Floor armor seam mounting and fixing device and construction method thereof

By designing a floor armor joint installation fixture including a door frame, a height adjustment mechanism and a horizontal position adjustment top rod, the problems of low installation accuracy and low construction efficiency are solved, and high-quality armor joint installation and visual effect are improved.

CN119933331APending Publication Date: 2025-05-06CHINA CONSTR EIGHTH BUREAU TIANJIN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510290663.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-12
Publication Date
2025-05-06

AI Technical Summary

Technical Problem

The existing armor joint installation technology has problems such as difficulty in controlling the installation straightness, low installation accuracy and low construction efficiency, resulting in poor appearance and effect of molded concrete floors.

Method used

A floor armor joint installation fixture is designed, including a door frame, a height adjustment mechanism and a horizontal position adjustment pole. Through the combination of these components, precise position adjustment and fixation of the armor joint is achieved.

Benefits of technology

This device effectively improves the installation accuracy and straightness of armor joints, improves construction efficiency, and ensures the visual quality of the molded concrete floor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119933331A_ABST
    Figure CN119933331A_ABST
Patent Text Reader

Abstract

The invention discloses a terrace armor seam mounting and fixing device and a construction method thereof, and belongs to the technical field of building construction.The terrace armor seam mounting and fixing device comprises a gate-type frame, a height adjusting mechanism, a horizontal position adjusting ejector rod and an armor seam, the gate-type frame is formed by welding two vertical stand columns and a frame top beam, bottom feet are welded to the bottoms of the vertical stand columns, and the height adjusting mechanism is arranged between the vertical stand columns and the frame top beam; round through holes are formed in the two ends of the frame top beam and used for allowing the height adjusting mechanisms to penetrate through, the vertical stand columns are sleeved with the horizontal position adjusting ejector rods which can freely slide, and the armor seams are formed in the horizontal position adjusting ejector rods through short steel bars. The floor armor seam mounting and fixing device adopting the structure is simple and easy to operate, improves the construction efficiency, reduces rework, and is economical and reasonable while the construction quality is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a floor armor seam installation and fixing device and a construction method thereof. Background Art

[0002] At present, in order to reduce concrete cracks and improve the visual quality of the formed surface, most concrete floors widely use armor joints (i.e., separation joints) as floor separation measures. The main function of the armor joint is to provide a position for controlling cracks during the concrete hardening process, thereby avoiding the generation of disordered cracks and ensuring the overall beauty and structural stability of the floor; however, the armor joints are installed on site in sections, and the installation straightness is difficult to control, the installation accuracy is low, and the construction efficiency is not high, resulting in the armor joints on the final concrete floor being not straight, affecting the final visual effect.

[0003] In order to solve the above problems, the market is in urgent need of a new device or method that can improve the installation accuracy and straightness of the armor seam while ensuring the construction quality and efficiency, thereby improving the appearance of the final concrete floor. Summary of the invention

[0004] The object of the present invention is to provide a floor armor seam installation and fixing device and a construction method thereof to solve the problems mentioned in the above background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides a floor armor seam installation and fixing device, including a portal frame, a height adjustment mechanism, a horizontal position adjustment rod and an armor seam, the portal frame is formed by connecting two vertical columns and a frame top beam, the top of the vertical column is connected to the frame top beam, the bottom of the vertical column is connected to a foot, both ends of the frame top beam are provided with circular through holes for passing the height adjustment mechanism, the two ends of the horizontal position adjustment rod are respectively mounted on the vertical column and can slide freely, and the armor seam is set on the horizontal position adjustment rod through short steel bars.

[0006] Preferably, the height adjustment mechanism includes two symmetrically arranged height adjustment hand cranks, the top ends of the height adjustment hand cranks are connected to L-shaped rotating handles, the tops of the height adjustment hand cranks are provided with a first nut, the middle part is provided with a second nut, and the bottom part is provided with a third nut.

[0007] Preferably, the height adjustment hand crank is arranged in the vertical column, the top of the height adjustment hand crank passes through the circular through hole and is connected to the rotating handle, the top of the height adjustment hand crank is connected to the vertical column through the first nut, and the bottom of the height adjustment hand crank is connected to the base through the third nut.

[0008] Preferably, the horizontal position adjusting push rod comprises two sets of outer square steel and inner square steel which are slidably sleeved, and the ends of the outer square steel are connected to square steel pipes.

[0009] Preferably, one end of the second nut is sleeved on the height adjustment hand crank and slides freely, and the other end of the second nut is connected to the inner side of the square steel tube.

[0010] Preferably, the square steel tube is sleeved on the vertical column and slides freely.

[0011] Preferably, the armor seam is sandwiched between two groups of the inner square steels, and the top of the inner square steel is in contact with the armor seam through the short steel bars.

