Intelligent park operation and construction comprehensive index analysis system
Through the smart park operation and construction of a comprehensive index analysis system, problems such as data integration and energy management have been solved, real-time and accurate assessment of park operations have been achieved, resource utilization efficiency and policy implementation effects have been improved, and energy waste has been reduced.
Patent Information
- Application Number
- CN202411098895.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-12-06
AI Technical Summary
The existing smart park lacks a unified data integration platform, lack of secondary development and utilization capabilities, in real-time energy management, asset management and environmental maintenance rely on manual and extensive, making it difficult to evaluate the park's intelligent operation status, resulting in resource utilization efficiency Low and energy waste.
Provide a comprehensive index analysis system for smart park operation and construction, including data acquisition and processing module, energy consumption monitoring module, policy analysis and talent evaluation module and park environmental maintenance module. Through real-time data acquisition and analysis, comprehensive index is calculated and real-time operation evaluation is provided. and optimization suggestions.
Real-time and accurate assessment of smart park operations has been achieved, resource utilization efficiency has been improved, energy waste has been reduced, and data support has been provided to improve operational efficiency and policy implementation effect.
Smart Images

Figure CN119090336A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a park information index analysis system, and in particular to a smart park operation and construction comprehensive index analysis system. Background Art
[0002] Smart parks have gradually become a new engine for urban development. They not only carry the aggregation and innovation of high-tech industries, but also represent the advanced concepts and technical applications of urban management. Various industrial parks, service parks, and logistics parks are emerging in an endless stream under the name of intelligence and smartness. However, many parks may only add temperature and humidity sensors, a certain degree of data visualization, and park IT projects, and are named smart parks. Therefore, it is very important to evaluate the operation and construction quality of smart parks.
[0003] In the daily operation and management of smart parks, how to ensure the operation quality of the park, improve resource utilization efficiency, and optimize service experience has become an important issue facing managers. The existing operation and construction of smart parks have the following problems:
[0004] 1. How to improve the processing capabilities of various types of data
[0005] Although the digital middle platform has solved the problem of internal information integration in the company to a good extent, there is a lack of a unified platform for data integration for the entire park; and the ability for secondary development and utilization of data is insufficient.
[0006] 2. Inability to manage massive amounts of assets
[0007] Asset classification, procurement, and inventory are difficult; there are a large number of blind spots in the operation and maintenance of enterprise equipment; and there is no visualization tool for rental control information.
[0008] 3. Park energy management monitoring
[0009] There is a lack of effective monitoring and management of the park's energy planning information and actual operation optimization data; the energy consumption of asset operation and maintenance is high, and there is no real-time monitoring method; the start and stop control management of high-energy-consuming equipment is extensive, and the difference in tiered electricity prices is large, resulting in unnecessary energy waste.
[0010] 4. Policy information utilization analysis and talent assessment are not perfect
[0011] Policy information is mostly in the form of text clauses, which are difficult to directly use for digital analysis. Talent assessment is not perfect, the assessment of enterprise operating vitality indicators is inaccurate, and it is impossible to accurately evaluate the effectiveness of policy implementation.
[0012] 5. Park environment maintenance
[0013] The existing park environment maintenance is relatively simple and extensive, and mainly relies on manual labor, without achieving accurate assessment.
[0014] As can be seen from the above, the existing technology cannot truly evaluate the intelligent operation status of the park, is not conducive to improving the efficiency of the system, cannot intuitively measure the operation and development trend of the park, and is not conducive to horizontal quantitative comparison of the operation and construction of various smart parks. Therefore, it is necessary to provide a comprehensive index analysis system for the operation and construction of smart parks. Summary of the invention
[0015] The technical problem to be solved by the present invention is to provide a comprehensive index analysis system for the operation and construction of a smart park, which can solve the problem of comprehensive quantitative reference evaluation of the operation and construction of each smart park, provide effective data support for the operation evaluation of the smart park, and ensure the real-time and accuracy of the data.
