Single-person assembly type grave facilitating external decoration and decoration technology

By using the structural combination of decorative columns, decorative stone slabs and stable metal columns in the prefabricated tomb, the problem of wear and tear due to sun and rain is solved, and the flexible replacement of the external patterns of the tomb is achieved, meeting personalized funeral needs and maintaining a fresh sense of commemorative significance.

CN120061637APending Publication Date: 2025-05-30BEIJING TIANSHUNYUAN ENVIRONMENTAL PROTECTION TECHNOLOGY CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202510241221.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-03
Publication Date
2025-05-30

AI Technical Summary

Technical Problem

After long-term use of the existing prefabricated tombs, the stone carving patterns on the exterior decorations have worn and depreciated due to sun and rain, which affects the appearance of the tombs.

Method used

A single-person prefabricated tomb that is convenient for external decoration is designed, using the structural combination of decorative columns, decorative stone slabs and stable metal columns. The tomb manufacturers can replace the decorative stone roof, decorative stone slabs and decorative handrails according to customer preferences and family traditions, so as to realize the flexible replacement of the external patterns of the tomb.

Benefits of technology

Through flexible replacement of decoration, personalized funeral needs are met, allowing the tomb to be updated with the changes in time and family emotions, maintaining the freshness and sense of time of commemorative significance, while improving the diversity and customer satisfaction of the tomb.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120061637A_ABST
    Figure CN120061637A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of assembly type graves, and relates to a single assembly type grave convenient for exterior decoration and a decoration technology.The single assembly type grave comprises a first base, the bottom end of a stable square stone strip is connected with the first base, a second base, a third base and a fourth base in an inserted mode, and clamping stone strips are connected to the center of a mounting base and the top end of the stable square stone strip in an inserted mode; clamping metal columns are connected to the two sides of the clamping stone strip in an inserted mode, the bottom ends of the clamping metal columns are connected with the fourth base in an inserted mode, decorative stone columns are arranged on the two sides of the tombstone, and the decorative assembly is used in cooperation with the tombstone and the decorative stone columns. After the decorative stone top, the decorative stone plate, the first decorative handrail and the second decorative handrail are abraded and depreciated due to exposure to the sun and rain, the decorative stone top, the decorative stone plate, the first decorative handrail and the second decorative handrail can be detached and replaced under the condition that the grave body is not affected, and family members can conveniently replace patterns or decorations outside the grave at any time according to favors, family tradition or specific memorial significance of the departed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of prefabricated tombs, and relates to a single-person prefabricated tomb convenient for external decoration and a decoration process. Background Art

[0002] Prefabricated tombs are usually composed of multiple parts, which are prefabricated in a factory and then transported to the site for assembly. This method has many advantages. First, it can greatly improve the construction efficiency and shorten the construction time. Second, the prefabricated components of prefabricated tombs are usually produced in a factory, and the quality is easier to control, thus ensuring the durability and stability of the tombs.

[0003] For example, a stone tombstone convenient for storage disclosed in the patent (CN115287661A) can limit the tombstone through the cooperation between a sliding limit frame and a guide member, avoiding the tombstone from tipping over, so as to prevent the tombstone from being damaged and thus reducing economic losses.

[0004] For example, a rainproof and leak-proof prefabricated tomb disclosed in the patent (CN112376988B) can facilitate the sealing of the assembly connection of the tomb through the setting of a first sealing strip and a second sealing strip and the setting of a sealing spring at the upper ends of the first sealing strip and the second sealing strip, thereby avoiding moisture from penetrating into the tomb. By setting the first sealing strip and the second sealing strip, it can facilitate the blocking of the assembly connection of the tomb, thereby avoiding rainwater from entering the tomb.

[0005] For example, an integrated tomb floor structure disclosed in the patent (CN222456998U) realizes the combination of the functions of a tombstone base and a tomb cover by arranging the floor between a stone box and a tombstone, simplifies the tomb structure and the installation process, and the tomb cover has a certain slope to help drain water and avoid water accumulation.

[0006] In summary, it can be seen that the following technical problems exist in the prior art: The design of prefabricated tombs can meet the needs and aesthetic requirements of different customers. However, after the existing prefabricated tombs are installed and used for a long time, due to the reason that they are placed outdoors for a long time, the stone carvings used for external decoration will be worn and depreciated due to sun exposure and rain, affecting the overall appearance of the tomb. Therefore, the present application proposes a single-person prefabricated tomb convenient for external decoration and a decoration process, providing a new technical solution to solve the technical problems mentioned in the above patents. Summary of the Invention

[0007] The technical problem to be solved by the present invention is: After the existing prefabricated tombs are installed and used for a long time, due to the reason that they are placed outdoors for a long time, the stone carvings used for external decoration will be worn and depreciated due to sun exposure and rain, affecting the overall appearance of the tomb.

[0008] The technical solution adopted by the present invention to solve its technical problems is: a single-piece assembled tomb for external decoration and its decoration process, including a first base, characterized in that: a second base is installed at the top of the first base, a third base is installed at the top of the second base, a fourth base is installed at the top of the third base, a mounting seat is inserted and connected to one end of the top of the fourth base, a plurality of stable square stone bars are inserted and connected to the bottom of the mounting seat, the bottom ends of the stable square stone bars are inserted and connected to the first base, the second base, the third base and the fourth base, a clamping stone bar is inserted and connected to the center position of the mounting seat and the top ends of the stable square stone bars, clamping metal columns are inserted and connected to both sides of the clamping stone bar, and the bottom ends of the clamping metal columns are inserted and connected to the fourth base;

[0009] A tombstone, which is arranged at the center position of the top of the mounting seat, and decorative stone columns are arranged on both sides of the tombstone, and the bottom ends of the decorative stone columns are inserted and connected to the mounting seat;

[0010] A decoration component, which is arranged at the position outside the decorative stone column, and the decoration component is used in cooperation with the tombstone and the decorative stone column;

[0011] A tomb mound, which is arranged at the center position of the fourth base, and the part of the fourth base outside the tomb mound has a convex shape with a higher middle and lower sides.

