Large carrier rocket three-flat-mode test launch system and rocket launch method

By setting up temporary plants and rails near the rocket launch station, the rocket was reprinted on the vertical rack with an iron wheel grille and a crane to solve the problem of inconvenient transportation of large -scale carrier rockets. Methods and reduced transportation costs.

CN119374426APending Publication Date: 2025-01-28BEIJING ZHONGKE AEROSPACE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411677394.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-21
Publication Date
2025-01-28

AI Technical Summary

Technical Problem

The existing large-scale launch vehicle launch system has the problem of inconvenience in transporting the entire vehicle, especially the super high and long characteristics of the rocket, which leads to high transportation costs and high road transformation demands.

Method used

Set up temporary factories and rails near the launch station. Use an iron wheel rack to launch the rocket along the rails to the factory, until the vertical frame is parallel, and then use a heavy car to complete the Rockets to the vertical rack.

Benefits of technology

The convenience and reliability of the rocket's entire arrow transportation is realized, and the transportation cost is reduced, and the factory and equipment can be disassembled to meet the needs of multi -site launch.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119374426A_ABST
    Figure CN119374426A_ABST
Patent Text Reader

Abstract

The invention provides a large carrier rocket three-flat-mode test launch system and a rocket launch method. The system comprises a plant, a rail, an iron wheel carrier vehicle, a lifting appliance, a lorry-mounted crane, an erecting frame and a launch pad. The rail is laid from the interior of a plant and extends outwards to a launching station; the iron wheel carrier vehicle is movably connected to the rail; the lorry-mounted crane is arranged beside a rail, the lifting appliance is arranged on the lorry-mounted crane, and the lorry-mounted crane and the lifting appliance are used for transferring a rocket from the iron wheel carrier to the erecting frame; the erecting frame is in butt joint with the launching pad and used for erecting a rocket to the launching pad. A plant is arranged near a launching station and serves as a rocket horizontal general assembly test plant, and temporary rails are laid from the plant to the launching station and are arranged side by side with an erecting frame. After rocket horizontal testing work is finished, the iron wheel carrier vehicle is used for pushing the rocket out of the workshop along the temporary rail to the side-by-side position of the erecting frame, the lorry-mounted crane is used for transferring the rocket to the erecting frame, the whole rocket is convenient and reliable to transport, and cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of rocket launch technology, and in particular to a three-level mode test and launch system for a large carrier rocket and a rocket launch method. Background Art

[0002] At present, there are three main test and launch modes commonly used by launch vehicles in various countries around the world: one horizontal and two vertical (horizontal transfer of rockets, vertical assembly, vertical testing), three vertical (vertical transfer of rockets, vertical assembly, vertical testing) and three horizontal (horizontal transfer of rockets, horizontal assembly, horizontal testing). These three test and launch modes have their own advantages and disadvantages and are used in rocket launch processes at home and abroad. Most civilian and commercial space rockets use the three-horizontal test and launch mode, and the equipment composition and launch process of each large rocket test and launch system are different.

[0003] Civilian and commercial aerospace uses rockets with a three-horizontal test and launch mode. The launch process is generally as follows: the rocket is assembled and tested in the technical area, the rocket is transferred to the launch station using a general-purpose transport vehicle, and the rocket is transferred to the erection frame using a truck-mounted crane to erect the rocket. Alternatively, a special erection transport vehicle is used to transport the rocket to the launch station, the erection frame is docked with the launch pad, and the rocket is erected. For rockets that use a three-vertical test and launch mode, the vertical assembly and test plant is relatively close to the launch station, usually about 2 kilometers, and generally has rails laid. The entire rocket is vertically transported using a mobile launch platform, and there are no obstacles during transportation.