[0012] A construction method for a floor armor seam installation and fixing device comprises the following steps:

[0013] S1. Weld the portal frame, 50cm high and 40cm wide. Install the height adjustment hand crank inside the vertical columns on both sides of the portal frame. The top and bottom of the height adjustment hand crank are not threaded, and the position is fixed with nuts. After the installation is completed, continue to install the horizontal position adjustment rod;

[0014] S2. Find two short steel bars at the construction site and place them on the horizontal position adjustment rod to fix the height of the armor seam. First, fix the horizontal position of the armor seam by the horizontal position adjustment rod, and then adjust the height of the armor seam by the height adjustment hand crank.

[0015] S3. After all armor seams are adjusted, use theodolite to check the lines. After ensuring that they are qualified, perform permanent welding and fixation, remove the fixing device, and move on to the next armor seam installation operation.

[0016] Therefore, the present invention adopts a floor armor seam installation and fixing device with the above structure and its construction method, which can reasonably utilize commonly used materials on site and is simple to manufacture. It can effectively improve the armor seam installation quality and construction efficiency, respond to the concept of saving materials in the four savings and one environmental protection, and can effectively solve the problem of difficult control of armor seam installation accuracy. The armor seam is temporarily fixed by relying on this device, and the entire armor seam position is adjusted and uniformly welded and fixed, and the molding quality is high. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a front view of the overall structure of a floor armor seam installation and fixing device of the present invention;

[0018] Figure 2 It is a side view of the overall structure of a floor armor seam installation and fixing device of the present invention;

[0019] Figure 3 It is a top view of the overall structure of a floor armor seam installation and fixing device of the present invention;

[0020] Figure 4 It is a front view of a door-type frame of a floor armor seam installation and fixing device of the present invention;

[0021] Figure 5 A top view of a door-type frame of a floor armor seam installation and fixing device according to the present invention;

[0022] Figure 6 It is a schematic diagram of a height adjustment hand crank of a floor armor seam installation and fixing device of the present invention;

[0023] Figure 7 It is a front view of a horizontal position adjusting push rod of a floor armor seam installation and fixing device of the present invention;

[0024] Figure 8 A top view of a horizontal position adjusting push rod of a floor armor seam installation and fixing device of the present invention;

[0025] Figure numerals: 1. portal frame; 101. vertical column; 102. frame top beam; 103. base; 104. circular through hole; 2. height adjustment mechanism; 201. height adjustment hand crank; 202. rotating handle; 203. first nut; 204. second nut; 205. third nut; 3. horizontal position adjustment top rod; 301. inner square steel; 302. outer square steel; 303. square steel pipe; 4. armor seam; 5. short steel bar. DETAILED DESCRIPTION

[0026] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.

[0027] Unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0028] Example

[0029] like Figure 1-Figure 3 As shown, a floor armor seam installation and fixing device includes a door frame 1, a height adjustment mechanism 2, a horizontal position adjustment top rod 3 and an armor seam 4, as shown in FIG. Figure 4 and Figure 5 As shown, the portal frame 1 is welded from 5# channel steel, is 50 cm high and 40 cm wide, and includes two vertical columns 101 and a frame top beam 102. The frame top beam 102 is welded to the top of the vertical column 101, and the bottom of the vertical column 101 is welded to the foot 103. Circular through holes 104 are provided at both ends of the frame top beam 102 for passing the height adjustment mechanism 2. The portal frame 1 can also use other channel steels of similar models.

[0030] like Figure 6 As shown, the height adjustment mechanism 2 includes two symmetrically arranged height adjustment hand cranks 201, which are made of A10 round steel threaded and are located inside the vertical columns 101 on both sides of the portal frame 1. An L-shaped rotating handle 202 is welded at the top of the height adjustment hand crank 201 to facilitate workers' operation. A first nut 203 is arranged on the top of the height adjustment hand crank 201, a second nut 204 is arranged in the middle, and a third nut 205 is arranged at the bottom. The top and bottom positions of the height adjustment rod are not threaded, and their positions are fixed with nuts so that the height adjustment hand crank 201 can rotate freely in the portal frame 1. The top of the height adjustment hand crank 201 passes through the circular through hole 104 to connect with the rotating handle 202, the top of the height adjustment hand crank 201 is connected to the vertical column 101 through the first nut 203, and the bottom of the height adjustment hand crank 201 is connected to the base 103 through the third nut 205.

[0031] like Figure 7 and Figure 8 As shown, the horizontal position adjustment rod 3 is sleeved on the vertical column 101 and can slide freely. The armor seam 4 is set on the horizontal position adjustment rod 3 through the short steel bar 5. The horizontal position adjustment rod 3 includes two sets of slidable outer square steel 302 and inner square steel 301, which are made of 30mm*30mm outer square steel 302 sleeved with 20mm*20mm inner square steel 301. One end of the 30mm*30mm outer square steel 302 is welded on a small section of square steel pipe 303. The square steel pipe 303 is sleeved on the vertical column 101 of the portal frame 1 and can slide freely up and down. Lubricating oil is applied between the square steel pipe 303 and the vertical column 101 for easy sliding. One end of the second nut 204 is sleeved on the height adjustment hand crank 201 and slides freely. The other end of the second nut 204 is welded on the inner side of the square steel pipe 303. The second nut 204 is sleeved on the height adjustment hand crank 201 to achieve the purpose of adjusting the height of the horizontal position adjustment rod 3 by rotating the hand crank.

