Slideway cross beam hoisting system and hoisting positioning method thereof

By adopting the design of the tic toe beam support base and sling structure in the slide tic toe beam lifting system, combined with GPS positioning and precise positioning algorithm, the problem of poor positioning stability of traditional tic toe beam installation is solved, and the high-precision installation and construction efficiency of tic toe beams is achieved.

CN119898685APending Publication Date: 2025-04-29THE FIRST CONSTRUCTION COMPANY OF CCCC SECOND HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202510004931.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-02
Publication Date
2025-04-29

AI Technical Summary

Technical Problem

The underwater installation positioning of traditional slide tic toe beams has problems such as poor stability, low construction safety and efficiency, and difficult to ensure installation accuracy.

Method used

A sliding tic toe beam lifting system is adopted, including a tic toe beam bracket base and a sling structure. The stability of the tic toe structure is ensured through inclined fitting and nut connection, and the position of the tic toe beam is adjusted using a retractable oblique support frame and hydraulic cylinder. Combined with GPS positioning and precise positioning algorithms, the precise positioning and installation of tic toe beams is achieved.

Benefits of technology

It improves the installation accuracy of tic toe beams, enhances construction stability and safety, reduces construction failures and delays, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119898685A_ABST
    Figure CN119898685A_ABST
Patent Text Reader

Abstract

The invention provides a slideway cross beam hoisting system and a hoisting positioning method thereof, the slideway cross beam hoisting system comprises a cross beam support base and a lifting appliance structure, a cross beam is arranged on the cross beam support base, and the inclined surface of the lower surface of the lifting appliance structure is attached to the upper surface of the cross beam to enable the upper surface of the lifting appliance structure to be in a horizontal state; the lifting appliance structure is connected with a screw reserved on the upper surface of the cross beam through a nut, lifting appliance supporting structures are arranged on the two sides of the lifting appliance structure, and retractable inclined supporting frames are arranged on the lifting appliance supporting structures; and a lifting rope of the crane carriage bypasses the end part of the inclined support frame and is connected with a lifting hole of the cross beam. The unique design of the lifting appliance effectively solves the problem that the steel wire rope easily conflicts with the measuring inverted hanging frame, ensures the smooth construction process, reduces construction faults and delay, and improves the construction efficiency. The structural design of the cross beam support base enables the cross beam support base to adapt to different conditions, and the height and the levelness are adjusted through the hydraulic cylinder. The retractable design of the lifting appliance supporting structure is convenient to mount and dismount, and construction time and labor cost are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of slideway well hoisting, and in particular to a slideway well beam lifting and hoisting system and a hoisting and positioning method thereof. Background Art

[0002] With the booming shipbuilding industry and the growing demand for shipbuilding and repair, the construction of ship launching slides has attracted increasing attention. There are two main methods for slide construction: cast-in-place and prefabricated cross beam assembly. The cast-in-place method has a great impact on the surrounding environment due to the need to arrange cofferdams, and is subject to many restrictions in practical applications. Therefore, prefabricated cross beam assembly has become a common method for comb slide construction.

[0003] However, the underwater installation and positioning of prefabricated crisscross beams face many difficulties. Traditional installation measurements mostly use inverted frames, but in the lifting process, steel rods are often used to pierce holes for crisscross beam lifting. This method has poor stability. During the construction process, the wire rope is very likely to conflict with the inverted frame, which seriously affects the construction safety and efficiency, and it is difficult to ensure the accuracy of the crisscross beam installation. These problems urgently need to be effectively solved by a new slideway crisscross beam lifting and hoisting system and its lifting and positioning method to meet the requirements of construction quality and efficiency for ship launching slideway construction. Summary of the invention

[0004] The main purpose of the present invention is to provide a slideway cross-beam lifting and hoisting system and a hoisting and positioning method thereof, so as to solve the problem that traditional installation measurement mostly adopts an inverted frame, but in the hoisting process, steel rods are mostly punched for cross-beam hoisting. This method has poor stability. During the construction process, the steel wire rope is very easy to conflict with the inverted frame, which seriously affects the construction safety and efficiency.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a slideway cross beam lifting and hoisting system, comprising a cross beam support base and a hanger structure, the cross beam is arranged on the cross beam support base, and the inclined surface of the lower surface of the hanger structure is in contact with the upper surface of the cross beam so that the upper surface of the hanger structure is in a horizontal state; The hanger structure is connected to the screws reserved on the upper surface of the cross beam through nuts, and hanger support structures are provided on both sides of the hanger structure, and retractable oblique support frames are provided on the hanger support structures; The lifting rope of the lifting trolley passes around the end of the inclined support frame and is connected with the hoisting hole of the cross beam.

[0006] In a preferred embodiment, the lower portion of the sling support structure is arranged on one side of the sling structure, and the upper portion of the sling support structure is connected to a plurality of fixed cross bars on one side of the measuring inverted frame.

[0007] In the preferred embodiment, the sling support structure includes a frame structure with a quadrilateral structure composed of four frame support rods, at least two second connecting rods are hinged at the lower position of the frame structure, the other end of the second connecting rod is hinged to one end of the oblique support frame, the other end of the oblique support frame is hinged to the first connecting rod, and the two ends of the first connecting rod are slidably connected to both sides of the frame.

