Project range delimiting method and device, electronic equipment and storage medium

Through the method of generating and judging feasibility coefficients, the project scope of the secondary development area is automatically delimited, which solves the problem of the cumbersome delimitation process in the existing technology and improves efficiency and effect.

CN119358827APending Publication Date: 2025-01-24Shenzhen Longgang District Planning and Land Development Research Center
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411439602.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2025-01-24

AI Technical Summary

Technical Problem

The process of demarcating the project scope of the secondary development area is cumbersome, resulting in inefficiency and requiring a lot of human resources and time.

Method used

By obtaining the planning area of ​​the developed area and the current land area data, combined with the plot ratio and converting coefficient, the preset coefficient generates the current feasibility coefficient to determine whether it is greater than the preset feasibility coefficient, so as to automatically define the scope of the project.

Benefits of technology

The scope of the project scope is simplified, the efficiency is improved, the impact of manual operation is reduced, and the designation effect is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119358827A_ABST
    Figure CN119358827A_ABST
Patent Text Reader

Abstract

The invention discloses a project range delimiting method and device, electronic equipment and a storage medium. The method comprises the steps of obtaining a planned residential land area, a planned commercial land area and a planned industrial land area of a developed region; obtaining a current residential land area, a current commercial land area and a current industrial land area; generating a current feasibility coefficient according to the planned residential land area, the planned commercial land area, the first plot ratio, the second plot ratio, the third plot ratio, the first conversion coefficient, the second conversion coefficient, the planned industrial land area, the current residential land area, the current commercial land area, the current industrial land area, the third conversion coefficient and the fourth conversion coefficient; and when the current feasibility coefficient is greater than a preset feasibility coefficient, delimiting the geographical range of the developed area as the project range of the secondary development project. The method is beneficial to improving the delimiting efficiency of the project range of the secondary development area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of Internet technology, and in particular to a project scope delineation method, device, electronic device and storage medium. Background Art

[0002] Faced with the severe challenge of increasingly tight urban land resources, the demarcation of secondary development areas has become an important engine for promoting sustainable urban development and a core strategy for optimizing land resource allocation. This initiative not only focuses on the efficient reuse of current land, but also plans the future development blueprint of the city in a more profound way, aiming to stimulate the internal potential of the city, promote industrial upgrading and functional optimization through precise layout and scientific planning, and thus build a more livable urban environment.

[0003] However, the process of demarcating the project scope of the secondary development area in the prior art is cumbersome, which is not conducive to improving the efficiency of demarcation of the project scope. The reason is that the prior art mainly adopts the method of manual demarcation, which takes a long time and therefore consumes a lot of human resources and time resources. Therefore, the demarcation process of inefficient industrial land in the prior art is cumbersome, which is not conducive to improving the efficiency of demarcation of inefficient industrial land. Summary of the invention

[0004] The embodiments of the present application provide a project scope delineation method, device, electronic device and storage medium to solve the technical problem that the process of delineating the project scope of the secondary development area in the above-mentioned prior art is cumbersome and not conducive to improving the efficiency of project scope delineation.

[0005] In a first aspect, an embodiment of the present application provides a project scope delineation method, which is applied to an electronic device. The project scope delineation method includes:

[0006] Obtain the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area;

[0007] Obtain a first floor area ratio corresponding to the planned residential land area, obtain a second floor area ratio corresponding to the planned commercial land area, obtain a third floor area ratio corresponding to the planned industrial land area, obtain a first conversion coefficient corresponding to the planned commercial land area, and obtain a second conversion coefficient corresponding to the planned industrial land area;

[0008] Obtain the current residential land area, current commercial land area, and current industrial land area of ​​the developed area;

[0009] Obtaining a third conversion coefficient corresponding to the current commercial land area, and obtaining a fourth conversion coefficient corresponding to the current industrial land area;

[0010] Generate a current feasibility coefficient according to the planned residential land area, the planned commercial land area, the first floor area ratio, the second floor area ratio, the third floor area ratio, the first conversion coefficient, the second conversion coefficient, the planned industrial land area, the current residential land area, the current commercial land area, the current industrial land area, the third conversion coefficient, the fourth conversion coefficient and a preset coefficient generation model;

[0011] Determining whether the current feasibility coefficient is greater than a preset feasibility coefficient;

[0012] When the current feasibility coefficient is greater than the preset feasibility coefficient, the geographical scope of the developed area is defined as the project scope of the secondary development project.

