Traffic control system based on universal ball net belt, track and vehicle supporting plate
By using a universal ball mesh belt and a carriage disc at the intersection, the vehicles are automatically passed in sequence, solving the problem of urban traffic congestion and achieving a fast, safe and economical traffic flow.
Patent Information
- Application Number
- CN202411583030.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-07
- Publication Date
- 2025-03-07
AI Technical Summary
Urban traffic congestion is serious. Traditional traffic light control causes serious traffic congestion during peak hours. The cost of building bridges and islands is high, and it occupies a large amount of land resources.
An intelligent traffic control system with universal ball mesh belt and a cycling plate is adopted. Universal ball mesh belt is laid at the intersection, combining the cycling plate and track, so that the vehicle can automatically move in a predetermined order, so as to achieve a quick, safe and smooth passage through the intersection without waiting for signal lights.
The traditional traffic light waiting time is eliminated, the operation efficiency of the traffic system is improved, and the rapid, safe and orderly traffic flow is achieved, with low cost and small footprint.
Smart Images

Figure FT_1 
Figure FT_2
Abstract
Description
Technical fields: This invention relates to the field of urban traffic management technology, and in particular to a method and device for enabling vehicles to pass safely and efficiently through intersections without waiting for traffic lights by using a universal ball bearing conveyor belt and a trolley tray. Background technology: With the acceleration of urbanization, urban traffic congestion has become increasingly serious. Traditional traffic control methods, such as traffic lights, can ensure traffic safety to a certain extent, but often cause severe traffic jams during peak hours. Alternatively, people generally don't want to wait at traffic lights. While building overpasses and roundabouts can alleviate some traffic pressure, they are costly and consume large amounts of land. Therefore, finding an economical and efficient urban transportation solution is particularly important.
[0002] Vehicle Entry: When a vehicle enters its designated lane, the omnidirectional ball-bearing conveyor belt transfers the vehicle to the pallet. The conveyor belt under the pallet then transports both the pallet and the vehicle to the intersection of the tracks. The pallet is then released, and the vehicle is thrown off due to inertia. At the intersection, the omnidirectional ball-bearing conveyor belt accurately transfers the vehicle to the next pallet. This process continues until the intersection is cleared. Vehicles are then promptly driven away. The order of vehicle transport on the pallets is as follows: vehicles traveling straight are transported first, followed by vehicles traveling horizontally, then vehicles turning left from the opposite lane, and finally vehicles turning left from the opposite lane. This cycle repeats. If a smart camera at the intersection detects an accident, the omnidirectional ball-bearing conveyor belt stops operating. Resuming operation requires assessment by traffic personnel. After the system stops, traffic can continue as directed by traffic lights. The above achieves the goal of allowing vehicles to pass through intersections without waiting for traffic lights, overpasses, or roundabouts. Note: The pallet is fixed to the track and is transported by a swivel ball-bearing conveyor belt. When the vehicle reaches the end of the track section at the intersection, it is transported back to the starting point of the track from below, ensuring the vehicle is fully under the pallet and ready to transport the next vehicle. Note that the left and right pallets on the track are not connected; they are continuous. The lane starts operating when the system detects four wheels on the pallet, indicating a vehicle is present. Otherwise, it does not operate. Attached image description:
[0003] Figure 1 For track lines, track intersections.
[0004] Figure 2 It is a universal ball bearing conveyor belt, inspired by the steering and transmission systems used on assembly lines.
[0005] Figure 3 Example of a track intersection point.
[0006] The red box indicates the area covered by the universal ball bearing conveyor belt, and the area inside the red box is the vehicle pallet located on the universal ball bearing conveyor belt.
[0007] The rod-like structure in the middle of the trolley tray is the track. The red-framed area is the omnidirectional ball bearing belt at the track intersection point. Note that there is no track at the intersection point, only the omnidirectional ball bearing belt. Summary of the Invention:
[0011] This invention provides an intelligent traffic control system based on a universal ball bearing mesh belt and a trolley tray. By laying a universal ball bearing mesh belt at an intersection and combining it with a trolley tray and rails, vehicles can move automatically in a predetermined sequence, thus allowing them to pass through the intersection quickly, safely, and smoothly without waiting for traffic lights. Detailed implementation method:
[0012] 1. System Composition:
[0013] Universal ball bearing conveyor belt: laid on the ground of intersections and lanes to support the movement of pallets or cars.
[0014] Tray: Fixed to the rails, used to carry and secure vehicles, which are transported by an omnidirectional ball-bearing conveyor belt below. The system operates according to a fixed sequence of passing vehicles.
[0015] 2. Working principle:
[0016] Vehicle entry: When a vehicle enters the corresponding lane, the omnidirectional ball bearing conveyor belt will transfer the vehicle to the pallet when the system reaches this track.
[0017] Tray securing: Secure the vehicle once it arrives at the designated location.
