Construction method for quickly welding connector
By strictly controlling the temperature, uniform heating and appropriate cooling in the construction method of welding splicers, the deformation or damage of the splicers caused by uneven heating or cooling during the welding process is solved, and the stability and reliability of the splicers are achieved.
Patent Information
- Application Number
- CN202510050623.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-13
- Publication Date
- 2025-05-16
AI Technical Summary
Uneven heating or cooling during welding may cause deformation or damage to the connector, and the welding temperature and time need to be strictly controlled, cleaned and appropriate cooling are carried out to ensure welding quality and stability.
Provide a construction method for rapid welding splicers, including preliminary preparation, welding process and splicers installation. Specific steps include on-site survey to determine the joint position, cleaning up the surface attachments of the foundation pit, assembling the mounting parts and pretreating them (such as cleaning oxides and oil stains), welding with tungsten inert gas protective welding, and cooling appropriately after the welding is completed.
By strictly controlling the welding temperature and time, and heating the welding area evenly, ensuring the stability and reliability of the connector, avoiding deformation or damage, and improving welding quality.
Smart Images

Figure CN120016240A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of connectors, and in particular to a construction method of a quick welding connector. Background Art
[0002] A connector is an electromechanical device. In different industries, the styles, functions and other aspects are also different. A connector is roughly defined as connecting two electromechanical or electrical products. After the connection, information data can be transmitted or they can work together. Such a device, a connector is a steel bar connection material, which is actually a steel sleeve with a thread inside. According to the thread form, it can be divided into tapered thread and straight thread. During construction, the connector is installed on the reserved steel bars on the underground continuous wall steel cage. After the excavation is completed, the main reinforcement of the floor can be connected to the connector. The connector on the steel cage is installed on the anchor bar through special equipment. When constructing the base plate, one end of the steel bar is rolled into a thread, and then screwed to the connector with a wrench to achieve the form of steel bar connection. The connector is usually Used to connect two devices or components so that they can transmit data or signals. When in use, the two ends of the connector need to be inserted into the interfaces of the devices or components to be connected respectively. After ensuring that the connection is stable, you can start using it. The connector is a common connection tool and is widely used in various electronic devices and systems. Its main function is to serve as a bridge to connect two devices or components to achieve data or signal transmission. When using a connector, the first thing you need to pay attention to is to choose the appropriate type of connector. Different devices and systems may require different types of connectors. Therefore, you need to confirm the specifications and type of the required connector before use to ensure that it is compatible with the interface of the device or component. Therefore, a construction method for quickly welding a connector is required.
[0003] A common problem with this construction method of a quick welding connector is uneven heating or cooling during the welding process, which may cause deformation or damage to the connector. In order to avoid these problems, the welding temperature and time should be strictly controlled during construction to ensure that the welding area is evenly heated. In addition, the surface of the connector must be cleaned to remove oil and rust to ensure welding quality. After welding is completed, proper cooling should be carried out to prevent internal stress caused by rapid cooling, thereby ensuring the stability and reliability of the connector. Summary of the invention
[0004] The present invention provides a construction method for a rapid welding connector. A common problem is uneven heating or cooling during the welding process, which may cause deformation or damage to the connector. In order to avoid these problems, the welding temperature and time should be strictly controlled during construction to ensure that the welding area is heated evenly. In addition, the surface of the connector must be cleaned to remove oil and rust to ensure welding quality. After welding is completed, appropriate cooling should be performed to prevent internal stress caused by rapid cooling, thereby ensuring the stability and reliability of the connector.
[0005] To achieve the above object, the present invention provides a construction method of a rapid welding connector, a construction method of a rapid welding connector, comprising the following steps: S1. Preliminary preparation: Before installing the underground continuous wall connector, a site survey is required to determine the location and size of the joint; S2. Welding process: 1. Assembly of mounting parts; 2. Welding process; S3. Connector installation.
[0006] Preferably, in S2, after the connector mounting parts are assembled as required, the joint positions are cut into a state to be welded, and the mounting parts are pre-treated by cleaning, removing oxides, and removing oil stains before welding.
[0007] Preferably, in S2, the welding process should comply with relevant standards and specifications. For example, the welding joint should be welded using tungsten inert gas shielded welding, the welding current should be obtained through experiments, and attention should be paid to adjusting the welding machine parameters before welding. After fixing both ends of the joint, the position to be welded should be gradually heated. During welding, the heating should be uniform to ensure that the mounting parts are firmly connected to the joint.