[0008] In the preferred embodiment, the middle part of the second connecting rod is divided into two rods, the two rods are connected by a second connecting hinge, one rod is provided with a limiter, and the other rod abuts against the upper limit of the limiter, so that the second connecting rod is laterally arranged to support the oblique support frame.

[0009] In the preferred embodiment, slide grooves are provided on both sides of the frame, both ends of the first connecting rod are slidably connected to the slide grooves, and a raised limit block is provided inside the slide grooves; When the first connecting rod abuts against the limiting block, the oblique support frame is unfolded, and when the first connecting rod abuts against the upper end of the sliding groove, the oblique support frame is retracted.

[0010] In a preferred embodiment, a buckle is provided on the lower end of the frame, and when the oblique support frame is retracted, the end of the oblique support frame is clamped on the buckle and fixed.

[0011] In the preferred embodiment, the crisscross beam support base is provided with two high supports and two low supports, the two high supports and the two low supports are connected by a plurality of connecting rods to form the crisscross beam support base, and a plurality of anti-skid pads are provided on the high supports.

[0012] In the preferred embodiment, a first hydraulic cylinder is provided inside the high support, and the end of the telescopic rod at the upper end of the first hydraulic cylinder is connected to the anti-slip pad; A second hydraulic cylinder is arranged inside the short support, and a top plate is arranged at the end of the telescopic rod of the second hydraulic cylinder.

[0013] In the preferred embodiment, the lifting equipment includes a bridge erecting machine, which is arranged on the auxiliary piles through a plurality of legs, and the tops of the transversely arranged auxiliary piles are connected through transverse movable tracks, and the transverse movable tracks cover the entire pile foundation group, and the movement range of the bridge erecting machine covers the entire pile foundation group; There are multiple lifting trolleys on the top of the bridge-building machine, and the lifting ropes of the lifting trolleys are connected to the cross-shaped beam.

[0014] In a preferred embodiment, the method comprises: S1. Install the crisscross beam support base at the construction site, place the two high supports and the two low supports according to the designed position, and connect them with multiple connecting rods to ensure a firm connection to form a stable crisscross beam support base structure; A plurality of anti-skid pads are installed on the high support, and a first hydraulic cylinder is installed inside the high support so that the end of the telescopic rod at the upper end thereof is connected to the anti-skid pad; a second hydraulic cylinder is installed inside the low support and a top plate is set at the end of the telescopic rod; S2. Install the assembled hanger support structure on both sides of the hanger structure so that the lower part of the hanger support structure is on one side of the hanger structure, and connect the upper part of the hanger support structure to a plurality of fixed cross bars on one side of the measuring inverted frame; S3, using a lifting device to lift the prefabricated crisscross beam to the top of the crisscross beam support base, slowly lowering the crisscross beam to accurately place it on the crisscross beam support base, and supporting the crisscross beam through high supports and low supports; Start the first hydraulic cylinder inside the high support and the second hydraulic cylinder inside the low support, adjust the height and level of the cross beam, make the cross beam in a suitable initial installation position, and check the stability of the cross beam; S4. Place the sling structure on the cross beam, make the inclined surface of the lower surface of the sling structure fit with the upper surface of the cross beam, ensure that the upper surface of the sling structure is horizontal, and use nuts to firmly connect the sling structure with the screws reserved on the upper surface of the cross beam to ensure the reliability of the connection; S5, unfold the oblique support frame, push the first connecting rod to make it lean against the limit block inside the slide slot, at this time the oblique support frame is in the unfolded state, providing support for the subsequent suspension rope connection, Pass the lifting rope of the lifting trolley around the end of the oblique support frame and connect it to the lifting hole of the cross beam; S6. The method of hoisting and positioning the cross beam is: Establish a two-dimensional rectangular coordinate system in the entire pile group, determine the origin and axis direction of the coordinate system; record the coordinate position of each pile in the coordinate system to form a pile coordinate database; ensure that the bridge erection machine can obtain its own position information in the coordinate system, communicate well with the control system, and receive and execute positioning instructions; According to the construction plan, determine the target pile foundation position coordinates where the cross beam needs to be installed , extracting the information of the target pile foundation from the pile foundation coordinate database; Measurement of the cross beam The GPS positioning device on the inverted frame obtains the current position coordinates of the cross beam in real time and transmit the position information to the control system; The control system calculates the deviation between the current position of the cross beam (8) and the target position in the X-axis and Y-axis directions: ; ; According to the position deviation, the control system sends adjustment instructions to the bridge erection machine: if , then the bridge erection machine is controlled to move in the positive direction of the X axis distance; if , then move in the negative direction of the X axis distance; if , then the bridge erection machine is controlled to move in the positive direction of the Y axis distance; if , then move in the negative direction of the Y axis distance; After the bridge erection machine performs the adjustment action, wait for a while to allow the cross beam to stabilize in the new position, then obtain the position information of the measuring inverted frame again, and repeat steps 3 to 5 until the position deviation of the cross beam is within the allowable accuracy range; When the cross beam reaches the designated position and meets the accuracy requirements, the control system sends an installation instruction to the bridge erection machine, which slowly lowers the cross beam to the target pile foundation and continuously monitors the position during the installation process to ensure the accuracy of the installation process. S7. Slowly lower the cross beam to the installation position, and make it accurately dock with the pile foundation below to complete the installation and fixation; After the installation of the cross beam is completed, loosen the connection between the lifting rope and the lifting hole of the cross beam, and the lifting rope is connected to the support structure of the sling; Push the first connecting rod to make it abut against the upper end of the slide slot, so that the oblique support frame is retracted, and the end of the retracted oblique support frame is clamped on the buckle and fixed; Remove the connecting nuts between the hanger structure and the cross beam, and remove the hanger structure from the cross beam, wherein the hanger support structure is used to move the hanger structure and the measuring inverted frame out.