[0013] Exemplarily, the coefficient generation model includes:

[0014] F=(B1×W1+B2×W2×P1+B3×W3×P2) / (A1+A2×P3+A3×P4);

[0015] Wherein, F is the feasibility coefficient;

[0016] Among them, B1 is the planned residential land area, B2 is the planned commercial land area, and B3 is the planned industrial land area;

[0017] Wherein, W1 is the first floor area ratio corresponding to the planned residential land area, W2 is the second floor area ratio corresponding to the planned commercial land area; W3 is the third floor area ratio corresponding to the planned industrial land area;

[0018] Wherein, P1 is the first conversion coefficient corresponding to the planned commercial land area, and P2 is the second conversion coefficient corresponding to the planned industrial land area;

[0019] Among them, A1 is the current residential land area, A2 is the current commercial land area, and A3 is the current industrial land area;

[0020] Among them, P3 is the third conversion coefficient corresponding to the current commercial land area, and P4 is the fourth conversion coefficient corresponding to the current industrial land area.

[0021] Exemplarily, the larger the feasibility coefficient is, the higher the feasibility of demarcating the project scope of the developed area as the project scope of the secondary development area is, and the smaller the feasibility coefficient is, the lower the feasibility of demarcating the project scope of the developed area as the project scope of the secondary development area is.

[0022] In a possible implementation manner of the first aspect, obtaining the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area includes:

[0023] Obtain planning data corresponding to developed areas;

[0024] The planned residential land area, the planned commercial land area, and the planned industrial land area in the planning data are obtained.

[0025] In a possible implementation manner of the first aspect, obtaining the current residential land area, the current commercial land area, and the current industrial land area of ​​the developed area includes:

[0026] Acquire building data corresponding to the developed area;

[0027] The current residential land area, the current commercial land area, and the current industrial land area in the building data are obtained.

[0028] In a possible implementation manner of the first aspect, the determining whether the current feasibility coefficient is greater than a preset feasibility coefficient includes:

[0029] Obtain the city where the developed area is located, and obtain the preset feasibility coefficient corresponding to the city;

[0030] Determine whether the current feasibility coefficient is greater than the preset feasibility coefficient.

[0031] In a possible implementation manner of the first aspect, after defining the geographical scope of the developed area as the project scope of the secondary development project when the current feasibility coefficient is greater than the preset feasibility coefficient, the project scope defining method includes:

[0032] A file recording the project scope of the secondary development area is obtained, and the file is stored in a preset storage area.

[0033] In a possible implementation manner of the first aspect, after defining the geographical scope of the developed area as the project scope of the secondary development project when the current feasibility coefficient is greater than the preset feasibility coefficient, the project scope defining method includes:

[0034] Connect the screen and control the screen to display the geographical location of the secondary development area.

[0035] In a possible implementation manner of the first aspect, after defining the geographical scope of the developed area as the project scope of the secondary development project when the current feasibility coefficient is greater than the preset feasibility coefficient, the project scope defining method includes:

[0036] Connect to a preset server and upload the project scope of the secondary development area to the server.

[0037] In a second aspect, an embodiment of the present application provides a project scope delineation device, which is applied to an electronic device, including:

[0038] The first acquisition module is used to obtain the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area;

[0039] The second acquisition module is used to obtain the first floor area ratio corresponding to the planned residential land area, obtain the second floor area ratio corresponding to the planned commercial land area, obtain the third floor area ratio corresponding to the planned industrial land area, obtain the first conversion coefficient corresponding to the planned commercial land area, and obtain the second conversion coefficient corresponding to the planned industrial land area;

[0040] A third acquisition module is used to acquire the current residential land area, the current commercial land area, and the current industrial land area of ​​the developed area;

[0041] A fourth acquisition module, used to acquire a third conversion coefficient corresponding to the current commercial land area, and to acquire a fourth conversion coefficient corresponding to the current industrial land area;

[0042] A generation module, for generating a current feasibility coefficient according to the planned residential land area, the planned commercial land area, the first floor area ratio, the second floor area ratio, the third floor area ratio, the first conversion coefficient, the second conversion coefficient, the planned industrial land area, the current residential land area, the current commercial land area, the current industrial land area, the third conversion coefficient, the fourth conversion coefficient and a preset coefficient generation model;

[0043] A determination module, used to determine whether the current feasibility coefficient is greater than a preset feasibility coefficient;

[0044] A demarcation module is used to demarcate the geographical scope of the developed area as the project scope of the secondary development project when the current feasibility coefficient is greater than the preset feasibility coefficient.

[0045] In a third aspect, an embodiment of the present application provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the project scope definition method of any one of the above-mentioned first aspects is implemented.

[0046] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the project scope definition method of any one of the above-mentioned first aspects is implemented.

[0047] In a fifth aspect, an embodiment of the present application provides a computer program product. When the computer program product is run on an electronic device, the electronic device executes the project scope delineation method described in any one of the first aspects above.