[0032] The two groups of inner square steels 301 of the horizontal position adjustment mandrel 3 sandwich an armor seam 4 , and the top of the inner square steel 301 contacts the armor seam 4 through the short steel bar 5 .

[0033] A construction method for a floor armor seam installation and fixing device comprises the following steps:

[0034] S1, weld the portal frame 1, 50 cm high and 40 cm wide, install the height adjustment hand crank 201 inside the vertical columns 101 on both sides of the portal frame 1, the top and bottom of the height adjustment hand crank 201 are not threaded, and the position is fixed with nuts. After the installation is completed, continue to install the horizontal position adjustment top rod 3;

[0035] S2. Find two short steel bars 5 at the construction site and fix the height of the armor seam 4 on the horizontal position adjustment rod 3. First, fix the horizontal position of the armor seam 4 by the horizontal position adjustment rod 3, and then adjust the height of the armor seam 4 by the height adjustment hand crank 201;

[0036] S3. After all armor seams 4 are adjusted, use theodolite to check the lines. After ensuring that they are qualified, perform permanent welding and fixation, remove the fixing device, and move on to the next armor seam 4 installation operation.

[0037] Therefore, the present invention adopts a floor armor seam installation and fixing device and a construction method of the above structure, which effectively solves the problem of difficult control of armor seam installation accuracy. The armor seam is temporarily fixed by the device, and the entire armor seam position is uniformly welded and fixed after adjustment, and the molding quality is high. While ensuring the construction quality, the device is simple and easy to operate, improves construction efficiency, reduces rework, and is economical and reasonable.

[0038] Finally, it should be noted that the above embodiments are only preferred specific implementation methods of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A floor armor seam installation and fixing device, characterized in that: It includes a portal frame, a height adjustment mechanism, a horizontal position adjustment rod and an armor seam. The portal frame is connected by two vertical columns and a frame top beam. The top of the vertical column is connected to the frame top beam, and the bottom of the vertical column is connected to a foot. Circular through holes are opened at both ends of the frame top beam for passing the height adjustment mechanism. The two ends of the horizontal position adjustment rod are respectively mounted on the vertical column and slide freely. The armor seam is set on the horizontal position adjustment rod through a short steel bar.

2. A floor armor seam installation and fixing device according to claim 1, characterized in that: The height adjustment mechanism includes two symmetrically arranged height adjustment hand cranks, the top ends of the height adjustment hand cranks are connected with L-shaped rotating handles, the tops of the height adjustment hand cranks are provided with a first nut, the middle part is provided with a second nut, and the bottom is provided with a third nut.

3. A floor armor seam installation and fixing device according to claim 2, characterized in that: The height adjustment hand crank is arranged in the vertical column, the top of the height adjustment hand crank passes through the circular through hole and is connected to the rotating handle, the top of the height adjustment hand crank is connected to the vertical column through the first nut, and the bottom of the height adjustment hand crank is connected to the base through the third nut.

4. A floor armor seam installation and fixing device according to claim 1, characterized in that: The horizontal position adjustment push rod comprises two groups of outer square steel and inner square steel which are slidably sleeved, and the end of the outer square steel is connected with a square steel pipe.

5. A floor armor seam installation and fixing device according to claim 4, characterized in that: One end of the second nut is sleeved on the height adjustment hand crank and can slide freely, and the other end of the second nut is connected to the inner side of the square steel tube.

6. A floor armor seam installation and fixing device according to claim 4, characterized in that: The square steel pipe is sleeved on the vertical column and can slide freely.

7. A floor armor seam installation and fixing device according to claim 4, characterized in that: The armor seam is sandwiched between the two groups of inner square steels, and the top of the inner square steel is in contact with the armor seam through the short steel bars.

8. A construction method for the floor armor seam installation and fixing device according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1. Weld the portal frame, install the height adjustment hand crank inside the vertical columns on both sides of the portal frame, and then install the horizontal position adjustment rod after the installation is completed; S2. Find two short steel bars at the construction site and place them on the horizontal position adjustment rod to fix the height of the armor seam. First, fix the horizontal position of the armor seam by the horizontal position adjustment rod, and then adjust the height of the armor seam by the height adjustment hand crank. S3. After all armor seams are adjusted, use theodolite to check the lines. After ensuring that they are qualified, perform permanent welding and fixation, remove the fixing device, and move on to the next armor seam installation operation.