Tunnel inter-ring slab staggering deformation model test device based on OFDR technology and manufacturing method
The OFDR-based tunnel ring misalignment deformation model test device addresses the limitations of traditional monitoring technologies by using optical fibers and strain gauges to accurately monitor and calculate misalignment, improving structural health assessment and maintenance planning.
Patent Information
- Application Number
- CN202411285894.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-12-06
AI Technical Summary
Traditional monitoring technologies such as displacement sensors, levels, total stations, and three-dimensional laser scanning cannot effectively monitor the misalignment and deformation of tunnel segments, which are critical for assessing the health and safety of subway tunnels.
A tunnel ring inter-ring misalignment deformation model test device based on Optical Frequency Domain Reflectometry (OFDR) technology, comprising an environment simulation unit, tunnel simulation unit, and detection unit, with optical fibers and strain gauges to monitor and calculate misalignment deformation.
The device provides accurate, real-time monitoring of tunnel segment misalignment, enhancing the evaluation of structural health and informing maintenance strategies by converting strain into deformation calculations, with improved accuracy compared to existing methods.
Smart Images

Figure CN119086260A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel engineering in geotechnical and underground engineering, and in particular to an OFDR-based tunnel inter-ring misalignment deformation model test device and a manufacturing method thereof. Background Art
[0002] Affected by complex geological conditions, adjacent engineering activities, train vibration and other factors, as the service time increases, tunnels will have a series of structural disease problems, posing a major safety hazard to subway operations. Tunnel deformation is intuitive and easily induces a variety of diseases; cracking of tunnel segments is one of the main structural manifestations of the disease, and it has a significant impact on the transmission of structural internal forces and the integrity of the segments, requiring timely health diagnosis and maintenance of the tunnel structure.
[0003] As an assembled structure, the joints of shield tunnels are the weakest parts. When affected by external engineering activities such as ground overload and unloading of adjacent foundation pits, the joints are often the first to deform and damage, including joint opening-closing deformation, misalignment between segments, and misalignment between segment rings. In addition, uneven settlement of shield tunnels can also cause tunnel segment misalignment. Therefore, in addition to studying the lateral deformation monitoring of shield tunnels, it is also extremely important to conduct research on deformation monitoring of shield tunnel segment joints.
[0004] However, since traditional monitoring technologies such as displacement sensors, levels, total stations, machine vision technology, and three-dimensional laser scanning technology cannot meet the requirements of modern tunnel structure health monitoring, a new and efficient testing method is urgently needed to meet the needs of modern tunnel structure monitoring. Optical Frequency Domain Reflectometry (OFDR) technology, as a cutting-edge structural health monitoring technology, has the characteristics of high spatial resolution, high measurement accuracy, and distributed continuous testing. It has great advantages in the field of structural health monitoring and is expected to overcome the defects of traditional point and cross-sectional monitoring technologies. Based on this, domestic and foreign scholars have carried out extensive and in-depth research in the field of tunnel structure health monitoring based on distributed fiber optic sensing technology. Summary of the invention
[0005] The purpose of the present invention is to provide a tunnel ring inter-ring misalignment deformation model test device and a manufacturing method based on OFDR technology to solve the problems listed in the background technology.
[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0007] The tunnel ring inter-ring misalignment deformation model test device based on OFDR technology of the present invention comprises an environment simulation unit, a tunnel simulation unit and a detection unit, wherein the tunnel simulation unit is buried inside the environment simulation unit, the detection unit is installed inside the tunnel simulation unit, and the detection unit is electrically connected to a data acquisition instrument.
[0008] Preferably, the tunnel simulation unit comprises a shield segment lining ring, the shield segment lining ring seams are connected by I-shaped joint pieces, grooves are relatively provided between the outer surface and the inner surface of the shield segment lining ring, and the detection unit is installed in the shield segment lining ring.
[0009] Preferably, the I-shaped connector piece is made of PE material.
[0010] Preferably, the detection unit comprises an organic glass panel and a point strain gauge, the organic glass panel is placed inside the shield segment lining ring, and a displacement meter is placed inside the organic glass panel;
[0011] The point strain gauges are relatively installed at equal intervals on the inner and outer surfaces of the shield segment lining ring, and the point strain gauges located on the inner surface of the shield segment lining ring are electrically connected to the displacement meter;
[0012] The point strain gauge and the displacement meter are both electrically connected to the data acquisition instrument.