[0048] The beneficial effects of the embodiments of the present application lie in two aspects. On the one hand, when the current feasibility coefficient is greater than the preset feasibility coefficient, the geographical scope of the developed area is defined as the project scope of the secondary development project. Since no manual delineation is required, the process of defining the project scope of the secondary development area is simplified, which is beneficial to improving the efficiency of defining the project scope of the secondary development area. On the other hand, the current feasibility coefficient is generated according to the preset coefficient generation model, which eliminates the influence of manual operation in the delineation process, which is beneficial to improving the effect of defining the project scope of the secondary development area. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0050] Figure 1 An application scenario diagram of the project scope delineation method provided in an embodiment of the present application;

[0051] Figure 2 It is a flowchart of a project scope delineation method provided in an embodiment of the present application;

[0052] Figure 3 A flowchart for obtaining building data provided in an embodiment of the present application;

[0053] Figure 4 A schematic block diagram of a project scope delineation device provided in an embodiment of the present application;

[0054] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0055] In order to make the purpose, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0056] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0057] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.

[0058] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0059] In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the fact that they can be implemented by ordinary technicians in this field. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0060] The flowcharts shown in the accompanying drawings are only examples and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps may also be decomposed, combined or partially merged, so the actual execution order may change according to actual conditions.

[0061] The project scope delimiting method provided in the embodiments of the present application can be applied to electronic devices such as mobile phones, tablet computers, wearable devices, vehicle-mounted devices, augmented reality (AR) / virtual reality (VR) devices, laptop computers, ultra-mobile personal computers (UMPC), netbooks, personal digital assistants (PDA), etc. The embodiments of the present application do not impose any restrictions on the specific types of electronic devices.

[0062] See also Figure 1 , Figure 1 The application scenario diagram of the project scope delineation method provided in the embodiment of the present application is detailed as follows:

[0063] The electronic device obtains the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area.

[0064] Among them, the planned residential land area, planned commercial land area, and planned industrial land area can be in one file or from multiple files.

[0065] For the sake of explanation, the planned residential land area, planned commercial land area, and planned industrial land area are taken from two files as an example, and the details are as follows:

[0066] The two files include file A and file B. The electronic device is connected to file A and file B respectively, and obtains the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area from file A and file B.

[0067] In an embodiment of the present application, the electronic device can connect to different files at the same time and obtain the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area from different files.

[0068] See also Figure 2 , Figure 2 It is a flowchart of a project scope delineation method provided in an embodiment of the present application, which method can be applied to electronic devices.

[0069] like Figure 2 As shown, the project scope delineation method provided in the embodiment of the present application includes the following steps, which are described in detail as follows:

[0070] S201, obtain the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area;

[0071] The acquisition of the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area includes:

[0072] Obtain planning data corresponding to developed areas;

[0073] The planned residential land area, the planned commercial land area, and the planned industrial land area in the planning data are obtained.

[0074] Among them, by visiting the official website of the planning department, you can find the planning data corresponding to the developed area.

[0075] S202, obtaining a first floor area ratio corresponding to the planned residential land area, obtaining a second floor area ratio corresponding to the planned commercial land area, obtaining a third floor area ratio corresponding to the planned industrial land area, obtaining a first conversion coefficient corresponding to the planned commercial land area, and obtaining a second conversion coefficient corresponding to the planned industrial land area;

[0076] Among them, the first conversion coefficient and the second conversion coefficient are set by the user or by system default, and are not limited here.

[0077] S203, obtaining the current residential land area, the current commercial land area, and the current industrial land area of ​​the developed area;

[0078] Among them, through the official website or platform, find the current residential land area, current commercial land area, and current industrial land area corresponding to the developed area.

[0079] S204, obtaining a third conversion coefficient corresponding to the current commercial land area, and obtaining a fourth conversion coefficient corresponding to the current industrial land area;

[0080] Among them, the third conversion coefficient and the fourth conversion coefficient are set by the user or by system default, and are not restricted here.

[0081] S205, generating a current feasibility coefficient according to the planned residential land area, the planned commercial land area, the first floor area ratio, the second floor area ratio, the third floor area ratio, the first conversion coefficient, the second conversion coefficient, the planned industrial land area, the current residential land area, the current commercial land area, the current industrial land area, the third conversion coefficient, the fourth conversion coefficient, and a preset coefficient generation model;

[0082] Exemplarily, the coefficient generation model includes:

[0083] F=(B1×W1+B2×W2×P1+B3×W3×P2) / (A1+A2×P3+A3×P4);

[0084] Wherein, F is the feasibility coefficient;

[0085] Among them, B1 is the planned residential land area, B2 is the planned commercial land area, and B3 is the planned industrial land area;

[0086] Wherein, W1 is the first floor area ratio corresponding to the planned residential land area, W2 is the second floor area ratio corresponding to the planned commercial land area; W3 is the third floor area ratio corresponding to the planned industrial land area;

[0087] Wherein, P1 is the first conversion coefficient corresponding to the planned commercial land area, and P2 is the second conversion coefficient corresponding to the planned industrial land area;

[0088] Among them, A1 is the current residential land area, A2 is the current commercial land area, and A3 is the current industrial land area;

[0089] Among them, P3 is the third conversion coefficient corresponding to the current commercial land area, and P4 is the fourth conversion coefficient corresponding to the current industrial land area.

