Human resource platform management method, system and equipment based on big data
Through the management method of human resources platform based on big data, we analyze project plans, build job collaboration matrix, evaluate and optimize team cooperation, solve the problem of inability to evaluate project team cooperation in the existing technology, and improve the team's execution and collaboration efficiency.
Patent Information
- Application Number
- CN202411562276.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing corporate human resource management cannot evaluate the cooperation of project team members, which causes project managers to spend a lot of time and energy to run-in the team, which is less efficient.
The human resources platform management method based on big data is adopted to obtain project requirements by analyzing project plans, build a job collaboration matrix, and obtain personnel allocation plans from the human resources pool based on indicators of team cooperation, and optimize the staffing of team members.
Effectively evaluate and optimize the cooperation of project team members, improve the team's execution and collaboration efficiency, and reduce the running-in time and energy of project managers.
Smart Images

Figure CN119067411A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of big data technology, and in particular to a human resources platform management method, system and device based on big data. Background Art
[0002] In project management, cooperation among team members is one of the key factors to ensure the smooth progress of the project. However, human resource issues often hinder effective cooperation among team members, including but not limited to team composition, communication mechanism, and personnel capabilities and motivation.
[0003] First, unreasonable team composition is an important reason for low cooperation. A diverse team can bring different perspectives and solutions to problems, but if the professional backgrounds and work styles of team members are too different, they may lead to disagreements and cooperation barriers if not properly managed and adjusted. In addition, when forming a team, project managers may consider technical or professional capabilities more and ignore the interpersonal relationships and collaboration capabilities among team members, which will also affect the overall cooperation of the team.
[0004] Secondly, insufficient ability and motivation of personnel are also key factors affecting team cooperation. If team members lack the necessary skills or knowledge to complete their tasks, or if they are not sufficiently committed to the project, it will directly affect the team's execution and collaboration efficiency. Project managers need to improve the ability and enthusiasm of team members through training and incentives, but the implementation of these measures often requires time and resources, and the effects are difficult to see immediately.
[0005] Existing human resource management in enterprises can often only evaluate whether an employee is capable of joining a project team, but cannot evaluate the degree of cooperation of project team members. Project managers need to spend a lot of time and energy to run in the project team, which is inefficient. Summary of the invention
[0006] The present invention provides a human resource platform management method, system and device based on big data, which at least solves the problem that the existing enterprise human resource management can often only evaluate whether an employee is capable of joining a project team, but cannot evaluate the cooperation of members in the project team. The project manager needs to spend a lot of time and energy to run in the project team, which is inefficient.
[0007] A human resources platform management method based on big data for personnel allocation of target projects, including: In response to receiving a project plan of a target project, parsing the project plan to obtain project requirements; According to the project requirements, obtaining the job requirements of the target project; Construct a position collaboration matrix based on the collaboration index between various positions; According to the job requirements and the job collaboration matrix, and based on the team cooperation index, at least one personnel allocation plan for the target project is obtained from a human resource pool.
[0008] Optionally, in response to receiving the project plan of the target project, parsing the project plan to obtain a project leader and project requirements includes: Establish project plan parsing rules and keyword library; In response to receiving a project plan of a target project, project requirements in the project plan are extracted through a preset model based on project plan parsing rules and a keyword library.
[0009] Optionally, in response to receiving the project plan of the target project, extracting project requirements in the project plan through a preset model based on the project plan parsing rules and the keyword library includes: In response to receiving a project plan of a target project, extracting a project text in the project plan; Based on the project plan parsing rules and the keyword library, the project text is parsed to obtain feature data in the project text corresponding to the keywords in the keyword library; According to the keywords and the corresponding feature data, the keywords and the corresponding feature data are input into a preset model to obtain project requirements, where the project requirements include at least one delivery target and a delivery time corresponding to the delivery target.
[0010] Optionally, obtaining the position requirements of the target project according to the project requirements includes: According to the delivery target, the supporting technology corresponding to the delivery target and the theoretical working hours corresponding to the supporting technology are obtained through the job analysis model; According to the supporting technology and the theoretical working hours, a supporting position and position working hours matching the supporting technology are obtained through a preset classification model; Obtain job requirements based on support positions and job hours.