[0013] Preferably, the environmental simulation unit includes a ground load and a model box, the bottom of the model box is filled with an underlying soil layer, the tunnel simulation unit is placed above the underlying soil layer, the upper surface of the underlying soil layer is filled with a penetrating soil layer, and the penetrating soil layer is coated on the outer peripheral surface of the tunnel simulation unit, and the ground load is placed above the penetrating soil layer.
[0014] Preferably, it also includes an optical fiber, which is fixedly mounted on the inner surface of the shield segment lining ring and is electrically connected to the data acquisition instrument.
[0015] The method for manufacturing a tunnel ring misalignment deformation model test device based on OFDR technology comprises the following steps:
[0016] S1. Obtaining geometric parameters and mechanical parameters of the shield segment lining structure to be used for the test;
[0017] S2. Propose geometric similarity ratio C L , get the geometric parameters of the shield segment lining structure;
[0018] S3. Proposed elastic modulus similarity ratio C E , and obtain the mechanical parameters of the shield segment lining structure;
[0019] S4. Formulate a water-paste ratio and manufacture the shield segment lining ring according to the proposed shield segment lining structure geometric parameters and mechanical parameters;
[0020] S5, measuring the mechanical parameters of the shield segment lining ring, and judging whether the corresponding mechanical parameters of the shield segment lining ring are equal to the set values;
[0021] S6. If the mechanical parameters of the shield segment lining ring are not equal to the set values, adjust the water-paste ratio, and repeat steps S4-S5 until the difference between the mechanical parameters of the shield segment lining ring and the set values is less than 5%, and fit the relationship between the water-paste ratio and the mechanical parameters obtained multiple times into a curve to determine the water-paste ratio corresponding to when the mechanical parameters of the shield segment lining ring are equal to the set values;
[0022] S7, making materials according to the water-paste ratio, and casting a single shield segment lining ring using the calculated geometric parameters;
[0023] S8. The slotting method is used to simulate the longitudinal joint of the shield segment. The cross-sectional size of the slot is determined according to the stiffness equivalence principle of the joint. In the calculation of the slot cross-sectional size selection, the bending stiffness K is taken as 5×10 7 N·m / rad; According to the similarity relationship of the shield segment longitudinal joints, the two-side slotting mode was selected, and the segment joints were slotted with a slot depth of 5.0mm and a width of 5.0mm;
[0024] S9, the ring seam joint is bonded by gluing I-shaped joint pieces to obtain the shield segment lining ring group;
[0025] S10, sticking strain gauges on the inner and outer arc surfaces of the second ring segment of the shield segment lining ring group, the arch top, arch bottom, left arch waist and right arch waist to measure the strain state;
[0026] S11. To paste the optical fiber, first grind the concrete surface smooth and make fixed point marks. Straighten the optical fiber along the mark and use glue to fix the straight section of the optical fiber outside the fixed point so that the optical fiber is close to the surface of the shield segment. Finally, use epoxy resin glue to seal and protect it, and let it stand for no less than 24 hours.
[0027] Compared with the prior art, the beneficial technical effects of the present invention are:
[0028] 1) Using OFDR distributed optical fiber to test the misalignment deformation between shield segment lining rings can timely discover the misalignment deformation between shield segment lining rings, and converting strain into calculation of misalignment deformation further provides a more intuitive and comprehensive actual deformation of the structure, thereby more accurately evaluating the health status of the structure and providing a reference for the design, maintenance and improvement of the structure;
[0029] 2) For the calculation method of the misalignment deformation between shield tunnel segments, an improvement is made based on the existing calculation method, and a calculation method for the misalignment deformation is proposed, which is suitable for the case where the optical fiber is directly attached to the surface of the segment. The two calculation methods are compared based on the test strain of the experimental optical fiber. The results show that the misalignment deformation of the existing calculation method is about twice that of the improved calculation method. The existing calculation method is not suitable for the misalignment deformation calculation of this test. The misalignment deformation calculated by the improved calculation method has a good consistency with the actual measured value of the dial indicator, and is comparable with the monitoring results of the actual tunnel project;
[0030] 3) Displacement meters and strain gauges are set in the tunnel model, and optical fibers can comprehensively and real-time monitor the evolution of the deformation of the shield segment lining rings after the tunnel model is subjected to stress. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The present invention will be further described below in conjunction with the accompanying drawings.
[0032] Figure 1 It is a front view schematic diagram of a tunnel ring misalignment deformation model test device based on OFDR technology of the present invention;
[0033] Figure 2 It is a schematic diagram of the splicing state of the shield segment lining ring of the present invention.
