Route verification method, system and device based on transportation feasibility
By introducing a route verification method for transportation feasibility in logistics transportation, the problem of lack of verification after transportation route planning is solved, ensuring the reliability of transportation routes, reducing transportation delays and cost increase.
Patent Information
- Application Number
- CN202411906154.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-04-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During logistics and transportation, there is a lack of verification steps after the transportation route planning, resulting in transportation delays and increased costs.
A route verification method based on transportation feasibility is proposed. By obtaining the target transportation route of the transport vehicle, comparing the checked routes within the set period, and determining whether there are abnormalities in the transportation nodes and road sections. If there is, the route will be replaced or rematched.
By verifying the abnormalities in the transportation nodes of the transportation route and making corresponding adjustments, we will ensure the reliability of the transportation route and reduce transportation delays and cost increase.
Smart Images

Figure CN119809500A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of logistics technology, and in particular to a route verification method, system and device based on transportation feasibility. Background Art
[0002] Logistics is the entire process of planning, implementing and managing the transportation, storage and distribution of raw materials, semi-finished products, finished products and related information from the place of production to the place of consumption of goods in order to meet the needs of customers at the lowest cost.
[0003] During the current logistics transportation process, the vehicle-cargo matching platform usually plans transportation routes for drivers based on factors such as transportation time and cost. However, there is a lack of verification steps after the transportation route is planned. In practice, problems with the route can easily affect the transportation of goods. For example, if cooperation expires or natural disasters occur at some transportation nodes, the platform fails to update data in a timely manner, and the execution of the planned transportation route may lead to transportation delays. Summary of the invention
[0004] In order to solve the technical problems existing in the background technology, the present invention proposes a route verification method, system and device based on transportation feasibility, which solves the problem of lack of verification steps after current transportation route planning.
[0005] The present invention proposes a route verification method based on transportation feasibility, comprising:
[0006] Obtain target transport routes for transport vehicles;
[0007] Comparing the target transport route with verified transport routes within a set period;
[0008] If it is detected that the state of the target transportation route is unverified, determining all transportation nodes on the target transportation route;
[0009] Determine whether there is an abnormality in the transport node;
[0010] If so, determine to replace the abnormal transport node and update the target transport route and send it to the terminal of the transport vehicle, or re-match the target transport route of the transport vehicle;
[0011] If not, confirm that the target transportation route verification has passed.
[0012] As a further improvement of the present invention, if it is detected that the state of the target transportation route is unverified, the method further includes:
[0013] Obtain the transport section composed of adjacent transport nodes;
[0014] Determine whether there is any abnormality in the transport section;
[0015] If so, re-plan the abnormal transport section and update the target transport route and send it to the terminal of the transport vehicle, or re-match the target transport route of the transport vehicle;
[0016] If not, confirm that the target transportation route verification has passed.
[0017] As a further improvement of the present invention, obtaining the target transport route of the transport vehicle includes:
[0018] If it is detected that the status of the target transportation route is verified, obtaining the verification result and processing plan;
[0019] If the verification result is normal, the transport vehicle is determined to perform the freight task according to the target transport route;
[0020] If the verification result is abnormal, the target transportation route is updated according to the processing plan.
[0021] As a further improvement of the present invention, if an abnormality is detected in the transport node, the method further includes:
[0022] Obtaining the fault type and fault level of the transport node;
[0023] Determine a first estimated time for the transport node to return to normal according to the fault type and fault level;
[0024] Obtaining a second estimated time required for the transport vehicle to arrive at the abnormal transport node;
[0025] If the interval between the first estimated time and the second estimated time is not greater than the set threshold time, confirming that the target transportation route verification has passed;
[0026] If the interval between the first estimated time and the second estimated time is longer than the set threshold time, it is determined to replace the abnormal transport node and update the target transport route to send to the terminal of the transport vehicle, or re-match the target transport route of the transport vehicle.
