Inspection method and system based on TOB boundary upgrading and storage medium

By comparing and filtering the boundary instructions for the first edition and the upgrade boundary, we can determine whether the upgrade difference data meets the setting requirements, which solves the problem of excessive review workload during the first edition boundary upgrade and improves inspection efficiency.

CN119941179APending Publication Date: 2025-05-06CGN CANGNAN NUCLEAR POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510107663.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-23
Publication Date
2025-05-06

AI Technical Summary

Technical Problem

When upgrading the first version of the border to the upgrade, the day shift quarantine manager needs to review a large number of border instructions, which increases the review workload and reduces the inspection efficiency.

Method used

By obtaining the boundary instructions of the first version and the upgraded version, comparing and filtering to remove the same instructions, we can determine whether the upgraded difference data meets the setting requirements. If it is met, confirm that the check is completed.

Benefits of technology

The number of reviewers checks during the boundary upgrade process is reduced, and the upgrade processing can be completed quickly by just checking the upgraded data, improving the efficiency of information upgrade inspection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119941179A_ABST
    Figure CN119941179A_ABST
Patent Text Reader

Abstract

The invention provides an inspection method and system based on TOB boundary upgrading and a storage medium, and relates to the technical field of isolation handover boundary management, the inspection method comprises the following steps: obtaining a primary version boundary after isolation handover boundary upgrading processing and a version raising boundary corresponding to the primary version boundary; comparing the initial edition boundary with the rising edition boundary to obtain upgrading difference data between the initial edition boundary and the rising edition boundary in the boundary upgrading process; and judging whether the upgrade difference data meets a set requirement or not, and if yes, confirming that the inspection of the boundary upgrade is completed. According to the inspection method and system and the storage medium, the boundary instruction inspection workload in the boundary upgrading process can be effectively reduced, and the boundary instruction inspection efficiency is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of isolation handover boundary management, and in particular to an inspection method, system and storage medium based on TOB (Transfer over Isolation) boundary upgrade. Background Art

[0002] TOB isolation handover refers to the handover of the isolation management responsibility of the system when the system is transferred from installation to debugging. In the TOB stage, the preliminary version boundary will be established according to the relevant requirements of the isolation handover, and the boundary status of different boundary devices will be set according to the preliminary version boundary.

[0003] In order to expand and upgrade the initial version boundary, it is necessary to upgrade the initial version boundary to the upgrade version boundary. However, in the process of upgrading the initial version boundary to the upgrade version boundary, the day shift quarantine manager needs to review the relevant boundary instructions in the initial version boundary and the upgrade version boundary. However, due to the large number of boundary instructions, the review workload of the upgrade process is increased, which reduces the inspection efficiency during the quarantine handover boundary upgrade. Summary of the invention

[0004] In view of the shortcomings of the prior art mentioned above, the purpose of the present invention is to provide an inspection method, system and storage medium based on TOB boundary upgrade, which is used to solve the problem that in the process of upgrading the initial version boundary to the upgraded version boundary, the day shift isolation manager needs to review the relevant boundary instructions in the initial version boundary and the upgraded version boundary, but due to the large number of boundary instructions, the audit workload of the upgrade process is increased, and the inspection efficiency during the isolation transfer boundary upgrade is reduced.

[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides an inspection method based on TOB boundary upgrade, comprising the following steps: obtaining the initial edition boundary after the isolated transfer boundary upgrade processing and the upgraded edition boundary corresponding to the initial edition boundary; comparing the initial edition boundary and the upgraded edition boundary to obtain the upgrade difference data between the initial edition boundary and the upgraded edition boundary during the boundary upgrade process; judging whether the upgrade difference data meets the set requirements, and if so, confirming that the inspection of the boundary upgrade is completed.

[0006] In one embodiment of the present invention, obtaining the initial version boundary after the isolation and transfer boundary upgrade process and the upgraded version boundary corresponding to the initial version boundary includes: obtaining all boundary instructions in the initial version boundary and all boundary instructions of the corresponding upgraded version boundary.

[0007] In one embodiment of the present invention, the upgraded version boundary is obtained by upgrading the initial version boundary through the corresponding boundary upgrade instruction.

