Emergency response method for customer power loss
Through the business system, the customer's power consumption status is automatically judged and the emergency fault response is initiated, which solves the problem of slow acquisition of the power supply system and single judgment logic when the customer loses power, and achieves fast and accurate emergency response.
Patent Information
- Application Number
- CN202411623579.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-14
- Publication Date
- 2025-03-11
AI Technical Summary
The existing power supply system is not fast enough to obtain power loss when the customer loses power, and the information interaction takes a long time, which may lead to information backflow. The customer's power loss judgment logic is single and the accuracy is low.
Automatically judge the customer's power consumption status through the business system, start emergency fault responses based on the customer classification level and the full factor database, and automatically push power loss information to multi-level objects.
It solves the problems of insufficient power loss acquisition, long information interaction, information backflow, single logic and low accuracy in customer power loss judgment, and fast and accurate customer power loss emergency response.
Smart Images

Figure CN119602462A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of emergency response, and in particular to an emergency response method for power outage of a customer. Background Art
[0002] The transmission network is a power transmission network that connects power plants, substations or substations, and is mainly responsible for the transmission of electric energy. According to the transmission voltage, it can be divided into high-voltage transmission network, extra-high-voltage transmission network and ultra-high-voltage transmission network;
[0003] The transmission network is composed of transmission equipment and substation equipment. The transmission equipment mainly includes transmission lines, towers, insulator strings, empty lines, etc. The substation equipment mainly includes transformers, reactors, capacitors, circuit breakers, grounding switches, lightning arresters, voltage transformers, current transformers, as well as power protection, monitoring, control, and communication systems.
[0004] In recent years, due to the aging of power supply lines and equipment, busbar tripping accidents have occurred from time to time in transmission lines, resulting in a greater risk to the quality of power supply services. When a customer loses power, the existing power supply system is not fast enough to obtain power outage information, and each professional and level needs to be notified by telephone step by step. The information exchange takes a long time and may cause information backflow. In addition, the logic for judging customer power outages is single and has low accuracy. Summary of the invention
[0005] The present invention provides an emergency response method for power outage of a customer, which automatically pushes power outage information to multi-level objects to solve the problems of time-consuming information interaction and information backflow.
[0006] According to an embodiment of the present invention, a method for emergency response to power outage of a customer includes:
[0007] Obtain the customer's electricity consumption information and the importance of electricity consumption, sort and classify them, obtain the customer classification level and establish a full-factor database; the customer classification level includes: important customers, livelihood customers, sensitive customers and concerned customers;
[0008] Determine the customer's electricity usage status through the business system; the business system includes: measurement center, RPA, procurement system, real-time dispatching system and new load management system;
[0009] Initiate emergency fault response based on customer classification level, full-factor database and customer's power usage status.
[0010] As an embodiment of the present invention, judging the power usage status of a customer through the business data of a business system includes:
[0011] When the measurement center extracts the switch position change signal of the customer's dedicated substation, the tripping status of the two power supplies is determined according to the switch position change signal; if both power supplies are tripped, the customer's power status is determined to be a power failure state, and message data is generated; if one power supply is tripped, the customer's power status is determined to be a warning state, and the warning process is started;
[0012] When the measurement center extracts the voltage information of the line where the special transformer is located or the high- and low-voltage sides of the special transformer, it determines whether there is a voltage loss based on the voltage information of the line where the special transformer is located or the high- and low-voltage sides of the special transformer; if there is a voltage loss, it determines that the customer's power consumption status is a power loss state and generates message data;
[0013] When the measurement center extracts the customer's on-off switch signal, it determines whether to trip based on the customer's on-off switch signal; if tripped, and the comprehensive current and load conditions determine that the customer has lost power, the customer's power status is determined to be a power-off state, and message data is generated; if tripped, and the comprehensive current and load conditions determine that the customer has not lost power, the customer's power status is determined to be a warning state, and the warning process is started; if not tripped, when the current and load are abnormal, the customer's power status is determined to be a power-off state, and message data is generated;
[0014] When the measurement center extracts the switch signals of the customer's ring main unit and branch box, it determines whether to trip based on the switch signals of the customer's ring main unit and branch box; if it trips, and the comprehensive current and load conditions determine that the customer has lost power, the customer's power status is determined to be a power-off state, and message data is generated; if it trips, and the comprehensive current and load conditions determine that the customer has not lost power, the customer's power status is determined to be a warning state, and the warning process is initiated; if it does not trip, when the current and load are abnormal, the customer's power status is determined to be a power-off state, and message data is generated.