[0027] As a further improvement of the present invention, when determining that there is an abnormal transport section on the target transport route, the method further includes:
[0028] Obtain fault information of abnormal transport sections;
[0029] Determine a first estimated time for eliminating the fault in the abnormal transport section according to the fault information;
[0030] Obtaining a second estimated time required for the transport vehicle to reach the abnormal transport section;
[0031] If the interval between the first estimated time and the second estimated time is not greater than the set threshold time, confirming that the target transportation route verification has passed;
[0032] If the interval between the first estimated time and the second estimated time is longer than a set threshold time, the abnormal transport section is replanned and the target transport route is updated and sent to the terminal of the transport vehicle, or the target transport route of the transport vehicle is rematched.
[0033] As a further improvement of the present invention, after determining whether the transport node has an abnormality or determining whether the transport section has an abnormality, the method further includes: updating the status of the target transport route to verified, and updating the verification result and processing plan of the target transport route according to the determination result.
[0034] The present invention also provides a route verification system based on transportation feasibility, comprising:
[0035] An acquisition module, used for acquiring a target transport route of a transport vehicle;
[0036] A comparison module, used for comparing the target transportation route with verified transportation routes within a set period;
[0037] A determination module, configured to determine all transportation nodes on the target transportation route if it is detected that the status of the target transportation route is unverified;
[0038] A judgment module, used to judge whether there is an abnormality in the transport node;
[0039] The processing module is used to determine whether to replace the abnormal transportation node and update the target transportation route to send to the terminal of the transportation vehicle, or re-match the target transportation route of the transportation vehicle if there is an abnormality in the transportation node; if there is no abnormality in the transportation node, confirm that the target transportation route has passed the verification.
[0040] The present invention also proposes a route verification device based on transport feasibility, comprising: a memory and a processor, wherein the memory is used to store information including program instructions, and the processor is used to control the execution of the program instructions, and when the program instructions are loaded and executed by the processor, the above-mentioned route verification method based on transport feasibility is implemented.
[0041] Beneficial effects:
[0042] The present invention obtains the target transportation route of the transport vehicle; compares the target transportation route with the verified transportation route within a set period; if it is detected that the state of the target transportation route is unverified, determines all the transportation nodes on the target transportation route; determines whether there is an abnormality in the transportation node; if so, determines to replace the abnormal transportation node and update the target transportation route to send it to the terminal of the transport vehicle, or re-matches the target transportation route of the transport vehicle; if not, confirms that the target transportation route has passed the verification. Therefore, by checking the abnormality of the transportation node of the target transportation route and making corresponding adjustments, the reliability of the transportation route is ensured, and the transportation delay and cost increase caused by route problems are reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 A flow chart of a route verification method based on transport feasibility proposed by the present invention;
[0044] Figure 2 The present invention is a flowchart of a route verification method based on transport feasibility proposed in an embodiment of the present invention. DETAILED DESCRIPTION
[0045] like Figure 1 As shown, Figure 1 A flow chart of a route verification method based on transportation feasibility according to an embodiment of the present invention;
[0046] Reference Figure 1 , a route verification method based on transportation feasibility proposed in an embodiment of the present invention includes:
[0047] S10: Obtaining a target transport route for the transport vehicle;
[0048] After the vehicle-cargo matching platform confirms the target transportation route, the following verification steps need to be performed.
[0049] S20: comparing the target transportation route with the verified transportation routes within a set period;
[0050] In some implementations, obtaining the target transportation route of the transportation vehicle includes:
[0051] If it is detected that the status of the target transportation route is verified, obtaining the verification result and processing plan;
[0052] If the verification result is normal, the transport vehicle is determined to perform the freight task according to the target transport route;
[0053] If the verification result is abnormal, the target transportation route is updated according to the processing plan.
[0054] S30: If it is detected that the state of the target transportation route is unverified, determine all transportation nodes on the target transportation route;
[0055] In some implementations, if it is detected that the status of the target transportation route is unverified, the method further includes:
[0056] Obtain the transport section composed of adjacent transport nodes;
[0057] Determine whether there is any abnormality in the transport section;
[0058] If so, re-plan the abnormal transport section and update the target transport route and send it to the terminal of the transport vehicle, or re-match the target transport route of the transport vehicle;
[0059] If not, confirm that the target transportation route verification has passed.