[0008] In one embodiment of the present invention, the boundary upgrade instruction includes: a modification upgrade instruction for directly upgrading the boundary based on the current first edition boundary, and an upgrade upgrade instruction for merging the current first edition boundary with other first edition boundaries.

[0009] In one embodiment of the present invention, the initial edition boundary and the upgraded edition boundary are compared to obtain the upgrade difference data between the initial edition boundary and the upgraded edition boundary in the boundary upgrade process, including: comparing all boundary instructions in the initial edition boundary with all boundary instructions of its corresponding upgraded edition boundary, finding out the inconsistent upgrade difference data in the boundary instructions, and controlling filtering to remove the boundary instructions shared by the initial edition boundary and the upgraded edition boundary.

[0010] In one embodiment of the present invention, the upgrade difference data includes: deletion, modification and addition of boundary instruction information.

[0011] In one embodiment of the present invention, it is determined whether the upgrade difference data meets the set requirements. If so, it is confirmed that the boundary upgrade check is completed, including: determining whether the difference operation corresponding to the upgrade difference data obtained by comparison meets the corresponding boundary isolation requirements. If so, the check is completed and the initial version boundary is confirmed to be upgraded to the upgrade version boundary. If not, the corresponding upgrade difference data is determined for re-checking.

[0012] In an embodiment of the present invention, after the initial edition boundary is confirmed and upgraded to the upgraded edition boundary, the method further includes: controlling printing of the upgraded difference data after the inspection is completed.

[0013] The present invention also provides an inspection system based on TOB boundary upgrade, including: an information acquisition unit, which acquires the initial edition boundary after the isolated and transferred boundary upgrade processing and the upgraded edition boundary corresponding to the initial edition boundary; a difference comparison unit, which compares the initial edition boundary and the upgraded edition boundary to obtain the upgraded difference data between the initial edition boundary and the upgraded edition boundary during the boundary upgrade process; and a difference verification unit, which determines whether the upgraded difference data meets the set requirements, and if so, confirms that the inspection of the boundary upgrade is completed.

[0014] The present invention further provides a computer-readable storage medium on which a computer program is stored, and the computer program is used to execute the above method.

[0015] Beneficial effects of the present invention: The present invention proposes an inspection method, system and storage medium based on TOB boundary upgrade. The inspection method, system and storage medium obtain the initial edition boundary and the upgraded edition boundary during the process of upgrading the initial edition boundary to the upgraded edition boundary, and compare the upgraded difference data between the two, that is, whether there is any deletion, addition or change of the boundary instruction of the initial edition boundary, and filter out the same boundary instructions in the initial edition boundary and the upgraded edition boundary, and check and judge the upgraded difference data obtained by filtering, and then determine whether the current upgraded difference data is accurate. By checking the initial edition boundary after the upgraded edition boundary is upgraded in the above manner, it can be achieved that after eliminating the same boundary instructions in the initial edition boundary and the upgraded edition boundary, only the upgraded difference data formed by the upgrade process is filtered and checked, thereby greatly improving the efficiency of information upgrade inspection during the upgrade process. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 The present invention is a flow chart of the inspection method.

[0017] Figure 2 It is a schematic diagram of the inspection process during TOB boundary upgrade in a preferred embodiment of the present invention.

[0018] Figure 3 It is a structural diagram of the inspection system of the present invention. DETAILED DESCRIPTION

[0019] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0020] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.

[0021] In the following description, numerous details are discussed to provide a more thorough explanation of the embodiments of the present invention. However, it is obvious to those skilled in the art that the embodiments of the present invention can be implemented without these specific details. In other embodiments, well-known structures and devices are shown in the form of block diagrams rather than in detail to avoid making the embodiments of the present invention difficult to understand.

[0022] See also Figure 1 In one embodiment of the present invention, the present invention provides an inspection method based on TOB boundary upgrade, including the following steps: obtaining the initial version boundary after the boundary upgrade processing of the isolated transfer and the upgraded version boundary corresponding to the initial version boundary; comparing the initial version boundary and the upgraded version boundary to obtain the upgrade difference data between the initial version boundary and the upgraded version boundary during the boundary upgrade process; judging whether the upgrade difference data meets the set requirements, and if so, confirming that the inspection of the boundary upgrade is completed.