[0011] Optionally, obtaining job requirements based on supporting jobs and job hours includes: Obtain the supporting technology corresponding to the supporting position and the theoretical working hours corresponding to the supporting technology, and obtain the position working hours corresponding to the supporting position; According to the delivery time and the job hours, job requirements are obtained, where the job requirements include job titles and required quantities.
[0012] Optionally, constructing a position collaboration matrix according to the collaboration indexes between various positions includes: Construct a position collaboration matrix according to each position, wherein the position collaboration matrix is an n*n matrix, where n is the number of positions; Get a job i and positions j Collaboration Index d i,j ,according to d i,j Fill the position collaboration matrix, and the filling method is: ,in The first i Line j The value of the column.
[0013] Optionally, the acquisition position i and positions j Collaboration Index d i,j ,include: Get a job i First position and position j the second position to which the first position belongs, determining whether the first position and the second position are the same position; When the first position and the second position are the same position, obtain the position type according to the type of the first position. i and positions j Collaboration Index d i,j ; When the first position and the second position are not the same position, determine the position i Is it an external communication position or position mentioned in the first position? j Whether it is an external communication position of the second position; When the position i The position is the external communication position in the first position and the position j When it is the external communication position of the second position, the position is obtained according to the correlation between the first position and the second position. i and positions j Collaboration Index d i,j .
[0014] Optionally, obtaining at least one personnel allocation plan for the target project from a human resource pool based on the job requirements and the job collaboration matrix and an indicator of team cooperation includes: According to the job requirements, determine a list of candidates for the job from the human resources pool; Calculate the team cooperation degree according to the candidate list and the position collaboration matrix, and select at least one plan whose team cooperation degree meets the requirements as at least one personnel allocation plan for the target project; The method for calculating team cooperation is: ; in A i,j For team cooperation, E i,j According to the position i Personnel and positions j The positions obtained by the historical cooperation records of the personnel i Personnel and positions j The degree of personnel coordination.
[0015] On the other hand, a human resources platform management system based on big data is used for personnel allocation of target projects, including a project management platform and a human resources platform; The project management platform is configured to: Receive user input, generate a project plan for the target project and send it to the human resources platform; Receive at least one personnel allocation plan for the target project sent by the human resources platform and display it to the user; The human resources platform is configured to: In response to receiving a project plan of a target project, parsing the project plan to obtain project requirements; According to the project requirements, obtaining the job requirements of the target project; Construct a position collaboration matrix based on the collaboration index between various positions; According to the job requirements and the job collaboration matrix, and based on the team cooperation index, at least one personnel allocation plan for the target project is obtained from a human resource pool.
[0016] On the other hand, a computer device is provided. The computer device includes a memory and a processor. The memory stores a computer program. The processor executes the computer program to implement the above method.
[0017] On the other hand, a computer storage medium stores a computer program, and a processor executes the computer program to implement the above method.
[0018] Compared with the prior art, the present invention has the following advantages and beneficial effects: The present invention provides a human resource platform management method, system and device based on big data, including: personnel allocation for target projects, including: in response to receiving a project plan of a target project, parsing the project plan to obtain project requirements; obtaining the position requirements of the target project according to the project requirements; constructing a position collaboration matrix according to the collaboration index between various positions; obtaining at least one personnel allocation plan for the target project from a human resource pool based on the team cooperation index according to the position requirements and the position collaboration matrix. The existing human resource management of enterprises can only evaluate whether an employee is capable of joining a project team, but cannot evaluate the cooperation of members in the project team. The project manager needs to spend a lot of time and energy to run in the project team, which is inefficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the specific implementation of the present application or the technical solution in the prior art, the following is a brief introduction to the drawings required for the specific implementation or the prior art description. In all drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, each element or part is not necessarily drawn according to the actual scale.
[0020] Figure 1 This is a flowchart of a human resources platform management method based on big data in this application; Figure 2 This is a schematic diagram of the structure of a computer device in this application.
[0021] Markings in the figure: 101 - processor, 102 - communication bus, 103 - network interface, 104 - user interface, 105 - memory.