[0016] The technical solution adopted by the present invention to solve the above technical problems is to provide a comprehensive index analysis system for the operation and construction of a smart park, including: a data collection and processing module: collecting various classified data of the smart park, including energy consumption data, crowd density data, enterprise operation vitality data, policy-related data and park environment maintenance data; an energy consumption monitoring module: obtaining the planning information of the park's comprehensive energy system; updating the energy consumption data in real time according to the planning information and in combination with the energy operation optimization data; a policy analysis and talent evaluation module: converting the policy clauses of the text structure into structured metadata to form a structured policy clause information library, making policy recommendations by formulating standardized interfaces, evaluating enterprise talents at the same time, and updating the enterprise operation vitality data in real time; a park environment maintenance module: carrying out an environmental maintenance quality assessment within the monitoring period of each target park from three dimensions: greening environment maintenance data, road environment maintenance data and building environment maintenance data, and updating the park environment maintenance data in real time; an index analysis module: analyzing the crowd density data within the monitoring period of each target park, and combining the real-time updated energy consumption data, enterprise operation vitality data and park environment maintenance data to evaluate the comprehensive operation and construction index of each target park within the monitoring period.
[0017] Furthermore, the index analysis module inputs energy consumption data, crowd density data, enterprise operation vitality data and park environment maintenance data into the comprehensive index calculation model for calculation; and converts the output of the comprehensive index model into an index trend chart and a corresponding analysis report through the index data model output module.
[0018] Furthermore, the comprehensive index model selects each classification data of the benchmark park that meets the conditions as samples, calculates the initial data of each classification as the benchmark value; then divides the real-time updated data of each classification by the corresponding benchmark value and multiplies it by 100 to obtain each classification index, and performs weighted summation on each classification index to obtain the operation and construction comprehensive index; the classification indexes include the crowd density index, energy consumption data index, enterprise operation vitality index and park environment maintenance index.
[0019] Furthermore, the crowd density data obtained by the comprehensive index calculation model include campus bus service indicators and in-and-out traffic indicators, and talent apartment overview, tenant statistics, monthly access control alarm statistics and monthly entry and exit abnormality statistics are incorporated into the crowd density index.
[0020] Furthermore, the energy consumption monitoring module establishes an energy coupling device model based on the planning information and combined with the energy operation optimization data, calculates the multi-stage planning configuration information of the park's comprehensive energy system; establishes a multi-stage planning model of the park's comprehensive energy system, and sets multi-stage planning constraints.
[0021] Furthermore, the energy consumption monitoring module realizes energy consumption forecasting, energy efficiency analysis and energy consumption benchmarking management through real-time edge-side energy management and control, and thus obtains energy operation optimization data; the real-time edge-side energy management and control includes unit electricity consumption sub-item energy consumption analysis, horizontal comparison of similar unit energy consumption, benchmark unit energy consumption comparison, historical comparison of building classification energy heating energy consumption and non-heating energy consumption, proportion of professional energy consumption of each system, comparison of HVAC energy consumption, water, electricity and gas, daily year-on-year data of HVAC energy consumption and daily month-on-month data of HVAC energy consumption; after comprehensive calculation and scoring, the updated energy consumption data is generated and sent to the comprehensive index calculation model.
[0022] Furthermore, the enterprise operation vitality data obtained by the comprehensive index calculation model include industry import indicators, work order quality indicators, equipment operation monitoring indicators and employment and electricity consumption indicators. The employment and electricity consumption indicators are obtained by the policy analysis and talent evaluation module through comprehensive calculation and scoring by analyzing the enterprise's visit volume, user retention rate, user activity, electricity consumption, electricity consumption time and electricity consumption comparison indicators in the same stage; the equipment operation monitoring indicators are obtained by the equipment operation and maintenance module after obtaining the equipment model visualization configuration, equipment status monitoring and equipment fault diagnosis data from the Internet of Things platform, and calculating and scoring.
[0023] Furthermore, the policy analysis and talent evaluation module evaluates the enterprise talents as follows: S1) uses the STAR method to mine the behavioral events and technical expertise of enterprise talents, and designs questions in combination with the structured policy clause information database; S2) obtains the answers of enterprise talents for preprocessing, removes stop words and repeated meaningless colloquial words; S3) uses the existing enterprise talent corpus to train the autoencoding language model; S4) uses the trained autoencoding language model as an encoder, builds a neural network and continues to use the existing enterprise talent corpus for training; S5) uses the trained neural network to predict the subsequent ability classification of enterprise talents, maps the abilities of all enterprise talents to a continuous value space for scoring, normalizes and standardizes the scoring results, and then multiplies them by preset weights and incorporates them into the enterprise operation vitality data.