[0012] Preferably, the decoration component includes a decorative stone top, a clamping square stone seat and a connecting seat. A decorative stone top is inserted and connected to the top of the tombstone. A plurality of decorative grooves are opened at one end of the decorative stone column. A clamping square stone seat is inserted and connected to the inner side of the decorative groove. A connecting seat is fixedly connected to the side of the clamping square stone seat close to the tombstone, and the connecting seat is inserted and connected to the tombstone.

[0013] Preferably, the decoration component further includes a decorative column, a decorative stone slab and a stable metal column. A decorative column is inserted and connected to the inner side of the clamping square stone seat. A decorative stone slab is fixedly connected to the end of the decorative column away from the clamping square stone seat. A stable metal column is inserted and connected to the inner sides of the decorative stone column, the decorative stone top, the clamping square stone seat and the decorative column.

[0014] Preferably, the tomb mound includes a tomb chamber floor, a first side plate of the tomb chamber, a second side plate of the tomb chamber, and a first clamping arc strip. Placement grooves are provided at one ends of the first base, the second base, the third base, and the fourth base corresponding to the mounting seat. The tomb chamber floor is installed at the bottom of the placement groove of the first base. Both sides of the tomb chamber floor are clamped and connected with the first side plate of the tomb chamber. Both ends of the first side plate of the tomb chamber away from the tomb chamber floor are fixedly connected with the first clamping arc strip. The first clamping arc strip is inserted and connected with the first base, the second base, the third base, and the fourth base. Both ends of the tomb chamber floor are provided with the second side plate of the tomb chamber. The second side plate of the tomb chamber is clamped and connected with the tomb chamber floor and the first side plate of the tomb chamber.

[0015] Preferably, the tomb mound further includes a sealing groove, a tomb chamber cover plate, a sealing stone strip, a second clamping arc strip, and a waterproof cover plate. The sealing groove is provided at the top of the first side plate and the second side plate of the tomb chamber. The tomb chamber cover plate is provided at the top of the first side plate and the second side plate of the tomb chamber. The bottom end of the tomb chamber cover plate is fixedly connected with the sealing stone strip. The sealing stone strip is inserted and connected with the sealing groove. Both ends of both sides of the tomb chamber cover plate are fixedly connected with the second clamping arc strip. The second clamping arc strip is inserted and connected with the fourth base. The waterproof cover plate is fixedly connected to the top end of the tomb chamber cover plate.

[0016] Preferably, first clamping square columns are provided on both sides of one end of the first base away from the fourth base. The bottom end of the first clamping square column is fixedly connected with a stabilizing stone strip. The stabilizing stone strip is inserted and connected with the first base. The top end of the first clamping square column is inserted and connected with a first decorative handrail.

[0017] Preferably, second clamping square columns are provided at the central positions on both sides of the first base and on both sides of one end of the first base away from the first clamping square column. One end of the first clamping square column close to the fourth base and one end of the second clamping square column at the central position on both sides of the first base close to the first clamping square column are fixedly connected with a first retaining wall socket. A first retaining wall board is inserted and connected between the two corresponding first retaining wall sockets.

[0018] Preferably, the bottom and top of the second clamping square columns located at the central positions on both sides of the first base are plugged and connected with first mounting plates. The bottom and top of the second clamping square columns located at both sides of one end of the first base away from the first clamping square column are plugged and connected with second mounting plates. The ends of the first mounting plates and the second mounting plates extending out of the second clamping square columns at the top of the second clamping square columns are plugged and connected with the fourth base. The ends of the first mounting plates and the second mounting plates extending out of the second clamping square columns at the bottom of the second clamping square columns are plugged and connected with the first base. First mounting clamping columns are provided at the four end corners of the fourth base. The first mounting clamping column close to the first clamping square column is clamped and connected with the first base, the second base, the third base, the fourth base and the first mounting plate. The first mounting clamping column away from the first clamping square column is clamped and connected with the first base, the second base, the third base, the fourth base and the second mounting plate. Second mounting clamping columns are provided inside the second clamping square columns. The second mounting clamping columns are plugged and connected with the corresponding second clamping square columns, first mounting plates and second mounting plates. The top end of the second clamping square column is detachably connected with a second decorative armrest.

[0019] Preferably, second retaining wall clamping seats are fixedly connected to the opposite ends of the two second clamping square columns located on both sides of the first base. A second retaining wall board is plugged and connected between the corresponding two second retaining wall clamping seats. Third retaining wall clamping seats are fixedly connected to the opposite sides of the two second clamping square columns located at one end of the first base away from the first clamping square column. A third retaining wall board is plugged and connected between the two third retaining wall clamping seats.

[0020] Preferably, a single-person assembled tomb decoration process for facilitating external decoration, which is used for the above-mentioned single-person assembled tomb for facilitating external decoration, mainly includes the following steps:

[0021] S1: The purchaser of the tomb selects the style of the tomb at the production site of the tomb. The purchaser selects the style of the tomb and the decorative stone top, decorative stone slab, first decorative armrest and second decorative armrest that are easy to replace according to his own preferences.

[0022] S2: First, the first base is connected and fixed to the tomb ground through cement mortar, and then the second base, the third base and the fourth base are sequentially bonded and fixed through epoxy resin glue.

[0023] S3: Epoxy resin glue is applied to the outside of multiple stable square stone strips in sequence, and then they are inserted into the first base, the second base, the third base and the fourth base coated with epoxy resin glue.