[0022] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0023] In order to enable those skilled in the art to better understand the scheme of the present disclosure, the technical scheme in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are only part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in the field without creative work should fall within the scope of protection of the present disclosure.
[0024] It should be noted that the terms "first", "second", etc. in the specification and claims of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present disclosure described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products, or devices.
[0025] Example 1 like Figure 1 As shown, a human resource platform management method based on big data is used for personnel allocation of target projects, including: S1. In response to receiving a project plan of a target project, the project plan is parsed to obtain project requirements.
[0026] Optionally, the project plan of the target project may be a project plan in text format, or a spreadsheet or online form including the project plan.
[0027] Optionally, in order to facilitate subsequent processing, the project requirements obtained through parsing are structured data.
[0028] Optionally, a method of parsing the project plan to obtain project requirements is to parse the project plan to obtain project requirements through an AI model, including: Get the project plan text and other data related to the project plan, such as project proposals, task lists, meeting minutes, emails, etc.
[0029] Preprocess the project plan text. The preprocessing methods include text cleaning, word segmentation and tagging. Text cleaning is used to remove noise in the text. Word segmentation and tagging are used to divide the text into words or phrases (tokens) and perform part-of-speech tagging (POS tagging) to identify nouns, verbs, adjectives, etc.
[0030] Determine the requirement type based on the user's choice, and clarify which types of requirements need to be extracted from the text, such as functional requirements, non-functional requirements, performance requirements, constraints, etc.; and formulate parsing rules, design regular expressions, lexicons or rule templates to match specific patterns in the text.
[0031] Project requirements are obtained by using NLP models for named entity recognition, dependency parsing, and relation extraction.
[0032] S2. Obtain the job requirements of the target project based on project requirements.
[0033] Optionally, job requirements include job title and quantity required, such as front-end programmer, quantity 5, etc.
[0034] Optionally, based on project requirements, a method for obtaining the job requirements of the target project is to obtain the abilities and skills required to complete the project requirements through project requirements, match positions with relevant abilities and skills based on the abilities and skills required to complete the project requirements, and determine the number of people required for the position based on the workload.
[0035] S3. Construct a job collaboration matrix based on the collaboration index between each job.
[0036] Since the responsibilities of each position are different, the objects and frequency of assistance, cooperation or communication required by each position are also different. Therefore, it is necessary to construct a position collaboration matrix based on the collaboration index between each position. The position collaboration matrix is used to characterize the frequency and importance of assistance, cooperation or communication required between each position.
[0037] S4. According to job requirements and job collaboration matrix, and based on the team cooperation indicator, obtain at least one personnel allocation plan for the target project from the human resource pool.
[0038] By quantifying team cooperation and providing users with at least one project staff allocation plan, we can solve the problem of existing enterprise human resource management, which can only evaluate whether an employee is capable of joining a project team, but cannot evaluate the cooperation of project team members. Project managers need to spend a lot of time and energy to run in the project team, which is inefficient.
[0039] Example 2 This embodiment is based on the first embodiment, and is a human resources platform management method based on big data, which is used for personnel allocation of target projects, including: S1. In response to receiving a project plan of a target project, the project plan is parsed to obtain project requirements.
[0040] Optionally, the project plan of the target project may be a project plan in text format, or a spreadsheet or online form including the project plan.
[0041] Optionally, in order to facilitate subsequent processing, the project requirements obtained through parsing are structured data.
[0042] Optionally, a method of parsing the project plan to obtain project requirements is to parse the project plan to obtain project requirements through an AI model, including: Get the project plan text and other data related to the project plan, such as project proposals, task lists, meeting minutes, emails, etc.
[0043] Preprocess the project plan text. The preprocessing methods include text cleaning, word segmentation and tagging. Text cleaning is used to remove noise in the text. Word segmentation and tagging are used to divide the text into words or phrases (tokens) and perform part-of-speech tagging (POS tagging) to identify nouns, verbs, adjectives, etc.
[0044] Determine the requirement type based on the user's choice, and clarify which types of requirements need to be extracted from the text, such as functional requirements, non-functional requirements, performance requirements, constraints, etc.; and formulate parsing rules, design regular expressions, lexicons or rule templates to match specific patterns in the text.