[0008] Preferably, in S3, the installation process of the connector is: Q1. First, you need to determine the appropriate length of the mounting piece and use a grinder to grind both ends of the mounting piece flat for better connection; Q2. Insert the two ends of the connector into the two ends of the mounting piece and tighten the screws. Be careful not to overtighten to avoid damaging the mounting piece. Q3. Tighten the screws with a wrench until the mounting joint is completely fixed, then heat the joint with a lighter to reach the required temperature for heating connection.
[0009] 1. Preferably, in S3, the operation items of the connector are: Z1. Protective measures; Z2, confirm the length; Z3, temperature status; Z4. Check the connection; Z5. Learn to operate.
[0010] Preferably, in Z2, before using the connector, it is necessary to confirm whether the size of the installation part is appropriate. For example, before using the steel bar connector, it is necessary to confirm whether the length of the steel bar is appropriate. If the length is not appropriate, it needs to be cut.
[0011] Preferably, in the Z3, when performing heating connection, attention should be paid to whether the temperature is appropriate. Too high a temperature will affect the strength of the mounting parts, and too low a temperature will make the connection impossible.
[0012] Preferably, in the Z4, after the connection is completed, the joint needs to be checked to ensure that the connection is firm. If the connection is not firm, it needs to be reconnected.
[0013] Compared with the prior art, the invention has the following beneficial effects: a construction method for a rapid welding connector has the following effects: 1. Insert both ends of the connector into the interfaces of the device or component to be connected. When inserting, make sure that the connector plug is aligned with the interface and insert gently to avoid damage caused by excessive force. At the same time, you also need to check whether the connector connection is stable to avoid looseness or poor contact. If the connector connection is unstable, it may cause data transmission interruption or signal quality degradation, affecting the normal use of the device or system.
[0014] 2. Once the connector is connected, you can start using it. During use, be careful to avoid excessive bending or pulling of the connector to avoid line breakage or damage. At the same time, you also need to regularly check the connection status of the connector to ensure that it always maintains good contact and transmission performance. If you encounter connection problems or abnormal data transmission, you can try to re-plug the connector or replace it with a new one to solve the problem.
[0015] 3. First, before installing the underground continuous wall connector, a site survey is required to determine the size of the joint position. Then the foundation pit should be cleaned, the surface attachments should be removed, and the quality of contact between the connector and the foundation pit should be ensured. At the same time, the construction site should be well ventilated to eliminate safety hazards. When assembling the installation parts, 1: After the installation parts are assembled, the connector steel plate is assembled as required, and the joint position is cut into a state to be welded. After pre-treatment such as cleaning the steel plate, removing oxides, and removing oil stains, welding can be started. 2: Welding process: The welding process should comply with relevant standards and specifications. For example, tungsten inert gas shielded welding should be used for welding joints, and the welding current should be obtained through experiments. Before welding, pay attention to adjusting the welding machine parameters, and gradually heat the position to be welded after fixing both ends of the joint. During welding, heat evenly to ensure that the steel plate and the joint are firmly connected. After the joint welding is completed, the steel plate installation can be started. Lower the connector steel plate into the foundation pit through equipment such as hooks, and adjust the distance between the steel plate and the foundation pit. Insert the steel plate into the joint, adjust the joint position, and install the bolts. When installing the steel plate, care should be taken to avoid damage to the underground continuous wall. After the steel plate is installed, it should be checked to ensure that it is tightly connected to the joint and meets the requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A schematic diagram of the operation flow of the welding connector provided by the present invention; Figure 2 A schematic diagram of the installation process of the connector provided by the present invention; Figure 3 This is a schematic diagram of the operation structure provided by the present invention. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] See also Figure 1-3 The present invention provides a construction method of a quick welding connector: a construction method of a quick welding connector, comprising the following steps: S1. Preliminary preparation: Before installing the underground continuous wall connector, a site survey is required to determine the location and size of the joint; S2. Welding process: 1. Assembly of mounting parts; 2. Welding process; S3. Connector installation.
