the conductor, thereby designing the length of the compensation section according to the deformation of the compensation section shell and the maximum deformation of the conductor.

2. The method for calculating the length of the shaft GIL compensation section according to claim 1, It is characterized in that In step S1, the calculation parameters of the GIL busbar compensation section length include the thermal expansion and contraction of the ambient temperature during installation, the axial elongation of the hoisting section shell under its own gravity, and the compression of the shell after hoisting is removed.

3. The method for calculating the length of the vertical shaft GIL compensation section according to claim 2, It is characterized in that In step S2, calculating the deformation of the GIL busbar shell in the lower section of the shaft during operation includes: S201, calculate the axial thermal expansion and contraction of the shell caused by changes in ambient temperature during installation: ΔL shell-环境 =α(t 2 -t 1 )L; Where α is the linear expansion coefficient of aluminum alloy material, t 2 is the ambient temperature at the time of installation, t 1 is the reference temperature, i.e., the transition temperature at which the shell undergoes thermal expansion and contraction, and L represents the calculated length of the GIL shell in the lower section of the shaft; S202, calculating the axial elongation of all shells above the compensation segment shell, i.e., the hoisting segment shell, under the action of its own gravity; S203, measuring the compression of the shell after the upper part of the GIL is removed, so as to calculate the axial elongation of the shell under the gravity of the GIL that needs to be compensated by the compensation section.

4. The method for calculating the length of the vertical shaft GIL compensation section according to claim 3, It is characterized in that In step S202, calculating the axial extension of all shells above the compensation section shell, i.e., the hoisting section shell under the action of its own weight, includes calculating the axial extension of the shell under the action of its own weight when the bridge crane lifts the hoisting section shell, specifically as follows: Calculate the hoisting shell length L of the hoisting section shell 吊装段 : L 吊装段 =LL n ; Where, L 吊装段 It indicates the length of the hoisting shell of the hoisting section after removing all the shells below the hoisting shell of the GIL section; L indicates the calculated length of the GIL shell in the lower section of the shaft; L n It represents the sum of the lengths of all shells below the shell of the hoisting section; Calculate the mass M of the lifting section 吊装 : M 吊装 =M-M n -M SF6 -M 绝缘子 ; Where M represents the total mass of the GIL phase, M n It represents the sum of the masses of all shells below the shell of the hoisting section, M SF6 Indicates the mass of SF6 gas filled in GIL, M 绝缘子 It represents the sum of the masses of the insulators installed in all the shells below the shell of the hoisting section; Hang the top of the hoisting section shell on the bridge crane hook, and adjust the hoisting shell length L calculated above. 吊装段 And the mass of the lifting section M 吊装 Input into ANSYS software, and calculate through ANSYS software to obtain the axial elongation ΔL of the shell under its own gravity during hoisting. 壳体自重拉伸 .

5. The method for calculating the length of the vertical shaft GIL compensation section according to claim 4, It is characterized in that In step S203, after the hook is removed, only the lower end of the entire shell is fixed. At this time, it is only affected by the gravity of the GIL itself, and the shell will be compressed and deformed along the axial direction. The maximum axial compression deformation ΔL of the GIL shell under the action of its own weight is measured. 壳体自重压缩 .

6. The method for calculating the length of the vertical shaft GIL compensation section according to claim 5, It is characterized in that In step S203, the axial elongation of the shell under the action of the GIL gravity that needs to be compensated by the compensation section shell is calculated as follows: ΔL weight =ΔL 壳体自重拉伸 +ΔL 壳体自重压缩 ; Here, positive values ​​indicate stretching and negative values ​​indicate shrinking.

7. The method for calculating the length of the vertical shaft GIL compensation section according to claim 6, It is characterized in that In step S3, the shell length of the compensation section is calculated as follows: S301, using a laser rangefinder to measure the actual length L of the outer casing of the compensation section pipeline at this time 实际 ; S302, calculate the final length of the compensation section shell: L 补偿段 =L 实际 +ΔL weight +ΔL shell-环境 ; Where, ΔL shell-环境 The calculated length L of the GIL shell of the lower section of the shaft is calculated. The calculated length L of the GIL shell of the lower section of the shaft includes the sum of the length of the hoisting section, the length below the hoisting section and the final compensation section length.

8. The method for calculating the length of the vertical shaft GIL compensation section according to claim 1, It is characterized in that In step S3, the deformation amount of the conductor is calculated as follows: ΔL 导体 =ΔL 导体自重 +ΔL 导体温升 ; Where, ΔL 导体自重 Indicates the axial deformation caused by the conductor's gravity, which is directly calculated by inputting the measured conductor length into the ANSYS software; ΔL 导体温升 The axial deformation caused by the temperature rise of the conductor is calculated by inputting the above data into ANSYS software through the measured conductor length, linear expansion coefficient of aluminum alloy material and allowable temperature rise under the rated current of the conductor.

Citation Information

Patent Citations

  • Ultra-high-voltage alternating-current mixed gas GIL segment temperature monitoring method

    CN106124928A

  • Gas-insulated metal-enclosed power transmission line and radial compensation unit thereof

    CN110829326A

  • GIL expansion joint on-line monitoring system

    CN117091524A

  • Flexible interface device for connecting two GIL buses

    CN219304424U