[0024] Furthermore, the comprehensive index calculation model also includes that when the change range of a certain classification index exceeds a preset threshold, the updated data corresponding to the classification index is handed over to the abnormal data receiving module for recording and processing, and the classification index is included after the increase or decrease range is limited, or the updated data that causes the abnormality is stripped and the classification index is recalculated.
[0025] Furthermore, the data acquisition and processing module obtains data from the archive platform and the data middle platform, provides unified data classification and coding standards, unified interface standards and unified database structure standards; and uses a fusion integration platform to connect the data of various systems in the park, and puts all structured data into the NoSQL database Hyperbase, and uses three types of metadata: monitoring indicators, monitoring assets and monitoring thresholds; assigns unique asset type codes to different monitored assets, and constructs the logical relationship between monitoring indicators and monitored assets through asset type codes.
[0026] Compared with the prior art, the present invention has the following beneficial effects: the comprehensive index analysis system for the operation and construction of a smart park provided by the present invention calculates the comprehensive index based on key data such as energy consumption, enterprise operation vitality, environmental maintenance, personnel flow, and talents, and combines policy-related data to intuitively measure the operational development trend of the park, solve the problem of comprehensive quantitative reference evaluation of the operation and construction of each smart park, provide effective data support for the operation evaluation of the smart park, and ensure the real-time and accuracy of the data. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is the architecture diagram of the comprehensive index analysis system for the operation and construction of the smart park of the present invention;
[0028] Figure 2 The present invention is a talent evaluation flow chart of the comprehensive index analysis system for the operation and construction of the smart park. DETAILED DESCRIPTION
[0029] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0030] Figure 1 This is the architecture diagram of the comprehensive index analysis system for the operation and construction of the smart park of the present invention.
[0031] See also Figure 1 The smart park operation and construction comprehensive index analysis system provided by the present invention includes:
[0032] Data collection and processing module: collects various classified data of the smart park, including energy consumption data, crowd density data, enterprise operation vitality data, policy-related data and park environment maintenance data;
[0033] Energy consumption monitoring module: obtains the planning information of the park's comprehensive energy system; updates the energy consumption data in real time based on the planning information and combined with energy operation optimization data;
[0034] Policy analysis and talent evaluation module: converts text-structured policy clauses into structured metadata to form a structured policy clause information database, recommends policies by formulating standardized interfaces, evaluates corporate talents, and updates corporate operational vitality data in real time;
[0035] Park environment maintenance module: Carry out environmental maintenance quality assessment of each target park during the monitoring period from three dimensions: greening environment maintenance data, road environment maintenance data and building environment maintenance data, and update the park environment maintenance data in real time;
[0036] Index analysis module: Analyzes the crowd density data of each target park during the monitoring period, and combines the real-time updated energy consumption data, enterprise operation vitality data and park environmental maintenance data to evaluate the comprehensive operation and construction index of each target park during the monitoring period.
[0037] The comprehensive index analysis system for the operation and construction of a smart park provided by the present invention calculates the comprehensive index based on key data such as energy consumption, environmental maintenance, personnel flow, and talents, and combines policy-related data to intuitively measure the operational development trend of the park, reflect the implementation effect of relevant policies, and solve the comprehensive quantitative evaluation and horizontal comparison problems of the operation and construction of each smart park, providing effective data support for the operation evaluation of the smart park, and ensuring the real-time and accuracy of the data; the selection and processing of the key data of the present invention are described in detail below.
[0038] 1. Crowded data
[0039] For data on dense crowds, you can consider indicators of park bus service and inbound and outbound traffic;
[0040] Park bus service indicators:
[0041] time 2023.11 2023.12 2024.01 2024.02 2024.03 2024.04 2024.05 2024.06 Number of people served 16117 15995 18130 11492 16955 16169 14799 13953 Full load rate 73.85% 74.21% 72.20% 61.83% 69.90% 67.16% 64.48% 68.60%
[0042] In addition to the number of passengers served and the load factor of the park bus, it can also provide further charts such as bus route overview, QR code scanning passenger statistics, timetables, and provide interactive functions.
