Substation automatic operation and maintenance method based on intelligent operation and maintenance gateway machine

By adopting the intelligent operation and maintenance gateway integrated automation equipment model in the substation, the problem of operation and maintenance reliance on manual and lack of automated monitoring in the existing technology is solved, and unified operation and maintenance management and risk warning of substation automation equipment is realized, and operation and maintenance efficiency and system stability are improved.

CN119892864APending Publication Date: 2025-04-25GUIZHOU POWER GRID CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411778636.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-05
Publication Date
2025-04-25

AI Technical Summary

Technical Problem

The existing substation automation operation and maintenance technology has the problem of relying on manual processing and lack of data integration and analysis between automation monitoring systems and equipment, resulting in low operation and maintenance efficiency and poor system stability.

Method used

Using an intelligent operation and maintenance gateway method, the automation equipment model in the substation is integrated into the entire station SCD model, and the operation data is collected through the intelligent operation and maintenance gateway, and the operation and maintenance communication service interface is standardized and the equipment model is standardized to realize automated operation and maintenance operations.

Benefits of technology

It has realized the unified operation and maintenance management of substation automation equipment, reduced the work burden of operation and maintenance personnel, improved the stability and operation and maintenance efficiency of the system, and established an early warning and evaluation system to effectively realize risk warning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119892864A_ABST
    Figure CN119892864A_ABST
Patent Text Reader

Abstract

The invention discloses a transformer substation automatic operation and maintenance method based on an intelligent operation and maintenance gateway machine, and the method comprises the steps: enabling the automatic equipment in a transformer substation to be connected with the intelligent operation and maintenance gateway machine, collecting the data information of the automatic equipment in real time through the intelligent operation and maintenance gateway machine, thereby effectively getting through the information islands between the automatic equipment, and achieving the automatic operation and maintenance of the transformer substation. And integrating originally isolated and single-purpose data, performing multi-dimensional analysis and checking, and performing visual display. The problems that automatic operation and maintenance of a current transformer substation completely depend on manual work, the workload is large, errors are prone to occurring and the like are solved, and operation and maintenance blind areas which cannot be touched by traditional manual work can be filled up along with deep mining and analysis of data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of substation automation operation and maintenance, and in particular to a substation automation operation and maintenance method based on an intelligent operation and maintenance gateway. Background Art

[0002] In the current operation and maintenance of substation automation equipment, most of the operation and maintenance management still adopts the traditional mode, which is isolated and passive, and it is difficult to ensure the smooth, orderly and stable operation and maintenance of automation equipment. The main manifestations are as follows.

[0003] (1) It mainly relies on manual processing, and the operation and maintenance personnel are often in a passive position. The operation and maintenance personnel handle the faults according to the errors reported by the users of the automation-related information system. Once the operation and maintenance manpower is tight when the problem occurs, there will not be enough personnel to carry out the operation and maintenance work, making it difficult to locate and solve the problem in a timely and accurate manner, which will seriously affect the normal operation of the automation system.

[0004] (2) There is no perfect automated monitoring system, and the data between devices lacks effective integration and analysis, so the early warning function cannot be realized. The work can only be triggered after the equipment alarm. The operation and maintenance personnel can often only handle the fault after the fault occurs. This not only increases the workload of the operation and maintenance personnel, but also greatly affects the stable operation of the entire substation system.

[0005] With the rapid development of science and technology in my country and the gradual transformation of low-carbon economic mode, smart grid technology is becoming more and more perfect, and smart substations have entered the stage of comprehensive promotion and construction. Compared with traditional substations, smart substations have many new technologies and solutions such as equipment types, communication standards, data transmission, and application support, which bring new vitality to substation operation and maintenance. Many achievements have been made in data flow transmission, secondary equipment status and intelligent monitoring of smart substations, but there are few studies on the intelligent operation and maintenance of automation equipment such as motion devices, measurement and control devices, switches and monitoring background. Based on the virtual local area network, a comprehensive digital model of the comprehensive data flow of intelligent electronic equipment in the substation is established. The fuzzy evaluation method is used to find the key factors that play a role in the accuracy of the status of secondary equipment in smart substations, and the evaluation is carried out to give the calculation steps of the evaluation. The storage method of the activation information of the Internet of Things and the secondary equipment of smart substations is improved, and the information of a single automation device is configured separately without unified operation and maintenance. The working mechanism of the monitoring problem of smart substations is evaluated, but the standardization of the operating parameters of the measurement and control device is not considered. Summary of the invention

[0006] In view of the above existing problems, the present invention is proposed.

