Construction method and device for line connection of power distribution network, electronic equipment and storage medium
By obtaining the topological structure, ledger data and geographical location information of the distribution network, and automatically determining and screening candidate lines, the problem of low efficiency in distribution network line contact construction in the existing technology is solved, and efficient line contact design and planning is achieved .
Patent Information
- Application Number
- CN202411432718.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2025-01-10
AI Technical Summary
In the prior art, the distribution network line connection construction efficiency is low, and the lack of unified and automated data processing methods leads to large tasks and low efficiency.
By obtaining the topological structure, ledger data and geographical location information of the distribution network, determining candidate lines, conducting simulated contact operation and screening, selecting target lines for contact, and realizing automated line contact construction.
It improves the construction efficiency of distribution network line connection, ensures that the selected target lines meet design requirements, narrows the selection range, ensures the quality of contact, and supports the planning and design of distribution networks.
Smart Images

Figure CN119298022A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power distribution network line connection, and in particular to a construction method, device, electronic equipment and storage medium for power distribution network line connection. Background Art
[0002] In the electric power sector, different distribution network lines are connected and communicated through appropriate equipment and methods to form an overall distribution network communication line, that is, to construct distribution network line connections, which can realize the transmission and distribution of electricity and ensure that each electrical equipment can be powered normally. Through reasonable distribution network line connection construction, the efficiency and reliability of the power system can be improved and the users' demand for power supply can be met.
[0003] At present, the construction of distribution network line connections in related technologies usually requires professional and technical personnel to manually analyze the connection structure based on the single-line diagram. The amount of distribution network line-related data that professional and technical personnel need to process is large, the workload is large, and there is a lack of a relatively unified and automated distribution network line data processing method, resulting in low efficiency in the construction of distribution network line connections.
[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0005] The embodiments of the present invention provide a method, device, electronic device and storage medium for constructing distribution network line connection, so as to at least solve the technical problem of low efficiency in constructing distribution network line connection in related technologies.
[0006] According to one aspect of an embodiment of the present invention, a method for constructing distribution network line connection is provided, comprising: obtaining a distribution network line topology structure, distribution network line inventory data, and geographic location information of a plurality of distribution devices in a distribution network in a preset area, wherein the distribution network includes at least a pre-selected distribution network line and a plurality of other distribution network lines, and the pre-selected distribution network line is to be connected with the plurality of other distribution network lines; based on the distribution network line topology structure and the geographic location information, determining a plurality of candidate distribution network lines for connecting with the pre-selected distribution network line from the plurality of other distribution network lines; based on the distribution network line topology structure and the distribution network line inventory data, screening the plurality of candidate distribution network lines to obtain at least one target distribution network line for connecting with the pre-selected distribution network line; connecting the pre-selected distribution network line with the at least one target distribution network line to obtain a distribution network line connection result.
[0007] Optionally, based on the distribution network line topology structure and geographic location information, multiple candidate distribution network lines for line connection with a pre-selected distribution network line are determined from multiple other distribution network lines, including: determining the equipment to be connected in the pre-selected distribution network line based on the distribution network line topology structure, wherein the equipment to be connected includes at least the line end public equipment in the pre-selected distribution network line; based on the geographic location information, the equipment to be connected and a preset distance range, determining multiple candidate distribution network lines from multiple other distribution network lines.
[0008] Optionally, based on the distribution network line topology structure and the distribution network line ledger data, multiple candidate distribution network lines are screened to obtain at least one target distribution network line for line connection with the pre-selected distribution network line, including: based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and multiple candidate distribution network lines are simulated for connection operation to obtain simulated connection operation results; based on preset connection operation specifications and the simulated connection operation results, multiple candidate distribution network lines are screened to obtain at least one target distribution network line, wherein the preset connection operation specifications include at least one of the following: line operation heavy overload connection specifications, line bus and substation connection specifications, and line branch status connection specifications.
[0009] Optionally, when the simulated interconnection operation result includes: the line operation heavy overload interconnection result; based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and multiple candidate distribution network lines are simulated interconnected to obtain the simulated interconnection operation result, including: based on the distribution network line topology structure and the distribution network line ledger data, the first year's maximum load, the second year's maximum load and the rated current carrying capacity of the candidate lines when the pre-selected distribution network lines and multiple candidate distribution network lines are simulated interconnected, wherein the first year's maximum load is used to represent the annual maximum load of the pre-selected distribution network line, the second year's maximum load is used to represent the corresponding annual maximum load of multiple candidate distribution network lines, and the rated current carrying capacity of the candidate lines is used to represent the corresponding rated current carrying capacity of multiple candidate distribution network lines; based on the first year's maximum load, the second year's maximum load and the rated current carrying capacity of the candidate lines, the line operation heavy overload interconnection result is determined.
[0010] Optionally, when the simulated interconnection operation result includes: the interconnection result between the line bus and the substation; based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and multiple candidate distribution network lines are simulated interconnected to obtain the simulated interconnection operation result, including: based on the distribution network line topology structure and the distribution network line ledger data, determining whether the pre-selected distribution network line and multiple candidate distribution network lines are powered by the same transmission bus or the same substation when performing simulated interconnection operation, and obtaining the interconnection result between the line bus and the substation.
[0011] Optionally, when the simulated connection operation result includes: the connection result of the line branch status; based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and multiple candidate distribution network lines are subjected to simulated connection operation to obtain the simulated connection operation result, including: based on the distribution network line topology structure and the distribution network line ledger data, determining the number of power supply users of each circuit breaker in the simulated connection line when the pre-selected distribution network line and multiple candidate distribution network lines are subjected to simulated connection operation, to obtain the line branch status connection result.
[0012] According to another aspect of an embodiment of the present invention, a device for constructing distribution network line connection is also provided, including: an acquisition module, used to acquire the distribution network line topology structure, distribution network line ledger data and geographical location information of multiple distribution equipment in the distribution network in a preset area, wherein the distribution network includes at least a pre-selected distribution network line and multiple other distribution network lines, and the pre-selected distribution network line is to be connected with multiple other distribution network lines; a determination module, used to determine multiple candidate distribution network lines for line connection with the pre-selected distribution network line from multiple other distribution network lines based on the distribution network line topology structure and geographical location information; a screening module, used to screen multiple candidate distribution network lines based on the distribution network line topology structure and distribution network line ledger data, and obtain at least one target distribution network line for line connection with the pre-selected distribution network line; a connection module, used to connect the pre-selected distribution network line with at least one target distribution network line to obtain a distribution network line connection result.
[0013] According to another aspect of an embodiment of the present invention, there is further provided an electronic device, comprising: a memory storing an executable program; and a processor for running the program, wherein the method in each embodiment of the present invention is executed when the program is running.