[0043]
[0044] Incoming and outgoing traffic indicators:
[0045] time 2024.01 2024.02 2024.03 2024.04 2024.05 2024.06 Incoming traffic 69812 49655 69055 67544 65068 107041 Traffic flow 119894 83197 114946 109812 104888 108675
[0046] For parks that provide talent apartments, the following apartment abnormality warning indicators can also be considered:
[0047] time 2023.11 2023.12 2024.01 2024.02 2024.03 2024.04 2024.05 2024.06 Number of exceptions 515 473 486 518 387 542 528 371
[0048] More specifically, the present invention also incorporates indicators such as talent apartment overview, tenant statistics, monthly access control alarm statistics, and monthly entry and exit abnormal statistics into the crowd density index.
[0049]
[0050] 2. Energy consumption data
[0051] The present invention provides project overview and energy and carbon overview indicators, and provides budget trend charts, benchmarking analysis and rankings.
[0052]
[0053]
[0054] The energy consumption data varies greatly. In order to carry out reasonable planning, the energy consumption monitoring module of the present invention establishes an energy coupling device model based on the planning information and combines the operation optimization plan to calculate the multi-stage planning configuration information of the park's comprehensive energy system; establishes a multi-stage planning model of the park's comprehensive energy system, and sets multi-stage planning constraints. Preferably, the present invention solves the established multi-stage planning model of the park's comprehensive energy system based on the Seagull optimization algorithm; after optimization calculation, the multi-stage planning configuration information of the park's comprehensive energy system is obtained through iterative calculation based on the Seagull optimization algorithm, so as to better reduce the fluctuation of the comprehensive index of operation and construction. The Seagull optimization algorithm not only has a strong global search capability and the ability to adaptively adjust the search space, but also the algorithm is relatively simple and easy to use, and is suitable for dealing with energy operation optimization problems.
[0055] At the same time, the present invention fully considers the energy-saving effect brought by the energy operation optimization solution. The energy consumption monitoring module of the present invention realizes energy consumption prediction, energy efficiency analysis and energy consumption benchmarking management through real-time edge-side energy control, and then obtains energy operation optimization data; the edge-side real-time energy control includes unit electricity consumption sub-item energy consumption analysis, horizontal comparison of similar unit energy consumption, benchmark unit energy consumption comparison, historical comparison of building classification energy heating energy consumption and non-heating energy consumption, proportion of professional energy consumption of each system, comparison of HVAC energy consumption water, electricity and gas, daily year-on-year data of HVAC energy consumption and daily month-on-month data of HVAC energy consumption; after comprehensive calculation and scoring, the updated energy consumption data is generated and sent to the comprehensive index calculation model.
[0056] 3. Enterprise operational vitality data
[0057] The enterprise operation vitality data includes industrial import indicators, work order quality indicators, equipment operation monitoring indicators, and employment and electricity consumption indicators; among them, the industrial import indicators are as follows:
[0058]
[0059] The work order quality indicators are as follows:
[0060] time 2023.11 2023.12 2024.01 2024.02 2024.03 2024.04 2024.05 2024.06 First-time completion rate 99.16% 99.04% 97.80% 96.62% 97.60% 97.84% 95.53% 98.24%
[0061] For equipment operation monitoring indicators, the present invention also includes an equipment operation maintenance module, which obtains equipment model visualization configuration, equipment status monitoring and equipment fault diagnosis data from the Internet of Things platform, calculates equipment operation monitoring indicators and incorporates them into enterprise operation vitality data.
[0062] For employment and electricity consumption indicators, the policy analysis talent evaluation module of the present invention provides specific scores and evaluation reports by analyzing the company's visit volume, user retention rate, user activity, electricity consumption, electricity consumption time and electricity consumption comparison indicators in the same stage; the scores are weighted, normalized and standardized to generate real-time updated enterprise operation vitality data.
[0063] The key to the vitality of an enterprise lies in talent. It is crucial to design the entire talent evaluation module so that it has a reliable theoretical support and the evaluation results have high reliability and validity. Figure 2 In the comprehensive index analysis system for operation and construction of smart parks provided by the present invention, the policy analysis talent evaluation module evaluates enterprise talents as follows:
[0064] S1) Use the STAR method to explore the behavioral events of corporate talents and design questions;
[0065] S (Situation): "What kind of situation is that? What factors lead to such a situation? Who is involved in this situation?"
[0066] T(Task): "What is the main task you are facing? What goal do you want to achieve?"
[0067] A (Action): "In that situation, what were your thoughts, feelings, and actions you wanted to take?" Here, it is important to understand the interviewee's perception of the situation and focus of the example.