[0045] Project requirements are obtained by using NLP models for named entity recognition, dependency parsing, and relation extraction.
[0046] Optionally, in response to receiving a project plan of the target project, parsing the project plan to obtain a project leader and project requirements, including: Establish project plan parsing rules and keyword library; In response to receiving a project plan of a target project, project requirements in the project plan are extracted through a preset model based on project plan parsing rules and a keyword library.
[0047] Optionally, the keyword library may include project leader, project manager, deliverables, functions, requirements, delivery date, milestones and other keywords related to the project plan.
[0048] Optionally, the parsing rules include mapping of keywords in the keyword library with key information, such as project leader and project manager both represent project leader, deliverables, functions, and requirements all correspond to the delivery goals of the project, etc.
[0049] Optionally, in response to receiving the project plan of the target project, based on the project plan parsing rules and the keyword library, extracting project requirements in the project plan through a preset model includes: In response to receiving a project plan of a target project, extracting a project text in the project plan; Based on the project plan parsing rules and the keyword library, parse the project text to obtain feature data in the project text corresponding to the keywords in the keyword library; According to the keywords and the corresponding feature data, the keywords and the corresponding feature data are input into a preset model to obtain project requirements, where the project requirements include at least one delivery target and a delivery time corresponding to the delivery target.
[0050] Optionally, when the project plan is a text document, the project text can be directly extracted. When the project plan is a PDF or image, the project text can be extracted using OCR technology.
[0051] Optionally, before parsing the project text, the project text is also preprocessed.
[0052] Optionally, delivery objectives include deliverables and acceptance criteria for deliverables.
[0053] S2. Obtain the job requirements of the target project based on project requirements.
[0054] Optionally, job requirements include job title and quantity required, such as front-end programmer, quantity 5, etc.
[0055] Optionally, based on project requirements, a method for obtaining the job requirements of the target project is to obtain the abilities and skills required to complete the project requirements through project requirements, match positions with relevant abilities and skills based on the abilities and skills required to complete the project requirements, and determine the number of people required for the position based on the workload.
[0056] Optionally, based on project requirements, obtain the job requirements of the target project, including: According to the delivery target, the supporting technology corresponding to the delivery target and the theoretical working hours corresponding to the supporting technology are obtained through the job analysis model; According to the supporting technology and theoretical working hours, the preset classification model is used to obtain the supporting positions and position working hours that match the supporting technology; Obtain job requirements based on support positions and job hours.
[0057] Optionally, the supporting technology corresponding to the delivery target and the theoretical working hours corresponding to the supporting technology are determined based on the deliverables and acceptance criteria of the delivery target. For example, if the deliverable is APP software, the acceptance criteria include APP functions, APP page design, etc. The theoretical working hours of the delivery target are obtained by inputting specific acceptance criteria into the working hours prediction model. The working hours prediction model is a machine learning model or deep learning model trained based on historical deliverables, historical acceptance criteria data and working hours data, with deliverables and acceptance criteria as input and working hours data as output.
[0058] Optionally, obtain job requirements based on support positions and job hours, including: Obtain the supporting technology corresponding to the supporting position and the theoretical working hours corresponding to the supporting technology, and obtain the position working hours corresponding to the supporting position; Based on the delivery time and job hours, job requirements are obtained, which include job titles and required quantities.
[0059] S3. Construct a job collaboration matrix based on the collaboration index between each job.
[0060] Since the responsibilities of each position are different, the objects and frequency of assistance, cooperation or communication required by each position are also different. Therefore, it is necessary to construct a position collaboration matrix based on the collaboration index between each position. The position collaboration matrix is used to characterize the frequency and importance of assistance, cooperation or communication required between each position.
[0061] Optionally, a position collaboration matrix is constructed based on the collaboration index between positions, including: Construct a job collaboration matrix based on each job. The job collaboration matrix is an n*n matrix, where n is the number of jobs. Get a job i and positions j Collaboration Index d i,j ,according to d i,j Fill the position collaboration matrix using the following method: ,in The first i Line j The value of the column.