[0015] The present invention provides a lifting and hoisting system for a slideway crisscross beam and a lifting and positioning method thereof. By measuring the GPS positioning device on the inverted frame to provide real-time feedback on the position information of the crisscross beam, combined with an accurate positioning algorithm, the position of the crisscross beam can be continuously adjusted to control the installation deviation within a very small range, thereby ensuring that the crisscross beam is accurately installed on the target pile foundation, greatly improving the installation accuracy compared to traditional methods.

[0016] The stable connection between the hoisting structure and the cross-beam and the reasonable design of the oblique support frame in the hoisting support structure provide reliable support for the cross-beam hoisting, avoiding shaking and displacement during the hoisting process, enhancing construction stability and reducing safety risks.

[0017] The unique hoist design effectively solves the problem of easy conflict between the wire rope and the measuring inverted frame, ensuring a smooth construction process, reducing construction failures and delays, and improving construction efficiency.

[0018] The structural design of the base of the cross-beam support enables it to adapt to different situations, such as adjusting the height and level through the hydraulic cylinder; the retractable design of the hanger support structure is convenient for installation and disassembly, facilitates construction operations, reduces construction time and labor costs, and improves construction efficiency.

[0019] The system and method are suitable for the hoisting and installation of the cross beam of the entire pile foundation group, can be accurately positioned and installed according to the different pile foundation positions, have strong versatility and adaptability, and can meet the needs of slideway construction of different scales and layouts.

[0020] From the design of each structure of the system to the implementation of the positioning method, we pay attention to construction safety, reduce the potential safety hazards caused by unstable lifting, component conflicts and other factors, ensure the safety of construction personnel and equipment, and reduce the occurrence rate of construction accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is the overall structural diagram of the hoisting structure of the present invention; Figure 2 This is the overall main structural diagram of the hoisting structure of the present invention; Figure 3 This is a structural diagram of the beam support structure of the present invention; Figure 4 This is a structural diagram of the hydraulic cylinder inside the beam support structure of the present invention; Figure 5 It is a structural diagram of the hanger support structure of the present invention; Figure 6 This is a structural diagram of the support structure of the sling of the present invention after contraction; Figure 7 This is a structural diagram of the chute of the hanger support structure of the present invention; Figure 8 It is a diagram of the installation structure of the stopper of the second connecting rod of the present invention; Fig. 9 This is a diagram of the installation structure of the cleaning head and the crank arm inside the protective shell of the present invention; Fig.10 This is a structural diagram of the installation of the cleaning and lifting device structure of the present invention; Fig.11 It is the installation structure diagram of the bridge erecting machine of the present invention.

[0022] In the figure: a cross-beam support base 1; a low support 101; a high support 102; a connecting rod 103; an anti-skid pad 104; a first hydraulic cylinder 105; a second hydraulic cylinder 106; a sling support structure 2; a frame support rod 201, a first connecting rod 202; a second connecting rod 203; an oblique support frame 204; a slide 205; a buckle 206; a first connecting hinge 207; a second connecting hinge 208; a third connecting hinge 209; a limiter 210; a sling structure 3; a sling frame 301; a detachable connecting beam 302; a limit device 303; a measuring inverted frame 4; a fixed crossbar 401; a pile foundation 5; an auxiliary pile 6; a transport vehicle 7; a cross-beam 8; a lifting hole 801; a lifting trolley 9; a bridge erecting machine 10; a leg 11; a transverse moving track 12; and a lifting rope 13. DETAILED DESCRIPTION

[0023] Example 1 like Figure 1-11 As shown, a slideway cross beam lifting and hoisting system comprises a cross beam support base 1 and a sling structure 3, a cross beam 8 is arranged on the cross beam support base 1, and the inclined surface of the lower surface of the sling structure 3 is fitted with the upper surface of the cross beam 8 so that the upper surface of the sling structure 3 is in a horizontal state; The hanger structure 3 is connected to the screws reserved on the upper surface of the cross beam 8 through nuts, and hanger support structures 2 are provided on both sides of the hanger structure 3, and a retractable oblique support frame 204 is provided on the hanger support structure 2; The lifting rope 13 of the lifting trolley 9 passes around the end of the oblique support frame 204 and is connected to the lifting hole 801 of the cross beam 8.