[0024] S4: The construction worker applies epoxy resin glue to the groove in the mounting seat, and then installs the tombstone and the decorative stone column on the mounting seat.

[0025] S5: After the tombstone is installed, the construction workers apply epoxy resin glue to the tomb chamber floor and place it in the placement groove on the first base;

[0026] S6: The construction workers install the two first clamping square columns to the first base through the stabilizing stone strips smeared with epoxy resin glue, thus completing the installation of the main tomb body;

[0027] S7: Install the four second decorative handrails to the corresponding second installation clamping columns, thus completing the installation of the tomb chamber retaining wall;

[0028] S8: After the main tomb body and the retaining wall are installed and the burial ceremony is completed, the family members of the deceased gently place the urn into the tomb chamber and seal the tomb.

[0029] The beneficial effects of the present invention are as follows:

[0030] 1. Through the structural cooperation design of the decorative columns, decorative stone slabs and stabilizing metal columns, firstly, when the tomb manufacturers reduce the main configuration of the main tomb body, they can increase the overall diversity of the tomb according to the easily detachable decorative columns and decorative stone slabs, which is convenient for providing customers with more style options. Secondly, after the tomb is used for a long time and the decorative stone top, decorative stone slabs, first decorative handrails and second decorative handrails are worn and depreciated due to sun exposure and rain, they can be disassembled and replaced without affecting the main tomb body, which is convenient for the family members to change the patterns or decorations outside the tomb at any time according to the preferences of the deceased, family traditions or specific commemorative meanings. This flexibility not only meets the family members' needs for personalized funerals, but also enables the tomb to be continuously updated with the passage of time and changes in family emotions, maintaining the freshness and sense of the times of its commemorative significance.

[0031] 2. The overall installation and connection of the tomb are all carried out by clamping through the mortise and tenon structure and then bonding and fixing with epoxy resin glue. The construction efficiency is high, and only assembly is required on site, which greatly shortens the construction period. Compared with traditional tombs that need to be cast or carved on site, the construction process is simpler and faster, and the cost is low. Since the components of the tomb can be mass-produced in the factory, the production cost is reduced. At the same time, on-site assembly reduces the labor cost and time cost, making the overall cost more economical.

[0032] 3. The convex surface design of the fourth base and the waterproof cover plate, with its shape characteristics, can naturally guide the rainwater to the surrounding ground, reducing the possibility of rainwater directly accumulating on the top of the tomb mound. This design helps to prevent the tombstone and the tomb body from being soaked by rainwater for a long time, thus reducing the damage caused by rain erosion. In the case of continuous rainfall, the convex tomb mound can better disperse the water flow. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 is the overall structural schematic diagram of the present invention.

[0034] Figure 2 It is a schematic structural diagram of the first base, the second base, the third base and the fourth base of the present invention.

[0035] Figure 3 It is a schematic structural diagram of the stable square stone strip and the tombstone of the present invention.

[0036] Figure 4 It is a schematic structural diagram of the tombstone and the decorative stone pillar of the present invention.

[0037] Figure 5 It is a schematic structural diagram of the snap - on square stone base and the decorative stone slab of the present invention.

[0038] Figure 6 It is a schematic structural diagram of the first side plate and the second side plate of the tomb chamber of the present invention.

[0039] Figure 7 It is a schematic structural diagram of the tomb chamber cover plate and the waterproof cover plate of the present invention.

[0040] Figure 8 It is a schematic structural diagram of the tomb chamber cover plate and the sealing stone strip of the present invention.

[0041] Figure 9 It is a schematic structural diagram of the tomb chamber floor of the present invention.

[0042] Figure 10 It is a schematic structural diagram of the first snap - on square column and the first decorative handrail of the present invention.

[0043] Figure 11 It is a schematic structural diagram of the first mounting plate of the present invention.

[0044] Figure 12 It is a schematic structural diagram of the second mounting plate of the present invention.

[0045] In the figure: 1. First base; 2. Second base; 3. Third base; 4. Fourth base; 5. Stable square stone bar; 6. Mounting seat; 7. Clamping stone bar; 8. Clamping metal column; 9. Tombstone; 10. Decorative stone column; 11. Decorative stone top; 12. Clamping square stone seat; 13. Connecting seat; 14. Decorative column; 15. Decorative stone slab; 16. Stable metal column; 17. Tomb chamber floor; 18. First side plate of the tomb chamber; 19. Second side plate of the tomb chamber; 20. First clamping arc bar; 21. Sealing groove; 22. Tomb chamber cover plate; 23. Sealing stone bar; 24. Second clamping arc bar; 25. Waterproof cover plate; 26. First clamping square column; 27. Stable stone bar; 28. First decorative handrail; 29. Second clamping square column; 30. First retaining wall clamping seat; 31. First retaining wall board; 32. First mounting plate; 33. First mounting clamping column; 34. Second mounting clamping column; 35. Second decorative handrail; 36. Second retaining wall clamping seat; 37. Second retaining wall board; 38. Second mounting plate; 39. Third retaining wall clamping seat; 40. Third retaining wall board. Detailed implementation mode

[0046] In order to make the technical means, creative features, achieved purposes and effects of the present invention easy to understand, the present invention will be further described below in conjunction with the detailed implementation mode.