[0034] Description of the drawings: 1. Ground load; 2. Model box; 3. Shield segment lining ring; 4. Plexiglas panel; 5. Passing soil layer; 6. Underlying soil layer; 7. Point strain gauge; 8. Displacement meter; 9. I-shaped joint piece; 10. Cutting groove; 11. Optical fiber. DETAILED DESCRIPTION
[0035] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0036] like Figure 1-2 As shown, a tunnel ring inter-stagger deformation model test device based on OFDR technology includes an environment simulation unit, a tunnel simulation unit and a detection unit. The tunnel simulation unit is buried inside the environment simulation unit, and the detection unit is installed inside the tunnel simulation unit. The detection unit is electrically connected to a data acquisition instrument.
[0037] Specifically, the environmental simulation unit includes a ground load 1 and a model box 2, the bottom of the model box 2 is filled with an underlying soil layer 6, the tunnel simulation unit is placed above the underlying soil layer 6, the upper surface of the underlying soil layer 6 is filled with a penetrating soil layer 5, and the penetrating soil layer 5 is covered on the outer peripheral surface of the tunnel simulation unit, and the ground load 1 is placed above the penetrating soil layer 5.
[0038] Specifically, the tunnel simulation unit includes a shield segment lining ring 3, the seams of the shield segment lining ring 3 are connected by I-shaped joint pieces 9, grooves 10 are relatively opened between the outer surface and the inner surface of the shield segment lining ring 3, and the detection unit is installed in the shield segment lining ring 3.
[0039] Specifically, the I-shaped connector piece 9 is made of PE material.
[0040] Specifically, the detection unit includes an organic glass panel 4 and a point strain gauge 7. The organic glass panel 4 is placed inside the shield segment lining ring, and a displacement meter 8 is placed inside the organic glass panel 4.
[0041] The point strain gauges 7 are relatively installed at equal intervals on the inner and outer surfaces of the shield segment lining ring, and the point strain gauges 7 located on the inner surface of the shield segment lining ring 3 are electrically connected to the displacement meter 8;
[0042] The point strain gauge 7 and the displacement meter 8 are both electrically connected to the data acquisition instrument; they can monitor and collect the change value of the force data of the tunnel simulation unit in real time and comprehensively; they can apply force to the soil layer through ground loading to simulate the influence of temporary surface load on the tunnel simulation unit;
[0043] It also includes an optical fiber 11, which is fixedly installed on the inner surface of the shield segment lining ring 3. The optical fiber 11 is electrically connected to the data acquisition instrument. Distributed optical fiber is used as one of the main monitoring means of the above test. The method of fixed-point optical fiber deployment is used to test the misalignment deformation between shield segment lining rings in the tunnel model test, and the optical fiber is used to identify and locate the misalignment deformation of the tunnel model; based on the existing calculation method, an improvement is made, and a method for calculating the misalignment deformation amount when the optical fiber is directly attached to the surface of the segment is proposed. The misalignment deformation amount is calculated by the optical fiber test strain, and the optical fiber strain law and misalignment deformation law under overload and eccentric load directly above are analyzed based on the optical fiber strain.
[0044] Furthermore, the geometric similarity ratio, strength, stress, cohesion, and elastic modulus similarity ratio between the model test device of this embodiment and the actual tunnel prototype are all 1:20, while the bulk density similarity ratio, Poisson's ratio, strain, and friction angle similarity ratio are all 1:1. It can better simulate the evolution of the dislocation deformation caused by the shield segment under surface overload, and provide reliable data support for actual tunnel engineering.
[0045] The method for manufacturing a tunnel ring misalignment deformation model test device based on OFDR technology comprises the following steps:
[0046] S1. Obtaining geometric parameters and mechanical parameters of the shield segment lining structure to be used for the test;
[0047] S2. Propose geometric similarity ratio C L , get the geometric parameters of the shield segment lining structure;
[0048] S3. Proposed elastic modulus similarity ratio C E , and obtain the mechanical parameters of the shield segment lining structure;
[0049] S4. Formulate a water-paste ratio and manufacture the shield segment lining ring according to the proposed shield segment lining structure geometric parameters and mechanical parameters;
[0050] S5, measuring the mechanical parameters of the shield segment lining ring, and judging whether the corresponding mechanical parameters of the shield segment lining ring are equal to the set values;
[0051] S6. If the mechanical parameters of the shield segment lining ring are not equal to the set values, adjust the water-paste ratio, and repeat steps S4-S5 until the difference between the mechanical parameters of the shield segment lining ring and the set values is less than 5%, and fit the relationship between the water-paste ratio and the mechanical parameters obtained multiple times into a curve to determine the water-paste ratio corresponding to when the mechanical parameters of the shield segment lining ring are equal to the set values;
[0052] S7, making materials according to the water-paste ratio, and casting a single shield segment lining ring using the calculated geometric parameters;
[0053] S8. The slotting method is used to simulate the longitudinal joint of the shield segment. The cross-sectional size of the slot is determined according to the stiffness equivalence principle of the joint. In the calculation of the slot cross-sectional size selection, the bending stiffness K is taken as 5×10 7 N·m / rad; According to the similarity relationship of the shield segment longitudinal joints, the two-side slotting mode was selected, and the segment joints were slotted with a slot depth of 5.0mm and a width of 5.0mm;
[0054] S9, the ring seam joint is bonded by gluing I-shaped joint pieces to obtain the shield segment lining ring group;
[0055] S10, sticking strain gauges on the inner and outer arc surfaces of the second ring segment of the shield segment lining ring group, the arch top, arch bottom, left arch waist and right arch waist to measure the strain state;
[0056] S11. To paste the optical fiber, first grind the concrete surface smooth and make fixed point marks. Straighten the optical fiber along the mark and use glue to fix the straight section of the optical fiber outside the fixed point so that the optical fiber is close to the surface of the shield segment. Finally, use epoxy resin glue to seal and protect it, and let it stand for no less than 24 hours.