[0004] Some rockets in the civilian and commercial aerospace industry are equipped with a mobile plant at the launch station, which can protect the launch station equipment and horizontal rockets. After the rocket completes the horizontal test in the technical area, it is transferred to the erection frame and pre-launch preparations are carried out in the mobile plant. Before the rocket is erected, the mobile plant is evacuated to a safe area. After the rocket is launched, the mobile plant is moved back to the launch station to prevent dust, rain, and sunlight, and to protect the erection frame, launch pad and other front-end equipment. Rockets that use the three-vertical test launch mode are usually equipped with a fixed launch tower, and the tower platform is closed to form a closed space to protect the rocket body. The platform is opened before launch, which does not affect the rocket's takeoff.

[0005] At present, civilian and commercial rockets are generally built in technical areas or borrowed from technical factories. The distance for transporting the rocket from the technical factory to the launch site is about several kilometers to tens of kilometers. The transfer of the entire rocket generally requires the use of horizontal transportation equipment.

[0006] At present, the shortcomings of the existing large-scale launch vehicle test and launch system are: a large rocket has a total length of more than 70 meters, and the transportation height in the horizontal transportation state is more than 10 meters, which exceeds the height of the existing technical factory door. It is inconvenient to transport the entire rocket in and out of the factory, and the existing technical factory needs to be modified. If other methods are used to transfer the rocket to the transport vehicle, the operation process will be increased. The transportation of the entire rocket is super high and super long, and the requirements for the passage road are high. The turning radius is required to be greater than 90 meters, and the existing road needs to be modified. The passing height is required to exceed 10 meters, and the traffic lights and other equipment along the way need to be removed. Considering the need for multi-station launch of rockets, the test equipment needs to be movable and used in other launch sites.

[0007] Therefore, the technical problem that urgently needs to be solved is: how to provide a three-level mode test and launch system for a large-scale carrier rocket and a rocket launch method to solve the problem of inconvenient transportation of the entire rocket at a lower cost. Summary of the invention

[0008] The purpose of the present application is to provide a three-level mode test and launch system for a large-scale carrier rocket and a rocket launch method, so as to solve the problem of inconvenient transportation of the whole rocket at a relatively low cost. The present application sets up a factory building near the launch station, which is used as a horizontal assembly and test factory building for the rocket. A temporary rail is laid from the factory building to the launch station, which is parallel to the erection frame. After the horizontal test of the rocket is completed, an iron wheel frame vehicle is used to push the rocket out of the factory building along the temporary rail to a position parallel to the erection frame, and a truck-mounted crane is used to transfer the rocket to the erection frame. The transportation of the whole rocket is convenient and reliable, which reduces costs.

[0009] To achieve the above-mentioned purpose, the present application provides a three-level mode test and launch system for a large-scale carrier rocket, the system comprising: a factory building, rails, an iron wheel frame car, a hoist, a truck crane, an erection frame and a launch platform; the rails are laid starting from the factory building and extending outward to the launch station; the iron wheel frame car is movably connected to the rails; the truck crane is arranged beside the rails, the hoist is arranged on the truck crane, the truck crane and the hoist are used to transfer the rocket from the iron wheel frame car to the erection frame; the erection frame is docked with the launch platform, and the erection frame is used to erect the rocket onto the launch platform.

[0010] The three-level mode test and launch system for a large launch vehicle as described above, wherein the rail includes a first rail and a second rail; the first rail and the second rail are arranged in parallel, and a connecting rod is fixedly connected between the first rail and the second rail; the first rail and the second rail both include a rail bottom, a rail head and a rail waist; the rail bottom and the rail head are connected through the rail waist.

[0011] As described above, the three-level mode test and launch system for a large launch vehicle, wherein a circular through hole is opened in the middle of the rail waist; the two ends of the connecting rod respectively pass through the circular through hole of the rail waist of the first rail and the circular through hole of the rail waist of the second rail, and the two ends of the connecting rod are threadedly connected with nuts.

[0012] The three-level mode test and launch system for a large launch vehicle as described above, wherein the iron wheel frame vehicle includes a frame body, a support seat and an iron wheel, wherein the support seat is arranged on the top of the frame body, and the support seat is used to place the rocket; the iron wheel is arranged at the bottom of the frame body, and the iron wheel is slidably connected to the rail, and the contact surface between the iron wheel and the rail head is a conical surface.