[0014] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided. The computer-readable storage medium includes a stored executable program, wherein when the executable program is running, the device where the computer-readable storage medium is located is controlled to execute the methods in various embodiments of the present invention.
[0015] According to another aspect of an embodiment of the present invention, a computer program product is provided, including a computer program. When the computer program is executed by a processor, the method in each embodiment of the present invention is implemented.
[0016] According to another aspect of an embodiment of the present invention, a computer program product is provided, including a non-volatile computer-readable storage medium, wherein the non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method in each embodiment of the present invention is implemented.
[0017] According to another aspect of the embodiments of the present invention, a computer program is further provided. When the computer program is executed by a processor, the methods in the embodiments of the present invention are implemented.
[0018] In an embodiment of the present invention, a method for constructing distribution network line connection is provided, comprising: obtaining a distribution network line topology structure of a distribution network in a preset area, distribution network line ledger data, and geographic location information of multiple distribution devices in the distribution network, wherein the distribution network includes at least a pre-selected distribution network line and multiple other distribution network lines, and the pre-selected distribution network line is to be connected with multiple other distribution network lines; based on the distribution network line topology structure and the geographic location information, determining multiple candidate distribution network lines for line connection with the pre-selected distribution network line from multiple other distribution network lines; based on the distribution network line topology structure and the distribution network line ledger data, screening multiple candidate distribution network lines to obtain at least one target distribution network line for line connection with the pre-selected distribution network line; connecting the pre-selected distribution network line with at least one target distribution network line to obtain a distribution network line connection result. It is easy to notice that by obtaining the distribution network line topology structure, distribution network line ledger data and geographical location information of multiple distribution equipment in the distribution network in the preset area, a clearer understanding of the specific situation of the distribution network can be obtained, providing a data basis for the design of line connection. Based on the distribution network line topology structure and geographical location information, potential line connection objects can be determined in advance, reducing the amount of data processing for subsequent screening based on distribution network line ledger data, and improving the efficiency of line connection construction. Based on the distribution network line topology structure and distribution network line ledger data, multiple candidate distribution network lines are screened to obtain at least one target distribution network line for line connection with the pre-selected distribution network line, ensuring that the selected target distribution network line meets the design requirements, and further narrowing the selection range. While ensuring the quality of line connection, the construction efficiency of distribution network line connection can be improved, providing better support for the planning and design of distribution networks, thereby solving the technical problem of low construction efficiency of distribution network line connection in related technologies. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0020] Figure 1 is a flow chart of a method for monitoring the operating status of distribution network equipment according to an embodiment of the present invention;
[0021] Figure 2 is a flow chart of an optional method for monitoring the operating status of distribution network equipment according to an embodiment of the present invention;
[0022] Figure 3is a schematic diagram of a device for monitoring the operating status of distribution network equipment according to an embodiment of the present invention. DETAILED DESCRIPTION
[0023] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0024] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0025] According to one aspect of an embodiment of the present invention, a method for monitoring the operating status of distribution network equipment is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0026] Figure 1 is a flow chart of a method for establishing a distribution network line connection according to an embodiment of the present invention, such as Figure 1 As shown, the method comprises the following steps:
[0027] Step S102, obtaining the distribution network line topology structure, distribution network line ledger data and geographic location information of multiple distribution devices in the distribution network in a preset area.
[0028] The distribution network at least includes a pre-selected distribution network line and a plurality of other distribution network lines, and the pre-selected distribution network line is to be connected with the plurality of other distribution network lines.
[0029] The above-mentioned preset area may refer to a pre-set or selected area. For example, the preset area may include a city, a district, a street, a community, etc. The preset area may also be determined according to actual needs and is not limited here.
[0030] The above-mentioned distribution network line topology structure may refer to the connection relationship and layout form between the distribution lines in the distribution network. The topology structure of the distribution network line may include a linear structure, a radial structure, a mesh structure, a ring structure and a hybrid structure of the above structures. It can be flexibly combined according to specific needs and conditions. The specific form of the distribution network line topology structure can be determined according to actual needs and is not limited here.
[0031] The above-mentioned distribution network line ledger data may refer to a data table or document that records detailed information on various lines in the distribution network. It may be managed by a power company or operator and used to track and monitor line equipment in the distribution network to ensure its normal operation and maintenance. The distribution network line ledger data may include: line name and number; line parameters, which may include technical parameters such as the line voltage level, rated capacity, line length, and cross-sectional area; equipment information, which records various equipment installed on the line, such as transformers, switches, and protective devices; operating status, which records the operating status of the line, including whether it is operating normally, whether maintenance is required, whether there is a fault, and other information; maintenance records, which record the maintenance and repair of the line, including maintenance date, maintenance content, maintenance personnel, and other information. Through the distribution network line ledger data, the operating conditions of each line can be timely understood, which can be used to analyze line loads and optimize the distribution network structure.
[0032] The above-mentioned multiple distribution equipment may refer to various types of equipment in the distribution network used for transmission, distribution, control and protection in the power system. The distribution equipment may include but is not limited to transformers; various types of switching equipment may include circuit breakers, disconnectors, grounding switches, etc., which are used to control the on and off, isolation and protection of circuits; cables and wires, protection equipment, etc. The specific distribution equipment can be determined according to actual needs and is not limited here.
[0033] The above-mentioned geographical location information may refer to the specific location information of each distribution device in the distribution network. The specific representation form of the geographical location information may be determined according to actual needs and is not limited here.
[0034] The above-mentioned pre-selected distribution network line may refer to the basic distribution network line required for line connection in this application. The pre-selected distribution network line may be determined according to actual needs and is not limited here.
[0035] The above-mentioned multiple other distribution network lines may refer to other distribution network lines in the distribution network except the pre-selected distribution network lines. The multiple other distribution network lines are not initially in a line connection state with the pre-selected distribution network lines. The multiple other distribution network lines may be determined according to actual conditions and are not limited here.
[0036] In an optional embodiment, during the construction of the distribution network line connection, the distribution network line topology structure, distribution network line ledger data and geographical location information of the distribution equipment of the distribution network in the preset area can be obtained. Specifically, the line topology structure data of the distribution network in the preset area can be collected, which may include the connection relationship between various distribution equipment, such as substations, distribution cabinets, switches, etc., as well as the direction and branching of the lines. These data can be obtained through on-site surveys, data provided by power companies, or geographic information systems. The distribution network line ledger data can be obtained, and the distribution network line ledger data may include technical parameters, equipment models, operating status and other information of each line. These data can be obtained through the power company's ledger system or on-site surveys. The precise geographical location information of each distribution equipment can be obtained through technologies such as global positioning or geographic information systems for subsequent line connection and planning. Pre-selected distribution network lines can be selected according to needs and conditions, and the lines to be connected with other distribution network lines can be determined. Through the above steps, the distribution network line topology structure, distribution network line ledger data and geographical location information of the distribution equipment of the distribution network in the preset area can be obtained, which provides data support for subsequent line connection design and the construction of distribution network line connection.