[0090] Exemplarily, the larger the feasibility coefficient is, the higher the feasibility of demarcating the project scope of the developed area as the project scope of the secondary development area is, and the smaller the feasibility coefficient is, the lower the feasibility of demarcating the project scope of the developed area as the project scope of the secondary development area is.

[0091] Among them, the first floor area ratio, the second floor area ratio, and the third floor area ratio are set by the user or by the system by default and are not restricted here.

[0092] Among them, the first conversion coefficient, the second conversion coefficient, the third conversion coefficient, and the fourth conversion coefficient are set by the user or by system default, and are not limited here.

[0093] For the sake of illustration, an example is given below:

[0094] For example, the planned residential land area, planned commercial land area, and planned industrial land area are 60,000 square meters, 80,000 square meters, and 100,000 square meters respectively;

[0095] The current residential land area, current commercial land area, and current industrial land area are 50,000 square meters, 70,000 square meters, and 70,000 square meters respectively;

[0096] The first floor area ratio is 6, the second floor area ratio is 8, and the third floor area ratio is 6.5;

[0097] The first conversion coefficient is 0.8, the second conversion coefficient is 0.4, the third conversion coefficient is 0.8, and the fourth conversion coefficient is 0.4; at this time, the coefficient generation model is:

[0098] F=(6×6+8×8×0.8+10×6.5×0.4) / (5+7×0.8+7×0.4)=8.44;

[0099] For the sake of illustration, an example is given below:

[0100] For example, the planned residential land area, planned commercial land area, and planned industrial land area are 90,000 square meters, 80,000 square meters, and 100,000 square meters respectively;

[0101] The current residential land area, current commercial land area, and current industrial land area are 60,000 square meters, 70,000 square meters, and 70,000 square meters respectively;

[0102] The first floor area ratio is 6, the second floor area ratio is 8, and the third floor area ratio is 6.5;

[0103] The first conversion coefficient is 1, the second conversion coefficient is 1, the third conversion coefficient is 0.8, and the fourth conversion coefficient is 0.4; at this time, the coefficient generation model is:

[0104] F=(9×6+8×8×1+10×6.5×1) / (6+7×0.8+7×0.4)=12.7;

[0105] S206, determining whether the current feasibility coefficient is greater than a preset feasibility coefficient;

[0106] Wherein, the determining whether the current feasibility coefficient is greater than a preset feasibility coefficient includes:

[0107] Obtain the city where the developed area is located, and obtain the preset feasibility coefficient corresponding to the city;

[0108] Determine whether the current feasibility coefficient is greater than the preset feasibility coefficient.

[0109] Different cities correspond to different preset feasibility coefficients.

[0110] For the sake of illustration, an example is given below:

[0111] For example, the preset feasibility coefficient for city A is 6;

[0112] For example, the preset feasibility coefficient for city B is 12.

[0113] S207: When the current feasibility coefficient is greater than the preset feasibility coefficient, the geographical scope of the developed area is defined as the project scope of the secondary development project.

[0114] For the sake of illustration, an example is given below:

[0115] The developed area is a comprehensive area that integrates multiple functions such as commercial, residential and light industrial. Its geographical scope is:

[0116] Northern boundary: 22°40′00″N.

[0117] Southern boundary: 22°37′30″ north latitude.

[0118] Eastern boundary: 114°03′00″ east longitude.

[0119] Western boundary: 114°00′00″ east longitude.

[0120] In order to promote the further development and transformation and upgrading of this developed area, its geographical scope is used as the project scope of the secondary development project to be launched soon.

[0121] Within this project scope, secondary development projects may cover multiple aspects, including but not limited to:

[0122] The construction of commercial complexes will attract well-known domestic and foreign brands to settle in, and enhance the business atmosphere and consumption level of the developed areas.

[0123] The development of high-end residential areas provides a modern and intelligent living environment to meet residents' pursuit of high-quality life.

[0124] The transformation and upgrading of industrial parks will introduce high-tech industries and modern service industries to promote the optimization and upgrading of the industrial structure in developed areas.

[0125] The improvement of infrastructure, such as the expansion and upgrading of transportation networks, the creation of green landscapes, and the provision of public service facilities, will enhance the overall quality of the region and the convenience of life for residents.

[0126] Such secondary development projects aim to transform the city’s developed areas into modern urban areas integrating commerce, residence, work and leisure through scientific planning and comprehensive development, injecting new vitality and impetus into the city’s sustainable development.

[0127] Among them, the preset feasibility coefficient is set by the user or by the system default, and is not restricted here.