[0013] The three-level mode test and launch system for large launch vehicles as described above, wherein the rails are arranged in parallel with the erection frame.

[0014] As described above, the three-level mode test and launch system for large-scale carrier rockets includes a plurality of iron wheel frame vehicles; the plurality of iron wheel frame vehicles are spaced apart and arranged on the rails for transporting rockets.

[0015] As described above, in the three-level mode test and launch system for a large carrier rocket, a guide groove is excavated directly below the launch platform, and the launch platform is located above the opening of the guide groove; after the rocket is ignited, the gas flow generated by the tail flame of the rocket engine is discharged through the guide groove.

[0016] The three-level mode test and launch system for large-scale carrier rockets as described above, wherein a gantry crane is provided in the factory building.

[0017] The three-level mode test and launch system for a large launch vehicle as described above also includes a temperature control device, which is used to supply air to the rocket fairing.

[0018] As a second aspect of the present application, the present application provides a rocket launching method, which is applied to the three-horizontal mode test and launch system of the large carrier rocket, and the launching method comprises the following steps: performing a horizontal test on the rocket; after the horizontal test of the rocket is completed, the rocket is moved from the factory along the rails to a position parallel to the erection frame by the iron wheel frame vehicle; the rocket is transferred to the erection frame by the vehicle-mounted crane and the hoist; the erection frame is erected, the rocket is in a vertical state, and the rocket is docked with the launch pad; according to the requirements of the payload in the rocket fairing, the temperature control equipment is used to supply air to the rocket fairing; the fuel filling equipment fills the rocket tank with fuel, and the cryogenic propellant filling equipment fills the rocket tank with cryogenic propellant; after the rocket completes the pre-launch inspection, the erection frame is tilted back, and the rocket is ignited and launched.

[0019] The beneficial effects achieved by this application are as follows:

[0020] (1) The present application sets up a factory building near the launch station to be used as a rocket horizontal assembly and test factory, thereby solving the problem of inconvenient transportation of large rockets at a relatively low cost.

[0021] (2) The factory building in this application has no walking function, which is convenient for closure and easy to ensure the temperature, humidity and cleanliness in the factory building. It is only equipped with a light movable gantry crane and only needs to lay a pair of rails, which reduces the construction cost.

[0022] (3) The present application uses an iron wheel frame vehicle to push the entire arrow out of the factory along a temporary rail to a position parallel to the erection frame. There is no need for a matching vehicle for transporting the entire arrow. A truck-mounted crane is used to unload the sub-stage arrow bodies and transfer the entire arrow. There is no need for a matching large truss crane, thereby reducing costs.

[0023] (4) The factory building, gantry crane and rails of this application can be disassembled and transported to other launch stations, which can adapt to multi-station rocket launches. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present application. For those skilled in the art, other drawings can also be obtained based on these drawings.

[0025] Figure 1 This is a schematic structural diagram of a three-level mode test and launch system for a large launch vehicle according to an embodiment of the present application.

[0026] Figure 2 Schematic diagram of the rail structure of an embodiment of the present application.

[0027] Figure 3 This is a schematic diagram of the connecting rod structure of an embodiment of the present application.

[0028] Figure 4 This is a schematic diagram of the factory structure of an embodiment of the present application.

[0029] Figure 5 This is a schematic diagram of the structure of an iron wheel frame vehicle according to an embodiment of the present application.

[0030] Figure 6 This is a flow chart of a rocket launching method according to an embodiment of the present application.

[0031] Figure 7 A schematic diagram of a rocket launch process according to an embodiment of the present application.