[0047] Embodiment 1

[0048] As Figures 1 to 12 shown, it includes a first base 1. A second base 2 is installed at the top end of the first base 1. A third base 3 is installed at the top end of the second base 2. A fourth base 4 is installed at the top end of the third base 3. Thus, it is convenient to form a tomb terrace through the first base 1, the second base 2, the third base 3 and the fourth base 4. A worship stone is installed at the step between the second base 2 and the third base 3, which is convenient for descendants to kneel and worship. One end of the top end of the fourth base 4 is inserted and connected with a mounting seat 6. In order to improve the installation stability of the mounting seat 6 and the fourth base 4, a plurality of stable square stone bars 5 are inserted and connected to the bottom of the mounting seat 6. The bottom ends of the stable square stone bars 5 are inserted and connected with the first base 1, the second base 2, the third base 3 and the fourth base 4. In order to further improve the connection stability between the stable square stone bar 5 and the mounting seat 6, a clamping stone bar 7 is inserted and connected to the center position of the mounting seat 6 and the top end of the stable square stone bar 5. Clamping metal columns 8 are inserted and connected to both sides of the clamping stone bar 7. The bottom ends of the clamping metal columns 8 are inserted and connected with the fourth base 4.

[0049] A tombstone 9 is arranged at the center position of the top end of the mounting seat 6. Decorative stone columns 10 are arranged on both sides of the tombstone 9. The bottom ends of the decorative stone columns 10 are inserted and connected with the mounting seat 6, which is convenient to identify the identity of the tomb owner through the tombstone 9.

[0050] The decorative component is set on the outer side of the decorative stone pillar 10 and is used in conjunction with the tombstone 9 and the decorative stone pillar 10. It facilitates the family members to change the patterns or decorations outside the tomb according to the preferences of the deceased, family traditions or specific commemorative meanings at any time. This flexibility not only meets the family members' needs for personalized funerals but also enables the tomb to be continuously updated as time and family emotions change, maintaining the freshness and sense of the times of its commemorative significance.

[0051] The tomb mound is set at the center of the fourth pedestal 4 and is convenient for placing the remains. The part of the fourth pedestal 4 outside the tomb mound has a convex shape with a higher middle and lower sides on both sides to prevent water accumulation on the tomb mound due to rain. At the corresponding position of the tomb mound on the fourth pedestal 4, there is a placement position for a worship table or sacrificial altar. The combination of the sacrificial altar and the incense burner is a necessity for worship and offering. Incense can be inserted into the incense burner on the table.

[0052] During work, after the tomb construction workers transport the tomb components to the construction site, first, the first pedestal 1 is connected and fixed to the tomb ground through cement mortar. Then, the second pedestal 2, the third pedestal 3, and the fourth pedestal 4 are sequentially adhesively fixed through epoxy resin glue in order. After applying epoxy resin glue to the outside of multiple stable square stone bars 5 in turn, they are inserted into the first pedestal 1, the second pedestal 2, the third pedestal 3, and the fourth pedestal 4 smeared with epoxy resin glue. After applying epoxy resin glue to the installation holes at the bottom of the mounting seat 6, it is connected to the stable square stone bar 5. After the stable square stone bar 5 and the mounting seat 6 are installed, the clamped square stone bar 7 smeared with epoxy resin glue is inserted into the stable square stone bar 5 and the mounting seat 6, and it is stabilized through the clamping metal column 8.

[0053] The construction workers apply epoxy resin glue to the grooves on the mounting seat 6, and then install the tombstone 9 and the decorative stone pillar 10 on the mounting seat 6, waiting for the epoxy resin glue on the stable square stone bar 5, the mounting seat 6, the tombstone 9, and the decorative stone pillar 10 to solidify.

[0054] Embodiment 2

[0055] As Figures 3 to 5 shown, the decorative component includes a decorative stone top 11, a clamped square stone seat 12, and a connecting seat 13. To improve the stability of the installation of the tombstone 9 and the decorative stone pillar 10 on the mounting seat 6, the top end of the tombstone 9 is inserted and connected with the decorative stone top 11. To facilitate the replacement of the decorative patterns on the decorative stone pillar 10, a plurality of decorative grooves are opened at one end of the decorative stone pillar 10, and the clamped square stone seat 12 is inserted and connected to the inner side of the decorative groove. To facilitate the installation and fixation of the tombstone 9 and the decorative stone pillar 10, the connecting seat 13 is fixedly connected to the side of the clamped square stone seat 12 close to the tombstone 9, and the connecting seat 13 is inserted and connected with the tombstone 9.

[0056] To facilitate the fixation of the snap - connected square stone base 12 and the decorative stone slab 15 after installation, the decorative component further includes a decorative column 14, a decorative stone slab 15, and a stabilizing metal column 16. The decorative column 14 is inserted and connected to the inner side of the snap - connected square stone base 12. One end of the decorative column 14 away from the snap - connected square stone base 12 is fixedly connected to the decorative stone slab 15. The stabilizing metal column 16 is inserted and connected to the inner sides of the decorative stone column 10, the decorative stone top 11, the snap - connected square stone base 12, and the decorative column 14.

[0057] During operation, the decorative stone top 11 is installed on the tombstone 9 and the decorative stone column 10 through epoxy resin glue, thereby completing the installation of the tomb base and the tombstone 9. The staff inserts the snap - connected square stone base 12 into the installation groove on the decorative stone column 10 without applying epoxy resin glue, and then inserts the decorative column 14 on the decorative stone slab 15 into the groove on the snap - connected square stone base 12. When multiple snap - connected square stone bases 12 and decorative stone slabs 15 are sequentially installed on the decorative stone column 10, they are fixed to the decorative stone column 10 through the stabilizing metal column 16. The manufacturer of the tomb can increase the diversity of the overall tomb while reducing the main configuration of the tomb body according to the easily detachable decorative column 14 and decorative stone slab 15, which is convenient for providing customers with more style options, and thus completes the installation of the external decoration of the tombstone 9 and the decorative stone column 10.