[0128] For the sake of illustration, an example is given below:

[0129] For example, the current feasibility coefficient is 8, the preset feasibility coefficient is 6, and the current feasibility coefficient is greater than the preset feasibility coefficient, and the geographical scope of the developed area is defined as the project scope of the secondary development project.

[0130] For the sake of illustration, an example is given below:

[0131] For example, the current feasibility coefficient is 12.7, the preset feasibility coefficient is 12, and the current feasibility coefficient is greater than the preset feasibility coefficient, and the geographical scope of the developed area is defined as the project scope of the secondary development project.

[0132] Wherein, when the current feasibility coefficient is greater than the preset feasibility coefficient, after defining the geographical scope of the developed area as the project scope of the secondary development project, the project scope defining method includes:

[0133] Step A, obtaining a file recording the project scope of the secondary development area, and storing the file in a preset storage area.

[0134] Wherein, when the current feasibility coefficient is greater than the preset feasibility coefficient, after defining the geographical scope of the developed area as the project scope of the secondary development project, the project scope defining method includes:

[0135] Step B, connecting the screen and controlling the screen to display the geographical location of the secondary development area.

[0136] Wherein, when the current feasibility coefficient is greater than the preset feasibility coefficient, after defining the geographical scope of the developed area as the project scope of the secondary development project, the project scope defining method includes:

[0137] Step C, connecting to a preset server, and uploading the project scope of the secondary development area to the server.

[0138] Step A can be executed before or after step B and step C, step B can be executed before or after step A and step C, step C can be executed before or after step A and step B, and step A can also be executed simultaneously with step B and step C. The specific execution order is not limited here.

[0139] The beneficial effects of the embodiments of the present application lie in two aspects. On the one hand, when the current feasibility coefficient is greater than the preset feasibility coefficient, the geographical scope of the developed area is defined as the project scope of the secondary development project. Since no manual delineation is required, the process of defining the project scope of the secondary development area is simplified, which is beneficial to improving the efficiency of defining the project scope of the secondary development area. On the other hand, the current feasibility coefficient is generated according to the preset coefficient generation model, which eliminates the influence of manual operation in the delineation process, which is beneficial to improving the effect of defining the project scope of the secondary development area.

[0140] See also Figure 3 , Figure 3 The flowchart for obtaining building data provided in the embodiment of the present application is described in detail as follows:

[0141] S301, obtaining building data corresponding to the developed area;

[0142] S302, obtaining the current residential land area, the current commercial land area, and the current industrial land area in the building data.

[0143] In an embodiment of the present application, building data corresponding to the developed area is obtained, and the current residential land area, current commercial land area, and current industrial land area of ​​the developed area can be obtained through the building data.

[0144] For the project scope delineation method described in the above example, please refer to Figure 4 , Figure 4 A schematic block diagram of a project scope delineation device provided in an embodiment of the present application, Figure 4 The project scoping apparatus 400 shown can be applied to Figure 1 The electronic device in the application scenario diagram shown below takes the electronic device as an example. Figure 4 The project scope delineation device 400 shown is described in detail. The project scope delineation device 400 may include a first acquisition module 401, a second acquisition module 402, a third acquisition module 403, a fourth acquisition module 404, a generation module 405, a determination module 406, and a delineation module 407.

[0145] The first acquisition module 401 is used to acquire the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area;

[0146] The second acquisition module 402 is used to acquire the first floor area ratio corresponding to the planned residential land area, acquire the second floor area ratio corresponding to the planned commercial land area, acquire the third floor area ratio corresponding to the planned industrial land area, acquire the first conversion coefficient corresponding to the planned commercial land area, and acquire the second conversion coefficient corresponding to the planned industrial land area;

[0147] The third acquisition module 403 is used to acquire the current residential land area, the current commercial land area, and the current industrial land area of ​​the developed area;

[0148] The fourth acquisition module 404 is used to acquire the third conversion coefficient corresponding to the current commercial land area and acquire the fourth conversion coefficient corresponding to the current industrial land area;

[0149] A generation module 405 is used to generate a current feasibility coefficient according to the planned residential land area, the planned commercial land area, the first floor area ratio, the second floor area ratio, the third floor area ratio, the first conversion coefficient, the second conversion coefficient, the planned industrial land area, the current residential land area, the current commercial land area, the current industrial land area, the third conversion coefficient, the fourth conversion coefficient and a preset coefficient generation model;

[0150] A determination module 406 is used to determine whether the current feasibility coefficient is greater than a preset feasibility coefficient;

[0151] The demarcation module 407 is used to demarcate the geographical scope of the developed area as the project scope of the secondary development project when the current feasibility coefficient is greater than the preset feasibility coefficient.