[0037] Step S104: Based on the distribution network line topology and geographical location information, a plurality of candidate distribution network lines for line communication with the pre-selected distribution network line are determined from a plurality of other distribution network lines.
[0038] In an optional embodiment, during the construction of distribution network line connection, multiple candidate distribution network lines for line connection with pre-selected distribution network lines can be determined. Specifically, a pre-selected distribution network line is selected in the distribution network. The line may be a line that needs to be expanded or renovated, or a newly built line. Other distribution network lines can be analyzed based on the collected distribution network line topology and geographical location information to determine multiple candidate distribution network lines that have the possibility of line connection with the pre-selected distribution network line. Based on the analysis results, multiple candidate distribution network lines for line connection with the pre-selected distribution network line can be determined. These candidate lines may be lines adjacent to the pre-selected line, or lines indirectly connected through other lines. Through the above steps, it is possible to determine multiple candidate distribution network lines for line connection with the pre-selected distribution network line from multiple other distribution network lines based on the distribution network line topology and geographical location information, providing important support for the optimal design and operation of distribution network lines.
[0039] Step S106, based on the distribution network line topology structure and the distribution network line ledger data, multiple candidate distribution network lines are screened to obtain at least one target distribution network line that is in line communication with the pre-selected distribution network line.
[0040] In an optional embodiment, during the construction of distribution network line connection, all candidate distribution network lines can be screened according to the distribution network line topology and ledger data. The screening conditions can be determined according to actual needs. Power system simulation software or other tools can be used to perform line connection analysis on the screened candidate distribution network lines and pre-selected distribution network lines to ensure the reliability and stability of the line connection. Then, based on the results of the line connection analysis, at least one target distribution network line can be determined, which can meet the requirements of the pre-selected distribution network lines and have good line connection performance. If there are multiple target distribution network lines, these lines can be compared and evaluated, and a better solution can be selected for implementation. The target distribution network line finally determined can be implemented, and monitored and adjusted during the implementation process to ensure the effectiveness and reliability of the line connection.
[0041] Step S108, connecting the pre-selected distribution network line with at least one target distribution network line to obtain a distribution network line connection result.
[0042] The above-mentioned distribution network line connection result may refer to a final distribution network connection line obtained by connecting a pre-selected distribution network line with at least one target distribution network line.
[0043] In an optional embodiment, the pre-selected distribution network line can be connected to the target distribution network line, and the line connection calculation can be performed using the corresponding power system simulation software based on the parameters of the pre-selected distribution network line and the target distribution network line. Through the calculation, the results of the distribution network line connection are obtained, including the load rate of the line, the flow distribution and other information. According to the results of the line connection calculation, the performance of the line can be evaluated and optimized. The parameters of the line can be adjusted according to the needs, such as increasing the line capacity, changing the line direction, etc., to achieve a better line connection effect. According to the results of the optimized design, the distribution network line is connected. This may involve the construction, transformation or adjustment of the line. Through the above steps, the pre-selected distribution network line can be effectively connected to the target distribution network line, the distribution network line connection result can be obtained, and the optimization and improvement of the distribution network line can be achieved.
[0044] In an embodiment of the present invention, a method for constructing distribution network line connection is provided, comprising: obtaining a distribution network line topology structure of a distribution network in a preset area, distribution network line ledger data, and geographic location information of multiple distribution devices in the distribution network, wherein the distribution network includes at least a pre-selected distribution network line and multiple other distribution network lines, and the pre-selected distribution network line is to be connected with multiple other distribution network lines; based on the distribution network line topology structure and the geographic location information, determining multiple candidate distribution network lines for line connection with the pre-selected distribution network line from multiple other distribution network lines; based on the distribution network line topology structure and the distribution network line ledger data, screening multiple candidate distribution network lines to obtain at least one target distribution network line for line connection with the pre-selected distribution network line; connecting the pre-selected distribution network line with at least one target distribution network line to obtain a distribution network line connection result. It is easy to notice that by obtaining the distribution network line topology structure, distribution network line ledger data and geographical location information of multiple distribution equipment in the distribution network in the preset area, a clearer understanding of the specific situation of the distribution network can be obtained, providing a data basis for the design of line connection. Based on the distribution network line topology structure and geographical location information, potential line connection objects can be determined in advance, reducing the amount of data processing for subsequent screening based on distribution network line ledger data, and improving the efficiency of line connection construction. Based on the distribution network line topology structure and distribution network line ledger data, multiple candidate distribution network lines are screened to obtain at least one target distribution network line for line connection with the pre-selected distribution network line, ensuring that the selected target distribution network line meets the design requirements, and further narrowing the selection range. While ensuring the quality of line connection, the construction efficiency of distribution network line connection can be improved, providing better support for the planning and design of distribution networks, thereby solving the technical problem of low construction efficiency of distribution network line connection in related technologies.
[0045] Optionally, based on the distribution network line topology structure and geographic location information, multiple candidate distribution network lines for line connection with a pre-selected distribution network line are determined from multiple other distribution network lines, including: determining the equipment to be connected in the pre-selected distribution network line based on the distribution network line topology structure, wherein the equipment to be connected includes at least the line end public equipment in the pre-selected distribution network line; based on the geographic location information, the equipment to be connected and a preset distance range, determining multiple candidate distribution network lines from multiple other distribution network lines.
[0046] The above-mentioned preset distance range may refer to a pre-set distance range, for example, it may be set to 1 kilometer, 100 meters, etc. The preset distance range may be determined according to actual needs and is not limited here.
[0047] In an optional embodiment, the equipment to be contacted in the pre-selected distribution network line can be determined based on the distribution network line topology structure. Specifically, the equipment to be contacted in the pre-selected distribution network line can be determined according to the topology structure. The equipment to be contacted at least includes the line end public equipment in the pre-selected distribution network line, that is, the equipment at the end of the line, such as a substation, a distribution cabinet, etc. These devices can be used as access points of the distribution network line and can communicate with other lines to realize power transmission; based on the geographical location information, the equipment to be contacted and the preset distance range, multiple candidate distribution network lines can be determined from multiple other distribution network lines, and the precise geographical location information of the equipment to be contacted can be obtained by using a geographic information system (GIS) or positioning technology, and According to the preset distance range, the search range around the device to be contacted is determined. A threshold distance can be set, and line equipment beyond this distance will not be considered. Within the search range, other distribution network lines that are within a suitable distance range from the device to be contacted can be screened out as candidate distribution network lines. Considering factors such as load balancing and power supply reliability of the power grid, the candidate distribution network lines can be further evaluated and screened to determine the final contact plan. Through the above steps, the device to be contacted can be determined based on the distribution network line topology, and the candidate distribution network lines can be determined based on the geographical location information and the preset distance range, so as to realize the construction of distribution network line connection, which can more effectively manage and dispatch distribution network lines and improve power supply reliability and operation efficiency.