[0019] First of all, before installing the underground continuous wall connector, a site survey is required to determine the location and size of the joint. Then the foundation pit should be cleaned, surface attachments should be removed, and the contact quality between the connector and the foundation pit should be ensured. At the same time, good ventilation should be ensured at the construction site to eliminate safety hazards. When assembling the installation parts, 1: After the installation parts assembly connector steel plate is assembled as required, the joint position is cut into the state to be welded. After pre-treatment such as cleaning, removing oxides and removing oil stains on the steel plate, welding can be started; 2: Welding process: The welding process should comply with relevant standards and specifications. For example, tungsten inert gas shielded welding should be used for welding joints, and the welding current should be obtained through experiments. Before welding, attention should be paid to adjusting the welding machine parameters. After fixing both ends of the joint, the position to be welded is gradually heated. During welding, uniform heating should be performed to ensure that the steel plate and the joint are firmly connected. After the joint welding is completed, the steel plate installation should be started. The connector steel plate is lowered into the foundation pit through equipment such as hooks, the distance between the steel plate and the foundation pit is adjusted, the steel plate is inserted into the joint, the joint position is adjusted, and the bolts are installed. When installing the steel plate, care should be taken to avoid damage to the underground continuous wall. After the steel plate is installed, an inspection should be carried out to ensure that it is tightly connected to the joint and meets the requirements.
[0020] Furthermore, in S2, after the connector mounting parts are assembled as required, the joint positions are cut into a state to be welded, and the mounting parts are pre-treated by cleaning, removing oxides, and removing oil stains before welding.
[0021] Furthermore, in S2, the welding process should comply with relevant standards and specifications. For example, tungsten inert gas shielded welding should be used for welding joints. The welding current should be obtained through experiments. Before welding, attention should be paid to adjusting the welding machine parameters. After fixing both ends of the joint, the welding position should be gradually heated. During welding, the heating should be uniform to ensure that the mounting parts and the joints are firmly connected.
[0022] Furthermore, in S3, the installation process of the connector is as follows: Q1. First, you need to determine the appropriate length of the mounting piece and use a grinder to grind both ends of the mounting piece flat for better connection; Q2. Insert the two ends of the connector into the two ends of the mounting piece and tighten the screws. Be careful not to overtighten to avoid damaging the mounting piece. Q3. Tighten the screws with a wrench until the mounting joint is completely fixed, then heat the joint with a lighter to reach the required temperature for heating connection; Q4. After the connection is completed, gently pull the steel bar by hand to check whether the joint is firm. If the joint is not firm, it needs to be reconnected.
[0023] When installing and connecting the connector, the preparation work is as follows: first, you need to determine the appropriate length of the mounting piece, and use a grinder to grind both ends of the mounting piece to make it smooth for better connection; install the connector: insert the two ends of the connector into the two ends of the mounting piece respectively, and tighten the screws. Be careful not to overtighten to avoid damage to the mounting piece; operate the connector: tighten the screws with a wrench until the mounting piece joint is completely fixed, and then use a lighter to heat the joint to reach the required temperature for heating connection; check the joint: after the connection is completed, gently pull the mounting piece by hand to check whether the joint is firm. If the joint is not firm, it needs to be reconnected; for example, in the steel bar connector, the method of use is as follows: 1. First clean the two steel bars to be connected at the connection to ensure that it is flat and free of debris; 2. Install the steel bar connector and fix it on the steel bar to be connected to ensure that it is in a vertical state; 3. Bring the second steel bar close to the steel bar connector and rotate the steel bar connector to wrap it around the second steel bar; 4. Clamp the steel bar connector and rotate it by hand until the connection of the two steel bars is aligned to complete the steel bar connection. The reason is: the design principle of the steel bar connector is to connect the steel bars together through a threaded joint to ensure It ensures the firmness of the connection and avoids the weaknesses of the steel bar connections and the fragility of the interfaces. At the same time, the use of steel bar connectors to connect steel bars can effectively improve work efficiency and connection accuracy and reduce the difficulty of manual connection. Content extension: Steel bar connectors are commonly used tools for construction workers. Their quality should usually be guaranteed and they should be tested by professionally qualified personnel before use. When connecting steel bars, attention should be paid to factors such as the distance between the connections, whether the installation is correct, and the accuracy of the steel bars to ensure the firmness and safety of the connection. At the same time, appropriate storage and maintenance methods can also extend the life and use of steel bar connectors.