[0057] The geometric parameters of the shield segment lining ring and the shield segment lining ring group are the corresponding segment splicing method, inner diameter, outer diameter, thickness and width, the depth of the annular joint groove, and the thickness and width of the longitudinal joint required to connect the segment rings. The mechanical parameters are the corresponding elastic modulus E and uniaxial compressive strength f cu .
[0058] The mechanical parameters of the shield segment lining ring group to be measured are the uniaxial compressive strength f cu,t, The set value is the standard value of uniaxial compressive strength f cu .
[0059] The positions where the grooves are opened on the shield segment lining ring are corresponding to the positions where the shield segment lining ring is circumferentially spliced with the original shield segment, and the grooves are arranged on the outer surface and the inner surface of the shield segment lining ring.
[0060] By combining the similarity principle and based on the mechanical properties of the shield segment lining ring joint, a specific microconcrete formula material is used to simulate the shield segment concrete. The material mainly uses cement as the cementitious material, and is mixed with quartz sand (0.3-0.5mm), quartz sand (1.0-2.0mm) and slag powder in a specific proportion. After sufficient mixing, compaction and hardening, a similar material is formed to ensure that the physical and mechanical properties of the similar material are closer to those of concrete.
[0061] By calculating, selecting and limiting the material stiffness of the annular joints of the simulated shield segment lining ring, using I-shaped joint pieces to simulate bolted joints, and setting the position of the I-shaped joint pieces when connecting the annular shield segment lining rings according to the distribution of annular bolts during the prototype shield segment lining, the annular local effect of the shield segment lining structure can be effectively reflected. In the model test, the force modes of the shield segment lining ring and the shield segment lining ring joints are consistent with the actual project, making the model test results more reliable and better reflecting the mechanical behavior and deformation law of the shield tunnel segment lining structure.
[0062] The longitudinal seam joint is simulated at the joint of the shield segment by cutting grooves. This method weakens the structural stiffness of the part by setting grooves of a certain cross-sectional size at the joint position by means of chiseling, grinding, cutting or pre-embedding. The circumferential joint stiffness simulated by the grooves is stable, and the influencing factors are simple and clear. It can be regarded as a more ideal circumferential joint simulation method.
[0063] In order to ensure that the scaled tunnel model can deform and form structural damage under reasonable overload conditions, soft soil is selected as the traversing soil layer in this test; in addition, in order to avoid excessive settlement of the scaled tunnel model during the test and affect the monitoring efficiency of the instrument, medium-weathered muddy siltstone is selected as the underlying soil layer; through repeated tests and comparisons, a mixture of river sand and rubber particles is selected as a similar material to simulate soft soil, and a hot-melt mixture of barite powder, quartz sand and paraffin is selected as a similar material to medium-weathered muddy siltstone; the prepared model experimental device is placed in the model box, and in order to avoid excessive settlement of the shield segment lining ring in the vertical direction during the test, the rock layer is selected as the underlying soil layer of the model experimental device, and the soft soil layer is selected as the traversing soil layer of the model experimental device.
[0064] In addition, a hole with a radius of 0.12m was opened in the middle of the model box to better measure the horizontal and vertical convergence of the shield segment lining ring and observe the development of cracks between the shield segment lining ring groups.
[0065] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variation thereof are intended to cover non-exclusive inclusion, so that a process, method, article or seal including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or seal.