[0048] Optionally, based on the distribution network line topology structure and the distribution network line ledger data, multiple candidate distribution network lines are screened to obtain at least one target distribution network line for line connection with the pre-selected distribution network line, including: based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and multiple candidate distribution network lines are simulated for connection operation to obtain simulated connection operation results; based on preset connection operation specifications and the simulated connection operation results, multiple candidate distribution network lines are screened to obtain at least one target distribution network line, wherein the preset connection operation specifications include at least one of the following: line operation heavy overload connection specifications, line bus and substation connection specifications, and line branch status connection specifications.
[0049] The above-mentioned line operation heavy overload communication specification may mean that during the operation of the distribution network line, if the load of a certain line exceeds its rated load capacity, it will cause the line operation to be overloaded, that is, the line operation heavy overload communication specification may mean that in the simulated communication operation, the load conditions of the distribution network lines are monitored and evaluated to ensure that the lines are within the normal operating range and no overload occurs.
[0050] The above-mentioned line bus and substation communication specifications may refer to the communication between the distribution network line and the bus and substation. The bus may be the main transmission line in the distribution network, and the substation may be the equipment that converts high-voltage electric energy into low-voltage electric energy to supply users. The line bus and substation communication specifications may indicate ensuring good connection and coordination between the line and the bus and substation to ensure normal transmission and distribution of electric energy.
[0051] The above-mentioned line branch status communication specification may refer to the communication specification of the distribution network line under branch conditions. The distribution network line usually has multiple branches, including tributaries, branches, etc. The line branch status communication specification is to ensure good connection and coordination between these branch lines to ensure the normal operation of the entire distribution network system. It may include monitoring and evaluation of branch line load, voltage and other parameters to avoid failures or imbalances.
[0052] In an optional embodiment, a simulated interconnection operation can be performed according to the topological structure and ledger data of the distribution network lines, that is, electrical simulation calculations are performed on the pre-selected distribution network lines and multiple candidate distribution network lines, the voltage, current, power and other parameters of the lines are simulated, and the simulated interconnection operation results are obtained; the candidate distribution network lines can be screened based on the preset interconnection operation specifications and the simulated interconnection operation results, and the simulated interconnection operation results can be evaluated and screened according to the preset interconnection operation specifications, such as the line operation heavy overload interconnection specifications, the line bus and substation interconnection specifications and the line branch status interconnection specifications, to determine the candidate distribution network lines that meet the specifications, and at least one target distribution network line can be determined according to the screening results, which meets the preset interconnection operation specifications and can meet the operation requirements of the distribution network. Through the above steps, simulated interconnection operation based on the distribution network line topological structure and ledger data can be realized, the candidate distribution network lines can be screened according to the preset interconnection operation specifications, and finally the target distribution network lines that meet the specifications are determined, providing effective support for the operation of the distribution network.
[0053] Optionally, when the simulated interconnection operation result includes: the line operation heavy overload interconnection result; based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and multiple candidate distribution network lines are simulated interconnected to obtain the simulated interconnection operation result, including: based on the distribution network line topology structure and the distribution network line ledger data, the first year's maximum load, the second year's maximum load and the rated current carrying capacity of the candidate lines when the pre-selected distribution network lines and multiple candidate distribution network lines are simulated interconnected, wherein the first year's maximum load is used to represent the annual maximum load of the pre-selected distribution network line, the second year's maximum load is used to represent the corresponding annual maximum load of multiple candidate distribution network lines, and the rated current carrying capacity of the candidate lines is used to represent the corresponding rated current carrying capacity of multiple candidate distribution network lines; based on the first year's maximum load, the second year's maximum load and the rated current carrying capacity of the candidate lines, the line operation heavy overload interconnection result is determined.
[0054] The above-mentioned simulated interconnection operation results can be compared and analyzed with the line operation heavy overload interconnection specifications to determine at least one target distribution network line.
[0055] In an optional embodiment, the maximum load in the first year, the maximum load in the second year and the rated current carrying capacity of the candidate lines when the pre-selected distribution lines and multiple candidate distribution lines are simulated for interconnected operation can be calculated based on the distribution network line topology and the distribution network line ledger data. The maximum carrying capacity of each line can be determined based on the rated current carrying capacity data of the candidate distribution lines. The power system simulation software can be used to simulate the interconnected operation of the pre-selected distribution lines and multiple candidate distribution lines, taking into account factors such as load changes and line losses. Based on the simulation results, it can be determined whether there is a line overload situation, as well as the specific overload situation and impact. Through the above steps, the interconnected operation of the distribution network lines can be effectively determined, providing an important reference for line planning and operation management.
[0056] Optionally, when the simulated interconnection operation result includes: the interconnection result between the line bus and the substation; based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and multiple candidate distribution network lines are simulated interconnected to obtain the simulated interconnection operation result, including: based on the distribution network line topology structure and the distribution network line ledger data, determining whether the pre-selected distribution network line and multiple candidate distribution network lines are powered by the same transmission bus or the same substation when performing simulated interconnection operation, and obtaining the interconnection result between the line bus and the substation.
[0057] The above-mentioned line bus and substation connection results can be compared and analyzed with the line bus and substation connection specifications to determine at least one target distribution network line.
[0058] In an optional embodiment, during the construction of the distribution network line connection, it can be determined whether the pre-selected distribution network line and multiple candidate distribution network lines are powered by the same transmission bus or the same substation when performing simulated connection operation. The distribution network simulation software can be used to simulate the connection operation of the pre-selected distribution network line and the candidate distribution network line. In the simulation, different power supply modes can be set, including whether the power is supplied by the same transmission bus or the same substation. The connection between the bus and the substation of the line can be analyzed based on the simulation results. Through analysis, it can be known how the power supply through the same transmission bus or the same substation affects the operation of the line, and whether the safety and stability of the power grid are met. Requirements: According to the analysis results, the power supply mode of the line can be adjusted and optimized to improve the operation efficiency and reliability of the distribution network. At the same time, the planning and design of the line can also be adjusted according to the analysis results to meet the development of future electricity demand. Through the above steps, it is possible to determine whether the pre-selected distribution network line and the candidate distribution network line are powered by the same transmission bus or the same substation during the simulated interconnection operation based on the distribution network line topology structure and the distribution network line ledger data. The process of obtaining the connection results between the line bus and the substation can help power system operators and planners better optimize the operation and planning of the distribution network and improve the safety and reliability of the power grid.