[0058] Embodiment Three

[0059] As Figures 6 to 9 shown, the tomb mound includes a tomb chamber floor 17, a first side plate 18 of the tomb chamber, a second side plate 19 of the tomb chamber, and a first snap - connecting arc strip 20. To improve the waterproofness and stability of the tomb mound, placing grooves are provided at one ends of the first base 1, the second base 2, the third base 3, and the fourth base 4 and corresponding to the mounting seat 6. The tomb chamber floor 17 is installed at the bottom of the placing groove of the first base 1. Both sides of the tomb chamber floor 17 are snap - connected to the first side plate 18 of the tomb chamber. To facilitate the connection and installation of the tomb chamber floor 17 and the first side plate 18 of the tomb chamber to the first base 1, the second base 2, the third base 3, and the fourth base 4, both ends of the first side plate 18 of the tomb chamber away from the tomb chamber floor 17 are fixedly connected to the first snap - connecting arc strip 20. The first snap - connecting arc strip 20 is inserted and connected to the first base 1, the second base 2, the third base 3, and the fourth base 4. Both ends of the tomb chamber floor 17 are provided with the second side plate 19 of the tomb chamber. The second side plate 19 of the tomb chamber is snap - connected to the tomb chamber floor 17 and the first side plate 18 of the tomb chamber. Since the placing groove on the first base 1 has a solid bottom design, the tomb chamber floor 17 installed on the first base 1 does not directly contact the ground, and the waterproof effect of the tomb mound is further improved through the installation of epoxy resin glue.

[0060] The tomb mound also includes a sealing groove 21, a tomb chamber cover plate 22, a sealing stone strip 23, a second clamping arc strip 24 and a waterproof cover plate 25. To facilitate the sealing and closing of the tomb mound, sealing grooves 21 are provided at the tops of the first tomb chamber side plate 18 and the second tomb chamber side plate 19. A tomb chamber cover plate 22 is provided at the tops of the first tomb chamber side plate 18 and the second tomb chamber side plate 19. A sealing stone strip 23 is fixedly connected to the bottom end of the tomb chamber cover plate 22. The sealing stone strip 23 is inserted and connected with the sealing groove 21. Second clamping arc strips 24 are fixedly connected to both ends on both sides of the tomb chamber cover plate 22. The second clamping arc strips 24 are inserted and connected with the fourth base 4. To prevent water accumulation, a waterproof cover plate 25 is fixedly connected to the top end of the tomb chamber cover plate 22. The shape characteristics of the waterproof cover plate 25 can naturally guide rainwater to the surrounding ground, reducing the possibility of rainwater directly accumulating on the top of the tomb mound.

[0061] During operation, after the construction workers complete the installation of the tombstone 9, they apply epoxy resin glue to the tomb chamber floor 17 and place it in the placement groove on the first base 1. Then, they sequentially install the two first tomb chamber side plates 18 coated with epoxy resin glue through the first clamping arc strips 20 with the first base 1, the second base 2, the third base 3 and the fourth base 4. When the first tomb chamber side plate 18 is butted and leveled with the tomb chamber floor 17, the installation of the tomb chamber floor 17 and the first tomb chamber side plate 18 is completed. Then, the two second tomb chamber side plates 19 are coated with epoxy resin glue and butted and leveled with the tomb chamber floor 17 and the first tomb chamber side plate 18, thereby completing the assembly of the tomb mound chamber. When the installation of the tomb main body and the retaining wall is completed and the burial ceremony is completed, the family members of the deceased gently place the urn in the tomb mound chamber. Then, the sealing stone strip 23 coated with epoxy resin glue is used to install the tomb chamber cover plate 22 and the waterproof cover plate 25 on the first tomb chamber side plate 18 and the second tomb chamber side plate 19 to seal the tomb.

[0062] Embodiment 4

[0063] As Figures 10 to 12 shown, to further enhance the stability and decoration of the tomb, first clamping square columns 26 are provided on both sides of the end of the first base 1 away from the fourth base 4. A stabilizing stone strip 27 is fixedly connected to the bottom end of the first clamping square column 26. The stabilizing stone strip 27 is inserted and connected with the first base 1. A first decorative handrail 28 is inserted and connected to the top end of the first clamping square column 26. According to the user's preference, the first decorative handrail 28 can be replaced with a lion or an as-you-wish symbol to improve the personalization of the overall external decoration of the tomb.

[0064] On both sides of the center of the first base 1 and on both sides of the end of the first base 1 away from one end of the first clamping square column 26, second clamping square columns 29 are provided. At one end of the first clamping square column 26 close to the fourth base 4 and at one end of the second clamping square column 29 located at the center positions on both sides of the first base 1 close to the first clamping square column 26, first retaining wall clamping seats 30 are fixedly connected. A first retaining wall board 31 is inserted and connected between the two corresponding first retaining wall clamping seats 30.

[0065] To facilitate the installation of the retaining wall, at the bottom and top of the second clamping square columns 29 located at the center positions on both sides of the first base 1, first mounting plates 32 are inserted and connected. To facilitate the installation and fixation of the second clamping square columns 29 to the first base 1, the second base 2, the third base 3, and the fourth base 4, at the bottom and top of the second clamping square columns 29 located on both sides of the end of the first base 1 away from the first clamping square column 26, second mounting plates 38 are inserted and connected. The ends of the first mounting plates 32 and the second mounting plates 38 extending out of the second clamping square columns 29 at the top of the second clamping square columns 29 are inserted and connected to the fourth base 4. The ends of the first mounting plates 32 and the second mounting plates 38 extending out of the second clamping square columns 29 at the bottom of the second clamping square columns 29 are inserted and connected to the first base 1. At the four end corners of the fourth base 4, first mounting clamping columns 33 are provided. The first mounting clamping column 33 close to the first clamping square column 26 is clamped and connected to the first base 1, the second base 2, the third base 3, the fourth base 4, and the first mounting plate 32. The first mounting clamping column 33 away from the first clamping square column 26 is clamped and connected to the first base 1, the second base 2, the third base 3, the fourth base 4, and the second mounting plate 38, further improving the stability of the tomb installation.