[0032] Figure numerals: 1-factory building; 2-railway; 3-iron wheel frame; 4-hanging device; 5-truck crane; 6-erection frame; 7-launching platform; 21-rail bottom; 22-rail head; 23-rail waist; 24-connecting rod; 31-iron wheel; 32-bracket; 33-frame; 241-rod body; 242-screw rod; 243-nut; DETAILED DESCRIPTION

[0033] The following is a clear and complete description of the technical solutions in the embodiments of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.

[0034] like Figure 1 As shown, the present application provides a three-level mode test and launch system for a large-scale carrier rocket, which includes: a factory building 1, rails 2, a wheeled vehicle 3, a hoist 4, a truck crane 5, an erection frame 6 and a launch platform 7, and a gantry crane is arranged in the factory building 1. The rails 2 are laid from the factory building 1 and extend outward to the launch station; the wheeled vehicle 3 is movably connected to the rails 2; the truck crane 5 is arranged beside the rails 2, and the hoist 4 is arranged on the truck crane 5, and the truck crane 5 and the hoist 4 are used to transfer the rocket from the wheeled vehicle 3 to the erection frame 6; the rails 2 are arranged in parallel with the erection frame 6. The erection frame 6 is docked with the launch platform 7, and the erection frame 6 is used to erect the rocket onto the launch platform 7, and the erection frame 6 is used to erect the rocket body, and the launch platform 7 is used to vertically support the rocket body after erection. The factory building 1 of the present application is built adjacent to the launch station, and the entire arrow is transported in a horizontal state using the wheeled vehicle 3, and no special transfer transport vehicle is required. The erection frame 6 is pre-jointed and debugged with the launch platform 7, and the vehicle-mounted crane 5 is used to transfer the rocket to the erection frame 6, without the need to carry the rocket to the launch platform 7. The present application provides an equipment layout of a three-level mode test and launch system for a large-scale carrier rocket, which is convenient for transporting rockets and reduces construction costs.

[0035] As a specific embodiment of the present invention, a three-level mode test and launch system for a large launch vehicle in the present application can be used not only for large launch vehicles, but also for medium-sized launch vehicles. The effect of using it for large launch vehicles is more obvious, and the transportation of the entire rocket is more convenient than the transportation methods in the prior art, thereby reducing transportation costs.

[0036] As a specific embodiment of the present invention, the rail 2 is laid in the factory building 1, extending from the factory building gate to the launch station, parallel to the erection frame 2, and the rail 2 is a temporary rail. Under the premise of meeting the safety distance between the rocket body and the erection frame 6, the rail 2 is as close to the erection frame 6 as possible to facilitate the transfer by the truck crane 5. There are several iron wheel frame vehicles 3, which are placed on the rail 2 and can be pushed along the rail 2. When the sub-stages of the rocket body are unloaded, the iron wheel frame vehicle 3 is pushed out of the factory building, and the truck crane 5 is used to transfer each sub-stage from the road transport vehicle to the iron wheel frame vehicle 3. Each sub-stage is pushed into the factory building 1 to carry out assembly and testing. After the whole arrow test is completed, the iron wheel frame vehicle 3 pushes the arrow body out of the factory building 1 along the rail 2, and the rocket and the erection frame 6 are placed side by side. The sling 4 and the truck crane 5 are used to transfer the arrow body, and transfer the arrow body from the iron wheel frame vehicle 3 to the erection frame 6. The launching platform 7 is located above the diversion groove and is fixedly connected to the diversion groove ground using a steel plate and a ground anchor. The erection frame 6 is pre-assembled on the launching station and docked with the launching platform 7.

[0037] As a specific embodiment of the present invention, the factory building 1 is located outside the explosion radius of the rocket launch, and is about 500m to 1000m away from the launch point. Here, the distance between the factory building 1 and the launch point is about 500m to 1000m, which is the preferred range, and can also be other ranges. The distance between the factory building 1 and the launch point is not limited here.

[0038] As a specific embodiment of the present invention, the plant 1 is a movable plant. This application uses a simple movable plant to replace a fixed technical plant to meet the needs of arrow body testing and reduce the cost of plant construction. The plant 1 is placed near the launch station, and there is no need to modify the transfer transportation road, which reduces the transportation cost of the entire arrow.