[0059] Optionally, when the simulated connection operation result includes: the connection result of the line branch status; based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and multiple candidate distribution network lines are subjected to simulated connection operation to obtain the simulated connection operation result, including: based on the distribution network line topology structure and the distribution network line ledger data, determining the number of power supply users of each circuit breaker in the simulated connection line when the pre-selected distribution network line and multiple candidate distribution network lines are subjected to simulated connection operation, to obtain the line branch status connection result.
[0060] The above-mentioned line branch status communication result can be compared and analyzed with the line branch status communication specification to determine at least one target distribution network line.
[0061] In an optional embodiment, the number of power supply users of each circuit breaker in the simulated interconnection line can be determined when the pre-selected distribution network line and multiple candidate distribution network lines are in simulated interconnection operation, and the line branch status interconnection result can be obtained. Specifically, the pre-selected distribution network line and the candidate distribution network line can be imported into the simulation model by using the power system simulation software, the simulation parameters can be set and the interconnection operation can be performed. In the simulated interconnection operation, the number of power supply users of each circuit breaker in the simulated line can be calculated and determined according to the load information and the position of the circuit breaker. According to the result of the simulated interconnection operation, the status interconnection result of the line branch can be obtained, including which line branches can supply power, which line branches have faults or power outages, etc. Through the above steps, it is possible to achieve the purpose of determining the number of power supply users of each circuit breaker when the pre-selected distribution network line and multiple candidate distribution network lines are in simulated interconnection operation based on the distribution network line topology structure and the distribution network line ledger data, and obtaining the line branch status interconnection result, which can help power system operators to effectively analyze and optimize the distribution network line interconnection and improve the reliability and stability of the power grid.
[0062] The technical solution proposed in this application is explained below in combination with an optional application scenario. As the end of the power system, the distribution network is directly connected to the power users and is responsible for providing reliable power supply to the power users. With the improvement of people's living standards, higher requirements are also placed on the quality of power supply, which brings challenges to the construction of a highly reliable grid structure of the distribution network. At the same time, with the construction of a new power system with new energy as the main body, more and more emerging energy, charging stations, energy storage and other equipment are connected to the distribution network. In order to ensure a high proportion of new energy consumption, more stringent requirements are placed on the grid structure of the distribution network. Based on the above analysis, in order to meet people's needs for high-reliability power supply quality and high-proportion consumption of new energy, it is necessary to transform the weak distribution network grid structure. For example, a single radial line improves the power supply reliability by establishing connections with other lines, and weak links in the grid such as large branches and heavy overloads need to re-establish a connection structure with other lines.
[0063] At present, the improvement of the distribution network line connection structure mainly relies on manual work. At the same time, since the distribution network line single-line diagram lacks the real-time location information of the equipment, manual work is required to further formulate the construction method of the distribution network line connection structure through on-site survey combined with systems such as equipment center and geographic information system. At present, this method has the problems of large workload and low efficiency, and there is insufficient data support, which leads to unreasonable results of the distribution network line connection construction analysis.
[0064] Based on the above problems, the main technical problems to be solved in this aspect mainly include the following aspects: based on the topological structure and geographic location information of the distribution network line, intelligent decision-making analysis of the location of the access point of the distribution network line connection structure is realized, replacing the large-scale data analysis of the location of the traditional manual connection access point; based on the distribution network line structure and operation data information, intelligent analysis of whether the newly built distribution network line connection will cause heavy overload, same-mother and same-station connection, head-end connection, etc. is realized, so as to achieve a reasonable layout of the newly built distribution network line connection; based on the geographic location information of the distribution network equipment, combined with the map system, the intelligent display of the newly constructed connection status of the distribution network line is realized, providing visual data support for the construction of distribution network line connection.
[0065] The present application proposes an intelligent decision-making analysis method for building a distribution network line connection, and its specific implementation process may include the following: data processing and analysis of distribution network line topology, operation data, geographic location information, etc., obtaining distribution network line ledgers and topology data based on the equipment center system, and obtaining distribution network line current data through the dispatching automation system, and obtaining the geographic location information of distribution network line equipment through the geographic information system (GIS), and performing correlation analysis on the data between each system.
[0066] Specifically, the distribution network line ledger and topological structure data acquisition can be based on the equipment center system to obtain the distribution network line model, and by parsing the distribution network line model, the distribution network line ledger and topological structure data information can be obtained; the distribution network line load data acquisition can be based on the distribution network line historical current data collected by the dispatching automation system to calculate the highest current of the distribution network line in the year; the distribution network line equipment geographic location information acquisition can be based on the geographic information system in the distribution network line ledger data to obtain the longitude and latitude data of the distribution network line equipment, so as to achieve the acquisition of the distribution network line equipment geographic location information.
[0067] It is possible to conduct intelligent analysis of the location of access points for the connection construction of distribution network lines. Based on the topological structure data of the distribution network lines, the analysis starts from the equipment at the end of the distribution network line public equipment that can establish the contact point and gradually moves towards the front end of the line. It is analyzed whether there are other adjacent lines within the specified range of the equipment where the contact point can be established, and other adjacent distribution network line access points within the specified range are used as access points for the connection construction of the distribution network lines.
[0068] Specifically, data analysis of public equipment on distribution network lines can be carried out. Based on the inventory data of distribution network line equipment analyzed by the distribution network model, it can be considered that only public equipment on distribution network lines can be used as distribution network line connection establishment points, and distribution network line dedicated equipment cannot be used as distribution network line connection establishment points; data analysis of the location of preliminary access points for connection of public equipment on distribution network lines can be carried out. Based on the data of common equipment of distribution network lines, the data of power room in cable lines and pole tower of overhead lines are analyzed and used as the data of preliminary access point for the construction of common equipment of distribution network lines; the situation of other lines adjacent to the preliminary access point for the construction of common equipment of distribution network lines can be analyzed. Among all the preliminary access point locations of common equipment of distribution network lines, starting from the end of distribution network lines, the preliminary access point is analyzed according to the geographical location information of the distribution network common equipment ledger to determine whether there are other adjacent distribution network lines that can be connected within the specified diameter range of K, for example, 500 meters can be used as the default. The access point for the connection of the other distribution network line must also be the power room in the cable line of common equipment of distribution network and the pole tower of overhead line. At the same time, if there are multiple adjacent distribution network lines that can be connected within the specified diameter range of K, all adjacent distribution network lines are included as access points that can be connected, and subsequent preferential analysis is performed.