[0060] S40: Determine whether there is an abnormality in the transport node;
[0061] In some implementations, if an abnormality is detected in a transport node, the method further includes:
[0062] S401: Obtain the fault type and fault level of the transport node;
[0063] S402: Determine a first estimated time for the transport node to return to normal according to the fault type and fault level;
[0064] S403: Obtaining a second estimated time required for the transport vehicle to arrive at the abnormal transport node;
[0065] S404: Determine whether the interval between the first estimated time and the second estimated time is not greater than a set threshold time;
[0066] S405: If the interval between the first estimated time and the second estimated time is not greater than the set threshold time, confirming that the target transportation route verification has passed;
[0067] S406: If the interval between the first estimated time and the second estimated time is longer than the set threshold time, determine to replace the abnormal transport node and update the target transport route and send it to the terminal of the transport vehicle, or re-match the target transport route of the transport vehicle.
[0068] S50: If yes, determine to replace the abnormal transport node and update the target transport route and send it to the terminal of the transport vehicle, or re-match the target transport route of the transport vehicle;
[0069] In some implementations, when determining that there is an abnormal transportation section on the target transportation route, the method further includes:
[0070] Obtain fault information of abnormal transport sections;
[0071] Determine a first estimated time for eliminating the fault in the abnormal transport section according to the fault information;
[0072] Obtaining a second estimated time required for the transport vehicle to reach the abnormal transport section;
[0073] If the interval between the first estimated time and the second estimated time is not greater than the set threshold time, confirming that the target transportation route verification has passed;
[0074] If the interval between the first estimated time and the second estimated time is longer than a set threshold time, the abnormal transport section is replanned and the target transport route is updated and sent to the terminal of the transport vehicle, or the target transport route of the transport vehicle is rematched.
[0075] S60: If not, confirm that the target transportation route verification has passed.
[0076] In some implementations, after determining whether the transport node has an abnormality or determining whether the transport section has an abnormality, the method further includes: updating the status of the target transport route to verified, and updating the verification result and processing plan of the target transport route according to the determination result.
[0077] First, obtain the target transport route of the transport vehicle, compare it with the verified routes, identify whether there are verified routes that can be used directly or directly determine the abnormal nodes. If the status of the target transport route is unverified, further determine all the transport nodes on the route. Check each transport node to determine whether there are any abnormalities. Abnormal factors may include expiration of transport node contracts, weather effects, natural disasters, etc.
[0078] Next, abnormal nodes are processed: If there are abnormal nodes, they need to be replaced and the target transportation route is updated. The updated route will be sent to the terminal of the transport vehicle to ensure that the vehicle can travel along the new route. Alternatively, according to the actual situation, the target transportation route of the transport vehicle is re-matched to ensure the feasibility of the route.
[0079] Also, if there are no abnormalities in all transportation nodes, the target transportation route verification is confirmed to have passed, and the vehicle can be transported along this route.
[0080] By comparing and verifying, the reliability of transportation routes is ensured, reducing transportation delays and cost increases caused by route problems.
[0081] The present invention also provides a route verification system based on transportation feasibility, comprising:
[0082] An acquisition module, used for acquiring a target transport route of a transport vehicle;
[0083] A comparison module, used for comparing the target transportation route with verified transportation routes within a set period;
[0084] A determination module, configured to determine all transportation nodes on the target transportation route if it is detected that the status of the target transportation route is unverified;
[0085] A judgment module, used to judge whether there is an abnormality in the transport node;
[0086] The processing module is used to determine whether to replace the abnormal transportation node and update the target transportation route to send to the terminal of the transportation vehicle, or re-match the target transportation route of the transportation vehicle if there is an abnormality in the transportation node; if there is no abnormality in the transportation node, confirm that the target transportation route has passed the verification.
[0087] The present invention also proposes a route verification device based on transport feasibility, comprising: a memory and a processor, wherein the memory is used to store information including program instructions, and the processor is used to control the execution of the program instructions, and when the program instructions are loaded and executed by the processor, the above-mentioned route verification method based on transport feasibility is implemented.
[0088] It should be noted that the program in the above embodiment can be any combination of one or more programming languages to write program codes for executing the operation of the embodiment of the present application, and the programming language includes object-oriented programming languages, such as Java, C++, etc., and also includes conventional procedural programming languages, such as "C" language or similar programming languages. The program code can be executed completely on the user computing device, partially on the user device, as an independent software package, partially on the user computing device and partially on the remote computing device, or completely on the remote computing device or server.