[0023] In this embodiment, through the steps of obtaining the first edition boundary after the isolation and transfer boundary upgrade process and the upgraded edition boundary corresponding to the first edition boundary, it can be seen that in the isolation and transfer process, after the isolation and transfer first edition boundary is established, the upgraded edition boundary is obtained by performing methods such as upgrading and expanding the first edition boundary. Specifically, upgrading refers to upgrading the upgraded edition boundary by directly modifying the first edition boundary. Expanding refers to merging and modifying the current first edition boundary with other first edition boundaries to upgrade the upgraded edition boundary. Therefore, in the obtained upgraded edition boundary, there will be a situation where some boundary instructions are different from the boundary instructions of the first edition boundary, such as modification, addition or deletion of the first edition boundary instruction. Through the step: comparing the initial version boundary and the upgraded version boundary, obtaining the upgrade difference data between the initial version boundary and the upgraded version boundary in the boundary upgrade process, it can be seen that after obtaining the initial version boundary and the upgraded version boundary, when checking the boundary upgrade situation, the initial version boundary and the upgraded version boundary will be further compared with the boundary instructions, so that through the comparison, the upgrade difference between the upgraded version boundary obtained after the initial version boundary is upgraded and the initial version boundary can be directly determined. And when comparing, the upgrade difference data corresponding to the upgrade difference is controlled to be output, so that it can be convenient to directly check whether the upgrade difference data is accurate during the upgrade check. Through the step: judging whether the upgrade difference data meets the set requirements, if so, confirming that the boundary upgrade check is completed, it can be seen that after comparing the initial version boundary and the upgraded version boundary to obtain the upgrade difference data, according to the relevant requirements for the initial version upgrade in the isolation transfer process, it is necessary to further judge whether the upgrade difference data obtained by comparison meets the above-mentioned relevant requirements. If so, it means that the upgrade information of the initial version boundary to the upgraded version boundary is accurate, and it can be confirmed that the upgrade process of the initial version boundary to the upgraded version boundary is completed. If it is not satisfied, further processing is required, such as rechecking the boundary instructions of the initial version boundary and the corresponding upgraded version boundary, making corresponding modifications, additions or deletions, and then re-entering the inspection stage. Through the above-mentioned inspection method steps for TOB boundary upgrade, the amount of boundary information verification by the auditor or approver during the inspection of boundary upgrades can be effectively reduced. Only by reviewing the upgrade difference data of the initial version boundary and the corresponding upgraded version boundary, the upgrade process can be quickly inspected, thereby improving the efficiency of the upgrade inspection.

[0024] In one embodiment of the present invention, when performing a boundary upgrade check, it is necessary to compare and check the initial edition boundary and the corresponding upgraded edition boundary, so it is necessary to obtain the initial edition boundary and the corresponding upgraded edition boundary at the same time. Specifically, obtaining the initial edition boundary after the isolated and transferred boundary upgrade processing and the upgraded edition boundary corresponding to the initial edition boundary includes: obtaining all boundary instructions in the initial edition boundary and all boundary instructions of the corresponding upgraded edition boundary. In this embodiment, in the process of comparing the initial edition boundary and the upgraded edition boundary, by obtaining all boundary instructions of the initial edition boundary and all boundary instructions of the corresponding upgraded edition boundary, all boundary instructions of the initial edition boundary and all boundary instructions of the corresponding upgraded edition boundary can be further compared to obtain the boundary instructions that produce the difference, and compare to obtain the upgrade difference data between the two, so as to facilitate the subsequent direct inspection of the upgrade difference data.

[0025] In one embodiment of the present invention, there are the same boundary instructions and different boundary instructions between the upgraded version boundary and the first version boundary. Specifically, the upgraded version boundary is obtained by upgrading the first version boundary through the corresponding boundary upgrade instruction. In this embodiment, the upgraded version boundary is obtained by upgrading the first version boundary, that is, there are the same boundary instructions between the upgraded version boundary and the first version boundary that have not been upgraded. Of course, there are also different upgrade difference data between the two. The upgrade difference data includes deletion of the boundary instruction of the first version boundary, addition of the boundary instruction to the first version boundary, or modification of the boundary instruction of the first version boundary.