[0024] The tightness and stability of the connection between the lower surface of the sling structure 3 and the upper surface of the cross beam 8 are ensured by the bevel fit and the nut connection, so that the upper surface of the sling structure 3 remains horizontal, providing a stable foundation for subsequent operations. The retractable oblique support frame 204 on the sling support structure 2 provides an effective support point for the lifting rope 13 of the lifting trolley 9. The lifting rope 13 passes through its end and connects to the lifting hole 801 of the cross beam 8. During the lifting process, the force can be reasonably dispersed, which effectively enhances the stability and safety of the lifting operation, helps to ensure the posture and position accuracy of the cross beam 8 during the lifting and installation process, thereby improving the construction efficiency and quality, and reducing the safety risks and construction errors caused by unstable lifting.

[0025] Connect the prefabricated crisscross beam with the lifting system: During the installation process, after the detachable connecting beam 302 is installed, the prefabricated crisscross beam 8 is connected to the lifting fixture 3 through a steel wire rope, so that the lifting fixture 3 can bear the weight of the crisscross beam 8 and realize the lifting operation. It is a key connecting component for lifting the crisscross beam 8 from the crisscross beam bracket 1 and transporting it to the designated installation location.

[0026] Avoid conflict with the measuring inverted frame: Its structural design avoids the conflict between the wire rope and the measuring inverted frame 4 during the installation of the crisscross beam 8. In the traditional method, the wire rope and the inverted frame are prone to conflict, but the present sling 3 has a reasonable structure, such as the ingenious arrangement of the detachable connecting beam 302 in the frame structure of the measuring inverted frame 4, so that the two can not interfere with each other during the installation process, ensuring the safe and reliable construction, and ensuring that the measuring inverted frame 4 can accurately measure the spatial position change of the prefabricated crisscross beam 8 without affecting the measurement accuracy.

[0027] Auxiliary measurement and subsequent operations: After the prefabricated cross beam 8 is installed, the cross beam 8 is separated from the hanger 3. By installing the limit device 303 on the hanger connecting beam 302, the hanger 3 can fix the measuring frame 4 and itself, which is convenient for subsequent operations. For example, when the measuring frame 4 and the hanger 3 are adjusted to the temporary support on the shore as a whole and the next prefabricated cross beam 8 is connected to the measuring frame 4, the hanger 3 plays the role of supporting and transferring the measuring frame 4, which is conducive to the continuity and efficiency of the construction.

[0028] In the preferred embodiment, the lower portion of the sling support structure 2 is arranged on one side of the sling structure 3 , and the upper portion of the sling support structure 2 is connected to a plurality of fixed cross bars 401 on one side of the measuring inverted frame 4 .

[0029] In the preferred embodiment, the sling support structure 2 includes a frame structure of a quadrilateral structure formed by four frame support rods 201, at least two second connecting rods 203 are hinged at the lower position of the frame structure, the other end of the second connecting rod 203 is hinged to one end of the oblique support frame 204, the other end of the oblique support frame 204 is hinged to the first connecting rod 202, and the two ends of the first connecting rod 202 are slidably connected to the two sides of the frame.

[0030] In the preferred embodiment, the middle part of the second connecting rod 203 is divided into two rods, which are connected by a second connecting hinge 208. A limiter 210 is provided on one rod, and the other rod rests against the upper limit of the limiter 210, so that the second connecting rod 203 is laterally arranged to support the oblique support frame 204.

[0031] In the preferred embodiment, a slide groove 205 is provided on both sides of the frame, and both ends of the first connecting rod 202 are slidably connected to the slide groove 205, and a raised limit block is provided inside the slide groove 205; When the first connecting rod 202 abuts against the limiting block, the oblique support frame 204 is deployed, and when the first connecting rod 202 abuts against the upper end of the sliding groove 205, the oblique support frame 204 is retracted.

[0032] In a preferred embodiment, a buckle 206 is provided on the lower end of the frame, and when the oblique support frame 204 is retracted, the end of the oblique support frame 204 is clamped on the buckle 206 and fixed.

[0033] The sling support structure 2: Its lower part is arranged on one side of the sling structure 3, and its upper part is connected to a plurality of fixed cross bars 401 on one side of the measuring inverted frame 4, which serves to connect the sling structure 3 and the measuring inverted frame 4, providing structural support and connection relationship for the entire lifting system, and ensuring that all components work together.

[0034] The quadrilateral frame structure composed of four frame support rods 201 constitutes the basic frame of the hanger support structure 2, provides an installation foundation and a stable support frame for other components, and ensures the shape and strength of the entire hanger support structure 2.

[0035] The second connecting rod 203: one end of which is hinged to the lower part of the frame structure, and the other end is hinged to the oblique support frame 204, and part of it is two rods connected by a second connecting hinge 208, one of the rods is provided with a limiter 210, and the other rod rests on the upper limit of the limiter 210, so that the second connecting rod 203 can be horizontally arranged to support the oblique support frame 204, and provide a stable supporting force for the oblique support frame 204 in the unfolded state, thereby ensuring the stability of the structure during the lifting process.

[0036] The oblique support frame 204: one end is hinged to the second connecting rod 203, and the other end is hinged to the first connecting rod 202. With the cooperation of the first connecting rod 202, it provides a support point for the lifting rope 13 of the lifting trolley 9, so that the lifting rope 13 can bypass its end and connect with the lifting hole 801 of the cross beam 8. Its structural design avoids the conflict between the wire rope and the measuring inverted frame 4 during the installation of the cross beam 8. In the traditional method, the position of the wire rope and the inverted frame is prone to conflict, but the present sling 3 has a reasonable structure, such as the ingenious setting of the detachable connecting beam 302 in the frame structure of the measuring inverted frame 4, so that the two can not interfere with each other during the installation process, ensuring safe and reliable construction, and ensuring that the measuring inverted frame 4 can accurately measure the spatial position change of the prefabricated cross beam 8 without affecting the measurement accuracy.