[0007] Therefore, the present invention provides a substation automation operation and maintenance method based on an intelligent operation and maintenance gateway, which can solve the problem that the traditional free surface related multiple wave suppression method cannot adapt to the seismic data collected by the seabed node observation method.

[0008] In order to solve the above technical problems, the present invention provides the following technical solutions: a substation automation operation and maintenance method based on an intelligent operation and maintenance gateway, comprising:

[0009] Integrate the substation automation equipment model into the whole station SCD model. The substation automation equipment includes: monitoring background, motion device and measurement and control device;

[0010] The SCD model of the entire station is stored in the intelligent operation and maintenance gateway to collect the operation data of the substation automation equipment;

[0011] Taking the intelligent operation and maintenance gateway as the carrier, the operation and maintenance communication service interface is standardized, the equipment model is normalized, and a modular design is adopted for different operation and maintenance objects to realize the operation and maintenance of automation equipment in the substation.

[0012] As a preferred solution of the substation automation operation and maintenance method based on the intelligent operation and maintenance gateway described in the present invention, the operating data of the substation automation equipment includes the motion configuration description file RCD, the motion section data file RCD_RT, the operating status of the monitoring host, the SCD model file, the whole station interlocking file and the interlocking verification information file, as well as the operating status and constant parameter file of the measurement and control device.

[0013] As a preferred solution of the substation automation operation and maintenance method based on the intelligent operation and maintenance gateway described in the present invention, the operation and maintenance operations of the automation equipment in the substation include motion RCD file verification, remote control pre-test function, seasonal test function, motion operation parameter management function and measurement and control parameter constant value management function.

[0014] As a preferred solution of the substation automation operation and maintenance method based on the intelligent operation and maintenance gateway described in the present invention, wherein: the intelligent operation and maintenance gateway includes, and the protocol for the intelligent operation and maintenance gateway to communicate with the automation equipment includes DL / T860 and IEC104;

[0015] Use DL / T860 protocol to obtain various file data of monitoring host, motion device and measurement and control device, including: motion configuration description file, motion section data file, SCD model file in monitoring host, whole station interlocking file, interlocking verification information file and operation status and fixed value parameter file of measurement and control device;

[0016] The IEC104 protocol is used to implement remote control pre-test operations of the motion device for measurement and control.

[0017] As a preferred solution of the substation automation operation and maintenance method based on the intelligent operation and maintenance gateway described in the present invention, the modular design includes: for the application module of the information verification function, manual verification and periodic automatic verification are adopted;

[0018] When the substation is under manual operation and inspection, manual verification can be performed to check the operation status of the current substation automation equipment;

[0019] When the substation is unattended, periodic automatic verification can be set in advance. When a fault or alarm is found, it can be sent to the main station system in real time. You can also view historical operation and maintenance reports to analyze and trace the cause of the fault.

[0020] As a preferred solution of the substation automation operation and maintenance method based on the intelligent operation and maintenance gateway described in the present invention, the motion RCD file verification includes triggering the "RCD file verification" button on the interface, calling the provincial adjustment and low-profile motion RCD files for the data gateway machine 1 and the data gateway machine 2 in turn, and performing dual-machine verification and standard verification in turn;

[0021] The dual-machine verification function analyzes and verifies the RCD files of the acquired data gateway machine 1 and data gateway machine 2 respectively;

[0022] The standard verification function analyzes and verifies the RCD standard value file stored locally and the called RCD file respectively;

[0023] RCD file verification uses keyword matching to perform line-by-line word segmentation comparison. The keyword consists of a segment name and a content identifier. The segment name is the information segment description information in the RCD file; the information segment description information includes an overview, basic information, version information, combined calculation participation information, synthetic calculation generation, remote signal forwarding information, telemetry forwarding information, remote control forwarding information, and remote adjustment forwarding information; the content identifier is an attribute segment with unique identification in the specific content, and the content identifier uses a fuzzy matching intelligent selection mode.