[0026] In one embodiment of the present invention, the upgrade boundary is obtained by upgrading the initial edition boundary through a boundary upgrade instruction. Specifically, the boundary upgrade instruction includes: a modification upgrade instruction for directly upgrading the boundary based on the current initial edition boundary, and an upgrade upgrade instruction for merging the current initial edition boundary with other initial edition boundaries. In this implementation, the boundary upgrade instruction mainly includes a modification upgrade instruction for directly upgrading the boundary based on the current initial edition boundary and an upgrade upgrade instruction for merging the current initial edition boundary with other initial edition boundaries. The modification upgrade instruction for directly upgrading the boundary based on the current initial edition boundary refers to the instruction processing that can directly modify the initial edition boundary, such as adding, changing, deleting boundary instructions, to achieve the purpose of upgrading the version, and obtain the upgrade boundary. Of course, the upgrade upgrade instruction for merging the current initial edition boundary with other initial edition boundaries refers to the instruction processing that merges and modifies the current initial edition boundary with other initial edition boundaries within the same isolation boundary range, so as to achieve the purpose of expanding the version, and obtain the upgrade boundary.

[0027] Furthermore, when creating the upgrade boundary, the upgrade instruction can be modified to import the first edition boundary into the upgrade boundary, and then based on the boundary upgrade instruction, the upgrade boundary is modified, such as adding, changing, deleting boundary instructions, etc., to complete the upgrade of the first edition boundary to the upgrade boundary. Of course, it is also possible to directly complete the modification, such as adding, changing, deleting boundary instructions, etc., at the first edition boundary stage according to the boundary upgrade instruction. And after the instruction processing is completed, the modified first edition boundary is further imported into the upgrade boundary.

[0028] In one embodiment of the present invention, after obtaining the initial version boundary and the upgraded version boundary, it is also necessary to compare the initial version boundary and the upgraded version boundary to determine the upgrade difference data between the two. Specifically, comparing the initial version boundary and the upgraded version boundary to obtain the upgrade difference data between the initial version boundary and the upgraded version boundary during the boundary upgrade process includes: comparing all boundary instructions in the initial version boundary with all boundary instructions of the corresponding upgraded version boundary, finding inconsistent upgrade difference data in the boundary instructions, and controlling filtering to remove the boundary instructions shared by the initial version boundary and the upgraded version boundary.

[0029] In this embodiment, when comparing the first edition boundary with the upgraded edition boundary, all boundary instructions of the first edition boundary are compared with all boundary instructions of the upgraded edition boundary to determine the inconsistent upgrade difference data between the two. The upgrade difference data includes the inconsistent boundary instructions, and of course, it can also include other inconsistent data such as when an error occurs. In addition, when comparing the first edition boundary with the upgraded edition boundary, the same boundary instructions in the first edition boundary and the upgraded edition boundary, that is, the common boundary instructions, are further identified. After identifying the common boundary instructions, they are filtered to ensure that only the different upgrade difference data between the first edition boundary and the upgraded edition boundary are displayed, so as to facilitate the auditor to perform efficient inspection when isolating and handing over the boundary upgrade according to the displayed upgrade difference data.