[0069] The feasibility analysis of the distribution network line connection construction plan can be carried out. Based on the analyzed distribution network line connection construction access point and the data information of the adjacent distribution network line on the opposite side, the heavy overload after the connection construction, the connection with the same 10kV bus and the same substation, and the large branch situation can be used to analyze whether the constructed connection point is feasible.
[0070] Specifically, a heavy overload analysis of the distribution network line connection construction can be performed. Based on the operating load data of the distribution network line on this side and the opposite distribution network line constructed by the connection, it can be analyzed whether the constructed connection will cause a heavy overload on the opposite distribution network line during the load transfer process during the actual operation process. The allowable current carrying capacity of the distribution network line on this side that needs to be connected can be determined. The annual maximum load of the distribution network line on this side is F1 amperes, which can be the maximum load of the first year mentioned above; the allowable current carrying capacity of the adjacent opposite distribution network line to establish the connection is F2 amperes, which can be the rated current carrying capacity of the candidate line mentioned above; the annual maximum load of the adjacent opposite distribution network line is L2 amperes, which can be the maximum load of the second year mentioned above; the load simultaneity rate is t, and after the load of the distribution network line on this side that needs to be connected is transferred to the adjacent opposite distribution network line, the annual maximum load rate of the adjacent opposite distribution network line is f, which can be the above-mentioned line operation heavy overload connection result, which can be expressed as:
[0071]
[0072] If the annual maximum load rate f of the adjacent opposite distribution network lines is greater than or equal to 80%, it means that the constructed connection will cause heavy overload of the adjacent opposite lines during the load transfer process, and the connection construction plan is not the optimal plan; if the annual maximum load rate f of the adjacent opposite distribution network lines is less than 80%, it means that the connection construction plan is a preliminary optional plan.
[0073] The distribution network line connection construction with the same 10kV bus and the same substation connection analysis can be carried out, that is, the connection result of the line bus and the substation can be determined. Based on the distribution network line ledger data, the 10kV bus and the substation to which the distribution network line on this side that needs to be connected belong can be analyzed, as well as the 10kV bus and the substation to which the distribution network line on the adjacent opposite side that is connected can be analyzed; if the distribution network line on this side that needs to be connected and the distribution network line on the adjacent opposite side that is connected belong to the same 10kV bus or are powered by the same substation, it means that the connection construction plan is not the optimal plan; if the distribution network line on this side that needs to be connected and the distribution network line on the adjacent opposite side that is connected do not belong to the same 10kV bus and are not powered by the same substation, it means that the connection construction plan is a preliminary optional plan, and the specifications of the above-mentioned line bus can be determined according to actual needs and are not limited here.
[0074] A large branch analysis of the distribution network line can be performed, that is, the connection result of the line branch status can be determined. Data can be parsed based on the distribution network line model to count the circuit breaker switches that do not have a connection point in the later section of the distribution network line after the distribution network line that needs to be connected is connected according to the plan. The distribution transformers powered by each circuit breaker switch are counted separately, and the user number of each distribution transformer is analyzed. If there are multiple distribution transformers with the same user number, they are defaulted to a unified user. The number of users powered by the circuit breaker in each later section that does not have a connection point is counted based on the user number. If the number of users powered by the circuit breaker switch that does not have a connection point in the later section is greater than the judgment threshold, for example, 10 households, it is defaulted to be a distribution network line that needs to be connected. The connection construction has a large branch, which means that the connection construction is not the optimal solution; if the number of users powered by the circuit breaker switch that does not have a contact point in the later section is greater than 10 households, it means that the connection construction plan is a preliminary optional plan. The judgment threshold of the number of users powered by the above-mentioned circuit breaker switch can also be determined according to actual needs and is not limited here.
[0075] It can conduct intelligent analysis on the optimal solution for the connection of distribution network lines. It can start from the access point at the very end of the distribution network line that can be connected, conduct feasibility analysis on the connection of distribution network lines, and analyze the access point and adjacent distribution network line content of the optimal solution for the connection of distribution network lines.
[0076] Specifically, during the feasibility analysis of the distribution network line connection construction, the access point at the end of the distribution network line that can be connected can be used. If there is no heavy overload, connection with the same 10kV bus and the same substation, large branches, etc. after the distribution network line connection is constructed, the network construction plan at the end of the distribution network line is the optimal plan, and the connection construction plan analysis work is completed.
[0077] If during the feasibility analysis of the distribution network line connection construction of the access point that can be connected at the end of the distribution network line, if there is heavy overload, connection with the same 10kV bus and the same substation, large branches, etc. after the distribution network line connection is constructed, the network construction plan at the end of the distribution network line is not the optimal plan, and it is necessary to continue to analyze the access points that can be connected from the end of the distribution network line forward.
[0078] During the feasibility analysis of the distribution network line connection construction from the access point at the end of the distribution network line to the front end of the line, if there is no heavy overload, connection with the same 10kV bus and the same substation, large branches, etc. after the distribution network line connection is constructed, the network construction plan analyzed only to this access point is the optimal plan, and the connection construction plan analysis work is completed.
[0079] During the feasibility analysis of the distribution network line connection construction from the last contactable access point to the front end of the line, if all the contact access points of the distribution network line are heavily overloaded, connected with the same 10kV bus and the same substation, and have large branches, then the last contactable access point in the distribution network line and the corresponding adjacent opposite line are the optimal solutions.
[0080] It is possible to display multi-dimensional data on the map of the distribution network line connection construction plan. Based on the distribution network line topology structure and the location information such as the longitude and latitude of the power supply equipment, combined with the analysis results of the distribution network line connection construction plan, it is possible to display multi-dimensional data on the map of the distribution network line topology structure and equipment, connection construction plan and other data information by calling the map.
[0081] The distribution network line topology and equipment map can be displayed in real time. Based on the geographical location information and topology of the distribution network line, the distribution network line topology and power supply equipment data can be displayed on the map by calling the real-time map information. The distribution network line topology and equipment map can be displayed in real time through the map.
[0082] It can intelligently sort and display the distribution network line connection construction schemes. It can realize intelligent sorting of distribution network line connection construction schemes based on the schemes analyzed by the distribution network line connection construction methods, and based on whether the connection construction schemes will cause heavy overload, mother 10kV bus or substation power supply, and large branches. It can also display the access points of the distribution network lines that need to be connected on this side of each scheme and the access points of the adjacent distribution network lines on the opposite side.
[0083] The map of the distribution network line connection construction plan can be displayed intuitively. According to the location information such as the longitude and latitude of the lines that need to be connected on this side and the access points of the adjacent distribution network lines on the opposite side of each connection construction plan, combined with the line power supply path relationship in the connection construction plan, the distribution network lines that need to be connected on this side, the adjacent distribution network lines on the opposite side and the newly constructed connection lines can be marked with different colors to realize the intuitive display of the distribution network line connection construction plan map.