[0015] As an embodiment of the present invention, the real-time scheduling system includes: a dedicated line customer monitoring module;
[0016] Judging the customer's electricity usage status through the business data of the business system also includes:
[0017] The dedicated customer monitoring module periodically obtains the customer's voltage, current and power. If the voltage and power are zero, the customer's power status is determined to be a power-off state, and message data is generated; if the current and power are less than 40% of the average current and power within the preset period, the corresponding staff is reminded to verify the cause.
[0018] As an embodiment of the present invention, judging the power usage status of a customer through the business data of the business system also includes:
[0019] The new load management system is used to monitor changes in important customers and people's livelihood customers. When changes occur, text messages are sent to the corresponding staff.
[0020] As an embodiment of the present invention, judging the power usage status of a customer through the business data of the business system also includes:
[0021] RPA is used to periodically obtain the energy meter information of the two power supplies of the customer in the procurement system, and determine whether the customer has lost voltage based on the energy meter information of the two power supplies. If the energy meter information of both power supplies shows loss of voltage, the customer's power usage status is determined to be a power loss state; if the energy meter information of only one power supply shows loss of voltage, the customer's power usage status is determined to be a warning state, and the warning process is initiated.
[0022] As an embodiment of the present invention, judging the power usage status of a customer through the business data of the business system also includes:
[0023] Obtain the information record of power outage preparation;
[0024] Through RPA, we can obtain the customer's actual power outage and power supply information based on the dedicated line, dedicated transformer, and substation data of the procurement system;
[0025] Determine whether the prepared power outage information ledger is the same as the actual power outage information ledger; if not, determine the customer's power status as a power outage state, and count the number of households with power outages and the number of frequent power outages.
[0026] As an embodiment of the present invention, an emergency fault response is initiated according to the customer classification level, the full factor database and the customer's power consumption status, including:
[0027] When the customer's power status is power outage and the customer's customer classification level is an important customer, the message data is obtained, and a preliminary disposal group and an analysis and judgment command group are established based on the full-factor database, and the relevant staff are automatically notified by phone and text message to carry out preliminary disposal and analysis work;
[0028] When the customer's power status is outage and the customer's customer classification level is not an important customer, the message data is obtained and pushed to the corresponding regional power outage handling group and the corresponding power supply station power outage handling group based on the full-factor database. Relevant personnel are automatically notified by phone and text message to carry out fault handling work, and the top level of the fault is determined according to the number of power outages and the number of frequent power outages, and a list of customers of the customer classification level involved is automatically pushed.