[0066] At the opposite ends of the two second clamping square columns 29 located on both sides of the first base 1, second retaining wall clamping seats 36 are fixedly connected. A second retaining wall board 37 is inserted and connected between the two corresponding second retaining wall clamping seats 36. At the opposite sides of the two second clamping square columns 29 located at the end of the first base 1 away from the first clamping square column 26, third retaining wall clamping seats 39 are fixedly connected. A third retaining wall board 40 is inserted and connected between the two third retaining wall clamping seats 39. Second mounting clamping columns 34 are provided inside the second clamping square columns 29. The second mounting clamping columns 34 are inserted and connected to the corresponding second clamping square columns 29, first mounting plates 32, and second mounting plates 38. At the top of the second clamping square columns 29, second decorative handrails 35 are detachably connected. There is a certain gap between the first retaining wall board 31, the second retaining wall board 37, the third retaining wall board 40 and the first base 1, the second base 2, the third base 3, and the fourth base 4, facilitating the outflow of accumulated water. This design helps prevent the tombstone 9 and the tomb body from being soaked by rainwater for a long time, thereby reducing the damage caused by rain erosion. In the case of continuous rainfall, the convex tomb mound can better disperse the water flow.

[0067] During operation, the construction workers install the two first clamping square columns 26 on the first base 1 through the stabilizing stone strips 27 smeared with epoxy resin glue. Then, place the four second clamping square columns 29 at the corresponding positions. After smearing epoxy resin glue on the first mounting plate 32 and the second mounting plate 38, insert them into the second clamping square columns 29 in sequence. Furthermore, install and fix the first mounting plate 32 and the second mounting plate 38 to the first base 1, the second base 2, the third base 3, and the fourth base 4 through the first mounting clamping column 33 smeared with epoxy resin glue. Then, insert the second mounting clamping column 34 smeared with epoxy resin glue into the second clamping square column 29 to complete the installation and fixation of the second clamping square column 29 and the first mounting plate 32. Then, insert the first wall protection board 31 smeared with epoxy resin glue into the first wall protection seat 30 in sequence for installation and fixation, insert the second wall protection board 37 smeared with epoxy resin glue into the second wall protection seat 36 for installation and fixation, and insert the third wall protection board 40 smeared with epoxy resin glue into the third wall protection seat 39 for installation and fixation. Thus, the installation of the tomb main body is completed.

[0068] After the installation of the tomb main body is completed, install the two first decorative handrails 28 on the corresponding first clamping square columns 26, and install the four second decorative handrails 35 on the corresponding second mounting clamping columns 34. Thus, the installation of the tomb wall protection is completed.

[0069] As Figures 1 to 12 shown, a single-person assembled tomb decoration process convenient for external decoration. This single-person assembled tomb decoration process convenient for external decoration is mainly applicable to the above-mentioned single-person assembled tomb convenient for external decoration. This decoration process mainly includes the following steps:

[0070] S1: The purchaser of the tomb selects the style of the tomb at the production site of the tomb. The purchaser selects the style of the tomb, the decorative stone top 11, the decorative stone slab 15, the first decorative handrail 28, and the second decorative handrail 35 that are convenient for replacement according to their own preferences. The tomb manufacturer transfers the tomb assembly parts ordered by the customer from the site to the cemetery.

[0071] S2: After the tomb construction workers transport the tomb parts to the construction site, first connect and fix the first base 1 to the tomb ground through cement mortar, and then bond and fix the second base 2, the third base 3, and the fourth base 4 in sequence through epoxy resin glue.

[0072] S3: Apply epoxy resin glue to the outside of multiple stable square stone bars 5 in sequence, then insert them into the first base 1, second base 2, third base 3, and fourth base 4 smeared with epoxy resin glue. Then apply epoxy resin glue to the mounting holes at the bottom of the mounting seat 6 and connect it to the stable square stone bar 5. After the stable square stone bar 5 and the mounting seat 6 are installed, insert the snap-in stone bar 7 smeared with epoxy resin glue into the stable square stone bar 5 and the mounting seat 6, and stabilize it with the snap-in metal column 8;

[0073] S4: The construction worker applies epoxy resin glue to the groove on the mounting seat 6, and then installs the tombstone 9 and the decorative stone column 10 on the mounting seat 6. After the epoxy resin glue on the stable square stone bar 5, the mounting seat 6, the tombstone 9, and the decorative stone column 10 solidifies, install the decorative stone top 11 on the tombstone 9 and the decorative stone column 10 with epoxy resin glue. Then, without applying epoxy resin glue, the worker inserts the snap-in square stone seat 12 into the mounting groove on the decorative stone column 10, and then inserts the decorative column 14 on the decorative stone slab 15 into the groove on the snap-in square stone seat 12. After multiple snap-in square stone seats 12 and decorative stone slabs 15 are installed on the decorative stone column 10 in sequence, fix them to the decorative stone column 10 with the stabilizing metal column 16;

[0074] S5: After the construction worker finishes installing the tombstone 9, apply epoxy resin glue to the tomb chamber floor 17 and place it in the placement groove on the first base 1. Then, in sequence, install the two first tomb chamber side plates 18 smeared with epoxy resin glue to the first base 1, second base 2, third base 3, and fourth base 4 through the first snap-in arc bar 20. When the first tomb chamber side plate 18 is butted flush with the tomb chamber floor 17, complete the installation of the tomb chamber floor 17 and the first tomb chamber side plate 18. Then, after applying epoxy resin glue to the two second tomb chamber side plates 19, butt them flush with the tomb chamber floor 17 and the first tomb chamber side plate 18, and then complete the assembly of the tomb mound chamber;