[0024] As a preferred solution of the substation automation operation and maintenance method based on the intelligent operation and maintenance gateway described in the present invention, wherein: the remote control pre-test function includes that the operation and maintenance substation needs to support the remote control pre-test initiated by the master station and the remote control pre-test initiated by the substation's own operation interface;

[0025] The operation and maintenance substation needs to support the selection of a single point or batch selection of multiple remote control points for remote control pre-test operations;

[0026] During the entire remote control pre-test process, the operation and maintenance substation must record the execution process and results of all commands and visualize the entire process.

[0027] As a preferred solution of the substation automation operation and maintenance method based on the intelligent operation and maintenance gateway described in the present invention, the seasonal test function includes manually or periodically triggering the seasonal test function to check whether the section data sent by the data gateway for scheduling is consistent with the data collected in real time by the substation background;

[0028] The remote control pre-test function includes calling the RCD_RT file from the data gateway through the file transfer service of DL / T 860, obtaining the real-time cross-sectional data of the data gateway and comparing it with the real-time telesignaling and telemetering data collected by the operation and maintenance substation, requiring the switch quantity to be consistent in state, and the analog quantity to be consistent within the fluctuation range of the allowable limit. When two sets of data gateways are configured, the comparison operation needs to be performed separately;

[0029] The sports operation parameter management function includes calling the sports operation parameters, obtaining the operation parameter file of the data gateway, and prompting the result of whether the calling is successful or not;

[0030] When there is no standard value file of motion operation parameters locally, the called motion operation parameter file will be automatically saved as the standard value file; when the standard value file already exists locally, the file verification logic will be directly performed, and the items with inconsistent verification will be highlighted;

[0031] The measurement and control parameter setting management function includes calling the measurement and control parameter setting, obtaining the parameter setting file of the measurement and control device, and prompting the result of whether the calling is successful or not;

[0032] When there is no standard value file for motion measurement and control parameter settings locally, the called motion parameter setting file will be automatically saved as the standard value file; when a standard value file already exists locally, the file verification logic will be directly performed, and items with inconsistent verification will be highlighted.

[0033] A computer device includes a memory and a processor, wherein the memory stores a computer program, and is characterized in that when the processor executes the computer program, steps of a substation automation operation and maintenance method based on an intelligent operation and maintenance gateway are implemented.

[0034] A computer-readable storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the steps of a substation automation operation and maintenance method based on an intelligent operation and maintenance gateway are implemented.

[0035] Beneficial effects of the present invention: The method of the present invention standardizes the operation and maintenance communication service interface, normalizes the equipment model, and adopts modular design for different operation and maintenance objects to realize the integrated operation and maintenance of the monitoring host, motion device, measurement and control device, switch and time synchronization device, and uniformly and effectively maintains and manages the whole station model, ledger information, configuration information, version information, etc. It realizes automatic verification of signals from the source to the background, to the remote control, and to the main station, reducing the workload of on-site information joint debugging; through equipment information analysis, mining, and extraction, it realizes panoramic visualization online monitoring and control of equipment configuration, program version, equipment status, and secondary virtual circuits, providing a basis for abnormal processing, accident analysis, equipment operation and maintenance, etc.; establishes an early warning evaluation system to evaluate the equipment operation status and effectively realize risk early warning; studies the automatic acquisition and parsing technology of substation network communication equipment configuration files, and realizes automatic verification of network communication equipment configuration. Strengthen the operation control of automation equipment from all aspects and in all aspects throughout the whole process, and build an online monitoring system for the operation condition of automation equipment, thereby improving the intelligence level and efficiency of substation automation equipment operation and maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0037] Figure 1 A schematic flow chart of a method for substation automation operation and maintenance based on an intelligent operation and maintenance gateway is provided as an embodiment of the present invention. DETAILED DESCRIPTION