[0018] Sequential transport: The central controller controls the transport of pallets according to a predetermined sequence, transporting vehicles sequentially through the intersection. The specific sequence is as follows:
[0019] 1. Vertical Straight Movement: First, transport vehicles that move straight in the vertical direction.
[0020] 2. Lateral Straight-Ahead: Then, the vehicle will be transported in a straight-ahead direction in the lateral direction.
[0021] 3. Vertical left turn: Then transport vehicles turning left from the opposite lane in the vertical direction.
[0022] 4. Lateral left turn: Finally, it delivers vehicles turning left from the opposite lane in the lateral direction.
[0023] Pallet transport: The pallet is transported to the track junction point by the omnidirectional ball bearing belt below. After reaching the end, the fixing is released, and the vehicle is thrown off the pallet by inertia and accurately transferred to the next track pallet by the omnidirectional ball bearing belt at the junction point.
[0024] Tray return: After the vehicle body is completely off the tray, it returns to the starting point of the track below the track intersection point to wait for the transport of the next vehicle.
[0025] Cyclic operation: After completing one round of delivery, the system returns to its initial state and prepares to receive the next vehicle.
[0026] Each lane carries only one vehicle at a time through the intersection. After passing through, the system cycles through the intersection. When the vehicle returns to the same lane, the omnidirectional ball bearing conveyor belt carries the parked vehicle into the pallet, starting the second transfer.
[0027] 3. Security Mechanism:
[0028] Smart cameras: Installed above intersections, they monitor traffic conditions in real time. Upon detecting an accident or other anomaly, the smart cameras immediately notify the central controller.
[0029] Emergency Stop: Upon receiving an abnormal signal, the central controller will immediately stop the operation of all omnidirectional ball bearing conveyors and trolley trays, and activate the traffic personnel intervention mode to ensure on-site safety.
[0030] advantage:
[0031] Improved efficiency: Eliminating waiting time caused by traditional traffic lights improves the overall efficiency of the transportation system, ensuring speed, safety, and order.
[0032] Cost-effective: Compared with building large-scale infrastructure such as overpasses, the implementation cost of this invention is lower and the footprint is smaller.
Claims
1. A traffic control system based on a universal ball mesh belt, a track and a vehicle tray, characterized in that: It includes a universal ball mesh belt laid on the ground of each lane at the intersection; A tray fixed on the track, used to carry and fix the vehicle; A central controller for controlling the transport of the pallets in a predetermined sequence; The tray is transported to the track intersection by the universal ball mesh belt below. When it reaches the end, the fixing device is released, and the vehicle is thrown off the tray by inertia and accurately transferred to the tray of the lower track by the universal ball mesh belt at the intersection. The pallet returns to the starting point of the track below the track intersection, waiting to transport the next car.
2. The traffic control system according to claim 1, characterized in that: The universal ball mesh belt can adjust the rolling direction as needed to guide the vehicle to travel along a specific path.
3. The traffic control system according to claim 1, characterized in that: The vehicle tray is fixed on the track, and the left and right trays of the track are not connected but continuous.
4. The traffic control system according to claim 1, characterized in that: The system also includes a smart camera installed above the intersection to monitor traffic conditions in real time; once an accident or other abnormal situation is detected, the smart camera will immediately stop the operation of all universal ball mesh belts and tow plates, and start the traffic personnel intervention mode to ensure on-site safety.
5. The traffic control system according to claim 1, characterized in that: The central controller controls the transport of the pallet in the following order:
1. First, transport the straight-moving vehicle in the vertical direction; 2. Then transport the straight-moving vehicle in the horizontal direction; 3. Then transport the left-turning vehicle in the opposite lane in the vertical direction; 4. Finally, transport the left-turning vehicles in the opposite lane in the lateral direction.
6. The traffic control system according to claim 1, characterized in that: The tray returns to the starting point of the track below the track intersection, waiting to transport the next car, and each track only carries one car through the intersection and passes through the intersection at a time.
7. The traffic control system according to claim 1, characterized in that: The system also includes a sensing device on the track, which is used to sense that there are four wheels on the vehicle tray, that is, the track starts to run when there is a vehicle, otherwise it does not run.
8. The traffic control system according to claim 1, characterized in that: The vehicle tray fixing device can ensure that the vehicle does not slide during transportation, thereby ensuring safety and stability.
9. The traffic control system according to claim 1, characterized in that: The system reduces the occurrence rate of traffic accidents by accurately controlling the driving path of each vehicle and the transportation of the tow tray.
10. The traffic control system according to claim 1, characterized in that: The system eliminates the waiting time caused by traditional traffic lights and improves the operating efficiency of the entire traffic system. Claim 1: Summarizes the overall structure and main components of the system. Claims 2-10: describe in detail each specific feature and function of the system to ensure that all important aspects of the invention are covered.