[0084] It can realize intelligent decision-making analysis of the location of the access point of the distribution network line connection structure, and can realize intelligent analysis of whether the newly built distribution network line connection will cause heavy overload, same-mother and same-station connection, head-end connection, etc.; it can realize intelligent display of the newly constructed connection status of the distribution network line.
[0085] Figure 2 is a flow chart of an optional method for monitoring the operating status of distribution network equipment according to an embodiment of the present invention, such as Figure 2 As shown, step S202, obtain the distribution network line topology structure, distribution network line ledger data and geographical location information of multiple distribution equipment in the distribution network in the preset area; step S204, determine the equipment to be contacted in the pre-selected distribution network line based on the distribution network line topology structure, and determine the multiple candidate distribution network lines from the multiple other distribution network lines based on the geographical location information, the equipment to be contacted and the preset distance range; step S206, based on the distribution network line topology structure and the distribution network line ledger data, simulate the connection operation of the pre-selected distribution network line and the multiple candidate distribution network lines to obtain the simulated connection operation result; based on the preset connection operation specification and the simulated connection operation result, screen the multiple candidate distribution network lines to obtain the at least one target distribution network line, wherein the preset connection operation specification includes at least one of the following: line operation heavy overload connection specification, line bus and substation connection specification and line branch status connection specification; step S208, connect the pre-selected distribution network line with the at least one target distribution network line to obtain the distribution network line connection result.
[0086] According to another aspect of an embodiment of the present invention, a device for constructing distribution network line connections is also provided. The device can execute the method for constructing distribution network line connections of the above embodiment. The specific implementation method and preferred application scenario are the same as those of the above embodiment and will not be repeated here.
[0087] Figure 3 is a schematic diagram of a device for constructing a distribution network line connection according to an embodiment of the present application, such as Figure 3 As shown, the device includes the following: an acquisition module 302 , a determination module 304 , a screening module 306 and a contact module 308 .
[0088] Among them, the acquisition module is used to obtain the distribution network line topology structure, distribution network line ledger data and geographical location information of multiple distribution equipment in the distribution network in a preset area, wherein the distribution network includes at least a pre-selected distribution network line and multiple other distribution network lines, and the pre-selected distribution network line is to be connected with multiple other distribution network lines; the determination module is used to determine multiple candidate distribution network lines for line connection with the pre-selected distribution network line from multiple other distribution network lines based on the distribution network line topology structure and geographical location information; the screening module is used to screen multiple candidate distribution network lines based on the distribution network line topology structure and distribution network line ledger data, and obtain at least one target distribution network line for line connection with the pre-selected distribution network line; the contact module is used to connect the pre-selected distribution network line with at least one target distribution network line to obtain the distribution network line connection result.
[0089] Among them, the determination module is also used to determine the equipment to be contacted in the pre-selected distribution network line based on the distribution network line topology structure, wherein the equipment to be contacted at least includes the line end public equipment in the pre-selected distribution network line; based on the geographical location information, the equipment to be contacted and the preset distance range, determine multiple candidate distribution network lines from multiple other distribution network lines.
[0090] Among them, the screening module is also used to simulate the interconnection operation of the pre-selected distribution network line and multiple candidate distribution network lines based on the distribution network line topology structure and the distribution network line ledger data to obtain the simulated interconnection operation results; based on the preset interconnection operation specifications and the simulated interconnection operation results, multiple candidate distribution network lines are screened to obtain at least one target distribution network line, wherein the preset interconnection operation specifications include at least one of the following: line operation heavy overload interconnection specifications, line bus and substation interconnection specifications and line branch status interconnection specifications.
[0091] Among them, when the simulated interconnection operation result includes: the line operation heavy overload interconnection result; the screening module is also used to determine the first year's maximum load, the second year's maximum load and the rated current carrying capacity of the candidate lines when the pre-selected distribution network lines and multiple candidate distribution network lines are subjected to simulated interconnection operation based on the distribution network line topology structure and the distribution network line ledger data, wherein the first year's maximum load is used to represent the annual maximum load of the pre-selected distribution network lines, the second year's maximum load is used to represent the corresponding annual maximum load of multiple candidate distribution network lines, and the rated current carrying capacity of the candidate lines is used to represent the corresponding rated current carrying capacity of multiple candidate distribution network lines; based on the first year's maximum load, the second year's maximum load and the rated current carrying capacity of the candidate lines, the line operation heavy overload interconnection result is determined.
[0092] Among them, when the simulation connection operation results include: the connection results between the line bus and the substation; the screening module is also used to determine whether the pre-selected distribution network line and multiple candidate distribution network lines are powered by the same transmission bus or the same substation when performing simulation connection operation based on the distribution network line topology structure and the distribution network line ledger data, and obtain the connection results between the line bus and the substation.
[0093] Among them, when the simulation connection operation result includes: the connection result of the line branch status; the screening module is also used to determine the pre-selected distribution network line and multiple candidate distribution network lines for simulation connection operation based on the distribution network line topology structure and the distribution network line ledger data, the number of power supply users of each circuit breaker in the simulation connection line is obtained to obtain the connection result of the line branch status.
[0094] An embodiment of the present application further provides an electronic device, comprising: a memory storing an executable program; and a processor for running the program, wherein the program executes the methods in various embodiments of the present invention when running.
[0095] The above-mentioned memory may refer to a device inside a computer for storing data and programs, and may include memory, hard disk, etc., wherein the memory may be used to temporarily store running programs and data, the hard disk may be used to store programs and data for a long time, and the memory may be used to enable the computer to read and write data, and execute programs; the above-mentioned processor may be responsible for executing instructions in computer programs and performing data processing, and may be responsible for controlling and executing various operations, including arithmetic operations, logical operations, data transmission, etc.
[0096] An embodiment of the present application further provides a computer-readable storage medium, which includes a stored executable program, wherein when the executable program is running, the device where the computer-readable storage medium is located is controlled to execute the methods in various embodiments of the present invention.
[0097] The above-mentioned computer storage medium may refer to a medium in a computer memory used to store certain discontinuous physical quantities. Computer storage media mainly include semiconductors, magnetic cores, magnetic drums, magnetic tapes, laser disks, etc.; the stored program included in the computer-readable storage medium may be a set of instructions that can be recognized and executed by a computer, running on an electronic computer, and is an information tool that meets certain needs of people.
[0098] An embodiment of the present application further provides a computer program product, including a computer program, which implements the methods in various embodiments of the present invention when executed by a processor.