[0030] In one embodiment of the present invention, the upgrade difference data includes: deletion, modification and addition of boundary instruction information. Specifically, the deletion, modification and addition of boundary instruction information include two situations. One is to modify the boundary instruction of the boundary state of the initial version boundary, so that the initial version boundary is upgraded to obtain the upgraded version boundary; wherein, the boundary instruction for modifying the boundary state includes the boundary instruction for deleting, modifying and adding the boundary state, and the boundary instruction includes the function position code and the equipment status information. That is to say, by modifying the boundary instruction corresponding to the boundary state of the initial version boundary, the purpose of adjusting the boundary state is achieved, thereby realizing the upgrade of the initial version boundary to the upgraded version boundary. Specifically, the boundary instruction for modifying the boundary state can be the deletion, modification or addition of the boundary instruction to adjust the boundary state of the boundary device. The equipment status information can be the state of the device, such as opening and closing. For example, when the boundary device of the initial version boundary is a boundary valve, the valve originally processed in the open state can be modified to the closed boundary state through the boundary instruction "close valve". Among them, the function position code is a coding method for describing the location information of each device in the nuclear power isolation handover, and each device can be assigned a unique function position code. The other is to merge and modify the boundary state of the initial edition boundary when the current device TOB is transferred and other initial edition boundaries when other devices TOB are transferred according to the upgrade instruction, and import them into the upgrade boundary to obtain the boundary state of the upgrade boundary. That is to say, when upgrading the upgrade boundary from the initial edition boundary according to the upgrade instruction, first, according to the upgrade instruction, merge and modify the boundary state of the initial edition boundary when the current isolation device is isolated and transferred and other initial edition boundaries when other isolation devices are isolated and transferred, so as to merge the original initial edition boundary with at least one other initial edition boundary and import them into the upgrade boundary to realize the expansion process and obtain the boundary state of the merged upgrade boundary.

[0031] In addition, when the initial version boundary and other initial version equipment are merged and expanded, the upgraded version boundary includes the boundary range of the initial version boundary when the current equipment TOB is transferred and the boundary range of other initial version boundaries when other equipment TOB is transferred. And it also supports the corresponding modification of boundary instructions for boundary status in the obtained new boundary range, specifically including boundary instructions for deleting, changing and adding boundary status. Among them, the equipment status information can be the status of the equipment being opened, closed, etc. For example, when the boundary device of the initial version boundary is a boundary valve, the boundary instruction "close valve" can be used to modify the valve originally processed in the open state to a closed boundary state. Among them, the functional location code is a coding method used to describe the location information of each device in the nuclear power isolation transfer, and each device can be assigned a unique functional location code.

[0032] In one embodiment of the present invention, when checking the upgrade difference data, an automatic judgment method can be used. Specifically, it is judged whether the upgrade difference data meets the set requirements. If so, it is confirmed that the check of the boundary upgrade is completed, including: judging whether the difference operation corresponding to the upgrade difference data obtained by comparison meets the corresponding boundary isolation requirements. If so, the check is completed and the initial version boundary is confirmed to be upgraded to the upgrade version boundary. If not, the corresponding upgrade difference data is determined for re-checking.

[0033] In this embodiment, when performing the upgrade difference data check, a setting requirement may be pre-set, for example, according to the upgrade requirement of the first edition boundary to the upgrade boundary, the boundary instruction that needs to be upgraded is pre-set, so as to obtain the corresponding boundary isolation requirement. Then, it is judged whether the difference operation corresponding to the boundary difference data obtained by comparison meets the corresponding boundary isolation requirement. For example, when the first edition boundary and the upgrade boundary are compared, the difference operation obtained is the deletion isolation state "CLOSED". Correspondingly, if there is also a corresponding "deletion isolation state CLOSED" in the boundary isolation requirement, it indicates that the upgrade process is correct, that is, the check is completed, and the first edition boundary is confirmed to be upgraded to the upgrade boundary. If the difference operation obtained is the deletion isolation state "CLOSED", when there is no corresponding operation in the boundary isolation requirement, it is necessary to re-check all the links of the difference operation that forms the deletion isolation state "CLOSED". Of course, when performing the upgrade difference data check, it can also be performed manually. For example, after obtaining the upgrade difference data, it is sent to the relevant auditor for manual inspection to determine whether the current first edition boundary can be upgraded to the upgrade boundary.

[0034] In one embodiment of the present invention, after the initial edition boundary is upgraded to the upgraded edition boundary after the inspection, it is necessary to further check and confirm according to the upgraded difference data obtained by the upgrade, or to perform on-site listing, delisting and other processing. Specifically, after the initial edition boundary is confirmed to be upgraded to the upgraded edition boundary, it also includes: controlling the printing of the upgraded difference data after the inspection is completed. That is, after the inspection is completed, the upgraded difference data can be printed out for inspection and other operations to further verify the accuracy of the upgraded difference data.