[0152] For the sake of illustration, an example is given below:

[0153] First, input the object, which can be a plot of land in a developed area or an area consisting of several plots of land in a relatively fixed format of DWG or SHP. The second step is to make a preliminary correction to the range according to relevant correction factors, which specifically involve three factors: status quo, planning and policy. The status quo factor mainly combines several factors such as land use function, land ownership, building conditions, road network, administrative boundaries and floor area ratio. Secondly, it combines the planned plot boundaries, controlling factors, urban control lines and land management, urban planning, land development and other comprehensive factors to form a simple correction range.

[0154] Then, the processor forms a base number for range determination according to the simplified corrected preliminary range through the first acquisition module 401, the second acquisition module 402 and the third acquisition module 403;

[0155] Then, after the generation module 405, the current feasibility coefficient is analyzed and obtained, and the coefficient is identified by the signal. If the current feasibility coefficient is greater than the preset feasibility coefficient, the geographical scope of the developed area is defined as the project scope of the secondary development project. If the current feasibility coefficient is not greater than the preset feasibility coefficient, the geographical scope of the developed area is automatically and simply corrected again, and the first acquisition module 401, the second acquisition module 402, the third acquisition module 403, the generation module 405 and the determination module 406 are re-executed to redefine the geographical scope of the developed area until the current feasibility coefficient is greater than the preset feasibility coefficient. The geographical scope of the re-defined developed area is used as the final scope, and the final scope is output as the scope of the secondary development project.

[0156] Among them, the Chinese full name of DWG format: Drawing Exchange Format, the English full name of DWG format: Drawing Exchange Format, DWG format is the core file format of AutoCAD and its compatible software, it is specially used to store and exchange two-dimensional and three-dimensional design drawings.

[0157] Among them, the Chinese full name of SHP format: Shape file, the English full name of SHP format: Shapefile, SHP format is an open format for storing geospatial vector data.

[0158] It should be noted that the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0159] The beneficial effects of the embodiments of the present application lie in two aspects. On the one hand, when the current feasibility coefficient is greater than the preset feasibility coefficient, the geographical scope of the developed area is defined as the project scope of the secondary development project. Since no manual delineation is required, the process of defining the project scope of the secondary development area is simplified, which is beneficial to improving the efficiency of defining the project scope of the secondary development area. On the other hand, the current feasibility coefficient is generated according to the preset coefficient generation model, which eliminates the influence of manual operation in the delineation process, which is beneficial to improving the effect of defining the project scope of the secondary development area.

[0160] See also Figure 5 , Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.

[0161] like Figure 5 As shown, Figure 5 The electronic device 2 includes: at least one processor 20, a memory 21, and a computer program 22 stored in the memory 21 and executable on the at least one processor 20, and when the processor 20 executes the computer program 22, the steps in any of the above-mentioned method embodiments are implemented.

[0162] The electronic device 2 may include, but is not limited to, a processor 20 and a memory 21. Those skilled in the art will appreciate that Figure 5 It is only an example of the electronic device 2 and does not constitute a limitation on the electronic device 2. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.

[0163] The processor 20 is used to run the computer program 22 stored in the memory 21, and implement the following steps when executing the computer program 22:

[0164] Obtain the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area;

[0165] Obtain a first floor area ratio corresponding to the planned residential land area, obtain a second floor area ratio corresponding to the planned commercial land area, obtain a third floor area ratio corresponding to the planned industrial land area, obtain a first conversion coefficient corresponding to the planned commercial land area, and obtain a second conversion coefficient corresponding to the planned industrial land area;

[0166] Obtain the current residential land area, current commercial land area, and current industrial land area of ​​the developed area;

[0167] Obtaining a third conversion coefficient corresponding to the current commercial land area, and obtaining a fourth conversion coefficient corresponding to the current industrial land area;

[0168] Generate a current feasibility coefficient based on the planned residential land area, the planned commercial land area, the first floor area ratio, the second floor area ratio, the third floor area ratio, the first conversion coefficient, the second conversion coefficient, the planned industrial land area, the current residential land area, the current commercial land area, the current industrial land area, the third conversion coefficient, the fourth conversion coefficient and a preset coefficient generation model; determine whether the current feasibility coefficient is greater than the preset feasibility coefficient; when the current feasibility coefficient is greater than the preset feasibility coefficient, define the geographical scope of the developed area as the project scope of the secondary development project.

[0169] In some embodiments, the processor 20 is configured to implement:

[0170] Obtain planning data corresponding to developed areas;

[0171] The planned residential land area, the planned commercial land area, and the planned industrial land area in the planning data are obtained.

[0172] In some embodiments, the processor 20 is configured to implement:

[0173] Acquire building data corresponding to the developed area;

[0174] The current residential land area, the current commercial land area, and the current industrial land area in the building data are obtained.