[0066] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. Tunnel ring misalignment deformation model test device based on OFDR technology, Features: It comprises an environment simulation unit, a tunnel simulation unit and a detection unit. The tunnel simulation unit is buried inside the environment simulation unit. The detection unit is installed inside the tunnel simulation unit. The detection unit is electrically connected to a data acquisition instrument.
2. The tunnel ring misalignment deformation model test device based on OFDR technology according to claim 1, Features: The tunnel simulation unit comprises a shield segment lining ring (3), wherein the seams of the shield segment lining ring (3) are connected via I-shaped joint pieces (9), grooves (10) are provided relatively between the outer surface and the inner surface of the shield segment lining ring (3), and the detection unit is installed in the shield segment lining ring (3).
3. The tunnel ring misalignment deformation model test device based on OFDR technology according to claim 2, Features: The I-shaped connector piece (9) is made of PE material.
4. The tunnel ring misalignment deformation model test device based on OFDR technology according to claim 3, Features: The detection unit comprises an organic glass panel (4) and a point strain gauge (7); the organic glass panel (4) is placed inside the shield segment lining ring; a displacement meter (8) is placed inside the organic glass panel (4); The point strain gauges (7) are installed at equal intervals on the inner and outer surfaces of the shield segment lining ring, and the point strain gauges (7) located on the inner surface of the shield segment lining ring (3) are electrically connected to the displacement meter (8); The point strain gauge (7) and the displacement meter (8) are both electrically connected to the data acquisition instrument.
5. The tunnel ring misalignment deformation model test device based on OFDR technology according to claim 4, Features: The environmental simulation unit comprises a ground load (1) and a model box (2), the bottom of the model box (2) is filled with an underlying soil layer (6), the tunnel simulation unit is placed above the underlying soil layer (6), the upper surface of the underlying soil layer (6) is filled with a through soil layer (5), and the through soil layer (5) is coated on the outer peripheral surface of the tunnel simulation unit, and the ground load (1) is placed above the through soil layer (5).
6. The tunnel ring misalignment deformation model test device based on OFDR technology according to claim 5, Features: It also comprises an optical fiber (11), wherein the optical fiber (11) is fixedly mounted on the inner surface of the shield segment lining ring (3), and the optical fiber (11) is electrically connected to the data acquisition instrument.
7. A method for manufacturing a tunnel ring misalignment deformation model test device based on OFDR technology according to any one of claims 1 to 6, Features: The steps include: S1. Obtaining geometric parameters and mechanical parameters of the shield segment lining structure to be used for the test; S2. Propose geometric similarity ratio C L , and obtain the geometric parameters of the shield segment lining structure; S3. Proposed elastic modulus similarity ratio C E , and obtain the mechanical parameters of the shield segment lining structure; S4. Formulate a water-paste ratio and manufacture the shield segment lining ring according to the proposed shield segment lining structure geometric parameters and mechanical parameters; S5, measuring the mechanical parameters of the shield segment lining ring, and judging whether the corresponding mechanical parameters of the shield segment lining ring are equal to the set values; S6. If the mechanical parameters of the shield segment lining ring are not equal to the set values, adjust the water-paste ratio, and repeat steps S4-S5 until the difference between the mechanical parameters of the shield segment lining ring and the set values is less than 5%, and fit the relationship between the water-paste ratio and the mechanical parameters obtained multiple times into a curve to determine the water-paste ratio corresponding to when the mechanical parameters of the shield segment lining ring are equal to the set values; S7, making materials according to the water-paste ratio, and casting a single shield segment lining ring using the calculated geometric parameters; S8. The slotting method is used to simulate the longitudinal joint of the shield segment. The cross-sectional size of the slot is determined according to the stiffness equivalence principle of the joint. In the calculation of the slot cross-sectional size selection, the bending stiffness K is taken as 5×10 7 N·m / rad; According to the similarity relationship of the shield segment longitudinal joints, the two-side slotting mode was selected, and the segment joints were slotted with a slot depth of 5.0mm and a width of 5.0mm; S9, the ring seam joint is bonded by gluing I-shaped joint pieces to obtain the shield segment lining ring group; S10, sticking strain gauges on the inner and outer arc surfaces of the second ring segment of the shield segment lining ring group, the arch top, arch bottom, left arch waist and right arch waist to measure the strain state; S11. To paste the optical fiber, first grind the concrete surface smooth and make fixed point marks. Straighten the optical fiber along the mark and use glue to fix the straight section of the optical fiber outside the fixed point so that the optical fiber is close to the surface of the shield segment. Finally, use epoxy resin glue to seal and protect it, and let it stand for no less than 24 hours.