[0029] Compared with the prior art, the present invention has the following beneficial effects: the customer's power usage status is automatically judged through the business system, and when it is judged to be a power outage, an emergency fault response is immediately initiated, which solves the problem that the speed of obtaining the power outage situation is not fast enough, and telephone notifications are required at each professional and level step by step, information exchange is time-consuming, information is backflowed, the customer's power outage judgment logic is single, and the accuracy is low. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1Schematic diagram of a flow chart of an embodiment of the present invention. DETAILED DESCRIPTION
[0031] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0032] like Figure 1 As shown, an embodiment of the present invention provides an emergency response method for a customer power outage, including:
[0033] Obtain the customer's electricity consumption information and the importance of electricity consumption, sort and classify them, obtain the customer classification level and establish a full-factor database; the customer classification level includes: important customers, livelihood customers, sensitive customers and concerned customers;
[0034] Determine the customer's electricity usage status through the business system; the business system includes: measurement center, RPA, procurement system, real-time dispatching system and new load management system;
[0035] Initiate emergency fault response based on customer classification level, full-factor database and customer power usage status;
[0036] The working principle of the above technical solution is as follows: In actual use, according to the importance of customers' electricity consumption, customer classification management is strengthened, and customers are divided into four types: important customers, livelihood customers, sensitive customers, and concerned customers. The classification standards are clarified to facilitate hierarchical management and control; at the same time, electricity consumption information of four types of customers is collected and sorted, and the electricity consumption information includes electricity consumption address, power supply line, substation, power supply station, grid manager and other contents, and a full-factor database is established; then the customer's electricity consumption status is judged through the business system, that is, a multi-dimensional channel trigger mechanism is established, and according to the different electricity consumption categories used by customers, such as dedicated lines, dedicated transformers, power supply transfers, and public transformers, corresponding technical means are adapted for monitoring important, livelihood, sensitive, and concerned customers, and a multi-dimensional channel trigger mechanism is established; data information such as measurement centers, real-time dispatching systems, new load management systems, procurement systems, and RPA are obtained, and a variety of technical routes are proposed to determine the customer's electricity consumption status; various technical routes use a parallel method to monitor customers uninterruptedly, so that suspected power outages are not let go; finally, emergency fault response is initiated according to customer classification levels, full-factor databases, and customer electricity consumption status;
[0037] The beneficial effects of the above technical solution: Through the above technical solution, the customer's power usage status is automatically judged through the business system. When it is judged to be a power outage, the emergency fault response is immediately initiated, which solves the problem that the speed of obtaining the power outage situation is not fast enough, and each professional and level needs to be notified by telephone step by step, the information exchange takes a long time, information backflows, the customer's power outage judgment logic is single, and the accuracy is low.
[0038] In one embodiment, judging the power usage status of a customer through the business data of a business system includes:
[0039] When the measurement center extracts the switch position change signal of the customer's dedicated substation, the tripping status of the two power supplies is determined according to the switch position change signal; if both power supplies are tripped, the customer's power status is determined to be a power failure state, and message data is generated; if one power supply is tripped, the customer's power status is determined to be a warning state, and the warning process is started;
[0040] When the measurement center extracts the voltage information of the line where the special transformer is located or the high- and low-voltage sides of the special transformer, it determines whether there is a voltage loss based on the voltage information of the line where the special transformer is located or the high- and low-voltage sides of the special transformer; if there is a voltage loss, it determines that the customer's power consumption status is a power loss state and generates message data;
[0041] When the measurement center extracts the customer's on-off switch signal, it determines whether to trip based on the customer's on-off switch signal; if tripped, and the comprehensive current and load conditions determine that the customer has lost power, the customer's power status is determined to be a power-off state, and message data is generated; if tripped, and the comprehensive current and load conditions determine that the customer has not lost power, the customer's power status is determined to be a warning state, and the warning process is started; if not tripped, when the current and load are abnormal, the customer's power status is determined to be a power-off state, and message data is generated;
[0042] When the measurement center extracts the switch signals of the customer's ring main unit and branch box, it determines whether to trip based on the switch signals of the customer's ring main unit and branch box; if tripped, and the comprehensive current and load conditions determine that the customer has lost power, the customer's power status is determined to be a power-off state, and message data is generated; if tripped, and the comprehensive current and load conditions determine that the customer has not lost power, the customer's power status is determined to be a warning state, and the warning process is started; if not tripped, when the current and load are abnormal, the customer's power status is determined to be a power-off state, and message data is generated;
[0043] The real-time dispatching system includes: dedicated line customer monitoring module;
[0044] Judging the customer's electricity usage status through the business data of the business system also includes:
[0045] The dedicated line customer monitoring module periodically obtains the customer's voltage, current and power. If the voltage and power are zero, the customer's power status is determined to be a power failure state, and message data is generated; if the current and power are less than 40% of the average current and power within the preset period, the corresponding staff is reminded to verify the cause;
[0046] Judging the customer's electricity usage status through the business data of the business system also includes:
[0047] The new load management system monitors changes in important customers and livelihood customers, and sends text messages to corresponding staff when changes occur;
[0048] Judging the customer's electricity usage status through the business data of the business system also includes:
[0049] RPA is used to periodically obtain the energy meter information of the two power supplies of the customer in the procurement system, and determine whether the customer has lost voltage based on the energy meter information of the two power supplies. If the energy meter information of both power supplies indicates that the customer has lost voltage, the customer's power consumption status is determined to be a power loss status. If the energy meter information of only one power supply indicates that the customer has lost voltage, the customer's power consumption status is determined to be a warning status, and the warning process is initiated.