[0062] Optional, get a job i and positions j Collaboration Index d i,j ,include: Get a job i First position and position j The second position to which it belongs, determines whether the first position and the second position are the same position; When the first position and the second position are the same position, get the position according to the type of the first position i and positions j Collaboration Index d i,j ; The higher the level of assistance required in the first position, d i,j The smaller; When the first position and the second position are not the same position, determine the position i Is it an external communication position and position in the first position? j Whether it is an external communication position for the second position; When the position i For the external communication position in the first position and the position j When it is the external communication position of the second position, obtain the position according to the correlation between the first position and the second position. i and positions j Collaboration Index d i,j; The higher the correlation between the first position and the second position, d i,j The smaller.
[0063] When the position i Not an external communication position or position in the first position j When it is not the external communication position of the second position, d i,j Is positive infinity.
[0064] post i and positions j It is a specific position. The first position and the second position are position types, such as front-end positions, back-end positions, and related positions. Each type of position includes multiple specific positions. Generally, only one person is required to coordinate with other positions in one type of position. For example, when the first position is a front-end position and the second position is a back-end position, only one front-end person and one back-end person are required to coordinate during joint debugging.
[0065] Optionally, when analyzing the correlation between positions, the correlation between the two positions can be obtained based on the types of the two positions through an analysis method such as an indicator system analysis method or an expert evaluation method. The correlation between the two positions can also be obtained based on the acquired frequency of communication between the two positions.
[0066] S4. According to job requirements and job collaboration matrix, and based on the team cooperation indicator, obtain at least one personnel allocation plan for the target project from the human resource pool.
[0067] By quantifying team cooperation and providing users with at least one project staff allocation plan, we can solve the problem of existing enterprise human resource management, which can only evaluate whether an employee is capable of joining a project team, but cannot evaluate the cooperation of project team members. Project managers need to spend a lot of time and energy to run in the project team, which is inefficient.
[0068] Optionally, according to the job requirements and the job collaboration matrix, based on the team cooperation index, at least one personnel allocation plan for the target project is obtained from the human resource pool, including: Determine the list of candidates for the position from the human resources pool based on the job requirements; Calculate the team coordination degree based on the candidate list and the job collaboration matrix, and select at least one plan with team coordination degree that meets the requirements as at least one personnel allocation plan for the target project; The method to calculate team cooperation is: ; in A i,j For team cooperation,E i,j According to the position i Personnel and positions j The positions obtained by the historical cooperation records of the personnel i Personnel and positions j The degree of personnel coordination.
[0069] Optionally, when the correlation between the first position and the second position is higher, d i,j The more hours, the more jobs i Personnel and positions j The higher the staff cooperation, E i,j At the same time, the method of selecting at least one plan that meets the requirements of team cooperation as at least one personnel allocation plan for the target project is to select At least one smaller plan serves as at least one personnel allocation plan for the target project.
[0070] Optional, used to determine E i,j The method used to determine the position i Corresponding personnel i and positions j Corresponding personnel j Methods to measure the degree of coordination between personnel include: Get the first cooperation times between personnel i and personnel j; Get the cooperation history between the first position to which position i belongs and the second position to which position j belongs, and rank the number of cooperation times between the first position personnel and the second position personnel according to the cooperation history; According to the first number of cooperation times and the ranking of the number of cooperation times, obtaining a first weight value for representing the ranking of the first number of cooperation times in the ranking of the number of cooperation times; Obtain the historical evaluations obtained by personnel i and personnel j in historical cooperation projects, obtain a second weight value according to the historical evaluation of personnel i, and obtain a third weight value according to the historical evaluation of personnel j; Obtain the historical evaluations of personnel i and personnel j in historical non-cooperative projects, respectively, obtain a fourth weight value according to the historical evaluation of personnel i, and obtain a fifth weight value according to the historical evaluation of personnel j; According to the first weight value, the second weight value, the third weight value, the fourth weight value and the fifth weight value, determine E i,j .
[0071] Optionally, the higher the ranking of the first number of cooperation times in the cooperation number ranking, the smaller the first weight value, the higher the historical evaluation of person i, the smaller the second weight value and the fourth weight value, the higher the historical evaluation of person j, and the smaller the third weight value and the fifth weight value.