[0039] As another embodiment of the present invention, the factory building 1 is provided with a walking function and can be transformed into a movable factory building. When the net height of the factory building 1 is greater than the arrow-carrying height of the erection frame 6, it can be used for temporary protection of the entire rocket after the rocket is transferred to the erection frame 6.

[0040] As another specific embodiment of the present invention, the factory building 1 cancels the walking function to improve the sealing performance. Compared with the mobile factory building, the factory building 1 cancels the walking part and cannot be walked on the ground floor at will, which further reduces the construction cost of the factory building. The factory building 1 is fixed with ground anchors and ropes to enhance the wind resistance.

[0041] As a specific embodiment of the present invention, rocket sub-stage docking, instrument installation and testing work are carried out in the factory building 1, and the unloading of each sub-stage and the transfer of the entire rocket are all carried out outside the factory building 1. There is no need for matching medium or large truss cranes, only matching light gantry cranes. No large truss cranes are installed in the factory building 1, only light and movable gantry cranes are used, which further reduces the cost of factory building construction.

[0042] like Figure 4As shown, only one pair of temporary rails 2 need to be laid in the factory building 1. Compared with two to three pairs of rails set in a fixed technical factory building, the span of the factory building 1 is reduced, further reducing the cost of factory building construction.

[0043] As a specific embodiment of the present invention, a pair of rails 2 are laid in the plant 1, and the iron wheel carriage 3 can be pushed along the rails 2. The doors at both ends can be opened automatically for easy entry and exit. The plant 1 has windproof, dustproof, rainproof and snowproof functions, and has its own air conditioning system to provide environmental protection for the rocket. It adopts AC power supply to provide electricity for rocket testing. A lighting system is installed to provide appropriate lighting for the plant 1.

[0044] As a specific embodiment of the present invention, an iron wheel carriage 3 is used to complete the transfer of the whole arrow from the factory building 1 to the launching station, without the need to use a general or special whole arrow transportation vehicle, further reducing the whole arrow transportation cost.

[0045] As a specific embodiment of the present invention, a truck-mounted crane 5 is used to complete the unloading of each sub-stage arrow body and the reloading of the entire arrow without the need for a large truss crane, thereby further reducing costs.

[0046] As a specific embodiment of the present invention, the factory building 1 and the gantry crane installed in the factory building 1 can be disassembled, and the rails can be disassembled after use and transported to other launch stations, which can adapt to multi-station launch. The erection frame 6 and the launch platform 7 are disassembled after the launch mission is completed and can be transported to other launch stations for multiple uses.

[0047] like Figure 2 As shown, the rail 2 includes a first rail and a second rail; the first rail and the second rail are arranged in parallel, and a connecting rod 24 is fixedly connected between the first rail and the second rail; the first rail and the second rail both include a rail bottom 21, a rail head 22 and a rail waist 23; the rail bottom 21 and the rail head 22 are connected through the rail waist 23. A circular through hole is opened in the middle of the rail waist 23; the two ends of the connecting rod 24 pass through the circular through hole of the rail waist 23 of the first rail and the circular through hole of the rail waist 23 of the second rail respectively, and nuts are threadedly connected to the two ends of the connecting rod 24.

[0048] like Figure 2 , 3As shown, the rail bottom 21 is directly laid on the ground of the field, and the rail head 22 carries the iron wheel 31 of the iron wheel frame vehicle 3. The two tracks (the first track and the second track) are used in pairs, and a circular through hole is opened in the middle of the rail waist 23, which is connected by a connecting rod 24 to maintain the track gauge. The commonly used track gauge is the 1435mm standard track gauge, and the track gauge is not limited to 1435mm here. It can also be a track gauge in other ranges, and a wide gauge or a narrow gauge can also be used. The rail 2 is laid from the factory building 1 to a position side by side with the erection frame 6. The distance between the center line of the rail 2 and the center line of the erection frame 6 is "rocket body radius + half width of the erection frame + safety gap", where the safety gap is between 500mm and 1000mm. The rail 2 is a temporary rail, which can be disassembled after use and transported to other launch stations for use.