[0050] Judging the customer's electricity usage status through the business data of the business system also includes:
[0051] Obtain the information record of power outage preparation;
[0052] Through RPA, we can obtain the customer's actual power outage and power supply information based on the dedicated line, dedicated transformer, and substation data of the procurement system;
[0053] Determine whether the power outage information ledger is the same as the actual power outage information ledger; if not, determine that the customer's power status is a power outage state, and count the number of households with power outages and the number of frequent power outages;
[0054] The working principle and beneficial effects of the above technical solutions: by establishing a multi-dimensional channel trigger mechanism, that is, proposing a variety of technical routes to determine the customer's electricity usage status; various technical routes use a parallel approach to monitor customers uninterruptedly, so as to ensure that no suspected power outage is missed; Technical Route 1: Extract data modeling through the measurement center, extract the switch change signal of the user's dedicated substation, automatically judge the tripping of the substation bus, outgoing line, etc., and generate message data; if two power sources trip, it is determined to be a power outage, and if one power source trips, it is determined that the power supply reliability is reduced, and it is necessary to pay more attention and start the early warning process; Technical Route 2: Extract the voltage information of the line where the dedicated transformer is located or the high and low voltage sides of the dedicated transformer through the measurement center, and generate message data in case of voltage loss; Technical Route 3: Extract the switch signal of the user's switch station through the measurement center, and issue an early warning in case of tripping, and judge whether it is comprehensive current and load conditions Power outage, generate message data; if the switch does not trip, but the current and load are abnormal, it is preliminarily determined that the customer-side fault is caused, and generate message data; Technical Route 4: Extract the switch signals of the user's ring network cabinet and branch box through the measurement center, and issue an alarm if they trip, and start the alarm process; comprehensively determine whether there is a power outage based on the current and load conditions, and generate message data; if the switch does not trip, but the current and load are abnormal, it is preliminarily determined that the customer-side fault is caused, and generate message data; Technical Route 5: Establish a dedicated line user monitoring module in the real-time scheduling system, periodically (preferably once a minute) collect voltage, current, power and other data, and comprehensively judge whether the customer has lost power; if the voltage and power are zero, it is determined that the user has lost power; if the current and power are reduced by more than 40% compared with the average of the previous 7 days, and combined with the SCADA curve to judge that the customer-side load is reduced, remind the staff to verify the cause. Technical Route 6: Through the monitoring of abnormal changes of important / civilian users in the new power system, text messages are automatically sent to the marketing department management personnel to organize on-site verification and fault rescue work; Technical Route 7: Through the RPA regular use of the system to measure the user's voltage in real time to determine whether there is a power outage; collect the voltage loss of the electric energy meter of two power supplies to determine a power outage; collect the voltage loss of the electric energy meter of one power supply to determine that the customer's power supply reliability has decreased; Technical Route 8: By collecting terminal data from dedicated lines, dedicated transformers, and substations, use RPA to export the power outage information ledger, match the four types of customer ledgers, and determine whether the customer has lost power; Among them, the early warning process is preferably to notify the relevant staff through text messages for processing.