[0024] Furthermore, in S3, the operation items of the connector are: Z1. Protective measures; Z2, confirm the length; Z3, temperature status; Z4. Check the connection; Z5. Learn to operate.
[0025] When using the rebar connector, you need to pay attention to safety. During the operation, you need to wear protective gloves, goggles and other protective equipment to avoid injury. Before using the connector, you need to confirm whether the size of the installation parts is appropriate. If the size is not appropriate, the installation parts need to be adjusted. When performing heating connections, you need to pay attention to whether the temperature is appropriate. Too high a temperature will affect the strength of the installation parts, and too low a temperature will not allow the connection to be made. After the connection is completed, the joint needs to be checked to ensure that the connection is firm. If the connection is not firm, it needs to be reconnected. Before using the connector, you need to first learn its operation method and master it proficiently. Only by mastering the operation method can construction efficiency and safety be guaranteed.
[0026] Furthermore, in Z2, before using the connector, it is necessary to confirm whether the size of the installation part is appropriate. For example, before using the steel bar connector, it is necessary to confirm whether the length of the steel bar is appropriate. If the length is not appropriate, it needs to be cut.
[0027] Furthermore, in Z3, when performing heating connection, it is necessary to pay attention to whether the temperature is appropriate. Too high a temperature will affect the strength of the installation, and too low a temperature will make the connection impossible.
[0028] Furthermore, in Z4, after the connection is completed, the connector needs to be checked to ensure that the connection is firm.
[0029] Working principle: A construction method for a quick welding connector. First, before installing the underground continuous wall connector, a site survey is required to determine the position and size of the joint. Then the foundation pit must be cleaned and the surface attachments must be removed to ensure the contact quality between the connector and the foundation pit. At the same time, the construction site must be well ventilated to eliminate safety hazards. When assembling the installation parts, 1: After the installation parts are assembled, the connector steel plates are assembled as required, the joint positions are cut into the state to be welded, and the steel plates are cleaned, oxides are eliminated, oil stains are removed and other pre-treatments are performed before welding; 2: Welding process: The welding process should comply with relevant standards and specifications. For example, tungsten inert gas shielded welding should be used for welding joints, and the welding current should be obtained through experiments. Before welding, pay attention to adjusting the welding machine parameters, fix both ends of the joint and gradually heat the welding position. Heat evenly during welding to ensure that the steel plate and the joint are firmly connected. After the joint is welded, start installing the steel plate. Lower the connector steel plate into the foundation pit through equipment such as hooks, adjust the distance between the steel plate and the foundation pit, insert the steel plate into the joint, adjust the joint position, and install the bolts. When installing the steel plate, pay attention to avoid damage to the underground continuous wall. After the steel plate is installed, check to ensure that it is tightly connected to the joint and meets the requirements.
[0030] When installing and connecting the connector, the preparation work is as follows: first, you need to determine the appropriate length of the mounting piece, and use a grinder to grind both ends of the mounting piece to make it smooth for better connection; install the connector: insert the two ends of the connector into the two ends of the mounting piece respectively, and tighten the screws. Be careful not to overtighten to avoid damage to the mounting piece; operate the connector: tighten the screws with a wrench until the mounting piece joint is completely fixed, and then use a lighter to heat the joint to reach the required temperature for heating connection; check the joint: after the connection is completed, gently pull the mounting piece by hand to check whether the joint is firm. If the joint is not firm, it needs to be reconnected; for example, in the steel bar connector, the method of use is as follows: 1. First clean the two steel bars to be connected at the connection to ensure that it is flat and free of debris; 2. Install the steel bar connector and fix it on the steel bar to be connected to ensure that it is in a vertical state; 3. Bring the second steel bar close to the steel bar connector and rotate the steel bar connector to wrap it around the second steel bar; 4. Clamp the steel bar connector and rotate it by hand until the connection of the two steel bars is aligned to complete the steel bar connection. The reason is: the design principle of the steel bar connector is to connect the steel bars together through a threaded joint to ensure It ensures the firmness of the connection and avoids the weaknesses of the steel bar connections and the fragility of the interfaces. At the same time, the use of steel bar connectors to connect steel bars can effectively improve work efficiency and connection accuracy and reduce the difficulty of manual connection. Content extension: Steel bar connectors are commonly used tools for construction workers. Their quality should usually be guaranteed and they should be tested by professionally qualified personnel before use. When connecting steel bars, attention should be paid to factors such as the distance between the connections, whether the installation is correct, and the accuracy of the steel bars to ensure the firmness and safety of the connection. At the same time, appropriate storage and maintenance methods can also extend the life and use of steel bar connectors.