[0035] See also Figure 2In a preferred embodiment, during the inspection and processing of the TOB boundary upgrade, the top row in the block diagram displays the planned plant (number 5120), the FB / TO number after expansion (FB100747B) and the query button. Below this row are two columns, "Existing Ticket Information" and "Expanded Ticket Information". Among them, the "Existing Ticket Information" on the left displays the FB / TO number before expansion (FB100748A), the creator and the work content. There is also specific display information below, which corresponds to the FB / TO number before expansion and the FB / TO number after expansion, respectively. Among them, the information displayed in the FB / TO number before expansion (FB100748A) includes the isolation operation order: 30000017358, short text: TOB debugging application creation, project: 1, functional location: CN-1-37-LKF, functional location description: nuclear island 380V normal power distribution system and application type TB (a short name for the TOB work application type). The expanded FB / TO number (FB100747B) shows the following information: Isolation Operation Sheet: 30000017362, Short Text: TOB Debugging Application Creation, Project: 1, Functional Location: CN-1-37-LKF, Functional Location Description: Nuclear Island 380V Normal Power Distribution System, and Application Type TB (an abbreviation for TOB's work application type). The "Expanded Ticket Information" on the right shows the expanded FB / TO number (FB100747B), Isolation Operation Sheet: 30000017464, Short Text: TOB Debugging Application Creation, Creator P625833, and Creator's Name. After clicking the query at the top, the expanded difference information will be displayed at the bottom of the frame diagram. When the difference exists in the FB / TO order number (FB100748A) before the expansion, the order number will be displayed: FB100748A, isolation operation order: 30000017362, project: 20, functional location: CN-1-37-LKF-21, functional location description: 1SBD2027CR SBD system socket box, isolation status: CLOSED, difference operation: delete (DELETE), existing ticket status: ETG (an isolation status during boundary management) and expansion ticket status "*"; when the difference exists in the FB / TO order number (FB100747B) after the expansion, the order number will be displayed: FB100747B, isolation operation order: 30000017464, project: 30, functional location: CN-1-37-LKF-26, functional location description: 1SBD2027CR SBD system socket box, isolation status: CLOSED, difference operation: add (ADD), existing ticket status "*" and expanded ticket status: ITG (an isolation status during border management).

[0036] like Figure 3As shown, in one embodiment of the present invention, the present invention also provides an inspection system based on TOB boundary upgrade, including: an information acquisition unit, the information acquisition unit acquires the initial version boundary after the isolated and transferred boundary upgrade processing and the upgraded version boundary corresponding to the initial version boundary; a difference comparison unit, the difference comparison unit compares the initial version boundary and the upgraded version boundary to obtain the upgrade difference data between the initial version boundary and the upgraded version boundary in the boundary upgrade process; a difference verification unit, the difference verification unit determines whether the upgrade difference data meets the set requirements, and if so, confirms that the inspection of the boundary upgrade is completed.

[0037] In this embodiment, in the inspection system of the present invention, the information acquisition unit can be used to obtain the initial edition boundary before the upgrade process and the upgraded edition boundary after the upgrade process during the TOB boundary upgrade process. And the difference comparison unit can be used to compare the boundary instruction data of the initial edition boundary and the upgraded edition boundary, so as to further obtain the upgrade difference data between the initial edition boundary and the upgraded edition boundary. Then, the upgrade difference data is judged by the difference verification unit to determine whether the upgrade difference data formed between the current initial edition boundary and the upgraded edition boundary meets the preset requirements of the upgrade process. If it meets the requirements, the inspection of the boundary upgrade is completed, that is, the upgrade process of the initial edition boundary to the upgraded edition boundary is determined to be completed. Through the above-mentioned inspection system, the amount of boundary information verification by the review or approval personnel during the inspection of the boundary upgrade process can be effectively reduced. Only by reviewing the upgrade difference data of the initial edition boundary and the corresponding upgraded edition boundary, the inspection of the upgrade process can be quickly realized, thereby improving the inspection efficiency of the boundary instruction during the upgrade process.

[0038] The present invention further provides a computer-readable storage medium on which a computer program is stored, and the computer program is used to execute the above method. The computer-readable storage medium may be included in the electronic device described in the above embodiment, or may exist independently without being assembled into the electronic device.