[0055] In one embodiment, an emergency fault response is initiated based on the customer classification level, the full factor database, and the customer's power usage status, including:
[0056] When the customer's power status is power outage and the customer's customer classification level is an important customer, the message data is obtained, and a preliminary disposal group and an analysis and judgment command group are established based on the full-factor database, and the relevant staff are automatically notified by phone and text message to carry out preliminary disposal and analysis work;
[0057] When the customer's power consumption status is power outage, and the customer's customer classification level is not an important customer, the message data is obtained and pushed to the corresponding regional power outage handling group and the corresponding power supply station power outage handling group based on the full-factor database, and the relevant staff are automatically notified by phone and SMS to carry out fault handling work, and the top level of the fault is defined according to the number of power outage households and the number of frequent power outages, and a customer list of the customer classification level involved is automatically pushed;
[0058] The working principle and beneficial effects of the above technical solution are as follows: according to the importance of the customer, establish the standards for initiating emergency and fault response; divide the customer power outage response into four stages: initiating consultation, consultation and analysis, response disposal, and response review; in the initiating consultation stage, if the customer's power status is a power outage and the customer's customer classification level is an important customer, RPA automatically captures the message data and triggers the establishment of a group, that is, an early disposal group and an analysis and judgment command group are established based on the full-factor database, and automatically notifies relevant staff by phone and text message to carry out early disposal and analysis work. At the same time, it automatically pushes a list of four types of customers and a one-household-one-policy emergency protection plan; and when the customer's power status is a power outage and the customer classification level is not When it is an important customer, RPA automatically captures message data and pushes it to the group. Based on the full-factor database, it pushes it to the corresponding regional power outage handling group and the corresponding power supply station power outage handling group, automatically notifies relevant staff by phone and text message to carry out fault handling work, and defines the top level of faults according to the number of power outages and the number of frequent power outages, and automatically pushes a list of customers involved in the customer classification level; subsequent consultation and judgment, response and handling, and response review are generally conducted by staff in the consultation and judgment stage, holding a telephone conference, verifying the incident situation, and proposing response classification suggestions. After approval by the commander-in-chief, the fault response is initiated, and the initial information reporting caliber is determined; in the response and handling stage, standard terms and push materials within the group are sorted out in advance, and work tasks are assigned. During the response review stage, improvement measures are proposed to optimize processes and fill in missing links in multiple dimensions such as power grid planning, fault repair, and customer service. Each stage will be different and can be carried out according to the execution standards set in advance for each classification level. For example, the consultation and assessment of important customers is to hold a telephone conference through iState Grid to verify the incident situation, put forward response classification suggestions, and initiate fault response after approval by the commander-in-chief; determine the scope of initial information reporting, and the company leaders and professional departments shall report to the counterparts according to the division of responsibilities; response and disposal is to establish a professional disposal group and assign tasks; each professional department shall promptly feedback the situation to the group; guide customers to start the second power supply or self-provided emergency power supply to provide grid services and stability maintenance in accordance with the division of tasks; response review is to optimize processes and fill in missing links in multiple dimensions such as power grid planning, fault repair, and customer service; dual power supplies are used at the same site for important customers; among them, the customer classification level list is established when the customer classification level is divided.
[0059] In one embodiment, digital intelligence support is strengthened to establish a customer electricity monitoring platform. Based on the energy big data application support platform, combined with business professional platforms such as the power grid map, PMS3.0, procurement system, marketing service system, and dispatching system, digital tools such as process robots, measurement centers, and data middle platforms are used to establish a panoramic display platform for electricity monitoring visualization. The customer's power supply voltage, current and other information are displayed in real time, and early warning reminders are issued for power failures; at the same time, the power-on and power-off events, equipment operating status, and power outage repair work order information are connected to display the progress stage of power outage disposal, helping monitoring personnel to understand the customer's electricity usage.
[0060] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. An emergency response method for a customer power outage, characterized in that: include: Obtain the customer's electricity consumption information and the importance of electricity consumption, sort and classify them, obtain the customer classification level and establish a full-factor database; the customer classification level includes: important customers, livelihood customers, sensitive customers and concerned customers; Determine the customer's electricity usage status through the business system; the business system includes: measurement center, RPA, procurement system, real-time dispatching system and new load management system; Initiate emergency fault response based on customer classification level, full-factor database and customer's power usage status.