[0068] How does the interviewee view other people (e.g., positive or negative) or situations (e.g., thinking about problem analysis and solution)?
[0069] What is the interviewee feeling (e.g., fear, confidence, excitement)?
[0070] What do the interviewees want to do? What ideas motivate them (e.g., wanting to do things better, impress their boss)?
[0071] R (Result): "What was the final result? What happened in the process?"
[0072] There are various preferential policies in the current parks. In order to fully evaluate the implementation effect of the policies, the present invention closely combines policy analysis and talent evaluation. The policy analysis and talent evaluation module of the present invention converts the policy clauses of the text structure into structured metadata, forms a structured policy clause information library, and makes policy recommendations by formulating standardized interfaces. Therefore, when designing questions, the behavioral events and technical expertise of enterprise talents are fully explored, and questions are designed in combination with the structured policy clause information library. The technical expertise of enterprise talents can be matched with the policy clause information library for similarity and the most matching related questions can be selected for asking.
[0073] S2) Get the answers of enterprise talents for preprocessing, remove stop words and repeated meaningless words (colloquial words, such as "um" and "ah"). This can make the corpus cleaner and remove useless interference items. In subsequent tasks, we can better focus on important semantic information and improve recognition accuracy.
[0074] S3) Use 10 million segments of enterprise talent corpus to train the auto-encoding language model. There are two training tasks. The first task is similar to the cloze task. The masked language model is trained. The input text is randomly masked at the word granularity. Any word may be masked. The probability of verb masking is appropriately increased. Then the context of the input text is used to predict what the masked word is. Only when the model truly understands the meaning of the context can it accurately predict what the current masked word is. This can greatly reduce the confusion of the language model, so that the model can truly have the ability to understand human natural language. The reason for increasing the masking probability of verbs is that the problem and evaluation of the present invention involve the behavior of enterprise talents. Behavior is generally a verb. In order to better understand the behavior, the masking probability of verbs should be increased, so that the model pays more attention to behavioral action phrases. The second task predicts the scene (study / life / work) answered by enterprise talents. This is a classification task. This is to allow the model to pay more attention to the event scenes told by enterprise talents and to pay more attention to behavior. Only by truly distinguishing different event scenes and what enterprise talents have done can the ability of enterprise talents be better evaluated accurately.
[0075] S4) The trained autoencoder language model is used as an encoder, and a layer of feed forward neural network is connected behind it to extract the language features of corporate talents. A classification layer is connected after the feed forward neural network layer to calculate the highest probability of which level the corporate talents' answers are in.
[0076] S5) According to the model trained in S5, the present invention can obtain the ability classification of enterprise talents. Combined with the classification and the answer language information, scoring is performed, and the classification can be mapped to a 0-100 point output result. The result can be regarded as the ability score of the enterprise talent under the guidance of BEI (Behavioral-event-interviews) theory. In this way, the capabilities of all enterprise talents can be mapped to a continuous value space, scored according to 0-100 points, and the scoring results can be normalized and standardized, and then multiplied by the preset weights and included in the enterprise operation vitality data. Different preset weights can be set for different experts and talents, and the weights can be adjusted according to relevant policy terms. For other classified data, they can also be mapped to a continuous value space and scored according to 0-100 points, which will not be repeated in the present invention.
[0077] 4. Park environment maintenance data
[0078] The park environment maintenance data is mainly developed from three dimensions: greening environment maintenance data, road environment maintenance data, and building environment maintenance data. The cumulative values of the three-dimensional indicators within the monitoring period of each target park are used as the environmental maintenance data of each target park. The greening environment maintenance data mainly includes green area, greening rate, number of new vegetation types, number of days between vegetation maintenance, and cleanliness and health of vegetation before and after maintenance; road environment data includes road network density, road length and width, road surface flatness, cumulative road damage area ratio (including cracks, potholes, subsidence, delamination, undulations and other forms), maximum road damage depth ratio, minimum street lamp brightness, and cumulative street lamp lighting area; building environment data includes building area, businessable area, housing supporting area, number of public supporting parking spaces, number of elevators, and water supply, power supply, cooling, heating, and elevator operation monitoring indicators of each building.