[0039] In summary, the present invention obtains the initial edition boundary and the upgraded edition boundary during the upgrade process of the initial edition boundary to the upgraded edition boundary, and compares the upgraded difference data between the two, that is, whether there is any deletion, addition or change of the boundary instruction of the initial edition boundary, and filters out the same boundary instructions in the initial edition boundary and the upgraded edition boundary, and checks and judges the upgraded difference data obtained by filtering, and then determines whether the current upgraded difference data is accurate. By checking the initial edition boundary after the upgraded edition boundary is upgraded to the upgraded edition boundary in the above manner, it can be achieved that after eliminating the same boundary instructions in the initial edition boundary and the upgraded edition boundary, only the upgraded difference data formed by the upgrade process is filtered and checked, and then the efficiency of the information upgrade inspection during the upgrade process can be greatly improved. Therefore, the present invention effectively overcomes various shortcomings in the prior art and has a high industrial utilization value.

[0040] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical ideas disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A TOB boundary upgrade inspection method, characterized in that: The steps include: Acquire the initial version boundary after the boundary upgrade process of the isolation transfer and the upgraded version boundary corresponding to the initial version boundary; Comparing the initial edition boundary with the upgraded edition boundary to obtain upgrade difference data between the initial edition boundary and the upgraded edition boundary during the boundary upgrade process; It is determined whether the upgrade difference data meets the set requirements. If so, it is confirmed that the check on the boundary upgrade is completed.

2. The inspection method based on TOB boundary upgrade according to claim 1 is characterized in that: Acquiring the initial version boundary after the boundary upgrade process of the isolation transfer and the upgraded version boundary corresponding to the initial version boundary, including: Obtain all boundary instructions in the initial version boundary and all boundary instructions corresponding to the upgraded version boundary.

3. The inspection method based on TOB boundary upgrade according to claim 1 or 2, characterized in that: The upgraded version boundary is obtained by upgrading the initial version boundary through the corresponding boundary upgrade instruction.

4. The inspection method based on TOB boundary upgrade according to claim 3 is characterized in that: The boundary upgrade instructions include: modification upgrade instructions for directly upgrading the boundary based on the current first edition boundary, and upgrade upgrade instructions for merging the current first edition boundary with other first edition boundaries.

5. The inspection method based on TOB boundary upgrade according to claim 1 is characterized in that: Comparing the initial version boundary with the upgraded version boundary to obtain upgrade difference data between the initial version boundary and the upgraded version boundary during the boundary upgrade process includes: All boundary instructions in the first edition boundary are compared with all boundary instructions in the corresponding upgraded edition boundary, the upgraded difference data that are inconsistent in the boundary instructions are found, and the boundary instructions shared by the first edition boundary and the upgraded edition boundary are filtered out.

6. The inspection method based on TOB boundary upgrade according to claim 1 or 5, characterized in that: The upgrade difference data includes: deletion, modification and addition of boundary instruction information.

7. The inspection method based on TOB boundary upgrade according to claim 1 is characterized in that: Determine whether the upgrade difference data meets the set requirements, and if so, confirm that the check on the boundary upgrade is completed, including: It is determined whether the difference operation corresponding to the upgraded difference data obtained by comparison meets the corresponding boundary isolation requirements. If so, the check is completed and the initial version boundary is confirmed to be upgraded to the upgraded version boundary. If not, the corresponding upgraded difference data is determined for rechecking.

8. The inspection method based on TOB boundary upgrade according to claim 7 is characterized in that: After the initial version boundary is confirmed and upgraded to the upgraded version boundary, the method further includes: The upgrade difference data after the inspection is completed is controlled and printed.

9. An inspection system based on TOB boundary upgrade, characterized in that: include: An information acquisition unit, the information acquisition unit acquires a primary version boundary after the boundary upgrade process of the isolation transfer and an upgraded version boundary corresponding to the primary version boundary; a difference comparison unit, the difference comparison unit comparing the initial edition boundary with the upgraded edition boundary to obtain upgrade difference data between the initial edition boundary and the upgraded edition boundary during boundary upgrade; The difference checking unit determines whether the upgrade difference data meets the set requirements, and if so, confirms that the check on the boundary upgrade is completed.

10. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and the computer program is used to execute the method according to any one of claims 1 to 8.