[0089] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example for illustration. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. The specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0090] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A route verification method based on transportation feasibility, characterized in that: include: Obtain target transport routes for transport vehicles; Comparing the target transport route with verified transport routes within a set period; If it is detected that the state of the target transportation route is unverified, determining all transportation nodes on the target transportation route; Determine whether there is an abnormality in the transport node; If so, determine to replace the abnormal transport node and update the target transport route and send it to the terminal of the transport vehicle, or re-match the target transport route of the transport vehicle; If not, confirm that the target transportation route verification has passed.
2. A route verification method based on transportation feasibility according to claim 1, characterized in that: If it is detected that the state of the target transportation route is unverified, the method further includes: Obtain the transport section composed of adjacent transport nodes; Determine whether there is any abnormality in the transport section; If so, re-plan the abnormal transport section and update the target transport route and send it to the terminal of the transport vehicle, or re-match the target transport route of the transport vehicle; If not, confirm that the target transportation route verification has passed.
3. A route verification method based on transportation feasibility according to claim 1, characterized in that: After obtaining the target transportation route of the transportation vehicle, it includes: If it is detected that the status of the target transportation route is verified, obtaining the verification result and processing plan; If the verification result is normal, the transport vehicle is determined to perform the freight task according to the target transport route; If the verification result is abnormal, the target transportation route is updated according to the processing plan.
4. A route verification method based on transportation feasibility according to claim 1, characterized in that: If an abnormality is detected in the transport node, it also includes: Obtaining the fault type and fault level of the transport node; Determine a first estimated time for the transport node to return to normal according to the fault type and fault level; Obtaining a second estimated time required for the transport vehicle to arrive at the abnormal transport node; If the interval between the first estimated time and the second estimated time is not greater than the set threshold time, confirming that the target transportation route verification has passed; If the interval between the first estimated time and the second estimated time is longer than the set threshold time, it is determined to replace the abnormal transport node and update the target transport route to send to the terminal of the transport vehicle, or re-match the target transport route of the transport vehicle.
5. A route verification method based on transportation feasibility according to claim 2, characterized in that: When determining that there is an abnormal transport section on the target transport route, the method further includes: Obtain fault information of abnormal transport sections; Determine a first estimated time for eliminating the fault in the abnormal transport section according to the fault information; Obtaining a second estimated time required for the transport vehicle to reach the abnormal transport section; If the interval between the first estimated time and the second estimated time is not greater than the set threshold time, confirming that the target transportation route verification has passed; If the interval between the first estimated time and the second estimated time is longer than a set threshold time, the abnormal transport section is replanned and the target transport route is updated and sent to the terminal of the transport vehicle, or the target transport route of the transport vehicle is rematched.
6. A route verification method based on transportation feasibility according to any one of claims 1 to 5, characterized in that: After determining whether the transport node has an abnormality or determining whether the transport section has an abnormality, the method further includes: updating the status of the target transport route to verified, and updating the verification result and processing scheme of the target transport route according to the determination result.
7. A route verification system based on transport feasibility, characterized in that: include: An acquisition module, used for acquiring a target transport route of a transport vehicle; A comparison module, used for comparing the target transportation route with verified transportation routes within a set period; A determination module, configured to determine all transportation nodes on the target transportation route if it is detected that the status of the target transportation route is unverified; A judgment module, used to judge whether there is an abnormality in the transport node; The processing module is used to determine whether to replace the abnormal transportation node and update the target transportation route to send to the terminal of the transportation vehicle, or re-match the target transportation route of the transportation vehicle if there is an abnormality in the transportation node; if there is no abnormality in the transportation node, confirm that the target transportation route has passed the verification.
8. A route verification device based on transport feasibility, characterized in that: include: A memory and a processor, wherein the memory is used to store information including program instructions, and the processor is used to control the execution of the program instructions, characterized in that: when the program instructions are loaded and executed by the processor, a route verification method based on transportation feasibility as described in any one of claims 1 to 6 is implemented.