[0079] The present invention provides a comprehensive index analysis system for the operation and construction of a smart park. The index analysis module inputs each classification data into a comprehensive index calculation model for calculation; and converts the content output by the comprehensive index model into an index trend chart and a corresponding analysis report through an index data model output module. The comprehensive index model selects various types of data from benchmark parks that meet the conditions as samples, calculates the initial data of each classification as a benchmark value, and is also a standard line for measuring the operation and development of the park; then the real-time updated data of each classification is divided by the corresponding benchmark value and multiplied by 100 to obtain each classification index, and the weighted sum of each classification index is obtained to obtain the comprehensive operation and construction index, and each classification index can also be directly provided as needed, including a crowd density index, an energy consumption data index, an operation vitality index, and a park environment maintenance index. The sample data used by each classification index can be added or deleted and adjusted according to actual needs. In order to avoid large fluctuations in the comprehensive operation and construction index, if the change range of a certain classification index exceeds the preset threshold, such as a rise or fall of 10%, the update data corresponding to the classification index is handed over to the abnormal data receiving module for recording and processing, and the classification index is included after the limit of the rise or fall, or the update data causing the abnormality is stripped and the classification index is recalculated.
[0080] In order to ensure the accuracy of the comprehensive index of operation and construction, it is particularly important to ensure the integrity, accuracy and uniformity of the data source. To this end, the data acquisition and processing module of the present invention obtains data from the archive platform and the data center, and provides a unified data classification and coding standard, a unified interface standard and a unified database structure standard; and uses a fusion integration platform to connect the data of various systems in the park, and puts all structured data into the NoSQL database Hyperbase, and manages them uniformly through metadata; for example, three types of metadata, monitoring indicators, monitoring assets and monitoring thresholds, are used; unique asset type codes are assigned to different monitored assets, and the logical relationship between monitoring indicators and monitored assets is constructed through asset type codes, forming a structured database based on metadata for system use. Specifically, the data acquisition and processing module extracts archive data from the archive platform, and the archive data includes equipment asset data, space asset data and space lease data; the data acquisition and processing module extracts the unique data identifier in the data center, and obtains engineering development management system data, asset operation management system data, apartment management system data and property expenditure control system data.
[0081] To sum up, the comprehensive index analysis system for the operation and construction of smart parks provided by the present invention calculates the comprehensive index based on key data such as energy consumption, enterprise operation vitality, environmental maintenance, personnel flow, talents, etc. and combines policy-related data to intuitively measure the operational development trend of the park, solve the problem of comprehensive quantitative reference evaluation of the operation and construction of each smart park, provide effective data support for the operation evaluation of smart parks, and ensure the real-time and accuracy of the data.
[0082] Although the present invention has been disclosed as above with preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art may make some modifications and improvements without departing from the spirit and scope of the present invention. Therefore, the scope of protection of the present invention shall be based on the definition of the claims.
Claims
1. A comprehensive index analysis system for operation and construction of a smart park, characterized in that: include: Data collection and processing module: collects various types of data of the smart park, including energy consumption data, crowd density data, enterprise operation vitality data, policy-related data and park environment maintenance data; Energy consumption monitoring module: obtains the planning information of the park's comprehensive energy system; updates the energy consumption data in real time based on the planning information and combined with energy operation optimization data; Policy analysis and talent evaluation module: converts text-structured policy clauses into structured metadata to form a structured policy clause information database, recommends policies by formulating standardized interfaces, evaluates corporate talents, and updates corporate operational vitality data in real time; Park environment maintenance module: Carry out environmental maintenance quality assessment of each target park during the monitoring period from three dimensions: greening environment maintenance data, road environment maintenance data and building environment maintenance data, and update the park environment maintenance data in real time; Index analysis module: Analyzes the crowd density data of each target park during the monitoring period, and combines the real-time updated energy consumption data, enterprise operation vitality data and park environmental maintenance data to evaluate the comprehensive operation and construction index of each target park during the monitoring period.
2. The smart park operation and construction comprehensive index analysis system according to claim 1, characterized in that: The index analysis module inputs energy consumption data, crowd density data, enterprise operation vitality data and park environment maintenance data into the comprehensive index calculation model for calculation; and converts the output of the comprehensive index model into an index trend chart and a corresponding analysis report through the index data model output module.
3. The smart park operation and construction comprehensive index analysis system as claimed in claim 2, characterized in that: The comprehensive index model selects the classified data of qualified benchmark parks as samples, calculates the initial data of each classification as the benchmark value; then divides the real-time updated data of each classification by the corresponding benchmark value and multiplies it by 100 to obtain the classification index, and performs weighted summation on the classification index to obtain the operation and construction comprehensive index; the classification indexes include the crowd density index, energy consumption data index, enterprise operation vitality index and park environment maintenance index.