[0072] Optional, E i,j The size of increases as the first weight value, the second weight value, and the third weight value increase, and decreases as the fourth weight value and the fifth weight value increase.
[0073] Optional, E i,j =first weight value*[second weight value / (second weight value+fourth weight value)+third weight value / (third weight value+fifth weight value)].
[0074] Example 3 A human resources platform management system based on big data, used for personnel allocation of target projects, including project management platform and human resources platform; The project management platform is configured to: Receive user input, generate a project plan for the target project and send it to the human resources platform; Receive at least one personnel allocation plan for the target project sent by the human resources platform and display it to the user; The HR platform is configured to: In response to receiving a project plan of a target project, parsing the project plan to obtain project requirements; According to project requirements, obtain the job requirements of the target project; Construct a position collaboration matrix based on the collaboration index between various positions; According to job requirements and job collaboration matrix, and based on team cooperation indicators, obtain at least one personnel allocation plan for the target project from the human resources pool.
[0075] Optionally, in response to receiving a project plan of the target project, parsing the project plan to obtain a project leader and project requirements, including: Establish project plan parsing rules and keyword library; In response to receiving a project plan of a target project, project requirements in the project plan are extracted through a preset model based on project plan parsing rules and a keyword library.
[0076] Optionally, in response to receiving the project plan of the target project, based on the project plan parsing rules and the keyword library, extracting project requirements in the project plan through a preset model includes: In response to receiving a project plan of a target project, extracting a project text in the project plan; Based on the project plan parsing rules and the keyword library, parse the project text to obtain feature data in the project text corresponding to the keywords in the keyword library; According to the keywords and the corresponding feature data, the keywords and the corresponding feature data are input into a preset model to obtain project requirements, where the project requirements include at least one delivery target and a delivery time corresponding to the delivery target.
[0077] Optionally, based on project requirements, obtain the job requirements of the target project, including: According to the delivery target, the supporting technology corresponding to the delivery target and the theoretical working hours corresponding to the supporting technology are obtained through the job analysis model; According to the supporting technology and theoretical working hours, the preset classification model is used to obtain the supporting positions and position working hours that match the supporting technology; Obtain job requirements based on support positions and job hours.
[0078] Optionally, obtain job requirements based on support positions and job hours, including: Obtain the supporting technology corresponding to the supporting position and the theoretical working hours corresponding to the supporting technology, and obtain the position working hours corresponding to the supporting position; Based on the delivery time and job hours, job requirements are obtained, which include job titles and required quantities.
[0079] Optionally, a position collaboration matrix is constructed based on the collaboration index between positions, including: Construct a job collaboration matrix based on each job. The job collaboration matrix is an n*n matrix, where n is the number of jobs. Get a job i and positions j Collaboration Index d i,j ,according to d i,j Fill the position collaboration matrix using the following method: ,in The first i Line j The value of the column.
[0080] Optional, get a job i and positions j Collaboration Index d i,j ,include: Get a job i First position and position j The second position to which it belongs, determines whether the first position and the second position are the same position; When the first position and the second position are the same position, get the position according to the type of the first position i and positions j Collaboration Index d i,j; The higher the level of assistance required in the first position, d i,j The smaller; When the first position and the second position are not the same position, determine the position i Is it an external communication position and position in the first position? j Whether it is an external communication position for the second position; When the position i For the external communication position in the first position and the position j When it is the external communication position of the second position, obtain the position according to the correlation between the first position and the second position. i and positions j Collaboration Index d i,j ; The higher the correlation between the first position and the second position, d i,j The smaller.
[0081] Optionally, according to the job requirements and the job collaboration matrix, based on the team cooperation index, at least one personnel allocation plan for the target project is obtained from the human resource pool, including: Determine the list of candidates for the position from the human resources pool based on the job requirements; Calculate the team coordination degree based on the candidate list and the job collaboration matrix, and select at least one plan with team coordination degree that meets the requirements as at least one personnel allocation plan for the target project; The method to calculate team cooperation is: ; in A i,j is the team cooperation, E i,j According to the position i Personnel and positions j The positions obtained by the historical cooperation records of the personnel i Personnel and positions j The degree of personnel coordination.