[0037] The first connecting rod 202: Both ends are slidably connected to the slide grooves 205 on both sides of the frame, and the expansion and retraction of the oblique support frame 204 are controlled by sliding in the slide grooves 205. When the oblique support frame 204 abuts against the limit block inside the slide groove 205, the oblique support frame 204 is expanded, and when it abuts against the upper end of the slide groove 205, the oblique support frame 204 is retracted, so as to facilitate the adjustment of the state of the sling support structure 2 at different construction stages.

[0038] Slide groove 205: It is arranged on both sides of the frame, and the limit block inside it is used to limit the position of the first connecting rod 202, so as to control the expansion and retraction state of the oblique support frame 204, provide guidance and limit for the sliding of the first connecting rod 202, and ensure the normal operation of the sling support structure 2.

[0039] Buckle 206: It is arranged at the lower end of the frame. When the oblique support frame 204 is retracted, its end is clamped on the buckle 206 and fixed, so as to prevent the oblique support frame 204 from shaking randomly in the non-working state, thereby ensuring the storage stability of the sling support structure 2.

[0040] In the preferred embodiment, the cross-beam support base 1 is provided with two high supports 102 and two low supports 101 , and the two high supports 102 and the two low supports 101 are connected by multiple connecting rods 103 to form the cross-beam support base 1 , and multiple anti-slip pads 104 are provided on the high supports 102 .

[0041] In the preferred embodiment, a first hydraulic cylinder 105 is provided inside the high support 102, and the end of the telescopic rod at the upper end of the first hydraulic cylinder 105 is connected to the anti-slip pad 104; A second hydraulic cylinder 106 is disposed inside the short support 101 , and a top plate is disposed at the end of the telescopic rod of the second hydraulic cylinder 106 .

[0042] The cross-beam support base 1 serves as the basic supporting structure of the entire system, and is used to place the cross-beam 8, providing a stable supporting platform for the cross-beam 8, ensuring that the position of the cross-beam 8 is relatively fixed during the installation process. It is composed of two high supports 102, two low supports 101 and multiple connecting rods 103, which ensures the strength and stability of the overall structure.

[0043] The high support 102 is an important part of the cross beam support base 1, and cooperates with the low support 101 and the connecting rod 103 to support the cross beam 8. The multiple anti-skid pads 104 arranged on it can increase the friction between the cross beam 8 and prevent the cross beam 8 from sliding during placement or adjustment, and further ensure its stable position; the first hydraulic cylinder 105 inside can adjust the height of the anti-skid pads 104 by telescoping, so as to facilitate fine-tuning the levelness and height of the cross beam 8 to meet different installation requirements.

[0044] The low support 101 works in conjunction with the high support 102 to support the cross beam 8. The top plate at the end of the telescopic rod of the second hydraulic cylinder 106 inside it can assist in supporting the cross beam 8 to a certain extent, and can also fine-tune the position of the cross beam 8 through the telescopic function of the hydraulic cylinder, and together with the high support 102, ensure that the cross beam 8 is in a suitable initial installation position.

[0045] The connecting rod 103 connects the two high supports 102 and the two short supports 101, so that they form an integral cross-beam support base 1 structure, thereby enhancing the rigidity and stability of the entire support base and ensuring that no deformation or displacement occurs when bearing the weight of the cross-beam 8 and external forces.

[0046] The anti-skid pad 104 is arranged on the high support 102 to prevent the cross beam 8 from sliding on the bracket base by increasing the friction force, thereby ensuring the stability of the cross beam 8 and providing a reliable basic condition for subsequent installation operations.

[0047] The first hydraulic cylinder 105 is located inside the high support 102, and its upper telescopic rod is connected to the anti-skid pad 104. It drives the anti-skid pad 104 to rise and fall through its own telescopic action, thereby achieving precise adjustment of the height and level of the cross beam 8 to meet the accuracy requirements during the installation process.

[0048] The second hydraulic cylinder 106 is inside the short support 101, and the top plate at the end of its telescopic rod can provide auxiliary support for the cross beam 8, and assist in adjusting the position of the cross beam 8 through the telescopic function, and work together with the first hydraulic cylinder 105 in the high support 102 to ensure the installation accuracy and stability of the cross beam 8.

[0049] In the preferred embodiment, the lifting equipment includes a bridge erecting machine 10, which is arranged on the auxiliary pile 6 through a plurality of legs 11, and the top of the transversely arranged auxiliary pile 6 is connected through a transverse movable track 12, and the transverse movable track 12 covers the entire pile foundation group, and the movement range of the bridge erecting machine 10 covers the entire pile foundation group; A plurality of lifting trolleys 9 are arranged on the top of the bridge erecting machine 10 , and the suspension ropes 13 of the lifting trolleys 9 are connected to the cross beam 8 .