[0038] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0039] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0040] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0041] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0042] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0043] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0044] Example 1, reference Figure 1 , which is the first embodiment of the present invention, and provides a substation automation operation and maintenance method based on an intelligent operation and maintenance gateway, comprising:

[0045] The automation equipment model in the substation is integrated into the whole station SCD model. The automation equipment in the substation includes: monitoring background, motion device and measurement and control device.

[0046] The whole-station SCD model is stored in the intelligent operation and maintenance gateway, and the operation data of the substation automation equipment is collected in real time, including: remote configuration description file (RCD), motion section data file (RCD_RT), monitoring host operation status, SCD model file, whole-station interlocking file and interlocking verification information file, and operation status and fixed parameter file of measurement and control device.

[0047] With the intelligent operation and maintenance gateway as the carrier, the automation equipment in the substation is operated and maintained. The operation and maintenance functions include: motion RCD file verification, remote control pre-test function, seasonal test function, motion operation parameter management function and measurement and control parameter fixed value management function.

[0048] Preferably, the method further comprises:

[0049] The protocols for communication between the intelligent operation and maintenance gateway and automation equipment include DL / T860 and IEC104;

[0050] Use DL / T860 protocol to obtain various file data of monitoring host, motion device and measurement and control device, including: motion configuration description file, motion section data file, SCD model file in monitoring host, whole station interlocking file, interlocking verification information file and operation status and fixed value parameter file of measurement and control device;

[0051] The IEC104 protocol is used to implement remote control pre-test operations of the motion device for measurement and control.

[0052] Preferably, the method further comprises:

[0053] For application modules whose main function is information verification, two methods are adopted: manual verification and periodic automatic verification;

[0054] When the substation is under manual operation and inspection, manual verification can be performed to check the operation status of the current substation automation equipment;

[0055] When the substation is unattended, you can set up periodic automatic verification in advance, and send the information to the main station system in real time after a fault or alarm is found. You can also view historical operation and maintenance reports to easily analyze and trace the cause of the fault.

[0056] Preferably, the method further comprises:

[0057] Trigger the "RCD file verification" button on the interface to call the provincial and low-profile motion RCD files for Data Gateway Machine 1 and Data Gateway Machine 2 in turn, and perform dual-machine verification and standard verification in turn;

[0058] The dual-machine verification function analyzes and verifies the RCD files of the acquired data gateway machine 1 and data gateway machine 2 respectively;

[0059] The standard verification function analyzes and verifies the RCD standard value file stored locally and the called RCD file.

[0060] Preferably, the RCD file verification algorithm specifically includes:

[0061] RCD file verification uses keyword matching to perform line-by-line word segmentation comparison. The keyword consists of a segment name and a content identifier. The segment name is the information segment description information in the RCD file, including: overview, basic information, version information, combined calculation participation information, synthetic calculation generation, remote signal forwarding information, telemetry forwarding information, remote control forwarding information, and remote adjustment forwarding information. The content identifier is an attribute segment with unique identification in the specific content, such as: sn, yx_no, yc_no, yk_no, yt_no, and the reference content information of each information point. The content identifier uses a fuzzy matching intelligent selection mode to effectively reduce the probability of matching failure due to damage to one or more content identifiers.

[0062] Preferably, the method further comprises:

[0063] Select the remote control information point that needs to be pre-tested for the remote control function. The remote control pre-test operation can be performed on a single point of the selected remote control information point, or the remote control pre-test operation can be automatically performed on all selected points in sequence.

[0064] Preferably, specific requirements for the remote control pre-test function include:

[0065] The operation and maintenance substation needs to support remote control pre-test initiated by the master station and the substation's own operation interface;

[0066] To improve work efficiency, the operation and maintenance substation needs to support the selection of a single point or batch selection of multiple remote control points for remote control pre-test operations;

[0067] During the entire remote control pre-test process, the operation and maintenance substation must record the execution process and results of all commands and visualize the entire process.