[0082] Example 4 This embodiment provides a computer device, which includes a memory and a processor. The memory stores a computer program, and the processor executes the computer program to implement any of the above methods.
[0083] Specifically, Figure 2 As shown, Figure 2This is a structural diagram of a computer device in the present application, and the computer device may include: a processor 101, such as a central processing unit (CPU), a communication bus 102, a user interface 104, a network interface 103, and a memory 105. Among them, the communication bus 102 is used to realize the connection and communication between these components. The user interface 104 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the user interface 104 may also include a standard wired interface and a wireless interface. The network interface 103 may optionally include a standard wired interface and a wireless interface (such as a wireless fidelity (WIreless-FIdelity, WI-FI) interface). The memory 105 may optionally be a storage device independent of the aforementioned processor 101. The memory 105 may be a high-speed random access memory (RAM) memory, or a stable non-volatile memory (NVM), such as at least one disk storage. The processor 101 may be a general-purpose processor, including a central processing unit, a network processor, etc., or may be a digital signal processor, an application-specific integrated circuit, a field programmable gate array or other programmable logic device, a discrete gate or transistor logic device, or a discrete hardware component.
[0084] Those skilled in the art will appreciate that Figure 2 The structure shown in the figure does not constitute a limitation on the electronic device, and may include more or less components than shown in the figure, or combine certain components, or arrange the components differently.
[0085] like Figure 2 As shown, the memory 105 as a storage medium may include an operating system, a network communication module, a user interface module, and an application program for implementing a human resources platform management method based on big data.
[0086] exist Figure 2 In the electronic device shown, the network interface 103 is mainly used for data communication with the network server; the user interface 104 is mainly used for data interaction with the user; the processor 101 and the memory 105 in the present application can be set in the electronic device, and the electronic device calls the application stored in the memory 105 for implementing a human resources platform management method based on big data through the processor 101 to implement the above method.
[0087] Example 5 This embodiment provides a computer-readable storage medium, on which a computer program is stored, and a processor executes the computer program to implement any of the above methods.
[0088] In some embodiments, the computer readable storage medium may be a memory such as FRAM, ROM, PROM, EPROM, EEPROM, flash memory, magnetic surface memory, optical disk, or CD-ROM; or various devices including one or any combination of the above memories. The computer may be various computing devices including intelligent terminals and servers.
[0089] In the above embodiments of the present disclosure, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0090] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0091] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed over multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0092] In addition, each functional unit in each embodiment of the present disclosure may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0093] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable non-volatile storage medium. Based on this understanding, the technical solution of the present disclosure is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a non-volatile storage medium, including a number of instructions to enable a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the various embodiments of the present disclosure. The aforementioned non-volatile storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk and other media that can store program codes.
[0094] The above are only preferred embodiments of the present disclosure. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present disclosure. These improvements and modifications should also be regarded as the protection scope of the present disclosure.
Claims
1. A human resources platform management method based on big data, characterized in that: Staffing for target projects, including: In response to receiving a project plan of a target project, parsing the project plan to obtain project requirements; According to the project requirements, obtaining the job requirements of the target project; Construct a position collaboration matrix based on the collaboration index between various positions; According to the job requirements and the job collaboration matrix, and based on the team cooperation index, at least one personnel allocation plan for the target project is obtained from a human resource pool.
2. According to the big data-based human resources platform management method of claim 1, it is characterized in that: In response to receiving the project plan of the target project, parsing the project plan to obtain a project leader and project requirements includes: Establish project plan parsing rules and keyword library; In response to receiving a project plan of a target project, project requirements in the project plan are extracted through a preset model based on project plan parsing rules and a keyword library.
3. According to the human resources platform management method based on big data according to claim 2, it is characterized in that: In response to receiving the project plan of the target project, extracting the project requirements in the project plan through a preset model based on the project plan parsing rules and the keyword library, includes: In response to receiving a project plan of a target project, extracting a project text in the project plan; Based on the project plan parsing rules and the keyword library, the project text is parsed to obtain feature data in the project text corresponding to the keywords in the keyword library; According to the keywords and the corresponding feature data, the keywords and the corresponding feature data are input into a preset model to obtain project requirements, where the project requirements include at least one delivery target and a delivery time corresponding to the delivery target.