[0075] S6: The construction workers install the two first clamping square columns 26 on the first base 1 through the stabilizing stone strips 27 smeared with epoxy resin glue. Then, place the four second clamping square columns 29 at the corresponding positions. After smearing epoxy resin glue on the first mounting plate 32 and the second mounting plate 38, insert them into the second clamping square columns 29 in sequence. Furthermore, install and fix the first mounting plate 32 and the second mounting plate 38 to the first base 1, the second base 2, the third base 3, and the fourth base 4 through the first mounting clamping column 33 smeared with epoxy resin glue. Then, insert the second mounting clamping column 34 smeared with epoxy resin glue into the second clamping square column 29 to complete the installation and fixation of the second clamping square column 29 and the first mounting plate 32. Then, insert the first wall protection board 31 smeared with epoxy resin glue into the first wall protection seat 30 in sequence for installation and fixation. Insert the second wall protection board 37 smeared with epoxy resin glue into the second wall protection seat 36 for installation and fixation. Then, insert the third wall protection board 40 smeared with epoxy resin glue into the third wall protection seat 39 for installation and fixation, thus completing the installation of the tomb main body;

[0076] S7: After the installation of the tomb main body is completed, install the two first decorative handrails 28 on the corresponding first clamping square columns 26, and install the four second decorative handrails 35 on the corresponding second mounting clamping columns 34, thus completing the installation of the tomb wall protection;

[0077] S8: After the installation of the tomb main body and the wall protection is completed and the burial ceremony is completed, the family members of the deceased gently place the urn into the tomb chamber. Then, install the sealing stone strip 23 smeared with epoxy resin glue, the tomb chamber cover plate 22, and the waterproof cover plate 25 on the first side plate 18 and the second side plate 19 of the tomb chamber to seal the tomb.

[0078] In the present invention, the description of the direction and relative position relationship of the structure, such as the description of front, back, left, right, up, and down, does not constitute a limitation to the present invention, but is only for the convenience of description.

Claims

1. A single-person assembled tomb convenient for external decoration, comprising a first base (1), characterized in that: A second base (2) is installed at the top of the first base (1), a third base (3) is installed at the top of the second base (2), a fourth base (4) is installed at the top of the third base (3), one end of the top of the fourth base (4) is plug-connected with a mounting seat (6), a plurality of stable square stone bars (5) are plug-connected at the bottom of the mounting seat (6), the bottom ends of the stable square stone bars (5) are plug-connected with the first base (1), the second base (2), the third base (3) and the fourth base (4), a clamping stone bar (7) is plug-connected at the center of the mounting seat (6) and the top of the stable square stone bar (5), both sides of the clamping stone bar (7) are plug-connected with clamping metal columns (8), and the bottom ends of the clamping metal columns (8) are plug-connected with the fourth base (4); A tombstone (9) is arranged at the center of the top of the mounting seat (6), and decorative stone columns (10) are arranged on both sides of the tombstone (9), and the bottom ends of the decorative stone columns (10) are plug-connected to the mounting seat (6); A decorative component, which is arranged at a position outside the decorative stone column (10), and the decorative component is used in conjunction with the tombstone (9) and the decorative stone column (10); The tomb mound is arranged at the center of the fourth base (4), and the fourth base (4) outside the tomb mound is convex in shape with a high middle and low sides.

2. A single-person assembled tomb convenient for exterior decoration according to claim 1, characterized in that: The decorative component comprises a decorative stone top (11), a snap-fitting square stone seat (12) and a connecting seat (13); the top of the tombstone (9) is plug-connected with the decorative stone top (11); one end of the decorative stone column (10) is provided with a plurality of decorative grooves; the inner side of the decorative groove is plug-connected with the snap-fitting square stone seat (12); the side of the snap-fitting square stone seat (12) close to the tombstone (9) is fixedly connected with the connecting seat (13); and the connecting seat (13) is plug-connected with the tombstone (9).

3. A single-person assembled tomb convenient for exterior decoration according to claim 2, characterized in that: The decorative component also includes a decorative column (14), a decorative stone slab (15) and a stable metal column (16); the decorative column (14) is plugged into the inner side of the snap-fitting square stone seat (12); the decorative stone slab (15) is fixedly connected to one end of the decorative column (14) away from the snap-fitting square stone seat (12); and the stable metal column (16) is plugged into the inner side of the decorative stone column (10) and connected to the decorative stone top (11), the snap-fitting square stone seat (12) and the decorative column (14).

4. A single-person assembled tomb convenient for exterior decoration according to claim 2, characterized in that: The tomb mound comprises a tomb floor (17), a first tomb side plate (18), a second tomb side plate (19) and a first clamping arc strip (20); one end of the first base (1), the second base (2), the third base (3) and the fourth base (4) and a position corresponding to the mounting seat (6) are provided with a placement groove; the tomb floor (17) is installed at the bottom of the placement groove of the first base (1); both sides of the tomb floor (17) are clamped and connected with the first tomb side plate (18); 18), both ends of the first side plate (18) of the tomb chamber away from the side of the tomb chamber floor (17) are fixedly connected with a first snap-fit ​​arc strip (20), the first snap-fit ​​arc strip (20) is plug-connected with the first base (1), the second base (2), the third base (3) and the fourth base (4), and both ends of the tomb chamber floor (17) are provided with a second side plate (19), the second side plate (19) of the tomb chamber is snap-connected with the tomb chamber floor (17) and the first side plate (18) of the tomb chamber.