[0068] Preferably, the method further comprises:

[0069] Manually or periodically trigger the seasonal test function to check whether the section data sent by the data gateway for scheduling is consistent with the data collected in real time by the substation background.

[0070] Preferably, specific requirements for the remote control pre-test function include:

[0071] Through the file transfer service of DL / T 860, the RCD_RT file is called from the data gateway to obtain the real-time cross-section data of the data gateway and compare it with the real-time telesignaling and telemetry data collected by the operation and maintenance substation. The switch quantity is required to be consistent in state, and the analog quantity is required to be consistent within the fluctuation range of the allowable limit. When two sets of data gateways are configured, the comparison operation must be performed separately.

[0072] Preferably, the method further comprises:

[0073] Summon the motion running parameters, obtain the running parameter file of the data gateway, and prompt the result of whether the summoning is successful or not;

[0074] When there is no standard value file of motion operation parameters locally, the called motion operation parameter file is automatically saved as the standard value file; when a standard value file already exists locally, the file verification logic is directly performed, and the items with inconsistent verification need to be highlighted.

[0075] Preferably, the specific contents of the sports operation parameter management function include:

[0076] Network card parameter configuration table, routing parameter configuration table, NTP synchronization parameter configuration table, 860 access global parameter configuration table, communication parameter configuration table and protocol parameter configuration table of various protocols running on the data gateway, etc.

[0077] Preferably, the method further comprises:

[0078] Call measurement and control parameter setting values, obtain parameter setting value files of measurement and control devices, and prompt the result of calling success or failure;

[0079] When there is no standard value file for motion measurement and control parameter settings locally, the called motion parameter setting file will be automatically saved as the standard value file; when a standard value file already exists locally, the file verification logic will be directly performed, and items with inconsistent verification will be highlighted.

[0080] Preferably, the specific contents of the measurement and control parameter setting management function include:

[0081] The measurement and control parameter setting file contains telemetry parameters, communication parameters, remote control parameters, synchronization parameters and other related parameters.

[0082] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

[0083] Example 3

[0084] The third embodiment of the present invention is different from the first two embodiments in that:

[0085] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.

[0086] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0087] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0088] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0089] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0090] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A substation automation operation and maintenance method based on an intelligent operation and maintenance gateway, characterized in that: include, Integrate the substation automation equipment model into the whole station SCD model. The substation automation equipment includes: monitoring background, motion device and measurement and control device; The SCD model of the entire station is stored in the intelligent operation and maintenance gateway to collect the operation data of the substation automation equipment; Taking the intelligent operation and maintenance gateway as the carrier, the operation and maintenance communication service interface is standardized, the equipment model is normalized, and a modular design is adopted for different operation and maintenance objects to realize the operation and maintenance of automation equipment in the substation.

2. A substation automation operation and maintenance method based on an intelligent operation and maintenance gateway according to claim 1, characterized in that: The operation data of the substation automation equipment includes the motion configuration description file RCD, the motion section data file RCD_RT, the monitoring host operation status, the SCD model file, the whole station interlocking file and the interlocking verification information file, and the operation status and fixed value parameter file of the measurement and control device.

3. A substation automation operation and maintenance method based on an intelligent operation and maintenance gateway as claimed in claim 2, characterized in that: The operation and maintenance of the automation equipment in the substation includes motion RCD file verification, remote control pre-test function, seasonal test function, motion operation parameter management function and measurement and control parameter fixed value management function.

4. A substation automation operation and maintenance method based on an intelligent operation and maintenance gateway as claimed in claim 3, characterized in that: The intelligent operation and maintenance gateway includes, and the protocols for the intelligent operation and maintenance gateway to communicate with the automation equipment include DL / T860 and IEC104; Use DL / T860 protocol to obtain various file data of monitoring host, motion device and measurement and control device, including: motion configuration description file, motion section data file, SCD model file in monitoring host, whole station interlocking file, interlocking verification information file and operation status and fixed value parameter file of measurement and control device; The IEC104 protocol is used to implement remote control pre-test operations of the motion device for measurement and control.