[0050] As the core part of the lifting equipment, the bridge erecting machine 10 is stably set on the auxiliary pile 6 through multiple legs 11. Its moving range can cover the entire pile foundation group and can move freely on the transverse moving track 12, so that it can accurately reach the top of each pile foundation position, provide support and mobile platform for the lifting trolley 9, and realize the lifting operation of the cross beam 8. It is the key equipment that undertakes the main lifting tasks in the entire lifting system.

[0051] The legs 11 connect the bridge erecting machine 10 and the auxiliary piles 6, and evenly transfer the weight of the bridge erecting machine 10 to the auxiliary piles 6, thereby ensuring the stability of the bridge erecting machine 10 during operation, preventing it from shaking or shifting, and providing a reliable support foundation for the normal operation of the bridge erecting machine 10.

[0052] The auxiliary piles 6 serve as the supporting foundation of the bridge erecting machine 10 and cooperate with the legs 11 to bear the various loads of the bridge erecting machine 10 and the lifting process, ensuring that the bridge erecting machine 10 is in a stable state during operation and providing solid ground support for the entire lifting operation.

[0053] Transverse moving track 12: laid on the top of the laterally arranged auxiliary piles 6, connecting each auxiliary pile 6, so that the bridge-building machine 10 can move laterally smoothly above it, covering the entire pile foundation group, expanding the operation range of the bridge-building machine 10, ensuring that the cross-shaped beam 8 can be hoisted on the pile foundations at different positions, and improving construction efficiency and flexibility.

[0054] The lifting trolley 9 is arranged on the top of the bridge-building machine 10 and is connected to the cross-beam 8 through a lifting rope 13. Under the movement and support of the bridge-building machine 10, the lifting rope 13 is used to realize the lifting and lowering operations of the cross-beam 8. It is a lifting component that directly acts on the cross-beam 8 and is responsible for lifting the cross-beam 8 from the cross-beam support base 1 and transporting it to the designated installation position.

[0055] The lifting rope 13 connects the lifting trolley 9 and the cross beam 8. When driven by the lifting trolley 9, the lifting rope 13 bears the weight of the cross beam 8, realizes the vertical lifting of the cross beam 8, moves the cross beam 8 between different heights, and ensures that the cross beam 8 can be accurately installed on the target pile foundation.

[0056] Example 2 Further illustrate with reference to Example 1, Figure 1-11 The structure shown, S1, install the tic-tac-toe beam support base 1 at the construction site, place two high supports 102 and two low supports 101 according to the designed position, and use multiple connecting rods 103 to connect them to ensure that the connection is firm to form a stable tic-tac-toe beam support base structure; A plurality of anti-skid pads 104 are installed on the high support 102, and a first hydraulic cylinder 105 is installed inside the high support 102, so that the end of the telescopic rod at the upper end thereof is connected to the anti-skid pad 104; a second hydraulic cylinder 106 is installed inside the low support 101, and a top plate is set at the end of the telescopic rod; S2, installing the assembled hanger support structure 2 on both sides of the hanger structure 3, so that the lower part of the hanger support structure 2 is located on one side of the hanger structure 3, and the upper part of the hanger support structure 2 is connected to a plurality of fixed cross bars 401 on one side of the measuring inverted frame 4; S3, using a lifting device to lift the prefabricated crisscross beam 8 to the top of the crisscross beam support base 1, slowly lowering the crisscross beam 8 to accurately place it on the crisscross beam support base 1, and supporting the crisscross beam 8 through the high support 102 and the low support 101; Start the first hydraulic cylinder 105 in the high support 102 and the second hydraulic cylinder 106 in the low support 101, adjust the height and level of the cross beam 8, make the cross beam 8 in a suitable initial installation position, and check the stability of the cross beam 8; S4, place the sling structure 3 on the cross beam 8, make the inclined surface of the lower surface of the sling structure 3 fit with the upper surface of the cross beam 8, ensure that the upper surface of the sling structure 3 is horizontal, use nuts to firmly connect the sling structure 3 with the screws reserved on the upper surface of the cross beam 8 to ensure the reliability of the connection; S5, unfold the oblique support frame 204, push the first connecting rod 202 to make it lean against the limit block inside the slide groove 205, at this time the oblique support frame 204 is in the unfolded state, providing support for the subsequent suspension rope connection, The lifting rope 13 of the lifting trolley 9 is passed around the end of the oblique support frame 204 and connected to the lifting hole 801 of the cross beam 8; S6. The method of hoisting and positioning the cross beam is: Establish a two-dimensional rectangular coordinate system in the entire pile group, determine the origin and coordinate axis direction of the coordinate system; record the coordinate position of each pile in the coordinate system to form a pile coordinate database; ensure that the bridge erection machine 10 can obtain its own position information in the coordinate system, and communicate well with the control system to receive and execute positioning instructions; According to the construction plan, determine the target pile foundation position coordinates where the cross beam 8 needs to be installed. , extracting the information of the target pile foundation from the pile foundation coordinate database; The GPS positioning device on the inverted frame 4 of the measurement of the cross beam 8 obtains the current position coordinates of the cross beam 8 in real time and transmit the position information to the control system; The control system calculates the deviation between the current position of the cross beam 8 and the target position in the X-axis and Y-axis directions: ; ; According to the position deviation, the control system sends an adjustment instruction to the bridge erection machine (10): if , then the bridge erection machine 10 is controlled to move in the positive direction of the X axis distance; if , then move in the negative direction of the X axis distance; if , then the bridge erection machine 10 is controlled to move in the positive direction of the Y axis distance; if , then move in the negative direction of the Y axis distance; After the bridge erection machine 10 performs the adjustment action, it waits for a while to allow the cross beam 8 to stabilize in the new position, and then obtains the position information of the measuring inverted frame 4 again, and repeats steps 3 to 5 until the position deviation of the cross beam 8 is within the allowable accuracy range; When the cross beam 8 reaches the designated position and meets the accuracy requirements, the control system sends an installation instruction to the bridge erection machine 10, and the bridge erection machine 10 slowly lowers the cross beam 8 to the target pile foundation and continuously monitors the position during the installation process to ensure the accuracy of the installation process; S7, slowly lower the cross beam 8 to the installation position, so that it can be accurately docked with the pile foundation 5 below, and the installation and fixation are completed; After the installation of the cross beam 8 is completed, the connection between the lifting rope 13 and the lifting hole 801 of the cross beam 8 is loosened, and the lifting rope 13 is connected to the sling support structure 2; Push the first connecting rod 202 to make it abut against the upper end of the slide slot 205, so that the oblique support frame 204 is retracted, and the end of the retracted oblique support frame 204 is clamped on the buckle 206 to be fixed; The connecting nuts between the hanger structure 3 and the cross beam 8 are removed, and the hanger structure 3 is removed from the cross beam 8 , wherein the hanger support structure 2 is used to move the hanger structure 3 and the measuring inverted frame 4 out.