[0049] like Figure 3 As shown, the connecting rod 24 includes a rod body 241, a screw rod 242, and a nut 243. The two ends of the rod body 241 are screw rods 242, which pass through the through hole of the rail waist 23 and are fastened by nuts 243. The length of the rod body 241 is determined according to the required track gauge. The rod body 241 has a boss structure, and the boss structure of the rod body 241 abuts against the rail waist 23 to keep the track gauge at a set value.

[0050] like Figure 5 As shown, the iron wheel carriage 3 includes a frame 33, a bracket 32 ​​and an iron wheel 31. The bracket 32 ​​is arranged at the top of the frame 33, and the bracket 32 ​​is used to place the rocket; the iron wheel 31 is arranged at the bottom of the frame 33, and the iron wheel 31 is slidably connected to the rail 2, and the contact surface between the iron wheel 31 and the rail head 22 is a conical surface. The iron wheel 31 is a walking part, and the contact surface between the iron wheel 31 and the rail head 22 is a conical surface, which can be pushed along the rail 2, has a self-guiding function, and will not derail. The bracket 32 ​​is arc-shaped, matching the shape of the arrow body, and is used to place the rocket. The frame 33 usually has a lifting, lateral movement, and rolling mechanism to adjust the rocket posture, so as to facilitate the docking of each sub-stage into a whole arrow.

[0051] As a preferred embodiment of the present invention, the iron wheel frame vehicle 3 includes a plurality of iron wheel frame vehicles 3; the plurality of iron wheel frame vehicles 3 are spaced apart and arranged on the rails 2, and are used to transfer rockets. The present application uses a plurality of iron wheel frame vehicles 3 to jointly support the rocket. When the sub-stages of the rocket body are unloaded, the iron wheel frame vehicle 3 is pushed out of the factory building, and the vehicle-mounted crane 5 is used to transfer the sub-stages from the road transport vehicle to the iron wheel frame vehicle 3, and then push them into the factory building 1. In the factory building 1, the iron wheel frame vehicle 3 is used to horizontally park the sub-stages of the rocket, and the sub-stages are docked to form a complete arrow, and the final assembly and testing work is carried out on the iron wheel frame vehicle 3. After the rocket test is completed, the iron wheel frame vehicle 3 pushes the rocket out of the factory building 1 along the rails 2, and the rocket body and the erection frame 6 are placed side by side.

[0052] As a specific embodiment of the present invention, the sling 4 and the truck crane 5 are used for transferring the rocket body. In the state of transferring the rocket body, the iron wheel frame 3 is parked in parallel with the erection frame 6, the sling 4 is connected to the rocket body, and the truck crane 5 is used in cooperation with the sling 4 to transfer the rocket body from the iron wheel frame 3 to the erection frame 6. Since the length of the rocket body is relatively long, two truck cranes are used to complete the transfer work. After the transfer of the entire rocket is completed, the sling 4 is withdrawn and the truck crane 5 drives away from the launch site.

[0053] As a specific embodiment of the present invention, a guide groove is excavated directly below the launch pad 7, and the launch pad 7 is located above the guide groove opening; after the rocket is ignited, the gas flow generated by the tail flame of the rocket engine is discharged through the guide groove.

[0054] As a specific embodiment of the present invention, a three-level mode test and launch system for a large carrier rocket also includes a temperature control device, which is used to supply air to the rocket fairing.

[0055] As a specific embodiment of the present invention, a three-level mode test and launch system for a large launch vehicle further includes a fuel filling device, an oxidant filling device, and an electrical test device. The fuel filling device, the oxidant filling device, and the electrical test device are existing equipment and will not be described in detail here.