4. According to the big data-based human resources platform management method of claim 3, it is characterized in that: According to the project requirements, the job requirements of the target project are obtained, including: According to the delivery target, the supporting technology corresponding to the delivery target and the theoretical working hours corresponding to the supporting technology are obtained through the job analysis model; According to the supporting technology and the theoretical working hours, a supporting position and position working hours matching the supporting technology are obtained through a preset classification model; Obtain job requirements based on support positions and job hours.
5. According to the big data-based human resources platform management method of claim 4, it is characterized in that: The job requirements are obtained based on the supporting positions and job hours, including: Obtain the supporting technology corresponding to the supporting position and the theoretical working hours corresponding to the supporting technology, and obtain the position working hours corresponding to the supporting position; According to the delivery time and the job hours, job requirements are obtained, where the job requirements include job titles and required quantities.
6. According to the big data-based human resources platform management method of claim 1, it is characterized in that: According to the collaboration index between various positions, a position collaboration matrix is constructed, including: Construct a position collaboration matrix according to each position, wherein the position collaboration matrix is an n*n matrix, where n is the number of positions; Get a job i and positions j Collaboration Index d i,j ,according to d i,j Fill the position collaboration matrix, and the filling method is: ,in The first i Line j The value of the column.
7. The method for managing a human resources platform based on big data according to claim 6 is characterized in that: Obtaining the position i and positions j Collaboration Index d i,j ,include: Get a job i First position and position j the second position to which the first position belongs, determining whether the first position and the second position are the same position; When the first position and the second position are the same position, obtain the position type according to the type of the first position. i and positions j Collaboration Index d i,j ; When the first position and the second position are not the same position, determine the position i Is it an external communication position or position mentioned in the first position? j Whether it is an external communication position of the second position; When the position i The position is the external communication position in the first position and the position j When it is the external communication position of the second position, the position is obtained according to the correlation between the first position and the second position. i and positions j Collaboration Index d i,j .
8. The method for managing a human resources platform based on big data according to claim 7, characterized in that: The obtaining at least one personnel allocation plan for the target project from a human resource pool according to the position requirements and the position collaboration matrix and based on an indicator of team cooperation includes: According to the job requirements, determine a list of candidates for the job from the human resources pool; Calculate the team cooperation degree according to the candidate list and the position collaboration matrix, and select at least one plan whose team cooperation degree meets the requirements as at least one personnel allocation plan for the target project; The method for calculating team cooperation is: ; in A i,j For team cooperation, E i,j According to the position i Personnel and positions j The positions obtained by the historical cooperation records of the personnel i Personnel and positions j The degree of personnel coordination.
9. A human resources platform management system based on big data, characterized in that: Used for personnel allocation of target projects, including project management platform and human resources platform; The project management platform is configured to: Receive user input, generate a project plan for the target project and send it to the human resources platform; Receive at least one personnel allocation plan for the target project sent by the human resources platform and display it to the user; The human resources platform is configured to: In response to receiving a project plan of a target project, parsing the project plan to obtain project requirements; According to the project requirements, obtaining the job requirements of the target project; Construct a position collaboration matrix based on the collaboration index between various positions; According to the job requirements and the job collaboration matrix, and based on the team cooperation index, at least one personnel allocation plan for the target project is obtained from a human resource pool.
10. A computer device, characterized in that: The computer device includes a memory and a processor, the memory stores a computer program, and the processor executes the computer program to implement the method according to any one of claims 1 to 8.
Citation Information
Patent Citations
Personnel and post matching method and device, equipment and storage medium
CN115456413A
Designer team resource management method and device and medium
CN117455403A
Text data recognition processing method and device based on recognition model
CN118734839A
Matrix analysis-based man-post matching analysis method and system
CN118798837A
Employee scheduling management system and method for enterprise
CN118839805A
Cited By
RPA full-process automatic declaration data processing method and system
CN120874803A
RPA full-process automatic declaration data processing method and system
CN120874803B
Automobile technological process development human resource investment assessment method
CN120875780A