2. The method for emergency response to power outage of a customer according to claim 1, characterized in that: The customer's electricity usage status is determined through the business data of the business system, including: When the measurement center extracts the switch position change signal of the customer's dedicated substation, the tripping status of the two power supplies is determined according to the switch position change signal; if both power supplies are tripped, the customer's power status is determined to be a power failure state, and message data is generated; if one power supply is tripped, the customer's power status is determined to be a warning state, and the warning process is started; When the measurement center extracts the voltage information of the line where the special transformer is located or the high- and low-voltage sides of the special transformer, it determines whether there is a voltage loss based on the voltage information of the line where the special transformer is located or the high- and low-voltage sides of the special transformer; if there is a voltage loss, it determines that the customer's power consumption status is a power loss state and generates message data; When the measurement center extracts the customer's on-off switch signal, it determines whether to trip based on the customer's on-off switch signal; if tripped, and the comprehensive current and load conditions determine that the customer has lost power, the customer's power status is determined to be a power-off state, and message data is generated; if tripped, and the comprehensive current and load conditions determine that the customer has not lost power, the customer's power status is determined to be a warning state, and the warning process is started; if not tripped, when the current and load are abnormal, the customer's power status is determined to be a power-off state, and message data is generated; When the measurement center extracts the switch signals of the customer's ring main unit and branch box, it determines whether to trip based on the switch signals of the customer's ring main unit and branch box; if it trips, and the comprehensive current and load conditions determine that the customer has lost power, the customer's power status is determined to be a power-off state, and message data is generated; if it trips, and the comprehensive current and load conditions determine that the customer has not lost power, the customer's power status is determined to be a warning state, and the warning process is initiated; if it does not trip, when the current and load are abnormal, the customer's power status is determined to be a power-off state, and message data is generated.
3. The method for emergency response to power outage of a customer according to claim 1, characterized in that: The real-time dispatching system includes: dedicated line customer monitoring module; Judging the customer's electricity usage status through the business data of the business system also includes: The dedicated customer monitoring module periodically obtains the customer's voltage, current and power. If the voltage and power are zero, the customer's power status is determined to be a power-off state, and message data is generated; if the current and power are less than 40% of the average current and power within the preset period, the corresponding staff is reminded to verify the cause.
4. The method for emergency response to power outage of a customer according to claim 1, characterized in that: Judging the customer's electricity usage status through the business data of the business system also includes: The new load management system is used to monitor changes in important customers and people's livelihood customers. When changes occur, text messages are sent to the corresponding staff.
5. The method for emergency response to power outage of a customer according to claim 1, characterized in that: Judging the customer's electricity usage status through the business data of the business system also includes: RPA is used to periodically obtain the energy meter information of the two power supplies of the customer in the procurement system, and determine whether the customer has lost voltage based on the energy meter information of the two power supplies. If the energy meter information of both power supplies shows loss of voltage, the customer's power usage status is determined to be a power loss state; if the energy meter information of only one power supply shows loss of voltage, the customer's power usage status is determined to be a warning state, and the warning process is initiated.
6. The method for emergency response to power outage of a customer according to claim 1, characterized in that: Judging the customer's electricity usage status through the business data of the business system also includes: Obtain the information record of power outage preparation; Through RPA, we can obtain the customer's actual power outage and power supply information based on the dedicated line, dedicated transformer, and substation data of the procurement system; Determine whether the prepared power outage information ledger is the same as the actual power outage information ledger; if not, determine the customer's power status as a power outage state, and count the number of households with power outages and the number of frequent power outages.
7. The method for emergency response to power outage of a customer according to claim 6, characterized in that: Initiate emergency fault response based on customer classification level, full-factor database and customer power usage status, including: When the customer's power status is power outage and the customer's customer classification level is an important customer, the message data is obtained, and a preliminary disposal group and an analysis and judgment command group are established based on the full-factor database, and the relevant staff are automatically notified by phone and text message to carry out preliminary disposal and analysis work; When the customer's power status is outage and the customer's customer classification level is not an important customer, the message data is obtained and pushed to the corresponding regional power outage handling group and the corresponding power supply station power outage handling group based on the full-factor database. Relevant personnel are automatically notified by phone and text message to carry out fault handling work, and the top level of the fault is determined according to the number of power outages and the number of frequent power outages, and a list of customers of the customer classification level involved is automatically pushed.