[0057] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A slideway cross beam lifting and hoisting system, characterized by: It comprises a cross-beam support base (1) and a sling structure (3), wherein the cross-beam (8) is arranged on the cross-beam support base (1), and the inclined surface of the lower surface of the sling structure (3) is fitted with the upper surface of the cross-beam (8) so that the upper surface of the sling structure (3) is in a horizontal state; The sling structure (3) is connected to the screws reserved on the upper surface of the cross beam (8) through nuts, and sling support structures (2) are provided on both sides of the sling structure (3), and a retractable oblique support frame (204) is provided on the sling support structure (2); The lifting rope (13) of the lifting trolley (9) passes around the end of the oblique support frame (204) and is connected to the lifting hole (801) of the cross beam (8).

2. According to claim 1, a slideway cross beam lifting and hoisting system is characterized by: The lower part of the sling support structure (2) is arranged on one side of the sling structure (3), and the upper part of the sling support structure (2) is connected to a plurality of fixed cross bars (401) on one side of the measuring inverted frame (4).

3. According to claim 2, a slideway cross beam lifting and hoisting system is characterized in that: The sling support structure (2) comprises a frame structure of a quadrilateral structure formed by four frame support rods (201), at least two second connecting rods (203) are hingedly connected at the lower position of the frame structure, the other end of the second connecting rod (203) is hingedly connected to one end of the oblique support frame (204), the other end of the oblique support frame (204) is hingedly connected to the first connecting rod (202), and the two ends of the first connecting rod (202) are slidably connected to the two sides of the frame.

4. According to claim 3, a slideway cross beam lifting and hoisting system is characterized in that: The middle portion of the second connecting rod (203) is divided into two rods, the two rods are connected via a second connecting hinge (208), one rod is provided with a limiter (210), and the other rod abuts against the upper limit of the limiter (210), so that the second connecting rod (203) is laterally arranged to support the oblique support frame (204).

5. According to claim 3, a slideway cross beam lifting and hoisting system is characterized in that: Slide grooves (205) are provided on both sides of the frame, and both ends of the first connecting rod (202) are slidably connected to the slide grooves (205), and a protruding limit block is provided inside the slide grooves (205); When the first connecting rod (202) abuts against the limit block, the oblique support frame (204) is deployed, and when the first connecting rod (202) abuts against the upper end of the slide groove (205), the oblique support frame (204) is retracted.

6. According to claim 5, a slideway cross beam lifting and hoisting system is characterized in that: A buckle (206) is provided on the lower end of the frame, and when the oblique support frame (204) is retracted, the end of the oblique support frame (204) is clamped on the buckle (206) and fixed.

7. According to claim 1, a slideway cross beam lifting and hoisting system is characterized by: The crisscross beam support base (1) is provided with two high supports (102) and two low supports (101); the two high supports (102) and the two low supports (101) are connected via a plurality of connecting rods (103) to form the crisscross beam support base (1); and a plurality of anti-slip pads (104) are provided on the high supports (102).

8. According to claim 7, a hoisting system for a slideway cross beam is characterized in that: A first hydraulic cylinder (105) is provided inside the high support (102), and the end of the telescopic rod at the upper end of the first hydraulic cylinder (105) is connected to the anti-slip pad (104); A second hydraulic cylinder (106) is provided inside the short support (101), and a top plate is provided at the end of the telescopic rod of the second hydraulic cylinder (106).