[0056] Embodiment 2

[0057] like Figure 6 and 7 As shown, the present application provides a rocket launching method, which is applied to a three-level mode test and launch system of a large carrier rocket. The launching method comprises the following steps:

[0058] Step S1, transport the rocket and perform a horizontal test on the rocket.

[0059] Specifically, each sub-stage of the rocket is transported horizontally to the launch site and parked side by side with the rails outside the factory building. The iron-wheeled frame car is pushed along the rails to the outside of the factory building, unloaded using a truck-mounted crane, and each sub-stage is pushed into the factory building. Each sub-stage is docked horizontally, the entire rocket is assembled, and the rocket is horizontally tested.

[0060] Step S2, after the rocket horizontal test is completed, the rocket is moved from the factory along the rails to a position parallel to the erection frame by a wheeled vehicle.

[0061] Step S3, transferring the rocket to the erection frame by means of a truck-mounted crane and a sling.

[0062] Specifically, connect the hoist, use the truck crane and the hoist to transfer the rocket to the erection frame.

[0063] Step S4, the erection frame is erected, the rocket is in a vertical state, and the rocket is docked with the launch pad.

[0064] Step S5, using temperature control equipment to supply air to the rocket fairing according to the requirements of the payload in the rocket fairing.

[0065] Among them, the temperature control equipment is a device in the existing technology, which can supply air to the rocket fairing.

[0066] Step S6, the combustible filling device fills the rocket tank with combustibles, and the cryogenic propellant filling device fills the rocket tank with cryogenic propellants.

[0067] Step S7, after the rocket completes the pre-launch inspection, the erection frame is erected and then collapsed, and the rocket is ignited and launched.

[0068] Specifically, after the rocket completes the pre-launch inspection, the erection frame is erected and then collapsed, and the rocket is ignited and launched. After the rocket is ignited and launched, the equipment is withdrawn and can be moved to other launch positions.

[0069] like Figure 7 As shown, a rocket launch process includes: transporting each sub-stage of the rocket to the outside of the factory, unloading the car on temporary rails, unloading each sub-stage of the rocket onto the iron wheel carriage, pushing the iron wheel carriage into the factory, and horizontally assembling the rocket; performing a horizontal test on the rocket; the iron wheel carriage drives the rocket out of the factory, and the iron wheel carriage drives the rocket and the erection frame side by side; the truck crane transfers the rocket to the erection frame, the erection frame drives the rocket to stand up and dock with the launch platform, the temperature control equipment supplies air, the fuel is filled, the oxidant is filled, the rocket is inspected before launch, the launch frame is tilted back, and the rocket is ignited and launched.

[0070] The beneficial effects achieved by this application are as follows:

[0071] (1) The present application sets up a factory building near the launch station to be used as a rocket horizontal assembly and test factory, thereby solving the problem of inconvenient transportation of large rockets at a relatively low cost.

[0072] (2) The factory building in this application has no walking function, which is convenient for closure and easy to ensure the temperature, humidity and cleanliness in the factory building. It is only equipped with a light movable gantry crane and only needs to lay a pair of rails, which reduces the construction cost.

[0073] (3) The present application uses an iron wheel frame vehicle to push the entire arrow out of the factory along a temporary rail to a position parallel to the erection frame. There is no need for a matching vehicle for transporting the entire arrow. A truck-mounted crane is used to unload the sub-stage arrow bodies and transfer the entire arrow. There is no need for a matching large truss crane, thereby reducing costs.

[0074] (4) The factory building, gantry crane and rails of this application can be disassembled and transported to other launch stations, which can adapt to multi-station rocket launches.

[0075] In the description of this application, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "plurality" means two or more, unless otherwise clearly and specifically defined.