4. The smart park operation and construction comprehensive index analysis system as claimed in claim 2, characterized in that: The crowd density data obtained by the comprehensive index calculation model include campus bus service indicators and in-and-out traffic indicators, and talent apartment overview, tenant statistics, monthly access control alarm statistics and monthly entry and exit abnormality statistics are incorporated into the crowd density index.
5. The comprehensive index analysis system for operation and construction of a smart park as claimed in claim 2, characterized in that: The energy consumption monitoring module establishes an energy coupling device model based on planning information and combined with energy operation optimization data, calculates multi-stage planning configuration information of the park's comprehensive energy system; establishes a multi-stage planning model of the park's comprehensive energy system, and sets multi-stage planning constraints.
6. The smart park operation and construction comprehensive index analysis system according to claim 5, characterized in that: The energy consumption monitoring module realizes energy consumption forecasting, energy efficiency analysis and energy consumption benchmarking management through real-time edge-side energy management and control, and thus obtains energy operation optimization data; the real-time edge-side energy management and control includes unit electricity consumption sub-item energy consumption analysis, horizontal comparison of similar unit energy consumption, benchmark unit energy consumption comparison, historical comparison of building classification energy heating energy consumption and non-heating energy consumption, proportion of professional energy consumption of each system, comparison of HVAC energy consumption water, electricity and gas, daily year-on-year data of HVAC energy consumption and daily month-on-month data of HVAC energy consumption; after comprehensive calculation and scoring, the updated energy consumption data is generated and sent to the comprehensive index calculation model.
7. The smart park operation and construction comprehensive index analysis system as claimed in claim 2, characterized in that: The enterprise operation vitality data obtained by the comprehensive index calculation model include industrial import indicators, work order quality indicators, equipment operation monitoring indicators and employment and electricity consumption indicators. The employment and electricity consumption indicators are obtained by the policy analysis and talent evaluation module through comprehensive calculation and scoring by analyzing the enterprise's visit volume, user retention rate, user activity, electricity consumption, electricity consumption time and electricity consumption comparison indicators in the same stage; The equipment operation monitoring indicators are obtained by the equipment operation and maintenance module by obtaining the equipment model visualization configuration, equipment status monitoring and equipment fault diagnosis data from the Internet of Things platform, and calculating and scoring them.
8. The smart park operation and construction comprehensive index analysis system according to claim 7, characterized in that: The policy analysis and talent assessment module assesses corporate talents as follows: S1) Use the STAR method to explore the behavioral events and technical expertise of corporate talents, and design questions in combination with the structured policy terms information database; S2) Obtain answers from enterprise talents and pre-process them to remove stop words and repeated meaningless spoken words; S3) Use existing corporate talent corpus to train the auto-encoding language model; S4) Use the trained autoencoder language model as an encoder to build a neural network and continue to use the existing corporate talent corpus for training; S5) Use the trained neural network to predict the subsequent ability classification of enterprise talents, map the abilities of all enterprise talents into a continuous value space for scoring, normalize and standardize the scoring results, and then multiply them by preset weights and incorporate them into the enterprise operation vitality data.
9. The comprehensive index analysis system for operation and construction of a smart park as claimed in claim 2, characterized in that: The comprehensive index calculation model also includes that when the change range of a certain classification index exceeds a preset threshold, the updated data corresponding to the classification index is handed over to the abnormal data receiving module for recording and processing, and the classification index is included after the increase or decrease range is limited, or the updated data that causes the abnormality is stripped and the classification index is recalculated.
10. The smart park operation and construction comprehensive index analysis system according to claim 1, characterized in that: The data acquisition and processing module obtains data from the archive platform and the data middle platform, provides unified data classification and coding standards, unified interface standards and unified database structure standards; and uses a fusion integration platform to connect the data of various systems in the park, and puts all structured data into the NoSQL database Hyperbase, and uses three types of metadata: monitoring indicators, monitoring assets and monitoring thresholds; assigns unique asset type codes to different monitored assets, and constructs the logical relationship between monitoring indicators and monitored assets through asset type codes.
Citation Information
Cited By
Smart park policy intelligent matching calculation method and system based on large model
CN121010167A