5. A single-person assembled tomb convenient for exterior decoration according to claim 4, characterized in that: The tomb mound further comprises a sealing groove (21), a tomb chamber cover (22), a sealing stone strip (23), a second snap-fit ​​arc strip (24) and a waterproof cover (25); the sealing groove (21) is arranged at the top of the first side plate (18) and the second side plate (19) of the tomb chamber; the tomb chamber cover (22) is arranged at the top of the first side plate (18) and the second side plate (19) of the tomb chamber; the bottom end of the tomb chamber cover (22) is fixedly connected with a sealing stone strip (23); the sealing stone strip (23) is plug-connected with the sealing groove (21); the two ends of both sides of the tomb chamber cover (22) are fixedly connected with the second snap-fit ​​arc strip (24); the second snap-fit ​​arc strip (24) is plug-connected with the fourth base (4); the top end of the tomb chamber cover (22) is fixedly connected with the waterproof cover (25).

6. A single-person assembled tomb convenient for exterior decoration according to claim 1, characterized in that: First snap-fitting square columns (26) are provided on both sides of one end of the first base (1) away from the fourth base (4); a stabilizing stone bar (27) is fixedly connected to the bottom end of the first snap-fitting square column (26); the stabilizing stone bar (27) is plug-connected to the first base (1); and a first decorative handrail (28) is plug-connected to the top end of the first snap-fitting square column (26).

7. A single-person assembled tomb convenient for exterior decoration according to claim 6, characterized in that: Second clamping square columns (29) are arranged at the center positions of both sides of the first base (1) and at both sides of the end of the first base (1) away from the first clamping square column (26); one end of the first clamping square column (26) close to the fourth base (4) and one end of the second clamping square column (29) located at the center positions of both sides of the first base (1) close to the first clamping square column (26) are fixedly connected with a first wall protection bracket (30); and a first wall protection board (31) is plugged and connected between the two corresponding first wall protection brackets (30).

8. A single-person assembled tomb convenient for exterior decoration according to claim 7, characterized in that: The bottom and top of the second clamping square column (29) located at the center of both sides of the first base (1) are plugged and connected with the first mounting plate (32); the bottom and top of the second clamping square column (29) located on both sides of the first base (1) away from the end of the first clamping square column (26) are plugged and connected with the second mounting plate (38); the first mounting plate (32) and the second mounting plate (38) located at the top of the second clamping square column (29) extend out of the end of the second clamping square column (29) and are plugged and connected with the fourth base (4); the first mounting plate (32) and the second mounting plate (38) located at the bottom of the second clamping square column (29) extend out of the end of the second clamping square column (29) and are plugged and connected with the first base (1); the first mounting clamping column (38) is provided at the four end corners of the fourth base (4). 3), a first mounting clamping column (33) close to the first clamping square column (26) is clamped and connected with the first base (1), the second base (2), the third base (3), the fourth base (4) and the first mounting plate (32), and a first mounting clamping column (33) away from the first clamping square column (26) is clamped and connected with the first base (1), the second base (2), the third base (3), the fourth base (4) and the second mounting plate (38), a second mounting clamping column (34) is arranged on the inner side of the second clamping square column (29), and the second mounting clamping column (34) is plug-connected with the corresponding second clamping square column (29), the first mounting plate (32) and the second mounting plate (38), and the top end of the second clamping square column (29) is detachably connected with a second decorative handrail (35).

9. A single-person assembled tomb convenient for exterior decoration according to claim 8, characterized in that: The opposite ends of the two second clamping square columns (29) located on both sides of the first base (1) are fixedly connected to the second wall protection clamping seat (36), and the second wall protection board (37) is plugged and connected between the two corresponding second wall protection clamping seats (36). The opposite sides of the two second clamping square columns (29) located at the end of the first base (1) away from the first clamping square column (26) are fixedly connected to the third wall protection clamping seat (39), and the third wall protection board (40) is plugged and connected between the two third wall protection clamping seats (39).

10. A one-person assembled tomb decoration process convenient for external decoration, characterized by: The decoration process of the single-person assembled tomb convenient for external decoration is applicable to the single-person assembled tomb convenient for external decoration described in claims 1-9, and the decoration process mainly comprises the following steps: S1: The purchaser of the tomb selects the style of the tomb at the tomb production site. The purchaser selects the style of the tomb and the easily replaceable decorative stone top (11), decorative stone slab (15), first decorative handrail (28) and second decorative handrail (35) according to his / her own preferences; S2: First, the first base (1) is connected and fixed to the tomb floor by cement mortar, and then the second base (2), the third base (3) and the fourth base (4) are bonded and fixed in sequence by epoxy resin glue; S3: applying epoxy resin glue to the outside of a plurality of stable square stone bars (5) in sequence and inserting them into the first base (1), the second base (2), the third base (3) and the fourth base (4) coated with epoxy resin glue; S4: The construction personnel apply epoxy resin glue to the groove on the mounting seat (6), and then install the tombstone (9) and the decorative stone column (10) on the mounting seat (6); S5: After the construction personnel have completed the installation of the tombstone (9), they apply epoxy resin glue to the tomb floor (17) and place it in the placement groove on the first base (1); S6: The construction personnel install the two first clamping square columns (26) with the first base (1) through the stabilizing stone strips (27) coated with epoxy resin glue, thereby completing the installation of the tomb body; S7: Install four second decorative handrails (35) and corresponding second mounting posts (34), thereby completing the installation of the tomb retaining wall; S8: When the main body of the tomb and the retaining wall are installed and the burial ceremony is completed, the family of the deceased will place the urn steadily into the tomb chamber and seal it.

Citation Information

Patent Citations

  • A rainproof and leak-proof prefabricated tomb

    CN112376988B

  • Pickling device for production and welding of high-power module

    CN115287661A

  • Integrated grave terrace structure

    CN222456998U