9. According to claim 1, a slideway cross beam lifting and hoisting system is characterized by: The lifting device comprises a bridge erecting machine (10), wherein the bridge erecting machine (10) is arranged on an auxiliary pile (6) via a plurality of legs (11), the tops of the transversely arranged auxiliary piles (6) are connected via transversely movable tracks (12), the transversely movable tracks (12) cover the entire pile foundation group, and the movement range of the bridge erecting machine (10) covers the entire pile foundation group; A plurality of lifting trolleys (9) are arranged on the top of the bridge erecting machine (10), and the lifting ropes (13) of the lifting trolleys (9) are connected to the cross beam (8).

10. A method for hoisting and positioning a slideway cross beam hoisting system according to any one of claims 1 to 9, characterized in that: The method includes: S1. Install the crisscross beam support base (1) at the construction site, place two high supports (102) and two low supports (101) according to the designed positions, and connect them using multiple connecting rods (103) to ensure that the connection is firm, so as to form a stable crisscross beam support base structure; A plurality of anti-skid pads (104) are installed on the high support (102), and a first hydraulic cylinder (105) is installed inside the high support (102) so that the end of the telescopic rod at the upper end thereof is connected to the anti-skid pad (104); a second hydraulic cylinder (106) is installed inside the low support (101) and a top plate is provided at the end of the telescopic rod; S2, installing the assembled hanger support structure (2) on both sides of the hanger structure (3), so that the lower part of the hanger support structure (2) is located on one side of the hanger structure (3), and the upper part of the hanger support structure (2) is connected to a plurality of fixed cross bars (401) on one side of the measuring inverted frame (4); S3, using a lifting device to lift the prefabricated crisscross beam (8) to the top of the crisscross beam support base (1), slowly lowering the crisscross beam (8) so that it is accurately placed on the crisscross beam support base (1), and supporting the crisscross beam (8) by means of a high support (102) and a low support (101); Start the first hydraulic cylinder (105) in the high support (102) and the second hydraulic cylinder (106) in the low support (101), adjust the height and levelness of the cross beam (8), make the cross beam (8) in a suitable initial installation position, and check the stability of the cross beam (8); S4, placing the sling structure (3) on the cross beam (8), making the inclined surface of the lower surface of the sling structure (3) fit with the upper surface of the cross beam (8), ensuring that the upper surface of the sling structure (3) is in a horizontal state, and using nuts to firmly connect the sling structure (3) and the screws reserved on the upper surface of the cross beam (8) to ensure the reliability of the connection; S5, unfold the oblique support frame (204), push the first connecting rod (202) to make it lean against the limit block inside the slide groove (205), and then the oblique support frame (204) is in an unfolded state, providing support for the subsequent suspension rope connection. The lifting rope (13) of the lifting trolley (9) is passed around the end of the oblique support frame (204) and connected to the lifting hole (801) of the cross beam (8); S6. The method of hoisting and positioning the cross beam is: Establishing a two-dimensional rectangular coordinate system in the entire pile foundation group, determining the origin and coordinate axis directions of the coordinate system; recording the coordinate position of each pile foundation in the coordinate system to form a pile foundation coordinate database; ensuring that the bridge erection machine (10) can obtain its own position information in the coordinate system, and communicate well with the control system, and can receive and execute positioning instructions; According to the construction plan, determine the target pile foundation position coordinates where the cross beam (8) needs to be installed. , extracting the information of the target pile foundation from the pile foundation coordinate database; The GPS positioning device on the measuring frame (4) of the cross beam (8) obtains the current position coordinates of the cross beam (8) in real time. and transmit the position information to the control system; The control system calculates the deviation between the current position of the cross beam (8) and the target position in the X-axis and Y-axis directions: ; ; According to the position deviation, the control system sends an adjustment instruction to the bridge erection machine (10): if , then the bridge erection machine (10) is controlled to move in the positive direction of the X axis distance; if , then move in the negative direction of the X axis distance; if , then the bridge erection machine (10) is controlled to move in the positive direction of the Y axis distance; if , then move in the negative direction of the Y axis distance; After the bridge erection machine (10) performs the adjustment action, it waits for a period of time to allow the cross beam (8) to stabilize at the new position, and then obtains the position information of the measuring inverted frame (4) again, and repeats steps 3 to 5 until the position deviation of the cross beam (8) is within the allowable accuracy range; When the cross beam (8) reaches the designated position and meets the accuracy requirements, the control system sends an installation instruction to the bridge erection machine (10), and the bridge erection machine (10) slowly lowers the cross beam (8) to install it on the target pile foundation, and continuously monitors the position during the installation process to ensure the accuracy of the installation process; S7, slowly lowering the cross beam (8) to the installation position, so that it is accurately docked with the pile foundation (5) below, and the installation and fixing are completed; After the installation of the cross beam (8) is completed, the connection between the lifting rope (13) and the lifting hole (801) of the cross beam (8) is loosened, and the lifting rope (13) is connected to the lifting device support structure (2); Pushing the first connecting rod (202) to make it abut against the upper end of the slide groove (205), so as to retract the oblique support frame (204), and clamping the end of the retracted oblique support frame (204) on the buckle (206) to fix it; The connecting nuts between the hanger structure (3) and the cross beam (8) are removed, and the hanger structure (3) is removed from the cross beam (8), wherein the hanger support structure (2) is used to move the hanger structure (3) and the measuring inverted frame (4) out.

Citation Information

Cited By

  • Flexible gabion box underwater hoisting construction equipment and method thereof

    CN121536818A