[0031] When using the rebar connector, you need to pay attention to safety. During the operation, you need to wear protective gloves, goggles and other protective equipment to avoid injury. Before using the connector, you need to confirm whether the size of the installation parts is appropriate. If the size is not appropriate, the installation parts need to be adjusted. When performing heating connections, you need to pay attention to whether the temperature is appropriate. Too high a temperature will affect the strength of the installation parts, and too low a temperature will not allow the connection to be made. After the connection is completed, the joint needs to be checked to ensure that the connection is firm. If the connection is not firm, it needs to be reconnected. Before using the connector, you need to first learn its operation method and master it proficiently. Only by mastering the operation method can construction efficiency and safety be guaranteed.
[0032] After welding the connector, the weld needs to be carefully inspected to ensure that the quality of the welding meets the standards. The staff who carry out the inspection must have relevant qualifications and be able to accurately identify any defects in the welding. If problems are found, they should be repaired in time to ensure the strength and safety of the welded parts. After completing the welding inspection, the entire connector is finally inspected and confirmed to ensure that all components are stable and not loose, and to ensure that the specifications of the project are met. During the entire construction period, continuous supervision of the working environment must be ensured to ensure that environmental factors such as temperature and humidity meet the regulations to ensure that the quality of the construction work is not affected.
[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the implementation rules without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction method for a quick welding connector, characterized in that: The method comprises the following steps: S1. Preliminary preparation: Before installing the underground continuous wall connector, a site survey is required to determine the location and size of the joint; S2. Welding process: Mounting parts assembly; Welding process; S3. Connector installation.
2. The construction method of a quick welding connector according to claim 1, characterized in that: In S2, after the connector mounting parts are assembled as required, the joint positions are cut into a state to be welded, and the mounting parts are pre-treated by cleaning, removing oxides, and removing oil stains before welding.
3. The construction method of a quick welding connector according to claim 1, characterized in that: In S2, the welding process should comply with relevant standards and specifications. For example, tungsten inert gas shielded welding should be used for welding joints. The welding current should be obtained through experiments. Before welding, attention should be paid to adjusting the welding machine parameters. After fixing both ends of the joint, the welding position should be gradually heated. During welding, the heating should be uniform to ensure that the mounting parts and the joints are firmly connected.
4. The construction method of a quick welding connector according to claim 1, characterized in that: In S3, the installation process of the connector is as follows: Q1. First, you need to determine the appropriate length of the mounting piece and use a grinder to grind both ends of the mounting piece flat for better connection; Q2. Insert the two ends of the connector into the two ends of the mounting piece and tighten the screws. Be careful not to overtighten to avoid damaging the mounting piece. Q3. Tighten the screws with a wrench until the mounting joint is completely fixed, then heat the joint with a lighter to reach the required temperature for heating connection; Q4. After the connection is completed, gently pull the steel bar by hand to check whether the joint is firm. If the joint is not firm, it needs to be reconnected.
5. The construction method of a quick welding connector according to claim 1, characterized in that: In S3, the operation items of the connector are: Z1. Protective measures; Z2, confirm the length; Z3, temperature status; Z4. Check the connection; Z5. Learn to operate.
6. A construction method for a rapid welding connector according to claim 5, characterized in that: In the Z2, before using the connector, it is necessary to confirm whether the size of the installation part is appropriate. For example, before using the steel bar connector, it is necessary to confirm whether the length of the steel bar is appropriate. If the length is not appropriate, it needs to be cut.
7. The construction method of a rapid welding connector according to claim 5, characterized in that: In the Z3, when performing heating connection, it is necessary to pay attention to whether the temperature is appropriate. Too high a temperature will affect the strength of the mounting parts, and too low a temperature will make the connection impossible.
8. The construction method of a rapid welding connector according to claim 5, characterized in that: In the Z4, after the connection is completed, the joint needs to be checked to ensure that the connection is firm. If the connection is not firm, it needs to be reconnected.