[0076] In the description of the present application, the word "for example" is used to mean "used as an example, illustration or explanation". Any embodiment described as "for example" in the present application is not necessarily to be construed as being more preferred or advantageous than other embodiments. The following description is given to enable any technician in the field to implement and use the present invention. In the following description, details are listed for the purpose of explanation. It should be understood that a person of ordinary skill in the art can recognize that the present invention can be implemented without using these specific details. In other examples, well-known structures and processes will not be elaborated in detail to avoid obscuring the description of the present invention with unnecessary details. Therefore, the present invention is not intended to be limited to the embodiments shown, but is consistent with the widest scope consistent with the principles and features disclosed in the present application.

[0077] The above description is only an embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.

Claims

1. A three-level mode test and launch system for a large launch vehicle, characterized in that: The system includes: plant, rails, iron wheel carriage, spreader, truck crane, erection frame and launching platform; The rails are laid starting from the factory building and extending outward to the launching station; The iron wheel frame vehicle is movably connected to the rail; The truck crane is arranged beside the rails, and the hoist is arranged on the truck crane. The truck crane and the hoist are used to transfer the rocket from the iron wheel frame vehicle to the erection frame; The erection frame is docked with the launch platform, and the erection frame is used to erect the rocket onto the launch platform.

2. The large launch vehicle three-level mode test and launch system according to claim 1, characterized in that: The rails include a first rail and a second rail; The first track and the second track are arranged in parallel, and a connecting rod is fixedly connected between the first track and the second track; The first rail and the second rail both include a rail bottom, a rail head and a rail waist; The rail bottom and the rail head are connected via the rail waist.

3. The large launch vehicle three-level mode test and launch system according to claim 2 is characterized in that: A circular through hole is provided in the middle of the rail waist; Two ends of the connecting rod pass through the circular through hole of the rail waist of the first rail and the circular through hole of the rail waist of the second rail respectively, and two ends of the connecting rod are threadedly connected with nuts.

4. The large launch vehicle three-level mode test and launch system according to claim 2, characterized in that: The iron wheel frame vehicle comprises a frame body, a bracket and iron wheels. The bracket is arranged on the top of the frame, and the bracket is used to place the rocket; The iron wheel is arranged at the bottom of the frame, the iron wheel is slidably connected to the rail, and the contact surface between the iron wheel and the rail head is a conical surface.

5. The large launch vehicle three-level mode test and launch system according to claim 1, characterized in that: The rails are arranged parallel to the erecting frame.

6. The large launch vehicle three-level mode test and launch system according to claim 1, characterized in that: The iron wheel frame vehicle comprises a plurality of; A plurality of the iron wheel frame vehicles are spaced apart and arranged on the rails for transferring rockets.

7. The large launch vehicle three-level mode test and launch system according to claim 1, characterized in that: A guide groove is excavated directly below the launch platform, and the launch platform is located above the guide groove opening; After the rocket is ignited, the gas flow generated by the tail flame of the rocket engine is discharged through the guide groove.

8. The large launch vehicle three-level mode test and launch system according to claim 1, characterized in that: A gantry crane is arranged in the factory building.

9. The large launch vehicle three-level mode test and launch system according to claim 1, characterized in that: The system also includes temperature control equipment, The temperature control device is used to supply air to the rocket fairing.

10. A rocket launching method, characterized in that: The three-level mode test and launch system for a large launch vehicle according to any one of claims 1 to 9, wherein the launch method comprises the following steps: Conduct horizontal testing of the rocket; After the horizontal test of the rocket is completed, the rocket is moved from the factory along the rails to a position parallel to the erection frame by the iron wheel frame vehicle; Transferring the rocket to the erection frame by means of the truck-mounted crane and the sling; The erection frame is erected, the rocket is in a vertical state, and the rocket is docked with the launch pad; Use temperature control equipment to supply air to the rocket fairing according to the requirements of the payload in the rocket fairing; The incendiary agent filling equipment fills incendiary agent into the rocket tank, and the cryogenic propellant filling equipment fills in cryogenic propellant into the rocket tank; After the rocket completes the pre-launch inspection, the erection frame is tilted back and the rocket is ignited and launched.