5. A substation automation operation and maintenance method based on an intelligent operation and maintenance gateway as claimed in claim 4, characterized in that: The modular design includes two methods: manual verification and periodic automatic verification for the application module of the information verification function; When the substation is under manual operation and inspection, manual verification can be performed to check the operation status of the current substation automation equipment; When the substation is unattended, periodic automatic verification can be set in advance. When a fault or alarm is found, it can be sent to the main station system in real time. You can also view historical operation and maintenance reports to analyze and trace the cause of the fault.

6. A substation automation operation and maintenance method based on an intelligent operation and maintenance gateway as claimed in claim 5, characterized in that: The motion RCD file verification includes triggering the "RCD file verification" button on the interface, calling the provincial and low-profile motion RCD files of the data gateway machine 1 and the data gateway machine 2 in turn, and performing dual-machine verification and standard verification in turn; The dual-machine verification function analyzes and verifies the RCD files of the acquired data gateway machine 1 and data gateway machine 2 respectively; The standard verification function analyzes and verifies the RCD standard value file stored locally and the called RCD file respectively; RCD file verification uses keyword matching to perform line-by-line word segmentation comparison. The keyword consists of a segment name and a content identifier. The segment name is the information segment description information in the RCD file; the information segment description information includes an overview, basic information, version information, combined calculation participation information, synthetic calculation generation, remote signal forwarding information, telemetry forwarding information, remote control forwarding information, and remote adjustment forwarding information; the content identifier is an attribute segment with unique identification in the specific content, and the content identifier uses a fuzzy matching intelligent selection mode.

7. A substation automation operation and maintenance method based on an intelligent operation and maintenance gateway according to claim 6, characterized in that: The remote control pre-test function includes that the operation and maintenance substation needs to support the remote control pre-test initiated by the master station and the remote control pre-test initiated by the substation's own operation interface; The operation and maintenance substation needs to support the selection of a single point or batch selection of multiple remote control points for remote control pre-test operations; During the entire remote control pre-test process, the operation and maintenance substation must record the execution process and results of all commands and visualize the entire process.

8. A substation automation operation and maintenance method based on an intelligent operation and maintenance gateway as claimed in claim 7, characterized in that: The seasonal test function includes manually or periodically triggering the seasonal test function to check whether the section data sent by the data gateway for scheduling is consistent with the data collected in real time by the substation background; The remote control pre-test function includes calling the RCD_RT file from the data gateway through the file transfer service of DL / T 860, obtaining the real-time cross-sectional data of the data gateway and comparing it with the real-time telesignaling and telemetering data collected by the operation and maintenance substation, requiring the switch quantity to be consistent in state, and the analog quantity to be consistent within the fluctuation range of the allowable limit. When two sets of data gateways are configured, the comparison operation needs to be performed separately; The sports operation parameter management function includes calling the sports operation parameters, obtaining the operation parameter file of the data gateway, and prompting the result of whether the calling is successful or not; When there is no standard value file of motion operation parameters locally, the called motion operation parameter file will be automatically saved as the standard value file; when the standard value file already exists locally, the file verification logic will be directly performed, and the items with inconsistent verification will be highlighted; The measurement and control parameter setting management function includes calling the measurement and control parameter setting, obtaining the parameter setting file of the measurement and control device, and prompting the result of whether the calling is successful or not; When there is no standard value file for motion measurement and control parameter settings locally, the called motion parameter setting file will be automatically saved as the standard value file; when a standard value file already exists locally, the file verification logic will be directly performed, and items with inconsistent verification will be highlighted.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 8 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 8 are implemented.

Citation Information

Patent Citations

  • Intelligent substation monitoring information automatic acceptance method and system

    CN112366818A

  • Intelligent substation whole station and measurement and control device model online management and control method

    CN112633640A

  • Intelligent substation automation equipment operation and maintenance management and control system suitable for power system

    CN113315222A