[0099] The above-mentioned computer program product may refer to a software program that has been written, tested and released and can be run on a computer or other device. The computer program product may include an application, an operating system, tool software, etc., which is used to implement specific functions or solve specific problems.
[0100] An embodiment of the present application further provides a computer program product, including a non-volatile computer-readable storage medium, wherein the non-volatile computer-readable storage medium is used to store a computer program, and when the computer program is executed by a processor, the method in each embodiment of the present invention is implemented.
[0101] The above-mentioned non-volatile computer-readable storage medium may refer to a medium for storing data. The non-volatile computer-readable storage medium can keep the data from being lost when the power is off, and can be used to store long-term data, such as operating systems, applications, and user files. The non-volatile storage medium may include hard disk drives, solid-state drives, optical disks, and flash memory storage devices, etc.
[0102] The embodiments of the present application further provide a computer program, which implements the methods in the above-mentioned embodiments of the present invention when executed by a processor.
[0103] The above-mentioned computer program may refer to a collection of instructions used to tell a computer to perform a specific task or operation. A computer program may be written by a programmer using a specific programming language and may include algorithms, data structures, logic, and control flows. A computer program may be used for a variety of purposes, including application software, operating systems, and the like.
[0104] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0105] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0106] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0107] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0108] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0109] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for establishing a connection between distribution network lines, characterized in that: include: Obtaining a distribution network line topology structure, distribution network line ledger data, and geographic location information of a plurality of distribution devices in a distribution network in a preset area, wherein the distribution network includes at least a pre-selected distribution network line and a plurality of other distribution network lines, and the pre-selected distribution network line is to be connected with the plurality of other distribution network lines; Based on the distribution network line topology and the geographical location information, determining a plurality of candidate distribution network lines for line communication with the pre-selected distribution network line from the plurality of other distribution network lines; Based on the distribution network line topology structure and the distribution network line ledger data, the multiple candidate distribution network lines are screened to obtain at least one target distribution network line that is in line communication with the pre-selected distribution network line; The pre-selected distribution network line is connected to the at least one target distribution network line to obtain a distribution network line connection result.
2. The method for constructing a power distribution network line connection according to claim 1, characterized in that: Based on the distribution network line topology and the geographical location information, determining a plurality of candidate distribution network lines for line communication with the pre-selected distribution network line from the plurality of other distribution network lines, comprising: Determine the equipment to be contacted in the pre-selected distribution network line based on the distribution network line topology structure, wherein the equipment to be contacted at least includes the line end common equipment in the pre-selected distribution network line; Based on the geographic location information, the device to be contacted and a preset distance range, the plurality of candidate distribution network lines are determined from the plurality of other distribution network lines.
3. The method for establishing the connection of distribution network lines according to claim 1, characterized in that: Based on the distribution network line topology structure and the distribution network line ledger data, the plurality of candidate distribution network lines are screened to obtain at least one target distribution network line for line communication with the pre-selected distribution network line, including: Based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and the multiple candidate distribution network lines are simulated for connection operation to obtain a simulated connection operation result; Based on the preset interconnection operation specifications and the simulated interconnection operation results, the multiple candidate distribution network lines are screened to obtain the at least one target distribution network line, wherein the preset interconnection operation specifications include at least one of the following: line operation heavy overload interconnection specifications, line bus and substation interconnection specifications, and line branch status interconnection specifications.
4. The method for establishing the connection of distribution network lines according to claim 3, characterized in that: When the simulated liaison operation result includes: line operation heavy overload liaison result; based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and the multiple candidate distribution network lines are simulated for liaison operation to obtain the simulated liaison operation result, including: Based on the distribution network line topology structure and the distribution network line ledger data, determine the first year maximum load, the second year maximum load and the candidate line rated current carrying capacity when the pre-selected distribution network line and the multiple candidate distribution network lines are in simulated interconnection operation, wherein the first year maximum load is used to represent the annual maximum load of the pre-selected distribution network line, the second year maximum load is used to represent the corresponding annual maximum load of the multiple candidate distribution network lines, and the candidate line rated current carrying capacity is used to represent the corresponding rated current carrying capacity of the multiple candidate distribution network lines; Based on the maximum load of the first year, the maximum load of the second year and the rated current carrying capacity of the candidate line, the heavy overload contact result of the line operation is determined.
5. The method for establishing the connection of distribution network lines according to claim 3, characterized in that: When the simulated liaison operation result includes: the liaison result between the line bus and the substation; based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and the multiple candidate distribution network lines are simulated for liaison operation to obtain the simulated liaison operation result, including: Based on the distribution network line topology structure and the distribution network line ledger data, it is determined whether the pre-selected distribution network line and the multiple candidate distribution network lines are powered by the same transmission bus or the same substation when performing simulated communication operation, and the communication result between the line bus and the substation is obtained.
6. The method for establishing the connection of distribution network lines according to claim 3, characterized in that: When the simulated liaison operation result includes: line branch status liaison result; based on the distribution network line topology structure and the distribution network line ledger data, the pre-selected distribution network line and the multiple candidate distribution network lines are simulated for liaison operation to obtain the simulated liaison operation result, including: Based on the distribution network line topology structure and the distribution network line ledger data, the number of power supply users of each circuit breaker in the simulated connection line when the pre-selected distribution network line and the multiple candidate distribution network lines are operated in simulated connection is determined to obtain the connection result of the line branch status.
7. A device for establishing a connection between distribution network lines, characterized in that: include: An acquisition module is used to acquire a distribution network line topology structure, distribution network line ledger data, and geographic location information of a plurality of distribution devices in a distribution network in a preset area, wherein the distribution network includes at least a pre-selected distribution network line and a plurality of other distribution network lines, and the pre-selected distribution network line is to be connected with the plurality of other distribution network lines; A determination module, configured to determine, based on the distribution network line topology and the geographical location information, a plurality of candidate distribution network lines for line communication with the pre-selected distribution network line from the plurality of other distribution network lines; A screening module, configured to screen the plurality of candidate distribution network lines based on the distribution network line topology structure and the distribution network line ledger data, and obtain at least one target distribution network line for line communication with the pre-selected distribution network line; The connection module is used to connect the pre-selected distribution network line with the at least one target distribution network line to obtain a distribution network line connection result.
8. An electronic device, characterized in that: include: A memory storing an executable program; A processor is used to run the program, wherein the program, when running, executes the method for constructing distribution network line connection as described in any one of claims 1 to 6.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored executable program, wherein when the executable program is run, the device where the storage medium is located is controlled to execute the method for establishing distribution network line connection according to any one of claims 1 to 6.
10. A computer program product, characterized in that The invention comprises a computer program, which, when executed by a processor, implements the method for constructing power distribution network line connection according to any one of claims 1 to 6.