[0175] In some embodiments, the processor 20 is configured to implement:

[0176] Obtain the city where the developed area is located, and obtain the preset feasibility coefficient corresponding to the city;

[0177] Determine whether the current feasibility coefficient is greater than the preset feasibility coefficient.

[0178] In some embodiments, the processor 20 is configured to implement:

[0179] A file recording the project scope of the secondary development area is obtained, and the file is stored in a preset storage area.

[0180] In some embodiments, the processor 20 is configured to implement:

[0181] Connect the screen and control the screen to display the geographical location of the secondary development area.

[0182] In some embodiments, the processor 20 is configured to implement:

[0183] Connect to a preset server and upload the project scope of the secondary development area to the server.

[0184] The processor 20 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0185] In some embodiments, the memory 21 may be an internal storage unit of the electronic device 2, such as a hard disk or memory of the electronic device 2. In other embodiments, the memory 21 may also be an external storage device of the electronic device 2, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 2. Further, the memory 21 may also include both an internal storage unit of the electronic device 2 and an external storage device. The memory 21 is used to store an operating system, an application program, a boot loader (Boot Loader), data, and other programs, such as the program code of the computer program, etc. The memory 21 may also be used to temporarily store data that has been output or is to be output.

[0186] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0187] An embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.

[0188] The computer-readable storage medium stores program codes, which can be called by a processor to execute the project scope delineation method described in the above method embodiment.

[0189] The computer-readable storage medium has a storage space for program codes.

[0190] The program code includes the code of any step in the project scoping method described in the above method embodiment.

[0191] For example, the program code is called by the processor and can execute the following steps:

[0192] Obtain the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area;

[0193] Obtain a first floor area ratio corresponding to the planned residential land area, obtain a second floor area ratio corresponding to the planned commercial land area, obtain a third floor area ratio corresponding to the planned industrial land area, obtain a first conversion coefficient corresponding to the planned commercial land area, and obtain a second conversion coefficient corresponding to the planned industrial land area;

[0194] Obtain the current residential land area, current commercial land area, and current industrial land area of ​​the developed area;

[0195] Obtaining a third conversion coefficient corresponding to the current commercial land area, and obtaining a fourth conversion coefficient corresponding to the current industrial land area;

[0196] Generate a current feasibility coefficient according to the planned residential land area, the planned commercial land area, the first floor area ratio, the second floor area ratio, the third floor area ratio, the first conversion coefficient, the second conversion coefficient, the planned industrial land area, the current residential land area, the current commercial land area, the current industrial land area, the third conversion coefficient, the fourth conversion coefficient and a preset coefficient generation model;

[0197] Determining whether the current feasibility coefficient is greater than a preset feasibility coefficient;

[0198] When the current feasibility coefficient is greater than the preset feasibility coefficient, the geographical scope of the developed area is defined as the project scope of the secondary development project.

[0199] The specific implementation of the above operations can be found in the previous embodiments, which will not be described in detail here.

[0200] The computer-readable storage medium may also be an external storage device of the project scope delineation device or electronic device, for example, a plug-in hard disk, a smart memory card (SmartMedia Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), a non-transitory computer-readable storage medium (non-transitory computer-readable storage medium), etc., equipped on the project scope delineation device or electronic device.

[0201] Since the computer program stored in the computer-readable storage medium can execute any one of the project scope delineation methods provided in the embodiments of the present application, the computer-readable storage medium can achieve the beneficial effects that can be achieved by any one of the project scope delineation methods provided in the embodiments of the present application. Please see the previous embodiments for details and will not be repeated here.

[0202] An embodiment of the present application provides a computer program product. When the computer program product is run on an electronic device, the electronic device executes the above-mentioned project scope delineation method.

[0203] The computer program product is loaded into the electronic device and can execute the following steps:

[0204] Obtain the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area;

[0205] Obtain a first floor area ratio corresponding to the planned residential land area, obtain a second floor area ratio corresponding to the planned commercial land area, obtain a third floor area ratio corresponding to the planned industrial land area, obtain a first conversion coefficient corresponding to the planned commercial land area, and obtain a second conversion coefficient corresponding to the planned industrial land area;

[0206] Obtain the current residential land area, current commercial land area, and current industrial land area of ​​the developed area;

[0207] Obtaining a third conversion coefficient corresponding to the current commercial land area, and obtaining a fourth conversion coefficient corresponding to the current industrial land area;

[0208] Generate a current feasibility coefficient according to the planned residential land area, the planned commercial land area, the first floor area ratio, the second floor area ratio, the third floor area ratio, the first conversion coefficient, the second conversion coefficient, the planned industrial land area, the current residential land area, the current commercial land area, the current industrial land area, the third conversion coefficient, the fourth conversion coefficient and a preset coefficient generation model;

[0209] Determining whether the current feasibility coefficient is greater than a preset feasibility coefficient;

[0210] When the current feasibility coefficient is greater than the preset feasibility coefficient, the geographical scope of the developed area is defined as the project scope of the secondary development project.

[0211] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium.

[0212] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0213] Based on such understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device capable of carrying the computer program code to an electronic device, a recording medium, a computer memory, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), an electric carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.

[0214] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0215] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A project scoping method, characterized in that: Applied to electronic equipment, the project scoping approach includes: Obtain the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area; Obtain a first floor area ratio corresponding to the planned residential land area, obtain a second floor area ratio corresponding to the planned commercial land area, obtain a third floor area ratio corresponding to the planned industrial land area, obtain a first conversion coefficient corresponding to the planned commercial land area, and obtain a second conversion coefficient corresponding to the planned industrial land area; Obtain the current residential land area, current commercial land area, and current industrial land area of ​​the developed area; Obtaining a third conversion coefficient corresponding to the current commercial land area, and obtaining a fourth conversion coefficient corresponding to the current industrial land area; Generate a current feasibility coefficient according to the planned residential land area, the planned commercial land area, the first floor area ratio, the second floor area ratio, the third floor area ratio, the first conversion coefficient, the second conversion coefficient, the planned industrial land area, the current residential land area, the current commercial land area, the current industrial land area, the third conversion coefficient, the fourth conversion coefficient and a preset coefficient generation model; Determining whether the current feasibility coefficient is greater than a preset feasibility coefficient; When the current feasibility coefficient is greater than the preset feasibility coefficient, the geographical scope of the developed area is defined as the project scope of the secondary development project.

2. The project scope determination method according to claim 1, characterized in that: The acquisition of the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area includes: Obtain planning data corresponding to developed areas; The planned residential land area, the planned commercial land area, and the planned industrial land area in the planning data are obtained.

3. The project scope determination method according to claim 1, characterized in that: The obtaining of the current residential land area, the current commercial land area, and the current industrial land area of ​​the developed area includes: Acquire building data corresponding to the developed area; The current residential land area, the current commercial land area, and the current industrial land area in the building data are obtained.

4. The project scope determination method according to claim 1, characterized in that: The determining whether the current feasibility coefficient is greater than a preset feasibility coefficient includes: Obtain the city where the developed area is located, and obtain the preset feasibility coefficient corresponding to the city; Determine whether the current feasibility coefficient is greater than the preset feasibility coefficient.

5. The project scope determination method according to claim 1, characterized in that: After the geographical scope of the developed area is defined as the project scope of the secondary development project when the current feasibility coefficient is greater than the preset feasibility coefficient, the project scope definition method includes: A file recording the project scope of the secondary development area is obtained, and the file is stored in a preset storage area.

6. The project scoping method according to claim 1, characterized in that: After the geographical scope of the developed area is defined as the project scope of the secondary development project when the current feasibility coefficient is greater than the preset feasibility coefficient, the project scope definition method includes: Connect the screen and control the screen to display the geographical location of the secondary development area.

7. The project scoping method according to claim 1, characterized in that: After the geographical scope of the developed area is defined as the project scope of the secondary development project when the current feasibility coefficient is greater than the preset feasibility coefficient, the project scope definition method includes: Connect to a preset server and upload the project scope of the secondary development area to the server.

8. A project scope definition device, characterized in that: Used in electronic equipment, including: The first acquisition module is used to obtain the planned residential land area, planned commercial land area, and planned industrial land area of ​​the developed area; The second acquisition module is used to obtain the first floor area ratio corresponding to the planned residential land area, obtain the second floor area ratio corresponding to the planned commercial land area, obtain the third floor area ratio corresponding to the planned industrial land area, obtain the first conversion coefficient corresponding to the planned commercial land area, and obtain the second conversion coefficient corresponding to the planned industrial land area; A third acquisition module is used to acquire the current residential land area, the current commercial land area, and the current industrial land area of ​​the developed area; A fourth acquisition module, used to acquire a third conversion coefficient corresponding to the current commercial land area, and to acquire a fourth conversion coefficient corresponding to the current industrial land area; A generation module, for generating a current feasibility coefficient according to the planned residential land area, the planned commercial land area, the first floor area ratio, the second floor area ratio, the third floor area ratio, the first conversion coefficient, the second conversion coefficient, the planned industrial land area, the current residential land area, the current commercial land area, the current industrial land area, the third conversion coefficient, the fourth conversion coefficient and a preset coefficient generation model; A determination module, used to determine whether the current feasibility coefficient is greater than a preset feasibility coefficient; A demarcation module is used to demarcate the geographical scope of the developed area as the project scope of the secondary development project when the current feasibility coefficient is greater than the preset feasibility coefficient.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the project scope definition method according to any one of claims 1 to 7 is implemented.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the project scope definition method according to any one of claims 1 to 7 is implemented.